Sewing device synchronization method and system

By obtaining the process and custom parameters of the sewing equipment, the process score is generated, the network connection between the sewing equipment and the hanging equipment is realized, the problem of interoperability between the sewing equipment data and the process is solved, the whole process is automatically optimized and automatically scheduled, and the improvement is improved It improves production efficiency and accuracy and improves sewing quality.

WO2024198029A1PCT designated stage expired Publication Date: 2024-10-03JACK SEWING MASCH CO LTD
View PDF 6 Cites 0 Cited by

Patent Information

Application Number
PCT/CN2023/091182
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-03-31
Filing Date
2023-04-27
Publication Date
2024-10-03

AI Technical Summary

Technical Problem

In the existing technology, the data of sewing equipment cannot be communicated with the process and the entire process, and the effective combination of sewing machine data and production conditions cannot be achieved, resulting in the inability to carry out optimized control based on the process flow.

Method used

By obtaining the process parameters of the sewing equipment and the operator's habit parameters, the process score is determined and sent to the hanging equipment to realize the network connection of multiple sewing equipment, generate a production line balance sheet, automatic production scheduling and process automation Arrange, reduce non-productive time and improve production efficiency.

Benefits of technology

It has realized the synchronous optimization of the whole process of sewing equipment and technology, automatic production scheduling, improved production efficiency and accuracy, reduced production scheduling errors, can monitor and trace the production process, and improved sewing quality.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023091182_03102024_PF_FP_ABST
    Figure CN2023091182_03102024_PF_FP_ABST
Patent Text Reader

Abstract

Provided are a sewing device synchronization method and system. The method comprises the following steps: acquiring process parameters of each of sewing devices (1) and habit parameters of each of operators; and determining process scores according to the process parameters and the habit parameters, and according to the process scores, sending a production scheduling signal to a hanging device (2). By communicationally connecting a plurality of sewing devices (1) with each other, each different sewing device (1) is connected to a network, the unified production scheduling of a plurality of different sewing devices (1) is realized, process data of each dimension is conveniently monitored, skills of the employees are conveniently evaluated, the work of a workshop is arranged in a targeted manner, and the capacity of the workshop is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Sewing equipment synchronization method and system Technical Field

[0001] The present invention relates to the technical field of cooperative control of sewing equipment, and in particular to a sewing equipment synchronization method and system. Background Art

[0002] The basic concept behind existing garment hanging systems in the apparel industry is to hang whole garment pieces on hangers. These are automatically delivered to the operator of the next process according to pre-programmed work steps, significantly reducing non-productive time associated with handling, tying, and folding. Once a production worker completes a process, they simply press a button, and the hanging system automatically transfers the hanger to the next process station, where piecework is counted. Garment hanging systems facilitate production scheduling, effectively controlling production output and arranging and adjusting process steps. The hanging system primarily circulates order production data. Currently, IoT-enabled sewing machines can collect operating data from the sewing machine, but this data cannot be integrated with higher-level production conditions. Sewing machine data can only be accessed at the device level, not from the perspective of processes, employees, or other production processes.

[0003] For example, a "sewing machine control method and system based on industrial Ethernet" disclosed in Chinese patent literature, with publication number: CN107948282A, discloses that a controller transmits control information to a corresponding driver via the EtherCAT communication protocol; wherein the control information includes sewing information; the driver generates corresponding motion control information based on the received control information, and sends the motion control information to the connected mechanical equipment; the mechanical equipment performs the corresponding sewing task based on the received motion control information; the present invention uses the EtherCAT bus to connect the controller with the driver of the mechanical equipment, and uses the controller to uniformly control multiple mechanical equipment, thereby realizing coordinated control of different mechanical equipment. However, this solution only discloses how to issue sewing tasks, and does not optimize process-based control.

[0004] Summary of the Invention

[0005] In order to solve the problem in the prior art that the data of sewing equipment cannot be communicated with the process and the entire process, the present invention provides a sewing equipment synchronization method and system, which adds the parameters of the sewing machine to the process optimization control to achieve synchronous optimization of the entire process.

