Vapor chamber and method for manufacturing vapor chamber
The vapor chamber design with a recessed flow path and protrusions on the first metal sheet, combined with a top surface joint and gap flow path, addresses mechanical strength and heat transport issues, ensuring efficient cooling and reduced leakage.
Patent Information
- Application Number
- JP2020112762
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-06-30
- Publication Date
- 2024-10-16
- Estimated Expiration
- 2040-06-30
AI Technical Summary
Existing vapor chambers suffer from insufficient mechanical strength and heat transport performance due to annealing during manufacturing, which affects their ability to efficiently cool high-performance electronic components.
A vapor chamber design featuring a first metal sheet with a recessed flow path and protrusions, and a second metal sheet joined via a top surface joint with a gap flow path, allowing for improved mechanical strength and heat transport properties through localized thermal annealing and capillary action.
The design enhances mechanical strength and heat transport efficiency by minimizing thermal annealing effects, improving fluid circulation and reducing leakage, while maintaining effective cooling performance under various orientations.
Smart Images

Figure 0007568431000001 
Figure 0007568431000002 
Figure 0007568431000003
Abstract
Description
[Technical field]
[0001] The present disclosure relates to vapor chambers and methods of making vapor chambers. [Background technology]
[0002] Electronic components such as semiconductor elements mounted in electric and electronic devices such as notebook computers, digital cameras, and mobile phones tend to generate more heat due to their high density mounting as a result of their high performance. In order to operate electric and electronic devices normally for a long period of time, it is necessary to efficiently cool the electronic components.
[0003] For example, Patent Document 1 describes a vapor chamber having a first metal sheet and a second metal sheet, and a liquid flow path portion in a sealed space provided between the first metal sheet and the second metal sheet. In the vapor chamber of Patent Document 1, for each groove constituting the liquid flow path portion, the width of the first communication groove is larger than the width of the first mainstream groove and the width of the second mainstream groove, the width of the second communication groove is larger than the width of the second mainstream groove and the width of the third mainstream groove, the depth of the first communication groove is deeper than the depth of the first mainstream groove and the depth of the second mainstream groove, and the depth of the second communication groove is deeper than the depth of the second mainstream groove and the depth of the third mainstream groove.
[0004] In the vapor chamber of Patent Document 1, the first metal sheet and the second metal sheet are joined by diffusion bonding, brazing, or the like. When performing diffusion bonding or brazing, the first metal sheet and the second metal sheet are entirely heat-treated and annealed by heat. In this way, the entire vapor chamber is annealed by heat, so the mechanical strength of the vapor chamber is reduced. Also, in the vapor chamber of Patent Document 1, the grooves constituting the liquid flow path satisfy a predetermined relationship to improve the heat transport efficiency. However, this is insufficient for the cooling performance requirements in electric and electronic devices, which have been increasing in recent years. [Prior art documents] [Patent documents]
[0005] [Patent Document 1] JP 2019-158323 A Summary of the Invention [Problem to be solved by the invention]
[0006] An object of the present disclosure is to provide a vapor chamber having excellent mechanical strength and heat transport properties, and a method for manufacturing the vapor chamber. [Means for solving the problem]
[0007] [1] A vapor chamber having a working fluid in an internal space formed between a first metal sheet and a second metal sheet, the first metal sheet having a recessed flow path and at least one protrusion, the recessed flow path being provided on an inner surface of the first metal sheet, the protrusion protruding from the inner surface of the first metal sheet toward the second metal sheet, and a top surface of the protrusion abutting the second metal sheet, the vapor chamber having at least one top surface joint and a gap flow path portion, the top surface joint joining a portion of the top surface of the protrusion to the second metal sheet, and the gap flow path portion separating the top surface from the second metal sheet. [2] The vapor chamber described in [1] above, wherein the gap flow path portion is provided between a top surface abutment portion of the top surface of the first metal sheet that is not joined to the second metal sheet and an inner surface abutment portion of the second metal sheet that abuts against the top surface abutment portion, and has a blocking portion on the top surface joint portion side of the top surface abutment portion and an opening portion on the side side of the protruding portion of the top surface abutment portion. [3] The vapor chamber described in [2] above, wherein the gap length from the blocking portion to the opening is longer than the gap width between the top surface abutment portion and the inner surface abutment portion. [4] The vapor chamber described in [2] or [3] above, wherein the gap flow path portion has an average gap width between the top surface abutment portion and the inner surface abutment portion of 1.0 μm or more and 100.0 μm or less. [5] The vapor chamber according to any one of the above [2] to [4], wherein the gap flow passage portion has an average gap length from the blocking portion to the opening portion of 40.0 μm or more. [6] A vapor chamber described in any one of [2] to [5] above, wherein the gap flow passage portion has a gap expansion portion on the blocked portion side, and the average gap width between the top surface abutment portion and the inner surface abutment portion in the gap expansion portion is longer than the average gap width in the gap flow passage portion other than the gap expansion portion. [7] A vapor chamber described in any one of [1] to [6] above, wherein the ratio (t2 / t1) of the sheet thickness t2 at the protruding portion of the first metal sheet to the sheet thickness t1 at the recessed flow path of the first metal sheet is 0.1 or more and 10.0 or less. [8] The vapor chamber according to any one of the above [1] to [7], wherein the protrusion extends along the longitudinal direction of the vapor chamber. [9] The vapor chamber according to any one of the above [1] to [8], wherein the vapor chamber has a plurality of the top surface bonding portions on one of the protruding portions.
