Process and equipment for combined drying of dry granulated slag and sludge

The combined drying process using steel balls to cool and granulate slag and dry sludge addresses the inefficiencies of current methods by effectively recovering residual heat and stabilizing slag for better utilization, reducing water consumption and pollution, and enhancing sludge drying efficiency.

JP7564939B2Active Publication Date: 2024-10-09BAOSHAN IRON & STEEL CO LTD
View PDF 3 Cites 0 Cited by

Patent Information

Application Number
JP2023506530
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Priority Date
2020-07-31
Filing Date
2021-06-21
Publication Date
2024-10-09
Estimated Expiration
2041-06-21

AI Technical Summary

Technical Problem

Current methods for treating blast furnace slag and sludge result in wasted high-grade residual heat, excessive water consumption, environmental pollution, and low heat recovery efficiency, while conventional granulation methods produce slag that is disadvantageous for subsequent use and have high operating costs.

Method used

A process and apparatus that combines slag cooling, granulation, and sludge drying using steel balls as a heat transfer medium, where high-temperature slag is mixed with steel balls to cool and granulate, and the steel balls are then used to dry sludge, with a cycle process for repeated use.

Benefits of technology

This method efficiently recovers residual heat from slag for low-cost sludge drying, stabilizes the slag for better utilization, reduces water consumption, and minimizes environmental pollution, achieving fast, stable, and continuous treatment of both materials.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007564939000002
    Figure 0007564939000002
  • Figure 0007564939000003
    Figure 0007564939000003
  • Figure 0007564939000004
    Figure 0007564939000004
Patent Text Reader

Abstract

The process and equipment for combined drying of dry-type granulated slag and sludge includes the following steps: 1) mixing and soaking the slag with the balls. The high-temperature slag and steel balls are thoroughly mixed and heat-exchanged. The heat of the high-temperature slag is rapidly absorbed by the steel balls, causing them to cool and break down, forming granular slag. The steel balls then absorb the heat from the high-temperature slag and heat up. 2) drying the sludge. The high-temperature steel balls are transported to a sludge dryer and mixed with the injected sludge. The sludge is dried. After the moisture content of the sludge reaches a set value, the steel balls and sludge are separated and then discharged separately. The present invention uses the residual heat of the high-temperature slag to heat the steel balls, which then dry the sludge. This achieves the combined process of slag cooling, granulation, and sludge drying, solving the two difficult problems of slag cooling and sludge drying and significantly increasing the residual heat recovery and utilization rate of the high-temperature slag.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] Technical Field The present invention relates to the technical field of metallurgical slag residual heat recovery, in particular to a process and an apparatus for the combined drying of dry granulated slag and sludge. [Background technology]

[0002] Background technology China is currently the world's largest steel producer, and has ranked first in steel production for 16 consecutive years, far surpassing other countries. In 2019, mainland China produced 996 million tons of steel. As the slag produced during the steel smelting process contains a huge amount of heat, it is necessary to recover the heat from blast furnace slag and reuse it as a resource from the perspective of energy conservation, environmental protection, and the cost performance of steel plants. The tapping temperature of blast furnace slag is usually 1400-1550°C. One ton of slag is (1260-1880) x 10 3 It contains 100 kJ of sensible heat, which is equivalent to the calorific value of 60 kg of standard coal. For every ton of pig iron produced, 0.3 tonnes of blast furnace slag is a by-product, and for every tonne of steel produced, 0.13 tonnes of steel slag is a by-product. Based on 996 million tonnes of steel production, this amounts to more than 428 million tonnes of blast furnace slag and converter slag, with a sensible heat equivalent to 25.7 million tonnes of standard coal.

[0003] At present, there are two methods for treating blast furnace slag: the dry pit cooling method and the granulated slag method. In the dry pit cooling method, molten blast furnace slag is poured into a dry pit for air cooling, and then water cooling after solidification. This method pollutes groundwater sources, releases a large amount of water vapor when the temperature drops, and at the same time releases a large amount of H2S and SO2 gas, which damages buildings, damages equipment, and worsens the working environment, so it is only used in accident disposal. In China, 90% of blast furnace slag is treated by the granulated slag method, and the obtained granulated slag is used to produce cement, slag bricks, fine slag powder, and insulation fillers. There are various methods for granulating blast furnace slag, and the main treatment processes include: OCP method, INBA method, RASA method, TYNA method, MTC method, etc. Although the granulation process continues to develop, the core of the technology remains that of granulating blast furnace slag by injecting water onto it, cooling it, and granulating it into granulated slag. The water and slag are then separated, and the granulation water is allowed to settle, filtered, and then recycled.

