Remote Control System

The remote control system for cranes addresses safety concerns by enabling multiple operators to confirm and approve travel routes, improving safety and efficiency in suspended load transportation.

JP7563208B2Active Publication Date: 2024-10-08TADANO LTD
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2021016683
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-02-04
Publication Date
2024-10-08
Estimated Expiration
2041-02-04

AI Technical Summary

Technical Problem

Existing crane operation systems rely on a single operator to confirm the safety of the surrounding area for suspended load transportation, which is challenging due to changing obstacles at construction sites, leading to potential safety risks.

Method used

A remote control system with multiple route confirmation terminal devices that allow multiple operators to independently confirm and approve a planned travel route for a suspended load, ensuring safety and efficient operation.

Benefits of technology

Improves safety and reduces the time required for starting suspended load transportation by allowing simultaneous confirmation and approval from multiple operators, enhancing operational efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007563208000001
    Figure 0007563208000001
  • Figure 0007563208000002
    Figure 0007563208000002
  • Figure 0007563208000003
    Figure 0007563208000003
Patent Text Reader

Abstract

To improve the safety of a remote control system for remotely operating a crane when conveying a suspended load.SOLUTION: A remote control system 1 includes a route generation device 3 for generating a planned moving route of a suspended load W of a crane 6, a first route confirmation terminal device 4 and a second route confirmation terminal device 5 for urging to select whether or not to approve the planned moving route, and a construction management device 2 for permitting the start of moving in the planned moving route when the approval of the planned moving route is selected in the first route confirmation terminal device 4 and the second route confirmation terminal device 5.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a remote control system for remotely controlling a crane. [Background technology]

[0002] Various technologies have been proposed for automatic crane operation. For example, Patent Document 1 discloses an automatic operation system that automatically transports a suspended load by operating a touch panel installed in the driver's seat of a tower crane. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-112178 A Summary of the Invention [Problem to be solved by the invention]

[0004] According to the technology of Patent Document 1, operations can only be input through a touch panel installed in the driver's seat of the crane. With this configuration, the operator sitting in the driver's seat of the crane operates the touch panel after confirming the safety of the surroundings, and then approves the automatic transport of the suspended load. However, at construction sites where cranes are used, there are many obstacles to the transport of the suspended load, such as materials and buildings under construction, and the situation changes from moment to moment, so it is difficult for a single operator to fully confirm the safety of the surroundings.

[0005] An object of the present invention is to improve safety when transporting a suspended load in a remote control system that remotely controls a crane. [Means for solving the problem]

[0006] The present invention is a remote operation system for remotely operating a crane, and includes a route generation device that generates a planned movement route for a load suspended by the crane, a plurality of route confirmation terminal devices that prompts a user to select whether or not to approve the planned movement route, and a construction management device that permits start of movement along the planned movement route when approval of the planned movement route is selected in all of the route confirmation terminal devices.

[0007] According to the above configuration, in order to start automatic transportation of a suspended load, multiple operators must check the safety of the surrounding area and approval of the planned travel route must be selected in all route confirmation terminal devices, thereby improving safety when transporting a suspended load.

[0008] In the above remote operation system, when the construction management device permits the start of movement along the planned movement route, it may transmit an instruction to the crane to start movement along the planned movement route.

[0009] According to the above configuration, when approval of the planned movement route is selected in all the route confirmation terminal devices, the crane automatically starts automatic transportation of the load W. Therefore, the time required for the process of permitting the start of movement can be shortened.

[0010] In the above remote operation system, the route confirmation terminal device may have an approval key for approving the planned travel route and a rejection key for rejecting the planned travel route.

[0011] According to the above configuration, the route confirmation terminal device can be easily operated.

[0012] In addition, in the above remote control system, if no selection operation is performed in one or more of the route confirmation terminal devices to approve or not approve the planned travel route within a first predetermined time, the construction management device may reject the start of travel along the planned travel route.

[0013] According to the above configuration, the remote control system can be operated smoothly.