[10] A vapor chamber described in any one of [1] to [9] above, wherein the second metal sheet has at least one protrusion on its inner surface, the protrusion of the second metal sheet protruding from the inner surface of the second metal sheet toward the first metal sheet, and the top surface of the protrusion abuts the recessed flow path of the first metal sheet.
[11] A method for manufacturing a vapor chamber according to any one of the above [1] to
[10] , comprising a laser bonding step of forming the top surface bonding portion by laser.
[12] The method for manufacturing a vapor chamber described in
[11] above, further comprising a laser welding process of welding the outer edge of the first metal sheet and the outer edge of the second metal sheet with a laser before or after the laser joining process.
[13] A method for manufacturing a vapor chamber described in
[11] or
[12] above, further comprising a press processing step of forming the recessed flow path and the protruding portion of the first metal sheet by press molding prior to the laser joining step and the laser welding step. Effect of the Invention
[0008] According to the present disclosure, it is possible to provide a vapor chamber having excellent mechanical strength and heat transport properties, and a method for manufacturing a vapor chamber. [Brief description of the drawings]
[0009] [Figure 1] FIG. 1 is a perspective view showing an example of a vapor chamber of the first embodiment. [Diagram 2] FIG. 2 is an enlarged cross-sectional view of surface A in FIG. [Diagram 3] FIG. 3 is an enlarged cross-sectional view showing another example of the second metal sheet constituting the vapor chamber of the first embodiment. [Figure 4] FIG. 4 is a perspective view showing another example of the protruding portion constituting the vapor chamber of the first embodiment. [Diagram 5] FIG. 5 is a perspective view showing an example of a vapor chamber of the second embodiment. [Figure 6] FIG. 6 is an enlarged cross-sectional view of surface B of FIG. [Figure 7] FIG. 7 is an enlarged cross-sectional view showing another example of the protruding portion constituting the vapor chamber of the second embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0010] Hereinafter, a detailed description will be given based on an embodiment.
[0011] As a result of extensive research, the inventors have attempted to improve the mechanical strength and heat transport properties by focusing on the configuration of the joint that joins the first metal sheet and the second metal sheet.
[0012] The vapor chamber of one embodiment is a vapor chamber having a working fluid in an internal space formed between a first metal sheet and a second metal sheet, the first metal sheet having a recessed flow path and at least one or more protrusions, the recessed flow path being provided on the inner surface of the first metal sheet, the protrusions protruding from the inner surface of the first metal sheet toward the second metal sheet, and the top surface of the protrusions abutting the second metal sheet, the vapor chamber having at least one or more top surface joints and gap flow path portions, the top surface joints joining a portion of the top surface of the protrusions to the second metal sheet, and the gap flow path portions separating the top surface from the second metal sheet.
[0013] (First embodiment) Fig. 1 is a perspective view showing an example of a vapor chamber of the first embodiment. Fig. 2 is an enlarged cross-sectional view of surface A of Fig. 1. For convenience, Fig. 1 shows a partially transparent state so that the internal structure of the vapor chamber can be seen. In Figs. 1 and 2, the flow direction of the gas phase working fluid F(G) is indicated by a solid arrow, and the flow direction of the liquid phase working fluid F(L) is indicated by a hollow arrow.
[0014] As shown in FIGS. 1 and 2, the vapor chamber 1 of the first embodiment has a first metal sheet 10 and a second metal sheet 20. The first metal sheet 10 and the second metal sheet 20 are joined together so that the inner surface 10a of the first metal sheet 10 and the inner surface 20a of the second metal sheet 20 face each other. That is, the first metal sheet 10 and the second metal sheet 20 are closed inside. The vapor chamber 1 has a working fluid in an internal space S formed between the first metal sheet 10 and the second metal sheet 20. The internal space S is sealed by the first metal sheet 10 and the second metal sheet 20. The working fluid is sealed in the internal space S provided inside the vapor chamber 1.
[0015] From the viewpoint of the cooling performance of the vapor chamber 1, the working fluid sealed in the internal space S may be, for example, pure water, ethanol, methanol, or acetone.
[0016] The first metal sheet 10 constituting the vapor chamber 1 includes a recessed flow passage 11 and at least one protrusion 12 .
[0017] 1, the recessed flow passage 11 is provided on the inner surface 10a of the first metal sheet 10. The recessed flow passage 11 provided on the inner surface 10a side is recessed from the outer edge 10c of the first metal sheet 10 to the center of the inner surface 10a. For example, the recessed flow passage is a space excluding the protruding portion 12 and the gap flow passage portion 14 from the internal space S. A working fluid mainly in a gas phase flows through the recessed flow passage 11.
[0018] The protrusion 12 protrudes from the inner surface 10a of the first metal sheet 10 toward the inner surface 20a of the second metal sheet 20. A top surface 13 of the protrusion 12 abuts against the inner surface 20a of the second metal sheet 20. For example, the protrusion 12 has a rectangular prism shape.
