Building systems, evacuation methods and evacuation programs

The building system uses elevator control and autonomous mobile objects to navigate flood risks, enabling efficient evacuation of mobile objects to safe floors within flooded buildings.

JP7593521B1Active Publication Date: 2024-12-03MITSUBISHI ELECTRIC BUILDING SOLUTIONS CORP

Patent Information

Application Number
JP2024033611
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-03-06
Publication Date
2024-12-03
Estimated Expiration
2044-03-06

AI Technical Summary

Technical Problem

Existing technologies for autonomous vehicles struggle with evacuating within flooded buildings due to insufficient power, making it difficult to reach safe evacuation floors.

Method used

A building system that includes an elevator control system and autonomous mobile objects, utilizing weather information to calculate flood risk and direct mobile objects to safe evacuation floors using elevators.

Benefits of technology

Effectively evacuates autonomous mobile objects within flooded buildings to safe floors, ensuring their safety and functionality during flooding events.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007593521000001_ABST
    Figure 0007593521000001_ABST
Patent Text Reader

Abstract

To provide a building system that supports the evacuation of an autonomous mobile body that can autonomously move within a building using an elevator to a safe evacuation floor within the building when flooding occurs in the building due to abnormal weather. [Solution] The building system calculates whether a target area will be flooded based on weather information obtained from an external service, and if the target area is flooded, calculates an evacuation floor for evacuating from flood damage within a building in the target area. The building system then instructs one or more autonomous mobile bodies in the target area to get into an elevator car installed in the building and get off at an evacuation floor, and instructs the elevator to move the car containing the one or more autonomous mobile bodies to the evacuation floor.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present disclosure relates to a building system technology that evacuates autonomous mobile bodies in flood-prone areas to evacuation floors of a building. [Background technology]

[0002] Patent Document 1 discloses a technology for quickly evacuating or evacuating a vehicle when a disaster occurs. When the controller of the autonomous vehicle in this technology receives disaster information such as a tsunami warning, eruption warning, or heavy rain warning, it controls the actuator for shifting the transmission so that the gear ratio of the transmission becomes larger, and quickly evacuates to higher ground or the like. [Prior art documents] [Patent documents]

[0003] [Patent Document 1] JP 2019-206300 A Summary of the Invention [Problem to be solved by the invention]

[0004] The technology of Patent Document 1 is targeted at autonomous vehicles that run outdoors. For this reason, for example, in the event of flood damage, even if the technology of Patent Document 1 is applied to an autonomous mobile body that can autonomously move within a building using elevators, it is expected that evacuation will be difficult due to insufficient running power.

[0005] The present disclosure has been made to solve the problems described above, and aims to provide a building system that assists in the evacuation of an autonomous mobile object that can move autonomously within a building using an elevator to a safe evacuation floor within the building when flooding occurs inside the building due to abnormal weather. [Means for solving the problem]

[0006] The building system disclosed herein is a building system that controls the operation of elevators installed in buildings within a target area and the operation of one or more autonomous moving bodies that can move autonomously within the building using the elevators, and includes an acquisition unit that acquires weather information, a flooding calculation unit that calculates whether the target area will be flooded based on the weather information, an evacuation floor calculation unit that calculates an evacuation floor to evacuate from flooding damage within the building if the target area is flooded, a moving body control unit that instructs the one or more autonomous moving bodies in the target area to board the elevator car and disembark at an evacuation floor, and an elevator control unit that instructs the elevator to move the car containing the one or more autonomous moving bodies to the evacuation floor.

[0007] In addition, the evacuation method disclosed herein is an evacuation method that is executed by a computer and causes one or more autonomous moving bodies capable of autonomously moving within a building using an elevator to evacuate to an evacuation floor within a building in a target area, and includes the steps of acquiring weather information for the target area, calculating whether the target area will be flooded based on the weather information, and if the target area is flooded, calculating an evacuation floor within the building to evacuate from flooding damage, instructing the one or more autonomous moving bodies in the target area to board the elevator car and disembark at the evacuation floor, and instructing the elevator to move the car containing the one or more autonomous moving bodies to the evacuation floor.

[0008] Furthermore, the evacuation program of the present disclosure is an evacuation program that causes a computer to evacuate one or more autonomous moving bodies that can move autonomously within a building using an elevator to an evacuation floor within a building in a target area, and is configured to cause a computer to acquire weather information for the target area, calculate whether the target area will be flooded based on the weather information, and if the target area will be flooded, calculate an evacuation floor within the building to evacuate from flooding damage, instruct the one or more autonomous moving bodies in the target area to board the elevator car and disembark at the evacuation floor, and instruct the elevator to move the car containing the one or more autonomous moving bodies to the evacuation floor. Effect of the Invention

[0009] According to the technology disclosed herein, it is possible to provide a building system that assists in the evacuation of an autonomous mobile object that can move autonomously within a building using an elevator to a safe evacuation floor within the building when flooding occurs within the building due to abnormal weather. [Brief description of the drawings]

[0010] [Figure 1] FIG. 1 is a block diagram for explaining an overview of a building system according to a first embodiment. [Diagram 2] 2 is a block diagram showing the functions of a control device of the building system according to the first embodiment. FIG. [Diagram 3] 4 is a flowchart of a process executed in the building system according to the first embodiment. [Figure 4] FIG. 13 is a diagram illustrating a modified example of the hardware resources of the control device of the building system. [Diagram 5] FIG. 11 is a block diagram showing the functions of a control device of a building system according to a second embodiment. [Figure 6] FIG. 11 is a diagram showing an example of a method for determining an evacuation building in the building identification process. [Figure 7] 11 is a flowchart of a process executed in a building system according to a second embodiment. [Figure 8]FIG. 11 is a block diagram showing the functions of a control device of a building system according to a third embodiment. [Figure 9] FIG. 13 illustrates an example of a priority table. [Figure 10] 11 is a flowchart of a process executed in a building system according to a third embodiment. [Figure 11] FIG. 11 is a block diagram showing the functions of a control device of a building system according to a fourth embodiment. [Figure 12] 13 is a flowchart of a process executed in a building system according to a fourth embodiment. [Figure 13] FIG. 13 is a block diagram showing the functions of a control device of a building system according to embodiment 5. [Figure 14] FIG. 11 is a diagram showing an example of a method for determining an evacuation site in the evacuation site calculation process. [Figure 15] 13 is a flowchart of a process executed in a building system according to a fifth embodiment. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0011] Hereinafter, an embodiment will be described with reference to the drawings. In addition, elements common to the various drawings are given the same reference numerals, and duplicated explanations will be omitted.

