Concrete pouring device and concrete pouring method

The concrete placing device addresses uneven force distribution by using a rotary joint and support mechanisms to ensure smooth horizontal rotation and distribution of concrete.

JP7569257B2Active Publication Date: 2024-10-17KAJIMA CORP
View PDF 5 Cites 0 Cited by

Patent Information

Application Number
JP2021066303
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2021-04-09
Publication Date
2024-10-17
Estimated Expiration
2041-04-09

AI Technical Summary

Technical Problem

The existing concrete pouring device experiences uneven force distribution due to the weight of the second concrete pipe, leading to increased rotational resistance and difficulties in smooth concrete distribution.

Method used

A concrete placing device with a concrete supply pipe and a horizontally rotatable distribution pipe connected via a rotary joint, supported by a rotation auxiliary part and guided by a rotation guide, which reduces friction and allows smooth horizontal rotation.

Benefits of technology

Enables smooth distribution of concrete to multiple destinations by reducing rotational resistance and uneven forces, thereby facilitating efficient concrete placement.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007569257000001
    Figure 0007569257000001
  • Figure 0007569257000002
    Figure 0007569257000002
  • Figure 0007569257000003
    Figure 0007569257000003
Patent Text Reader

Abstract

To provide a concrete placing device and a concrete placing method capable of smoothly distributing concrete.SOLUTION: A concrete placing device 1 is provided with a concrete supply pipe 5 for conveying concrete supplied from above, and a concrete distribution pipe 7 having a horizontal pipe part 7b extending in the horizontal direction and connected to the downstream side of the concrete supply pipe 5 in a horizontal rotatable manner, and below a connecting pipe part 5c of the concrete supply pipe 5, a vertical connecting pipe part 7a of the concrete distribution pipe 7 is connected rotatably around the pipe axis through a rotary joint part 13, and is equipped with a rotary auxiliary part 50 which supports the concrete distribution pipe 7 at a position vertically below the rotary joint part 13 and is also rotatable around the pipe axis.SELECTED DRAWING: Figure 3
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a concrete pouring device and a concrete pouring method. [Background technology]

[0002] Conventionally, a concrete pouring device described in Patent Document 1 below is known as a technique in this field. This concrete pouring device includes a first concrete pipe that distributes concrete supplied from below, and a second concrete pipe in which a concrete discharge port is formed. The second concrete pipe extends further upward from the first concrete pipe, and is connected to the first concrete pipe via a joint so as to be horizontally rotatable. It has been proposed that the second concrete pipe bends above the joint and extends horizontally, and that the discharge port is located away from the center of rotation, thereby enabling the concrete to be distributed circumferentially. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2007-217906 A Summary of the Invention [Problem to be solved by the invention]

[0004] However, in the concrete pouring device of Patent Document 1, the second concrete pipe is supported at one end at the joint with the first concrete pipe and protrudes in the radial direction of rotation. Therefore, an uneven force acts on the joint in the circumferential direction due to the weight of the second concrete pipe, which increases the rotational resistance of the second concrete pipe and may cause problems in the smooth distribution of concrete. Therefore, an object of the present invention is to provide a concrete pouring device and a concrete pouring method that can smoothly distribute concrete. [Means for solving the problem]

[0005] The concrete pouring device of the present invention comprises a concrete supply pipe that transports concrete supplied from above, and a concrete distribution pipe that has a horizontal pipe section extending horizontally and a concrete discharge outlet from which the concrete is discharged, and is connected to the downstream side of the concrete supply pipe so as to be horizontally rotatable, and the vertical upstream end of the concrete distribution pipe is connected below the downstream end of the concrete supply pipe so as to be rotatable about the pipe axis via a rotary joint section, and a rotation assist section is provided that holds the concrete distribution pipe at a position vertically below the rotary joint section and is rotatable about the pipe axis.

[0006] The rotation assisting part may support a part of the weight of the concrete distribution pipe. The concrete pouring device of the present invention may further include a rotation guide part that supports the horizontal pipe part at a position radially outward of the rotation assisting part and guides it in the circumferential direction of rotation.

[0007] In the rotary joint, when one of the concrete supply pipe and the concrete distribution pipe is the first pipe and the other is the second pipe, the end of the first pipe on the second pipe side is provided with a flange retaining portion having a stopper surface that wraps around to and faces the back side of the second pipe flange formed at the end of the second pipe on the first pipe side, and that uses the stopper surface to regulate displacement of the second pipe flange in the axial direction away from the first pipe, and a friction-reducing material is sandwiched between the back side of the second pipe flange and the stopper surface.

