Compaction Work Management System

The compaction work management system uses imaging and skeletal analysis to ensure even compaction in concrete construction, addressing defects by monitoring and adjusting compaction times in predefined areas, enhancing concrete quality.

JP7567121B2Active Publication Date: 2024-10-16WAKACHIKU CONSTR
View PDF 9 Cites 0 Cited by

Patent Information

Application Number
JP2020147761
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2020-09-02
Publication Date
2024-10-16
Estimated Expiration
2040-09-02

AI Technical Summary

Technical Problem

In concrete construction, uncompacted areas can lead to initial defects such as honeycombing, and there is a need for precise management of compaction work to ensure even compaction across the entire work area.

Method used

A compaction work management system using an imaging unit, a skeleton estimation unit, and a work position estimation unit to accurately measure and monitor compaction positions and times in predefined work unit blocks, ensuring even compaction by notifying workers when necessary.

Benefits of technology

The system enables accurate measurement and management of compaction work, preventing defects by ensuring uniform compaction across the work area, thereby improving the quality of concrete.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007567121000001
    Figure 0007567121000001
  • Figure 0007567121000002
    Figure 0007567121000002
  • Figure 0007567121000003
    Figure 0007567121000003
Patent Text Reader

Abstract

To provide a compaction work management system capable of accurately measuring a compaction position.SOLUTION: A compaction work management system 1 includes: a camera 3 for imaging a work region 10 of a compaction work including a worker P; a skeleton estimation part 21 for estimating a skeleton of the worker P using a photographic image photographed by the camera 3; and a work position estimation part 22 for estimating a work position of the compaction work of the worker P on the basis of the skeleton information estimated by the skeleton estimation part 21.SELECTED DRAWING: Figure 2
Need to check novelty before this filing date? Find Prior Art

Description

[Technical Field]

[0001] The present disclosure relates to a compaction operation management system. [Background technology]

[0002] In concrete construction, the process of removing air bubbles trapped in the concrete when it is poured into a formwork and increasing its density is called "compaction." This compaction can be performed, for example, by inserting a vibrator into the concrete and directly vibrating the concrete within the formwork (see, for example, Patent Document 1). [Prior art documents] [Patent documents]

[0003] [Patent Document 1] Japanese Patent Application Laid-Open No. 2014-198991 Summary of the Invention [Problem to be solved by the invention]

[0004] If there are areas within the concrete pouring work area that have not been compacted, initial defects such as junk are likely to occur. To prevent this, it is desirable to be able to accurately manage the compaction work so that the compaction work is carried out evenly throughout the entire work area. To improve management accuracy, it is desirable to be able to accurately measure the position of the compaction work.

[0005] The present disclosure aims to provide a compaction work management system that can accurately measure compaction positions. [Means for solving the problem]

[0006] A compaction work management system according to one aspect of an embodiment of the present invention includes an imaging unit that captures an image of a work area for compaction work including a worker, a skeleton estimation unit that estimates the skeleton of the worker using an image captured by the imaging unit, and a work position estimation unit that estimates the work position of the worker for the compaction work based on the skeleton information estimated by the skeleton estimation unit. Scaffolding boards on which the worker stands when performing the compaction work are installed at a height position above the surface of the concrete within the work area, and the scaffolding boards are installed so that the height position is constant throughout the work area, and the work position estimation unit estimates the position of the worker's feet as the work position based on the skeletal information. . Similarly, a compaction work management system according to one aspect of an embodiment of the present invention comprises an imaging unit that images the work area of ​​the compaction work including the worker, a skeleton estimation unit that estimates the skeleton of the worker using the image captured by the imaging unit, and a work position estimation unit that estimates the work position of the worker for the compaction work based on the skeletal information estimated by the skeleton estimation unit, and comprises a monitoring unit that divides the work area of ​​the compaction work into specified areas to set multiple work unit blocks and monitors the compaction time for each work unit block, the multiple work unit blocks being rectangular, and the monitoring unit measures the compaction time in a specified work unit block based on information about the work position of the worker estimated by the work position estimation unit. Similarly, a compaction work management system according to one aspect of an embodiment of the present invention comprises an imaging unit that images a work area for compaction work including a worker, a skeleton estimation unit that estimates the skeleton of the worker using an image taken by the imaging unit, and a work position estimation unit that estimates the work position of the worker for the compaction work based on the skeleton information estimated by the skeleton estimation unit, and further comprises a monitoring unit that divides the work area for the compaction work into predetermined areas to set a plurality of work unit blocks and monitors the compaction time for each of the work unit blocks, and the monitoring unit monitors the compaction time estimated by the work position estimation unit. Based on the information on the work position of the worker, the compaction time in the specified work unit block is measured, and if the compaction time in the specified work unit block is less than a specified time based on the measured compaction time, a warning is given to the worker that the compaction work in the specified work unit block is insufficient and that compaction work will be performed again, and if the measured compaction time exceeds the specified time, the worker is notified that the compaction work in the specified work unit block has been performed sufficiently and that he may move to another work unit block. [Effects of the Invention]