[0006] In order to achieve the above object, the present invention provides the following technical solutions:

[0007] A method for synchronizing sewing equipment includes the following steps: obtaining the process parameters of the sewing equipment and the operator's habit parameters; determining a process score based on the process parameters and habit parameters; and sending a production scheduling signal to a hanging device based on the process score. Multiple identical or different sewing equipment are connected to the same network, obtaining the sewing equipment's own process parameters and the corresponding operator's information; determining the operator's habit parameters based on the operator's information; and determining the process score of the operator performing the process on the equipment based on the process parameters and habit parameters. The process score represents the operator's work efficiency for the corresponding process on the sewing equipment. A process score is determined for each sewing equipment, and the process score is compiled into a production line balance table based on the hanging efficiency. Production is scheduled based on the production line balance table. Automatic production scheduling is achieved, and a process adjustment method is provided to automatically arrange processes, save IE time, and achieve automatic optimization of the entire process.

[0008] Preferably, obtaining the process parameters of the sewing equipment includes obtaining electrical information from the sewing equipment and determining the process parameters based on the electrical information; the process parameters include the sewing equipment's operating efficiency and work progress. Training is performed based on the sewing equipment's historical operating data to obtain different operating efficiency ranges for the sewing equipment in various processes. Standard operating information for the sewing equipment is determined based on the sewing equipment's electrical information, and the different operating efficiency ranges and standard operating information are stored in the controller as a process parameter library. Simultaneously, the actual physical position data of the sewing equipment relative to the hanging device is obtained, and process data for the sewing equipment is obtained via a communication connection. By obtaining the process parameters and position of the sewing machine, each sewing machine can be monitored, facilitating unified production scheduling.

[0009] Preferably, while obtaining the electrical information of the sewing equipment, the position data and process data of the sewing equipment are also obtained, and the electrical information is marked according to the position data and process data of the corresponding sewing equipment. The position data and process data of the sewing equipment are not included in the process parameters, but the position data and process data of the sewing equipment can be used for production scheduling. The position data and process data are marked in the corresponding process parameters, so that after the production schedule is determined according to the process parameters, the production schedule of the hanging equipment can be controlled according to the position data and process data, without the need for multiple data acquisitions, so that the electrical information is traceable.

[0010] Preferably, obtaining the operator's custom parameters includes logging in the operator's information through a sewing terminal and obtaining the custom parameters corresponding to the operator's information. The custom parameters include stitch length and work rate, and the custom parameters are determined based on historical task completion. A sewing terminal is provided for the sewing equipment. The sewing terminal is a portable terminal attached to the sewing equipment and is used to obtain custom parameters and process parameters. The sewing terminal obtains the process parameters of the sewing equipment by electrically connecting to the sewing equipment. The sewing terminal obtains the operator's custom parameters through a network connection to a controller. The sewing terminal is also connected to a controller of a hanging device, and the controller is located between the sewing terminal and the controller. Obtaining the operator's custom parameters and the process parameters of the sewing equipment through the sewing terminal facilitates the synchronous control of different types and ages of sewing equipment, and facilitates obtaining data for different types and ages of sewing equipment, as well as data for different operators and different processes.

[0011] Preferably, determining the process score includes establishing a correction function for process parameters and custom parameters, obtaining detailed data of the current process of each product through the correction function, determining the processing time based on the detailed data, and obtaining the process score based on the processing time. The correction function inputs include process parameters and custom parameters, using the stitch length and number of stitches in the custom parameters as a first efficiency value, correcting the work efficiency in the process parameters based on the first efficiency value and using it as a second efficiency value, correcting the work rate in the custom parameters based on the second efficiency value and using it as a third efficiency value, dividing the third efficiency value into single-piece data, combining the single-piece data with the process parameters to obtain the actual working time of the single piece, and combining the actual working time of the single piece with the position data of the sewing equipment and storing it in the controller. Combining the process parameters and custom parameters through the process score to obtain the actual working time avoids inaccurate production scheduling results caused by the inherent characteristics of the equipment or different habits of the operators, and at the same time, cross-correcting the process parameters and custom parameters to reduce production scheduling errors.

[0012] Preferably, after determining the processing time, a production line balance sheet is obtained based on the processing time, and the process score is obtained according to the production line balance sheet. A data list of each sewing device is established based on the actual working hours and used as a production line balance sheet. The production line balance sheet records the time of each process of each single piece of sewing equipment, sorts the time of the last process of the single piece, and determines the current process score of each workpiece according to the production line balance sheet, so as to perform production scheduling. The process time of each single piece of all sewing equipment is traversed and scheduled through the production line balance sheet, so that production scheduling can be performed for each operator at the specific process time of each sewing device. Improve production scheduling efficiency and accuracy. This enables uploading of small pieces of data and overall multi-dimensional monitoring of the production process.

