Power generation system and power generation control device
The described power generation system addresses the slow response of hydroelectric generators by using a controlled water flow and alkaline storage batteries to rapidly increase power output, ensuring stable grid support during failures.
Patent Information
- Application Number
- JP2023202694
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2023-11-30
- Publication Date
- 2024-10-08
- Estimated Expiration
- 2043-11-30
AI Technical Summary
Conventional power generation systems using hydroelectric generators struggle to respond quickly and sustainably to power failures, as they cannot instantly increase generated power, limiting their effectiveness as a primary regulating force.
A power generation system comprising a series arrangement of hydroelectric power stations with water storage tanks, controlled by a power generation control device, which manages water flow to hydroelectric generators to rapidly increase power output during grid failures, utilizing both hydroelectric generators and alkaline storage batteries for immediate and sustained power support.
The system enables hydroelectric generators to function as a primary regulating force with a response time of 10 seconds or less and a duration of 5 minutes or more, providing stable power to the grid by combining immediate discharge from batteries with controlled water flow adjustments to hydroelectric generators.
Smart Images

Figure 0007563684000001_ABST
Abstract
Description
[Technical field]
[0001] The present invention relates to a power generation system and a power generation control device. [Background technology]
[0002] Patent Document 1 proposes a power generation system comprising a renewable energy generator, a storage battery, a renewable energy power generation prediction unit that predicts a renewable energy power generation possible value, an energy trading information receiving unit that receives energy trading information, a battery control calculation unit that calculates command values for power trading power generation, renewable energy power generation, and battery charging / discharging from the renewable energy power generation forecast amount predicted by the renewable energy power generation prediction unit and the energy trading information, and a power converter that distributes power in accordance with the power trading power generation and renewable energy power generation. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2019-140862 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, when a hydroelectric generator is used as a renewable energy generator in the conventional power generation system described above, the system is unable to instantaneously increase the amount of power generated, and therefore has the problem that it cannot function as a primary control force with a response time of 10 seconds or less and a duration of 5 minutes or more to respond to intra-hour fluctuations (very short-term cycle components) and power source failures.
[0005] The present invention has been made to solve the above-mentioned problems, and aims to provide a power generation system and a power generation control device that can cause a hydroelectric generator to function as a primary control reserve. [Means for solving the problem]
[0006] The power generation system according to the present invention includes a hydroelectric generator and a water tank for storing water to be supplied to the hydroelectric generator, and includes a plurality of hydroelectric power plants capable of supplying electric power from the hydroelectric generator to a power grid, an electric power storage device capable of being charged from the power grid and discharging the stored electric power to the power grid, and a power generation control device for controlling the hydroelectric generator and the electric power storage device, The plurality of hydroelectric power plants are provided in series to form one water flow path, and water is supplied to the water tank from the upstream side of the flow path, and the water supplied from the water tank to the hydroelectric generator is discharged from the hydroelectric generator to the downstream side of the flow path. The power generation control device controls to maintain the water level of the water tank, and when power in the power grid is insufficient, executes discharge control to control the power storage device to discharge power to the power grid, and initiates power increase control to control a hydroelectric generator of at least one of the hydroelectric power plants among the multiple hydroelectric power plants to increase power generation during a period in which power is being discharged from the power storage device to the power grid, and executes the power increase control by increasing the flow rate of water supplied from the water tank to the hydroelectric generator with priority over maintaining the water level of the water tank. In a state where the discharge control is being performed due to a power shortage in the power grid, the power increase control is started for the hydroelectric generator of the most downstream hydroelectric power plant among the plurality of hydroelectric power plants when the charging rate of the power storage device becomes equal to or lower than a threshold value, and the power increase control is started for the hydroelectric generator of the hydroelectric power plants other than the most downstream hydroelectric power plant among the plurality of hydroelectric power plants when the water level of the water tank of the hydroelectric power plant downstream of the flow path becomes equal to or lower than a predetermined value. It has a configuration. Effect of the Invention
[0007] The present invention can provide a power generation system and a power generation control device that can cause a hydroelectric generator to function as a primary control reserve. [Brief description of the drawings]
[0008] [Figure 1] FIG. 1 is a schematic configuration diagram of a power generation system according to a first embodiment of the present invention. [Diagram 2] FIG. 2 is a schematic configuration diagram of a hydroelectric power plant according to a first embodiment of the present invention. [Diagram 3] FIG. 3 is a graph showing the relationship between the opening degree of the guide vanes of the hydroelectric generator according to the first embodiment of the present invention and the output power of the hydroelectric generator. [Figure 4] FIG. 4 is a schematic configuration diagram for explaining the power generation control device according to the first embodiment of the present invention. [Diagram 5] FIG. 5 is a conceptual diagram for explaining a target value of the water level of the water tank according to the first embodiment of the present invention. [Figure 6]FIG. 6 is a state transition diagram for explaining the control modes of the power generation control device for the alkaline storage battery according to the first embodiment of the present invention. [Figure 7] FIG. 7 is a state transition diagram for explaining the control modes of the power generation control device for the hydroelectric generator according to the first embodiment of the present invention. [Figure 8] FIG. 8 is a time chart for explaining the adjustment power output by the power generation system according to the first embodiment of the present invention. [Figure 9] FIG. 9 is a state transition diagram for explaining the control modes of the power generation control device for the hydroelectric generator according to the second embodiment of the present invention. [Figure 10] FIG. 10 is a time chart for explaining the adjustment power output by the power generation system according to the second embodiment of the present invention. [Figure 11] FIG. 11 is a time chart for explaining the adjustment power output by the modified example of the power generation system according to the second embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] Hereinafter, an embodiment of the present invention will be described with reference to the drawings.
[0010] [First embodiment] As shown in Fig. 1, the power generation system 1 includes a plurality of hydroelectric power plants 2a to 2c, an alkaline storage battery 3, and a power generation control device 4. Although three hydroelectric power plants 2a to 2c are shown in Fig. 1, this does not limit the number of hydroelectric power plants included in the power generation system according to the present invention.
