Mounting board manufacturing system
The system optimizes vacuum pump operation in mounting board manufacturing by stopping and restarting based on conditions, addressing energy inefficiencies and achieving substantial energy savings.
Patent Information
- Application Number
- JP2023576617
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Priority Date
- 2022-01-25
- Filing Date
- 2022-10-14
- Publication Date
- 2024-10-04
- Estimated Expiration
- 2042-10-14
AI Technical Summary
Existing mounting board manufacturing systems face inefficiencies in energy consumption due to the continuous operation of vacuum pumps, despite measures to reduce power supply, necessitating further improvements for energy savings.
A mounting board manufacturing system that includes a determination unit to stop and restart the vacuum pump based on specific conditions, such as the duration of non-use and predicted work resumption, ensuring minimal impact on component mounting operations.
This approach achieves a significant energy-saving effect by optimizing vacuum pump usage without affecting the manufacturing process, thereby reducing overall energy consumption.
Smart Images

Figure 0007561400000001 
Figure 0007561400000002 
Figure 0007561400000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to a mounting substrate manufacturing system equipped with a mounting line for manufacturing mounting substrates. [Background technology]
[0002] Conventionally, component mounting devices that mount components on a board using a work head are known, and mounted board manufacturing systems that manufacture mounted boards using a mounting line including such component mounting devices are widely used. The component mounting devices that make up the mounting line supply negative pressure to a suction nozzle to vacuum-suck components, and for this purpose the component mounting devices are equipped with a vacuum pump that generates negative pressure and a control unit (vacuum pump control unit) for the vacuum pump. While the component mounting device is performing component mounting work using the work head, it turns on the power supply of the vacuum pump to continue supplying negative pressure to the suction nozzle. However, since a large amount of power is required to drive the vacuum pump, a power saving measure is taken to reduce the power supplied to the vacuum pump while component mounting work is not being performed (for example, see Patent Document 1 below). [Prior art documents] [Patent documents]
[0003] [Patent Document 1] International Publication No. 2015 / 097880 Summary of the Invention
[0004] However, the above-mentioned method of reducing the power supplied to the vacuum pump does not stop the operation of the vacuum pump itself, so it is still insufficient as an energy saving measure and further improvement is desired.
[0005] Therefore, an object of the present disclosure is to provide a mounting board manufacturing system that can achieve a significant energy saving effect for the entire mounting line.
[0006] The mounted board manufacturing system disclosed herein includes at least one component mounting device having a work head that holds components with a suction nozzle that holds the components and mounts them on a board, and a vacuum pump that supplies negative pressure to the suction nozzle for holding the components, and is equipped with a mounting line that delivers a board that has been worked on in upstream equipment to the component mounting device to mount components on the board, and delivers the board with the components mounted thereon from the component mounting device to downstream equipment to manufacture a mounted board in which the components are soldered to the board, and is equipped with a determination unit that determines whether to stop the vacuum pump or to resume operation of a stopped vacuum pump while the mounting line is in operation, and a vacuum pump control unit that controls the vacuum pump based on the determination of the determination unit. The determination unit determines to stop operation of the vacuum pump if an operation stop condition for stopping the vacuum pump in operation is satisfied while the mounting line is in operation, and determines to resume operation if a condition for restarting the operation of the stopped vacuum pump is satisfied while the mounting line is in operation, and determines that an operation stop condition is satisfied if component mounting work is not being performed by the work head and the operation time, which is the continuous time from the start of operation of the vacuum pump, has reached a first time for preventing a breakdown of the vacuum pump. . Another mounted board manufacturing system of the present invention includes at least one component mounting device having a work head that holds a component with a suction nozzle that holds the component and mounts the component on a board, and a vacuum pump that supplies negative pressure to the suction nozzle for holding the component, and is equipped with a mounting line that delivers the board on which a work has been performed in upstream equipment to the component mounting device and mounts the components on the board, and delivers the board on which the components have been mounted from the component mounting device to downstream equipment to manufacture a mounted board in which the components are soldered to the board, and the vacuum pump is stopped during operation of the mounting line, or the operation of the vacuum pump that has been stopped is resumed and a vacuum pump control unit which controls the vacuum pump based on the judgment of the judgment unit, wherein the judgment unit judges to stop operation of the vacuum pump if an operation stop condition for stopping the vacuum pump in operation is met while the mounting line is in operation, and judges to resume operation if a condition for resuming operation of the stopped vacuum pump is met while the mounting line is in operation, and the judgment unit judges that the operation restart condition is met when the stop time, which is the duration since the vacuum pump was stopped, reaches a second time for preventing a breakdown of the vacuum pump and it is predicted that component mounting work by the work head will resume within a second predetermined time.
[0007] According to the present disclosure, a significant energy saving effect can be achieved for the entire mounting line. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a block diagram showing a configuration of a mounting board manufacturing system according to a first embodiment of the present disclosure. [Diagram 2] FIG. 2 is a configuration diagram of a component mounting device constituting a mounting line provided in the mounted substrate manufacturing system according to the first embodiment of the present disclosure. [Diagram 3] FIG. 3 is a block diagram showing a control system of the mounting substrate manufacturing system according to the first embodiment of the present disclosure. [Figure 4] FIG. 4 is a flowchart showing a flow of control executed by the determination unit of the mounting board manufacturing system according to the first embodiment of the present disclosure. [Diagram 5] FIG. 5 is a block diagram showing a configuration of a mounting board manufacturing system according to the second embodiment of the present disclosure. [Figure 6] FIG. 6 is a block diagram showing a control system of a mounting substrate manufacturing system according to the second embodiment of the present disclosure. [Figure 7]FIG. 7 is a flowchart showing a flow of control executed by a determination unit of the mounting board manufacturing system according to the second embodiment of the present disclosure. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] (Embodiment 1) Fig. 1 shows the configuration of a mounted board manufacturing system 1 in the first embodiment of the present disclosure. In Fig. 1, the mounted board manufacturing system 1 includes a mounting line 2 and an information management unit 3. The mounting line 2 includes a board supply device 11, a screen printing device 12, a solder inspection device 13, a plurality of component mounting devices 14, a mounting state inspection device 15, a reflow device 16, a mounted board inspection device 17, and a board storage device 18.
