Pre-casting inspection system and inspection method

The pre-casting inspection system uses a movable string-like object with a camera to capture images inside the formwork, addressing inefficiencies in conventional methods by enabling easy and reliable inspection of hard-to-reach areas.

JP7563922B2Active Publication Date: 2024-10-08SHIMIZU CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2020149079
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-04
Publication Date
2024-10-08
Estimated Expiration
2040-09-04

AI Technical Summary

Technical Problem

Conventional pre-casting inspection methods are inefficient and labor-intensive, particularly in areas difficult to visually inspect, such as under densely arranged reinforcing bars in concrete slabs or walls, due to the need for manual cleaning and visual confirmation.

Method used

A pre-casting inspection system utilizing a movable string-like object with a photographing means, such as a camera, to capture images inside the formwork, allowing for easy and reliable inspection by moving the camera along the string.

Benefits of technology

Enables easy and reliable pre-casting inspection by obtaining clear images of hard-to-reach areas within the formwork, facilitating efficient confirmation of the inspection results outside the formwork.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007563922000001
    Figure 0007563922000001
Patent Text Reader

Abstract

To provide a pre-casting inspection system capable of easily and reliably performing a pre-casting inspection, and an inspection method.SOLUTION: A pre-casting inspection system 10 is a system for inspecting the condition in a formwork 16 before placing concrete in the formwork 16. The system includes: a string 18 that is bridged in a concrete form 16 movably in the bridge direction X; and imaging means 20 that is attached to the string 18 for picking up images the condition in the concrete form 16.SELECTED DRAWING: Figure 1
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a pre-pouring inspection system and inspection method suitable for inspecting the inside of a formwork before pouring concrete. [Background technology]

[0002] Conventionally, in concrete pouring work, if foreign matter such as garbage or fallen leaves is mixed in before pouring concrete, it may affect the quality of the concrete. For this reason, foreign matter inside the formwork is cleaned and removed using a water jet or the like just before pouring concrete, and concrete is poured after a visual inspection is performed to confirm that the inside of the formwork is clean (see, for example, Patent Document 1). Since the entire surface inside the formwork must be cleaned, this is inefficient and requires a lot of labor. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2002-61498 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, there is a problem in that it is difficult to visually inspect places that are hard to reach, such as under the rebars densely arranged on the underside of the concrete slab, or under the wall concrete. For this reason, there has been a demand for a method to easily and reliably inspect such places before pouring.

[0005] The present invention has been made in consideration of the above, and aims to provide a pre-pouring inspection system and inspection method that can easily and reliably perform pre-pouring inspection. [Means for solving the problem]

[0006] In order to solve the above-mentioned problems and achieve the objective, the pre-pouring inspection system of the present invention is a system for inspecting the condition inside a formwork before pouring concrete into the formwork, and is characterized in that it comprises a string-like object that is erected inside the formwork and can be moved in the erection direction, and an imaging means that is attached to the string-like object and takes images of the condition inside the formwork.

[0007] Another pre-pouring inspection system according to the present invention is a system for inspecting the condition inside a formwork before pouring concrete into the formwork, and is characterized in that it comprises a string-like object installed within the formwork, an imaging means attached to the string-like object so as to be movable along the string-like object and which photographs the condition inside the formwork, and a moving means for moving the imaging means along the string-like object.

[0008] In addition, the pre-pouring inspection method of the present invention is a method for inspecting the condition inside a formwork before pouring concrete into the formwork, and is characterized by comprising the steps of erecting a string-like object inside the formwork so that it can be moved in an extension direction, attaching a photographing means to the string-like object, and moving the photographing means by moving the string-like object in the erection direction and photographing the condition inside the formwork with the photographing means.

[0009] Another pre-pouring inspection method according to the present invention is a method for inspecting the condition inside a formwork before pouring concrete into the formwork, and is characterized in that it includes the steps of: erecting a string-like object inside the formwork; providing a photographing means on the string-like object so that the photographing means can move along the string-like object; and moving the photographing means along the string-like object and photographing the condition inside the formwork with the photographing means. Effect of the Invention

[0010] According to the pre-pouring inspection system of the present invention, the system is for inspecting the condition inside the formwork before pouring concrete into the formwork, and includes a string-like object that is erected inside the formwork and can move in the erection direction, and a photographing means that is attached to the string-like object and photographs the condition inside the formwork. Therefore, by photographing while moving the photographing means via the string-like object, a photographed image of the condition inside the formwork can be obtained. By viewing the photographed image outside the formwork, the condition inside the formwork can be easily and reliably confirmed. Therefore, the effect of being able to easily and reliably perform pre-pouring inspection is achieved.

[0011] According to another pre-pouring inspection system of the present invention, the system is for inspecting the condition inside the form before pouring concrete into the form, and includes a string-like object installed inside the form, a photographing means attached to the string-like object so as to be movable along the string-like object and photographing the condition inside the form, and a moving means for moving the photographing means along the string-like object, so that an image of the condition inside the form can be obtained by photographing while moving the photographing means along the string-like object. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, the effect of being able to easily and reliably perform pre-pouring inspection is achieved.