[0019] As shown in FIG. 2, the vapor chamber 1 includes at least one top surface joint portion 13a and a gap flow passage portion .
[0020] The top surface bonding portion 13a bonds a part of the top surface 13 of the protrusion 12 to the second metal sheet 20. In this manner, at the abutment surface between the top surface 13 of the protrusion 12 and the inner surface 20a of the second metal sheet 20, the top surface bonding portion 13a bonds a part of the top surface 13 of the protrusion 12 to a part of the inner surface 20a of the second metal sheet 20.
[0021] The vapor chamber 1 does not include a thermally annealed portion 50 that is generated by heat when forming the top surface joint 13a that joins the first metal sheet 10 and the second metal sheet 20 throughout the vapor chamber 1, but includes it locally in a portion adjacent to the top surface joint 13a. For example, as shown in Fig. 2, the vapor chamber 1 includes a thermally annealed portion 50 that is formed in the second metal sheet 20 adjacent to the top surface joint 13a. The metal structure of the thermally annealed portion 50 and the metal structure of the portion other than the thermally annealed portion 50 are clearly different when observed with an SEM.
[0022] The first metal sheet 10 and the second metal sheet 20 are joined via the top surface joint 13a. The length 13ax of the top surface joint 13a, which joins a part of the top surface 13 and a part of the inner surface 20a, is smaller than the length 12x of the protrusion 12. From the viewpoint of suppressing a decrease in the mechanical strength of the vapor chamber 1, the ratio (13ax / 12x) of the length 13ax of the top surface joint 13a to the length 12x of the protrusion 12 is preferably smaller than 0.5. The length 13ax of the top surface joint 13a and the length 12x of the protrusion 12 are distances perpendicular to the thickness direction of the vapor chamber 1 in a cross section of the vapor chamber 1 including the top surface joint 13a as shown in FIG. 2.
[0023] In the gap flow passage portion 14, the top surface 13 of the first metal sheet 10 is separated from the second metal sheet 20. In the gap flow passage portion 14, a liquid phase working fluid flows.
[0024] Such gap flow path portion 14 is provided between top surface abutment portion 13b of top surface 13 of protrusion 12 and inner surface abutment portion 21 of second metal sheet 20. Top surface abutment portion 13b of first metal sheet 10 is a portion of top surface 13 of first metal sheet 10 that is not joined to inner surface 20a of second metal sheet 20. Inner surface abutment portion 21 of second metal sheet 20 is a portion of inner surface 20a of second metal sheet 20 that abuts top surface abutment portion 13b.
[0025] Top surface abutment portion 13b and inner surface abutment portion 21 are not joined but abut on each other so as to be separable from each other. Gap flow passage portion 14 is a gap that occurs when top surface abutment portion 13b and inner surface abutment portion 21 abut on each other. For the sake of convenience, in order to make gap flow passage portion 14 easy to understand, top surface abutment portion 13b and inner surface abutment portion 21 are shown clearly separated from each other.
[0026] Furthermore, the gap flow passage section 14 has a blocking section 14a on the top surface joint 13a side of the top surface abutment section 13b. The blocking section 14a is a portion where the top surface abutment section 13b and the top surface joint 13a are connected, and is blocked by the top surface joint 13a. Furthermore, the gap flow passage section 14 has an opening section 14b on the protruding portion side surface side of the top surface abutment section 13b. The protruding portion side surface side is the side surface 12a side of the protruding portion 12, which is the recess flow passage 11 side. In this way, the gap flow passage section 14 is blocked on the top surface joint 13a side of the top surface abutment section 13b, and is open on the protruding portion side surface side of the top surface abutment section 13b.
[0027] The gap flow passage portion 14 is provided between the recess flow passage 11 and the top surface joint portion 13a on the top surface 13 side of the protruding portion 12. The gap flow passage portion 14 provided around the top surface joint portion 13a on the top surface 13 side of the protruding portion 12 extends in a direction perpendicular to the thickness direction of the vapor chamber 1. The gap flow passage portion 14 is connected to the recess flow passage 11 via the opening portion 14b. Specifically, the gap flow passage portion 14 is connected to the recess flow passage 11 on the second metal sheet 20 side.
[0028] The gap width 14w of the gap flow passage portion 14 is very small compared to the groove interval p of the recessed flow passage 11. The gap width 14w of the gap flow passage portion 14 is the distance between the top surface abutment portion 13b and the inner surface abutment portion 21. The groove interval p of the recessed flow passage 11 is the distance between the adjacent protrusions 12 or the distance between the protrusion 12 and the outer edge 10c. As described above, the gap flow passage portion 14 is a gap generated by the abutment between the top surface abutment portion 13b and the inner surface abutment portion 21, and the gap width 14w of the gap flow passage portion 14 is very small. Therefore, the gap flow passage portion 14 exhibits capillary action with respect to the liquid phase working fluid.
[0029] The vapor chamber 1 cools the heat generating element 30 mainly through the following cooling paths.
