Climbing crane
The climbing crane addresses the challenge of differentiating mast deflection from foundation subsidence by using removable legs with sensors to detect and display subsidence, enhancing safety during operations.
Patent Information
- Application Number
- JP2020040410
- Authority / Receiving Office
- JP · JP
- Patent Type
- Patents
- Current Assignee / Owner
- Filing Date
- 2020-03-10
- Publication Date
- 2024-11-28
- Estimated Expiration
- 2040-03-10
AI Technical Summary
Operators of climbing cranes face difficulty in distinguishing between mast deflection due to load and foundation subsidence, as the inclination of the crane is not clearly indicative of the latter, leading to safety concerns during high-altitude operations.
A climbing crane equipped with removable legs having weight parts and a sinking amount acquisition means, such as tilt sensors or laser scanners, that detect and display the subsidence state of the foundation to the operator through a control unit.
Enables operators to work safely by providing real-time information on foundation subsidence, distinguishing it from mast deflection, thereby ensuring safer high-altitude operations.
Smart Images

Figure 0007591350000001 
Figure 0007591350000002 
Figure 0007591350000003
Abstract
Description
[Technical field]
[0001] The present invention relates to a climbing crane. [Background technology]
[0002] Generally, the operator of a climbing crane performs work at height from a cockpit located at the top of the mast (Patent Document 1). In addition, the frame supporting the mast is fixed by being connected to anchor bolts protruding from the foundation concrete, and then a climbing crane is installed (see FIG. 3 of Patent Document 1). However, depending on the location where the crane is to be installed, there are some places where it is not possible to pour foundation concrete. Therefore, in Patent Application No. 2019-201880, the applicant invented a climbing crane that is installed by weights to prevent the crane from falling over, rather than by connecting it to anchor bolts, by mounting weights on the legs of the platform that is installed on a level ground. [Prior art documents] [Patent documents]
[0003] [Patent Document 1] JP 2016-137955 A Summary of the Invention [Problem to be solved by the invention]
[0004] However, although the operator can sense the tilt of the climbing crane when operating it, there is a problem in that he or she does not know whether the tilt is due to the mast bending when a load is applied, such as when breaking through the ground, or due to the foundation sinking because the crane is not installed on a concrete foundation.
[0005] The present invention has been made in consideration of the above circumstances, and its main object is to provide a climbing crane that can inform the operator of the sinking state of the foundation. [Means for solving the problem]
[0006] According to the present invention, there is provided a climbing crane comprising a mast that is stacked one above the other, a cockpit installed at the top of the mast, and a base provided at the base end of the mast, the base being configured to allow a number of legs to be attached and detached, each leg being provided with a weight to prevent tipping over, and a subsidence amount acquisition means being provided which can acquire the subsidence state of each weight and each leg, the cockpit being provided with a display which displays the subsidence state to the operator, and a control unit which outputs data acquired from the subsidence amount acquisition means to the display.
[0007] The climbing crane according to the present invention can inform the operator of the sinking state of the foundation, thereby enabling the operator to work safely with peace of mind. [Brief description of the drawings]
[0008] [Figure 1] 1 is a schematic diagram showing an entire climbing crane according to an embodiment of the present invention. FIG. [Diagram 2] FIG. 2 is a schematic diagram showing a submerged state of the climbing crane according to the embodiment of the present invention. [Diagram 3] FIG. 2 is a schematic plan view of a base structure according to the embodiment of the present invention. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS
[0009] A preferred embodiment of the foundation structure of the crane will be specifically described with reference to the drawings. The present invention is not limited to the following embodiment, and appropriate modifications are possible without departing from the scope of the effects of the present invention. In the following, the top and bottom in the vertical direction may be referred to as "top or peak" and "bottom".
[0010] 1. Overview of the climbing crane Section 1 describes the schematic configuration of the climbing crane 1. Fig. 1 is a schematic diagram showing the entire climbing crane according to an embodiment of the present invention, Fig. 2 is a schematic diagram showing the submerged state of the climbing crane according to an embodiment of the present invention, and Fig. 3 is a schematic plan view of the foundation structure according to an embodiment of the present invention.
[0011] The climbing crane 1 is a device that climbs by its own mechanism as the height of a building increases. As shown in Figure 1, the climbing crane 1 has a mast 2 on a frame 10, and a crane body 3 is installed on the top of the mast. The mast 2 is configured so that it can be stacked vertically, thereby enabling the crane body 3 to move vertically relative to it. The crane body 3 comprises a rotating body 3a supported for free rotation on a rotating bearing (not shown) provided at the top of the mast 2, a jib 3b supported on the rotating body 3a so that it can be raised and lowered, a hoisting winch 3c fixed to the rotating body 3a, a hoisting rope 3d wound up by the hoisting winch 3c, and a hook 3e attached to the end of the hoisting rope 3d.