[0011] Each of the hydroelectric power plants 2a to 2c is provided so as to be capable of supplying the generated electric power to the power grid 5. The alkaline storage battery 3 constitutes an electric power storage device and is, for example, a nickel-metal hydride battery. The alkaline storage battery 3 is provided so as to be capable of being charged from the power grid 5 and capable of discharging the charged electric power to the power grid 5.
[0012] Each of the hydroelectric power plants 2a to 2c is composed of a run-of-river type power plant without a storage dam. The hydroelectric power plants 2a to 2c are arranged in series to form a single water flow path 6. In FIG. 1, water that flows in from a river 7 via an intake weir 8 returns to the river 7 via the hydroelectric power plants 2a, 2b, and 2c in that order.
[0013] As shown in Fig. 2, each of the hydroelectric power plants 2a to 2c (hereinafter also collectively referred to as "hydroelectric power plant 2") has a water tank 10 and a hydroelectric generator 11. Water is supplied to the water tank 10 from the upstream side of the flow path 6. The water tank 10 stores water to be supplied to the hydroelectric generator 11.
[0014] The water tank 10 is composed of a settling tank that removes impurities such as mud from the water supplied from the flow path 6, an upper water tank that stabilizes the water pressure of the water supplied from the flow path 6, a water conduit that operates at the same water surface as the upper water tank, or a tank or pond that stores other water. The water tank 10 is provided with a water level gauge 21 that detects the water level of the water stored in the water tank 10.
[0015] The hydroelectric generator 11 has a water turbine 22 and a generator 23. The water turbine 22 generates a rotational force according to the flow rate of water supplied from the water tank 10. The generator 23 converts the rotational force generated by the water turbine 22 into electric power. The water supplied from the water tank 10 to the hydroelectric generator 11 is discharged from the hydroelectric generator 11 to the downstream side of the flow path 6.
[0016] In this embodiment, the water turbine 22 is configured by a Francis water turbine. The water turbine 22 has a guide vane 31 and an actuator 32. The actuator 32 adjusts the opening degree of the guide vane 31 between a closed state and an open state.
[0017] When the guide vanes 31 are open, the flow rate of water supplied from the water tank 10 to the water turbine 22 is maximized. Therefore, the rotational force generated by the water turbine 22 is maximized, and the generated power of the generator 23 becomes the rated power.
[0018] When the guide vanes 31 are closed, the flow rate of water supplied from the water tank 10 to the water turbine 22 is about 3% compared to when the guide vanes 31 are open. As a result, the power generated by the generator 23 is reduced to the minimum power that can be generated.
[0019] 3 shows the relationship between the opening degree of the guide vane 31 and the output power of the hydroelectric generator 11. The opening degree A corresponds to the opening degree in the open state. When the opening degree of the guide vane 31 is the opening degree A, the hydroelectric generator 11 outputs the rated power.
[0020] The opening degree B corresponds to the opening degree during normal power generation when the hydroelectric generator 11 generates power according to the flow rate of water supplied to the water tank 10. During normal power generation, the guide vanes 31 are controlled by the power generation control device 4 so that the water level in the water tank 10 remains constant (corresponding to "target value 1" shown in FIG. 5).
[0021] Therefore, when the opening degree of the guide vane 31 is the opening degree B, water is supplied to the hydroelectric generator 11 at the same flow rate as the water supplied to the water tank 10. Therefore, when the opening degree of the guide vane 31 is the opening degree B, the hydroelectric generator 11 outputs normal generated power according to the flow rate of the water supplied to the water tank 10.
[0022] The flow rate of water supplied to the water tank 10 depends on the flow rate of the river 7 and is affected by the season and rainfall. Therefore, the opening degree B is not a constant value but varies depending on the flow rate of water supplied to the water tank 10.
[0023] The opening degree C corresponds to the opening degree at the time of supplying adjustment power when the power generation system 1 supplies adjustment power to the power grid 5. When the opening degree of the guide vane 31 is the opening degree C, in addition to the water supplied to the water tank 10, the water stored in the water tank 10 is supplied to the hydroelectric generator 11.
[0024] Therefore, when the opening degree of the guide vane 31 is opening degree C, a flow rate of water that is greater than the flow rate of water supplied to the water tank 10 is supplied to the hydroelectric generator 11. For this reason, when the opening degree of the guide vane 31 is opening degree C, the hydroelectric generator 11 outputs an adjustment power supplying power that is the sum of the normal generated power according to the flow rate of water supplied to the water tank 10 and the adjustment power Pm according to the amount of water stored in the water tank 10 that has decreased.
[0025] The power generation system 1 supplies regulating power to the power grid 5 by the discharged power of the alkaline storage batteries 3 and the regulating power Pm of the hydroelectric generators 11 in each of the hydroelectric power plants 2a to 2c. When the sum of the normal power generation power and the regulating power Pm becomes the rated power, the opening degree C becomes equal to the opening degree A.
[0026] The opening degree D corresponds to the opening degree at the time of restoring the water level to the water tank 10. The opening degree D is set to be larger than the opening degree E corresponding to the opening degree in the closed state, and smaller than the opening degree B. When the opening degree of the guide vane 31 is the opening degree D, water is supplied to the hydroelectric generator 11 at a flow rate smaller than that of the water supplied to the water tank 10.
[0027] Therefore, if the flow rate of water supplied to the water tank 10 is the same during normal power generation and during water level recovery, when the opening degree of the guide vane 31 is opening degree D, during water level recovery, the hydroelectric generator 11 outputs a water level recovery power that is lower than the normal power generation power.
[0028] In FIG. 1, the power generation control device 4 is composed of a computer device having a CPU (Central Processing Unit), a RAM (Random Access Memory), a ROM (Read Only Memory), a flash memory for storing backup data, etc., an input port, and an output port.
[0029] The ROM of this computer unit stores various constants and other data as well as a program for causing the computer unit to function as the power generation control device 4. That is, the CPU executes the program stored in the ROM using the RAM as a working area, causing the computer unit to function as the power generation control device 4 in this embodiment.