[0030] Heat generated by the heating element 30, which is thermally connected to the outer surface 20b of the second metal sheet 20, is transferred to the evaporation section 41 located on the inner surface 20a of the second metal sheet 20. As shown in FIG. 2, the evaporation section 41 evaporates the liquid-phase working fluid flowing through the gap flow passage section 14 by the heat transferred from the heating element 30, and changes the phase of the working fluid to a gas-phase working fluid as shown by the arrow F (G). The gas-phase working fluid heated by the evaporation flows to the condensation section 42 located away from the evaporation section 41, as shown by the arrow F (G) in FIG. 1. In the process in which the gas-phase working fluid flows toward the condensation section 42, the temperature of the working fluid decreases. In the condensation section 42, the gas-phase working fluid with the reduced temperature is condensed and changes the phase of the working fluid to a liquid-phase working fluid. The latent heat generated by the phase change is transferred to the first metal sheet 10 and the second metal sheet 20, and is released to the outside of the vapor chamber 1. The condensed liquid-phase working fluid easily penetrates into the gap passage section 14 by capillary action, as shown by the arrow F(L) in Fig. 2. The liquid-phase working fluid moves through the gap passage section 14 and returns to the evaporation section 41. This good circulation of the liquid-phase and gas-phase working fluids allows the vapor chamber 1 to efficiently cool the heating element 30.
[0031] When the vapor chamber 1 is provided with the gap passage portion 14 on the top surface 13 side of the protruding portion 12, the liquid phase working fluid easily penetrates from the recessed passage 11 into the gap passage portion 14 due to the capillary phenomenon of the gap passage portion 14 with respect to the liquid phase working fluid, and the liquid phase working fluid in the gap passage portion 14 is unlikely to leak out of the gap passage portion 14. On the other hand, in a conventional vapor chamber not provided with the gap passage portion 14, since a configuration corresponding to the gap passage portion 14 of the vapor chamber 1 is not provided, the liquid phase working fluid flows in the recessed passage. Thus, compared to the conventional vapor chamber, the vapor chamber 1 provided with the gap passage portion 14 has a larger amount of liquid phase working fluid held and a larger return amount of the working fluid. Therefore, the amount of heat transport in the internal space S is improved. Furthermore, in the internal space S of the vapor chamber 1, a state in which the liquid phase working fluid does not exist in the evaporation portion, so-called dry out, can be suppressed, and the circulation flow of the liquid phase and gas phase working fluid is improved, thereby improving heat transport. For this reason, the vapor chamber 1 can have excellent heat transport properties.
[0032] Furthermore, the gap flow passage section 14 easily takes in the liquid phase working fluid by capillary action, and the liquid phase working fluid taken in is unlikely to leak out of the gap flow passage section 14. For example, no matter what position the vapor chamber 1 is in, such as when the vapor chamber 1 shown in FIG. 1 is tilted 90 degrees on the paper or upside down, the liquid phase working fluid easily enters the gap flow passage section 14 and is unlikely to leak out of the gap flow passage section 14. In this way, regardless of the arrangement state of the vapor chamber 1, the circulation flow of the liquid phase and gas phase working fluid is good, and therefore the vapor chamber 1 has excellent heat transport characteristics.
[0033] Furthermore, the vapor chamber 1 has a thermally annealed portion 50 generated by the heat when forming the top surface bonded portion 13a, not in the entire vapor chamber 1, but locally in the portion adjacent to the top surface bonded portion 13a. The thermally annealed portion 50 annealed by heat treatment reduces the mechanical strength of the material. In the conventional vapor chamber, the thermally annealed portion is not locally provided in the portion adjacent to the top surface bonded portion 13a of the vapor chamber 1, but is provided over a wide area of the first metal sheet and the second metal sheet. Thus, compared to the conventional vapor chamber, the area of the thermally annealed portion 50 in the vapor chamber 1 is small, and the decrease in mechanical strength due to annealing by heat can be suppressed. Therefore, the vapor chamber 1 can have excellent mechanical strength.
[0034] Moreover, it is preferable that the gap length 14x from the blocking portion 14a to the opening 14b of the gap flow passage portion 14 is longer than the gap width 14w between the top surface abutment portion 13b and the inner surface abutment portion 21. When the gap length 14x of the gap flow passage portion 14 is longer than the gap width 14w, the amount of liquid-phase working fluid held in the gap flow passage portion 14 increases, and the capillary phenomenon of the gap flow passage portion 14 improves. Therefore, the heat transport characteristic of the vapor chamber 1 is further improved.
[0035] From the viewpoint of improving the heat transport property of the vapor chamber 1, the ratio (14x / 14w) of the gap length 14x to the gap width 14w is preferably 1.0 or more and 30.0 or less, more preferably 2.0 or more and 10.0 or less.
[0036] The average value of the gap width 14w of the gap flow passage portion 14 is preferably 1.0 μm or more and 100.0 μm or less, more preferably 3.0 μm or more and 50.0 μm or less, and even more preferably 5.0 μm or more and 20.0 μm or less. When the average value of the gap width 14w is 1.0 μm or more, the gap flow passage portion 14 can be easily formed. When the average value of the gap width 14w is 100.0 μm or less, the capillary phenomenon of the gap flow passage portion 14 is improved, and the heat transport property of the vapor chamber 1 is further improved.