[0007] According to the present disclosure, a compaction work management system can be provided that can measure the compaction position with high accuracy. [Brief explanation of the drawings]

[0008] [Figure 1] Schematic configuration diagram of a compaction work management system according to an embodiment [Figure 2] Functional block diagram of the compaction work management system [Figure 3] Management device hardware configuration diagram [Figure 4] FIG. 10 is a diagram illustrating an example of a skeletal model of a worker estimated by the management device. [Figure 5] FIG. 10 is a diagram showing an example of a management mode of a work area by a management device; [Figure 6] Compaction work management process flowchart DETAILED DESCRIPTION OF THE INVENTION

[0009] Hereinafter, embodiments will be described with reference to the accompanying drawings. To facilitate understanding of the description, the same components in the drawings will be denoted by the same reference numerals as much as possible, and duplicated descriptions will be omitted.

[0010] Fig. 1 is a schematic configuration diagram of a compaction work management system 1 according to an embodiment. Fig. 2 is a functional block diagram of the compaction work management system 1.

[0011] As shown in Figure 1, in concrete pouring work, compaction is performed on a work area 10 consisting of ready-mixed concrete (mixed concrete) poured into a formwork. In the example of Figure 1, the formwork is rectangular, and the work area 10 is also approximately rectangular parallelepiped in shape along the formwork, with its top surface being a rectangular flat surface. During compaction, a worker P uses a vibration generator such as a vibrator 11 to input vibrations into the ready-mixed concrete in the work area 10 (see Figure 4). This removes air bubbles trapped in the concrete and increases its density. To ensure the compaction effect throughout the entire work area, compaction is performed at intervals of approximately 50 cm or less, and the compaction time at each location is preferably approximately 5 to 15 seconds. In this way, pouring and compaction are repeated for multiple layers of a specified height until the construction object is finally completed.

[0012] The compaction work management system 1 of this embodiment is a system for accurately managing the compaction work in such concrete pouring work so that it is performed evenly throughout the entire work area 10 within the formwork. The compaction work management system 1 includes a management device 2 and a camera 3 (imaging unit).

[0013] The camera 3 captures an image of the entire work area 10 for compaction work, including the worker P. The camera 3 is communicably connected to the management device 2, and transmits the captured image of the work area 10 to the management device 2. The camera 3 may be any camera that can capture image information that can acquire the relative positional relationship between the work area 10 and the worker P performing compaction work on this work area 10, and the imaging method is not particularly limited (for example, a drone may be used). The captured image may be a still image or a video.

[0014] The management device 2 measures the work position of the compaction work based on the image of the work area 10 captured by the camera 3, and manages the compaction time at each work position. In particular, in this embodiment, the skeleton of the worker P is estimated, and the work position is estimated based on the estimated skeleton information.

[0015] Fig. 4 is a diagram showing an example of a skeletal model M of a worker P estimated by the management device 2. As shown in Fig. 4, the management device 2 can estimate the skeletal model M (skeletal information) of the worker P using an image of the worker P performing compaction work in the work area 10.

[0016] Furthermore, the management device 2 can manage whether compaction is being carried out throughout the entire work area 10, based on information about the work position estimated based on the skeleton information. Figure 5 is a diagram showing an example of how the work area 10 is managed by the management device 2. In this embodiment, as shown in Figure 5, the management device 2 divides the work area 10 into a plurality of meshed cells (hereinafter also referred to as "work unit blocks") 12, and can manage the progress of compaction work for each individual work unit block 12.

[0017] As shown in FIG. 2, the management device 2 includes a framework estimation unit 21, a work position estimation unit 22, and a compaction monitoring unit 23 as functions related to the management of compaction work.

