Distribution wall configuration method, apparatus, and system, and storage medium
By optimizing the configuration of the number of grids in the distribution wall and selecting the appropriate number of grids based on resource consumption information, the problems of low utilization and insufficient efficiency caused by the fixed number of grids in the distribution wall are solved, and more efficient logistics processing is achieved.
Patent Information
- Application Number
- PCT/CN2023/130379
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-04-19
- Filing Date
- 2023-11-08
- Publication Date
- 2024-10-24
AI Technical Summary
The number of grids in the existing distribution wall is usually fixed, which leads to the problem of planning too much or too little in actual projects, resulting in low overall utilization or insufficient distribution efficiency, and cannot effectively improve the efficiency of logistics processing.
By determining the resource consumption information corresponding to each alternative grid port number, select the target grid port number, configure the distribution wall according to the target grid port number, and optimize the grid port number to improve resource utilization and processing efficiency.
It improves distribution wall grid utilization and logistics processing efficiency, reduces labor costs and task duration, and adapts to different distribution task requirements.
Smart Images

Figure CN2023130379_24102024_PF_FP_ABST
Abstract
Description
Configuration method, device, system and storage medium of put wall
[0001] CROSS-REFERENCE TO RELATED APPLICATIONS
[0002] This application is based on and claims priority to an application filed in China with application number 202310423404.0 and filing date April 19, 2023. The disclosed content of the Chinese application is hereby introduced as a whole into this application. Technical Field
[0003] The present disclosure relates to the field of logistics technology, and in particular to a configuration method, device, system, and storage medium for a put wall. Background Art
[0004] The automatic distribution wall system uses distribution vehicles to quickly distribute products to their corresponding slots after they have been scanned by the packaging station. This system replaces the current situation of manual sorting and long-distance shelving across aisles. Instead, it enables rapid, automated sorting followed by narrower, more pedestrian shelving, saving labor costs and improving logistics efficiency.
[0005] In the related art, the number of slots in a put wall is usually fixed, that is, all the slots in the put wall are used.
[0006] Summary of the Invention
[0007] According to a first aspect of some embodiments of the present disclosure, a method for configuring a distribution wall is provided, comprising: determining resource consumption information corresponding to each number of grid openings for a plurality of alternative numbers of grid openings of the distribution wall; selecting a target number of grid openings from a plurality of alternative numbers of grid openings based on the resource consumption information corresponding to each alternative number of grid openings; and configuring the distribution wall based on the target number of grid openings.
[0008] In some embodiments, the resource consumption information includes at least one of the number of people changing boxes, the number of people putting boxes on shelves, and the duration of the task.
[0009] In some embodiments, determining the resource consumption information corresponding to each number of slots includes: determining the task parameters affected by the alternative number of slots; using the task parameters, determining the representation of the total box change time and the representation of the total shelving time; and determining the resource consumption information corresponding to the number of slots with the constraint that the total broadcast time is not less than the total box change time and the total shelving time.
[0010] In some embodiments, the task parameters affected by the number of alternative slots include at least one of the unit time for changing boxes on the put wall and the unit time for putting goods on shelves.
[0011] In some embodiments, the unit time for changing containers is positively correlated with the number of available slots; the unit time for loading and unloading goods is negatively correlated with the number of available slots.
[0012] In some embodiments, the task parameters include the unit time of box change of the broadcast wall; the resource consumption information includes the number of people changing boxes; the representation of the total box change time is determined by the unit time of box change, the number of box changes and the number of people changing boxes.
[0013] In some embodiments, the total time for changing boxes is positively correlated with the unit time for changing boxes and the number of box changes, and negatively correlated with the number of people changing boxes.
[0014] In some embodiments, the task parameters include the unit time for putting goods on the shelves; the resource consumption information includes the number of people putting goods on the shelves; the representation of the total shelving time is determined by the unit time for putting goods on the shelves, the number of shelving times, the unit time for putting goods on the shelves and the number of people putting goods on the shelves.
[0015] In some embodiments, the total time of shelving is positively correlated with the unit time of shelving, the number of shelving times, and the unit time of shelving walking, and is negatively correlated with the number of people shelving.