[0012] In addition, according to the pre-pouring inspection method of the present invention, the method is a method for inspecting the condition inside the form before pouring concrete into the form, and includes the steps of erecting a string-like object in the form so as to be movable in the extension direction, attaching a photographing means to the string-like object, and moving the photographing means by moving the string-like object in the erection direction and photographing the condition inside the form with the photographing means. Therefore, by photographing while moving the photographing means through the string-like object, a photographed image of the condition inside the form can be obtained. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, the effect of being able to easily and reliably perform pre-pouring inspection is achieved.

[0013] According to another pre-pouring inspection method of the present invention, the method is a method for inspecting the condition inside the form before pouring concrete into the form, and includes the steps of: setting a string-like object inside the form; providing a photographing means on the string-like object so as to be movable along the string-like object; and moving the photographing means along the string-like object and photographing the condition inside the form with the photographing means. By photographing while moving the photographing means along the string-like object, a photographed image of the condition inside the form can be obtained. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, the effect of being able to easily and reliably perform pre-pouring inspection is achieved. [Brief description of the drawings]

[0014] [Figure 1] FIG. 1 is a diagram showing an embodiment of a pre-pouring inspection system and an inspection method according to the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0015] Hereinafter, preferred embodiments of the pre-pouring inspection system and inspection method according to the present invention will be described in detail with reference to the drawings. Note that the present invention is not limited to these preferred embodiments.

[0016] As shown in Fig. 1, a pre-pouring inspection system 10 according to an embodiment of the present invention is applied to the pouring work of a concrete slab 12. This concrete slab 12 is a reinforced concrete structure constructed by pouring concrete into a formwork 16 in which reinforcing bars 14 are arranged. The formwork 16 is erected in a wall shape around the pouring area. The reinforcing bars 14 are arranged in a lattice pattern in multiple vertical stages.

[0017] The pre-pouring inspection system 10 is for inspecting the condition inside the formwork 16 before pouring concrete, and comprises a string 18 (string-like object) that is movably installed in the formwork 16 in the installation direction X, and a camera 20 (imaging means) fixed to the string 18.

[0018] The string 18 is installed horizontally in a straight line inside the formwork 16, and both ends of the string 18 are movably passed through the formwork 16 on both sides and come out to the outside of the formwork 16. The string 18 is placed in the inspection target area A. In this embodiment, the inspection target area A is the area below the reinforcing bars 14 placed on the underside of the slab. This area is hidden by the reinforcing bars 14, so it is difficult to inspect this area with the human eye from above the formwork 16. In order to reliably inspect this area, the string 18 is placed below the reinforcing bars 14. The position of the string 18 is set corresponding to the inspection target area A. If the inspection target area A is in a diagonal direction or a vertical direction relative to the horizontal, the string 18 may be placed along these directions. The string 18 may be made of any material as long as it can move and control the camera 20.

[0019] The camera 20 photographs the condition of the inspection target area A in the formwork 16, and is fixed to the string 18. The camera 20 may be of any type as long as it can photograph the inspection target area A, but is preferably a camera that can photograph an angle of 360° around itself, such as a spherical camera. Such a camera is efficient because it can obtain images of the surroundings at once. The camera 20 may be equipped with a light-emitting body so that flash photography can be performed in a dark place. The camera 20 can be fixed to the string 18 by a known fixing method. For example, the camera body may be detachably fixed to the string 18 via a jig.

[0020] The operation and function of the above configuration will now be described. First, when setting up the formwork 16, the string 18 is threaded through the formwork 16. The formwork 16 is selected at a position where the string 18 can be stretched over the inspection target area A. In addition, the camera 20 is fixed to the string 18 inside the formwork 16.

[0021] After the formwork 16 is installed and the reinforcing bars 14 are arranged, a pre-casting inspection is performed. First, both ends of the string 18 are pulled from the outside of the formwork 16 to stretch the string 18 in a straight line. Next, one end 18A of the string 18 is pulled and the other end 18B is loosened to move the string 18 in the extension direction. This causes the camera 20 fixed to the string 18 to move in the erection direction X of the string 18. The camera 20 is moved slowly from one side of the inspection target area A to the other side, and the surroundings are photographed with the camera 20 to obtain a photographed image. If a flash photograph is taken with a light-emitting body provided in the camera 20, a clear photographed image can be obtained even in a dark place. The camera 20 can be collected or remotely operated to view the photographed image outside the formwork 16, and the situation of the inspection target area A can be easily and reliably confirmed. Therefore, a pre-casting inspection can be easily and reliably performed. In addition, the photographing position can be easily grasped by matching the length of the movement of the string 18 with the image.