[0008] The concrete distribution pipe may have a downstream distribution pipe section connected to the downstream side of the horizontal pipe section via another rotary joint section and rotatable around the pipe axis of the horizontal pipe section, and the downstream distribution pipe section may deliver concrete in a direction intersecting the rotation axis.

[0009] The concrete pouring method of the present invention includes a step of using any of the above-mentioned concrete pouring devices to horizontally rotate a concrete distribution pipe relative to a concrete supply pipe, and moving the concrete discharge outlet of the concrete distribution pipe to each distribution destination arranged on a horizontal circumference approximately centered on the rotary joint portion to pour concrete. Effect of the Invention

[0010] According to the present invention, a concrete pouring device and a concrete pouring method capable of smoothly distributing concrete can be provided. [Brief description of the drawings]

[0011] [Figure 1] 1 is a cross-sectional view of a construction site of a vertical shaft to which a concrete pouring device and a concrete pouring method according to an embodiment of the present invention are applied. [Diagram 2] FIG. 2 is a plan view of the shaft of FIG. 1. [Diagram 3] FIG. 2 is a perspective view showing the main parts of a concrete pouring device. [Figure 4] FIG. [Diagram 5] FIG. [Figure 6] FIG. 11 is a cross-sectional view showing a modified example of the rotary joint portion. [Figure 7] 13 is a perspective view showing a main part of a concrete pouring device according to a modified example. FIG. [Figure 8] FIG. 11 is a cross-sectional view showing a flat hose in a formwork according to a modified example. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0012] Hereinafter, a concrete pouring device 1 and a concrete pouring method according to an embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1 is a cross-sectional view of a construction site of a circular vertical shaft 91 to which the concrete pouring device 1 and the concrete pouring method of the present embodiment are applied, and FIG. 2 is a plan view thereof. FIG. 3 is a perspective view showing a main part of the concrete pouring device 1. The vertical shaft 91 is, for example, a circular vertical shaft constructed underground with a diameter of about 10 m and a depth of about 40 m, and at the construction site of the vertical shaft 91, a cylindrical side wall 93 with a thickness of about 1.5 m is constructed by pouring concrete. For this concrete pouring, a formwork 95 for the side wall 93 is provided on the periphery of the vertical shaft 91, and a work stage 97 is provided inside the vertical shaft 91 and above the formwork 95.

[0013] Below, we will explain the concrete pouring device 1 for pouring concrete into the formwork 95. The concrete pouring device 1 is equipped with a concrete pipe 3 that transports concrete from a concrete supply facility 2 (e.g., a concrete pump) on the ground to the inside of the formwork 95. The concrete pouring device 1 is equipped with two systems of concrete pipes 3 with the same configuration, but below we will mainly explain one of the concrete pipes 3 and omit redundant explanations.

[0014] The concrete piping 3 is roughly divided into an upstream concrete supply pipe 5 and a downstream concrete distribution pipe 7. The concrete supply pipe 5 extends from the concrete supply equipment 2 to the vicinity of the work stage 97. The concrete distribution pipe 7 is connected to the concrete supply pipe 5 near the work stage 97 and extends to the position of the formwork 95. The connection part 9 between the concrete supply pipe 5 and the concrete distribution pipe 7 is located approximately on the central axis of the vertical shaft 91. Since there are two systems of concrete piping 3, the connection parts 9 of each system are arranged close to each other across the central axis of the vertical shaft 91.

[0015] The concrete supply pipe 5 mainly includes a vertical pipe section 5a, a horizontal pipe section 5b, and a connecting pipe section 5c from the upstream side. The vertical pipe section 5a extends vertically along the wall of the shaft 91. The vertical pipe section 5a may include an S-shaped pipe or a bent pipe, etc., in the middle of the vertical pipe section 5a in order to suppress material separation caused by the concrete falling vertically inside the pipe. The horizontal pipe section 5b bends from the lower end of the vertical pipe section 5a to the inside of the shaft 91 and extends horizontally to a position almost at the center of the shaft 91. The connecting pipe section 5c is the downstream end of the concrete supply pipe 5, and is bent from the horizontal pipe section 5b at a position almost at the center of the shaft 91 and extends vertically downward. By such a concrete supply pipe 5, concrete is transported from the concrete supply facility 2 on the ground to the vicinity of the work stage 97.