[0012] 1. Embodiment 1 1-1. Overview of the building system of the first embodiment 1 is a block diagram for explaining an overview of a building system according to embodiment 1. A building system 10 according to the present embodiment is a system that evacuates autonomous moving objects in a building within a flood-prone area to a safe floor when flooding occurs due to abnormal weather such as heavy rain, a tsunami, or a high tide.

[0013] The building system 10 of the first embodiment is connected to an external service 2, one or more elevators 4, and one or more autonomous moving bodies 6 via a communication network 8 such as the Internet.

[0014] The external service 2 is an external service that distributes disaster information such as weather information, etc. The external service 2 is provided by a public institution such as the Japan Meteorological Agency in Japan or a similar institution in another country.

[0015] Each elevator 4 is installed in a building having multiple floors in a target area under the jurisdiction of the building system 10. Multiple elevators 4 may be provided in one building. A hoistway for the elevator 4 is provided in the building. The hoistway is a vertically long space that spans multiple floors. A landing adjacent to the hoistway is provided on each floor.

[0016] The elevator 4 includes, as main components not shown, a hoist, a main rope, a car, and a counterweight. The main rope is wound around a sheave of the hoist. The main rope supports the load of the car on one side of the sheave of the hoist. The main rope supports the load of the counterweight on the other side of the sheave of the hoist. The car is a device that transports users of the elevator 4 or autonomous moving bodies between multiple floors by traveling up and down the hoistway. The car travels up and down the hoistway in conjunction with the movement of the main rope due to the rotation of the sheave of the hoist.

[0017] The autonomous mobile body 6 is a robot capable of autonomously moving within a building using the elevator 4 while determining its own position. The autonomous mobile body 6 autonomously calls the elevator 4 in cooperation with the elevator 4, and can board the car corresponding to the call. The autonomous mobile body 6 operates under the control of a mobile body control device (not shown). There are no limitations on the attributes and operation control of the autonomous mobile body 6. For example, the attributes of the autonomous mobile body 6 can be exemplified as a transport robot that transports luggage, a cleaning robot that cleans floors, a security robot that provides security within a building, and the like.

[0018] The building system 10 is a device that performs various controls to evacuate the autonomous mobile objects 6 in a flooded area to a safe floor in the building when flooding occurs in the target area under its jurisdiction. The building system 10 communicates with the external service 2, the autonomous mobile objects 6, and the elevators 4 via a communication network 8.

[0019] The building system 10 includes a control device 20 and a database 50. The control device 20 is a microcomputer including at least one processor 30 and at least one memory 40. The control device 20 is also called an information processing device.

[0020] The memory 40 stores a save program 42 and various data 44 for operating the save program 42. The processor 30 includes a CPU (Central Processing Unit). The processor 30 reads and executes the save program 42 to realize various functions of the control device 20 of the building system 10. The realized functions will be described in detail later. The save program 42 may be recorded on a computer-readable recording medium, or may be stored in a server capable of communicating with the building system 10, such as a cloud server.

[0021] The database 50 includes building information for the target area and a hazard map. The hazard map is a map including information on areas expected to suffer flood damage due to external flooding, internal flooding, tsunamis, etc. The hazard map may include, for example, information on the planned amount of drainage facilities for each area. Furthermore, the hazard map may include information on the locations of disaster prevention facilities such as tsunami evacuation sites or evacuation routes.

[0022] 1-2. Functional configuration of the building system according to the first embodiment Next, the functional configuration of the control device 20 provided in the building system 10 will be described in more detail. Fig. 2 is a block diagram showing the functions of the control device of the building system according to embodiment 1. The building system 10 includes a weather information acquisition unit 21, a flood calculation unit 22, an evacuation floor calculation unit 23, a mobile body control unit 24, and an elevator control unit 25 as functions realized by the processor 30 reading and executing the evacuation program 42.

[0023] The weather information acquisition unit 21 executes a process of acquiring weather information from the external service 2. This process is hereinafter referred to as "weather information acquisition process." The weather information here is forecast information for estimating the flooding situation in a target area, and includes, for example, the amount of precipitation due to heavy rain, the height of a tsunami, or the height of a storm surge.

[0024] The flood calculation unit 22 executes a process of determining whether a target area will be flooded and a process of calculating the flood depth if flooded, based on meteorological information and a hazard map stored in the database 50. This process is hereinafter referred to as the "flood calculation process."

[0025] When it is determined in the flood calculation process that flooding will occur in the target area, the evacuation floor calculation unit 23 executes a process of calculating an evacuation floor for safely evacuating from flood damage in each building located in the target area. This process is hereinafter referred to as "evacuation floor calculation process." The evacuation floor here is a floor that is higher than the flood depth and is suitable for the autonomous mobile body 6 to evacuate to. For example, the evacuation floor is a floor that is higher than the flood depth and has no security restrictions on disembarking.

[0026] The mobile body control unit 24 executes a process of instructing the autonomous mobile body 6 to be evacuated and located in a lower position than the evacuation floor in each building to move to the evacuation floor. This process is hereinafter referred to as the "mobile body control process", and the autonomous mobile body 6 to be evacuated in the building is hereinafter referred to as the "intra-building mobile body". Typically, in the mobile body control process, the mobile body control unit 24 acquires position information of each autonomous mobile body 6. There is no limitation on the method of acquiring the position information. The mobile body control unit 24 identifies the intra-building mobile body based on the acquired position information. Then, the mobile body control unit 24 instructs each identified intra-building mobile body to move to the elevator 4 landing, get on the elevator 4, and get off at the evacuation floor.