[0010] Board supplying device 11 stocks a plurality of boards and sends them out one by one to screen printing device 12 on the downstream side. Screen printing device 12 receives the boards sent out from board supplying device 11, carries them in, and applies solder to the boards by screen printing. After screen printing device 12 has applied solder to the board, it carries the board out to solder inspection device 13 on the downstream side. Solder inspection device 13 carries in the boards carried out from screen printing device 12 and inspects the solder applied to the boards using a camera or the like. After inspection, solder inspection device 13 carries the boards out to component mounting device 14 on the downstream side.
[0011] The multiple component mounting devices 14 consist of four component mounting devices 14 numbered #1, #2, #3, and #4. The four component mounting devices 14 numbered #1, #2, #3, and #4 are lined up in this order from the upstream side. All four component mounting devices 14 have the same configuration, and they carry in and position the board sent from the upstream equipment, mount the components, and carry it out to the downstream equipment. The "upstream equipment" here includes the component mounting devices 14 as well as the screen printing device 12 and the solder inspection device 13. The "downstream equipment" also includes the component mounting devices 14 as well as the mounting state inspection device 15. The configuration of the component mounting devices 14 will be described in detail later.
[0012] The mounting state inspection device 15 receives and carries in a board from the component mounting device 14 numbered #4, which is located furthest downstream among the multiple component mounting devices 14, and inspects the mounting state of the components on the board. The mounting state inspection device 15 takes an image of the board from above with a camera (not shown), and inspects whether predetermined components are mounted in the correct position. After inspecting the board, the mounting state inspection device 15 carries the board out to the downstream reflow device 16.
[0013] The reflow device 16 carries in the board received from the mounting state inspection device 15 and performs a reflow process on the board while transporting it downstream. This melts and solidifies the solder applied to the board by the screen printing device, and the components mounted by each component mounting device 14 that makes up the mounting line 2 are held on the board. The reflow device 16 carries out the board that has been subjected to the reflow process to a mounted board inspection device 17 on the downstream side.
[0014] Mounted board inspection device 17 carries in and positions the board received from reflow device 16, and inspects the state of the components on the board that has been subjected to the reflow process. Mounted board inspection device 17 carries out the board after inspection to downstream board storage device 18. Board storage device 18 stores the board received from mounted board inspection device 17. In this manner, a mounted board on which components are mounted (mounted) is manufactured by mounted board manufacturing system 1.
[0015] Next, the component mounting device 14 will be described. Fig. 2 is a configuration diagram of the component mounting device 14 constituting the mounting line 2 provided in the mounted board manufacturing system 1 in the first embodiment of the present disclosure. Fig. 3 is a block diagram showing a control system of the mounted board manufacturing system 1 in the first embodiment of the present disclosure. As shown in Figs. 2 and 3, the component mounting device 14 includes a board transport unit 21, a component supply unit 22, a work head 23, a valve system 24, a vacuum pump 25, a control unit 26, and an operation / input unit 27.
[0016] 2, the board transport unit 21 is, for example, a belt conveyor mechanism, and receives and positions the board KB from the nearest upstream facility. The board transport unit 21 also carries out the board KB on which the components BH have been mounted by the component mounting operation of the work head 23 to the nearest downstream facility.
[0017] The component supply unit 22 is composed of, for example, a tape feeder. The tape feeder supplies the components BH to a predetermined component pick-up position while feeding a carrier tape (not shown) storing multiple components BH with a sprocket (not shown). In addition to the tape feeder, the component supply unit 22 may be a tray feeder that supplies the components BH by moving a tray on which multiple components BH are arranged in an aligned state to a predetermined position.
[0018] 2, working head 23 is provided so as to be movable relative to substrate KB positioned by substrate transport unit 21, and is equipped with a plurality of suction nozzles 23N extending downward. Working head 23 uses a built-in nozzle drive mechanism (not shown) to move (raise and lower) each suction nozzle 23N in the vertical direction and also rotates it around an axis along the vertical direction.
[0019] 2, the valve system 24 is built into the working head 23. The valve system 24 is connected to each suction nozzle 23N through a plurality of pipes 24H extending inside the working head 23. The valve system 24 is connected to a vacuum pump 25 through piping 23T extending outside the working head 23. The vacuum pump 25 supplies negative pressure to the suction nozzle 23N of the working head 23 for holding the part BH. Therefore, by driving the valve system 24 while negative pressure is being supplied from the vacuum pump 25, each suction nozzle 23N can be caused to individually perform a suction operation and a suction release operation.
[0020] Thus, the mounting line 2 of the mounted board manufacturing system 1 in the first embodiment is configured to include a component mounting device 14 having a work head 23 that holds components BH with suction nozzle 23N and mounts them on board KB, and a vacuum pump 25 that supplies negative pressure to the suction nozzle 23N for holding the components BH. The mounting line 2 is configured to deliver the board KB that has been worked on in the upstream equipment to the component mounting device 14, where the components BH are mounted on the board KB, and deliver the board KB with the components BH mounted thereon from the component mounting device 14 to the downstream equipment to manufacture a mounted board in which the components BH are soldered to the board KB.
[0021] 3, control unit 26 includes substrate transport processing unit 31, vacuum pump control unit 32, component mounting operation processing unit 33, communication processing unit 34, and memory unit 35. Control unit 26 controls substrate transport unit 21, component supply unit 22, work head 23, valve system 24, and vacuum pump 25. Operation / input unit 27 is formed of, for example, a touch panel, and is connected to control unit 26. An operator can perform required operations from operation / input unit 27 to provide necessary input to control unit 26.
