The steel protective shelter with a tapered hood and three-part structure addresses the inefficiencies and safety concerns of traditional guide shaft construction, enabling quick and safe assembly with reduced ground exposure and backfill requirements.

JP7595329B1Active Publication Date: 2024-12-06DAITETSU IND +2
View PDF 4 Cites 0 Cited by

Patent Information

Application Number
JP2024039179
Authority / Receiving Office
JP · JP
Patent Type
Patents
Current Assignee / Owner
Filing Date
2024-03-13
Publication Date
2024-12-06
Estimated Expiration
2044-03-13

AI Technical Summary

Technical Problem

Existing guide shaft construction methods using the sheet pile method expose a significant section of the ground, lack workability, and pose safety risks due to inadequate reinforcement.

Method used

A method utilizing a steel protective shelter with a tapered hood and a three-part structure, comprising a front end cutting part, propulsion jack installation part, and shoring assembly part, featuring a lotus petal or horseshoe-shaped outer circumference, allowing for safe and quick assembly of shoring by extending the construction period.

Benefits of technology

Enables safe, rapid, and efficient construction of guide shafts with minimal ground exposure, reducing the need for backfill and reinforcing materials, thereby enhancing safety and workability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure 0007595329000001_ABST
    Figure 0007595329000001_ABST
Patent Text Reader

Abstract

To provide a method for constructing a guide pilot tunnel, which can be easily, quickly and safely constructed. [Solution] A steel protective shelter consisting of a front blade section, a thrust jack installation section, and a support assembly section is used, and both the steel protective shelter and the support have the outer circumference of a lotus petal or horseshoe shape, and the support is a half-assembled type with this lotus petal or horseshoe shape.The support is gradually extended by repeating the process of excavating with the front blade section of the steel protective shelter, thrusting the steel protective shelter with a thrust jack in the thrust jack installation section, and assembling the support in the support assembly section of the steel protective shelter.
Need to check novelty before this filing date? Find Prior Art

Description

[Technical field]

[0001] The present invention relates to a method for constructing a guide pilot tunnel, which is a small tunnel excavated at a location that will become the base slab of a tunnel prior to the construction of a tunnel such as a box culvert located directly beneath a railway line or road. [Background technology]

[0002] Guide pilot shafts are also shown in the following patent documents, and as shown in Figure 15, a protective pipe roof 3 is constructed between a starting shaft 21 and a destination shaft 22, and a guide pilot shaft 6 is excavated at a position that will become the bottom slab of the tunnel. [Patent Document 1] JP 2002-242582 A

[0003] The guide tunnel 6 can be constructed by a known tunnel excavation method. For example, a method of constructing a tunnel by the sheet pile method, repeating the steps of assembling shoring → erecting sheet piles → excavation → assembling shoring, can be adopted.

[0004] The concrete box 5 is constructed inside the starting shaft 21, and a frame material 8, which serves as a back frame, is attached to the end of the concrete box 5 opposite the excavation direction, i.e., the rear end. In addition to constructing such a concrete box 5 as a cast-in-place box with an RC structure, it may also be a precast concrete box manufactured in a factory or a steel segment box.

[0005] One end of the towing member 71 is fixed to a fixed point 91 provided on the arrival shaft 22 side, for example, and the other end is attached to the frame material 8 via a towing jack 73.

[0006] The traction member 72 installed below the tunnel is inserted into the guide pit 6. Like the traction member 71 installed above, the traction member 72 installed below has one end fixed to a fixed point 92 and the other end attached to the frame material 8 via a traction jack 73.

[0007] Concrete box 5 Guide tunnel construction groundThe concrete box body 5 is towed to the ground by a combination of excavation using an excavator or the like at the front side (the surface in contact with the ground) of the concrete box body 5 and towing the concrete box body 5 by operating a jack 73.

[0008] The above has described the case of the towing method, but a pushing method is also possible. As shown in Figure 16, a pushing jack 74 is installed in the starting shaft 21 and the concrete box body 5 is pushed forward by this pushing jack 74. Prior to this, a box-shaped roof 76 is installed in place of the protective pipe roof 3.

[0009] The box-shaped roof 76 has small jacks 77 housed in jack housing pipes at its base, and each jack is used to excavate the concrete box 5 using reaction force, and then the concrete box 5 is excavated.

[0010] In the figure, reference numeral 75 denotes a reaction wall provided in the departure shaft 21, and reference numeral 78 denotes a support for the box-shaped roof 76 provided in the arrival shaft 22. Summary of the Invention [Problem to be solved by the invention]

[0011] As mentioned above, the guide tunnel 6 is constructed by a known tunnel excavation method, and the steel supports are erected by the sheet pile method. Guide tunnel The sheet pile method is a method in which the excavated ground is supported by steel supports and sheet piles. After excavation and removal of debris, the supports are erected, but this requires leaving a section of about 1m exposed for the steel supports without sheet piles. back ground Generally, this is done for ground improvement work such as chemical grouting. back ground Although the work involved reinforcement, it lacked workability and safety.