[0030] As shown in FIG. 4, various sensors are connected to the input port of the power generation control device 4 directly or via a communication line, including water level gauges 21 (hereinafter also referred to as "water level gauge 21a," "water level gauge 21b," and "water level gauge 21c") provided in the water tanks 10 of each hydroelectric power plant 2a to 2c, a SOC sensor 41 that detects the state of charge (hereinafter also referred to as "SOC") of the alkaline storage battery 3, and a frequency sensor 42 that detects the power supply frequency of the power grid 5.
[0031] The output port of the power generation control device 4 is connected directly or via a communication line to various control objects including actuators 32 (hereinafter also referred to as "actuator 32a", "actuator 32b" and "actuator 32c") provided on the turbines 22 of each of the hydroelectric power plants 2a to 2c and an inverter 43 provided on the power grid 5 side of the alkaline storage battery 3. The power generation control device 4 controls the various control objects connected to the output port based on information obtained from various sensors connected to the input port.
[0032] As shown in Fig. 5, target values 1 to 3 are set in the power generation control device 4 for the water level in the water tank 10 of each of the hydroelectric power plants 2a to 2c. Target value 1 represents the target water level during normal power generation. During normal power generation, the power generation control device 4 uses the water levels detected by each of the water level gauges 21a to 21c as feedback values and controls the opening degree of the guide vanes 31 so that the water level in the water tank 10 of each of the hydroelectric power plants 2a to 2c is maintained at target value 1.
[0033] Target value 2 represents the lower limit water level during normal power generation. Therefore, target value 2 is equal to or less than target value 1, and is the target water level when the water level is restored. Target value 3 represents the lower limit water level when adjustment power is supplied, which causes the hydroelectric generator 11 to output power generated during adjustment. Therefore, target value 3 is less than target value 2 and equal to or greater than the lower limit for preventing air from being mixed into the water supplied to the hydroelectric generator 11, and is the target water level when adjustment power is supplied.
[0034] The operation of the power generation control device 4 in the power generation system 1 configured as above will be described with reference to FIGS.
[0035] 6, the power generation control device 4 controls the alkaline storage battery 3 in three battery control modes: a normal battery mode, an adjustable power output mode, and an SOC recovery mode. In normal times, the power generation control device 4 controls the alkaline storage battery 3 in the normal battery mode.
[0036] <Normal battery mode> In the normal battery mode, the alkaline storage battery 3 is charged to a predetermined charging rate that does not overcharge the alkaline storage battery 3. In the normal battery mode, the power generation control device 4 controls the inverter 43 to prohibit discharging from the alkaline storage battery 3 to the power grid 5 and charging from the power grid 5 to the alkaline storage battery 3.
[0037] In the normal battery mode, when the power of the power grid 5 is insufficient, the power generation control device 4 transitions the battery control mode to the regulated power output mode. When the frequency detected by the frequency sensor 42 falls outside the allowable range, the power generation control device 4 determines that the power of the power grid 5 is insufficient.
[0038] <Adjustable power output mode> In the adjustable power output mode, the power generation control device 4 controls the inverter 43 so that power equivalent to the adjustable power of the power generation system 1 is discharged from the alkaline storage battery 3 to the power grid 5. In this way, in the adjustable power output mode, the power generation control device 4 executes discharge control to control the alkaline storage battery 3 so as to discharge power to the power grid 5.
[0039] In the regulating power output mode, when the sum of the regulating powers Pm of the hydraulic generators 11 of the respective hydroelectric power plants 2a to 2c becomes equal to or greater than the regulating power of the power generation system 1, the power generation control device 4 shifts the battery control mode to the SOC recovery mode.
[0040] <SOC recovery mode> In the SOC recovery mode, the power generation control device 4 controls the inverter 43 so that the alkaline storage battery 3 is charged from the power grid 5. In the SOC recovery mode, when the SOC detected by the SOC sensor 41 becomes equal to or higher than a predetermined charging rate, the power generation control device 4 shifts the battery control mode to the normal battery mode. The predetermined charging rate is set to such an extent that the power corresponding to the regulating power of the power generation system 1 can be discharged from the alkaline storage battery 3 to the power grid 5 for a certain period of time (for example, 5 minutes) or longer.
[0041] Note that since the SOC of the alkaline storage battery 3 may decrease due to self-discharge, in the normal battery mode, when the SOC detected by the SOC sensor 41 decreases beyond the allowable range from the predetermined charging rate, the power generation control device 4 shifts the battery control mode to the SOC recovery mode.
[0042] As shown in FIG. 7, the power generation control device 4 individually controls the hydraulic generators 11 of the respective hydroelectric power plants 2a to 2c in three hydraulic control modes: the normal hydraulic mode, the regulating hydraulic mode, and the water level recovery mode. In normal times, the power generation control device 4 controls the hydraulic generator 11 in the normal hydraulic mode.
[0043] <Normal hydraulic mode> In the normal hydraulic mode, the power generation control device 4 controls the actuator 32 so that the opening degree of the guide vane 31 provided in the hydraulic generator 11 becomes the opening degree B (see FIG. 3) during normal power generation. That is, in the normal hydraulic mode, the power generation control device 4 controls the actuator 32 so that the water level of the water storage tank 10 maintains the target value 1 (see FIG. 5). Therefore, in the normal hydraulic mode, the normal power generation power is supplied from the hydraulic generator 11 to the power grid 5.
[0044] In the normal hydropower mode, when the battery control mode is the regulated power output mode and the SOC detected by the SOC sensor 41 becomes equal to or lower than the threshold value THc, the power generation control device 4 transitions the hydropower control mode to the regulated hydropower mode. The threshold value THc is set to the charge rate at which the discharge power of the alkaline storage battery 3 starts to decrease.