[0022] The substrate transport processing unit 31 cooperates with the upstream equipment to cause the substrate transport unit 21 to carry in the substrate KB. When carrying in the substrate KB, the substrate transport processing unit 31 first transmits, while the substrate transport unit 21 is stopped, a carry-in permission signal requesting the upstream equipment to carry out the substrate KB through the signal line LN (FIG. 2) (arrow S1 shown in FIG. 2).
[0023] After sending the carry-in permission signal to the upstream equipment, the substrate transport processing unit 31 waits for a substrate unloading permission signal to be sent from the upstream equipment via the signal line LN, which allows the substrate KB to be unloaded. Then, when it detects that a substrate unloading permission has been sent from the upstream equipment (when it receives the substrate unloading permission signal) (arrow S2 shown in FIG. 2), it enters a substrate loading waiting state. Then, after that, when the substrate KB has been unloaded from the upstream equipment, it operates the substrate transport unit 21 to carry in the substrate KB, and when it reaches a predetermined working position, it stops the substrate transport unit 21 and holds the substrate KB in that position.
[0024] Furthermore, the substrate transport processing unit 31 cooperates with the downstream equipment to cause the substrate transport unit 21 to carry out the substrate KB. When carrying out the substrate KB, the substrate transport processing unit 31 first monitors whether or not a carry-in permission signal is sent from the downstream equipment through the signal line LN while the substrate transport unit 21 is stopped. Then, when the carry-in permission signal is sent from the downstream equipment (arrow S3 shown in FIG. 2), the substrate transport processing unit 31 judges whether or not the substrate KB can be carried out to the downstream equipment, and when it judges that the substrate KB can be carried out to the downstream equipment, outputs a substrate unloading permission signal to the downstream equipment through the signal line LN (arrow S4 shown in FIG. 2). After sending the substrate unloading permission signal to the downstream equipment, the substrate transport processing unit 31 operates the substrate transport unit 21 to carry out the substrate KB to the downstream equipment.
[0025] The vacuum pump control unit 32 turns on or off the vacuum pump 25 depending on the state of the component mounting device 14 to which it belongs. When the vacuum pump 25 is turned on by the vacuum pump control unit 32, the vacuum pump 25 supplies negative pressure to the valve system 24 through the pipe 23T. On the other hand, when the vacuum pump 25 is turned off by the vacuum pump control unit 32, the vacuum pump 25 does not supply negative pressure to the valve system 24.
[0026] The component mounting work processing unit 33 coordinates the operation of the component supply unit 22, the work head 23, the valve system 24, and the vacuum pump 25 to perform a component mounting work of mounting the component BH on the board KB. In the component mounting work, the work head 23 is controlled by the component mounting work processing unit 33 to move back and forth between a position above the component supply unit 22 and a position above the board KB, and performs an operation of sucking (holding) the component BH supplied by the component supply unit 22 with the suction nozzle 23N, and an operation of releasing the hold (suction) of the component BH at the target mounting position on the board KB. Here, the holding and releasing of the component BH by the work head 23 are switched by the component mounting work processing unit 33 operating the valve system 24 while the vacuum pump 25 supplies negative pressure to the valve system 24 through the piping 23T.
[0027] 2 and 3, the communication processing unit 34 is connected to other equipment including upstream equipment and downstream equipment through the communication network NW, and is also connected to the information management unit 3. Therefore, the control unit 26 of the component mounting device 14 can exchange information with other equipment through the information management unit 3. The memory unit 35 stores various data related to the component mounting device 14, and also stores a program for performing the component mounting work, data on the parts BH, and the like as component mounting information 35a.
[0028] Thus, in the first embodiment, the information management unit 3 is capable of communicating with other equipment including each component mounting device 14, and when controlling a component mounting device 14 to be controlled (hereinafter referred to as a "target component mounting device"), it is capable of acquiring information such as the transport status of the substrate KB in the upstream equipment as viewed from the target component mounting device. Then, based on the acquired information such as the transport status of the substrate KB in the upstream equipment, it is capable of controlling the vacuum pump control unit 32 provided in the target component mounting device.
[0029] The information management unit 3 functions as a higher-level system for the mounting line 2, and issues commands to each piece of equipment constituting the mounting line 2 to collect information on the status of that equipment. In FIG. 1, the information management unit 3 includes an equipment information collection unit 41, a work start time prediction unit 42, and a judgment unit 43. The equipment information collection unit 41 collects the status (status information) of each component mounting device 14. Specifically, the equipment information collection unit 41 acquires log information stored in the storage unit 35, operation information of each component mounting device 14 (information on the presence or absence of a board KB, the status of the board KB (information on the loading, positioning, loading, etc.)), and information on the time when these operations were performed. The log information, operation information, and board information collected by the equipment information collection unit 41 are utilized as information for knowing the transport status of the board KB.
[0030] The work start time prediction unit 42 predicts the time (work start time) at which each component mounting device 14 starts component mounting work. For example, the work start time may be any one of (1) the time at which the board KB is carried in, (2) the time at which positioning of the board KB is completed, and (3) the time at which work by the work head 23 starts. The work start time of a component mounting device 14 is predicted based on the times at which the board KB is carried in, work times, and times required from the end of work to the discharge of the board KB in other component mounting devices 14, solder inspection devices 13, screen printing devices 12, and the like located upstream of the component mounting device 14.
[0031] The determination unit 43 determines whether to stop the vacuum pump 25 while the mounting line 2 is in operation, or to resume the operation of the stopped vacuum pump 25. The determination unit 43 transmits a stop command or an operation restart command to the control unit 26 of the component mounting device 14. Here, the "stop command" is a command to stop the vacuum pump 25 that is in operation, and the "operation restart command" is a command to resume the operation of the vacuum pump 25 that is in a stopped state.