[0012] The object of the present invention is to provide a method for constructing a guide tunnel and a steel protective shelter structure which can eliminate the inconveniences of the above-mentioned conventional examples and can be easily, quickly and safely constructed. [Means for solving the problem]

[0013] In order to achieve the above object, the present invention as set forth in claim 1 provides: In order to prevent the collapse of the face, a tapered hood was formed so that the top of the tip protrudes. A steel protective shelter consisting of a front blade section, a thrust jack installation section, and a support assembly section is used, and both the steel protective shelter and the support have the outer circumference of a lotus petal or horseshoe shape, and the support is a half-assembled type with this lotus petal or horseshoe shape. The gist of this system is that excavation is performed at the front blade section of the steel protective shelter, the steel protective shelter is thrust with a thrust jack in the thrust jack installation section, and the support is assembled in the support assembly section of the steel protective shelter, and the process is repeated to gradually extend the support.

[0014] According to the present invention as described in claim 1, a guide tunnel is constructed using a steel protective shelter consisting of a front end cutting edge section, a thrust jack installation section, and a support assembly section, and since the support can be assembled in the support assembly section of the steel protective shelter, construction can be carried out safely and quickly.

[0015] Furthermore, both the steel protection shelter and the shoring have a lotus petal or horseshoe shaped outer circumference, and the shoring can be easily assembled at the shoring assembly section of the steel protection shelter.

[0016] The present invention described in claim 2 is directed to a half-assembled type support structure having an outer shape resembling a lotus petal or a horseshoe, in which one side is erected first and used as a temporary support, and the other side is then erected and the tops are bolted together to form a ring.

[0017] According to the present invention as described in claim 2, the shoring can be easily assembled in the shoring assembly section of the steel protective shelter, and the shoring can be assembled more safely because one side is erected first, used as a temporary support, and the other side is erected and the tops are bolted together to form a ring body.

[0018] The present invention according to claim 3 comprises: By forming a tapered hood, the amount of overexcavation is reduced, and by advancing the cutting edge and the steel protective shelter as a single unit without erecting shoring at the face in front of the cutting edge, the area behind the shelter where the ground is exposed is significantly reduced. The gist of this document is that

[0019] According to the present invention described in claim 3, the steel protective shelter is advanced in sequence in response to excavation, Back of guide tunnel It becomes ground This limits the exposed section to around 0.2m, allowing for safe excavation of the face.

[0020] The present invention according to claim 4 comprises: The method for constructing the guide tunnel according to claim 1 It is a steel protective shelter to be used. It is shaped like a lotus petal or horseshoe, tapering at the tip. The structure is divided into three parts by assembling the cutting edge section, the thrust jack installation section, and the support assembly section with bolt connections, and the support assembly section has a base plate only at the front, while the rear half is open at the bottom.

[0021] According to the present invention as set forth in claim 4, the steel protective shelter is By tapering the tip into a lotus petal shape, the strength of the tip can be increased, improving digging performance.

[0022] In addition, the support assembly section has a bottom slab only at the front, while the rear half is open at the bottom, exposing the ground. The support is assembled in the rear part of the shelter where the ground is exposed. In order to ensure space for assembly of the support, no reinforcing members are provided in the support assembly section, and removable reinforcing members with built-in jacks can be placed as support beams to prevent deformation. This makes it possible to narrow the gap between the inner surface of the steel protective shelter and the support and reduce the amount of backfill injected, ensuring safety during excavation and improving workability.

[0023] By installing removable reinforcement materials in the support assembly area inside the steel shelter, deformation of the steel shelter due to the earth pressure of the guide tunnel can be suppressed without installing reinforcement materials, and the support can be assembled close to the inner surface of the steel shelter, so the backfill thickness can be about 50 mm. ground This allows for a minimum of excavation and a reduced amount of backfill injection. Effect of the Invention

[0024] As described above, the guide tunnel construction method and steel protective shelter structure of the present invention enable the construction of guide tunnels easily, quickly, and safely. [Brief description of the drawings]