[0022] In the above embodiment, the case where the string 18 is movable in the erection direction X has been described as an example, but the present invention is not limited to this. For example, both ends of the string 18 may be fixed immovably to the formwork 16 and stretched in the inspection target area A, and the camera 20 may be fixed movably along the string 18. The method of fixing the camera 20 to the string 18 may be, for example, a method of providing a guide groove or hole in the camera body and movably engaging or inserting the string 18 into the guide groove or hole. As a moving means for moving the camera 20 along the string 18, for example, a means of attaching a control rope to the camera 20 and arranging it along the string 18, and pulling and operating the control rope from one side may be mentioned. By photographing while moving the camera 20 along the string 18, it is possible to obtain a photographed image of the inspection target area A. Therefore, the pre-casting inspection can be easily and reliably performed. In addition, if the string 18 and the camera 20 are installed before the arrangement of the reinforcing bars 14, and if it interferes with the arrangement of the reinforcing bars, the string 18 and the camera 20 may be installed after the arrangement of the reinforcing bars, if possible. In addition, the order of installation may be changed as appropriate, for example, by installing only the string 18 before the reinforcement and installing the camera 20 after the reinforcement.

[0023] As described above, the pre-pouring inspection system according to the present invention is a system for inspecting the condition inside a form before pouring concrete into the form, and includes a string-like object that is erected inside the form and can move in the erection direction, and a photographing means that is attached to the string-like object and photographs the condition inside the form, so that an image of the condition inside the form can be obtained by photographing while moving the photographing means via the string-like object. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, pre-pouring inspection can be easily and reliably performed.

[0024] According to another pre-pouring inspection system of the present invention, the system is for inspecting the condition inside the form before pouring concrete into the form, and includes a string-like object installed inside the form, a photographing means attached to the string-like object so as to be movable along the string-like object and photographing the condition inside the form, and a moving means for moving the photographing means along the string-like object, so that an image of the condition inside the form can be obtained by photographing while moving the photographing means along the string-like object. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, the pre-pouring inspection can be easily and reliably performed.

[0025] According to the pre-pouring inspection method of the present invention, the method is for inspecting the condition inside the form before pouring concrete into the form, and includes the steps of: erecting a string-like object in the form so as to be movable in the extension direction; providing a photographing means on the string-like object; and moving the string-like object in the erection direction to move the photographing means and photographing the condition inside the form with the photographing means. Therefore, by photographing while moving the photographing means through the string-like object, a photographed image of the condition inside the form can be obtained. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, the pre-pouring inspection can be easily and reliably performed.

[0026] According to another pre-pouring inspection method of the present invention, the method is for inspecting the condition inside the form before pouring concrete into the form, and includes the steps of: setting a string-like object inside the form; providing a photographing means on the string-like object so as to be movable along the string-like object; and moving the photographing means along the string-like object and photographing the condition inside the form with the photographing means. By photographing while moving the photographing means along the string-like object, a photographed image of the condition inside the form can be obtained. By viewing the photographed image outside the form, the condition inside the form can be easily and reliably confirmed. Therefore, the pre-pouring inspection can be easily and reliably performed. [Industrial Applicability]

[0027] INDUSTRIAL APPLICABILITY As described above, the pre-pouring inspection system and inspection method of the present invention are useful for inspecting the inside of a formwork before pouring concrete, and are particularly suitable for performing pre-pouring inspection easily and reliably. [Explanation of symbols]

[0028] 10 Pre-Pouring Inspection System 12 Slab Concrete 14 Reinforcement 16 Formwork 18 String (string-like object) 18A one end 18B other end 20 Camera (photography means) A. Inspection Area X Erection direction

Claims

1. A system for inspecting a condition inside a formwork before pouring concrete into the formwork, comprising: A pre-pouring inspection system comprising: a string-like object that is erected within the formwork and can be moved in the erection direction; and an imaging means that is attached to the string-like object and takes images of the situation within the formwork, wherein the string-like object is arranged below the reinforcing bars within the formwork in which the reinforcing bars are placed.

2. A system for inspecting a condition inside a formwork before pouring concrete into the formwork, comprising: A pre-pouring inspection system comprising: a string-like object suspended below the reinforcing bar within the formwork in which the reinforcing bar is placed; an imaging means attached to the string-like object so as to be movable along the string-like object and which photographs the situation within the formwork; and a moving means for moving the imaging means along the string-like object.

3. 1. A method for inspecting conditions within a form prior to pouring concrete into the form, comprising the steps of: A pre-pouring inspection method comprising the steps of: erecting a string-like object below the reinforcing bar within the formwork in which the reinforcing bar is placed so that the object can be moved in its extension direction; attaching a photographing means to the string-like object; and moving the string-like object in the erection direction to move the photographing means and photographing the situation within the formwork with the photographing means.

4. 1. A method for inspecting conditions within a form prior to pouring concrete into the form, comprising the steps of: A pre-pouring inspection method comprising the steps of: installing a string-like object below the reinforcing bar within the formwork in which the reinforcing bar is to be placed; attaching a photographing means to the string-like object so that the photographing means can move along the string-like object; and moving the photographing means along the string-like object and photographing the situation inside the formwork with the photographing means.

Citation Information

Patent Citations

  • Bucket for cable crane

    JP1992112193A

  • Form internal monitoring camera unit for concrete placing work

    JP1996135191A

  • Concrete placement control system

    JP2000129919A

  • Method for constructing top slab section of reinforced concrete structure

    JP2002061498A

  • jig

    JP2020118013A