Method for constructing cast-in-place piles, temporary casing support device used in said method, and excavator for cast-in-place piles

A casing temporary support device with a temporary receiving part and moving mechanism ensures safe re-suspension and removal of casings and tremie pipes in cast-in-place pile construction, addressing safety risks and enabling continuous construction operations.

JP7576371B1Active Publication Date: 2024-10-31CUP CHAMBER OF COMMERCE CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
JP2024091701
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-06-05
Publication Date
2024-10-31
Estimated Expiration
2044-06-05

AI Technical Summary

Technical Problem

The construction of cast-in-place piles is hindered by safety risks during the removal of casings and tremie pipes due to the need for repeated suspension and re-suspension of reinforcing bar cages and tremie pipes using cranes, which can lead to accidents and unsafe working conditions.

Method used

A method involving a casing temporary support device that includes a temporary receiving part and a moving mechanism, allowing for safe re-suspension and removal of casings and tremie pipes by temporarily supporting them with a crane, ensuring they are not left suspended, thereby preventing accidents and ensuring worker safety.

Benefits of technology

The method enhances work safety by preventing accidents during the re-suspension and removal of casings and tremie pipes, allowing for smooth continuation of construction processes without interference with other operations.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007576371000001_ABST
    Figure 0007576371000001_ABST
Patent Text Reader

Abstract

To provide a method for constructing cast-in-place piles capable of improving the safety of work during construction. [Solution] A construction method for cast-in-place piles including an excavation process, a setting process, and a casting process, in which the casting process includes a process of pouring ready mixed concrete 5 to a predetermined height, and then repeatedly performing a casing removal process in which, while the reinforcing bar cage 30 is suspended by a crane, one casing 20 is pulled out and separated and then removed, and the casing removal process includes a process of lifting and supporting the separated casing 20A with a crane, a temporary support process of placing the temporary support part 11 of the casing temporary support device 10 under the casing 20A lifted and supported by the crane, and a first re-hanging process of placing the temporary support part 11 of the casing temporary support device 10 and then re-hanging the reinforcing bar cage 30 suspended by the crane to the upper opening 20a of the casing 20 buried in the ground.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing cast-in-place piles, a casing temporary support device used in the construction method, and an excavator for cast-in-place piles, and in particular to a method for constructing cast-in-place piles that can improve work safety during construction, a casing temporary support device used in the construction method, and an excavator for cast-in-place piles. [Background technology]

[0002] At construction sites, a method is generally adopted in which piles are driven into the ground to form pile foundations that support the structures in order to increase the earthquake resistance of the structures. One of the construction methods for pile foundations is the cast-in-place pile construction method. A cast-in-place pile is, for example, a cylindrically assembled rebar cage that is placed in a drilled pile hole, and after the cage is placed, ready-mixed concrete is poured into the pile hole and allowed to harden. There are several known construction methods for cast-in-place piles, such as the all-casing method, the earth drill method, and the reverse method, which differ in the method of excavating the ground.

[0003] The outline of the construction sequence for cast-in-place piles using the all-casing method is as follows (see, for example, Patent Document 1). (1) Install the excavator. (2) The excavator presses in the casing (also called a casing tube), excavates the inside of the casing with a hammer grab or similar tool, and then connects the casing, repeatedly drilling to the specified depth (bearing layer) to form pile holes. (3) Place a reinforcing bar cage in the pile hole. (4) Place a tremie pipe in the pile hole and pour ready-mixed concrete. (5) Backfilling is performed.

[0004] When constructing cast-in-place piles using the all-casing method described above, generally, during the process of pouring the ready-mixed concrete, a reinforcing bar cage is placed in the pile hole in a free-standing position, and part of the casing is pulled out of the pile hole and detached in accordance with the amount of ready-mixed concrete to be poured, and the detached casing is then lowered by crane to a temporary storage area, and this removal work is repeated.

[0005] In recent years, the reinforcing bar cages used to construct cast-in-place piles have become significantly thicker and more numerous, particularly at the pile heads, which receive horizontal forces during earthquakes, in order to withstand large earthquakes, and the excessive load at the pile heads is now supported by the same main bars at the legs as before, that is, by reinforcing bar cages made of thinner main bars and fewer main bars than the reinforcing bar cage at the pile heads. In addition, the reinforcing bar cages now use extremely thick main bars such as D51, which were rarely used before, and thick ties (also called hoop bars) such as D32 and D35, and the pile lengths have changed significantly from reaching the intermediate bearing layer to reaching deeper bearing layers, with the arrangement of the reinforcing bars, the structure of the piles themselves, and the pile lengths changing dramatically from the conventional reinforcing bar cages.

[0006] Therefore, in the process of pouring the ready-mixed concrete, if the reinforcing bar cage is placed in the pile hole in a self-supporting state as described above, there is a risk that the reinforcing bar cage will buckle due to the effects of the weight of the reinforcing bar, the sinking of the ready-mixed concrete, etc., and measures to prevent such buckling are required. As one of such measures, in the process of pouring the ready-mixed concrete, the ready-mixed concrete is poured in a state where the reinforcing bar cage is suspended in the pile hole by a crane or the like.