[0016] The concrete distribution pipe 7 includes, from the upstream side, a connection pipe section 7a, a horizontal pipe section 7b, a discharge pipe section 7c, and a rubber hose 7d. The connection pipe section 7a is coaxially connected to the lower part of the connection pipe section 5c of the concrete supply pipe 5 and extends vertically downward. The horizontal pipe section 7b is bent horizontally from the connection pipe section 7a and extends to a position above the formwork 95 along approximately the radius of the vertical shaft 91. The discharge pipe section 7c is bent vertically downward from the horizontal pipe section 7b at a position above the formwork 95. The rubber hose 7d is a flexible pipe and is connected to the discharge pipe section 7c so as to extend downward from the discharge pipe section 7c. A concrete discharge port 8 is provided at the downstream end of the rubber hose 7d, and concrete is discharged through the rubber hose 7d. By such a concrete distribution pipe 7, concrete is transported horizontally from a position approximately on the central axis of the vertical shaft 91 along approximately the radius of the vertical shaft 91.

[0017] The connection part 9 between the concrete supply pipe 5 and the concrete distribution pipe 7 will be further described. In the connection part 9, the vertical connection pipe part 5c and the vertical connection pipe part 7a are connected coaxially in the vertical direction via the rotary joint part 13. The connection pipe part 5c is fixed to the work stage 97 via a predetermined support part (not shown), and the entire concrete supply pipe 5 including the connection pipe part 5c is fixed immovably to the work stage 97 and the vertical shaft 91. The connection pipe part 7a can rotate around its own axis relative to the connection pipe part 5c based on the structure of the rotary joint part 13, which will be described in detail later. Therefore, in the vertical shaft 91, the entire concrete distribution pipe 7 including the connection pipe part 7a can rotate horizontally around the rotary joint part 13. Due to this horizontal rotation, the concrete discharge port 8 of the concrete distribution pipe 7 moves circumferentially on a circumference that is approximately concentric with the vertical shaft 91, at a height near the upper end of the formwork 95.

[0018] Meanwhile, near the upper end of the formwork 95, a plurality of (for example, about 20) morning glory hoppers 15 are regularly arranged in the circumferential direction of the vertical shaft 91. A sunny hose 17 is attached to the discharge outlet of each morning glory hopper 15, extending vertically downward within the formwork 95 to the concrete pouring position. The horizontal rotation of the concrete distribution pipe 7 described above allows the concrete discharge outlet 8 of the concrete distribution pipe 7 to access each morning glory hopper 15 (distribution destination) in turn.

[0019] The concrete pouring method using the above-described concrete pouring device 1 is as follows. By the horizontal rotation of the concrete distribution pipe 7, the concrete discharge port 8 is moved to the position of one of the morning glory hoppers 15, and the concrete discharge port 8 is disposed above the morning glory hopper 15. Here, the construction worker may manually rotate the concrete distribution pipe 7 horizontally by pushing the horizontal pipe portion 7b in the direction of rotation. Also, here, the lower end of the rubber hose 7d may be inserted into the morning glory hopper 15. Even if the positioning accuracy of the horizontal rotation of the concrete distribution pipe 7 is poor, since the most downstream portion of the concrete distribution pipe 7 is the flexible rubber hose 7d, the position of the concrete discharge port 8 can be finely adjusted in the circumferential direction by deforming only the rubber hose 7d without rotating the entire concrete distribution pipe 7. Therefore, excessive positioning accuracy of the concrete distribution pipe 7 is not required.

[0020] Next, when a specific valve is opened with the concrete discharge port 8 placed at the position of one of the Morning Glory hoppers 15, concrete from the concrete supply equipment 2 is poured into the Morning Glory hopper 15 through the concrete supply pipe 5 and the concrete distribution pipe 7, and is further poured into the formwork 95 through the sunny hose 17. At this time, the concrete is compacted by a construction worker inside the formwork 95. Then, when the required amount of concrete has been poured, the specific valve is closed and the pouring of concrete into that Morning Glory hopper 15 is stopped.

[0021] Thereafter, the concrete distribution pipe 7 is rotated horizontally again, the concrete discharge port 8 is moved into the adjacent morning glory hopper 15, and concrete is poured into that morning glory hopper 15 in the same manner as above. By repeating the above, concrete is poured into half of the morning glory hoppers 15, and concrete is poured to a predetermined height evenly around half the circumference of the formwork 95. As described above, there are two systems of concrete pipes 3, so concrete pouring is similarly performed around the remaining half of the circumference of the formwork 95 using the other concrete pipe 3, and pouring of concrete to the predetermined height is completed around the entire circumference of the formwork 95.