[0032] If the determination unit 43 determines that the operation stop condition for stopping the vacuum pump 25 in operation has been met while the mounting line 2 is in operation, the determination unit 43 transmits a stop command to the control unit 26 of the corresponding component mounting device 14. In addition, if the determination unit 43 determines that the operation restart condition for the vacuum pump 25 that has been stopped has been met while the mounting line 2 is in operation, the determination unit 43 transmits an operation restart command to the control unit 26 of the corresponding component mounting device 14. The component mounting device 14 that has received the stop command from the determination unit 43 stops the vacuum pump 25 through the vacuum pump control unit 32, and the component mounting device 14 that has received the operation restart command from the determination unit 43 resumes the operation of the vacuum pump 25 through the vacuum pump control unit 32.
[0033] The judgment unit 43 judges whether the operation stop condition or the operation restart condition has been met in either a first mode in which the judgment is made based on the work start time predicted by the work start time prediction unit 42, or a second mode in which the judgment is made based on the state of the upstream equipment.
[0034] 1, judgment unit 43 has component mounting device (#1) data 51, component mounting device (#2) data 52, component mounting device (#3) data 53 and component mounting device (#4) data 54 as individual data (component mounting device data) for each of four component mounting devices 14 numbered #1, #2, #3 and #4. Each component mounting device data includes a first timer 61 and a second timer 62.
[0035] The first timer 61 measures the duration of operation of the vacuum pump 25 from the start of operation (hereinafter referred to as the "operating time"). Due to its structure, a typical vacuum pump 25 is prone to malfunction if stopped immediately after starting operation. For this reason, when stopping the vacuum pump 25 during operation, it is necessary to wait until a certain amount of time has passed since the start of operation. The first timer 61 times out when the operating time of the vacuum pump 25 reaches the "first time" that is set as the time to prevent the vacuum pump 25 from malfunctioning.
[0036] The second timer 62 measures the duration since the vacuum pump 25 has stopped (hereinafter referred to as the "stop time"). Due to its structure, a typical vacuum pump 25 is prone to malfunction if it is restarted immediately after being stopped. For this reason, when restarting the operation of a stopped vacuum pump 25, it is necessary to wait a certain amount of time after the operation has been stopped. The second timer 62 times out when the measured time, which is the duration since the vacuum pump 25 was stopped, reaches the "second time" defined as the time to prevent the vacuum pump 25 from malfunctioning.
[0037] Next, the operation stop condition and the operation restart condition of the vacuum pump 25 will be described. The operation stop condition in this embodiment includes a first operation stop condition and a second operation stop condition. The operation restart condition includes a first operation restart condition and a second operation restart condition.
[0038] The "first condition for stopping operation" is that no component mounting operation is being performed by the work head 23, and the operation time, which is the duration from the start or restart of the vacuum pump 25, reaches the time (first time) for preventing a breakdown of the vacuum pump 25. In this embodiment, when the "first condition for stopping operation" is met, the first timer 61 times out. Therefore, the determination unit 43 refers to the first timer 61 to determine whether the first condition for stopping operation is met.
[0039] The "second condition for stopping operation" is that component mounting work is not being performed by the work head 23, and the time during which component mounting work is not being performed is predicted to continue for a predetermined time (first predetermined time) or more. When the determination unit 43 is set to the first mode, the determination as to whether the "second condition for stopping operation" is met is made based on the work start time predicted by the work start time prediction unit 42. When the determination unit 43 is set to the second mode, the determination is made based on the state of the upstream equipment.
[0040] The "first condition for restarting operation" is that the stop time, which is the duration since the vacuum pump 25 was stopped, reaches the time (second time) for preventing a breakdown of the vacuum pump 25. In this embodiment, when the "first condition for restarting operation" is satisfied, the second timer 62 times out. Therefore, the determination unit 43 determines whether the first condition for restarting operation is satisfied by referring to the second timer 62.
[0041] The "second condition for resuming operation" is that it is predicted that the component mounting operation by the work head 23 will be resumed within a predetermined time (second predetermined time). When the determination unit 43 is set to the first mode, the determination as to whether the "second condition for resuming operation" is met is made based on the work start time predicted by the work start time prediction unit 42. When the determination unit 43 is set to the second mode, the determination is made based on the state of the upstream equipment.
[0042] 4 is a flowchart showing the flow of control that the determination unit 43 of the information management unit 3 performs on the vacuum pump control unit 32 of each component mounting device 14. Here, an example of control in the case where the component mounting device 14 numbered #1 is set as the target component mounting device is shown, but the same applies to the cases where the other component mounting devices 14 (numbered #2, #3, #4) are set as the target component mounting devices.
[0043] 4, the determination unit 43 first checks whether the component mounting device 14 with the number #1 is started immediately after the power is turned on to the mounting line 2 (step ST1). After checking whether the component mounting device 14 with the number #1 is started, the determination unit 43 then checks whether the vacuum pump 25 of the component mounting device 14 with the number #1 is started (step ST2). If the vacuum pump 25 is not started, the check is repeated until it is started.
[0044] When the determination unit 43 confirms that the vacuum pump 25 has started, it starts the first timer 61 from the component mounting device (#1) data 51 and resets the second timer 62 (step ST3). By starting the first timer 61, measurement of the duration from the start of operation of the vacuum pump 25 provided in the component mounting device 14 numbered #1 (i.e., the operation time) is started.
[0045] The judgment unit 43 starts the first timer 61 and resets the second timer 62, i.e., sets the second time and makes it ready to start at any time. Next, the judgment unit 43 judges whether the component mounting device 14 with the number #1 is performing component mounting work (step ST4). If the component mounting device 14 is performing component mounting work, neither the operation stop condition nor the operation restart condition is satisfied. Therefore, if the component mounting device 14 with the number #1 is performing component mounting work in step ST4, the judgment unit 43 repeats the same process until the component mounting work is no longer being performed, and if it is judged that the component mounting work is not being performed, the judgment unit 43 proceeds to a step for judging whether either the operation stop condition or the operation restart condition is satisfied.