[0007] [Problem to be solved by the invention] In the process of pouring the ready-mixed concrete, for example, when pouring the ready-mixed concrete with a reinforcing bar cage suspended using the parent (main) hook of a crane, the detached casing cannot be removed while the reinforcing bar cage is still suspended by the parent hook. Therefore, when performing the above-mentioned casing removal work, it is necessary to resuspend the reinforcing bar cage in order to temporarily set the parent hook in a free state.

[0008] That is, after one casing to be removed is pulled out and separated, the separated casing is lifted using the child (auxiliary) hook of the crane, and the reinforcing bar cage suspended using the main hook directly below the lifted casing is resuspended using a hoisting jig or the like to the opening of the casing located on the work platform of the excavator, and the main hook must be temporarily set free. Therefore, the resuspending work of the reinforcing bar cage is performed directly below the casing lifted using the child hook, i.e., directly below the suspended load, which creates the problem that work safety is not ensured. [Prior art documents] [Patent documents]

[0009] [Patent Document 1] Patent Publication No. 2022-242178 Summary of the Invention Means for solving the problem and their effects

[0010] The present invention has been made in consideration of the above-mentioned problems, and aims to provide a construction method for cast-in-place piles that can improve work safety during construction, a casing temporary support device used in the construction method, and a drilling machine for cast-in-place piles.

[0011] In order to achieve the above object, the present invention provides a method for constructing a cast-in-place pile (1), comprising the steps of: pressing a casing into the ground, and drilling inside the casing while adding to it to form a pile hole; An erection process of erecting a reinforcing bar cage into the pile hole; A casting process of casting fresh concrete into the pile hole with the reinforcing bar cage suspended in the pile hole, The casting step comprises: After pouring the ready-mixed concrete to a predetermined height, the reinforcing bar cage is suspended by a crane, and one casing is pulled out and separated, followed by repeatedly removing the casing. The casing removal step includes: Lifting and supporting the separated casing with the crane; a temporary support process of disposing a temporary support portion of a casing temporary support device under the casing hoisted and supported by the crane; This method is characterized by including a first re-hanging process in which, after the temporary support part is arranged in the temporary support process, the reinforcing bar cage suspended by the crane is re-hanged to the upper opening of the casing buried in the ground.

[0012] According to the above-mentioned cast-in-place pile construction method (1), in the casing removal process of the casting process, a process of lifting and supporting the separated casing with the crane, a temporary support process of arranging a temporary support part of a casing temporary support device under the casing lifted and supported by the crane, and a first re-hanging process of re-hanging the reinforcing bar cage suspended by the crane to the upper opening of the casing buried in the ground after arranging the temporary support part in the temporary support process are carried out. Therefore, the casing lifted and supported by the crane can be temporarily supported on the temporary support portion of the casing temporary support device before the first re-hanging step, i.e., the re-hanging work of the reinforcing bar cage, can be carried out. Therefore, it is possible to prevent accidents such as the casing that is lifted and supported falling, and it is possible to carry out the work while ensuring the safety of the workers performing the rehanging work of the reinforcing bar cage, thereby improving work safety during construction. In addition, the reinforcing bar cage may be suspended by, for example, a first hoisting means of the crane, and the separated casing may be suspended by a second hoisting means of the crane.

[0013] The present invention also relates to a method (2) for constructing a cast-in-place pile, comprising the steps of: The casting step comprises: The method includes a step of erecting a tremie pipe into the pile hole, suspending the tremie pipe from an upper opening of the casing buried in the ground, and then pouring the ready-mixed concrete into the tremie pipe, The casing removal step includes: After pouring the fresh concrete to a predetermined height, the tremie pipe is suspended and supported by the crane, This method is characterized in that after the temporary support part is arranged in the temporary support process, it further includes a second re-hanging process of re-hanging the tremie pipe suspended and supported by the crane to the upper opening of the casing buried in the ground.

[0014] According to the above-mentioned cast-in-place pile construction method (2), the casing lifted and supported by the crane can be temporarily supported in the temporary support portion of the casing temporary support device, and then the second re-suspending process, i.e., the re-suspending work of the tremie pipe, can be carried out. Therefore, it is possible to prevent accidents such as the casing that has been lifted and supported falling, and it is possible to carry out the work while ensuring the safety of the workers performing the tremie pipe replacement work, thereby improving work safety during construction. In addition, the tremie tube may be suspended, for example, by the third hoisting means of the crane, or may be suspended by the first hoisting means.

[0015] The present invention also relates to a method (3) for constructing a cast-in-place pile, comprising the steps of: The casting step comprises: a returning step of returning the temporary support portion of the casing temporary support device to a predetermined position after the casing removal step; and a third re-hanging process of re-hanging the reinforcing bar cage so that it is suspended by the crane.

[0016] According to the above-mentioned cast-in-place pile construction method (3), the casting process includes the returning process and the third re-hanging process after the casing removal process. Therefore, in the third re-hanging process, the temporary support part of the casing temporary support device does not get in the way of the re-hanging work of the rebar cage, and the next casting work of the ready-mixed concrete and the subsequent casing removal process can be carried out smoothly.

[0017] The present invention also provides a method (4) for constructing a cast-in-place pile, in any one of the above methods (1) to (3) for constructing a cast-in-place pile, The casting step comprises: This method is characterized by including a tremie pipe removal process, which includes, before or after the casing removal process, changing the tremie pipe suspended from the upper opening of the casing buried in the ground to a suspended state by the crane, and then pulling up the tremie pipe, cutting off a portion of it, and removing it.

