How to build a foundation beam

By employing precast concrete members and formwork panels with reinforcing bars, the method addresses the inefficiencies of conventional foundation beam construction, achieving faster and more accurate on-site assembly.

JP7554660B2Active Publication Date: 2024-09-20HAZAMA ANDO CORP
View PDF 10 Cites 0 Cited by

Patent Information

Application Number
JP2020210854
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-12-19
Publication Date
2024-09-20
Estimated Expiration
2040-12-19

AI Technical Summary

Technical Problem

Existing methods for constructing foundation beams using precast concrete members face challenges with large cross-sectional dimensions and long beam spans, leading to increased weight, requiring heavy machinery and limiting transportation and on-site work efficiency, and complicating installation accuracy.

Method used

The method involves constructing a part of the foundation beam with precast concrete members and using formwork panels with reinforcing bars, where precast concrete blocks are assembled as side formworks, and reinforcing bars are placed in parallel directions to form an open overlap joint, allowing for efficient on-site construction and improved accuracy.

Benefits of technology

This approach speeds up on-site construction and enhances beam construction accuracy by utilizing precast concrete members as semi-finished products, reducing on-site formwork complexity and improving installation precision.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007554660000003
    Figure 0007554660000003
  • Figure 0007554660000002
    Figure 0007554660000002
  • Figure 0007554660000001
    Figure 0007554660000001
Patent Text Reader

Abstract

To achieve quick execution of site construction of a footing beam and foundation slab concrete, and improvement of construction accuracy of a beam.SOLUTION: Parts of lower end main reinforcements 13 and lower stirrups 14 of a footing beam 10 are arranged in a cross section, and a lower block 11 made of precast concrete as a part of the cross section of the footing beam 10 is mounted at a construction position of the footing beam 10. Subsequently, upper end main reinforcements 23 and upper stirrups 24 of the footing beam 10 are held on a reinforcement trestle 15 erected on the lower block 11. Furthermore, mold frame panels 30 with reinforcement lattices are assembled as a side face form of the footing beam 10 with the lower block 11 used as a guide. Foundation slab concrete 12 is placed in a space partitioned by the lower block 11 and the mold frame panels 30.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing a foundation beam, and more particularly to a method for constructing a foundation beam by constructing a portion of the foundation beam from a precast concrete member and constructing the other portion from cast-in-place concrete using reinforced panel members, thereby speeding up the on-site construction of the foundation beam and slab and improving the construction accuracy of the beam. [Background technology]

[0002] As a conventional technique for improving the production of reinforced concrete foundation beams, a labor-saving construction method has been proposed in which foundation beams are manufactured as precast concrete members in a factory and then transported to the construction site. However, foundation beams often have large cross-sectional dimensions and long beam spans, which results in a heavy finished product. This requires equipment with a large capacity for lifting and moving within the factory, and the number of manufacturing factories is limited. In addition, when transporting the product to the site, the weight and length of the foundation beams manufactured to the design beam length are large, which limits the transport vehicles and delivery routes, and also limits the capacity of the heavy machinery that can be operated at the site where the product is delivered. This results in poor work efficiency, and the number of sites where foundation beams made of precast concrete members can be introduced is limited.

[0003] In order to solve the above-mentioned problems, a method of constructing a foundation beam efficiently while reducing the weight of the component by constructing part of the cross section of the foundation beam from a precast concrete component has been proposed (Patent Documents 1 and 2).

[0004] In the method of constructing reinforced concrete foundation beams disclosed in Patent Document 1, a precast plate B that forms the side of the beam is erected on the top surface of a mat slab constructed from cast-in-place concrete, and reinforcing bars 9, 10 of the upper and lower slabs 3, 12 are arranged in the vertical stiffening bars 8 protruding from the top and bottom of the precast plate B, and concrete is poured between the two precast plates B and into the upper and lower slabs.

[0005] Patent document 2 discloses a block-shaped floor panel portion (block body) 18 made of precast concrete that is ultimately embedded in part of the floor panel 14 in order to construct a reinforced concrete floor panel 14 and foundation beam 16, and a precast concrete plate body 20 that is erected so that part of its bottom is supported by the block body 18 and forms the outer surface of the foundation beam 16. [Prior art documents] [Patent documents]

[0006] [Patent Document 1] Japanese Patent Application Publication No. 5-287759 [Patent Document 2] JP 2016-98479 A Summary of the Invention [Problem to be solved by the invention]

[0007] In the foundation beam disclosed in Patent Document 1, a part (side surface) of the foundation beam is composed of a precast concrete member with predetermined rib reinforcement and web reinforcement arranged in advance. This makes it possible to streamline the construction of the foundation beam, but since concrete is poured into the foundation beam at the same time as the upper and lower slabs, the precast concrete member that serves as the formwork must be supported in a hollow position by a leveling support 5 installed on the leveling concrete 2, making it difficult to ensure installation accuracy, and the reinforcement work must be performed at the same time as the reinforcement of the upper and lower slabs, which creates the problem of complication of on-site work.