[0045] In this way, the power generation control device 4 in this embodiment transitions the hydraulic control mode for the hydraulic generators 11 of the hydroelectric power plants 2a to 2c from the normal hydraulic mode to the regulated hydraulic mode based on the same transition condition. That is, in this embodiment, the hydraulic control modes for the hydraulic generators 11 of the hydroelectric power plants 2a to 2c transition from the normal hydraulic mode to the regulated hydraulic mode simultaneously.
[0046] <Adjusted hydraulic power mode> In the regulated hydraulic power mode, the power generation control device 4 controls the actuator 32 so that the opening degree of the guide vane 31 provided in the hydroelectric generator 11 becomes the opening degree C (see FIG. 3) when regulated power is being supplied. That is, in the regulated hydraulic power mode, the power generation control device 4 controls the actuator 32 so that the water level of the water tank 10 becomes the target value 3 (see FIG. 5).
[0047] Therefore, in the regulated hydropower mode, when the opening degree of the guide vanes 31 provided in the hydroelectric generator 11 reaches opening degree C (see FIG. 3), regulated power supply power, which is the sum of the normal generated power and the regulated power Pm, is supplied from the hydroelectric generator 11 to the power grid 5. In this way, in the regulated hydropower mode, the power generation control device 4 executes power increase control to control the hydroelectric generator 11 to increase the generated power from the normal generated power.
[0048] In the regulated hydraulic power mode, when the water level detected by the water level gauge 21 falls to or below the target value 3 (see FIG. 5), the power generation control device 4 transitions the hydraulic power control mode to the water level recovery mode.
[0049] <Water level recovery mode> In the water level recovery mode, the power generation control device 4 controls the actuator 32 so that the opening degree of the guide vane 31 provided in the hydroelectric generator 11 becomes the opening degree D (see FIG. 3) during water level recovery. That is, in the water level recovery mode, the power generation control device 4 controls the actuator 32 so that the water level of the water tank 10 becomes the target value 2 (see FIG. 5).
[0050] Therefore, in the water level recovery mode, when the opening degree of the guide vanes 31 provided in the hydroelectric generator 11 reaches opening degree D (see FIG. 3), water level recovery power is supplied from the hydroelectric generator 11 to the power grid 5. In the water level recovery mode, if the water level detected by the water level gauge 21 reaches or exceeds target value 2 (see FIG. 5), the power generation control device 4 transitions the hydropower control mode to the normal hydropower mode.
[0051] The adjustment power output by the power generation system 1 described above will be described with reference to Fig. 8. Fig. 8 shows the trends in the discharge power Pc of the alkaline storage battery 3 and the adjustment power Pm of the hydroelectric generator 11 of each of the hydroelectric power plants 2a to 2c (hereinafter also referred to as "adjustment power Pm1", "adjustment power Pm2", and "adjustment power Pm3").
[0052] At time 0, when the power generation control device 4 determines that the power of the power grid 5 is insufficient, the battery control mode transitions from the normal battery mode to the adjustment power output mode, whereby the power generation control device 4 executes discharge control.
[0053] Therefore, at time 0, discharge from the alkaline storage battery 3 to the power grid 5 begins, and at time t1 (0.1 seconds later in the figure), the adjustment power of the power generation system 1 is supplied from the alkaline storage battery 3 to the power grid 5.
[0054] At time t2, when the SOC detected by the SOC sensor 41 becomes equal to or lower than the threshold value THc, the hydraulic control mode for the hydroelectric generators 11 of each of the hydroelectric power plants 2a to 2c transitions from the normal hydraulic mode to the regulated hydraulic mode.
[0055] Therefore, the power generation control device 4 executes power increase control for the hydroelectric generators 11 of each of the hydroelectric power plants 2a-2c. Accordingly, at time t2, each of the actuators 32a-32c is controlled so that the opening degree of the guide vane 31 of each of the hydroelectric generators 11 of the hydroelectric power plants 2a-2c changes from opening degree B to opening degree C (see FIG. 3), and the regulated powers Pm1-Pm3 supplied to the power grid 5 from the hydroelectric generators 11 of each of the hydroelectric power plants 2a-2c increase.
[0056] At time t3 (60 seconds later in the figure), when the opening degree of the guide vanes 31 of the hydroelectric generators 11 of each hydroelectric power plant 2a to 2c reaches opening degree C (see Figure 3), the sum of the regulating powers Pm1 to Pm3 supplied to the power grid 5 from the hydroelectric generators 11 of each hydroelectric power plant 2a to 2c becomes the regulating power of the power generation system 1, and the battery control mode transitions from the regulating power output mode to the SOC recovery mode, so that the discharge power Pc of the alkaline storage battery 3 becomes 0.
[0057] At time t4 (6 minutes later in the figure), when the water level detected by the water level gauge 21a installed in the water tank 10 of the hydroelectric power plant 2a, the most upstream of the flow path 6, reaches target value 3 (see Figure 5), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a transitions from the adjustment hydraulic mode to the water level recovery mode.
[0058] Therefore, the actuator 32a is controlled so that the opening of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2a changes from opening C to opening D (see Figure 3), and the regulated power Pm1 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2a to the power grid 5 is reduced.
[0059] At time t5 (8 minutes later in the figure), when the water level detected by the water level gauge 21b installed in the water tank 10 of the hydroelectric power plant 2b downstream of the flow path 6 from the hydroelectric power plant 2a reaches the target value 3 (see Figure 5), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b transitions from the adjustment hydraulic mode to the water level recovery mode.
[0060] Therefore, the actuator 32b is controlled so that the opening of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2b changes from opening C to opening D (see Figure 3), and the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 is reduced.
[0061] At time t6 (10 minutes later in the figure), when the water level detected by the water level gauge 21c installed in the water tank 10 of the hydroelectric power plant 2c downstream of the flow path 6 from the hydroelectric power plant 2b reaches the target value 3 (see Figure 5), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c transitions from the adjustment hydraulic mode to the water level recovery mode.
[0062] Therefore, the actuator 32c is controlled so that the opening of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2c changes from opening C to opening D (see Figure 3), and the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 is reduced.