[0018] According to the above-mentioned cast-in-place pile construction method (4), the tremie pipe removal process is carried out before or after the casing removal process. Therefore, in the tremie pipe removal process, the temporary support portion of the casing temporary support device does not get in the way of the tremie pipe removal work, and the work of pulling up the tremie pipe, cutting off a portion of it, and then removing it can be carried out safely and smoothly.

[0019] The casing temporary support device (1) according to the present invention is a casing temporary support device used in any one of the above-mentioned cast-in-place pile construction methods (1) to (4), A temporary support portion for temporarily supporting the separated casing above a drilling machine for cast-in-place piles; A moving mechanism that moves the temporary holder in a horizontal direction; and a base to which the movement mechanism is attached.

[0020] According to the above-mentioned casing temporary support device (1), the temporary support part can temporarily support the casing that has been separated and lifted above the excavator, thereby ensuring work safety during the casing removal process. In addition, since the temporary holding portion can be moved horizontally by the moving mechanism, it is possible to prevent the temporary holding portion from interfering with construction work in processes other than the casing removal process that do not use the temporary holding portion. In addition, it is possible to provide a device that can improve work safety with a small number of components, such as the temporary holding portion, the moving mechanism, and the base portion.

[0021] The casing temporary support device (2) according to the present invention is characterized in that in the above-mentioned cast-in-place pile installation method (1), the base or the moving mechanism is configured to be attachable to the excavator.

[0022] According to the above-mentioned casing temporary support device (2), since the base or the moving mechanism can be attached to the excavator, it is possible to make the configuration compact. Also, since it can be configured as an integral part of the excavator, it is possible to install it in a state integrated with the excavator, and it is possible to prevent the installation work from becoming complicated.

[0023] The casing temporary support device (3) according to the present invention is the casing temporary support device (1) or (2) described above, wherein the temporary support portion includes one or more gate-type racks, The distance between the legs of the gate-type frame is greater than the width of the work platform of the excavator, The moving mechanism includes a linear guide unit that slidably supports the leg of the gate-type frame, The linear guide portion is longer than the work table and is disposed outside the work table.

[0024] According to the above-mentioned casing temporary support device (3), the temporary support section is configured to include one or more of the gate-type frames, and the distance between the legs of the gate-type frames is greater than the width of the work platform of the excavator. Therefore, with the detached casing placed on the gate-type frame, i.e., with a safe working space secured, the resuspending work of the reinforcing bar cage and the tremie pipe (the first resuspending process and the second resuspending process) can be carried out. Furthermore, since the moving mechanism is configured to include the linear guide unit, which is longer than the work table and is arranged outside the work table, it is possible to retract the gate-type stand to the outside of the work table in processes other than the casing removal process, and it is possible to prevent the gate-type stand from interfering with work during construction.

[0025] The present invention also provides a drilling machine for cast-in-place piles, characterized in that it includes any one of the above-mentioned casing temporary support devices (1) to (3). According to the above-mentioned drilling machine for cast-in-place piles, it is possible to function as a drilling machine that exhibits the effects of the above-mentioned temporary casing support devices (1) to (3), and it is possible to improve the safety of work during construction of cast-in-place piles. [Brief description of the drawings]

[0026] [Figure 1] FIG. 1 is a diagram for explaining a method of constructing a cast-in-place pile in accordance with an embodiment of the present invention, in which (a) shows the state in which the first load of ready mixed concrete has been poured to a specified height, and (b) shows the state in which one casing has been pulled out. [Diagram 2] FIG. 11 is a diagram for explaining a construction method for a cast-in-place pile according to an embodiment, in which (a) shows the state in which the detached casing is supported by the temporary support portion of the casing temporary support device, and (b) shows the state in which the rebar cage has been replaced. [Diagram 3] FIG. 11 is a diagram for explaining a construction method for a cast-in-place pile according to an embodiment, in which (a) shows the state in which the detached casing is being removed, and (b) shows the state in which a part of the tremie pipe is being detached and removed. [Figure 4] FIG. 13 is a diagram for explaining a method of constructing a cast-in-place pile according to an embodiment, showing the state after a second load of ready-mixed concrete has been poured to a predetermined height. [Diagram 5] 1A to 1C are diagrams for explaining the configuration of an excavator equipped with a casing temporary support device according to an embodiment, where (a) is a front view, (b) is a plan view, and (c) is a side view. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0027] The method for constructing a cast-in-place pile according to the present invention, the casing temporary support device used in the method, and the drilling machine for the cast-in-place pile will be described below with reference to the drawings. Note that the embodiments described below are preferred examples of the present invention, and therefore various technically preferable limitations are attached to them, but the scope of the present invention is not limited to these embodiments unless otherwise specified in the following description to the effect that the present invention is limited thereto.

[0028] 1 to 4 are diagrams for explaining a method for constructing a cast-in-place pile according to an embodiment, and in particular, for explaining a casing removal process included in a casting process. In the following embodiment, a case where an all-casing method is applied to a method for constructing a cast-in-place pile will be described.