[0018] The skeleton estimation unit 21 estimates a skeleton model M of the worker P using an image captured by the camera 3. The skeleton estimation unit 21 estimates a skeleton model M of the worker P from a captured image in which the worker P appears, for example, as shown in FIG. 4. To estimate the skeleton model M based on the image of the worker P, an inference device such as a deep neural network can be used, which acquires the correspondence between a person's image and a skeleton by a machine learning method such as deep learning.

[0019] The skeletal model M is expressed as a link model that connects the major joints of worker P, such as the neck, shoulders, elbows, wrists, waist, hips, knees, and ankles, with linear links between these joints, as shown in Figure 4. Furthermore, if multiple workers appear in a single image, the skeletal models of each worker can be estimated individually.

[0020] The work position estimation unit 22 estimates the work position of the worker P performing compaction work based on the skeletal information estimated by the skeleton estimation unit 21. The work position estimation unit 22 can calculate the positions of the head, hands, and feet of the worker P, for example, by using the position coordinates of the tips of the links corresponding to the head, hands, and feet of the skeleton model M shown in FIG. 4. In this embodiment, the work position estimation unit 22 uses the position coordinates of the tip 13L of the left foot link and the tip 13R of the right foot link of the skeleton model M to estimate the work position of the worker P. As shown in FIG. 5, the work position estimation unit 22 plots the positions of both feet 13L and 13R of the worker P in the work area 10 divided into a plurality of cells 12, and estimates that one specific cell 12A in which the left foot 13L and the right foot 13R (or the center position of the line connecting the left foot 13L and the right foot 13R) are located is the work position where the worker P is currently performing compaction work. In addition, when only one foot (left foot 13L or right foot 13R) can be recognized due to an obstacle or the like, the work position of the worker P's feet is estimated using only the information on that one foot.

[0021] That is, the work position estimation unit 22 estimates the position of the feet of the worker P as the work position based on the skeleton information estimated by the skeleton estimation unit 21. Note that the term "feet" used in this embodiment refers to the area hidden by the feet of the worker P when the worker P is standing.

[0022] The compaction monitoring unit 23 divides the work area 10 for the compaction work into predetermined areas to set a plurality of work unit blocks 12, and monitors the compaction time for each work unit block 12. The compaction monitoring unit 23 measures the compaction time for a predetermined work unit block 12A based on information about the work position of the worker estimated by the work position estimation unit 22.

[0023] In addition, if the compaction time in a specific work unit block 12A is less than a predetermined time, the compaction monitoring unit 23 can alert the worker P by any method such as sound or light to the fact that the compaction is insufficient, so as to urge the worker P to perform the compaction work again.

[0024] Fig. 3 is a hardware configuration diagram of the management device 2. As shown in Fig. 3, the management device 2 can be physically configured as a computer system including a CPU (Central Processing Unit) 101, RAM (Random Access Memory) 102 and ROM (Read Only Memory) 103 which are main storage devices, input devices 104 such as a keyboard and a mouse which are input devices, output device 105 such as a display, communication module 106 which is a data transmission / reception device such as a network card, auxiliary storage device 107, etc.

[0025] Each function of the management device 2 shown in Figure 2 is realized by loading predetermined computer software (compaction work management program) onto hardware such as the CPU 101 and RAM 102, thereby operating the communication module 106, input device 104, and output device 105 under the control of the CPU 101, and reading and writing data from and to the RAM 102 and auxiliary storage device 107. In other words, by executing the compaction work management program according to this embodiment on a computer, the management device 2 functions as the skeleton estimation unit 21, work position estimation unit 22, and compaction monitoring unit 23 of Figure 2.

[0026] The compaction work management program of this embodiment is stored, for example, in a storage device provided in a computer. Note that the compaction work management program may be configured so that part or all of it is transmitted via a transmission medium such as a communication line, and is received and recorded (including installed) by a communication module or the like provided in the computer. Also, the compaction work management program may be configured so that part or all of it is stored on a portable storage medium such as a CD-ROM, DVD-ROM, or flash memory, and then recorded (including installed) in the computer.

[0027] The management device 2 may be a circuit configured with an analog circuit, a digital circuit, or an analog-digital mixed circuit. It may also include a control circuit that controls each function of the management device 2. Each circuit may be implemented using an ASIC (Application Specific Integrated Circuit), FPGA (Field Programmable Gate Array), etc.