[0027] The elevator control unit 25 executes a process to instruct each elevator 4 to transport the intra-building moving body to the evacuation floor. This process is hereinafter referred to as "elevator control process." The instructions here include an instruction to register a call from a hall to the evacuation floor when the autonomous moving body 6 arrives at the hall on a floor lower than the evacuation floor.

[0028] 1-3. Specific processing executed in the building system according to the first embodiment Specific processing executed in the building system 10 will be described below with reference to a flowchart. Fig. 3 is a flowchart of processing executed in the building system according to the first embodiment. The routine shown in Fig. 3 is executed by the processor 30 of the control device 20 of the building system 10 executing the evacuation program 42 stored in the memory 40. This routine also represents a part of an evacuation method for evacuating the autonomous moving body 6 to a safe evacuation floor in the building system 10 when flooding occurs in a target area.

[0029] 3, in step S100, the weather information acquisition unit 21 executes weather information acquisition processing to acquire weather information from the external service 2. The acquired weather information is sent to the flood calculation unit 22. After the processing of step S100 is performed, the process proceeds to step S102.

[0030] In step S102, a flood calculation process is executed to determine whether flooding will occur in the target area. As an example, when the weather information includes information on heavy rain, the flood calculation unit 22 determines whether the amount of precipitation in the target area due to heavy rain exceeds the drainage facility planning amount included in the hazard map. Furthermore, when flooding will occur in the target area, the flood calculation unit 22 estimates the flood depth in the target area based on the amount of precipitation and the hazard map of external water flooding or internal water flooding. As another example of the flood calculation process, when the weather information includes information on tsunami or storm surge, the flood calculation unit 22 determines whether the flooded area estimated based on the hazard map related to the tsunami or storm surge is included in the target area, and estimates the depth of the flood in the event of flooding. If the determination in step S102 is found to be true, the process proceeds to step 104, and if the determination is not found to be true, the process in step S100 is executed again.

[0031] In step S104, evacuation floor calculation processing is executed. Here, the evacuation floor calculation unit 23 refers to the building information of the target area stored in the database 50, and calculates, as evacuation floors, suitable floors selected from among floors higher than the flood depth calculated in the flood calculation processing in each building in the target area. As an example, the evacuation floor calculation unit 23 calculates, as evacuation floors, floors 2 and above when the flood depth is in the range of 0.0 to 0.5 m, floors 3 and above when the flood depth is in the range of 0.5 to 3.0 m, and floors 4 and above when the flood depth is in the range of 3.0 to 5.0 m. Note that evacuation floors are preferably floors with no security entry restrictions, and the more vehicles they can accommodate, the more preferable they are. After the processing of step S104 is performed, the processing proceeds to step S106.

[0032] In steps S106 and S108, the mobile object control process is executed. Specifically, in step S106, the mobile object control unit 24 acquires the position information of the autonomous mobile object 6 in each building in the target area, and identifies the mobile object in the building that is on a floor lower than the evacuation floor. After the process of step S106 is performed, the process proceeds to step S108.

[0033] In step S108, the mobile object control unit 24 instructs each of the identified in-building mobile objects to move to the elevator 4 hall, to board the elevator 4 at the hall, and to disembark from the elevator 4 at the evacuation floor.

[0034] In step S110, elevator control processing is executed. Here, when an intra-building moving body arrives at a landing at a floor lower than the evacuation floor, the elevator control unit 25 registers a call from the landing to the evacuation floor. The determination as to whether the intra-building moving body has arrived at the landing is performed, for example, based on the position information of the intra-building moving body. Alternatively, when the intra-building moving body that has arrived at the landing has a configuration for sending an arrival notification to the building system 10, it is determined that the intra-building moving body has arrived at the landing based on the received arrival notification.

[0035] According to the series of processes of the building system 10 according to the first embodiment as described above, when flooding occurs in the target area, an intra-building moving object on a floor below the evacuation floor moves to the elevator 4 landing in accordance with instructions. When the intra-building moving object arrives at the landing, a call from the landing to the evacuation floor is registered. The intra-building moving object gets into the elevator 4 car in accordance with instructions. The elevator 4 car moves to the evacuation floor in accordance with the call. The intra-building moving object disembarks at the evacuation floor in accordance with instructions. This makes it possible to evacuate the intra-building moving object to a safe evacuation floor.

[0036] 1-4.Modifications The building system 10 of the first embodiment may adopt the following modified aspects. Note that these modified aspects may also be applied to building systems of other embodiments described later.

[0037] 1-4-1. Building System 10 Hardware Resources Fig. 4 is a diagram showing a modified example of the hardware resources of a control device of a building system. In the example shown in Fig. 4, the control device 20 includes, for example, a processor 30, a memory 40, and a processing circuit 82 including dedicated hardware 80. Fig. 4 shows an example in which a part of the functions of the control device 20 is realized by the dedicated hardware 80. All of the functions of the control device 20 may be realized by the dedicated hardware 80. As the dedicated hardware 80, a single circuit, a composite circuit, a programmed processor, a parallel programmed processor, an ASIC, an FPGA, or a combination of these can be adopted.

[0038] The memory 40 may be independent of the control device 20, and the role of the memory 40 may be performed by a cloud or the like.

[0039] In the building system 10, all or part of the functions of the control device 20 may be installed in the elevator 4 or the autonomous moving body 6. In addition, the role of the database 50 may be played by a cloud or the like.

[0040] 1-4-2. Mobile control processing In the mobile object control process, there is no limitation on the division of control between the control device 20 of the building system 10 and the autonomous mobile object 6. In other words, in the mobile object control process, it is sufficient that the control device 20 of the building system 10 and the autonomous mobile object 6 can work together to move the autonomous mobile object 6 to an evacuation floor, and internal processing such as generating a movement path to an evacuation floor may be performed by either the control device 20 or the autonomous mobile object 6.