[0025] [Figure 1] FIG. 2 is a vertical cross-sectional side view showing one embodiment of a guide tunnel construction method of the present invention. [Diagram 2] FIG. 2 is a vertical cross-sectional side view showing an excavation state illustrating one embodiment of the guide pit construction method of the present invention. [Diagram 3] This is a vertical cross-sectional side view of the front end cutting edge of the steel protective shelter. [Figure 4] This is a vertical cross-sectional side view of the propulsion jack installation section of the steel protective shelter. [Diagram 5] This is a longitudinal side view of the support assembly part of the steel protective shelter. [Figure 6] FIG. 4 is a view taken along line A in FIG. [Figure 7] 5 is a view taken along line B in FIG. 4. [Figure 8] FIG. 6 is a view taken along line C in FIG. 5. [Figure 9] FIG. 2 is a cross-sectional plan view of a completed embodiment of a guide tunnel construction method according to the present invention. [Figure 10] This is a front view of the first step showing the procedure for erecting support structures. [Figure 11] This is a front view of the second step showing the procedure for erecting the support structure. [Figure 12] This is a front view of the third step showing the procedure for erecting the support structure. [Figure 13] This is a front view of the fourth step showing the procedure for erecting the support structure. [Figure 14] This is a front view of wooden sheet piles installed on the support structure. [Figure 15] FIG. 2 is a vertical cross-sectional side view showing an example of a guide tunnel. [Figure 16] FIG. 11 is a vertical cross-sectional side view showing another example of a guide tunnel. DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS

[0026] Hereinafter, an embodiment of the present invention will be described in detail with reference to the drawings. Fig. 1 is a vertical cross-sectional side view showing one embodiment of the construction method for a guide pilot tunnel of the present invention, in which 21 is a starting shaft and 2 is a steel protective shelter.

[0027] The construction method of the present invention uses a steel protective shelter 2 for constructing a guide tunnel. The steel protective shelter 2 is a steel shell having an outer periphery with a lotus petal or horseshoe shaped cross section.

[0028] The steel protective shelter 2 can also be divided to make it easier to set up and retrieve. This figure shows a structure divided into three parts: a front cutting edge section 2a, a propulsion jack installation section 2b, and a support assembly section 2c, which are assembled by bolting flanges.

[0029] As shown in Fig. 3, the front cutting edge 2a has an upward facing tip to prevent the face from collapsing. Tension The tapered hood allows for drilling with a slope at the face.

[0030] Also, By forming a tapered hood, the amount of over-excavation is reduced, and by advancing the cutting edge and the steel protective shelter as a single unit without erecting shoring at the face in front of the cutting edge, the area where the guide tunnel ground is exposed behind the shelter is significantly reduced. It is possible.

[0031] The propulsion jack installation section 2b has four installation stands 7 for the propulsion jacks 4 provided therein as horizontal brackets.

[0032] Both the front end cutting edge section 2a and the propulsion jack installation section 2b are closed-type steel shells with a bottom plate 9, while the support assembly section 2c has a bottom plate only at the front and is open at the bottom at the rear half, exposing the ground. The support described below is assembled at the exposed ground.

[0033] In addition, in order to secure space for assembling the shoring, the reinforcing member 8 is not provided in the shoring assembly section 2c, but a removable reinforcing member 10 with a jack built in can be placed as a support beam to prevent deformation. This narrows the gap between the inner surface of the steel protective shelter and the shoring, and reduces the amount of backfill injection.

[0034] Furthermore, lighting (LED) 11a and lighting (fluorescent lamp) 11b are provided inside the steel protective shelter 2.

[0035] A thrust reaction body 12 is formed of steel and brackets in the starting shaft 21, and the steel protective shelter 2 is excavated in sequence with the interposition of struts (for thrust construction) 13. This excavation is carried out by digging the face of the front end cutting edge part 2a by hand or with a small backhoe or shaft loader, the excavated soil is sent to the rear with a trolley 17, the thrust jack 4 is extended to excavate the steel protective shelter 2, and the strut 13 is added to the void created by the retraction of the thrust jack 4.

[0036] The shoring 14 is assembled in the shoring assembly section 2c of the steel protective shelter 2. This allows the shoring to be assembled in a space protected by the steel protective shelter, making it possible to safely assemble the shoring. When assembled, the shoring 14 has an outer periphery with a lotus petal or horseshoe shape, just like the steel protective shelter 2, and is a combination of shoring materials 14a and 14b that curve together to form a shoring ring.

[0037] Figures 10 to 13 show the procedure for erecting this shoring 14, with one side of the shoring material 14a being erected first at the shoring assembly section 2c of the steel protective shelter 2 and then temporarily supported by a temporary support material 15 such as a pipe. The other side of the shoring material 14b is then erected and the tops are secured together with bolts, and a strut (shoring material) 16 is placed across the bottom ends to form a ring.

[0038] The supports 14 are arranged at intervals, and wooden sheet piles 18 are attached to the outside of them as shown in Figure 13. The wooden sheet piles 18 arranged at the top are equipped with packers 19.