[0046] If the determination unit 43 determines that the component mounting operation is not in progress, it determines whether the vacuum pump 25 is in operation (step ST5). If the determination unit 43 determines that the vacuum pump 25 is in operation in step ST5, it branches to a process of determining whether an operation stop condition is satisfied in steps ST6 and ST7. On the other hand, if the determination unit 43 determines that the vacuum pump 25 is not in operation, it branches to a process of determining whether an operation restart condition is satisfied in steps ST9 and ST10. That is, step ST5 is a process of determining whether to check the operation stop condition or the operation restart condition.
[0047] The determination unit 43 determines whether the first condition for stopping operation is satisfied based on whether the first timer 61 has timed out (step ST6). If the first timer 61 has timed out, the duration from the start of operation of the vacuum pump 25 exceeds the first time, and therefore the determination unit 43 determines that the first condition for stopping operation is satisfied because the first timer 61 has timed out.
[0048] When the determination unit 43 determines in step ST6 that the first timer 61 has not timed out and the first condition for stopping operation has not been satisfied, it determines that the operation stop condition is not satisfied and returns to step ST4. On the other hand, when the determination unit 43 determines that the first timer 61 has timed out and the first condition for stopping operation has been satisfied, it proceeds to the next step ST7.
[0049] In step ST7, the determination unit 43 determines whether or not a second condition for stopping operation is satisfied. Here, the "second condition for stopping operation" is that the component mounting operation by the working head 23 is not being performed (this requirement is satisfied at the time of transition from step ST4 to step ST5), and the time during which the component mounting operation is not being performed is predicted to continue for a predetermined time (first predetermined time) or more, in other words, that the component mounting operation is predicted not to start until the first predetermined time has elapsed from the time of the determination in step ST7.
[0050] The first predetermined time is a time parameter related to the energy saving effect. The first predetermined time can be set arbitrarily by the operator, and the shorter the set first predetermined time, the more frequently the vacuum pump 25 is stopped, but the longer the total stop time, so the greater the energy saving effect. On the other hand, the longer the set first predetermined time, the less frequently the vacuum pump 25 is stopped, so the less the energy saving effect.
[0051] Repeated stopping and restarting operations can damage the vacuum pump 25. For this reason, the first predetermined time is set taking into consideration the durability against damage of the vacuum pump 25. If the vacuum pump 25 being used is sufficiently durable and has little risk of breakdown even when it is frequently stopped and restarted, it is preferable to shorten the first predetermined time to enhance the energy saving effect.
[0052] When the determination unit 43 is set to the first mode, the determination unit 43 obtains the work start time of the target component mounting device (component mounting device 14 with number #1) predicted by the work start time prediction unit 42. Then, if the work start time is after the first predetermined time has elapsed from the time of the determination in step ST7, the determination unit 43 determines that the second condition for stopping operation is satisfied.
[0053] When the judgment unit 43 is set to the second mode, the judgment unit 43 acquires the log information, operation information, and board information of the upstream equipment collected by the equipment information collection unit 41, and checks the transport status of the board KB in the upstream equipment. Then, if it is predicted from the transport status of the board KB that the time during which the component mounting work is not performed will continue for more than the first predetermined time, or if it is predicted from the information of the upstream equipment that the time during which the component mounting work is not performed will continue for more than the first predetermined time, the judgment unit 43 judges that the second condition for stopping operation is established. For example, in the component mounting device 14 numbered #1, if it is known in advance that "if the board KB is not present in the screen printing device 12 and the solder inspection device 13, the time when the component mounting work will start will be after the first predetermined time has elapsed," the judgment unit 43 judges that the second condition for stopping operation is established by confirming that the board KB is not present in the screen printing device 12 and the solder inspection device 13.
[0054] The transport status of the substrate KB of the upstream device or the state of the upstream equipment when the time during which component mounting work is not performed continues for more than the first predetermined time can be predicted by simulation, etc. For this reason, the transport status of the substrate KB of the upstream device or the state of the upstream equipment when the second condition for operation shutdown is established may be stored in advance in the memory unit 35 of each component mounting device 14 as an operation shutdown judgment criterion, and in step ST7, the judgment unit 43 may judge that the second condition for operation shutdown is established if the upstream equipment collected by the equipment information collection unit 41 is in the same state as the operation shutdown judgment criterion based on the log information, operation information, and substrate information.
[0055] If the determination unit 43 determines in step ST7 that the second condition for stopping operation is satisfied, it transmits a command (stop command) to the vacuum pump control unit 32 of the component mounting device 14 numbered #1 to stop operation of the vacuum pump 25, starts time measurement by the second timer 62, and resets the first timer 61 (step ST8). On the other hand, if the determination unit 43 determines in step ST7 that the second condition for stopping operation is not satisfied, it returns to step ST4 as it determines that the condition for stopping operation is not satisfied.
[0056] Thus, in the first embodiment, the determination unit 43 determines that the first condition for stopping operation is satisfied if the work head 23 is not performing component mounting operation and the operation time, which is the duration from the start of operation of the vacuum pump 25, reaches the first time for preventing a breakdown of the vacuum pump 25 (the first timer is up). The determination unit 43 also determines that the second condition for stopping operation is satisfied if the work head 23 is not performing component mounting operation and the time during which the component mounting operation is not performed is predicted to continue for a first predetermined time or more. Then, when it is determined that the first condition for stopping operation and the second condition for stopping operation are satisfied, a stop command for stopping the operation of the vacuum pump 25 is transmitted to the target component mounting device.