[0041] 2. Embodiment 2 In the second embodiment, differences from the example disclosed in the first embodiment will be described in particular detail. For features not described in the second embodiment, any of the features of the example disclosed in the first embodiment may be adopted.

[0042] 2-1. Functional configuration of the building system according to the second embodiment The building system 10 of the second embodiment is characterized by a process of evacuating the autonomous moving body 6 moving outside the building in the target area to an evacuation floor in the building when flooding occurs in the target area.

[0043] 5 is a block diagram showing functions of a control device of a building system according to embodiment 2. The control device 20 of the building system 10 further includes a building identification unit 26 as a function realized by the processor 30 reading and executing the evacuation program 42.

[0044] The building identification unit 26 is a functional block for executing a process of determining an evacuation building for the autonomous mobile body 6 moving outside a building in the target area. This process is hereinafter referred to as a "building identification process", and the autonomous mobile body 6 outside a building to be evacuated is hereinafter referred to as an "outside-building mobile body".

[0045] In the building identification process, the building identification unit 26 acquires the position information of each autonomous moving body 6, and identifies outside-building moving bodies moving in the target area based on the acquired position information. Then, the building identification unit 26 determines an evacuation building to which each of the identified outside-building moving bodies is to evacuate from one or more candidate evacuation buildings provided in the target area. The candidate evacuation buildings here are buildings for which evacuation floors have been set in the evacuation floor calculation process.

[0046] 6 is a diagram showing an example of a method for determining an evacuation building in the building identification process. In the example shown in this figure, buildings A, B, and C are illustrated as evacuation building candidates. In the building identification process, the building identification unit 26 determines building A, which is the nearest evacuation building candidate from the position of the outside-building moving body, as the evacuation building.

[0047] In the mobile object control process, the mobile object control unit 24 executes a process of instructing the outside mobile object to move to an evacuation floor of an evacuation building. Typically, the mobile object control unit 24 instructs each of the inside-building mobile objects to move into and enter the determined evacuation building, move to the elevator 4 landing, get on the elevator 4, and get off at the evacuation floor.

[0048] According to the series of processes of the building system 10 of embodiment 2 described above, when flooding occurs in the target area, it becomes possible to quickly evacuate outside-building moving objects moving outside the building in the target area to a safe evacuation floor within the building.

[0049] 2-2. Specific processing executed in the building system according to the second embodiment Fig. 7 is a flowchart of processing executed in the building system according to embodiment 2. The routine shown in Fig. 7 is executed by the processor 30 of the control device 20 of the building system 10 executing the evacuation program 42 stored in the memory 40. Note that this routine also represents a part of an evacuation method for evacuating the autonomous moving body 6 to a safe evacuation floor in the building system 10 when flooding occurs in a target area.

[0050] In steps S200 to S204 of the routine shown in Fig. 7, the same processes as those in steps S100 to S104 of the routine shown in Fig. 3 are executed. After the process in step S204 is executed, the process proceeds to step S206.

[0051] In steps S206 and S208, a building identification process is executed. Specifically, in step S206, the building identification unit 26 acquires position information of the autonomous moving object 6 in the target area and identifies an outside-building moving object moving outside the building. After the process of step S206 is performed, the process proceeds to step S208.

[0052] In step S208, the building identification unit 26 determines, as an evacuation building, the evacuation building candidate closest to each outside moving body among the evacuation building candidates in the target area in which the evacuation floors were set in the evacuation floor calculation process in step S204. When the process of step S208 is completed, the process proceeds to step S210.

[0053] In step S210, the mobile body control unit 24 instructs each of the identified outside-building mobile bodies to move to the evacuation building determined in step S208, to move to the elevator 4 landing of the evacuation building, to board the elevator 4 at the landing, and to disembark from the elevator 4 at the evacuation floor.

[0054] Also, in step S212, elevator control processing is executed. Here, when an outside-building moving object arrives at a landing in an evacuation building, the elevator control unit 25 registers a call from the landing to the evacuation floor. The determination as to whether the outside-building moving object has arrived at the landing is performed, for example, based on the position information of the outside-building moving object. Alternatively, when the outside-building moving object that has arrived at the landing has a function of sending a landing arrival notice to the building system 10, it is determined that the outside-building moving object has arrived at the landing based on the received landing arrival notice. As a result, the car of the elevator 4 is dispatched to the landing.

[0055] According to the series of processes of the building system 10 according to the second embodiment as described above, when flooding occurs in the target area, an outside-building moving object moving outside the building in the target area moves to the elevator 4 landing of the nearest evacuation building in accordance with instructions. When the outside-building moving object arrives at the landing, a call to the evacuation floor is registered from the landing. The outside-building moving object gets into the elevator 4 car in accordance with instructions. The elevator 4 car moves to the evacuation floor in accordance with the call. The outside-building moving object disembarks at the evacuation floor in accordance with instructions. This makes it possible to evacuate the outside-building moving object to a safe evacuation floor.

[0056] 2-3.Modifications The building system 10 of the second embodiment may employ the following modified aspects.

[0057] 2-3-1. Building identification processing The evacuation building determined in the building identification process does not necessarily have to be the candidate evacuation building closest to the outside-building moving object. In other words, if the evacuation of the outside-building moving objects is concentrated in one building, it is assumed that the evacuation to the evacuation floor cannot be performed quickly. Therefore, in the building identification process, the building identification unit 26 may determine the evacuation building taking into consideration the degree of congestion of the candidate evacuation buildings in the target area. In this case, for example, the building identification unit 26 excludes from the candidates evacuation buildings in the target area those buildings in which the number of outside-building moving objects evacuating has reached the allowable number. This process makes it possible to prevent the evacuation of the outside-building moving objects from concentrating in a specific building.

[0058] 3.Embodiment 3. In the third embodiment, differences from the example disclosed in the first embodiment will be described in particular detail. For features not described in the third embodiment, any of the features of the example disclosed in the first embodiment may be adopted.

[0059] 3-1. Functional configuration of the building system according to the third embodiment The building system 10 of the third embodiment is characterized by a process for setting the priority of the evacuation order when the intra-building moving objects are evacuated to an evacuation floor.