[0004] The granulated slag method cannot fundamentally change the process characteristics that granulation of slag consumes water, and the physical heat of the furnace slag is basically all dissipated. The emission of pollutants such as SO2 and H2S during the granulation process not only affects the working environment, but may also cause air pollution. The granulated slag method has various disadvantages, including: 1. High-quality residual heat resources contained in blast furnace slag are wasted: Liquid blast furnace slag at 1350℃~1450℃ is discharged from the slag discharge port and crushed and cooled by high-pressure water. At such high temperatures, most of the liquid water quickly vaporizes and is discharged into the atmosphere as steam, so a large amount of heat contained in this steam is wasted. From the viewpoint of energy utilization efficiency, the residual heat quality of liquid blast furnace slag is very high and has utility value.

[0005] 2. A large amount of water resources is wasted: During the water granulation process, the water pressure exceeds 0.2MPa, the slag to water ratio is 1:10, and 0.8-1.2 tons of fresh water is consumed for 1 ton of slag. At present, China's blast furnace pig iron production exceeds 680 million tons, the annual blast furnace slag production is about 200 million tons, and the fresh water consumption for granulated slag is about 200 million tons.

[0006] 3. Harmful gases such as SO2 and H2S are produced, polluting the environment: During the granulation process, large amounts of H2S and SO x This is produced and released into the atmosphere along with water vapor, which, if condensed to a certain extent, can cause acid rain.

[0007] Regarding the recovery of residual heat from blast furnace slag, the recovery and utilization of residual heat from granulated slag is limited to heating and hot water for bathrooms, etc., which use the residual heat from the water used for granulation. The recovery rate of residual heat is low, at only about 10%, and is limited by time and area. In summer or in areas without heating facilities, this part of the energy is wasted, which limits its general use. Currently, the focus of attention in the development of sensible heat recovery technology from blast furnace slag is the dry recovery method, which is more water-saving and environmentally friendly than the traditional granulated slag method, and is in line with the development concept.

[0008] Previously, the main technologies that have achieved a certain level of success include the Japanese internal cooling rotating drum method, the rotating drum granulation method, the air crushing method, the mechanical mixing method, the continuous casting and continuous rolling method, and the British centrifugal rotating disk method. The conventional technologies have the following problems: 1. The granulation effect is not good, which is disadvantageous for subsequent use: The cooled slag obtained by the internally cooled rotating drum method is discharged in the form of sheets, which is disadvantageous for subsequent use. The particle size distribution range of the granulated slag obtained by the air smashing method is wide, which is disadvantageous for subsequent processing. The plate furnace slag obtained by the continuous casting and continuous rolling method is in the form of large sheets, which is disadvantageous for subsequent use.

[0009] 2. The quality of the heat exchange gas is not high: The centrifugal rotating disk method uses a fluidized bed for heat exchange, but back mixing in the bed layer is intense and the outlet temperature is not high, at 400-500°C, so the energy quality is low and the high-temperature heat source is not used effectively.

[0010] 3. Low heat recovery efficiency: The heat absorbed by the heat transfer medium in the internally cooled rotating drum method is about 40% of the slag sensible heat, and the air permeability of the plate-type high-temperature slag obtained by the continuous casting and rolling method significantly affects the heat exchange efficiency between the cooling air and the water-cooled wall.

[0011] 4. Low vitrification degree and low added value: The rotary drum granulation method is a semi-quenching process, and the product obtained is concrete aggregate, which has low added value. The slag particles obtained by the mechanical mixing method are large and uneven in size, and the degree of vitrification is not high, so it can only be used as road paving material.

[0012] 5. High equipment operating costs and huge investment: The air crushing method consumes a lot of power during the granulation process, and the cooling speed of air crushing is slow. In order to prevent the granulated slag from sticking to the surface of the equipment before solidification, a large equipment size is required, which increases the investment cost.

[0013] The conventional metallurgical slag granulation technology not only wastes the high-quality residual heat resources contained in blast furnace slag, but also wastes a large amount of new water resources, and at the same time causes serious environmental pollution. This method cannot be fully adapted to the new industrialization and cycle economy development mode, so it can only be fundamentally modified or abandoned. In addition, the conventional blast furnace slag dry granulation method technology is still immature, and the efficiency is low, the performance of the blast furnace slag is affected, which reduces the added value, and the investment in equipment is huge, so this problem cannot be effectively solved.

[0014] In recent years, the amount of sludge produced has been increasing. Currently, the total amount of wastewater discharged annually in Japan is 400×10 8 t, and the annual amount of dried sludge discharged is about 5.50 × 10 6 ~6.00×106 t and continues to grow, due to the ever-increasing population served by the wastewater network, while at the same time, water quality discharge standards become increasingly stringent.