[0057] In FIG. 4, if the determination unit 43 determines in the above-mentioned step ST5 that the vacuum pump 25 is not in operation, it determines in steps ST9 and ST10 whether or not the operation restart condition is satisfied.
[0058] The judgment unit 43 judges whether the first condition for restarting operation is satisfied based on whether the second timer 62 has timed out (step ST9). If the second timer 62 has timed out, the duration since the vacuum pump 25 stopped operating exceeds the second time, and therefore the judgment unit 43 judges that the first condition for restarting operation is satisfied because the second timer 62 has timed out.
[0059] When the judgment unit 43 judges in step ST9 that the second timer 62 has not timed out and the first condition for restarting operation has not been satisfied, it judges that the operation restart condition is not satisfied and returns to step ST4. On the other hand, when the judgment unit 43 judges that the second timer 62 has timed out and the first condition for restarting operation has been satisfied, it proceeds to the next step ST10.
[0060] In step ST10, the judgment unit 43 judges whether or not a second condition for restarting operation is satisfied. Here, the "second condition for restarting operation" is that the component mounting operation by the working head 23 is predicted to be restarted within a predetermined time (a second predetermined time).
[0061] The second specified time is a time longer than the time it takes for the vacuum pump 25 to start operating and be able to supply sufficient negative pressure to the suction nozzle 23N, and is determined taking into consideration the capacity of the vacuum pump 25, the number of suction nozzles 23N in the work head 23, the length of the piping 23T, etc.
[0062] When the judgment unit 43 is set to the first mode, the judgment unit 43 judges that the second condition for resuming operation is met if the work start time of the target component mounting device (component mounting device 14 numbered #1) predicted by the work start time prediction unit 42 at the time of judgment in step ST10 arrives before a second predetermined time has elapsed from the time of judgment in step ST10, i.e., before the second predetermined time has elapsed from the current time.
[0063] When the judgment unit 43 is set to the second mode, the judgment unit 43 acquires the log information, operation information, and board information of the upstream equipment collected by the equipment information collection unit 41, and checks the transportation status of the board KB in the upstream equipment. Then, if it is predicted from the transportation status of the board KB that the component mounting work will be resumed within the second predetermined time, or if it is expected from the information of the upstream equipment that the component mounting work will be resumed within the second predetermined time, the judgment unit 43 judges that the second condition for resuming operation is satisfied. For example, in the component mounting device 14 numbered #1, if it is known in advance that "when the board KB is positioned in the solder inspection device 13, the component mounting work will start within the second predetermined time," the judgment unit 43 judges that the second condition for resuming operation is satisfied by confirming that the solder inspection device 13 has positioned the board KB.
[0064] In addition, the transport status of the substrate KB of the upstream device or the state of the upstream equipment when the second condition for stopping operation is satisfied may be stored in advance in the memory unit 35 of each component mounting device 14 as a criterion for determining whether to resume operation, and in step ST10, the judgment unit 43 may determine that the second condition for stopping operation is satisfied if the log information, operation information, and substrate information of the upstream equipment collected by the equipment information collection unit 41 are in the same state as the criterion for determining whether to resume operation.
[0065] If the determination unit 43 determines in step ST10 that the second condition for restarting operation is satisfied, it transmits a command (operation restart command) to the vacuum pump control unit 32 of the component mounting device 14 numbered #1 to restart the operation of the vacuum pump 25, starts time measurement by the first timer 61, and resets the second timer 62 (step ST11). On the other hand, if the determination unit 43 determines in step ST10 that the second condition for restarting operation is not satisfied, it determines that the operation restart condition is not satisfied and returns to step ST4.
[0066] Thus, in the first embodiment, the judgment unit 43 judges that the first condition for restarting operation is satisfied if the stop time, which is the duration from when the vacuum pump 25 has been stopped, reaches the second time for preventing a breakdown of the vacuum pump 25 (the second timer 62 times out). The judgment unit 43 also judges that the second condition for restarting operation is satisfied if it is predicted that the component mounting work by the work head 23 will be resumed within the second predetermined time. Then, when it is judged that the first condition for restarting operation is satisfied and the second condition for restarting operation is satisfied, the judgment unit 43 transmits an operation restart command to the target component mounting device to restart the operation of the vacuum pump 25.
[0067] As described above, the mounting board manufacturing system 1 in the first embodiment is configured to include a determination unit 43 that determines whether to stop the vacuum pump 25 while the mounting line 2 is in operation or to resume operation of the stopped vacuum pump 25, and a vacuum pump control unit 32 that controls the vacuum pump based on the determination of the determination unit 43. If the operation stop conditions (both the first operation stop condition and the second operation stop condition) for stopping the operating vacuum pump 25 while the mounting line 2 is in operation are met, the determination unit 43 determines to stop the operation of the vacuum pump 25 (outputs an operation stop), and upon receiving a stop command from the determination unit 43, the vacuum pump control unit 32 stops the vacuum pump 25 and maintains the stopped state of the vacuum pump 25 until it next receives an operation restart command from the determination unit 43. Furthermore, if the conditions for restarting operation of the vacuum pump 25 that has been stopped while the mounting line 2 is in operation (both the first condition for restarting operation and the second condition for restarting operation) are met, the judgment unit 43 judges to restart operation of the vacuum pump 25 (outputs a command to restart operation), and upon receiving the command to restart operation from the judgment unit 43, the vacuum pump control unit 32 restarts the operation of the vacuum pump 25 and maintains the stopped state of the vacuum pump 25 until it next receives a command to stop it from the judgment unit 43.
[0068] In this way, in the mounted board manufacturing system 1 in the first embodiment, the vacuum pumps 25 provided in the component mounting devices 14 of the mounting line 2 are stopped and restarted as much as possible without affecting the component mounting work. By controlling the stopping and restarting of the vacuum pumps 25 provided in the component mounting devices 14 in this way in an integrated manner for the entire mounting line 2A, a large energy saving effect can be achieved for the entire mounting line 2A.