[0060] 8 is a block diagram showing functions of a control device of a building system according to embodiment 3. The control device 20 of the building system 10 further includes an evacuation order calculation unit 27 as a function realized by the processor 30 reading and executing the evacuation program 42.

[0061] The evacuation order calculation unit 27 is a functional block for executing a process of calculating the order in which a plurality of moving objects in a building in a target area should be evacuated to evacuation floors. This process is hereinafter referred to as "evacuation order calculation process."

[0062] FIG. 9 is a diagram showing an example of a priority table. In the example of the priority table shown in this figure, the priority of the evacuation order is set for each autonomous moving body 6 according to the amount of the moving body. The database 50 stores, for example, a priority table as shown in FIG. 9. In the evacuation order calculation process, the evacuation order calculation unit 27 determines the evacuation order of the moving bodies in the building in descending order of priority based on the priority table. Note that the "evacuation order" here refers to the order of arrival at the evacuation floor and disembarking, and is not necessarily the same as the order of boarding the elevator 4.

[0063] In the mobile object control process, the mobile object control unit 24 executes a process of instructing the intra-building mobile objects to move to an evacuation floor of an evacuation building. Typically, when there are multiple intra-building mobile objects, the mobile object control unit 24 instructs each of the intra-building mobile objects to move to the elevator 4 landing, get on the elevator 4, and get off at the evacuation floor so that the objects arrive at the evacuation floor according to the evacuation order determined by the evacuation order calculation process.

[0064] For example, when the number of autonomous moving bodies 6 that can board the car of the elevator 4 is one, the moving body control unit 24 instructs the intra-building moving body that is the earliest in the evacuation order among the multiple intra-building moving bodies to board and disembark from the elevator 4. When the number of autonomous moving bodies 6 that can board is two, the moving body control unit 24 instructs the intra-building moving body that is the earliest and second earliest in the evacuation order among the multiple intra-building moving bodies to board and disembark from the elevator 4. At this time, there are no restrictions on the boarding order of the two intra-building moving bodies.

[0065] 3-2. Specific processing executed in the building system according to the third embodiment Fig. 10 is a flowchart of processing executed in the building system according to embodiment 3. The routine shown in Fig. 10 is executed by the processor 30 of the control device 20 of the building system 10 executing the evacuation program 42 stored in the memory 40. Note that this routine also represents a part of an evacuation method for evacuating the autonomous moving body 6 to a safe evacuation floor in the building system 10 when flooding occurs in a target area.

[0066] In steps S300 to S304 of the routine shown in Fig. 10, the same processes as those in steps S100 to S104 of the routine shown in Fig. 3 are executed. After the process in step S304 is executed, the process proceeds to step S306.

[0067] In steps S306 and S308, evacuation order calculation processing is executed. Specifically, in step S306, the evacuation order calculation unit 27 acquires position information of the autonomous moving bodies 6 in each building in the target area, and identifies the moving bodies in the building that are on a floor lower than the evacuation floor of each building. Then, the evacuation order calculation unit 27 judges whether there are multiple moving bodies in the building that have been identified. As a result, if the judgment is found to be true, the process proceeds to step S308, and if the judgment is not found to be true, the process proceeds to step S310.

[0068] In step S308, the evacuation order calculation unit 27 determines the evacuation order for the multiple intra-building moving objects in the building in descending order of priority based on the priority table stored in the database 50. When the process of step S308 is completed, the process proceeds to step S310.

[0069] In step 310, a mobile object control process is executed. Typically, the mobile object control unit 24 instructs each of the mobile objects in the building to move to the elevator 4 landing, to get on the elevator 4, and to get off at the evacuation floor, so that the mobile objects arrive at the evacuation floor according to the evacuation order determined by the evacuation order calculation process.

[0070] In step S312, elevator control processing is executed. Here, the elevator control unit 25 registers elevator calls so that the intra-building moving objects are allowed to disembark at the evacuation floor in order of evacuation. In this case, in consideration of the operation efficiency of the elevator 4, the boarding order of the intra-building moving objects does not have to be the same as the evacuation order, and intra-building moving objects in the same car may be allowed to board in a different order.

[0071] According to the series of processes of the building system 10 according to the third embodiment as described above, when flooding occurs in a target area, it is possible to quickly evacuate autonomous moving bodies 6 with high priority to evacuation floors.

[0072] 3-3.Modifications The building system 10 of the third embodiment may adopt the following modified aspects.

[0073] 3-3-1.Priority table In the priority table, the priorities may be set based on criteria other than the amount of money. For example, the priority table may set the priorities of the autonomous moving bodies based on the degree of necessity for business continuity.

[0074] 3-3-2. Autonomous moving object to be controlled In the building system 10 of the third embodiment, the autonomous moving object 6 to be controlled is not limited to an in-building moving object, and may include an outside-building moving object.

[0075] 4.Embodiment 4 In the fourth embodiment, differences from the example disclosed in the first embodiment will be described in particular detail. For features not described in the fourth embodiment, any of the features of the example disclosed in the first embodiment may be adopted.

[0076] 4-1. Functional configuration of the building system according to the fourth embodiment The building system 10 of the fourth embodiment is characterized by a process for preventing flood damage to autonomous moving bodies 6 inside buildings in a target area when flooding occurs in the target area.

[0077] 11 is a block diagram showing functions of a control device of a building system according to embodiment 4. The control device 20 of the building system 10 further includes a movement restriction unit 28 as a function realized by the processor 30 reading and executing the evacuation program 42.

[0078] The movement restriction unit 28 is a functional block for executing a process of restricting the movement of the autonomous moving body 6 in a building in the target area. This process is hereinafter referred to as "movement restriction process." Specifically, in the movement restriction process, the movement restriction unit 28 restricts the movement of the autonomous moving body 6 on a floor equal to or higher than the evacuation floor to a floor lower than the evacuation floor. In addition, the movement restriction unit 28 restricts the movement of the autonomous moving body 6 in the building to the outside of the building.