[0014] In the above remote control system, the route confirmation terminal device may have a temporary wait key for postponing the selection of whether or not to approve the planned travel route, and when the temporary wait key is operated within the first specified time in one or more of the route confirmation terminal devices, the construction management device may reject the start of travel along the planned travel route if no selection operation of whether or not to approve the planned travel route is performed within a second specified time that is longer than the first specified time.

[0015] According to the above configuration, it is possible to postpone the selection of whether or not to approve the planned travel route in the route confirmation terminal device, and to operate the remote operation system smoothly. Effect of the Invention

[0016] According to the present invention, in a remote control system for remotely controlling a crane, it is possible to improve safety when transporting a suspended load. [Brief description of the drawings]

[0017] [Figure 1] FIG. 1 is a diagram illustrating a configuration of a remote control system according to an embodiment. [Diagram 2] 2 is a block diagram showing a part of a control configuration of the remote control system of FIG. 1. [Diagram 3] 4 is a flowchart showing an operation related to approval of a planned travel route in the remote operation system of FIG. [Figure 4] FIG. 2 is a diagram showing a first route confirmation terminal device displaying a planned travel route and operation keys. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0018] [Remote control system configuration] As shown in Figures 1 and 2, the remote operation system 1 is a system for remotely operating a crane 6 via wireless communication, and includes a construction management device 2, a path generating device 3, a first path confirmation terminal device 4, a second path confirmation terminal device 5, and a crane 6. The construction management device 2 and the path generating device 3 are installed in a management room at the construction site or in an office or the like away from the construction site. The first path confirmation terminal device 4, the second path confirmation terminal device 5, and the crane 6 are arranged at the construction site.

[0019] The construction management device 2 is operated by an operator X1, the first path confirmation terminal device 4 is operated by an operator X2, the second path confirmation terminal device 5 is operated by an operator X3, and the path generation device 3 and the crane 6 are operated unmanned. The operators X2 and X3 are located at positions away from each other and at positions where the operation of the crane 6 can be visually confirmed.

[0020] <Construction management device> The construction management device 2 is composed of a computer such as a PC (personal computer). The construction management device 2 includes a control unit 21, a display unit 22, an operation unit 23, and a communication unit 24. The control unit 21 is composed of a control device such as a CPU and a storage device such as a RAM (Random Access Memory) and a ROM (Read Only Memory). The control unit 21 is connected to the display unit 22, the operation unit 23, and the communication unit 24, and controls each unit.

[0021] The display unit 22 is composed of a display device such as a liquid crystal panel, and displays various information to the operator X1. The operation unit 23 is composed of a keyboard, and is operated by the operator X1 to input various instructions.

[0022] The communication unit 24 is composed of an antenna and a transceiver, and converts information into a radio signal and sends it out, and also receives the radio signal and restores it to information. The Internet network or a mobile phone network can be used for wireless communication. The communication unit 24 is wirelessly connected to the route generation device 3, the first route confirmation terminal device 4, the second route confirmation terminal device 5, and the crane 6. Therefore, the control unit 21 can transmit information to the route generation device 3, the first route confirmation terminal device 4, the second route confirmation terminal device 5, and the crane 6 through the communication unit 24. The control unit 21 can also obtain information transmitted by the route generation device 3, the first route confirmation terminal device 4, the second route confirmation terminal device 5, and the crane 6 through the communication unit 24.

[0023] <Route Generation Device> The path generating device 3 is composed of a computer such as a PC (personal computer). The path generating device 3 includes a control unit 31 and a communication unit 32. The path generating device 3 may include a display unit and an operation unit. The control unit 31 includes a control device such as a CPU and a storage device such as a RAM or a ROM, and the storage device stores performance data related to the work such as the workable range. The control unit 31 is connected to the communication unit 32 and controls the communication unit 32. The communication unit 32 includes an antenna and a transceiver, and is wirelessly connected to the construction management device 2, the first path confirmation terminal device 4, the second path confirmation terminal device 5, and the crane 6.