[0029] Figure 1(a) shows the state in which the first machine (first stage) has poured fresh concrete to a specified height (pouring length), and Figure 1(b) shows the state in which one casing has been pulled out. FIG. 2(a) shows the state in which the separated casing is supported by the temporary support portion of the casing temporary support device, and FIG. 2(b) shows the state in which the reinforcing bar cage has been resuspended. FIG. 3(a) shows the state in which the separated casing is being removed, and FIG. 3(b) shows the state in which a part of the tremie pipe is being separated and removed. FIG. 4 is a diagram showing the state in which the ready mixed concrete in the second unit (second stage) has been poured to a predetermined height.

[0030] First, the steps up to the state shown in FIG. 1(a) will be described. First, an excavator 1 for cast-in-place piles is installed on the ground. That is, the excavator 1 is lifted by a crane such as a crawler crane (not shown), and the pile core is aligned and installed on a mounting stand that has been installed on the ground in advance. The excavator 1 is, for example, a device that functions as a full rotation excavator and can cut and press-in a casing 20 while rotating it all around, and can pull out the casing 20 vertically. In addition, a casing temporary support device 10 is attached to the excavator 1. The configuration of the casing temporary support device 10 will be explained later.

[0031] Next, the process proceeds to an excavation step, in which the casing 20 is pressed into the ground, and the inside of the casing 20 is excavated while being added to form a pile hole 4 of a predetermined depth. Specifically, first, a casing 20 (first casing) is set on the excavator 1, and the casing 20 is rotated while cutting and pressing into the ground, after which a hammer grab is attached to a crane and the inside of the casing 20 is excavated. The first casing 20 is pressed into the ground to a predetermined depth, and when the excavation of the inside is completed, the hammer grab is temporarily pulled up, and an extension casing 20 is hung by a crane and connected to the first casing 20. This process is repeated until the excavation reaches a predetermined depth, a pile hole 4 is formed, and then pile bottom processing is performed. Note that a drilling bucket may be used instead of a hammer grab depending on the site conditions.

[0032] Next, the process proceeds to an installation process in which the reinforcing bar cage 30 is installed in the pile hole 4. The installation process is a process in which the reinforcing bar cage 30 is hoisted by a crane and inserted inside the casing 20 in alignment with the axis of the casing 20 in the pile hole 4. Note that in the installation process, the reinforcing bar cage 30 may be installed while being connected.

[0033] The reinforcing bar cage 30 is constructed by connecting multiple reinforcing bar cages each having a substantially cylindrical shape, and the upper reinforcing bar cage (pile head) is constructed with a larger diameter and a larger number of main bars than the lower reinforcing bar cage. Note that the reinforcing bar cage 30 shown in the figure is constructed by connecting three reinforcing bar cages, but the number of connections is appropriately designed according to the pile length, pile diameter, etc. The reinforcing bar cage 30 is composed of a plurality of main reinforcements (vertical reinforcements) 31, a plurality of hoop reinforcements (horizontal reinforcements) 32 that intersect with these main reinforcements 31, and a plurality of reinforcing rings 33 that intersect with these main reinforcements 31. The intersections between these main reinforcements 31 and the reinforcing rings 33 are fixed, for example, by reinforcing bar fixing metal fittings (not shown), and the intersections between the main reinforcements 31 and the hoop reinforcements 32 are fixed by iron wire ties, metal fittings, etc. (not shown).

[0034] The size of the reinforcing bar cage 30 varies depending on the construction site, with diameters ranging from about 0.6 m to 3 m or more. The length of the reinforcing bar cage 30 can reach about 12 m to 14 m per cage, and the total length of the reinforcing bar cage 30 can reach about 70 m or more. The main bars 31 are sometimes arranged individually, and sometimes arranged in groups of two bundled together horizontally or vertically.

[0035] A crane (not shown) is used to erect the reinforcing bar cage 30. For this crane, it is preferable to use a device equipped with at least two hooks, for example, a device equipped with a parent hook 6 attached to the wire of a first (main) winch serving as a first hoisting means, and a child hook 7 attached to the wire of a second (auxiliary) winch serving as a second hoisting means. It is even more preferable to use a device equipped with a child hook 8 attached to the wire of a third winch serving as a third hoisting means, in addition to the parent hook 6 and child hook 7.

[0036] In the process of erecting the reinforcing bar cage 30, the reinforcing bar cage 30 is suspended by a hoisting device 6a including, for example, a traverser 6b suspended from a main hook 6 and a hoisting bar 6c suspended from the traverser 6b. The hanging bar 6c may be attached to the reinforcing bar cage 30 by, for example, engaging a hook member or a shackle (not shown) fixed to the lower end of the hanging bar 6c with a reinforcing ring 33 of the reinforcing bar cage 30. Although the figure shows an example in which the reinforcing bar cage 30 is hung at two points, it may be hung at four points depending on the size of the reinforcing bar cage 30. In this case, a circular ring member may be used instead of the traverser 6b.

[0037] The reinforcing bar cage 30 is not freestanding in the pile hole 4, but is held in a suspended state in the pile hole 4 (not in contact with the pile bottom). For example, as shown in Fig. 1(a), the reinforcing bar cage 30 may be held in a suspended state by a crane, or may be held in a suspended state by a hanging jig 25 (Fig. 2(b)) disposed in the upper opening 20a of the casing 20.