[0015] In general, domestically, sludge is a semi-solid or solid material produced during the wastewater treatment process, which is defined as a complex heterogeneous body composed of organic matter, bacteria, inorganic pellets and gel. From the source of sludge, it is mainly classified into water supply sludge, industrial wastewater sludge and domestic sewage sludge. From the wastewater treatment process, sludge is also classified into the following types: primary settling sludge, activated sludge, humus sludge, chemical sludge, etc. The moisture content of sludge is mainly determined by the type of solids in the sludge and the size of its pellets. Usually, the finer the solid pellets are, the more organic matter they contain, and the higher the moisture content of the sludge. The moisture content or solid content of sludge is closely related to the volume of sludge, for example, when the moisture content of sludge drops from 95% to 90%, the volume of sludge is reduced by half, so it is quite important to reduce the moisture content in sludge.

[0016] Sludge drying technology is the premise and foundation for realizing sludge treatment and resource utilization. Conventional sludge drying technology has high energy costs, and when reducing the moisture content of sludge from 80% to 20%, the energy consumed to dry one ton of sludge is more than 740 kilowatt-hours, which is equivalent to about 90 kg of standard charcoal, and this severely limits the development and application of sludge drying technology. Summary of the Invention [Problem to be solved by the invention]

[0017] Summary of the Invention The objective of the present invention is to provide a process and apparatus for combined drying of dry granulated slag and sludge, which uses the residual heat of high-temperature slag to dry sludge, realizes the combined processing of slag cooling, granulation and sludge drying, solves the two problems of high-temperature slag cooling and sludge drying, and greatly improves the recovery and utilization rate of the residual heat of high-temperature slag. [Means for solving the problem]

[0018] In order to achieve the above objectives, the technical solutions adopted in the present invention are: A method for slag cooling, granulation and sludge drying, comprising the steps of: 1) Mixing and heating slag and spheres In the slag cooling treatment device, the high-temperature slag and the steel balls are mixed in a weight ratio of 1:50-100, and the high-temperature slag and the steel balls are mixed sufficiently and uniformly by rolling, and heat exchange is performed between them, and the heat of the high-temperature slag is absorbed by the steel balls, and the high-temperature slag is gradually cooled and crushed by the steel balls to form granular slag with a particle size of ≦150 mm and a temperature of less than 400°C; the temperature of the steel balls after absorbing the heat is 200-400°C; 2) Separation of slugs and balls The granular slag is discharged by the slag discharge mechanism, and the steel balls after absorbing heat are thrown into the high-temperature steel ball groove; 3) Drying of sludge The steel balls after absorbing the heat are transported to the sludge drying device through the high-temperature steel ball channel and mixed with the injected sludge. The sludge drying device rotates under the driving force of the driving device, so the sludge and steel balls inside roll, mix evenly and exchange heat, and the steel balls after absorbing the heat dry the sludge. After the moisture content of the sludge reaches the set value, the steel balls and the dried sludge are separated. The dried sludge is discharged by the dried sludge discharge device, and the steel balls after cooling are discharged through the outlet. The mass ratio of the steel balls to the injected sludge is 2-10:1.

[0019] In some embodiments, the present invention provides a process for combined drying of dry granulated slag and sludge, comprising the steps of: 1) Mixing and heating slag and spheres The high-temperature slag and the steel balls are transported into the slag cooling treatment device respectively. The slag cooling treatment device rotates under the driving force of the driving device, so that the high-temperature slag and the steel balls roll and mix uniformly and exchange heat, and the heat of the high-temperature slag is absorbed by the steel balls. The high-temperature slag is gradually cooled and crushed by the steel balls to form granular slag with a particle size of 150 mm or less and a temperature of less than 400°C. The granular slag and the steel balls are separated, and the granular slag is discharged by the slag discharge mechanism. The steel balls after absorbing the heat are thrown into the high-temperature steel ball groove; the weight ratio of the high-temperature slag to the steel balls is 1:50-100, and the temperature of the steel balls after absorbing the heat is 200-400°C; 2) Drying of sludge The steel balls after absorbing heat are transported to the sludge drying device through the high-temperature steel ball channel and mixed with the injected sludge. The sludge drying device rotates under the driving force of the driving device, so that the sludge and steel balls inside roll, mix evenly and exchange heat, and the steel balls after absorbing heat realize the drying of the sludge. After the moisture content of the sludge reaches the set value, the steel balls and the dried sludge are separated, and the dried sludge is discharged by the dried sludge discharge device, and the steel balls after cooling are discharged through the outlet; the mass ratio of the steel balls to the injected sludge is 2-10:1.