[0024] The control unit 31 has a path generation unit 311. The path generation unit 311 is a calculation device that generates a planned movement path of the load W of the crane 6. The planned movement path is a path for moving the load W from the current position to the destination position. There is no particular limitation on the method of calculating the planned movement path, and it can be generated, for example, using image data captured by the camera 68 of the crane 6, position information detected by the orientation sensor 69 of the crane 6, performance data, etc. The generated planned movement path is transmitted to the first path confirmation terminal device 4, the second path confirmation terminal device 5, and the crane 6 through the communication unit 32.

[0025] <First route confirmation terminal device> The first route confirmation terminal device 4 is composed of a mobile terminal device such as a tablet terminal or a smartphone. The first route confirmation terminal device 4 includes a control unit 41, a display unit 42, an operation unit 43, and a communication unit 44. The control unit 41 is composed of a control device such as a CPU and a storage device such as a RAM or a ROM. The control unit 41 is connected to the display unit 42, the operation unit 43, and the communication unit 44, and controls each unit.

[0026] The display unit 42 is composed of a display device such as a liquid crystal panel, and displays various information such as the planned movement path of the suspended load W to the operator X2. The operation unit 43 is composed of a touch panel or the like superimposed on the display unit 42, and is operated by the operator X2 to input various instructions. The communication unit 44 is composed of an antenna and a transceiver, and is wirelessly connected to the construction management device 2 and the path generation device 3.

[0027] <Second route confirmation terminal device> The second route confirmation terminal device 5 has the same configuration as the first route confirmation terminal device 4, and includes a control unit 51, a display unit 52, an operation unit 53, and a communication unit .

[0028] <Crane> As shown in Fig. 1, the crane 6 includes a vehicle 61 and a crane device 62. The vehicle 61 includes a pair of left and right front wheels 611 and rear wheels 612. The vehicle 61 also includes outriggers 613 that are grounded to provide stability when transporting luggage W. The vehicle 61 allows the crane device 3 supported on its upper portion to freely rotate by an actuator.

[0029] The crane apparatus 62 is provided with a boom 621 that protrudes forward from its rear. The boom 621 is rotatable by a hydraulic motor for rotation (not shown), extendable by a hydraulic cylinder for extension (not shown), and can be raised and lowered by a hydraulic cylinder for elevation (not shown). The rotation angle, rotation speed, extension length, extension speed, elevation angle, and elevation speed of the boom 621 are detected by a plurality of sensors (not shown).

[0030] A wire rope 622 is stretched across the boom 621. A winch 623 around which the wire rope 622 is wound is disposed on the base end side of the boom 621, and a hook 624 is suspended by the wire rope 622 on the tip end side of the boom 621. The winch 623 is configured integrally with a winding hydraulic motor (not shown), and enables the wire rope 622 to be wound in and out. The hook 624 can be raised and lowered by the winding hydraulic motor. The hanging length and lifting speed of the hook 624 are detected by a sensor (not shown).

[0031] The crane apparatus 62 further includes a cabin 625 on the side of the boom 621. Inside the cabin 625, a swivel operation tool, a telescopic operation tool, a hoisting operation tool, a winding operation tool, and the like for manually operating the crane apparatus 62 are provided.

[0032] 2, the crane 6 includes a control unit 63, a rotation valve 64, an extension valve 65, a hoisting valve 66, a winding valve 67, a camera 68, a direction sensor 69, and a communication unit 70. The control unit 63 is composed of a control device such as a CPU and a storage device such as a RAM or a ROM. The control unit 63 is connected to the rotation valve 64, the extension valve 65, the hoisting valve 66, the winding valve 67, the camera 68, the direction sensor 69, and the communication unit 70, and controls each unit.

[0033] The swing valve 64 is an electromagnetic proportional control valve that operates the swing hydraulic motor. The extension valve 65 is an electromagnetic proportional control valve that operates the extension hydraulic cylinder. The elevation valve 66 is an electromagnetic proportional control valve that operates the elevation hydraulic cylinder. The winding valve 67 is an electromagnetic proportional control valve that operates the winding hydraulic motor.

[0034] A plurality of cameras 68 are provided on the tip of the boom 621 or on the vehicle 62, and photograph the hook 624, the load W, features around the load W, the surroundings of the crane 6, etc. Image data photographed by the camera 68 is transmitted to the route generation device 3 and used to generate a planned travel route.