[0008] In the foundation disclosed in Patent Document 2, the block body 18 supporting the plate body 20 is small compared to the horizontal dimension of the plate body 20, so gaps are generated between the arranged plate bodies 20, and formwork 36 is used to close those gaps. Furthermore, the plate body 20 is used as an embedded formwork on the outside of the foundation beam, but conventional formwork 46, 48 is assembled as the inner formwork, and concrete C2 is poured into the formed internal space. As such, Patent Document 2 requires a lot of formwork assembly work on site, so sufficient results cannot be expected in terms of efficiency of on-site work.

[0009] Therefore, the object of the present invention is to provide a method for constructing foundation beams that eliminates the problems associated with the conventional techniques described above and that utilizes precast concrete members, reinforced formwork panels, etc., which are semi-finished products manufactured in advance in a factory, to speed up on-site construction of foundation beams and slabs and improve the construction accuracy of the beams. [Means for solving the problem]

[0010] The method for constructing a foundation beam of the present invention is to place a precast concrete block, which is a part of the cross section of the foundation beam, at a position for constructing the foundation beam, and to hold the upper end main reinforcement and the upper stirrup reinforcement of the foundation beam on a reinforcing bar stand erected on the precast concrete block. In a direction parallel to the upper stirrups and the lower stirrups The reinforcing bar is then placed on the formwork panel. Part of the stirrups will be the upper stirrups, the lower stirrups and the intermediate stirrups that form the open lap joint. The precast concrete block is assembled to a guide as a side formwork for the foundation beam, and concrete for the foundation beam is poured into the space partitioned by the precast concrete block and the formwork panel.

[0011] It is preferable that the form panel is attached such that the reinforcing bars are spaced a predetermined distance from the steel plate surface via a lattice-shaped spacer.

[0013] Furthermore, it is preferable to pour the concrete of the foundation beam up to the height of the underside of the slab, place and hold the panel end of the slab underside panel member on the shoulder of the upper surface of the poured concrete of the foundation beam, and after the remaining slab reinforcement is arranged, pour the beam concrete at the upper end of the foundation beam and the slab concrete together.

[0014] As a construction method of a foundation beam of another invention, the lower end main reinforcement of the foundation beam and a part of the lower stirrup are arranged in the cross section, and a precast concrete block which will be a part of the cross section of the foundation beam is placed at the foundation beam construction position, the upper end main reinforcement and the upper stirrup of the foundation beam are held on a reinforcing bar stand erected on the precast concrete block, and a form panel with reinforcing bars arranged on one side is assembled as a side form for the foundation beam with the reinforcing bars positioned on the inner side and the precast concrete block as a guide, The panel ends of the slab underside panel members are held on the reinforcing bar stand, and after the remaining slab reinforcement is arranged, the beam concrete above the precast concrete block of the foundation beam and the slab concrete are poured together. Characterized by . Effect of the Invention

[0015] As described above, according to the present invention, it is possible to expedite the on-site construction of foundation beams and slabs and improve the construction accuracy of beams by utilizing precast concrete members and the like which are semi-finished products manufactured in advance in a factory. [Brief description of the drawings]

[0016] [Figure 1] FIG. 1(a) to FIG. 1(d) are explanatory diagrams showing the work procedures up to the stage of completing formwork assembly in the method for constructing a foundation beam of the present invention. [Diagram 2] FIG. 2 is a perspective view showing a schematic view of a part of the internal structure of the formwork at the stage of completion of the formwork assembly shown in FIG. 1 (FIG. 1(d)). [Diagram 3] 3(a) to 3(c) are explanatory diagrams showing the work procedure from pouring concrete for the foundation beams to completing pouring of slab concrete in the method for constructing a foundation beam of the present invention. [Figure 4] 4(a) and (b) are explanatory diagrams showing the assembled state of formwork for pouring the concrete for the foundation beam and the slab concrete at the same time in the method for constructing the foundation beam of the present invention. [Diagram 5] An explanatory diagram showing the configuration of a modified example of the lower block of the foundation beam and the completed state of assembly of the formwork. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0017] Hereinafter, an embodiment of a method for constructing a foundation beam of the present invention will be described with reference to the accompanying drawings.