[0012] A cockpit is provided on the rotating body 3a, from which the operator operates the crane. A control panel (control unit) 3f is installed near the cockpit, and the operator operates the crane via the control panel. In addition, a touch panel (display) is provided around the cockpit, and information from the control panel is output to the touch panel. This allows the operator to work while obtaining various information.
[0013] A frame 10 is fixed to the base end (lower side) of the mast 2. The frame 10 is a frame for indirectly supporting the crane body 3 via the mast 2, and as shown in FIG. 2, the frame 10 is provided with four leg attachment parts 11, to which the legs 12 can be attached, in a cross shape at 90 degree intervals around the central axis of the frame 10. That is, the four legs 12 can be attached to the four leg attachment parts 11 in a cross shape. The connection between the leg attachment parts 11 and the legs 12 is not particularly limited as long as they can be connected, but they may be connected by tightening with a plurality of bolts so as to be detachable, or may be connected by using a hinge structure so as to be openable and closable. The number of the legs 12 and the leg attachment parts 11 is not limited to four, and may be three or five or more.
[0014] Generally, cranes are installed by bolting anchor bolts protruding from a concrete foundation to a platform. However, depending on the installation location, a concrete foundation cannot be used and the platform may be installed directly on a level ground. In such cases, if the platform is installed directly on the ground, the bearing capacity of the ground may be insufficient. Therefore, the applicant reviewed the foundation structure in Patent Application No. 2019-201880, focusing on distributing the vertical load generated by the crane with legs 12 having a predetermined length, and is actively studying a structure that does not lack the bearing capacity of the ground.
[0015] That is, the foundation structure of the crane is composed of the base 10, legs 12, and a counter base 20 fixed to the legs 12. In other words, one end of the legs 12 is connected to each of the four leg mounting parts 11 of the base 10, and the lower end surface of the other end of each of the legs 12 is fixed to the upper end surface of the counter base 20 that is directly installed on the ground. In this case, the counter base 20 has a predetermined height and a contact area proportional to the height.
[0016] As shown in Figure 2, for example, when operating a climbing crane, the operator feels a tilt when lifting the crane off the ground, but does not know whether the tilt is due to the mast bending due to the load applied when lifting the crane off the ground, or due to the foundation sinking because the crane is not installed on the foundation concrete. In other words, operators working at height are unsure whether they can work safely.
[0017] The applicant therefore conceived the present invention based on the idea that by detecting the displacement of the leg 12 at the point where the crane is in contact with the ground, it would be possible to convey to the operator that the tilt is due to subsidence of the foundation, rather than bending of the mast.
[0018] That is, as shown in FIG. 3, the leg 12 is provided with a sinking amount acquisition means 30 capable of acquiring the sinking state of the leg 12. Moreover, the attachment point is preferably the tip of the leg 12, which makes it easier to detect the inclination and calculate the amount of subsidence. Furthermore, the location of the subsidence amount acquisition means 30 is not limited to the leg 12, but may be the counter base 20 or any other location where the subsidence state can be acquired.
[0019] In this embodiment, the subsidence amount acquisition means 30 is an inclination sensor that detects the amount of inclination. A goniometer is provided as the inclination sensor. The inclination sensor is connected to the control panel 3f and transmits the detection value of the inclination sensor (the inclination angle of the leg 12) to the control panel 3f.
[0020] Furthermore, the subsidence amount acquiring means 30 is not limited to an inclination sensor, and a laser scanner or the like capable of acquiring three-dimensional information may be used as long as it is capable of calculating the subsidence amount d.
[0021] The presence or absence of ground subsidence is detected, for example, by storing the detection value (tilt angle) of the tilt sensor when the crane is set up in the control panel. Then, the operator compares the detection value (tilt angle) of the tilt sensor when the crane is lifted off the ground with the pre-stored tilt angle before the lifting, and displays the angle difference θ on the touch panel in the operator's seat. This allows the operator to instantly know which of the four legs 12 is tilted during work, allowing him to work with peace of mind.
[0022] Also, instead of notifying the operator of the angular difference θ itself, if a deviation equal to or exceeds a predetermined value is detected, a warning may be given to the operator.
[0023] Also, the subsidence amount d of the installation surface of the counter base 20 may be calculated based on the angle difference θ. Then, the subsidence amount may be displayed on a touch panel to inform the operator. Similarly, if there is a deviation of the subsidence amount that is greater than a predetermined value, a warning may be issued to the operator.
[0024] The settlement amount acquisition means 30 may also be a goniometer that is attached to the frame 10. In this case, the value obtained by subtracting the inclination due to the work moment of the crane from the value obtained by the goniometer may be displayed on a touch panel or the like. The applicant has invented a tower crane equipped with a means for calculating the inclination due to the work moment of the crane (Patent No. 4986643). In other words, by subtracting the value obtained by the calculation means from the value of the goniometer, it is possible to inform the operator that the inclination is due to the settlement of the foundation, not the inclination of the mast. These controls may be performed by the control panel 3f.