[0013] A sewing equipment synchronization system includes a sewing device connected to a hanging device. The hanging device and the sewing device are both connected to a controller. The controller receives information from the sewing device and the hanging device and generates a process score. The hanging device is connected to a production control system, which transmits control information to the hanging device based on the process score. There are multiple hanging devices, each of which is used to perform hanging operations at each sewing device location. The controller is used to obtain data generated by the hanging devices and the sewing device. The production control system is used to schedule production for the hanging devices based on the production information of the sewing devices. The production control system provides unified control of the sewing and hanging devices, achieving efficient production scheduling.

[0014] Preferably, the sewing equipment is connected to a sewing terminal, which is connected to a position sensor. The sewing terminal is used to obtain operating data of the sewing equipment and the operator's customary parameters. The position sensor is used to detect the distance between the sewing equipment and the lifting device. The sewing terminal is in communication with the controller. The sewing terminal enables unified access to different sewing equipment, especially for different intelligent equipment, facilitating production scheduling and monitoring.

[0015] The present invention has the following advantages:

[0016] (1) Automatic production scheduling is achieved, providing a process adjustment tool to automatically arrange the process, save IE time, and achieve automatic optimization of the entire process. By connecting multiple sewing equipment, each different sewing equipment can be connected to the grid, and unified production scheduling for multiple different sewing equipment can be achieved; (2) It is convenient to monitor process data in various dimensions, evaluate employee skills, arrange sewing work in a targeted manner, and improve sewing production capacity; (3) Through cross-correction of process parameters and customary parameters, the production scheduling error is reduced, and the production is accurately scheduled for each operator at the specific process time of each sewing equipment. Improve production scheduling efficiency and accuracy; production can be traced according to process details, which is convenient for analyzing the causes of quality problems, and is convenient for prompting abnormal processes in the quality inspection link, thereby improving sewing quality. BRIEF DESCRIPTION OF THE DRAWINGS

[0017] The drawings described below are merely exemplary. A person skilled in the art can derive other implementation drawings based on the provided drawings without inventive effort.

[0018] FIG1 is a schematic diagram of a synchronization system for sewing equipment in the present invention.

[0019] FIG2 is a block diagram of a synchronization system for sewing equipment in the present invention.

[0020] FIG3 is a schematic diagram of the working logic of the hanging device in the third embodiment.

[0021] FIG4 is a schematic diagram of the division of single data in the present invention.

[0022] FIG5 is a schematic diagram showing the balance of the production line in the present invention.

[0023] In the picture:

[0024] 1-Sewing equipment; 2-Hanging equipment; 3-Controller; 4-Production control system; 5-Controller. DETAILED DESCRIPTION

[0025] The following describes the implementation methods of the present invention through specific embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making any creative work are within the scope of protection of the present invention.

[0026] As shown in FIG1 , in a preferred embodiment, the present invention discloses a method for synchronizing sewing equipment, comprising: before obtaining the process parameters of the sewing equipment and the operator's customary parameters, establishing a sewing equipment network, connecting the sewing equipment and the hanging equipment to the same controller 5, and specifically, establishing a communication connection between multiple sewing equipment and the hanging equipment, and the controller is configured to control the hanging equipment based on the information from the sewing equipment. By establishing a communication connection between the multiple sewing equipment, each different sewing equipment is connected to the network, thereby achieving unified production scheduling for the multiple different sewing equipment.

[0027] During use, devices with built-in communication capabilities are assigned a network address and connected to the same system as the hanging device. Older devices still in use are equipped with a sewing terminal. The sewing terminal includes a microprocessor connected to a communication circuit, which connects the device to the same system via the communication circuit. The controller is located in this system.