[0018] 1(a) to 1(d) show the procedure up to the completion of the assembly of the formwork in the method for constructing the foundation beam of the present invention. Fig. 2 shows the configuration inside the formwork after the assembly is completed, with a part of the formwork shown in Fig. 1(d) cut away.

[0019] FIG. 1(a) shows the end face of the lower block 11 of the foundation beam 10 installed on the leveled concrete 2 poured to ensure a predetermined level on the foundation 1. The lower block 11 of the foundation beam shown in the figure (hereinafter referred to as the lower block 11) is a precast reinforced concrete member manufactured in advance at a factory, and as shown in FIG. 1(a) and FIG. 2, it is integrated with the upper part of the foundation beam 10, which is poured later, and becomes a part of the foundation beam 10. For this reason, the lower end main reinforcement 13 of the foundation beam 10 is arranged in advance along the longitudinal direction of the block in the lower block 11, and further, the lower stirrups 14 are arranged at a predetermined pitch along the longitudinal direction so as to surround the lower surface of each lower stage reinforcement of the lower end main reinforcement 13 arranged in two stages. In this embodiment, the lower end main reinforcement 13 of the foundation beam 10 is D29 arranged in four stages x two stages. The lower end of the lower stirrup 14 is embedded in the lower block 11, and the upper end extends to near the middle of the height of the foundation beam 10, forming a U-shaped hook 14a. In this embodiment, the reinforcing bar pitch is set to 200 mm in the longitudinal direction. In this embodiment, a plurality of flat plate-shaped cotters 16 are arranged on the upper surface of the lower block 11. These cotters 16 can integrate the upper concrete 12 and the lower block 11, which will be poured later, so it is preferable to appropriately install them according to the size of the foundation beam 10. In this embodiment, the lower block 11 of the foundation beam 10 is installed on the leveling concrete 2, but the lower block 11 may be installed directly on the base 1 without using the leveling concrete. In addition, the upper end main reinforcement 23 and the lower end main reinforcement 13 of the foundation beam 10 are both arranged in two stages, but the number of stages of reinforcing bar is appropriately set according to the design cross section.

[0020] On the upper surface of the lower block 11 installed at the design position of the foundation beam 10 on the leveled concrete 2, reinforcing bar frames 15 made of known products are installed at a predetermined interval in the longitudinal direction of the beam. As shown in FIG. 1(b), this reinforcing bar frame 15 is composed of a base plate 15a, a pole 15b of a predetermined length erected on the base plate 15a, and a reinforcing bar support bar 15c attached to the upper end of the pole 15b and capable of holding the upper end main bar 23 and the upper stirrup bar 24 of the foundation beam 10. The height of the pole 15b and the position of the reinforcing bar support bar 15c are set so that the upper end main bar 23 and the upper stirrup bar 24 are located within a predetermined cross section of the foundation beam 10. Using this reinforcing bar frame 15, the upper end main bar 23 and the upper stirrup bar 24 are arranged at a predetermined position within the cross section of the foundation beam 10. In this embodiment, the upper stirrup 24 and the lower stirrup 14 are arranged so that the U-shaped hooks 14a, 24a face each other at a distance from each other in the vertical direction at the midpoint of the foundation beam 10, but the tips of both stirrup reinforcements 14, 24 may be extended in a straight line and overlapped.

[0021] FIG. 1(c) shows the state before the side formwork of the foundation beam 10 is attached. In the present invention, a formwork panel with reinforcing bars lattice 30 (hereinafter, referred to as the reinforcing bar formwork panel 30) is used as the side formwork. The reinforcing bar formwork panel 30 is a known steel plate processed product in which reinforcing bars 33 held by a lattice 32 are attached at a predetermined pitch to one side of a steel plate 31 such as a folded plate or a corrugated plate called a deck plate. In this embodiment, the reinforcing bars 33 attached to the steel plate 31 are arranged in a direction such that they are arranged in the vertical direction of the beam as shown in FIG. 1(c) and FIG. 2, so as to maintain the strength of the formwork panel, and as described later, they are attached from the side to the upper stirrups 24 and the lower stirrups 14 that have already been arranged, forming an open lap joint and functioning as stirrups of the foundation beam 10.