[0020] Furthermore, the steel balls after cooling are transported back into the slag cooling treatment device, thus completing a cycle treatment process.

[0021] Preferably, the initial moisture content of the sludge is 30 to 95%, and the moisture content of the sludge after drying is 3 to 10%.

[0022] Furthermore, after the granular slag is discharged by the slag discharge mechanism, it is collected by the cooled slag collection device and transferred to the cooled slag hopper below for subsequent resource processing and utilization.

[0023] Furthermore, the slag discharge mechanism is installed at the end of the slag cooling treatment device. Furthermore, the dried sludge is discharged by the dried sludge discharger, collected in the dried sludge collector, and then sent to the dried sludge hopper below for subsequent resource recovery and utilization.

[0024] According to the present invention, there is no particular limitation on the size of the steel balls, as long as they can crush the high-temperature slag and form granular slag with a particle size of ≦150 mm. For example, the diameter of the steel balls may be 80 mm to 200 mm.

[0025] In the method and process of combined drying of dry granulated slag and sludge according to the present invention: The high-temperature slag enters the slag cooling treatment device through the slag supply hopper, and the steel balls, which are the slag cooling medium, are transported from the slag supply hopper to the slag supply hopper and mixed with the high-temperature slag. The inner wall of the slag cooling treatment device is equipped with a slag and ball driving mechanism (e.g., a screw shovel plate), and the steel balls and high-temperature slag are mixed evenly as the slag cooling treatment device rotates. The high-temperature slag is slowly cooled and crushed by the steel balls, and the heat is transferred to the steel balls. After the high-temperature slag is cooled and crushed, it forms granular slag with a particle size of 150 mm or less and a temperature of less than 400°C. The cooled and solidified granular slag is discharged by the slag discharge mechanism at the end of the slag cooling treatment device, collected by the cooled slag collection device, and transferred to the cooled slag hopper below for subsequent resource processing and utilization. The steel balls after absorbing heat move forward further as the slag cooling treatment device rotates and are discharged into the high-temperature steel ball groove.

[0026] The temperature of the steel balls after absorbing heat is 200-400℃, and they are transported by the high-temperature steel ball channel, mixed with the sludge transported by the sludge transport device, and enter the sludge dryer. The inner wall of the sludge dryer is also equipped with a mud and ball propulsion mechanism (e.g., a screw shovel plate), and the steel balls and sludge are transported forward while being mixed and dried under the action of the mud and ball propulsion mechanism (e.g., a screw shovel plate). After the sludge is dried to the set moisture content, it is discharged from the dried sludge discharge device at the end of the sludge dryer, collected in the dried sludge collector, and sent to the dried sludge hopper below for subsequent resource treatment and utilization. The moisture content of the dried sludge can be set according to the needs of the user, and the process parameters can be adjusted to meet the requirements of the moisture content of the dried sludge. Usually, the initial moisture content of the sludge is 30-95% by weight, and the moisture content of the dried sludge can reach 3-10% by weight.

[0027] The steel balls discharged from the sludge drying equipment enter the low-temperature steel ball groove and are transported into the steel ball transport device. Under the force of gravity and the propulsion action of the propulsion mechanism, the steel balls are discharged from the outlet of the steel ball transport device and enter the slag supply hopper of the slag cooling treatment device, and the movement of the steel balls forms a cycle and is reused repeatedly.

[0028] The apparatus for the combined drying process of dry granulated slag and sludge according to the present invention includes: A slag cooling treatment device having a cylindrical structure, a propelling mechanism is provided on the inner wall, a slag supply hopper is provided at the inlet, and a slag discharge mechanism is provided at the outlet; the slag cooling treatment device is provided with a first driving device capable of driving the rotation thereof; a number of steel balls and a steel ball transport device connected to an inlet of the slag cooling treatment device; a hot steel ball channel having an end connected to an outlet of the slag cooling treatment device; A sludge drying apparatus having a cylindrical structure, a propulsion mechanism provided on the inner wall, a sludge transport device provided at the inlet, and a dried sludge discharge device provided at the outlet; the sludge drying apparatus is connected to a second driving device capable of driving its rotation; the inlet of the sludge drying apparatus is connected to the other end of the high-temperature steel ball groove.

[0029] Here, the slag cooling treatment device is used for cooling the slag; the sludge dryer is used for drying the sludge; the high-temperature steel ball channel is used for receiving the high-temperature steel balls after separation from the granular slag from the slag cooling treatment device and transferring them to the sludge dryer; the low-temperature steel ball channel is used for receiving the steel balls after separation from the dried sludge from the sludge dryer and transferring them to the steel ball transport device.