[0016] In some embodiments, the unit time for walking to the rack includes the average time for walking to the aisle and the average time for walking in the aisle.
[0017] In some embodiments, the average time spent traveling within an aisle is determined based on the average number of types of goods in a tote.
[0018] In some embodiments, the total time for changing boxes is also represented by the number of people changing boxes, and the total time for putting boxes on the shelves is also represented by the number of people putting boxes on the shelves, and the total broadcasting time is constrained to be not less than the total time for changing boxes and the total time for putting boxes on the shelves, and the resource consumption information corresponding to the number of slots is determined, including: constraining the total broadcasting time to be not less than the total time for changing boxes and the total time for putting boxes on the shelves, solving the number of people changing boxes in the representation of the total time for changing boxes, and the number of people putting boxes on the shelves in the representation of the total time for putting boxes on the shelves; using the solved number of people changing boxes and the number of people putting boxes on the shelves, determine the total broadcasting time and the total time for putting boxes on the shelves corresponding to the number of slots; and determining the task completion time based on the maximum value of the total broadcasting time, the total time for changing boxes, and the total time for putting boxes on the shelves.
[0019] In some embodiments, configuring the put wall according to the target number of slots includes: opening a corresponding number of slots in the put wall according to the target number of slots.
[0020] According to a second aspect of some embodiments of the present disclosure, a configuration device for a distribution wall is provided, including: a determination module, configured to determine resource consumption information corresponding to each of a plurality of alternative grid numbers of the distribution wall; a selection module, configured to select a target grid number from a plurality of alternative grid numbers based on the resource consumption information corresponding to each alternative grid number; and a configuration module, configured to configure the distribution wall according to the target grid number.
[0021] According to a third aspect of some embodiments of the present disclosure, a system for configuring a put wall is provided, comprising: any one of the aforementioned put wall configuration devices; and a put wall.
[0022] According to a fourth aspect of some embodiments of the present disclosure, a device for configuring a put wall is provided, comprising: a memory; and a processor coupled to the memory, the processor being configured to execute any of the aforementioned methods for configuring a put wall based on instructions stored in the memory.
[0023] According to a fifth aspect of some embodiments of the present disclosure, a computer-readable storage medium is provided, on which a computer program is stored, wherein when the program is executed by a processor, any of the aforementioned methods for configuring a put wall is implemented.
[0024] According to a sixth aspect of some embodiments of the present disclosure, there is provided a computer program comprising: instructions, which, when executed by a processor, cause the processor to execute any one of the aforementioned methods for configuring a put wall.
[0025] Other features and advantages of the present disclosure will become apparent from the following detailed description of exemplary embodiments of the present disclosure with reference to the accompanying drawings. BRIEF DESCRIPTION OF THE DRAWINGS
[0026] In order to more clearly illustrate the embodiments of the present disclosure or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, the drawings described below are only some embodiments of the present disclosure. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0027] FIG1 shows a schematic flow chart of a method for configuring a put wall according to some embodiments of the present disclosure.
[0028] FIG2 shows a schematic flow chart of a method for determining resource consumption information according to some embodiments of the present disclosure.
[0029] FIG3 shows a flow chart of a method for determining a target number of openings according to some embodiments of the present disclosure.
[0030] FIG4 shows a schematic structural diagram of a put wall configuration device according to some embodiments of the present disclosure.
[0031] FIG5 shows a schematic structural diagram of a put wall configuration system according to some embodiments of the present disclosure.
[0032] FIG6 shows a schematic structural diagram of a put wall configuration device according to other embodiments of the present disclosure.
[0033] FIG7 shows a schematic structural diagram of a put wall configuration device according to yet other embodiments of the present disclosure. DETAILED DESCRIPTION
[0034] The following will be combined with the drawings in the embodiments of the present disclosure to clearly and completely describe the technical solutions in the embodiments of the present disclosure. Obviously, the described embodiments are only part of the embodiments of the present disclosure, rather than all the embodiments. The following description of at least one exemplary embodiment is actually only illustrative and is in no way intended to limit the present disclosure and its application or use. Based on the embodiments in the present disclosure, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present disclosure.
[0035] Unless specifically stated otherwise, the relative arrangement of components and steps, the numerical expressions and numerical values set forth in these embodiments do not limit the scope of the present disclosure.