[0079] 4-2. Specific processing executed in the building system according to the fourth embodiment Fig. 12 is a flowchart of processing executed in the building system according to embodiment 4. The routine shown in Fig. 12 is executed by the processor 30 of the control device 20 of the building system 10 executing the evacuation program 42 stored in the memory 40. Note that this routine also represents a part of an evacuation method for evacuating the autonomous moving body 6 to a safe evacuation floor in the building system 10 when flooding occurs in a target area.

[0080] In steps S400 to S404 of the routine shown in Fig. 12, the same processes as those in steps S100 to S104 of the routine shown in Fig. 3 are executed. After the process in step S404 is executed, the process proceeds to step S406.

[0081] In steps S406 and S408, the movement constraint process is executed. Specifically, in step S406, the movement constraint unit 28 acquires position information of the autonomous moving bodies 6 in each building in the target area, and identifies the autonomous moving bodies 6 that are on the evacuation floor or higher of each building. Then, the evacuation order calculation unit 27 instructs the identified autonomous moving bodies 6 to be prohibited from moving to floors below the evacuation floor. In addition, in step S408, the movement constraint unit 28 instructs all the autonomous moving bodies 6 in the building to be prohibited from moving outside the building.

[0082] According to the series of processes of the building system 10 according to the fourth embodiment as described above, when flooding occurs in a target area, it is possible to protect the autonomous moving body 6 inside the building from flood damage.

[0083] 4-3.Modifications The building system 10 of the fourth embodiment may adopt the following modified aspects.

[0084] 4-3-1.Movement constraint processing In the movement constraint processing, the movement constraint unit 28 may be configured to execute only one of a process of restricting the movement of an autonomous moving body 6 located on a floor above the evacuation floor to a floor below the evacuation floor, and a process of restricting the movement of an autonomous moving body 6 inside a building to outside the building.

[0085] 5.Embodiment 5. In the fifth embodiment, differences from the example disclosed in the second embodiment will be described in particular detail. For features not described in the fifth embodiment, any of the features of the example disclosed in the second embodiment may be adopted.

[0086] 5-1. Functional configuration of the building system according to the fifth embodiment The building system 10 of the fifth embodiment is characterized by a process of evacuating the autonomous moving bodies 6 outside the building to an outdoor evacuation site when flooding occurs in a target area.

[0087] 13 is a block diagram showing functions of a control device of a building system according to embodiment 5. The control device 20 of the building system 10 further includes an evacuation time calculation unit 31, a damage occurrence predicted time calculation unit 32, and an evacuation site calculation unit 33 as functions realized by the processor 30 reading and executing the evacuation program 42.

[0088] The evacuation time calculation unit 31 is a functional block for executing a process of calculating the evacuation time required for an outside-building moving body to move to the evacuation building determined in the building identification process. This process is hereinafter referred to as the "evacuation time calculation process." Specifically, in the evacuation time calculation process, the evacuation time calculation unit 31 calculates the evacuation time based on the distance from the outside-building moving body to the evacuation building and the moving speed of the outside-building moving body.

[0089] The damage occurrence predicted time calculation unit 32 is a functional block for executing a process to calculate a predicted time required for flood damage to occur in an evacuation building. This process is hereinafter referred to as "predicted time calculation process." In the predicted time calculation process, the damage occurrence predicted time calculation unit 32 calculates a predicted time based on meteorological information. Examples of meteorological information referenced here include real-time map information on flood disasters caused by heavy rain, predicted time information on the arrival of tsunamis similar to tsunamis, and tide level prediction information for storm surges.

[0090] The evacuation site calculation unit 33 is a functional block for executing a process for determining an outdoor evacuation site for the outside-building moving body. This process is hereinafter referred to as "evacuation site calculation process". In the evacuation site calculation process, the evacuation site calculation unit 33 compares the evacuation time with the predicted time to determine whether the outside-building moving body can evacuate to an evacuation building before damage occurs. The database 50 stores information on outdoor evacuation sites for when flooding occurs on high ground, etc. When it is determined that the outside-building moving body cannot evacuate to an evacuation building before damage occurs, the evacuation site calculation unit 33 refers to the information on the outdoor evacuation site candidates stored in the database 50 and calculates the nearest outdoor evacuation site candidate from the outside-building moving body as the final evacuation site. The elevator control unit 25 instructs the outside-building moving body to move to the evacuation site determined by the evacuation site calculation process.

[0091] 14 is a diagram showing an example of a method for determining an evacuation site in the evacuation site calculation process. In the example shown in this figure, an evacuation building and evacuation sites D and E as outdoor evacuation site candidates are illustrated. For example, in the evacuation site calculation process, the evacuation site calculation unit 33 determines, as the evacuation site, evacuation site D, which is the nearest outdoor evacuation site candidate from the position of the outside-building moving body.

[0092] According to the series of processes of the building system 10 relating to embodiment 5 as described above, when it is difficult to evacuate to an evacuation building before flood damage occurs, it is possible to protect the autonomous moving body 6 from flood damage by evacuating to an outdoor evacuation site.

[0093] 5-2. Specific processing executed in the building system according to the fifth embodiment Fig. 15 is a flowchart of processing executed in the building system according to embodiment 5. The routine shown in Fig. 15 is executed by the processor 30 of the control device 20 of the building system 10 executing the evacuation program 42 stored in the memory 40. Note that this routine also represents a part of an evacuation method for evacuating the autonomous moving body 6 to a safe evacuation floor in the building system 10 when flooding occurs in a target area.

[0094] In steps S500 to S508 of the routine shown in Fig. 15, the same processes as those in steps S200 to S208 of the routine shown in Fig. 7 are executed. After the process in step S508 is executed, the process proceeds to step S510.