[0022] In order to enable smooth distribution of concrete to each morning glory hopper 15 as described above, the concrete pouring device 1 is equipped with a rotary joint unit 13, a rotation assist unit 50, and a rotation guide unit 61, as described below.

[0023] [Rotary joint part 13] Fig. 4 is an exploded perspective view of the rotary joint 13, and Fig. 5 is its cross-sectional view. As shown in the figure, a flange 21 is formed at the lower end of the connecting pipe 5c. In contrast, a flange 23 (second pipe flange) having a smaller diameter than the flange 21 is formed at the upper end of the connecting pipe 7a. Such flanges 21 and 23 are butted together in the pipe axial direction to connect the connecting pipe 5c (downstream end) of the concrete supply pipe 5 (first pipe) and the connecting pipe 7a (upstream end) of the concrete distribution pipe 7 (second pipe).

[0024] A flange receiving ring 29, which is in the shape of a ring and has approximately the same outer diameter as the flange 21, is bolted to the lower part of the flange 21 to hold the flange 23. Reference numeral 30 in FIG. 4 denotes a bolt hole for the bolting. A flange receiving portion 31 is provided on the lower part of the inner peripheral surface of the flange receiving ring 29, which protrudes to the inner peripheral side so as to wrap around the lower surface 23b of the flange 23. The connection pipe portion 7a is inserted into the flange receiving ring 29 from above together with thrust washers 33, 33 described later, and the flange 23 is hooked on the upper surface 31a of the flange receiving portion 31, so that the connection pipe portion 7a is supported by the flange receiving portion 31. The upper surface 31a (stopper surface) of the flange receiving portion 31 faces the lower surface 23b (rear surface of the second pipe flange) of the flange 23 and restricts the downward displacement of the flange 23. On the other hand, the upward displacement of the flange 23 is restricted by the lower surface 21b of the flange 21.

[0025] In this way, the flange 21 and flange receiving ring 29 provided at the lower end of the connecting pipe portion 5c form a flange holding portion 47 having a stopper surface (upper surface 31a of the flange receiving portion 31) that wraps around to the back side (lower surface 23b side) of the flange 23 and faces the lower surface 23b, and that restricts downward displacement of the flange 23 with the stopper surface. That is, the flange holding portion 47 includes the flange 21 formed on the connecting pipe portion 5c so as to abut against the flange 23, and the flange receiving ring 29 that is attached to the outer circumferential side of the lower surface 21b of the flange 21 and has a stopper surface (upper surface 31a).

[0026] The flange 23 is housed in a space surrounded by the inner peripheral surface of the upper part of the flange receiving ring 29, the upper surface 31a of the flange receiving portion 31, and the lower surface 21b of the flange 21 with a radial clearance that allows rotation. This clearance allows the connection pipe portion 7a to rotate around the pipe axis relative to the connection pipe portion 5c.

[0027] Furthermore, a thrust washer 33 (friction reducing material) is sandwiched between the lower surface 23b of the flange 23 and the upper surface 31a of the flange receiving portion 31. The thrust washer 33 is an annular thin plate having almost the same shape as the lower surface 23b of the flange 23 when viewed from the pipe axial direction. The thrust washer 33 realizes low friction with the smooth surfaces of the steel material (the lower surface 23b of the flange 23 and the upper surface 31a of the flange receiving portion 31) due to its material and surface condition. The upper end surface 33a of the thrust washer 33 adheres to the lower surface 23b of the flange 23 and slides smoothly on the lower surface 23b. The lower end surface 33b of the thrust washer 33 adheres to the upper surface 31a of the flange receiving portion 31 and slides smoothly on the upper surface 31a. The material of the thrust washer 33 is, for example, high-strength brass casting. A commercially available thrust washer may be adopted as the thrust washer 33. A similar thrust washer 33 is also sandwiched between the lower surface 21b of the flange 21 and the upper surface 23a of the flange 23.

[0028] In the above-described rotary joint 13, the load due to the weight of the concrete distribution pipe 7 acts vertically from the lower surface 23b of the flange 23 to the upper surface 31a of the flange receiving portion 31, and the friction between the lower surface 23b and the upper surface 31a may hinder the smooth rotation of the connection pipe portion 7a. In contrast, according to the rotary joint 13, the friction between the lower surface 23b of the flange 23 and the upper surface 31a of the flange receiving portion 31 is reduced due to the presence of the thrust washer 33. Similarly, the friction between the lower surface 21b and the upper surface 23a of the flange 23 is reduced by the thrust washer 33 between the lower surface 21b of the flange 21 and the upper surface 23a of the flange 23. The above-described configuration of the rotary joint 13 reduces the rotational resistance of the connection pipe portion 7a relative to the connection pipe portion 5c, and contributes to the smooth horizontal rotation of the concrete distribution pipe 7.