[0025] The subsidence amount acquiring means 30 may be a laser measuring device, which may be installed at a position where it can measure each leg 12. The height of the anchor parts that fix each counter base 20 and each leg 12 may be measured, and the amount of change may be measured and displayed on a touch panel.
[0026] 5. Conclusion As described above, according to this embodiment, a climbing crane can be provided that can inform the operator of the sinking state of the foundation.
[0027] It may be provided in any of the following ways: 1. A climbing crane, wherein the sinking amount acquisition means is an inclination sensor, the inclination sensor being provided at the tip of a leg. A climbing crane, wherein the control unit pre-stores data acquired from the subsidence amount acquisition means when the crane is set up, compares the data acquired from the subsidence amount acquisition means when an operator operates the crane, and outputs the difference value to the display. 1. A climbing crane, wherein the difference value is a tilt angle, and the display displays the tilt angle. A climbing crane, wherein the difference value is a sinking amount, and the display displays the sinking amount. Of course, this is not the case.
[0028] Finally, although various embodiments of the present invention have been described, these are presented as examples and are not intended to limit the scope of the invention. The novel embodiments can be implemented in various other forms, and various omissions, substitutions, and modifications can be made without departing from the spirit of the invention. The embodiments and their modifications are included within the scope and spirit of the invention, and are included in the scope of the invention and its equivalents described in the claims. [Explanation of symbols]
[0029] 1. Climbing crane 2 Mast 3. Crane body 3a Rotating body 3b Jib 3c Hoisting winch 3d Winding Rope 3f Control section 4 Lifting device 10 Mounting stand 11 Leg attachment part 12 Legs 20 Counter Base 30. Means of acquiring settlement amount θ angle difference d Subsidence
Claims
1. A climbing crane, Masts that can be stacked up and down, A cockpit installed at the top of the mast; A platform provided at a base end of the mast; Equipped with The stand is provided with a plurality of detachable legs extending horizontally in a cross shape, Each leg is provided with a weight to prevent the device from falling over. A sinking amount acquiring means capable of acquiring a sinking state of each of the weights and each of the legs is provided at a tip of each of the legs, The cockpit includes a control unit and a display that displays the sinking state to the pilot, The control unit outputs the data acquired from the subsidence amount acquisition means to the display unit, This allows the operator to immediately determine which of the multiple legs is tilted due to sinking, allowing them to work with peace of mind. Climbing crane.
2. 2. A climbing crane according to claim 1, The subsidence amount acquisition means is an inclination sensor, The tilt sensor is provided at the tip of the leg. Climbing crane.
3. A climbing crane according to claim 1 or 2, The control unit stores in advance the data acquired from the sinking amount acquisition means when the crane is installed. The operator compares the data acquired from the sinking amount acquisition means during operation with the data acquired from the sinking amount acquisition means, and the difference value is outputting the signal to the display; Climbing crane.
4. A climbing crane according to claim 3, The difference value is a tilt angle, The indicator displays the tilt angle. Climbing crane.
5. A climbing crane according to claim 3, The difference value is a subsidence amount, The indicator displays the amount of subsidence. Climbing crane.
6. A climbing crane, Masts that can be stacked up and down, A cockpit installed at the top of the mast; A platform provided at a base end of the mast; Equipped with The stand is configured so that a plurality of legs can be detachably attached, Each leg is provided with a weight to prevent the device from falling over. a sinking amount acquisition means capable of acquiring a sinking state of each of the weight portions and each of the legs is provided, The cockpit includes a control unit and a display that displays the sinking state to the pilot, The control unit outputs the data acquired from the subsidence amount acquisition means to the display unit, The subsidence amount acquisition means is a goniometer, The angle meter is provided on a stand, The control unit stores data on the deflection of the mast in advance, A difference value between the value obtained by the angle meter and the data is output to the display. Climbing crane.
7. A climbing crane, Masts that can be stacked up and down, A cockpit installed at the top of the mast; A platform provided at a base end of the mast; Equipped with The stand is configured so that a plurality of legs can be detachably attached, Each leg is provided with a weight to prevent the device from falling over. a sinking amount acquisition means capable of acquiring a sinking state of each of the weight portions and each of the legs is provided, The cockpit includes a control unit and a display that displays the sinking state to the pilot, The control unit outputs the data acquired from the subsidence amount acquisition means to the display unit, The subsidence amount acquisition means is a laser measuring instrument, the laser measuring device is installed at a position where each of the legs can be measured; Measure the height of the anchor portion that fixes the weight portion and the leg portion; Measure the amount of change in each of the components and output the measured values to the display. Climbing crane.