[0037] The average value of the gap length 14x of the gap passage section 14 is preferably 40.0 μm or more, more preferably 80.0 μm or more, and even more preferably 150.0 μm or more. The average value of the gap length 14x is preferably 1.0 mm or less, more preferably 500.0 μm or less, and even more preferably 200.0 μm or less. When the average value of the gap length 14x is 40.0 μm or more, the amount of liquid phase working fluid held in the gap passage section 14 increases, and the capillary phenomenon of the gap passage section 14 improves, so that the heat transport characteristics of the vapor chamber 1 are further improved. When the average value of the gap length 14x is 1.0 mm or less, the gap passage section 14 can be easily formed.
[0038] 2, the gap passage section 14 includes the gap expansion section 15 on the blocking section 14a side, and the average value of the gap width 15w between the top surface abutment section 13b and the inner surface abutment section 21 in the gap expansion section 15 is preferably longer than the average value of the gap width 14w between the top surface abutment section 13b and the inner surface abutment section 21 in the gap passage section 14 other than the gap expansion section 15. When the average value of the gap width 15w of the gap expansion section 15 is longer than the average value of the gap width 14w between the top surface abutment section 13b and the inner surface abutment section 21 in the gap passage section 14 other than the gap expansion section 15, the amount of liquid-phase working fluid held in the gap passage section 14 and the gap expansion section 15 increases, and the capillary phenomenon of the gap passage section 14 improves. Therefore, the heat transport characteristic of the vapor chamber 1 is further improved.
[0039] From the viewpoint of improving the heat transport properties of the vapor chamber 1, the ratio (15w / 14w) of the gap width 15w to the gap width 14w is preferably 1.1 or more and 2.0 or less. When the ratio (15w / 14w) is 1.1 or more, the heat transport properties of the vapor chamber 1 are improved. When the ratio (15w / 14w) is 2.0 or less, the gap expansion portion 15 can be easily formed.
[0040] From the viewpoint of improving the heat transport properties of the vapor chamber 1, the expanded gap portion 15 is preferably provided in the portion of the top surface abutting portion 13b closest to the top surface joining portion 13a, in other words, in the blocking portion 14a, as shown in Fig. 2. Similarly, from the viewpoint of improving the heat transport properties of the vapor chamber 1, the shape of the expanded gap portion 15 is preferably spherical as shown in Fig. 2.
[0041] 1, it is preferable that the protrusion 12 extends along the longitudinal direction L1 of the vapor chamber 1. When the protrusion 12 extends along the longitudinal direction L1 of the vapor chamber 1, the distance from the evaporator 41 to the condenser 42 becomes longer, and the return amount of the working fluid increases. Therefore, the heat transport property of the vapor chamber 1 is further improved.
[0042] In addition, the vapor chamber 1 preferably has a plurality of top surface bonding portions 13a on each of the protruding portions 12. When a single protruding portion 12 has a plurality of top surface bonding portions 13a, the bonding strength between the first metal sheet 10 and the second metal sheet 20 is improved. When each protruding portion 12 has a plurality of top surface bonding portions 13a, the bonding strength between the first metal sheet 10 and the second metal sheet 20 is further improved.
[0043] Fig. 3 is an enlarged cross-sectional view showing another example of the second metal sheet 20 constituting the vapor chamber 1. As shown in Fig. 3, the second metal sheet 20 has at least one protruding portion 22 on the inner surface 20a, and the protruding portion 22 of the second metal sheet 20 preferably protrudes from the inner surface 20a of the second metal sheet 20 toward the first metal sheet 10, and the top surface 23 of the protruding portion 22 preferably abuts against the recessed flow path 11 of the first metal sheet 10.
[0044] The top surface 23 of the protruding portion 22 of the second metal sheet 20 abuts against the recessed flow passage 11, i.e., the inner surface 10a of the first metal sheet 10. This further improves the mechanical strength of the vapor chamber 1 in the thickness direction. In addition, a gap is provided between the top surface 23 of the protruding portion 22 and the inner surface 10a of the first metal sheet 10 due to this abutment. This gap, like the gap flow passage portion 14, exhibits capillary action for the liquid phase working fluid, and can easily take in the liquid phase working fluid. This further improves the heat transport properties of the vapor chamber 1.
[0045] In addition, the inner surface 10a of the first metal sheet 10 and the inner surface 20a of the second metal sheet 20 preferably have a roughened structure or a grooved structure. The roughened structure is formed by roughening treatment of the inner surface 10a or the inner surface 20a. When the inner surface 10a or the inner surface 20a has a roughened structure or a grooved structure, the liquid phase working fluid flows easily along these structures, and the circulation of the liquid phase and gas phase working fluid is improved. Therefore, the heat transport property of the vapor chamber 1 is further improved.
[0046] For the formation of the top surface joint portion 13a and the gap passage portion 14 that improve the heat transport properties of the vapor chamber 1, and for the local formation of the thermal annealing portion 50, processing using a laser is preferable, and processing using a fiber laser is more preferable. In processing using a laser, the formation and expansion of the thermal annealing portion 50 can be suppressed, and the top surface joint portion 13a and the gap passage portion 14 can be formed in a desired shape in a short time. As a result, the thermal annealing portion 50 is not formed in a wide area of the vapor chamber 1, but is formed locally. On the other hand, in the bonding of the first metal sheet and the second metal sheet using diffusion bonding adopted in the conventional vapor chamber, the formation of the top surface joint portion 13a and the gap passage portion 14, especially the formation of the gap passage portion 14, is difficult, and the thermal annealing portion is formed throughout the vapor chamber, and the processability is very low compared to laser processing.