[0069] (Embodiment 2) Next, a second embodiment of the present disclosure will be described. Figures 5 and 6 show a mounting board manufacturing system (referenced as "1A") in the second embodiment. As can be seen from Figures 5 and 6, the mounting board manufacturing system 1A in the second embodiment also includes a mounting line (referenced as "2A") and an information management unit (referenced as "3A"), and the overall configuration is the same as the mounting board manufacturing system 1 in the first embodiment. In the second embodiment, the information management unit 3A can also communicate with the upstream equipment and each component mounting device 14, and is configured to acquire the status of the upstream equipment and each component mounting device 14 and the transport status of the substrate KB, and the component mounting device 14 is configured to have a vacuum pump control unit 32, but each component mounting device 14 is configured to have a judgment unit (referenced as "43A") that acquires the status of the upstream equipment and the transport status of the substrate KB from the information management unit 3A and makes a judgment.
[0070] Thus, in the second embodiment, the information management unit 3A does not have the determination unit 43A, but each component mounting device 14 has it individually, which is different from the first embodiment. In detail, in the second embodiment, the information management unit 3A, which is a higher-level system of the mounting line 2A, has only the equipment information collection unit 41 and the work start time prediction unit 42, and the function of the determination unit 43 in the first embodiment is distributed and handled by each component mounting device 14 constituting the mounting line 2A. In the second embodiment, the determination unit 43A possessed by each component mounting device 14 accesses the equipment information collection unit 41 or the work start time prediction unit 42 of the information management unit 3A to obtain necessary information, and determines whether to stop or restart the vacuum pump 25 equipped in the component mounting device 14 itself. The determination unit 43A is also set to either the first mode or the second mode like the determination unit 43 in the first embodiment, and performs processing in the set mode.
[0071] 7 is a flowchart showing the flow of control that the determination unit 43A of each component mounting device 14 performs on the vacuum pump control unit 32 of the component mounting device 14 to which it belongs. The specific processing content is the same as the processing by the determination unit 43 in the first embodiment, so a detailed description will be omitted.
[0072] In this manner, in the second embodiment, the judgment unit 43A judges that the first condition for restarting operation is satisfied if the stop time, which is the duration from when the vacuum pump 25 has been stopped, reaches the second time for preventing a breakdown of the vacuum pump 25 (the second timer 62 times out), as in the first embodiment. In addition, the judgment unit 43A judges that the second condition for restarting operation is satisfied if it is predicted that the component mounting work by the work head 23 will be resumed within the second predetermined time. Then, when it is judged that the first condition for restarting operation is satisfied and the second condition for restarting operation is satisfied, the judgment unit 43A transmits an operation restart command to the target component mounting device to restart the operation of the vacuum pump 25.
[0073] In this manner, like the mounting board manufacturing system 1 in the first embodiment, the mounting board manufacturing system 1A in the second embodiment is configured to include a judgment unit 43A that judges whether to stop the vacuum pump 25 during operation of the mounting line 2A or to resume operation of the stopped vacuum pump 25, and a vacuum pump control unit 32 that controls the vacuum pump based on the judgment of the judgment unit 43A. If the operation stop conditions (both the first operation stop condition and the second operation stop condition) for stopping the operating vacuum pump 25 during operation of the mounting line 2A are satisfied, the judgment unit 43A judges to stop the operation of the vacuum pump 25 (outputs an operation stop command), and upon receiving the stop command from the judgment unit 43A, the vacuum pump control unit 32 stops the vacuum pump 25 and maintains the stopped state of the vacuum pump 25 until it next receives an operation restart command from the judgment unit 43A. Furthermore, if the conditions for restarting operation of the vacuum pump 25 that has been stopped while the mounting line 2A is in operation (both the first condition for restarting operation and the second condition for restarting operation) are met, the judgment unit 43A judges to restart operation of the vacuum pump 25 (outputs a command to restart operation), and upon receiving the command to restart operation from the judgment unit 43A, the vacuum pump control unit 32 restarts the operation of the vacuum pump 25 and maintains the stopped state of the vacuum pump 25 until it next receives a command to stop operation from the judgment unit 43A.
[0074] In this way, also in the mounted board manufacturing system 1A in the second embodiment, the vacuum pumps 25 provided in the component mounting devices 14 of the mounting line 2 are stopped and restarted as much as possible within the scope that does not affect the component mounting work. By controlling the stopping and restarting of the vacuum pumps 25 provided in the component mounting devices 14 in this way in an integrated manner for the entire mounting line 2A, a large energy saving effect can be achieved for the entire mounting line 2A.
[0075] As described above, the mounting board manufacturing system (1, 1A) in the first and second embodiments includes a determination unit (43, 43A) that determines whether to stop the vacuum pump (25) while the mounting line (2, 2A) is in operation or whether to resume operation of the stopped vacuum pump (25), and a vacuum pump control unit (32) that controls the vacuum pump (25) based on the determination of the determination unit (43, 43A). The determination unit (43, 43A) determines to stop operation of the vacuum pump (25) if an operation stop condition for stopping the operating vacuum pump (25) is satisfied while the mounting line (2, 2A) is in operation (steps ST8, ST28), and determines to resume operation of the stopped vacuum pump (25) if a condition for resuming operation of the stopped vacuum pump (25) is satisfied while the mounting line (2, 2A) is in operation (steps ST11, ST31).
[0076] In the mounting board manufacturing system (1, 1A) in the first and second embodiments, the vacuum pumps (25) of the component mounting devices (14) of the mounting lines (2, 2A) are stopped and restarted as much as possible without affecting the component mounting work. Such control of stopping and restarting the vacuum pumps (25) of the component mounting devices (14) is performed in an integrated manner for the entire mounting line (2, 2A), so that a large energy saving effect can be obtained for the entire mounting line (2, 2A).