[0038] Next, the process proceeds to a pouring process in which fresh concrete 5 is poured into the pile hole 4 with the reinforcing bar cage 30 suspended in the pile hole 4. First, as shown in Fig. 1(a), the tremie pipe 40 is erected in the center of the reinforcing bar cage 30, a hopper section 41 is attached to the upper end of the tremie pipe 40, and the tremie pipe 40 is supported by a bar 26 (jig) disposed in the upper opening 20a of the casing 20. A crane is used to erect the tremie pipe 40.

[0039] Next, start pouring the ready mixed concrete (concrete) 5. That is, pour the ready mixed concrete 5 into the tremie pipe 40, and while checking the amount of concrete that rises, pour the ready mixed concrete 5 to a predetermined height from the bottom of the pile, until the first (first stage) ready mixed concrete 5 shown in FIG. 1(a) is poured to a predetermined height (for example, the height of one casing).

[0040] Before proceeding to the description of the next casing removal process, the configuration of the casing temporary support device 10 attached to the excavator 1 will be described with reference to FIG. The casing temporary support device 10 comprises a temporary support part 11 for temporarily supporting the detached casing 20A above the excavator 1 during the casing removal process described below, a moving mechanism 13 for moving the temporary support part 11 horizontally, and a base 15 to which the moving mechanism 13 is attached, and is configured so that the base 15 or the moving mechanism 13 can be attached to the excavator 1.

[0041] The temporary support portion 11 is configured to include two gate-type frames 12, and each pair of the gate-type frames 12 has a base portion 12a and legs 12b, and the distance between the legs 12b is configured to be greater than the vertical width of the work platform 2 of the excavator 1. The height of the gate-type frames 12 is set to a level that allows an operator to work under the gate-type frames 12 with the separated casing 20A temporarily placed on the gate-type frames 12.

[0042] The movement mechanism 13 is configured to include two rail sections 14 that slidably support the legs 12b of the gate-shaped frame 12, and these rail sections 14 are attached to the excavator 1 in a state in which they are longer than the width of the work platform 2 of the excavator 1 and are disposed outside the work platform 2. The rail sections 14 are an example of a linear motion guide section. The legs 12b of the gate-type platform 12 are provided with wheels (not shown) at their lower ends, and the wheels are adapted to be placed on the rail section 14. The wheels also have a stopper function to hold rotation. Therefore, an operator can manually move the gate-type platform 12 along the rail section 14 and hold it at a predetermined position. In another configuration example, the rail section 14 may be configured with a hydraulic slide rail or an electric slide rail.

[0043] The base 15 has two side panels 16 attached to both ends of the two rail sections 14 arranged in parallel. The side panels 16 function as car stops for the gate-type frame 12. The base 15 also has support sections 17 that support the two rail sections 14. The configuration for attaching the base 15 or the moving mechanism 13 to the excavator 1 is not particularly limited as long as the mounting structure has the strength to temporarily support the separated casing 20. For example, the support part 17 of the base 15 or the rail part 14 of the moving mechanism 13 can be attached to the work platform 2 or the main body 3 of the excavator 1 using fasteners such as bolts, a connecting plate, a support plate disposed on the work platform 2, or other fixing devices. A counterweight 3a for reaction force can be attached to the main body 3 of the excavator 1.

[0044] Next, the casing removal process carried out in the casting process will be described. As shown in Fig. 1(a), after pouring the ready-mixed concrete 5 to a predetermined height, as shown in Fig. 1(b), the tremie pipe 40 is suspended and supported by a hoist 8a attached to the grandchild hook 8 of the crane, and the reinforcing bar cage 30 is suspended and supported by a hoist 6a attached to the parent hook 6 of the crane. Also, before the casing 20 is pulled out, the hoist 7a attached to the child hook 7 of the crane is attached to the casing 20 protruding above the work platform 2. Note that instead of the method of suspending the tremie pipe 40 by the hoist 8a attached to the grandchild hook 8 of the crane, the hoist 8a may be attached to the traverser 6b in advance, and the tremie pipe 40 may be suspended and supported by the hoist 8a attached to the traverser 6b.

[0045] Thereafter, the excavator 1 starts the work of extracting one casing 20. The excavator 1 has a function of catching the casing 20 and extracting it vertically. Then, when the connecting part 20b of the casing 20 reaches the top of the work platform 2, the extraction work is stopped, the metal fittings of the connecting part 20b of the casing 20 are removed, and then the work of lifting the separated casing 20A with a crane is started.

[0046] Thereafter, as shown in FIG. 2(a), when the lower end of the separated casing 20A comes above the gate-shaped stand 12 of the casing temporary support device 10, the lifting of the separated casing 20A is stopped. Next, the process proceeds to a temporary support step in which the temporary support portion 11 of the casing temporary support device 10 is disposed under the casing 20A hoisted and supported by the crane. That is, as shown in FIG. 1(b), the gate-shaped frames 12 of the casing temporary support device 10 located on both sides of the work platform 2 of the excavator 1 are moved to below the casing 20A lifted and supported by a crane, as shown in FIG. 2(a), and then the detached casing 20A is placed on top of the gate-shaped frames 12 to be temporarily supported.