[0047] In addition, the materials constituting the first metal sheet 10 and the second metal sheet 20 are preferably copper, copper alloys, aluminum, aluminum alloys, and stainless steel from the viewpoints of high thermal conductivity and ease of processing with a laser. Among them, aluminum and aluminum alloys are more preferable for the purpose of weight reduction, and stainless steel is more preferable for the purpose of increasing mechanical strength. In addition, tin, tin alloys, titanium, titanium alloys, nickel, nickel alloys, etc. may be used for the first metal sheet 10 and the second metal sheet 20 depending on the usage environment.
[0048] The heating element 30 attached to the vapor chamber 1 is a member such as an electronic component, such as a semiconductor element, that generates heat during operation.
[0049] Next, a method for manufacturing the vapor chamber 1 will be described.
[0050] The manufacturing method of the vapor chamber 1 includes a laser joining step of forming the top surface joint 13a with a laser. In the laser joining step, it is preferable to form the top surface joint 13a for joining the first metal sheet 10 and the second metal sheet 20 with a fiber laser. In laser processing, the top surface joint 13a can be easily processed and controlled to a desired shape, and the top surface joint 13a can be formed in a short time. Furthermore, in laser processing, the part to be joined can be locally heated, so that the heat annealed part 50 generated by heating is not formed in a wide area of the vapor chamber 1, but is formed locally in the part adjacent to the top surface joint 13a. Among lasers, the fiber laser is even more excellent in processing control and short-time processing. When the top surface joint 13a is formed, the gap flow passage part 14 is also formed as a result. Since a process of separately attaching a capillary structure (wick structure) as in the conventional method is not required, it is possible to reduce manufacturing costs and manufacturing time and to facilitate manufacturing.
[0051] Specifically, the inner surface 10a of the first metal sheet 10 having the recessed flow passage 11 and the protruding portion 12 and the inner surface 20a of the second metal sheet 20 face each other, and the top surface 13 of the protruding portion 12 of the first metal sheet 10 is in contact with the inner surface 20a of the metal sheet 20, and a laser is irradiated to a part of the top surface 13. For example, the laser may be irradiated to a part of the top surface 13 from the first metal sheet 10 side, or the laser may be irradiated to a part of the top surface 13 from the second metal sheet 20 side, or these laser irradiations may be combined.
[0052] On the other hand, in the case of bonding by diffusion bonding or the like used in conventional vapor chambers, the first metal sheet and the second metal sheet are entirely heat-treated. In such heat treatment, the entire top surface 13 of the protruding portion 12 is bonded to the inner surface of the second metal sheet 20, so that it is difficult to form the top surface bonding portion 13a and the gap flow passage portion 14. Therefore, in addition to the process of bonding the first metal sheet and the second metal sheet, a separate process of setting the capillary structure is required. Furthermore, since the first metal sheet and the second metal sheet are entirely heat-treated and annealed by heat, the mechanical strength of the vapor chamber is reduced.
[0053] Moreover, the method for manufacturing the vapor chamber 1 preferably further includes a laser welding step of welding the outer edge 10c of the first metal sheet 10 and the outer edge 20c of the second metal sheet 20 with a laser before or after the laser joining step. By welding the outer edge 10c of the first metal sheet 10 and the outer edge 20c of the second metal sheet 20 with a laser, a weld 51 is formed, and the vapor chamber 1 having the internal space S therein can be easily manufactured. If the laser used in the laser joining step and the laser welding step are the same, the vapor chamber can be easily manufactured in an even shorter time.
[0054] Specifically, a laser is irradiated to the first metal sheet 10 and the second metal sheet 20 in a state in which the inner surface 10a of the first metal sheet 10 and the inner surface 20a of the second metal sheet 20 face each other and the outer edge 10c of the first metal sheet 10 and the outer edge 20c of the metal sheet 20 are in contact with each other. For example, a laser may be irradiated to the contact portion of the outer edge 10c and the outer edge 20c from the first metal sheet 10 side, a laser may be irradiated to the contact portion of the outer edge 10c and the outer edge 20c from the second metal sheet 20 side, a laser may be irradiated to the contact portion of the outer edge 10c and the outer edge 20c from the in-plane direction of the vapor chamber 1, or these laser irradiations may be combined.
[0055] The vapor chamber 1 thus manufactured is suitable for use in electronic devices such as mobile phones that require good heat transport properties even in various positions. Electronic devices equipped with the vapor chamber 1 have high heat transport properties of the vapor chamber 1 even in various usage conditions.
[0056] According to the embodiment described above, the liquid phase working fluid easily penetrates and flows through the gap flow passage portion, improving the circulation flow of the liquid and gas phase working fluids and increasing the heat transport within the internal space of the vapor chamber. Therefore, the vapor chamber can have excellent heat transport properties. In addition, the vapor chamber does not have a thermal annealing portion over a wide area, but has it locally. Therefore, the deterioration of the mechanical strength of the vapor chamber due to the thermal annealing portion can be suppressed.