[0028] FIG. 6 is a flowchart of the compaction work management process.

[0029] In step S1, the worker P starts compaction work in the work area 10, and the compaction work management system 1 also starts up.

[0030] In step S2, the camera 3 captures an image of the work area 10 including the worker P who is performing the compaction work, and the captured image is sent to the management device 2.

[0031] In step S3, the skeleton estimation unit 21 of the management device 2 estimates the skeleton of the worker P in the captured image. The skeleton estimation unit 21 outputs the skeleton model M of the worker P described with reference to FIG. 4 using, for example, an inference model that acquires the correspondence between a person's image and a skeleton through machine learning.

[0032] In step S4, the work position estimation unit 22 determines the work section (one work unit block 12A within the work area 10) where the worker P is currently performing compaction work from the foot position information of the skeleton estimation result.

[0033] In step S5, the compaction monitoring unit 23 measures the compaction time in the task unit block 12A. The compaction time can be measured, for example, as the time that the worker P stays in a specific block. The compaction time can also be measured in conjunction with the driving time of the vibrator 11. In this case, for example, the time from when the vibrator 11 is activated to when it is stopped while the worker P is in a specific block can be output as the compaction time for that block.

[0034] In step S6, the compaction monitoring unit 23 monitors the compaction work based on the compaction time measured in step S5. For example, if the compaction time in a specific task unit block 12A is less than a predetermined time, the compaction monitoring unit 23 issues a warning to the worker P that compaction in this block is insufficient and that compaction will be performed again. Alternatively, if the compaction time exceeds a predetermined time, the compaction monitoring unit 23 can notify the worker P that compaction has been sufficiently performed and that he may move on to another block.

[0035] The monitoring of the compaction work in step S6 is carried out until compaction is completed for a predetermined time or more in all cells 12 in the work area 10.

[0036] As such, the compaction work management system 1 of this embodiment comprises a camera 3 that captures an image of the work area 10 for compaction work including worker P, a skeleton estimation unit 21 that estimates the skeleton of worker P using the image captured by the camera 3, and a work position estimation unit 22 that estimates the work position of worker P for compaction work based on the skeleton information estimated by the skeleton estimation unit 21.

[0037] With this configuration, the position of the worker P in the work area 10 can be estimated with high accuracy using the skeletal model M of the worker P estimated based on the captured image, and by using this accurately estimated position information, the position where the compaction work will be performed can also be determined with high accuracy. This makes it possible to accurately manage the compaction work so that the compaction work is performed evenly throughout the entire work area 10, improving the quality of the concrete.

[0038] Furthermore, in the compaction work management system 1 of this embodiment, the work position estimation unit 22 estimates the positions 13L and 13R of the feet of the worker P as the work position for the compaction work based on the skeletal information.

[0039] The working position for the compaction work can be determined by using any of the positions of the worker P's body parts based on the skeletal model M (e.g., the positions of the hands, torso, head, or center of gravity of the torso), but it is particularly preferable to use the positions 13L and 13R of the worker P's feet. In most cases, compaction work is performed while standing on scaffolding or other structures installed above the surface of the ready-mixed concrete in the work area 10. Because the height of the scaffolding or other structures is constant, the position of the worker's feet remains roughly constant even when the worker P moves to any position on the work area 10. Meanwhile, the height positions of the worker P's hands, head, and torso change depending on changes in the worker P's posture. In this embodiment, the working position is estimated from an image of the work area 10 captured by the camera 3. Therefore, if the height position serving as the reference for estimating the working position remains constant even when the block 12 being worked on changes, errors in estimating the coordinates of the working position can be minimized, resulting in more accurate estimation of the working position.

[0040] Furthermore, although it would be ideal to use the position of the vibrator 11 as the compaction work position, because the vibrator 11 is inserted below the surface of the ready-mixed concrete during compaction work (see FIG. 4), it is not possible to directly obtain position information for the vibrator 11 from the image captured by the camera 3. For this reason, in this embodiment, the work position is estimated based on the positions of each measurable part of the worker P's body. In this case, if the hand position is used as the basis for work position estimation, differences in the worker P's physique, such as their height and arm length, must be taken into account. Furthermore, because the relative position to the vibrator 11 changes depending on changes in posture, such as how the worker grips the tool, the calculation process becomes complicated when attempting to accurately estimate the work position. In contrast, the positional relationship between the worker's feet and the vibrator 11 is less affected by the worker P's physique, making it possible to accurately estimate the work position through a simpler process.