[0047] Thereafter, the process proceeds to a re-hanging process of the reinforcing bar cage 30 (first re-hanging process) and a re-hanging process of the tremie pipe 40 (second re-hanging process) shown in FIG. 2(b). In the re-suspension process of the reinforcing bar cage 30, the reinforcing bar cage 30 suspended by the main hook 6 of the crane as shown in Fig. 2(a) is re-suspended to the upper opening 20a of the casing 20 (on the work platform 2) buried in the ground. For example, as shown in Fig. 2(b), a suspension jig 25 for the suspension bar 6c is attached to the upper opening 20a of the casing 20, the suspension bar 6c suspending the reinforcing bar cage 30 is fixed to the suspension jig 25, the reinforcing bar cage 30 is suspended and supported in the pile hole 4 by the suspension jig 25 and the suspension bar 6c, and the main hook 6 of the crane and the traverser 6b that suspended the reinforcing bar cage 30 are pulled up.

[0048] In the process of replacing the tremie pipe 40, the tremie pipe 40 suspended by the super-hook 8 of the crane as shown in Fig. 2(a) is resuspended to the upper opening 20a of the casing 20 (on the workbench 2) buried in the ground. For example, as shown in Fig. 2(b), two shim bars 26 are arranged at the upper opening 20a of the casing 20, the flange at the upper end of the tremie pipe 40 is placed between the two shim bars 26, and the tremie pipe 40 is suspended and supported in the pile hole 4, and the super-hook 8 of the crane and the hoisting tool 8a from which the tremie pipe 40 was suspended are then pulled up.

[0049] In the re-hanging process of the reinforcing bar cage 30 (first re-hanging process) and the re-hanging process of the tremie pipe 40 (second re-hanging process), the detached casing 20A is placed on the gate-shaped stand 12 of the casing temporary support device 10 and temporarily supported, so that the re-hanging work can be performed while ensuring work safety.

[0050] Then, after the re-hanging process of the reinforcing bar cage 30 (first re-hanging process) and the re-hanging process of the tremie pipe 40 (second re-hanging process) are completed, the work of removing the separated casing 20A shown in FIG. 3(a) is performed. That is, the casing 20A, which is temporarily supported on the gate-shaped frame 12 of the casing temporary support device 10, is lifted by a crane, the crane is rotated to lower the casing 20A to a designated temporary storage area, the crane's hoisting gear 7a is removed from the casing 20A, the hoisting gear 7a is lifted together with the sub hook 7, and the crane is returned to its designated position. After completing the casing removal process, as shown in FIG. 3(a), the gate-shaped frame 12 of the casing temporary support device 10 is moved along the rail portion 14 to both sides of the workbench 2, and the gate-shaped frame 12 is returned to its designated position, i.e., the return process is performed.

[0051] After that, the tremie tube removal process begins. As shown in Fig. 3(b), in the tremie pipe removal process, the tremie pipe 40 suspended from the upper opening 20a of the casing 20 (on the workbench 2) buried in the ground is resuspended from the sub-hook 8 of the crane. The tremie pipe 40 is then lifted up by the crane, and the lifting is stopped when the connecting part of the tremie pipe 40 is positioned above the upper opening 20a of the casing 20. The amount of lifting of the tremie pipe 40 is within a range that allows the lower end of the tremie pipe 40 in the pile hole 4 to be maintained inserted 2 m or more into the ready mixed concrete 5.

[0052] Thereafter, two shim bars 26 are arranged in the upper opening 20a of the casing 20, and the flange of the connecting part of the tremie pipe 40 is placed between the two shim bars 26, and the tremie pipe 40 is suspended and supported in the pile hole 4. Thereafter, the metal fittings of the connecting part of the tremie pipe 40 are removed to separate it, the tremie pipe 40A suspended by the grandchild hook 8 of the crane is lifted up, the crane is rotated to lower the tremie pipe 40A to a predetermined temporary storage area, the hoisting tool 8a of the crane is removed from the tremie pipe 40A, and the hoisting tool 8a is lifted up together with the grandchild hook 8 to return the crane to the predetermined position. Note that the detached tremie pipe 40 may be suspended by the child hook 7 or the parent hook 6 instead of the grandchild hook 8 of the crane.

[0053] After the tremie pipe removal process is completed, the rebar cage 30, which is suspended from the hoisting rod 6c and the hoisting jig 25 at the upper opening 20a of the casing 20 (on the work platform 2) buried in the ground as shown in Fig. 3(b) (third re-hanging process), is re-suspended to the crane's main hook 6 and the hoisting tool 6a as shown in Fig. 4. Then, the process proceeds to the pouring of the ready mixed concrete 5 for the second unit (second stage). That is, the ready mixed concrete 5 is poured into the tremie pipe 40, and the ready mixed concrete 5 is poured to a specified height while checking the amount of concrete that rises.

[0054] Thereafter, the casing removal process described in Fig. 1(b) to Fig. 3(b) is repeated, and the pouring process is completed by pouring the ready-mixed concrete 5 up to the pile head. After that, backfilling is performed, and the next cast-in-place pile construction work is started.