[0035] The orientation sensor 69 is provided at the tip of the boom 621 and detects position information such as the orientation and position centered on the tip of the boom 621. For example, a GNSS receiver constituting a Global Navigation Satellite System can be used as the orientation sensor 69. The position information detected by the orientation sensor 69 is transmitted to the route generation device 3 and used for generating a planned movement route.

[0036] The communication unit 70 is composed of an antenna and a transceiver, and is wirelessly connected to the construction management device 2 and the path generating device 3. The control unit 63 can control the automatic operation of the crane apparatus 62 by acquiring the planned movement path generated by the path generating device 3 through the communication unit 70.

[0037] The remote operation system 1 may not include the crane 6. In other words, the remote operation system 1 communicates with the crane 6. The construction management device 2 and the path generating device 3 may be configured as one computer such as a PC. The remote operation system 1 of this embodiment uses two path confirmation terminal devices, the first path confirmation terminal device 4 and the second path confirmation terminal device 5, but multiple path confirmation terminal devices may be used, and for example, three path confirmation terminal devices may be used.

[0038] [Remote control system operation] Next, the operation of each device in the remote operation system 1 for approving the planned movement path of the suspended load W will be described.

[0039] 3 is a flowchart showing the operation related to approval of a planned movement path in the remote operation system 1. First, when a load W is hung from the crane 6 and an operator X1 operates the operation unit 23 of the construction management device 2 to input a destination position to which the load W is to be moved, in step S10, the control unit 21 acquires the input destination position. The destination position can be input, for example, on an image of the surroundings of the crane 6 displayed on the display unit 23. The control unit 21 considers that a request for generating a planned movement path for the load W has been made when the destination position is input, and transmits the request for generating the planned movement path and the destination position to the path generation device 3 via the communication unit 24.

[0040] The control unit 31 of the path generating device 3 that has received the request to generate a planned movement path generates a planned movement path of the suspended load W in the path generating unit 311 in step S11. The control unit 31 transmits the generated planned movement path and an image of the surroundings of the crane 6 to the first path confirmation terminal device 4 and the second path confirmation terminal device 5 via the communication unit 32. In addition, the control unit 31 transmits a notification to the construction management device 2 via the communication unit 32 to the first path confirmation terminal device 4 and the second path confirmation terminal device 5 that transmission of the planned movement path has been completed.

[0041] In step S12, the control unit 41 of the first route confirmation terminal device 4 that has received the planned route of movement and the image of the surroundings of the crane 6 causes the display unit 42 to display an image 82 of the surroundings of the crane 6 with the planned route of movement 81 superimposed thereon, and icons of various operation keys, as shown in Fig. 4. The operation keys are operation unit 43 that can be selected and operated by operating the touch panel on the icons, and consist of an approval key 83, a rejection key 84, a temporary wait key 85, and a maintenance key 86.

[0042] The approval key 83 is indicated by an "OK" icon, and is a key for approving the displayed planned movement route 81. The rejection key 84 is indicated by an "NG" icon, and is a key for rejecting the displayed planned movement route 81. The temporary waiting key 85 is indicated by a "Wait" icon, and is a key for postponing the choice of whether to approve or reject the planned movement route 81. The maintenance key 86 is indicated by a spanner-shaped icon, and is a key that is operated when the actual situation of obstacles around the crane 6 or the actual installation position of the crane 6 differs from the displayed image 82. It is sufficient that the operation keys include at least the approval key 83 and the rejection key 84.

[0043] The operator X2 checks the planned travel route 81 displayed on the display unit 42, and if there is no problem with the safety of the surroundings, selects and operates the approval key 83, and if there is a problem, selects and operates either the rejection key 84, the temporary waiting key 85, or the maintenance key 86 depending on the situation.

[0044] Similarly, the control unit 51 of the second route confirmation terminal device 5, which has received the image of the planned route of movement and the surroundings of the crane 6, causes the display unit 52 to display the image of Fig. 4 in step S13. Then, the operator X3 checks the planned route of movement 81 displayed on the display unit 52, and selects and operates any one of the operation keys.