[0063] During the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2a is released to the downstream side of the flow path 6, thereby increasing the flow rate of water supplied to the water tank 10 of the hydroelectric power plant 2b.
[0064] Therefore, after the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a transitions from the regulated hydraulic mode to the water level recovery mode, the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b transitions from the regulated hydraulic mode to the water level recovery mode.
[0065] In addition, during the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2a is released to the downstream side of the flow path 6, thereby increasing the flow rate of water supplied to the water tank 10 of the hydroelectric power plant 2c.
[0066] Furthermore, during the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2b is released to the downstream side of the flow path 6, thereby increasing the flow rate of water supplied to the water tank 10 of the hydroelectric power plant 2c.
[0067] Therefore, after the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b transitions from the regulated hydraulic mode to the water level recovery mode, the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c transitions from the regulated hydraulic mode to the water level recovery mode.
[0068] In this manner, during the period from time t1 to time t2, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the discharged power Pc of the alkaline storage battery 3. Furthermore, during the period from time t2 to time t3, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the sum of the discharged power Pc of the alkaline storage battery 3 and the adjustment powers Pm1 to Pm3 of the hydroelectric generators 11 of each of the hydroelectric power plants 2a to 2c. Furthermore, during the period from time t3 to time t4, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the sum of the adjustment powers Pm1 to Pm3 of the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c.
[0069] <Action and effect> As described above, the power generation system 1 of this embodiment can supply primary control power to the power grid 5 with a response time of 10 seconds or less and a duration of 5 minutes or more, thereby allowing the hydroelectric generator 11 to function as primary control power.
[0070] Furthermore, the power generation system 1 according to this embodiment forms a power storage device using the alkaline storage battery 3 with good start-up characteristics, and when the power of the power grid 5 becomes insufficient, discharge control is started to discharge the power charged in the alkaline storage battery 3 to the power grid 5, thereby improving responsiveness when the power grid 5 becomes insufficient.
[0071] In the power generation system 1 of this embodiment, the alkaline storage battery 3 can instantly discharge a large current, so that when there is a power shortage in the power grid 5, a power shortage such as a blackout can be instantly resolved.
[0072] Furthermore, the power generation system 1 according to this embodiment starts power increase control for the hydroelectric power plants 2a-2c during a period in which power is being discharged from the alkaline storage battery 3 to the power grid 5, so that power is supplied from the hydroelectric generators 11 of the hydroelectric power plants 2a-2c to the power grid 5 before the power stored in the alkaline storage battery 3 is consumed. Therefore, the power generation system 1 according to this embodiment can continuously supply stable power to the power grid 5, and can eliminate power shortages in the power grid 5.
[0073] Furthermore, the power generation system 1 according to this embodiment can supply a large amount of power to the power grid 5 since the power generation by the hydroelectric generators 11 of the hydroelectric power stations 2a to 2c is increased simultaneously by the power increase control.
[0074] Furthermore, in the power generation system 1 according to this embodiment, a water tank 10 is provided in each of the hydroelectric power plants 2a-2c, and the water stored in the water tank 10 is used to increase the power generation of the hydroelectric generator 11. Therefore, even if each of the hydroelectric power plants 2a-2c is a run-of-river power plant that does not have a water storage dam, it can supply power to the power grid 5 when there is a power shortage in the power grid 5.
[0075] <Modification> In this embodiment, the water turbine 22 is a Francis turbine. However, the water turbine 22 may be a turbine other than a Francis turbine as long as it can adjust the flow rate of water supplied from the water tank 10 to the water turbine 22. For example, the water turbine 22 may be a reaction turbine such as a Kaplan turbine, or an impulse turbine such as a Pelton turbine.
[0076] In addition, in this embodiment, an example has been described in which the adjustment power of the power generation system 1 is supplied to the power grid 5 by the sum of the discharge power Pc of the alkaline storage battery 3 and the adjustment powers Pm1 to Pm3 of the hydroelectric generators 11 in the hydroelectric power plants 2a to 2c.
[0077] In contrast, in the power generation system 1 of this embodiment, when the adjustment power of the power generation system 1 can be output by one of the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c (for example, the hydroelectric generator 11 of the hydroelectric power plant 2a), the adjustment power of the power generation system 1 may be supplied to the power grid 5 by the sum of the discharge power Pc of the alkaline storage battery 3 and the adjustment power Pm of this one hydroelectric generator 11.
[0078] In addition, in the power generation system 1 of this embodiment, when the adjustment power of the power generation system 1 can be output by two of the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c (for example, the hydroelectric generators 11 of the hydroelectric power plants 2a, 2b), the adjustment power of the power generation system 1 may be supplied to the power grid 5 by the sum of the discharge power Pc of the alkaline storage battery 3 and the adjustment power Pm of these two hydroelectric generators 11.
[0079] In addition, in this embodiment, as described with reference to Figure 6, an example has been described in which the power generation control device 4 transitions from the battery control mode to the SOC recovery mode when the sum of the adjustment powers Pm of the hydroelectric generators 11 of each hydroelectric power plant 2a to 2c becomes the adjustment power of the power generation system 1 in the adjustment power output mode.
[0080] In response to this, in the adjustment power output mode, when the sum of the adjustment powers Pm of the hydroelectric generators 11 of each hydroelectric power plant 2a to 2c becomes the adjustment power of the power generation system 1, the power generation control device 4 may control the inverter 43 to prohibit discharging from the alkaline storage battery 3 to the power grid 5, and after a certain period of time (e.g., 5 hours) has elapsed, transition the battery control mode to the SOC recovery mode.
[0081] Furthermore, in the adjustable power output mode, when the sum of the adjustable powers Pm of the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c becomes the adjustable power of the power generation system 1, the power generation control device 4 may control the inverter 43 to prohibit discharging from the alkaline storage batteries 3 to the power grid 5, and may transition the battery control mode to the SOC recovery mode when it is determined that the power of the power grid 5 has become excessive. In this case, the power generation control device 4 determines that the power of the power grid 5 has become excessive when the frequency detected by the frequency sensor 42 rises outside the allowable range.