[0041] The compaction work management system 1 of this embodiment also divides the work area 10 for the compaction work into predetermined areas to set a plurality of work unit blocks 12, and is equipped with a compaction monitoring unit 23 that monitors the compaction time for each work unit block 12. The compaction monitoring unit 23 measures the compaction time for a predetermined work unit block 12A based on information about the work position of the worker P estimated by the work position estimation unit 22.

[0042] This configuration makes it possible to monitor whether compaction has been carried out for the specified compaction time for each of the multiple work unit blocks 12 that divide the work area 10, thereby eliminating any omissions in compaction work throughout the entire work area 10 and improving the quality of the concrete.

[0043] The present embodiment has been described above with reference to specific examples. However, the present disclosure is not limited to these specific examples. Design modifications to these specific examples made by a person skilled in the art as appropriate are also included within the scope of the present disclosure as long as they comprise the features of the present disclosure. The elements of the above-described specific examples, as well as their arrangement, conditions, shape, etc., are not limited to those exemplified and can be modified as appropriate. The elements of the above-described specific examples can be combined in various ways as appropriate, as long as no technical contradictions arise. [Explanation of symbols]

[0044] 1 Compaction work management system 2 Management device 3 Camera (imaging unit) 21 Skeleton Estimation Department 22 Work position estimation section 23 Compaction Monitoring Unit 10 work area 12 Unit of Work Blocks 13L, 13R Foot position P worker M Skeleton Model

Claims

1. An imaging unit that images a work area of ​​a compaction work including a worker; a skeleton estimation unit that estimates a skeleton of the worker using an image captured by the imaging unit; and a work position estimation unit that estimates a work position of the worker for the compaction work based on the skeleton information estimated by the skeleton estimation unit; Equipped with A scaffold board on which the worker stands when performing the compaction work is installed at a height above the surface of the concrete in the work area, The scaffolding boards are installed so that the height position is constant throughout the work area, The work position estimation unit estimates a position of a foot of the worker as the work position based on the skeletal information. Compaction work management system.

2. An imaging unit that images a work area of ​​a compaction work including a worker; a skeleton estimation unit that estimates a skeleton of the worker using an image captured by the imaging unit; and a work position estimation unit that estimates a work position of the worker for the compaction work based on the skeleton information estimated by the skeleton estimation unit; Equipped with A monitoring unit is provided for dividing the work area of ​​the compaction work into predetermined areas to set a plurality of work unit blocks and monitoring the compaction time for each of the work unit blocks, The plurality of task unit blocks are rectangular, The monitoring unit measures the compaction time in a predetermined task unit block based on information on the work position of the worker estimated by the work position estimation unit. Compaction work management system.

3. An imaging unit that images a work area of ​​a compaction work including a worker; a skeleton estimation unit that estimates a skeleton of the worker using an image captured by the imaging unit; and a work position estimation unit that estimates a work position of the worker for the compaction work based on the skeleton information estimated by the skeleton estimation unit; Equipped with A monitoring unit is provided for dividing the work area of ​​the compaction work into predetermined areas to set a plurality of work unit blocks and monitoring the compaction time for each of the work unit blocks, The monitoring unit measures the compaction time in a predetermined task unit block based on information on the work position of the worker estimated by the work position estimation unit, If the compaction time in the specified task unit block is less than a specified time based on the measured compaction time, a warning is issued to the worker to the effect that the compaction work in the specified task unit block is insufficient and that the compaction work should be performed again; When the measured compaction time exceeds the predetermined time, a notification is given to the worker that the compaction work in the predetermined task unit block has been sufficiently performed and that the worker may move to another task unit block. Compaction work management system.

Citation Information

Patent Citations

  • Apparatus and method for displaying concrete compacting position

    JP2008144384A

  • Unit for displaying degree of compaction of concrete, and method for displaying degree of compaction of concrete

    JP2013053492A

  • Concrete compaction control device, concrete compaction device and concrete compaction method

    JP2014074297A

  • Tamping state management system and tamping state management method

    JP2014198991A

  • Work support device, work support method, and program

    JP2018109880A