[0030] In addition, the apparatus for the combined drying process of dry granulated slag and sludge according to the present invention further includes a low-temperature steel ball channel, one end of which is connected to the outlet of the sludge drying apparatus, and the other end of which is connected to the steel ball inlet of the steel ball transporting apparatus.

[0031] Furthermore, the steel ball inlet of the steel ball transporting device is connected to the outlet of the sludge drying device by a low-temperature steel ball groove, the steel ball outlet of the steel ball transporting device is connected to the slag supply hopper of the slag cooling treatment device, and the slag cooling treatment device is connected to the inlet of the sludge drying device by a high-temperature steel ball groove.

[0032] Furthermore, the steel ball inlet of the steel ball transporting device is connected to the outlet of the sludge drying device by a low-temperature steel ball groove, and the steel ball outlet of the steel ball transporting device is connected to the slag supply hopper of the slag cooling treatment device, so that the slag cooling treatment device, the steel ball transporting device, and the sludge drying device are connected to each other in a triangular configuration.

[0033] Preferably, the steel ball transport device is installed so that the outlet side is inclined upward with respect to the horizontal plane, and the inclination angle is 25°-80°.

[0034] Preferably, the steel ball transporting device has a cylindrical structure, a propulsion mechanism is provided on the inner wall, and the steel ball transporting device is connected to a drive device capable of driving its rotation.

[0035] Preferably, the slag cooling treatment device and the sludge drying device are installed at an acute angle.

[0036] Preferably, the slag cooling treatment device is installed horizontally or inclined downwards with the inlet side, and the inclination angle is 0°-45°, preferably 5°-15°.

[0037] Preferably, the sludge drying apparatus is installed horizontally or with the outlet side tilted downward, with an inclination angle of 0°-15°.

[0038] Preferably, the slag discharge mechanism and the dried sludge discharge device are provided with an exhaust gas collection and discharge device.

[0039] Preferably, the first driving device and the second driving device each include a ring gear installed in the slag cooling treatment device or the sludge drying device, and a driving gear meshing with the ring gear, and the driving gear is installed at the output end of the reducer of the linked motor.

[0040] Preferably, the third driving device includes a ring gear installed in the steel ball transporting device, and a driving gear meshing with the ring gear, and the driving gear is installed at the output end of a reducer of the linked motor.

[0041] Preferably, the propulsion mechanism is a screw shovel plate. In the design of the equipment for the combined drying process of dry granulated slag and sludge according to the present invention: By installing a slag cooling treatment device, a sludge drying device and a steel ball transport device, the present invention can not only realize the rapid granulation of high-temperature slag and the recovery of residual heat, but also realize the drying of sludge. This not only solves the difficult problem of effectively utilizing the huge amount of slag residual heat in the steel industry, but also opens up new possibilities for the treatment and resource utilization of urban sludge. In addition, the preferred design is to connect the three together in a triangular configuration to form a cyclic treatment system, which makes the entire device more compact and improves treatment efficiency.

[0042] The present invention further provides an exhaust gas collection and discharge device in the slag discharge mechanism to collect dust generated during the high-temperature slag cooling and crushing process, and then treats the dust and water vapor-containing exhaust gas generated during the sludge drying process through a corresponding exhaust gas purification device before discharging the exhaust gas, thereby realizing environmentally friendly treatment.

[0043] Support devices are provided at both ends of the slag cooling treatment device, the sludge drying device and the steel ball transport device, and the support devices include support rings and support wheel support mechanisms. By adjusting the support devices, the inclination angles of each device relative to the horizontal plane can be adjusted.

[0044] Here, the temperature of the hot slag is usually ≧1300° C., for example, 1350° C. to 1500° C. After sufficient heat exchange with the sludge, the temperature of the hot steel ball usually drops to below 150° C. (i.e., it becomes the low-temperature steel ball described herein).

[0045] Beneficial effects of the present invention: 1. Performs the coordinated process of cooling slag and drying sludge.

[0046] The present invention closely links two different technical fields and industries, namely, slag treatment and sludge drying, and not only realizes efficient cooling and granulation of slag, but also efficiently recovers and utilizes its residual heat; and the recovered residual heat of the slag enables low-cost drying of sludge, not only solving the difficult problem of effectively utilizing the huge amount of slag residual heat in the steel industry, but also opening up new horizons in the treatment and recycling of urban sludge, and simultaneously solving the two difficult problems of slag cooling and sludge drying.

[0047] 2. The overall process of the present invention is rapid, stable and continuous. The present invention uses steel balls as an efficient cooling medium and heat storage medium, continuously recovers heat from the slag, transfers the heat into the low-temperature sludge, and realizes repeated use of the steel balls through cyclic transfer, thereby enabling stable and continuous treatment of slag and sludge.