[0057] In the above, an example has been shown in which the heating element 30 is attached to the outer surface 20b of the second metal sheet 20 as shown in FIG. 1, but the heating element 30 may be attached to the outer surface 10b of the first metal sheet 10.
[0058] In addition, it is preferable to install the vapor chamber 1 so that the second metal sheet 20 is arranged on the gravity direction side, that is, the second metal sheet 20 is arranged below and the first metal sheet 10 is arranged above along the gravity direction. When the vapor chamber 1 is installed so that the second metal sheet 20 is arranged on the gravity direction side, the gap flow passage portion 14 is arranged on the gravity direction side in the internal space S. The liquid phase working fluid is easily introduced into the gap flow passage portion 14 by gravity in addition to the capillary phenomenon of the gap flow passage portion 14. As a result, the heat transport property of the vapor chamber is further improved. In such an installed state of the vapor chamber, when the heating element 30 is attached to the outer surface 20b of the second metal sheet 20, i.e., the lower part of the vapor chamber 1, the heating element 30 can be efficiently cooled.
[0059] In the above, an example has been shown in which the protrusion 12 has a rectangular prism shape as shown in Fig. 1, but the shape of the protrusion 12 may be any shape as long as the top surface 13 can abut against the inner surface 20a of the second metal sheet 20. For example, the shape of the protrusion 12 may be cylindrical as shown in Fig. 4. In addition, when the first metal sheet 10 has multiple protrusions 12, the shapes of the protrusions 12 may all be the same or at least some of them may be different.
[0060] Second embodiment Fig. 5 is a perspective view showing an example of a vapor chamber of the second embodiment, and Fig. 6 is an enlarged cross-sectional view of surface B of Fig. 5.
[0061] In the following embodiments, the same components as those in the vapor chamber of the first embodiment are denoted by the same reference numerals, and duplicated explanations will be omitted or simplified.
[0062] The vapor chamber 2 of the second embodiment has basically the same configuration as the vapor chamber 1 of the first embodiment, except for the difference in the configuration of the first metal sheet 10. Therefore, the different configuration will be mainly described here.
[0063] 5 and 6, the first metal sheet 10 of the vapor chamber 2 has a higher uniformity in sheet thickness than the first metal sheet 10 of the vapor chamber 1 of the first embodiment. In the first metal sheet 10 of the vapor chamber 1, the sheet thickness at the protruding portion 12 is clearly larger than the sheet thickness at the recessed flow path 11, as shown in FIG.
[0064] As shown in Figure 6, in the vapor chamber 2, the ratio (t2 / t1) of the sheet thickness t2 at the protruding portion 12 of the first metal sheet 10 to the sheet thickness t1 at the recessed flow path 11 of the first metal sheet 10 is preferably 0.1 or more and 10.0 or less, more preferably 0.2 or more and 5.0 or less, even more preferably 0.5 or more and 2.0 or less, and most preferably 1.0, i.e., the sheet thickness t1 at the recessed flow path 11 and the sheet thickness t2 at the protruding portion 12 are the same.
[0065] When the ratio (t2 / t1) is within the above range, the variation in sheet thickness of the first metal sheet 10 is suppressed, thereby making it possible to reduce the weight of the vapor chamber 2. For forming the first metal sheet 10 having such a predetermined ratio (t2 / t1), processing by press molding is suitable.
[0066] 7 is an enlarged cross-sectional view showing another example of the protrusion 12 constituting the vapor chamber 2. As shown in FIG. 7, the first metal sheet 10 may further have a protrusion 16 protruding from a part of the top surface 13 toward the inner surface 20a of the second metal sheet 20. The top surface of the protrusion 16 provided on a part of the top surface 13 of the protrusion 12 is joined to the inner surface 20a of the second metal sheet 20. In this case, a part of the top surface of the protrusion 16 may be joined to the inner surface 20a of the second metal sheet 20, or the entire top surface of the protrusion 16 may be joined to the inner surface 20a of the second metal sheet 20. The protrusion 16 is preferably formed by processing using press molding.
[0067] When the vapor chamber 2 includes the protrusions 16, the shape of the gap passage portion 14 can be easily controlled, and the liquid-phase working fluid can be easily taken into the gap passage portion 14. This improves the heat transport properties of the vapor chamber. In addition, compared to the contact area between the top surface of the protrusions 16 and the inner surface 20a of the second metal sheet 20 in a vapor chamber not including the protrusions 16, the contact area between the top surface of the protrusions 16 and the inner surface 20a of the second metal sheet 20 can be easily reduced, and the thermal annealing portion 50 can be further localized. This further suppresses the decrease in mechanical strength of the vapor chamber due to the thermal annealing portion.
[0068] Next, a method for manufacturing the vapor chamber 2 will be described.
[0069] The method for producing the vapor chamber 2 preferably further includes a press working step of forming the recessed flow paths 11 and the protruding portion 12 of the first metal sheet 10 by press working before the laser joining step and the laser welding step. The recessed flow paths 11 and the protruding portion 12 can be easily formed by press working the first metal sheet 10. It is more preferable that in addition to the recessed flow paths 11 and the protruding portion 12, the protruding portion 16 is also formed on the first metal sheet 10 in the press working step.