[0077] Although the embodiments of the present disclosure have been described so far, the present disclosure is not limited to the above, and various modifications and the like are possible. For example, in the above-mentioned first and second embodiments, when both the first and second conditions for stopping operation are satisfied, a stop operation command is sent to the target component mounting device, and when both the first and second conditions for restarting operation are satisfied, a restart operation command is sent to the target component mounting device. However, if the durability of the vacuum pump 25 is high, when one of the first and second conditions for stopping operation is satisfied, a stop operation command may be sent to the target component mounting device, and when one of the first and second conditions for restarting operation is satisfied, a restart operation command may be sent to the target component mounting device. In addition, in the above-mentioned first and second embodiments, the mounting line 2, 2A is configured to include a plurality of component mounting devices 14, but the mounting line 2, 2A may include at least one component mounting device 14. [Industrial Applicability]
[0078] To provide a mounting board manufacturing system capable of achieving a large energy saving effect for the entire mounting line. [Explanation of symbols]
[0079] 1,1A PCB manufacturing system 2,2A mounting line 3,3A Information Management Department 11 Substrate supply device 12 Screen printing equipment 13 Solder inspection equipment 14 Parts mounting equipment 15. Mounting condition inspection device 16 Reflow equipment 17 Mounting board inspection equipment 18 Substrate storage device 21 Substrate transport section 22 Parts Supply Department 23 Working Head 23N Suction Nozzle 23T piping 24 Valve System 24H conduit 25 Vacuum Pump 26 Control Unit 27 Operation / Input section 31 Substrate transport processing section 32 Vacuum pump control section 33 Parts mounting processing section 34 Communication processing unit 35 Storage section 35a Parts mounting information 41 Facility Information Collection Department 42 Work start time prediction unit 43,43A Judgment part 61 First timer 62 Second timer BH Parts KB board LN signal line NW Communication network
Claims
1. A mounting line for manufacturing a mounted board, comprising at least one component mounting device having a work head that holds a component with a suction nozzle for holding the component and mounting the component on a board, and a vacuum pump that supplies a negative pressure to the suction nozzle for holding the component, the board on which a work has been performed in an upstream facility is transferred to the component mounting device, the components are mounted on the board, and the board on which the components have been mounted is transferred from the component mounting device to a downstream facility to manufacture a mounted board in which the components are soldered to the board, a determination unit that determines whether to stop the vacuum pump while the mounting line is in operation or whether to restart the operation of the vacuum pump that has been stopped; a vacuum pump control unit that controls the vacuum pump based on the determination of the determination unit; Equipped with the determination unit determines to stop operation of the vacuum pump if an operation stop condition for stopping the vacuum pump in operation is satisfied while the mounting line is in operation, and determines to resume operation of the vacuum pump if a condition for restarting the operation of the stopped vacuum pump is satisfied while the mounting line is in operation; the judgment unit judges that an operation stop condition has been met if component mounting work is not being performed by the work head and the operating time, which is the continuous operating time from the start of operation of the vacuum pump, has reached a first time for preventing a breakdown of the vacuum pump.
2. 2. The mounting board manufacturing system according to claim 1, wherein the determination unit determines that an operation stop condition is met when component mounting work is not being performed by the work head and when a time during which component mounting work is not being performed is predicted to continue for a first predetermined time or longer.
3. 3. The mounting board manufacturing system according to claim 2, wherein the determination unit determines whether a period of time during which no component mounting operation is performed continues for at least the first predetermined period of time based on a transportation status of the board in the upstream facility.
4. A mounted board manufacturing system comprising at least one component mounting device having a work head which holds a component with a suction nozzle for mounting the component on a board, and a vacuum pump which supplies negative pressure to the suction nozzle for holding the component, the board on which work has been performed in upstream equipment being transferred to the component mounting device to mount the components on the board, and the board with the components mounted thereon being transferred from the component mounting device to downstream equipment to manufacture a mounted board in which the components are soldered to the board, a determination unit that determines whether to stop the vacuum pump while the mounting line is in operation or whether to restart the operation of the vacuum pump that has been stopped; a vacuum pump control unit that controls the vacuum pump based on the determination of the determination unit; Equipped with the determination unit determines to stop operation of the vacuum pump if an operation stop condition for stopping the vacuum pump in operation is satisfied while the mounting line is in operation, and determines to resume operation of the vacuum pump if a condition for restarting the operation of the stopped vacuum pump is satisfied while the mounting line is in operation; The mounting board manufacturing system determines that the operation resumption condition is met when the stop time, which is the duration since the vacuum pump was stopped, reaches a second time for preventing a breakdown of the vacuum pump, and when it is predicted that component mounting work by the work head will resume within a second specified time.
5. 5. The mounting board manufacturing system according to claim 4, wherein the determination unit determines whether or not component mounting work will be resumed within the second predetermined time based on a transportation status of the board in the upstream facility.
6. 6. The mounting board manufacturing system according to claim 1, further comprising an information management unit capable of communicating with the upstream equipment and the component mounting device, and acquiring at least one of a state of the upstream equipment and the component mounting device and a transport status of the substrate, the information management unit having the judgment unit, and the component mounting device having the vacuum pump control unit.
7. 6. A mounting board manufacturing system as described in any one of claims 1 to 5, further comprising an information management unit capable of communicating with the upstream equipment and the component mounting device, and acquiring at least one of the states of the upstream equipment and the component mounting device and the transport status of the substrate, the component mounting device having the judgment unit and the vacuum pump control unit, and the judgment unit acquiring the at least one of the state of the upstream equipment and the transport status of the substrate from the information management unit to make a judgment.
Citation Information
Patent Citations
Electronic component mounting device and power supply control method in the same
JP2006313806A
Electronic component mounting device
JP2012069836A
Electronic component mounting machine
WO2015097880A1