[0045] The operation results of the operation keys of the first route confirmation terminal device 4 and the second route confirmation terminal device 5 are transmitted to the construction management device 2 through the respective communication units 44, 54. The control unit 21 of the construction management device 2 that receives the operation results executes a process based on the operation results in step S14. This process includes first to fourth processes, which will be described later, depending on the operation results.

[0046] On the other hand, the control unit 21 of the construction management device 2 starts timing from the point in time when it receives a notification from the route generation device 3 that the transmission of the planned travel route has been completed to the first route confirmation terminal device 4 and the second route confirmation terminal device 5, and if it does not receive the operation result of the operation keys from the first route confirmation terminal device 4 and the second route confirmation terminal device 5 within a first predetermined time (e.g., 2 minutes), it executes a process to reject the start of travel along the planned travel route 81.

[0047] The process of rejecting the start of movement is, for example, a process of displaying a message such as "Planned movement route 81 has been rejected because the operation result could not be received" on the display unit 22, and not transmitting an instruction to start movement along the planned movement route 81 to the crane 6. After the start of movement is rejected, in order to generate a new planned movement route, the process returns to the initial operation in FIG. 3, and the control unit 21 again transmits a request to generate a planned movement route.

[0048] The first process is a process in which the control unit 21 permits the start of movement along the planned movement route 81 when approval of the planned movement route is selected in all route confirmation terminal devices, that is, when the approval key 83 is selected and operated in both the first route confirmation terminal device 4 and the second route confirmation terminal device 5.

[0049] The process of permitting the start of movement can be, for example, a process of displaying a message such as "Starting movement" on the display unit 22, a selectable approval key such as "OK" for approving it, and a selectable denial key such as "NG" for denial, and prompting the operator X1 to make a selection. When the operator X1 selects the approval key, the control unit 21 transmits an instruction to the crane 6 to start movement along the planned movement path 81. As a result, the crane 6 obtains the planned movement path 81 from the path generation device 3, and starts automatic transportation of the suspended load W.

[0050] Furthermore, the process of permitting the start of movement may be, for example, a process in which the control unit 21 transmits an instruction to the crane 6 to start movement along the planned movement route 81. According to this, when the approval key 83 is selected and operated in both the first route confirmation terminal device 4 and the second route confirmation terminal device 5, the crane 6 automatically starts automatic transport of the load W without an approval operation by the operator X1. Therefore, the time required for the process of permitting the start of movement can be shortened.

[0051] According to this first process, multiple operators check the safety of the surrounding area, and automatic transportation of the load W begins when approval of the planned travel route is selected in all route confirmation terminal devices, thereby improving safety when transporting the load W.

[0052] The second process is a process in which the control unit 21 rejects the start of movement along the planned movement route 81 when at least one of the route confirmation terminal devices selects to reject the planned movement route, that is, when the reject key 84 is selected and operated in one or both of the first route confirmation terminal device 4 and the second route confirmation terminal device 5. The process of rejecting the start of movement here is, for example, a process of displaying a message such as "The planned movement route 81 has been rejected by the route confirmation terminal device" on the display unit 22 and not transmitting an instruction to start movement along the planned movement route 81 to the crane 6. After the start of movement is rejected, the process returns to the initial operation of FIG. 3 in order to generate a new planned movement route, and the control unit 21 again transmits a request to generate a planned movement route.

[0053] According to this second process, multiple operators check the safety of the surrounding area, and if at least one route confirmation terminal device selects to reject the planned travel route, the start of automatic transportation of the load W is rejected, thereby improving safety when transporting the load W.

[0054] The third process is a process in which, when the temporary wait key 85 is selected and operated in at least one route confirmation terminal device, the control unit 21 changes the time until it executes the process of rejecting the start of movement along the planned movement route 81 from a first predetermined time to a second predetermined time (e.g., 5 minutes). The second predetermined time is longer than the first predetermined time. The first predetermined time and the second predetermined time can be set to desired times in the construction management device 2.