[0029] Also, instead of the rotary joint 13 as described above, a rotary joint 13B as shown in Fig. 6 may be adopted. In the rotary joint 13B, the thrust washer 33 between the lower surface 21b of the flange 21 and the upper surface 23a of the flange 23 is omitted. Also, an O-ring 27 that annularly surrounds the concrete flow path is installed on the lower surface 21b of the flange 21. By sandwiching this O-ring 27 between the upper surface 23a of the flange 23, the inside of the concrete pipe 3 is sealed from the outside of the pipe, and concrete leakage is prevented. Note that the rotary joint 13 (Fig. 5) without the O-ring 27 is preferable to the rotary joint 13B in terms of reducing the rotational resistance caused by the friction of the O-ring 27.

[0030] In addition, in the rotary joint 13B, a pair of screw holes 41 that penetrate radially from the outer peripheral surface to the inner peripheral surface are formed at symmetrical positions on the upper part of the flange receiving ring 29. A thumbscrew 43 is attached to this screw hole 41, and the thumbscrew 43 can be tightened so that the tip of the thumbscrew 43 abuts against the outer peripheral surface of the flange 23, thereby preventing the rotation of the concrete distribution pipe 7 as described above. Components of the rotary joint 13B that are the same as or equivalent to those of the above-mentioned rotary joint 13 are given the same reference numerals in the drawings, and duplicate explanations will be omitted.

[0031] [Rotation assist unit 50] 1 and 3, the concrete pouring device 1 is equipped with a rotation assisting part 50 provided on a work stage 97. The rotation assisting part 50 holds the concrete distribution pipe 7 in a position directly below the rotary joint part 13, supports a part of the weight of the concrete distribution pipe 7, and is capable of horizontally rotating together with the concrete distribution pipe 7 around the rotation axis of the rotary joint part 13.

[0032] As a specific structure, the rotation assisting unit 50 has a cable jack 51 provided on the work stage 97 and a holding base 53 attached on the cable jack 51. The cable jack 51 is a tool that is originally used when feeding out a cable wound around a cable drum. The cable jack 51 has a jack body 51a including legs and the like, and a bearing 51b that rises and falls relative to the jack body 51a. In the original usage method, a shaft that is horizontally inserted through a central hole of the cable drum is supported at both ends by the bearings 51b of the two cable jacks 51, and the cable drum is lifted by raising the bearings 51b. The bearings 51b can also rotate horizontally (rotate around a vertical axis) relative to the jack body 51a.

[0033] The cable jack 51 is disposed vertically below the rotary joint 13, and the jack body 51a is fixed to the work stage 97. The axis of rotation of the bearing 51b relative to the jack body 51a coincides with the axis of the connecting pipe 7a, i.e., coincides with the axis of rotation of the rotary joint 13. A holding base 53 having a triangular shape in a side view is fixed to the bearing 51b via an appropriate metal fitting or the like, and the concrete distribution pipe 7 is held by the holding base 53 such that the bent portion between the connecting pipe 7a and the horizontal pipe 7b fits into the groove of the holding base 53. Therefore, the concrete distribution pipe 7 is not displaced relative to the holding base 53 and the cable jack 51. In addition, by operating the bearing 51b of the cable jack 51 in the direction of extension, part of the weight of the concrete distribution pipe 7 is supported by the rotation assisting part 50.

[0034] With this rotation assisting part 50, it is possible to arrange the horizontal pipe part 7b of the concrete distribution pipe 7 so that it is raised above the upper surface of the work stage 97 at a height corresponding to the height of the cable jack 51. Therefore, obstacles present on the work stage 97 are unlikely to interfere with the rotational movement of the horizontal pipe part 7b. Also, it is easy to arrange the horizontal pipe part 7b at a height where the construction worker can easily push it in the rotational direction when rotating the concrete distribution pipe 7.

[0035] [Rotation guide unit 61] 1 to 3, the rotation guide portion 61 supports the horizontal pipe portion 7b at a position radially outward of the rotation assist portion 50 and guides it in the circumferential direction. Two rotation guide portions 61 are provided for one concrete pipe 3 with an interval therebetween in the extension direction of the horizontal pipe portion 7b, and only one of them is shown in Fig. 3. The two rotation guide portions 61 have the same configuration, so a duplicated description will be omitted.