[0055] According to the construction method for cast-in-place piles of the above embodiment, the casing removal process of the casting process includes a process of lifting and supporting the separated casing 20A with the child hook 7 of the crane, a temporary support process of placing the temporary support part 11 of the casing temporary support device 10 under the casing 20A lifted and supported by the child hook 7, and a first re-hanging process of re-hanging the reinforcing bar cage 30 suspended by the parent hook 6 of the crane to the upper opening 20a of the casing 20 buried in the ground after the temporary support part 11 is placed in the temporary support process. Therefore, the casing 20A, which is lifted and supported by the secondary hook 7 of the crane, can be temporarily supported on the temporary support portion 11 of the casing temporary support device 10, before the first re-hanging process, i.e., the re-hanging work of the reinforcing bar cage, can be performed. Therefore, it is possible to prevent accidents such as the casing 20A lifted and supported by the sub-hook 7 falling, and the work can be carried out while ensuring the safety of the workers performing the resuspending work of the reinforcing bar cage 30, thereby improving work safety during construction.

[0056] Furthermore, according to the above-mentioned cast-in-place pile construction method, the casing 20A lifted and supported by the crane's sub-hook 7 can be temporarily supported on the temporary support portion 11 of the casing temporary support device 10, and then the second re-suspending process, i.e., the re-suspending work of the tremie pipe 40, can be carried out. Therefore, it is possible to prevent accidents such as the casing 20A lifted and supported by the sub hook 7 falling, and the work can be carried out while ensuring the safety of the workers performing the replacement of the tremie pipe 40, thereby improving work safety during construction.

[0057] Furthermore, according to the above-mentioned cast-in-place pile construction method, the casting process includes a return process and a third re-hanging process after the casing removal process, so that in the third re-hanging process, the temporary support part 11 of the casing temporary support device 10 does not get in the way of the re-hanging work of the rebar cage 30, and the next casting work of the ready-mixed concrete 5 and the subsequent casing removal process can be carried out smoothly.

[0058] Furthermore, according to the above-mentioned cast-in-place pile construction method, the tremie pipe removal process is carried out before or after the casing removal process, so that the work of pulling up the tremie pipe 40 and detaching some of the tremie pipes 40A and then removing them can be carried out safely and smoothly.

[0059] Furthermore, according to the casing temporary support device 10 according to the embodiment, the detached casing 20A can be temporarily supported by the temporary support portion 11, so that the safety of the work in the casing removal process can be ensured. In addition, since the temporary holding portion 11 can be moved horizontally by the moving mechanism 13, it is possible to prevent the temporary holding portion 11 from interfering with construction work in processes that do not use the temporary holding portion 11 other than the casing removal process. Furthermore, since the casing temporary support device 10 can be attached to the excavator 1, it is possible to provide an apparatus that can improve work safety with few components such as the temporary support part 11, the moving mechanism 13, and the base part 15, that is, with a compact, low-cost configuration.

[0060] Moreover, according to the casing temporary support device 10, the temporary support section 11 is configured to include two gate-type frames 12, and the distance between the legs 12b of these gate-type frames 12 is greater than the vertical width of the work platform 2 of the excavator 1, so that the resuspending work (first resuspending step and second resuspending step) of the reinforcing bar cage 30 and the tremie pipe 40 can be performed with the detached casing 20A placed on the gate-type frames 12, i.e., with a safe working space secured. The structure of the gate-type frames 12 is not limited to the form shown in the drawings, and can be modified into various forms. In addition, the moving mechanism 13 is configured to include a rail section 14 as a linear guide section, and the rail section 14 is configured to be able to be attached to the excavator 1 while being longer than the width of the work platform 2 and arranged outside the work platform 2. Therefore, during processes other than the casing removal process, the gate-type platform 12 can be retracted to the outside of the work platform 2, and the gate-type platform 12 can be prevented from interfering with work during construction.

[0061] In addition, since the drilling machine 1 for cast-in-place piles in the embodiment is equipped with a casing temporary support device 10, it can function as an excavator that provides the effects of the casing temporary support device 10, thereby improving work safety when constructing cast-in-place piles.

[0062] In the above embodiment, the all-casing method was applied as an example of a method for constructing a cast-in-place pile, but the present invention can also be applied to other construction methods for cast-in-place piles that include a process of pressing a casing into the ground and then pulling it out.

[0063] Further, the casing temporary support device 10 according to the above embodiment is configured so that the base 15 or the moving mechanism 13 can be attached to the excavator 1, but the configuration of the casing temporary support device according to the present invention is not limited to this. In another embodiment of the casing temporary support device, the base 15 may be configured to be placed on the ground around the excavator 1, for example, the base 15 may be configured to include a foundation including a plurality of supports, and may not be attached to the excavator 1. In this case, for example, the casing temporary support device is installed on the ground after the excavator 1 is installed on the ground. A casing temporary support device according to still another embodiment may be configured to be placed on the work platform 2 of the excavator 1.

[0064] In addition, in the casing temporary support device 10 of the above embodiment, the spacing between the legs 12b of the gate-shaped frame 12 constituting the temporary support portion 11 is larger than the width (vertical width) of the workbench 2 of the excavator 1, and the rail portion 14 constituting the linear guide portion is arranged on the outside of the workbench 2, but the configuration of the casing temporary support device of the present invention is not limited to this. For example, if the excavator 1 is large and the area of ​​the work platform 2 is large, the spacing between the legs 12b of the gate-shaped frame 12 may be smaller than the width (vertical width) of the work platform 2 (and larger than the diameter of the casing 20), and the rail portion 14 may be attached to the upper surface of the work platform 2.