[0082] In addition, when the power generation control device 4 determines that there is an excess of power in the power grid 5, it may reduce the power supplied from each of the hydroelectric power plants 2a to 2c to the power grid 5 by increasing the target value 1 (see Figure 5) for the water tank 10 of each of the hydroelectric power plants 2a to 2c.
[0083] In addition, in this embodiment, as described with reference to Figure 7, an example has been described in which, in the normal hydropower mode, when the battery control mode is the regulating power output mode and the SOC detected by the SOC sensor 41 becomes equal to or lower than the threshold value THc, the power generation control device 4 transitions the hydropower control mode for the hydroelectric generators 11 of each of the hydroelectric power plants 2a to 2c to the regulating hydropower mode.
[0084] In response to this, the power generation control device 4 may change the transition condition for transitioning the hydraulic control mode for the hydraulic generators 11 of the hydroelectric power plants 2a to 2c from the normal hydraulic mode to the regulating hydraulic mode during the period in which the battery control mode is the regulating power output mode.
[0085] For example, the power generation control device 4 may transition the hydraulic control mode for the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c from the normal hydraulic mode to the regulating hydraulic mode when a certain time (e.g., one minute) has elapsed since the battery control mode became the regulating power output mode.
[0086] Also, in this embodiment, an example has been described in which the hydroelectric power plants 2a to 2c are provided in series to form one water flow path 6. In contrast to this, the hydroelectric power plants 2a to 2c in this embodiment may be provided in parallel to form separate flow paths from each other.
[0087] For example, in FIG. 1, water flowing in from river 7 via intake weir 8 may return to river 7 via hydroelectric power plant 2a, water flowing in from river 7 via a first other intake weir may return to river 7 via hydroelectric power plant 2b, and water flowing in from river 7 via a second other intake weir may return to river 7 via hydroelectric power plant 2c.
[0088] In the present embodiment, the hydroelectric power plants 2a to 2c are configured as run-of-river power plants without a water storage dam, but the hydroelectric power plants 2a to 2c may be configured as dam-type power plants. When the hydroelectric power plants 2a to 2c are configured as dam-type power plants, the water tank 10 is configured as a dam lake.
[0089] [Second embodiment] Regarding the second embodiment of the present invention described below, differences from the first embodiment of the present invention will be described.
[0090] In comparison with the first embodiment of the present invention, this embodiment differs from the first embodiment of the present invention in that the transition conditions for transitioning the hydraulic control mode for the hydroelectric generators 11 of each of the hydroelectric power plants 2a, 2b, except for the hydroelectric power plant 2c, which is the most downstream hydroelectric power plant among the hydroelectric power plants 2a to 2c on the flow path 6, from the normal hydraulic mode to the regulated hydraulic mode are different from those for the state transition of the hydraulic control mode described with reference to Figure 7.
[0091] The transition conditions for transitioning the hydraulic control mode for the hydraulic generator 11 of the hydraulic power plant 2c from the normal hydraulic mode to the regulated hydraulic mode are as explained with reference to FIG. 7 for the first embodiment of the present invention.
[0092] As shown in Figure 9, in the power generation control device 4 of this embodiment, when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b is the normal hydraulic mode, if the water level detected by the water level gauge 21a provided in the water tank 10 of the hydroelectric power plant 2c downstream of the flow path 6 from the hydroelectric power plant 2b falls below the target value 3 (see Figure 5, corresponding to the "predetermined value" in this invention), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b is switched to the adjusted hydraulic mode.
[0093] Furthermore, in this embodiment, when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a is the normal hydraulic mode, if the water level detected by the water level gauge 21b provided in the water tank 10 of the hydroelectric power plant 2b downstream of the flow path 6 from the hydroelectric power plant 2a falls below the target value 3 (see Figure 5, corresponding to the "predetermined value" in this invention), the power generation control device 4 transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a to the adjusted hydraulic mode.
[0094] The regulating power output by the power generation system 1 described above will be described with reference to Fig. 10. Fig. 10 shows the transition of the discharge power Pc of the alkaline storage battery 3 and the regulating powers Pm1 to Pm3 of the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c.
[0095] At time 0, when the power generation control device 4 determines that the power of the power grid 5 is insufficient, the battery control mode transitions from the normal battery mode to the adjustment power output mode, whereby the power generation control device 4 executes discharge control.
[0096] Therefore, at time 0, discharging from the alkaline storage battery 3 to the power grid 5 begins, and at time t11 (0.1 seconds later in the figure), the adjustment power of the power generation system 1 is supplied from the alkaline storage battery 3 to the power grid 5.
[0097] At time t12, when the SOC detected by the SOC sensor 41 becomes equal to or lower than the threshold value THc, the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c transitions from the normal hydraulic mode to the regulated hydraulic mode.
[0098] For this reason, the power generation control device 4 executes power increase control on the hydroelectric generator 11 of the hydroelectric power plant 2c. Accordingly, at time t12, the actuator 32c is controlled so that the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2c changes from opening degree B to opening degree C (see FIG. 3), and the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 increases.
[0099] At time t13, when the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2c reaches opening degree C (see Figure 3), the regulating power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 becomes the regulating power of the power generation system 1, and the battery control mode transitions from the regulating power output mode to the SOC recovery mode, so that the discharge power Pc of the alkaline storage battery 3 becomes 0.
[0100] At time t14 (10 minutes later in the figure), when the water level detected by the water level gauge 21c installed in the water tank 10 of the hydroelectric power plant 2c reaches target value 3 (see Figure 5), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c transitions from regulated hydraulic mode to water level recovery mode, and the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b transitions from normal hydraulic mode to regulated hydraulic mode.
[0101] Therefore, the actuator 32c is controlled so that the opening of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2c changes from opening C to opening D (see Figure 3), and the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 is reduced.
[0102] Meanwhile, at time t14, the power generation control device 4 executes power increase control on the hydroelectric generator 11 of the hydroelectric power plant 2b. Therefore, the actuator 32b is controlled so that the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2b changes from opening degree B to opening degree C (see FIG. 3), and the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 increases.