[0036] Specifically, as shown in FIG. 2 and FIG. 3, the rotation guide unit 61 includes a rail 63 and wheels 65 that roll on the rail 63. The rail 63 is annular and extends in the circumferential direction of the shaft 91, and is supported by the work stage 97. The wheels 65 are fixed to the lower surface of the horizontal pipe section 7b, can rotate around an axis parallel to the extension direction of the horizontal pipe section 7b, and can roll on the rail 63 in the circumferential direction of the shaft 91. As an example, as shown in FIG. 3, the rail 63 may be made of an H-shaped steel that extends in a curved manner along the circumferential direction of the shaft 91. In this case, the web of the H-shaped steel is horizontally oriented, and the wheels 65 are accommodated in a U-shaped groove 63a surrounded by the web and two flanges. This configuration prevents the wheels 65 from coming off the rail 63. A part of the weight of the concrete distribution pipe 7 is supported by the rail 63 via the wheels 65.

[0037] The effects of the concrete pouring device 1 and the concrete pouring method described above will be described. As shown in FIG. 3 and other figures, the lower end of the connecting pipe portion 7a of the concrete distribution pipe 7 is held by the rotation assisting portion 50, so that the pipe axis of the connecting pipe portion 7a is unlikely to deviate from the rotation axis of the rotary joint portion 13 and the cable jack 51, and uneven force is unlikely to act on the rotary joint portion 13 in the circumferential direction. Therefore, friction between parts of the rotary joint portion 13 that are offset in the circumferential direction is suppressed, and rotation resistance in the rotary joint portion 13 is reduced. As a result, smooth horizontal rotation of the concrete distribution pipe 7 is possible. In addition, the rotation assisting portion 50 bears part of the weight of the concrete distribution pipe 7 vertically below the rotary joint portion 13, so that the force in the direction of the rotation axis acting on the rotary joint portion 13 is reduced. Therefore, friction between parts related to rotation in the rotary joint portion 13 is further reduced, and rotation resistance in the rotary joint portion 13 is further reduced. In this way, the rotational resistance in the rotary joint portion 13 is reduced, thereby enabling smooth horizontal rotation of the concrete distribution pipe 7, and enabling smooth distribution of concrete in the circumferential direction.

[0038] The concrete pouring device of the above-mentioned Patent Document 1 transports concrete upward from a concrete supply facility, and a horizontally rotatable downstream pipe is connected to extend upward from an upstream pipe. In this structure, when the downstream pipe is held on its rotation axis and part of the weight of the downstream pipe is to be borne, a relatively complicated support part must be constructed, such as a structure in which the downstream pipe is suspended from above. In contrast, the concrete pouring device 1 transports concrete downward from the above-ground concrete supply facility 2 into an underground formwork 95, and the connection pipe part 7a of the concrete distribution pipe 7 extends vertically downward from the concrete supply pipe 5. Therefore, a support part that holds the concrete distribution pipe 7 on its rotation axis and bears part of the weight of the concrete distribution pipe 7 can be constructed with a relatively simple structure in which the bent part of the lower end of the connection pipe part 7a is placed on the cable jack 51 via the holding base 53.

[0039] Furthermore, the rotation guide portion 61 supports part of the weight of the concrete distribution pipe 7 at a position relatively far from the rotation axis of the concrete distribution pipe 7, thereby reducing uneven force in the circumferential direction acting on the rotary joint portion 13 due to the weight of the horizontal pipe portion 7b, etc. As described above, the rotary joint portion 13 is provided with the thrust washer 33, thereby reducing friction between the parts involved in rotation, and thus further reducing the rotational resistance in the rotary joint portion 13. This enables the concrete distribution pipe 7 to rotate horizontally more smoothly, and the concrete can be distributed in the circumferential direction more smoothly.

[0040] Furthermore, according to the above-mentioned concrete pouring method using such a concrete pouring device 1, smooth horizontal rotation of the concrete distribution pipe 7 is possible, thereby reducing the workload of the process of moving the concrete discharge outlet 8 of the concrete distribution pipe 7 to each of the morning glory hoppers 15 arranged in the circumferential direction and pouring concrete into them.

[0041] As described above, the rotary joints 13 (connecting parts 9) of the two concrete pipes 3 are arranged close to each other across the central axis of the shaft 91. Strictly speaking, the rotation axis of the concrete distribution pipe 7 in each concrete pipe 3 is slightly offset from the central axis of the shaft 91. However, since this offset of the rotation axis is negligibly small compared to the diameter of the shaft 91, it may be considered that the rotation axis of the concrete distribution pipe 7 of each system coincides with the central axis of the shaft 91. Alternatively, the arrangement of the morning glory hoppers 15 and the position and shape of the rails 63 of the rotation guide unit 61 may be finely adjusted to strictly correspond to the offset of the rotation axes.