[0039] The steel protective shelter 2 will be excavated in stages. ground By limiting the exposed section to about 0.2 m, excavation can be carried out while suppressing the collapse of the ground in the tunnel, and backfill material 20 is injected through the gaps in the wooden sheet piles 18 of the support 14 extending from the support assembly section 2 c of the steel protective shelter 2.

[0040] The timing of excavation of the steel protective shelter 2 and assembly of the shoring 14 is as follows: excavation of the steel protective shelter 2 is carried out after two rings of the shoring 14 have been constructed and some of the wooden sheet piles 18 have been placed, and when the shoring 14 has emerged from the shoring assembly section 2c of the steel protective shelter 2, the remaining wooden sheet piles 18 are placed and backfill material 20 is injected.

[0041] Instead of injecting the backfill material 20, backfill soil may be used to fill the gap.

[0042] In this way, as the steel protective shelter 2 is excavated, the support structure is gradually extended and a guide tunnel is constructed.

[0043] In addition, the front cutting edge will be gradually protected by a steel protective shelter according to the excavation. Ground behind the guide tunnel This will significantly reduce the area where the equipment is exposed.

[0044] This will allow the construction of steel protective shelters in stages in accordance with the excavation. Guide tunnel It becomes back ground This limits the exposed section to around 0.2m, allowing for safe excavation of the face.

[0045] In addition, the back of the support and Ground behind the guide tunnel Gap of As a result, by providing removable reinforcement materials in the support assembly area inside the steel protection shelter, deformation of the steel pilot shelter due to the guide pilot earth pressure can be suppressed without providing reinforcement materials, and because the support can be assembled close to the inner surface of the steel protection shelter, the backfill thickness can be kept to about 50 mm, minimizing excavation of the ground and reducing the amount of backfill injection.

[0046] The completed form is shown in Figure 9, and once the steel protective shelter 2 reaches the arrival shaft 22, it is retrieved. [Explanation of symbols]

[0047] 1… Guide tunnel construction ground 2. Steel protective shelter 2a…Front edge part 2b…Propulsion jack installation part 2c…Shoring assembly section 3…Protective pipe roof 4... Push-in jack 5... Concrete box 6... Guide tunnel 7... Jack support member 8...Frame material 9...Bottom plate 10…Detachable reinforcement 11a…Lighting (LED) 11b...Lighting (fluorescent lamp) 12...Propulsion reaction body 13... Strut (for tunneling work) 14... Shoring 14a…Shoring material 14b…Shoring material 15...Temporary support material 16...Strut (support material) 17... Cart 18... Wooden sheet pile 19...Packer 20...Backfilling material 21...Departure shaft 22...Arrival shaft 71, 72... towing member 73... towing jack 74... Push jack 75... Reaction wall 76...Box roof 77...Small jack 78…Pedestal

Claims

1. A guide tunnel construction method using a steel protective shelter consisting of a front cutting edge section which is tapered to form a hood so that the top of the tip protrudes to prevent the collapse of the face, a thrust jack installation section and a support assembly section, wherein the steel protective shelter and the support both have the outer circumference of a lotus petal or horseshoe shape, and the support is a half-assembled type with this lotus petal or horseshoe shape, and wherein the support is gradually extended by repeating the process of excavating with the front cutting edge section of the steel protective shelter, thrusting the steel protective shelter with a thrust jack in the thrust jack installation section and assembling the support in the support assembly section of the steel protective shelter.

2. A construction method for a guide tunnel as described in claim 1, in which a half-assembled type support having an outer shape resembling a lotus petal or a horseshoe is erected on one side, which is used as a temporary support, and then the other side is erected and the tops are bolted together to form a ring.

3. A construction method for a guide tunnel as described in claim 1 or claim 2, in which the amount of overexcavation is reduced by tapering the tunnel to form a hood, and the cutting edge and the steel protective shelter are advanced as a single unit without erecting support structures at the face in front of the cutting edge, thereby drastically reducing the area where the ground behind the guide tunnel is exposed at the rear of the shelter.

4. A steel protective shelter used in the construction method of the guide tunnel of claim 1, characterized in that the tip is tapered into a lotus petal or horseshoe shape, and the cutting edge section, the thrust jack installation section and the support assembly section are assembled with bolts to form a three-part structure, and the support assembly section has a bottom slab only at the front and the rear half is open at the bottom.

Citation Information

Patent Citations

  • Tonnerukutsusakuyotsuriashiba

    JP1976096141A

  • JP1977094036U

  • Tunnel constructing method

    JP2002242582A

  • Tunnel support and method of constructing the same