[0065] In addition, in the casing temporary support device 10 of the above embodiment, the moving mechanism 13 is equipped with a rail portion 14 as a linear guide portion, and is configured to move the gate-shaped frame 12 horizontally in a straight line along the rail portion 14 (in a parallel movement form), but the configuration of the moving mechanism of the casing temporary support device of the present invention is not limited to this. In another embodiment of the casing temporary support device, for example, one of the legs of each of the two gate-type frames constituting the temporary support part is rotatably supported (axially supported) on a base arranged at a fixed interval (less than the diameter of the casing) on ​​one side of the work platform 2 of the excavator 1, and the base part is configured to be able to swivel and move horizontally around one of the legs, and after the base parts of the two gate-type frames are swiveled to a position where they are parallel, as shown in the plan view of Figure 5(b), the other leg of the two gate-type frames can be attached to a base provided on the other side (the side opposite to the one side) of the work platform 2 of the excavator 1 (swivel movement type). [Explanation of symbols]

[0066] 1. Excavator 2 Workbench 3 Main body 3a Counterweight 4 Pile hole 5. Ready-mix concrete 6 Parent hook (first winding means) 6a Hanging device 6b Traverser 6c Suspension bar 7. Child hook (second winding means) 7a Hanging equipment 8 Grandson Hook (Volume 3, Upper Means) 8a Hanging device 10 Casing temporary support device 11 Temporary support 12 Gate-type stand 12a Base 12b Legs 13 Moving mechanism 14 Rail section (linear guide section) 15 base 16 Side plate 17 Support part 20, 20A casing 20a Top opening 20b Connection 25 Hanging jig 26. Kanzashi muscle 30 Reinforced Concrete Cage 31 Main reinforcement 32 Hoop Muscle 33 Reinforcement Ring 40, 40A tremie tube 41 Hopper section

Claims

1. An excavation process in which a casing is pressed into the ground and excavated inside the casing while adding to the ground to form a pile hole; An erection process of erecting a reinforcing bar cage into the pile hole; A casting process of casting fresh concrete into the pile hole with the reinforcing bar cage suspended in the pile hole, The casting step comprises: After pouring the ready-mixed concrete to a predetermined height, the reinforcing bar cage is suspended by a crane, and one casing is pulled out and separated, followed by repeatedly removing the casing. The casing removal step includes: Lifting and supporting the separated casing with the crane; a temporary support process of disposing a temporary support portion of a casing temporary support device under the casing hoisted and supported by the crane; a first re-hanging process in which, after the temporary support part is arranged in the temporary support process, the reinforcing bar cage suspended by the crane is re-hanged to the upper opening of the casing buried in the ground.

2. The casting step comprises: The method includes a step of erecting a tremie pipe into the pile hole, suspending the tremie pipe from an upper opening of the casing buried in the ground, and then pouring the ready-mixed concrete into the tremie pipe, The casing removal step includes: After pouring the fresh concrete to a predetermined height, the tremie pipe is suspended and supported by the crane, 2. The method for constructing a cast-in-place pile as described in claim 1, further comprising a second re-hanging process of re-hanging the tremie pipe suspended and supported by the crane to the upper opening of the casing buried in the ground after the temporary support portion is arranged in the temporary support process.

3. The casting step comprises: a returning step of returning the temporary support portion of the casing temporary support device to a predetermined position after the casing removal step; 3. The method for constructing a cast-in-place pile according to claim 1 or claim 2, further comprising a third re-hanging step of re-hanging the reinforcing bar cage so that it is suspended by the crane.

4. The casting step comprises: The method for constructing a cast-in-place pile according to claim 2, characterized in that it further comprises a tremie pipe removal step of, before or after the casing removal step, resuspending the tremie pipe suspended from the upper opening of the casing buried in the ground to a suspended state by the crane, and then pulling up the tremie pipe, cutting off a portion of it, and removing it.

5. A casing temporary support device used in the method for constructing a cast-in-place pile according to claim 1, A temporary support portion for temporarily supporting the separated casing above a drilling machine for cast-in-place piles; A moving mechanism that moves the temporary holder in a horizontal direction; A casing temporary support device comprising: a base to which the moving mechanism is attached.

6. 6. A casing temporary support device according to claim 5, wherein the base or the moving mechanism is configured to be attachable to the excavator.

7. The temporary support portion is configured to include one or more gate-type racks, The distance between the legs of the gate-type frame is greater than the width of the work platform of the excavator, The moving mechanism includes a linear guide unit that slidably supports the leg of the gate-type frame, 7. The casing temporary support device according to claim 5, wherein the linear guide portion is longer than the work table and is disposed outside the work table.

8. A drilling machine for cast-in-place piles, comprising the temporary casing support device according to claim 5 or 6.

Citation Information

Patent Citations

  • Reinforcement cage erecting device for cast-in-place pile

    JP1996226121A

  • Cast-in-place pile and its work execution method

    JP2004263561A

  • Caisson type pile and its construction method

    JP2005350917A

  • Pile cage building method and pile cage building apparatus

    JP2008069577A

  • Hanging device and erecting method of reinforcement cage

    JP2021139111A