[0042] The present invention can be implemented in various forms including the above-described embodiment and various modifications and improvements based on the knowledge of those skilled in the art. In addition, it is possible to configure modified examples by utilizing the technical matters described in the above-described embodiment. The configurations of each embodiment may be used in appropriate combination.

[0043] For example, as shown in FIG. 7, the concrete distribution pipe 7 may further include a rotary joint 14 (another rotary joint) provided on the horizontal pipe section 7b at a position between the outer circumferential rotation guide section 61 and the discharge pipe section 7c. The rotary joint section 14 connects the downstream pipe of the rotary joint section 14 to the upstream pipe of the rotary joint section 14 so as to be rotatable about the pipe axis. The rotary joint section 14 may have a structure similar to the rotary joint section 13 or the rotary joint section 13B described above, but is not limited thereto. If the part downstream of the rotary joint section 14, including the discharge pipe section 7c and the rubber hose 7d, is called the distribution pipe downstream section 69, the distribution pipe downstream section 69 is rotatable about the pipe axis of the horizontal pipe section 7b with respect to the horizontal pipe section 7b, and delivers and discharges concrete in a direction perpendicular to the axis of rotation of the rotation.

[0044] The concrete pouring method described above can be performed in the same manner using such a concrete distribution pipe 7. In this concrete pouring method, the positioning accuracy of the concrete distribution pipe 7 may be poor when the concrete discharge port 8 is moved to each morning glory hopper 15 by horizontally rotating the concrete distribution pipe 7. Even in this case, the position of the concrete discharge port 8 can be finely adjusted in the circumferential direction by rotating only the downstream portion 69 of the distribution pipe without rotating the entire concrete distribution pipe 7. Therefore, excessive positioning accuracy of the concrete distribution pipe 7 is not required, and as a result, the workload in pouring concrete is reduced.

[0045] 7, a turntable 52 may be used in place of the cable jack 51 in the rotation assisting part 50. The turntable 52 is fixed to be horizontally rotatable relative to the working stage 97, and a holding base 53 is fixed to the upper surface of the turntable 52. In addition, the rotation assisting part 50 can use various types of devices, not limited to the turntable 52 or the cable jack 51 described above, as long as they are interposed between the holding base 53 and the working stage 97 and enable the holding base 53 to be horizontally rotatable relative to the working stage 97.

[0046] For example, in the embodiment, the sunny hose 17 is connected below the morning glory hopper 15, but instead of the sunny hose 17, a flat hose 18 may be used as shown in FIG. 8. In the example of FIG. 8, three flat hoses 18 are connected in series below the morning glory hopper 15 and supported by a formwork 95 via a bracket or the like. The flat hose 18 is a rubber hose having a flat cross-sectional shape. In the example of FIG. 8, the cross-sectional shape of the flat hoses 18 is almost circular at the connection parts (upper end and lower end) of the flat hoses 18, but the cross-sectional shape is flattened in the left and right direction in FIG. 8 except for the connection parts. The flat hose 18 has elasticity such that it maintains a flat shape when concrete is not passing through the inside, and expands to a circular cross-section due to internal pressure when concrete passes through the inside. Such a flat hose 18 suppresses the flow speed of the concrete in the pipe, and suppresses material separation caused by the concrete falling vertically in the pipe.

[0047] In addition, in the rotary joints 13 and 13B, other types of friction reducing materials capable of reducing friction in the rotational direction may be used instead of the thrust washer 33. The material of the thrust washer 33 is not limited to high-strength brass casting, and thrust washers made of various materials such as metal, resin, and ceramic may be used. As the material of the thrust washer 33, a material that not only has a small friction coefficient but also wears more easily than the connecting pipe parts 5c, 7a, and flange receiving ring 29 may be selected. In this case, wear of the connecting pipe parts 5c, 7a, and flange receiving ring 29 is suppressed, and only the worn thrust washer 33 needs to be replaced during maintenance.

[0048] In addition, in the rotary joint portion 13, 13B, the flange holding portion 47 is formed by the flange 21 and the flange receiving ring 29 which are bolted together, but the flange holding portion 47 may be formed integrally or may be formed by three or more parts.