[0028] Acquiring process parameters for sewing equipment and operator preferences; acquiring process parameters for the sewing equipment includes acquiring electrical information from the sewing equipment and determining process parameters based on the electrical information; process parameters include work efficiency and work progress; acquiring the electrical information while also acquiring the sewing equipment's position data and process data, and labeling the electrical information according to the corresponding sewing equipment position data and process data; the sewing equipment's position data and process data are not included in the process parameters, but can be used for production scheduling. Labeling the position data and process data with the corresponding process parameters allows, after determining the production schedule based on the process parameters, to control the production schedule of the hanging equipment based on the position data and process data, eliminating the need for multiple data acquisitions and making the electrical information traceable. Training is performed based on the sewing equipment's historical operating data to obtain different efficiency ranges for the sewing equipment in various processes, and standard operating information for the sewing equipment is acquired through an electrical connection to the sewing equipment's processor. The different efficiency ranges and standard operating information are stored in a controller as a process parameter library. Simultaneously, the actual physical position data of the sewing equipment relative to the hanging equipment is acquired, and the sewing equipment's process data is acquired through a communication connection. Acquiring an operator's customary parameters involves logging in to the operator's information through a sewing terminal and acquiring the corresponding customary parameters. These customary parameters include parameters influenced by personal habits, such as stitch length and work rate, and are determined based on historical task completion. A sewing terminal is provided for the sewing equipment. The sewing terminal is a portable terminal attached to the sewing equipment and is used to acquire customary and process parameters. The sewing terminal acquires the process parameters of the sewing equipment through an electrical connection to the sewing equipment. The sewing terminal acquires the operator's customary parameters through a network connection to a controller. The sewing terminal is also connected to the controller of the hanging equipment, which is located between the sewing terminal and the controller.

[0029] A process score is determined based on the process parameters and custom parameters, and a production scheduling signal is sent to the hanging equipment based on the process score. Determining the process score includes establishing a correction function for the process parameters and custom parameters. The correction function obtains detailed data on the current process for each product, determines the processing time based on the detailed data, and then determines the process score based on the processing time. The correction function inputs include the process parameters and custom parameters. The stitch length and number of stitches in the custom parameters are used as the first efficiency value. The work efficiency in the process parameters is corrected based on the first efficiency value and used as the second efficiency value. The work rate in the custom parameters is corrected based on the second efficiency value and used as the third efficiency value. This third efficiency value is divided into individual piece data, as shown in Figure 4. The individual piece data is combined with the process parameters to obtain the actual working time for each piece. The actual working time for each piece is then combined with the position data of the sewing equipment and stored in the controller. As shown in Figure 5, after the processing time is determined, a production line balance sheet is generated based on the processing time. The process score is obtained based on the production line balance sheet, and the hanging equipment is controlled based on the process score to schedule production. Based on the actual working hours, a data list of each sewing equipment is established and used as a production line balance sheet. The production line balance sheet records the time of each process of each single piece of sewing equipment, and sorts the time of the last process of the single piece to schedule production.

[0030] The correction function includes a dynamic correction coefficient, and each efficiency value is converted into a percentage to be multiplied as the dynamic correction coefficient.

[0031] When in use, multiple identical or different sewing devices are connected to the same network respectively, and the process parameters of the corresponding sewing device and the information of the corresponding operator are obtained through the electrical information of the sewing device. The operator's habitual parameters are determined according to the operator's information, and the process score of the operator performing the process on the device is determined according to the process parameters and habitual parameters. The process score is used to represent the operator's work efficiency for the corresponding process on the sewing device. The process score is determined for each sewing device, and the process score is made into a production line balance table according to the hanging efficiency, and production is scheduled according to the production line balance table.

[0032] As shown in Figure 2, in a second embodiment, the present invention discloses a sewing equipment synchronization system, comprising a sewing device 1, the sewing device 1 being connected to a hanging device 2, the hanging device 2 and the sewing device 1 being connected to a controller 3, the controller receiving information from the sewing device and the hanging device and generating a process score; the hanging device being connected to a production control system 4, the production control system transmitting control information for the hanging device based on the process score. The hanging device comprises a plurality of hanging devices, each of which is used to perform hanging actions at the position of each sewing device; the controller is used to store data generated by the hanging devices and the sewing devices; and the production control system is used to schedule production. The sewing device is connected to a sewing terminal, which is connected to a position sensor, which is used to obtain data from the sewing device during operation and the operator's habitual parameters. The position sensor is used to detect the distance between the sewing device and the hanging device, and the sewing terminal is in communication with the controller.

[0033] When in use, the controller is located in the production control system and is used to control production scheduling. A sewing terminal is added to the old sewing equipment. The sewing terminal receives tasks from the production control system. The operator obtains custom parameters and other data from the controller via the sewing terminal. The production control system obtains operator information from the sewing terminal and the corresponding custom parameters from the controller. After implementing the above method, the production control system performs production scheduling through the controller.

[0034] In a third embodiment, the sewing device connects to the controller via a 232 data cable, which binds its physical location to the controller, determining its current station. After binding, the sewing device can access the controller via Wi-Fi to obtain data about the current hanging station. Furthermore, the hanging device can interface with third-party MES and the Internet of Things, while the controller's IoT server retains third-party interfaces.