[0022] At the lower end of the reinforcing bar-equipped form panel 30, a part of the lattice 32 and reinforcing bar 33 is removed, and the steel plate 31 at that portion is attached directly to the side of the lower block 11 by anchor bolts 35. By fixing the lower end of the steel plate 31 in close contact with the side of the lower block 11, the verticality of the reinforcing bar-equipped form panel 30 can be ensured. Meanwhile, the upper end of the reinforcing bar-equipped form panel 30 extends to the same height as the lower surface of the slab 40 laid on the upper end of the foundation beam 10. Instead of the anchor bolts 35, a C-shaped separator can be embedded in the lower block 11, and the steel plate 31 of the reinforcing bar-equipped form panel 30 can be fixed to the screw part protruding from the side of the block.

[0023] 1(d) and 2 show the state where the reinforcing bar-equipped form panel 30 is attached as a side form and the form assembly of the foundation beam 10 is completed. In this embodiment, at the stage where the form is assembled, the reinforcing bar arrangement direction of the reinforcing bar-equipped form panel 30 is parallel to the reinforcing bar arrangement direction of the upper stirrups 24 and the lower stirrups 14, and the reinforcing bar arrangement pitch is both 200 mm, so that the reinforcing bars 33 of the reinforcing bar-equipped form panel 30 become lap joints with the upper stirrups 24 and the lower stirrups 14 as intermediate stirrups and can also serve as part of the stirrups of the foundation beam 10. The number of reinforcing bars of the reinforcing bar-equipped form panel 30 can be appropriately determined by setting the reinforcing bar arrangement pitch to, for example, 100 mm so as not to interfere with the upper stirrups 24 and the lower stirrups 14. Furthermore, to maintain the strength and dimensional accuracy of the side formwork, hook hardware 37 is attached as a position-retaining member for maintaining the separation (width) of the two reinforcing bar form panels 30. Furthermore, a separator 36, which functions as a sheathing when pouring the concrete 12, is attached as a fastening metal fitting to maintain the shape of the reinforcing bar form panel 30 to which lateral concrete pressure is applied, and sheathing stiffeners 38 are attached to the threaded portions at both ends of the separator 36.

[0024] [Pouring concrete] After the formwork assembly shown in Figure 1(d) and Figure 2 is completed, concrete is poured for the foundation beam 10. The concrete pouring work for this foundation beam 10 can be selected to pour the concrete 12 up to the bottom end of the slab 40 and then pour the concrete 42 for the slab 40, or to pour the concrete 12 for the foundation beam 10 and the concrete 42 for the slab 40 at the same time.

[0025] 3(a) to (c) show the procedure of pouring the concrete 12 of the foundation beam 10 to the bottom of the slab 40 until the concrete 42 of the slab 40 is poured. FIG. 3(a) shows the state where the concrete 12 constituting the foundation beam 10 has been poured to the bottom surface of the slab 40, leaving only the upper end main reinforcement 23 located in the slab 40. In this state, the upper end main reinforcement 23 and a part of the upper stirrup 24 of the foundation beam 10 located in the slab 40 are exposed from the top surface of the poured concrete 12. In this embodiment, a half precast concrete slab 45 (hereinafter, referred to as the upper stirrup 24 and the lower stirrup 14) is used to form the bottom panel member of the slab 40. As shown in FIG. 3(b), the half PCa slab 45 is supported so that its end is kept horizontal and placed on the shoulder 12a of the top surface of the poured concrete 12 of the foundation beam 10. In this case, support means such as shoring to support the half PCa panel 45 are not required. In this state, the necessary slab reinforcement is performed. After reinforcement other than the reinforcing bars 46 of the half PCa panel 45 is completed, the concrete 42 of the slab 40 is poured. Through the above work, a foundation structure is constructed in which the concrete 12 of the foundation beams 10 and the concrete 42 of the slab 40 are integrated. As the underside panel member of the slab 40, in addition to the half PCa panel 45, various known panel members that have the function of a bottom formwork and become part of the slab structure, such as a flat deck, a deck with reinforcing bar lattice, and a perforated PCa panel, can be used.