[0049] In addition, in the rotary joints 13 and 13B, the flange holding portion 47 is provided at the lower end of the connecting pipe portion 5c (first pipe), and the flange holding portion 47 holds the flange 23 of the connecting pipe portion 7a (second pipe) on the inside. However, the relationship between the connecting pipe portion 5c and the connecting pipe portion 7a may be reversed. That is, the flange holding portion 47 may be provided at the upper end of the connecting pipe portion 7a (first pipe), and the flange holding portion 47 may hold the flange 21 of the connecting pipe portion 5c (second pipe) on the inside. In this case, the cross-sectional view of the rotary joint portion 13 is a cross-sectional view of the rotary joint portion 13 in FIG. 5 turned upside down, and the cross-sectional view of the rotary joint portion 13B is a cross-sectional view of the rotary joint portion 13B in FIG. 6 turned upside down.

[0050] Furthermore, the rotary joint at the connection 9 between the concrete supply pipe 5 and the concrete distribution pipe 7 is not limited to the above-mentioned rotary joint 13, 13B, and is not limited to one having a friction reducing material, and rotary joints of various structures can be used as long as they rotatably connect the concrete distribution pipe 7 to the concrete supply pipe 5. Furthermore, the concrete pouring device 1 in the embodiment is equipped with two systems of concrete pipes 3, but is not limited thereto, and only one system of concrete pipes 3 may be provided, or three or more systems may be provided. [Explanation of symbols]

[0051] 1...concrete pouring device, 5...concrete supply pipe (first pipe, second pipe), 5c...connecting pipe section (downstream end), 7...concrete distribution pipe (second pipe, first pipe), 7a...connecting pipe section (upstream end), 7b...horizontal pipe section, 8...concrete discharge outlet, 13, 13B...rotary joint section, 14...rotary joint section (other rotary joint section), 15...morning glory hopper (distribution destination), 23...flange (second pipe flange), 23b...lower surface (reverse surface of second pipe flange), 33...thrust washer (friction reduction material), 31a...upper surface (stopper surface), 47...flange holding section, 50...rotation assist section, 61...rotation guide section, 69...downstream section of distribution pipe.

Claims

1. A concrete supply pipe for transporting concrete supplied from above, and a concrete distribution pipe having a horizontal pipe section extending horizontally and a concrete discharge port for discharging the concrete, the concrete distribution pipe being connected to the downstream side of the concrete supply pipe so as to be horizontally rotatable, The vertical upstream end of the concrete distribution pipe is connected to the lower downstream end of the concrete supply pipe via a rotary joint so as to be rotatable around the pipe axis; A concrete pouring device comprising a rotation assist unit including a jack that holds the concrete distribution pipe at a position vertically below the rotary joint unit, is rotatable around the pipe axis, and can raise and lower the concrete distribution pipe.

2. The concrete pouring device according to claim 1 , wherein the rotation assist portion supports a portion of the weight of the concrete distribution pipe.

3. The concrete pouring device according to claim 1 or 2, further comprising a rotation guide section that supports the horizontal pipe section at a position radially outward of the rotation assist section and guides it in the circumferential direction of rotation.

4. In the rotary joint portion, When one of the concrete supply pipe and the concrete distribution pipe is a first pipe and the other is a second pipe, a flange holding portion is provided at an end portion of the first pipe on the second pipe side, the flange holding portion having a stopper surface that wraps around to a back surface side of a second pipe flange formed at the end portion of the second pipe on the first pipe side so as to face the back surface and that restricts displacement of the second pipe flange in a pipe axis direction away from the first pipe by the stopper surface, The concrete pouring device according to any one of claims 1 to 3, wherein a friction reducing material is sandwiched between the back surface of the second pipe flange and the stopper surface.

5. The concrete distribution pipe has a distribution pipe downstream section connected to the horizontal pipe section downstream via another rotary joint section and rotatable around the pipe axis of the horizontal pipe section, The concrete pouring device according to any one of claims 1 to 4, wherein the downstream portion of the distribution pipe delivers the concrete in a direction intersecting the rotation axis.

6. A concrete pouring method comprising the steps of: using a concrete pouring device according to any one of claims 1 to 5, horizontally rotating the concrete distribution pipe relative to the concrete supply pipe; and moving the concrete discharge outlet of the concrete distribution pipe to each distribution destination arranged on a horizontal circumference approximately centered on the rotary joint portion to pour concrete.

Citation Information

Patent Citations

  • Conveying equipment for concrete etc*

    JP1977081608A

  • Swing type concrete placing device

    JP1998220006A

  • Distributor

    JP2007217906A

  • Pipe mounting structure

    JP2009001972A

  • Concrete filling pipe

    JP2019183526A