[0035] In fact, the physical spatial position of the sewing equipment has been set in the controller in advance through the 232 data line. When the controller obtains electrical information from the sewing equipment, it no longer obtains data such as the location information of the sewing equipment at the same time. After obtaining the electrical information, it binds it according to the address of the electrical information and the physical spatial position of the sewing equipment.

[0036] As shown in Figure 3, when the hanging device is operating, the sewing machine starts and obtains the hanging device's operating status. If successful, it uses the station number as the address to obtain the hanging data. Sewing machine data is periodically obtained and updated periodically, and the controller sends a message when the hanging station's output changes. In other words, in this solution, the controller controls the hanging device and periodically adjusts the hanging device's operation based on the sewing device's information.

[0037] After data is aggregated on the controller, sewing machine data is segmented based on production fluctuations during hanging. Detailed data for each process is reported to the controller database. A production line balance sheet for each group is generated based on processing times at different stations. A multi-dimensional process library is established within the database, allowing data to be searched by employee, process, group, order, and sewing equipment model. Once the hanging process is imported into this library, production is automatically scheduled based on the employee's process score. Stitch length is monitored by group and process, and displayed on the server. Sewing equipment parameter import: When an operator changes workstations or processes, the sewing machine receives recommended process configurations from the server, based on the employee's preferred configuration. These configurations can be disabled by the operator or issued by management on the server, locking the parameters. Quality inspection highlights: When a process's processing data is abnormal, a reminder is displayed at the quality inspection station for review. The recommended process configuration is the fastest configuration based on the current process score. The server is the monitoring terminal connected to the controller.

[0038] Although the present invention has been described in detail above using general descriptions and specific embodiments, it will be apparent to those skilled in the art that modifications and improvements may be made thereto. Therefore, such modifications and improvements, without departing from the spirit of the present invention, are intended to be within the scope of protection claimed herein.

Claims

1. A method for synchronizing sewing equipment, characterized in that: The steps include: Obtain the process parameters of sewing equipment and the habitual parameters of operators; The process score is determined according to the process parameters and customary parameters, and the production scheduling signal is sent to the hanging equipment according to the process score.

2. A method for synchronizing sewing equipment according to claim 1, characterized in that: The realization of obtaining the process parameters of the sewing equipment includes obtaining the electrical information of the sewing equipment and determining the process parameters according to the electrical information; the process parameters include the working efficiency and working progress of the sewing equipment.

3. A method for synchronizing sewing equipment according to claim 2, characterized in that: When acquiring the electrical information of the sewing equipment, the position data and process data of the sewing equipment are acquired, and the electrical information is marked according to the position data and process data of the corresponding sewing equipment.

4. A method for synchronizing sewing equipment according to claim 1, 2 or 3, characterized in that: The implementation of obtaining the operator's habit parameters includes logging in the operator information through the sewing terminal, obtaining the habit parameters corresponding to the operator information, the habit parameters include stitch length and working speed, and the habit parameters are determined according to the historical task completion amount.

5. A method for synchronizing sewing equipment according to claim 4, characterized in that: The process score determination includes establishing a correction function of process parameters and custom parameters, obtaining detailed data of the current process of each product through the correction function, determining the processing time according to the detailed data, and obtaining the process score according to the processing time.

6. A method for synchronizing sewing equipment according to claim 5, characterized in that: After the processing time is determined, a production line balance sheet is obtained based on the processing time, and a process score is obtained according to the production line balance sheet.

7. A sewing equipment synchronization system, applicable to a sewing equipment synchronization method as claimed in any one of claims 1 to 6, characterized in that: It includes sewing equipment, which is connected to a hanging equipment. The hanging equipment and the sewing equipment are jointly connected to a controller. The controller receives information from the sewing equipment and the hanging equipment and generates a process score. The hanging equipment is connected to a production control system, and the production control system sends control information of the hanging equipment according to the process score.

8. A sewing equipment synchronization system according to claim 7, characterized in that: The sewing device is connected with a sewing terminal, and the sewing terminal is connected with a position sensor. The sewing terminal is used to obtain the data of the sewing device when it is working and the habitual parameters of the operator.

Citation Information

Patent Citations

  • A dynamic production scheduling system and a production scheduling method for a composite material workshop

    CN109598416A

  • Sewing workshop utilization rate acquisition system and method

    CN111221310A

  • Intelligent clothing production system

    CN113869796A

  • Production management method and system, computer readable storage medium and management equipment

    CN114066380A

  • Automatic control device and control method for carrying between steps

    JP2019125085A