[0055] According to such a third process, the remote operation system can be operated smoothly while postponing the selection of whether or not to approve the planned travel route in the first route confirmation terminal device 4 and the second route confirmation terminal device 5.

[0056] The fourth process is a process in which the control unit 21 rejects the start of movement along the planned movement route 81 when the maintenance key 86 is selected and operated in at least one route confirmation terminal device. The process of rejecting the start of movement here is, for example, a process of displaying a message such as "The planned movement route 81 has been rejected because the site confirmation is required" on the display unit 22, and not sending an instruction to start movement along the planned movement route 81 to the crane 6. After the start of movement is rejected, the system transitions to a standby state waiting for some input operation. After that, when the site confirmation is completed, the operator X1 again inputs the destination position of the load W on the operation unit 23 of the construction management device 2. This returns to the initial operation of FIG. 3, and the control unit 21 again sends a request to generate a planned movement route.

[0057] According to this fourth process, if the actual situation of obstacles around the crane 6 or the actual installation position of the crane 6 differs from the displayed image 82, the operators X2 and X3 can reject the start of movement along the planned movement route 81 and instruct the operator to check the site.

[0058] The priority order for which of the second process to the fourth process is to be executed may be the second process, the fourth process, and the third process, in descending order of priority.

[0059] Furthermore, during automatic transport by the crane 6, by operating a stop key (not shown) on the first route confirmation terminal device 4 or the second route confirmation terminal device 5, an immediate stop instruction for transport is sent from the first route confirmation terminal device 4 or the second route confirmation terminal device 5 to the crane 6 via the construction management device 2, and the automatic transport is immediately stopped. The immediate stop instruction may be sent directly from the first route confirmation terminal device 4 or the second route confirmation terminal device 5 to the crane 6 without going through the construction management device 2. In this case, after the automatic transport is stopped, information that it has been stopped due to the immediate stop instruction is sent from the crane 6 to the construction management device 2.

[0060] In the above remote operation system 1, the information transmitted from each device to the other devices includes the identifier of the transmitting device. Therefore, the device that receives the information can determine from which device it was received. As a result, for example, when the construction management device 2 receives a denial of the planned travel route, it can determine from which route confirmation terminal device it was received, and can display on the display unit 22 the name of the route confirmation terminal device together with a message that the planned travel route 81 has been rejected. [Explanation of symbols]

[0061] 1 Remote Control System 2 Construction management device 3. Route Generation Device 4. First route confirmation terminal device (route confirmation terminal device) 5. Second route confirmation terminal device (route confirmation terminal device) 6. Crane 81 Planned travel route 83 Authorization Key 84 Rejection Key 85 Temporary Wait Key W Hanging load

Claims

1. A remote operation system for remotely operating a crane, comprising: A path generating device that generates a planned movement path of the load of the crane; a plurality of route confirmation terminal devices for prompting the user to select whether or not to approve the planned travel route; a construction management device that permits the start of movement along the planned movement route when approval of the planned movement route is selected in all of the route confirmation terminal devices.

2. The remote operation system according to claim 1 , wherein the construction management device transmits an instruction to the crane to start moving along the planned movement route when the start of movement along the planned movement route is permitted.

3. 3. The remote operation system according to claim 1, wherein said route confirmation terminal device has an approval key for approving said planned travel route and a rejection key for rejecting said planned travel route.

4. 4. The remote control system according to claim 1, wherein if no selection operation is performed in one or more of the route confirmation terminal devices to approve or not approve the planned travel route within a first predetermined time, the construction management device rejects the start of travel along the planned travel route.

5. the route confirmation terminal device has a temporary waiting key for postponing a selection of whether or not to approve the planned travel route, 5. The remote control system of claim 4, wherein when the temporary wait key is operated within the first predetermined time in one or more of the route confirmation terminal devices, the construction management device rejects the start of movement along the planned movement route if no selection operation is performed to approve or not approve the planned movement route within a second predetermined time that is longer than the first predetermined time.

Citation Information

Patent Citations

  • Crane work support system

    JP2016175766A

  • Automatic operation system for tower crane