[0070] After the pressing step, the vapor chamber 2 can be manufactured by performing a laser joining step followed by a laser welding step, or by performing a laser welding step followed by a laser joining step.
[0071] According to the embodiment described above, the vapor chamber can be made lighter by reducing the variation in the sheet thickness of the first metal sheet. The recessed flow path and the protruding portion of the first metal sheet can be easily formed in a short time by press molding. Therefore, the vapor chamber can be manufactured more simply.
[0072] Although the embodiments have been described above, the present invention is not limited to the above-described embodiments, but includes all aspects included in the concept and scope of the claims of the present disclosure, and can be modified in various ways within the scope of the present disclosure. [Explanation of symbols]
[0073] 1, 2 Vapor chamber 10 First metal sheet 10a: inner surface of first metal sheet 10b Outer surface of first metal sheet 10c Outer edge of first metal sheet 11 Recessed flow channel 12 Protrusion 12a Side of protrusion 13 Top surface of protrusion 13a Top joint 13b Top surface contact part 14 Gap flow passage 14a: Blockage of gap flow passage 14b Opening of gap flow passage 15 Expanded gap 16 Convex part 20 Second metal sheet 20a Inner surface of second metal sheet 20b Outer surface of second metal sheet 20c Outer edge of second metal sheet 21 Inner surface contact part 22 Protrusion 23 Top surface of protrusion 30 Heating element 41 Evaporation section 42 Condenser 50 Heat Annealing Section 51 Welding S interior space F(L) Flow of liquid phase working fluid F(G) Flow of gas phase working fluid
Claims
1. A vapor chamber having a working fluid in an interior space formed between a first metal sheet and a second metal sheet, the first metal sheet includes a recessed channel and at least one protrusion; The recessed flow passage is provided on an inner surface of the first metal sheet, The protrusion protrudes from the inner surface of the first metal sheet toward the second metal sheet, and a top surface of the protrusion abuts against the second metal sheet, The vapor chamber includes at least one top joint and a gap channel portion; The top surface joining portion joins a part of the top surface of the protrusion and the second metal sheet, The gap flow passage portion is such that the top surface and the second metal sheet are spaced apart from each other, The gap flow path portion is provided between a top surface abutment portion of the top surface of the first metal sheet that is not joined to the second metal sheet and an inner surface abutment portion of the second metal sheet that abuts against the top surface abutment portion, and is characterized in that it has a blocking portion on the top surface joint side of the top surface abutment portion and an opening on the side side of the protruding portion of the top surface abutment portion.
2. The vapor chamber according to claim 1 , wherein the gap length from the blocking portion to the opening is longer than the gap width between the top surface abutment portion and the inner surface abutment portion in the gap flow passage portion.
3. The vapor chamber according to claim 1 or 2, wherein the gap flow passage portion has an average gap width between the top surface abutment portion and the inner surface abutment portion of 1.0 μm or more and 100.0 μm or less.
4. The vapor chamber according to any one of claims 1 to 3, wherein the gap flow passage portion has an average gap length from the blocking portion to the opening portion of 40.0 µm or more.
5. The gap flow passage portion includes a gap enlargement portion on the closing portion side, A vapor chamber as described in any one of claims 1 to 4, wherein the average gap width between the top surface abutment portion and the inner surface abutment portion in the gap expansion portion is longer than the average gap width in the gap flow path portion other than the gap expansion portion.
6. The vapor chamber according to any one of claims 1 to 5, wherein the ratio (t2 / t1) of the sheet thickness t2 at the protruding portion of the first metal sheet to the sheet thickness t1 at the recessed flow path of the first metal sheet is 0.1 or more and 10.0 or less.
7. The vapor chamber according to any one of claims 1 to 6, wherein the protrusion extends along the longitudinal direction of the vapor chamber.
8. The vapor chamber according to any one of claims 1 to 7, wherein the vapor chamber comprises a plurality of the top surface joints on one of the protrusions.
9. the second metal sheet has at least one protrusion on an inner surface; The vapor chamber according to any one of claims 1 to 8, wherein the protrusion of the second metal sheet protrudes from the inner surface of the second metal sheet toward the first metal sheet, and a top surface of the protrusion abuts against the recessed flow path of the first metal sheet.
10. A method for manufacturing a vapor chamber according to any one of claims 1 to 9, comprising the steps of: A method for manufacturing a vapor chamber, comprising a laser bonding process for forming the top surface bonding portion using a laser.
11. The method for manufacturing a vapor chamber according to claim 10, further comprising a laser welding step of welding an outer edge of the first metal sheet and an outer edge of the second metal sheet with a laser before or after the laser joining step.
12. The method for manufacturing a vapor chamber according to claim 10 or 11, further comprising a press processing step of forming the recessed flow path and the protrusion of the first metal sheet by press molding prior to the laser joining step and the laser welding step.
Citation Information
Patent Citations
Vapor chamber, electronic equipment, metal sheet for vapor chamber, and method of manufacturing vapor chamber
JP2019158323A
Vapor chamber and electronic apparatus
JP2019178860A
Vapor chamber
JP2019207076A