[0103] At time t15, when the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2b becomes opening degree D (see Figure 3), the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 becomes 0, and when the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2b becomes opening degree C (see Figure 3), the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 becomes the regulated power of the power generation system 1.
[0104] At time t16 (20 minutes later in the figure), when the water level detected by the water level gauge 21b installed in the water tank 10 of the hydroelectric power plant 2b reaches target value 3 (see Figure 5), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b transitions from regulated hydraulic mode to water level recovery mode, and the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c transitions from normal hydraulic mode to regulated hydraulic mode.
[0105] Therefore, the actuator 32b is controlled so that the opening of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2b changes from opening C to opening D (see Figure 3), and the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 is reduced.
[0106] Meanwhile, at time t16, the power generation control device 4 executes power increase control on the hydroelectric generator 11 of the hydroelectric power plant 2c. Therefore, the actuator 32a is controlled so that the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2a changes from opening degree B to opening degree C (see FIG. 3), and the regulated power Pm1 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 increases.
[0107] At time t17, when the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2b becomes opening degree D (see Figure 3), the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 becomes 0, and when the opening degree of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2a becomes opening degree C (see Figure 3), the regulated power Pm1 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2a to the power grid 5 becomes the regulated power of the power generation system 1.
[0108] At time t18 (30 minutes later in the figure), when the water level detected by the water level gauge 21a installed in the water tank 10 of the hydroelectric power plant 2a reaches target value 3 (see Figure 5), the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a transitions from the adjustment hydraulic mode to the water level recovery mode.
[0109] Therefore, the actuator 32c is controlled so that the opening of the guide vane 31 of the hydroelectric generator 11 of the hydroelectric power plant 2a changes from opening C to opening D (see Figure 3), and the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 is reduced.
[0110] In this way, during the period from time t11 to time t12, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the discharged power Pc of the alkaline storage battery 3. Furthermore, during the period from time t12 to time t13, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the sum of the discharged power Pc of the alkaline storage battery 3 and the adjustment power Pm3 of the hydroelectric generator 11 of the hydroelectric power plant 2c. Furthermore, during the period from time t13 to time t14, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the adjustment power Pm3 of the hydroelectric generator 11 of the hydroelectric power plant 2c.
[0111] Furthermore, during the period from time t14 to time t15, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the sum of the adjustment powers Pm3 and Pm2 of the hydroelectric generators 11 of the hydroelectric power plants 2c and 2b. Furthermore, during the period from time t15 to time t16, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the adjustment power Pm2 of the hydroelectric generator 11 of the hydroelectric power plant 2b.
[0112] Furthermore, during the period from time t16 to time t17, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the sum of the adjustment powers Pm2 and Pm1 of the hydroelectric generators 11 of the hydroelectric power plants 2b and 2a. Furthermore, during the period from time t17 to time t18, the adjustment power of the power generation system 1 is supplied to the power grid 5 by the adjustment power Pm1 of the hydroelectric generator 11 of the hydroelectric power plant 2a.
[0113] <Action and effect> As described above, the power generation system 1 of this embodiment can supply primary control power with a response time of 10 seconds or less and a duration of 5 minutes or more to the power grid 5, thereby allowing the hydroelectric generator 11 of the hydroelectric power plant 2a to function as primary control power.
[0114] Moreover, the power generation system 1 according to this embodiment can extend the duration by sequentially shifting the hydraulic control mode of the hydraulic generators 11 of the hydroelectric power plants 2a to 2c to the regulated hydraulic mode.
[0115] Therefore, the power generation system 1 of this embodiment can supply secondary control power to the power grid 5 with a response time of less than 5 minutes and a duration of 30 minutes or more, thereby enabling the hydroelectric generators 11 of the hydroelectric power plants 2a to 2c to function as secondary control power.
[0116] Furthermore, in the power generation system 1 of this embodiment, during the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2b is released to the downstream side of the flow path 6, thereby enabling the water level of the water tank 10 of the hydroelectric power plant 2c to be quickly restored.
[0117] Furthermore, in the power generation system 1 of this embodiment, during the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2a is released to the downstream side of the flow path 6, thereby enabling the water level of the water tank 10 of the hydroelectric power plant 2b to be quickly restored.
[0118] <Modification> As in the first embodiment of the present invention, the power generation control device 4 may change the transition conditions for transitioning the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c from the normal hydropower mode to the regulating hydropower mode during the period in which the battery control mode is the regulating power output mode.
[0119] For example, the power generation control device 4 may transition the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c from the normal hydraulic mode to the regulated hydraulic mode when a certain time (e.g., one minute) has elapsed since the battery control mode became the regulated hydraulic output mode.
[0120] In this embodiment, an example has been described in which the power generation control device 4 sequentially transitions the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c, the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b, and the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a to the adjusted hydropower mode.
[0121] As described above, in the power generation system 1 of this embodiment, during the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2b is released to the downstream side of the flow path 6, thereby enabling the water level of the water tank 10 of the hydroelectric power plant 2c to be quickly restored.
[0122] Furthermore, in the power generation system 1 of this embodiment, during the period when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a is the adjusted hydraulic mode, the water stored in the water tank 10 of the hydroelectric power plant 2a is released to the downstream side of the flow path 6, thereby enabling the water level of the water tank 10 of the hydroelectric power plant 2b to be quickly restored.
[0123] Therefore, when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b transitions from the adjusted hydraulic mode to the water level recovery mode, the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c can be transitioned to the adjusted hydraulic mode.
[0124] Similarly, when the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a transitions from the adjusted hydraulic mode to the water level recovery mode, the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b can transition to the adjusted hydraulic mode.
[0125] Therefore, after sequentially transitioning the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c, the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b, and the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a to the adjusted hydropower mode as shown in Figure 9, the power generation control device 4 may further sequentially transition the hydropower control mode for the hydroelectric generators 11 of each of the hydroelectric power plants 2c, 2b to the adjusted hydropower mode as shown in Figure 11.