[0095] In step S510, evacuation time calculation processing, predicted time calculation processing, and evacuation site calculation processing are executed. Specifically, in the evacuation time calculation processing, the evacuation time calculation unit 31 calculates the evacuation time based on the distance from the outside-building moving object to the evacuation building and the moving speed of the outside-building moving object. In the predicted time calculation processing, the damage occurrence predicted time calculation unit 32 calculates the predicted time based on meteorological information. Then, in the evacuation site calculation processing, the evacuation site calculation unit 33 judges whether the evacuation time is shorter than the predicted time. As a result, if the judgment is found to be established, it is judged that evacuation to the evacuation building is possible before the occurrence of flooding, and the processing proceeds to step S512. In steps S512 to S514, the same processing as steps S210 to S212 of the routine shown in FIG. 7 is executed.

[0096] On the other hand, if the determination in step S510 is not established, it is determined that evacuation to an evacuation building is not possible before flooding occurs, and the process proceeds to step S516. In step S516, the evacuation site calculation unit 33 refers to the information on the outdoor evacuation site candidates stored in the database 50 in the evacuation site calculation process, and calculates the nearest outdoor evacuation site candidate from the outside-building moving object as the final outdoor evacuation site. After the process in step S516 is executed, the process proceeds to step S518. In step S518, the elevator control unit 25 instructs the outside-building moving object to move to the outdoor evacuation site determined by the evacuation site calculation process.

[0097] According to the series of processes of the building system 10 relating to embodiment 5 as described above, when it is difficult to evacuate to an evacuation building before flood damage occurs, it is possible to protect the autonomous moving body 6 from flood damage by evacuating to an outdoor evacuation site.

[0098] 5-3.Modifications The building system 10 of the fifth embodiment may adopt the following modified aspects.

[0099] 5-3-1. Evacuation site calculation processing The outdoor evacuation site determined in the evacuation site calculation process does not necessarily have to be the closest evacuation site candidate to the outside moving object. In other words, the evacuation site may be determined taking into consideration the location, size, altitude, and other conditions of the evacuation site candidate.

[0100] 6.Other Although the preferred embodiments have been described in detail above, the present disclosure is not limited to the above-described embodiments, and various modifications and substitutions can be made to the above-described embodiments without departing from the scope of the claims.

[0101] Various aspects of the present disclosure are summarized below as appendices.

[0102] (Appendix 1) A building system that controls the operation of an elevator installed in a building in a target area and the operation of one or more autonomous mobile objects that can autonomously move within the building using the elevator, An acquisition unit for acquiring meteorological information; A flood calculation unit that calculates whether the target area will be flooded based on the meteorological information; an evacuation floor calculation unit that calculates an evacuation floor for evacuating from flood damage in the building when the target area is flooded; a mobile object control unit that instructs the one or more autonomous mobile objects in the target area to get into the elevator car and get off at the evacuation floor; an elevator control unit that instructs the elevator to move the car in which the one or more autonomous moving bodies are riding to the evacuation floor; A building system comprising: (Appendix 2) The moving object control unit includes: The system is configured to instruct an intra-building moving body, among the one or more autonomous moving bodies, that moves within the building on a floor lower than the evacuation floor, to get into the elevator car and get off at the evacuation floor. 2. A building system as described in appendix 1. (Appendix 3) A building identification unit that identifies an evacuation building to which the one or more autonomous moving bodies will evacuate from among one or more evacuation building candidates in the target area, The moving object control unit includes: is configured to instruct an outside-building moving body, among the one or more autonomous moving bodies, that moves outside the building in the target area, to get into the elevator car installed in the evacuation building and get off at the evacuation floor; The elevator control unit includes: The elevator is configured to instruct the elevator installed in the evacuation building to move the car in which the outside-building moving body is riding to the evacuation floor. 2. A building system as described in appendix 1. (Appendix 4) The building identification unit identifies, as the evacuation building, a candidate evacuation building that is closest to the outside-building moving body among the one or more candidate evacuation buildings. 4. The building system of claim 3, configured as follows: (Appendix 5) The building identification unit excludes from the one or more evacuation building candidates in the target area a building in which the number of the autonomous moving bodies to evacuate has reached a permitted number. 5. The building system of claim 4, configured as follows: (Appendix 6) Further comprising an evacuation order calculation unit that calculates an evacuation order of each of the one or more autonomous moving bodies based on a priority of the evacuation order, The moving object control unit includes: configured to instruct one or more of the autonomous moving bodies to get into the car of the elevator and get off at the evacuation floor according to the evacuation order. 6. A building system according to any one of claims 1 to 5. (Appendix 7) 6. The building system according to any one of claims 1 to 5, further comprising a movement constraint unit that, when the target area is flooded, prohibits an autonomous moving body located on a floor in the building that is equal to or higher than the evacuation floor from moving to a floor that is lower than the evacuation floor. (Appendix 8) 6. The building system according to any one of claims 1 to 5, further comprising a movement restriction unit that prohibits an autonomous moving body, among the one or more autonomous moving bodies, that is within the building from moving outside the building when the target area is flooded. (Appendix 9) an evacuation time calculation unit that calculates an evacuation time required for the outside-building moving body to move to the evacuation building; and a predicted time calculation unit that calculates a predicted time required for flood damage to occur in the target area based on the meteorological information, A building system as described in any one of Supplementary Note 3 to Supplementary Note 5, wherein if the evacuation time is longer than the predicted time, the mobile object control unit is configured to instruct the outside-building mobile object to move to an outdoor evacuation site. (Appendix 10) The flood calculation unit is configured to calculate a flood depth when the target area is flooded based on a precipitation amount for the target area included in the meteorological information, 6. The building system according to any one of claims 1 to 5, wherein the evacuation floor calculation unit is configured to calculate the evacuation floor based on the flood depth. (Appendix 11) An evacuation method executed by a computer, for evacuating one or more autonomous moving bodies capable of autonomously moving within a building using an elevator to an evacuation floor within a building in a target area, comprising: acquiring weather information for the target area; calculating whether the target area will be flooded based on the meteorological information; When the target area is flooded, calculating an evacuation floor for evacuating from flood damage in the building; instructing the one or more autonomous moving bodies in the target area to get into the elevator car and get off at the evacuation floor; instructing the elevator to move the car in which the one or more autonomous moving bodies are riding to the evacuation floor; An evacuation method comprising: (Appendix 12) An evacuation program that causes a computer to execute a program for causing one or more autonomous moving bodies capable of autonomously moving within a building to evacuate to an evacuation floor within a building in a target area, the program comprising: Obtaining meteorological information about the target area; Calculating whether the target area will be flooded based on the meteorological information; When the target area is flooded, an evacuation floor for evacuating from flood damage within the building is calculated; instructing the one or more autonomous moving bodies in the target area to get into the elevator car and get off at the evacuation floor; Instruct the elevator to move the car in which the one or more autonomous moving bodies are riding to the evacuation floor. The evacuation program is configured to cause a computer to execute the following: [Explanation of symbols]