[0048] 3. High efficiency of slag processing. The slag is continuously and dynamically cooled and granulated, which overcomes the drawbacks of long static cooling and slow heat exchange in the traditional process, and greatly increases the processing efficiency of the slag.

[0049] 4. High thermal utilization rate of slag. Although the temperature of slag is high and the heat quality is high, slag is similar to refractory materials, has very low thermal conductivity, and dissipates heat slowly, so the heat it contains is difficult to recover and utilize through normal processes. Steel has a relatively high thermal conductivity, so it can absorb and dissipate heat quickly. When steel balls are used as heat transfer medium, they can quickly absorb the heat of the slag during the process of contacting and mixing with slag and become high-temperature steel balls. When the high-temperature steel balls are mixed with sludge, the high-temperature steel balls can quickly release their heat and send it to the sludge, so that the sludge can be dried.

[0050] 5. High sludge drying efficiency. In the present invention, the steel balls and sludge come into direct contact after absorbing heat and are repeatedly stirred, resulting in a large heat exchange area and high drying efficiency.

[0051] 6. A wide range of types of sludge can be dried. The present invention uses the steel balls after absorbing heat to dry the sludge. The steel balls are a heat transfer medium, and their surfaces are clean. The slag and the sludge do not come into contact with each other, so there is no mutual contamination between them. Therefore, the drying of the sludge is not limited by the type of slag and the type of sludge, and the blast furnace slag, converter slag or other slags can all provide heat, and both inorganic sludge and organic sludge can be dried. [Brief description of the drawings]

[0052] [Figure 1] FIG. 1 is a schematic diagram showing the structure of the combined drying apparatus for dry granulated slag and sludge according to the present invention. [Diagram 2] FIG. 2 is a view of FIG. 1 seen from direction A. [Diagram 3] FIG. 3 is a view of FIG. 1 seen from direction B. [Figure 4] FIG. 4 is a view of FIG. 1 seen from direction C. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0053] DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS Referring to Figures 1 to 4, the combined drying apparatus for dry granulated slag and sludge according to the present invention includes: A slag cooling treatment device 1 having a cylindrical structure, a driving mechanism 11 on the inner wall, a slag supply hopper 12 at the inlet of the slag, and a slag discharge mechanism 13 at the outlet; the slag cooling treatment device 1 is connected to a first driving device 14 capable of driving its rotation; a number of steel balls 2 and a steel ball transport device 3 connected to the inlet of the slag cooling treatment device 1; a high-temperature steel ball groove 4 whose end is connected to the outlet of the slag cooling treatment device 1; The sludge drying device 5 has a cylindrical structure, a propulsion mechanism 51 is provided on the inner wall, a sludge transport device 52 is provided at the sludge inlet, and a dried sludge discharge device 53 is provided at the outlet; the sludge drying device 5 is connected to a second driving device 54 that can drive its rotation; the inlet of the sludge drying device 5 is connected to the other end of the high-temperature steel ball groove 4.

[0054] Furthermore, the steel ball inlet of the steel ball transporting device 3 is connected to the outlet of the sludge drying device 5 by a low-temperature steel ball groove passage 6, and the steel ball outlet of the steel ball transporting device 3 is connected to the slag supply hopper 12 of the slag cooling treatment device 1 by a steel ball groove passage 7, so that the slag cooling treatment device 1, the steel ball transporting device 3, and the sludge drying device 5 are connected to each other in a triangular configuration.

[0055] Preferably, the steel ball transporting device 3 is installed so that the outlet side is inclined upward with respect to the horizontal plane, and the inclination angle is 25°-80°.

[0056] Preferably, the steel ball transporting device 3 has a cylindrical structure, a propulsion mechanism 31 is provided on the inner wall, and the steel ball transporting device 3 is connected to a third driving device 32 that can drive its rotation.

[0057] Preferably, the slag cooling treatment device 1 is installed so that the inlet side is inclined downward with respect to the horizontal plane, and the inclination angle is 0°-45°, preferably 5°-15°.

[0058] Preferably, the sludge drying apparatus 5 is installed horizontally or installed so that the outlet side is inclined downward with respect to the horizontal plane, and the inclination angle is 0°-15°.

[0059] Preferably, the slag discharge mechanism 13 and the dried sludge discharge device 53 are provided with an exhaust gas collecting and discharging device 8 .

[0060] Preferably, the first driving device 14 and the second driving device 54 each include a ring gear installed in the slag cooling treatment device or the sludge drying device, and a driving gear meshing with the ring gear, and the driving gear is installed at the output end of the reducer of the linked motor.

[0061] Preferably, the third driving device 32 includes a ring gear installed on the steel ball transporting device and a driving gear meshing with the ring gear, and the driving gear is installed on the output end of the reducer of the linked motor.