[0026] 4(a) and (b) show the assembled state of the formwork for pouring the concrete 12 of the foundation beam 10 and the concrete 42 of the slab 40 at the same time. FIG. 4(a) shows a conventional support system in which the bottom formwork 47 of the concrete 42 of the slab 40 is supported by support members in addition to the assembled state of the reinforcing bar-equipped formwork panel 30 as the formwork of the foundation beam 10 shown in FIG. 1(d). In this embodiment, the bottom formwork 47 is supported by pipe supports 49 via properly assembled joists and beams 48. For this reason, it is necessary to place many support members in the space 41 under the slab 40. In order to omit support members such as the pipe supports 49, it is also preferable to support the bottom formwork 47 with beam supports (not shown).

[0027] 4(b), the end of the half PCa plate 45, which forms the underside member of the slab 40, is supported by the top of the side formwork, and a support member 15S for suspending the half PCa plate 45 is attached to a part of the reinforcing bar stand 15, and the half PCa plate 45 is suspended by this support member 15S. This makes it possible to construct the foundation beam 10 and the concrete 12, 42 of the slab 40 as a single unit, without providing a support member in the space 41 under the slab 40, as compared to FIG. 4(a).

[0028] 5(a) and (b) show a modified example in which the cross-sectional shape of the lower block 11 of the foundation beam 10 is widened, and the completed assembly state of the reinforcing bar formwork panel 30. By manufacturing the lower block 11 with a width B wider than the beam width B0 of the foundation beam 10 as shown in Fig. 5(a), it becomes possible to position the lower end of the reinforcing bar formwork panel 30 as the side formwork of the foundation beam 10 simply by placing it at a predetermined position on the upper surface of the lower block 11.

[0029] The present invention is not limited to the above-described embodiment, and various modifications are possible within the scope of the claims. In other words, the technical scope of the present invention also includes embodiments obtained by combining technical means that are appropriately modified within the scope of the claims. [Explanation of symbols]

[0030] 10 Foundation beam 11 Lower Block 12 Beam top concrete 13 Bottom main reinforcement 14 Lower stirrup 15 Reinforced Concrete Frame 23 Top main bar 24 Upper stirrups 30 Reinforced concrete lattice formwork panel 31 Steel plate 3 2 Lattice 33 Reinforcement 40 Slab 42 Slab Concrete 45 Half precast concrete panel (half PCa panel)

Claims

1. A precast concrete block is placed at the foundation beam construction position, in which the lower end main reinforcement and a part of the lower stirrup reinforcement are arranged within the cross section and which becomes part of the cross section of the foundation beam. The upper end main reinforcement and the upper stirrup of the foundation beam are supported on a reinforcing bar stand erected on the precast concrete block, A method for constructing a foundation beam, comprising the steps of: assembling a form panel on one side of which reinforcing bars are arranged in a direction parallel to the upper stirrups and the lower stirrups as a side formwork for the foundation beam using the precast concrete block as a guide so that part of the reinforcing bars becomes an intermediate stirrup that constitutes an open lap joint with the upper stirrups and the lower stirrups; and pouring foundation beam concrete into the space partitioned by the precast concrete block and the form panel.

2. 2. The method for constructing a foundation beam according to claim 1, wherein the form panel is attached to the steel bars via lattice-shaped spacers so as to ensure a predetermined distance from the steel plate surface.

3. A method for constructing a foundation beam as described in claim 1, in which the concrete of the foundation beam is poured up to the height of the underside of the slab, the panel end of the slab underside panel member is placed and held on the shoulder of the upper surface of the poured concrete of the foundation beam, and after the remaining slab reinforcement is performed, the beam concrete at the upper end of the foundation beam and the slab concrete are poured together.

4. A precast concrete block in which the lower end main reinforcement of a foundation beam and a part of the lower stirrup reinforcement are arranged within the cross section and which becomes part of the cross section of the foundation beam is placed at the foundation beam construction position, The upper end main reinforcement and the upper stirrup of the foundation beam are supported on a reinforcing bar stand erected on the precast concrete block, A form panel with reinforcing bars arranged on one side is assembled as a side form for the foundation beam with the reinforcing bars positioned on the inner side and the precast concrete block as a guide; A method for constructing a foundation beam, characterized in that the panel ends of the slab underside panel members are supported on the reinforcing steel frame, and after the remaining slab reinforcement is arranged, the beam concrete above the precast concrete blocks of the foundation beam and the slab concrete are poured together.

Citation Information

Patent Citations

  • Construction for reinforced combination mold for beam

    JP1991140568A

  • Construction method of reinforced concrete foundation beam

    JP1993287759A

  • Construction method for foundation structure

    JP1994010359A

  • Structure portion using concrete block

    JP1995207678A

  • Footing block, and integrated method for constructing continuous footing employing footing block

    JP1996177059A