[0103] 2 External service, 4 Elevator, 6 Autonomous mobile object, 8 Communication network, 10 Building system, 20 Control device, 21 Weather information acquisition unit, 22 Flood calculation unit, 23 Evacuation floor calculation unit, 24 Mobile object control unit, 25 Elevator control unit, 26 Building identification unit, 27 Evacuation order calculation unit, 28 Movement constraint unit, 30 Processor, 31 Evacuation time calculation unit, 32 Damage occurrence forecast time calculation unit, 33 Evacuation location calculation unit, 40 Memory, 42 Evacuation program, 44 Data, 50 Database, 80 Dedicated hardware, 82 Processing circuit

Claims

1. A building system that controls the operation of an elevator installed in a building in a target area and the operation of one or more autonomous mobile objects that can autonomously move within the building using the elevator, An acquisition unit for acquiring meteorological information; A flood calculation unit that calculates whether the target area will be flooded based on the meteorological information; an evacuation floor calculation unit that calculates an evacuation floor for evacuating from flood damage in the building when the target area is flooded; a mobile object control unit that instructs the one or more autonomous mobile objects in the target area to get into the elevator car and get off at the evacuation floor; an elevator control unit that instructs the elevator to move the car in which the one or more autonomous moving bodies are riding to the evacuation floor; A building system comprising:

2. The moving object control unit includes: The system is configured to instruct an intra-building moving body, among the one or more autonomous moving bodies, that moves within the building on a floor lower than the evacuation floor to get into the elevator car and get off at the evacuation floor.

2. The building system of claim 1.

3. A building identification unit that identifies an evacuation building to which the one or more autonomous moving bodies will evacuate from among one or more evacuation building candidates in the target area, The moving object control unit includes: is configured to instruct an outside-building moving body, among the one or more autonomous moving bodies, that moves outside the building in the target area, to get into the elevator car installed in the evacuation building and get off at the evacuation floor, The elevator control unit includes: The elevator is configured to instruct the elevator installed in the evacuation building to move the car in which the outside-building moving body is riding to the evacuation floor.

2. The building system of claim 1.

4. The building identification unit identifies, as the evacuation building, a candidate evacuation building that is closest to the outside-building moving body among the one or more candidate evacuation buildings.

4. The building system according to claim 3, configured so as to

5. The building identification unit excludes a building in which the number of the autonomous moving bodies to be evacuated has reached an allowable number from the one or more evacuation building candidates in the target area.

5. The building system according to claim 4, configured so as to

6. Further comprising an evacuation order calculation unit that calculates an evacuation order of the one or more autonomous moving bodies based on a priority of the evacuation order, The moving object control unit includes: The system is configured to instruct one or more of the autonomous moving bodies to get into the car of the elevator and get off at the evacuation floor according to the evacuation order. A building system according to any one of claims 1 to 5.

7. The building system according to any one of claims 1 to 5, further comprising a movement constraint unit that, when the target area is flooded, prohibits an autonomous moving body located on a floor in the building that is higher than the evacuation floor from moving to a floor lower than the evacuation floor.

8. The building system according to any one of claims 1 to 5, further comprising a movement restriction unit that prohibits an autonomous mobile body, among the one or more autonomous mobile bodies, that is within the building from moving outside the building when the target area is flooded.

9. an evacuation time calculation unit that calculates an evacuation time required for the outside-building moving body to move to the evacuation building; and a predicted time calculation unit that calculates a predicted time required for flood damage to occur in the target area based on the meteorological information, The building system of any one of claims 3 to 5, wherein if the evacuation time is longer than the predicted time, the mobile object control unit is configured to instruct the outside-building mobile object to move to an outdoor evacuation site.

10. The flood calculation unit is configured to calculate a flood depth when the target area is flooded based on a precipitation amount for the target area included in the meteorological information, The building system according to claim 1 , wherein the evacuation floor calculation unit is configured to calculate the evacuation floor based on the flood depth.

11. An evacuation method executed by a computer, for evacuating one or more autonomous moving bodies capable of autonomously moving within a building using an elevator to an evacuation floor within a building in a target area, comprising: acquiring weather information for the target area; calculating whether the target area will be flooded based on the meteorological information; When the target area is flooded, calculating an evacuation floor for evacuating from flood damage in the building; instructing the one or more autonomous moving bodies in the target area to get into the elevator car and get off at the evacuation floor; instructing the elevator to move the car in which the one or more autonomous moving bodies are riding to the evacuation floor; An evacuation method comprising:

12. An evacuation program that causes a computer to execute a program for causing one or more autonomous moving bodies capable of autonomously moving within a building to evacuate to an evacuation floor within a building in a target area, the program comprising: Obtaining meteorological information about the target area; Calculating whether the target area will be flooded based on the meteorological information; When the target area is flooded, an evacuation floor for evacuating from flood damage within the building is calculated; instructing the one or more autonomous moving bodies in the target area to get into the elevator car and get off at the evacuation floor; Instruct the elevator to move the car in which the one or more autonomous moving bodies are riding to the evacuation floor. The evacuation program is configured to cause a computer to execute the following:

Citation Information

Patent Citations

  • Autonomous vehicle

    JP2019206300A

  • Elevator control system

    JP2022016918A

  • JPP7434652B

  • Elevator management system and elevator system

    WO2022259403A1

  • Notification device, notification method, and recording medium

    WO2023181387A1

Cited By

  • Elevator control device and elevator control system

    JP2026000718A