[0062] Preferably, the propulsion mechanism 11, 51, 31 is a screw shovel plate. Preferably, the slag cooling treatment device 1, the sludge drying device 5 and the steel ball transport device 3 are each provided with a support device 9 at both ends thereof.

[0063] Preferably, the slag discharge mechanism 13 is connected to a cooled slag collection device 16, below which a cooled slag hopper 17 is provided.

[0064] Preferably, the dry sludge discharge device 53 is connected to a dry sludge collector 18, below which a dry sludge hopper 19 is provided.

[0065] The combined drying process of dry granulated slag and sludge according to the present invention comprises the following steps: 1) Mixing and heating slag and spheres The high-temperature furnace slag 100 and some steel balls 2 are first sent to the rotating slag cooling treatment device 1 by the slag supply hopper 12, and the slag and balls are mixed. The high-temperature slag 100 is gradually cooled and crushed by the steel balls 2, and the heat is transferred to the steel balls 2. The high-temperature slag 100 is gradually cooled and crushed by the steel balls to form granular slag with a particle size of 150 mm or less and a temperature of less than 400 ° C. The granular slag is discharged by the slag discharge mechanism 13 at the end of the slag cooling treatment device 1, collected by the cooled slag collection device 16, and transferred to the cooled slag hopper 17 below for subsequent resource processing and utilization; the high-temperature steel balls 2 after absorbing heat move forward with the rotation of the slag cooling treatment device 1 and are discharged into the high-temperature steel ball groove 4. The weight ratio of the high-temperature slag to the steel balls is 1:50-100, and the temperature of the steel balls after absorbing heat is 200-400 ° C.

[0066] 2) Drying of sludge The high-temperature steel balls 2 are transported to the sludge drying device 5 through the high-temperature steel ball channel 4, and mixed with the sludge 200 injected by the sludge transport device 52 at the inlet. The mass ratio of the steel balls to the injected sludge is 2 to 10:1. The sludge drying device 5 rotates under the driving of the second driving device 54, so that the sludge 200 and the steel balls 2 inside roll, mix sufficiently uniformly, exchange heat, and dry the sludge 200 by the high-temperature steel balls 2. After the moisture content of the sludge 200 reaches a set value, the steel balls 2 and the sludge 200 are separated, and the sludge 200 is discharged by the dried sludge discharge device 53, collected by the dried sludge collector 18, and sent to the dried sludge hopper 19 below for subsequent resource recovery and utilization. The steel balls 2 after cooling are discharged from the outlet.

[0067] Furthermore, the steel balls 2 discharged from the sludge drying device 5 enter the low-temperature steel ball groove 6 and are transported into the steel ball transport device 3. Under the force of gravity and the propulsion action of the propulsion mechanism 31, the steel balls 2 are discharged from the outlet of the steel ball transport device 3 and enter the slag supply hopper 12 of the slag cooling treatment device 1, thereby completing a cycle treatment process.

[0068] Detailed process control parameters for an embodiment of the present invention are shown in Table 1.

[0069] [Table 1] [Explanation of symbols]

[0070] The symbols are: 1, slag cooling treatment device; 2, steel ball; 3, steel ball transport device; 4, high temperature steel ball groove; 5, sludge drying device; 6, low temperature steel ball groove; 7, steel ball groove; 8, exhaust gas collection and discharge device; 9, support device; 11, 31, 51, propulsion mechanism; 12, slag supply hopper; 13, slag discharge mechanism; 14, first drive device; 16, cooled slag collection device; 17, cooled slag hopper; 18, dried sludge collector; 19, dried sludge hopper; 52, sludge transport device; 53, dried sludge discharge device; 54, second drive device; 32, third drive device; 100, high temperature furnace slag; 200, sludge.

Claims

1. A method for slag cooling, granulation and sludge drying, comprising the steps of: 1) Mixing and heating slag and spheres In the slag cooling treatment device, high-temperature slag and steel balls are mixed in a weight ratio of 1:50-100, and the high-temperature slag and the steel balls are mixed sufficiently and uniformly by rolling, and heat exchange is performed between them, and the heat of the high-temperature slag is absorbed by the steel balls, and the high-temperature slag is gradually cooled and crushed by the steel balls to form granular slag with a particle size of ≦150 mm and a temperature of less than 400°C; the temperature of the steel balls after absorbing the heat is 200-400°C; 2) Separation of slug and ball The granular slag is discharged by the slag discharge mechanism, and the steel balls after absorbing heat are thrown into the high-temperature steel ball groove; 3) Drying of sludge The heat-absorbing steel balls are transported to the sludge drying device through the high-temperature steel ball channel and mixed with the injected sludge. The sludge drying device rotates under the driving force of the driving device, so that the sludge and steel balls inside roll, mix evenly and exchange heat, and the heat-absorbing steel balls dry the sludge. After the moisture content of the sludge reaches a set value, the steel balls and dried sludge are separated. The dried sludge is discharged by the dried sludge discharge device, and the cooled steel balls are discharged through the outlet. The mass ratio of the steel balls to the injected sludge is 2-10:

1.