[0126] In Figure 11, at time t18 (30 minutes later in the figure), when the water level detected by the water level gauge 21a installed in the water tank 10 of the hydroelectric power plant 2a reaches the target value 3 (see Figure 5), the power generation control device 4 transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2a to the water level recovery mode, and transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c to the adjusted hydraulic mode.
[0127] As a result, at time t19, the regulated power Pm1 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2a to the power grid 5 becomes 0, and the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 becomes the regulated power of the power generation system 1.
[0128] At time t20 (40 minutes later in the figure), when the water level detected by the water level gauge 21c installed in the water tank 10 of the hydroelectric power plant 2c reaches the target value 3 (see Figure 5), the power generation control device 4 transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c to a water level recovery mode, and transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b to an adjusted hydraulic mode.
[0129] As a result, at time t21, the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 becomes 0, and the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 becomes the regulated power of the power generation system 1.
[0130] At time t22 (50 minutes later in the figure), when the water level detected by the water level gauge 21b installed in the water tank 10 of the hydroelectric power plant 2b reaches the target value 3 (see Figure 5), the power generation control device 4 transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2b to a water level recovery mode, and transitions the hydraulic control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c to an adjusted hydraulic mode.
[0131] As a result, at time t23, the regulated power Pm2 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2b to the power grid 5 becomes 0, and the regulated power Pm3 supplied from the hydroelectric generator 11 of the hydroelectric power plant 2c to the power grid 5 becomes the regulated power of the power generation system 1.
[0132] At time t24 (60 minutes later in the figure), when the water level detected by the water level gauge 21c installed in the water tank 10 of the hydroelectric power plant 2c reaches the target value 3 (see Figure 5), the power generation control device 4 transitions the hydropower control mode for the hydroelectric generator 11 of the hydroelectric power plant 2c to a water level recovery mode.
[0133] With the above-described configuration, the power generation system 1 according to the present embodiment can further extend the duration.
[0134] Although the embodiment of the present invention has been disclosed above, it is apparent that modifications can be made to the embodiment of the present invention without departing from the scope of the present invention. The embodiment of the present invention is disclosed on the assumption that equivalents to such modifications are included in the invention described in the claims. [Explanation of symbols]
[0135] 1. Power generation system 2, 2a, 2b, 2c Hydroelectric power plants 3. Alkaline storage battery (electricity storage device) 4. Power generation control device 5 Power grid 6 Flow Path 10 Water Tank 11 Hydroelectric Generator
Claims
1. a plurality of hydroelectric power plants each including a hydroelectric generator and a water tank for storing water to be supplied to the hydroelectric generator, the hydroelectric generator being capable of supplying electric power to a power grid; a power storage device that can be charged from the power grid and can discharge the stored power to the power grid; a power generation control device that controls the hydroelectric generator and the power storage device, The plurality of hydroelectric power plants are arranged in series to form one water flow path; Water is supplied to the water tank from the upstream side of the flow path, The water supplied from the water tank to the hydroelectric generator is discharged from the hydroelectric generator to the downstream side of the flow path, The power generation control device includes: Controlling the water level of the water tank to maintain it; When the power grid runs out of power, execute discharge control to control the power storage device so as to discharge power to the power grid, and during a period in which power is being discharged from the power storage device to the power grid, start power increase control to control a hydroelectric generator of at least one of the plurality of hydroelectric power plants so as to increase generated power; Executing the power increase control by increasing the flow rate of water supplied from the water tank to the hydroelectric generator, with priority over maintaining the water level of the water tank; In a state in which the discharge control is being performed due to a shortage of power in the power grid, for the hydroelectric generator of the most downstream hydroelectric power plant among the plurality of hydroelectric power plants, when the charging rate of the power storage device becomes equal to or lower than a threshold value, the power increase control is started; This power generation system is characterized in that, for the hydroelectric generators of hydroelectric power plants other than the most downstream hydroelectric power plant among the plurality of hydroelectric power plants, the power increase control is initiated when the water level of the water tank of the hydroelectric power plant downstream of the flow path falls below a predetermined value.
2. a plurality of hydroelectric power plants each including a hydroelectric generator and a water tank for storing water to be supplied to the hydroelectric generator, the hydroelectric generator being capable of supplying electric power to a power grid; a power storage device that can be charged from the power grid and can discharge the charged power to the power grid; The plurality of hydroelectric power plants are arranged in series to form one water flow path; Water is supplied to the water tank from the upstream side of the flow path, The water supplied from the water tank to the hydroelectric generator is discharged from the hydroelectric generator to the downstream side of the flow path, The power generation control device includes: Controlling the water level of the water tank to maintain it; When the power grid runs out of power, execute discharge control to control the power storage device so as to discharge power to the power grid, and during a period in which power is being discharged from the power storage device to the power grid, start power increase control to control a hydroelectric generator of at least one of the plurality of hydroelectric power plants so as to increase generated power; Executing the power increase control by increasing the flow rate of water supplied from the water tank to the hydroelectric generator, with priority over maintaining the water level of the water tank; In a state in which the discharge control is being performed due to a shortage of power in the power grid, for the hydroelectric generator of the most downstream hydroelectric power plant among the plurality of hydroelectric power plants, when the charging rate of the power storage device becomes equal to or lower than a threshold value, the power increase control is started; A power generation control device characterized in that, for the hydroelectric generators of hydroelectric power plants other than the most downstream hydroelectric power plant among the plurality of hydroelectric power plants, the power increase control is initiated when the water level of the water tank of the hydroelectric power plant downstream of the flow path falls below a predetermined value.
Citation Information
Patent Citations
JP1974047936A
Hydraulic power generation control system
JP2016034194A
Frequency control device for power system, frequency control system with the same, frequency control method and frequency control program
JP2016082679A
Storage battery-combined renewable energy generator system
JP2019140862A
Power storage control system
JP2022002457A
Cited By
Power Control System
JP7776050B1