2. 2. The method of claim 1, wherein the cooled steel balls are transported back into the slag cooling treatment device, forming a cyclic treatment process.

3. 2. The method according to claim 1, wherein the initial moisture content of the sludge is 30-95%, and the moisture content of the sludge after drying is 3-10%.

4. An apparatus for use in the method according to any one of claims 1 to 3, characterized in that it comprises: A slag cooling treatment device having a cylindrical structure, a propelling mechanism provided on the inner wall, a slag supply hopper provided at the inlet, and a slag discharge mechanism provided at the outlet; the slag cooling treatment device is provided with a first drive device capable of driving the rotation thereof; a number of steel balls and a steel ball transport device connected to the inlet of the slag cooling treatment device; a hot steel ball channel having an end connected to the outlet of said slag cooling treatment device; A sludge drying apparatus having a cylindrical structure, a propulsion mechanism provided on the inner wall, a sludge transport device provided at the inlet, and a dried sludge discharge device provided at the outlet; the sludge drying apparatus is provided with a second driving device capable of driving its rotation; the inlet of the sludge drying apparatus is connected to the other end of the high-temperature steel ball channel.

5. 5. The apparatus according to claim 4, further comprising a low-temperature steel ball channel, one end of which is connected to the outlet of the sludge drying apparatus and the other end of which is connected to the steel ball inlet of the steel ball transporting apparatus.

6. The apparatus according to claim 4, characterized in that the steel ball inlet of the steel ball transporting device is connected to the outlet of the sludge drying device by a low-temperature steel ball groove, and the steel ball outlet of the steel ball transporting device is connected to the slag supply hopper of the slag cooling treatment device, so that the slag cooling treatment device, the steel ball transporting device, and the sludge drying device are connected to each other in a triangular configuration.

7. The apparatus according to claim 4, characterized in that the steel ball transporting device is installed so that the outlet side is inclined upward, and the inclination angle between the steel ball transporting device and a horizontal plane is 25°-80°.

8. 5. The apparatus according to claim 4, wherein the steel ball transporting device has a cylindrical structure, a propulsion mechanism is provided on the inner wall, and the steel ball transporting device is provided with a third driving device capable of driving its rotation.

9. 5. The apparatus according to claim 4, wherein the slag cooling treatment device and the sludge drying device are installed at an acute angle.

10. The apparatus according to claim 4, wherein the slag cooling treatment device is installed horizontally or with an inlet side inclined downward, and an inclination angle between the slag cooling treatment device and a horizontal plane is 0°-45°.

11. The apparatus described in claim 4, characterized in that the slag cooling treatment device is installed horizontally or with the inlet side inclined downward, and the inclination angle between the slag cooling treatment device and the horizontal plane is 5°-15°.

12. The apparatus according to claim 4, wherein the sludge drying apparatus is installed horizontally or with the outlet side tilted downward, and the tilt angle between the sludge drying apparatus and the horizontal plane is 0°-15°.

13. The apparatus according to claim 4, characterized in that the slag discharge mechanism and the dried sludge discharge device are provided with an exhaust gas collection and discharge device.

14. The apparatus according to claim 4, characterized in that the first driving device and the second driving device each include a ring gear installed in the slag cooling treatment device or the sludge drying device, and a driving gear meshing with the ring gear, and the driving gear is installed at the output end of the reducer of the linked motor.

15. 9. The device according to claim 8, characterized in that the third driving device includes a ring gear installed on the steel ball transport device and a driving gear meshing with the ring gear, and the driving gear is installed on the output end of the reducer of the linked motor.

16. The apparatus described in claim 4, characterized in that the propulsion mechanism provided on the inner wall of the cylindrical structure of the sludge drying apparatus is a screw shovel plate.

17. The apparatus described in claim 8, characterized in that the propulsion mechanism provided on the inner wall of the cylindrical structure of the steel ball transporting device is a screw shovel plate.

Citation Information

Patent Citations

  • Method and apparatus for drum process direct drying of inorganic sludge

    CN109293194A

  • Process and device for coupling drying of high temperature steel slag and sludge

    CN110330211A

  • Rotating barrel treatment process and equipment suitable for total steelmaking slag treatment

    JP2019520481A