[0036] At the same time, it should be understood that for the convenience of description, the sizes of the various parts shown in the drawings are not drawn according to the actual proportional relationship.
[0037] Technologies, methods, and equipment known to ordinary technicians in the relevant art may not be discussed in detail, but where appropriate, the technologies, methods, and equipment should be considered part of the specification.
[0038] In all examples shown and discussed herein, any specific values should be interpreted as merely exemplary and not limiting. Therefore, other examples of the exemplary embodiments may have different values.
[0039] It should be noted that like reference numerals and letters refer to like items in the following figures, and therefore, once an item is defined in one figure, it need not be further discussed in subsequent figures.
[0040] After analyzing relevant technologies, we found that due to the use of all slots, the actual SKU (Stock Keeping Unit) grouping strategy and slot utilization rate of the put wall are affected by the number of slots. The number of slots is generally determined directly by staff based on past experience. This can easily lead to problems such as excessive number of slots planned for a put wall in a project, resulting in low overall utilization and waste. Alternatively, too few slots can cause the slots to overflow during the put process, leading to frequent re-drops and inefficient put operations.
[0041] A technical problem to be solved by the embodiments of the present disclosure is: how to improve the efficiency of logistics processing.
[0042] First, the main components of the put wall are described exemplarily.
[0043] In some embodiments, the put wall includes put equipment, slot equipment, and a software system. The put equipment includes put carts, package supply stations, scanning equipment, and operation terminals; the slot equipment includes shelves, turnover boxes, radio frequency identification (RFID) tags, and card readers; and the software system includes a warehouse control system (WCS) and a scheduling system.
[0044] Then, the process of handling goods using a put wall is described as an example.
[0045] In some implementations, workers place goods on the packaging platform. Scanning equipment reads the goods' information and determines the slot to which they belong. The system dispatches a distribution cart to transport the goods. A belt on the cart transports the goods to the corresponding slot in the distribution wall, where they automatically drop into the corresponding turnover box. When a notification indicates that the corresponding turnover box is full, the box changer removes the box, places it in the designated location, and then places the empty box back in the slot.
[0046] In reverse logistics, such as returns, shelving staff will shelve goods from full turnover boxes, placing them in storage locations based on information such as SKU. Of course, put walls can also be used for shipping goods out of the warehouse, but this will not be discussed here.
[0047] It should be clear to those skilled in the art that the above embodiments are merely exemplary, and those skilled in the art may adopt other structures of the put wall as needed, or use the put wall to perform the put operation based on other usage processes.
[0048] Figure 1 shows a schematic flow chart of a method for configuring a put wall according to some embodiments of the present disclosure. As shown in Figure 1 , the method for configuring a put wall in this embodiment includes steps S102 to S106.
[0049] In step S102, for a plurality of candidate slot numbers of the put wall, resource consumption information corresponding to each slot number is determined.
[0050] For example, the candidate numbers of slots include a, b, and c, and the resource consumption information when the number of slots is a, the resource consumption information when the number of slots is b, and the resource consumption information when the number of slots is c can be calculated respectively.
[0051] Resource consumption information may be information on consumption of manpower or time. For example, resource consumption information includes at least one of the number of people changing boxes, the number of people putting things on shelves, and the duration of the task.
[0052] Changing the number of slots affects overall operational efficiency. For example, as the number of slots increases, the overall length of the put wall increases, increasing the walking time required for case changers to place full crates in designated locations. Another example is that increasing the number of slots reduces the number of SKUs in each crate, reducing the walking distance and sorting difficulty required for shelving personnel to complete the shelving of all SKUs in the crate, thereby shortening the time required for shelving personnel to do so.
[0053] In step S104, a target number of slots is selected from a plurality of candidate numbers of slots according to resource consumption information corresponding to each candidate number of slots.
[0054] In some embodiments, the number of slots that minimizes resource consumption is selected. For example, the number of slots that requires the least staff, or the number of slots that minimizes time consumption, or a combination of these two factors may be selected. Of course, other factors may also be considered. When resource consumption information is measured using multiple factors, it can be determined based on the weighted results of multiple dimensions, and the weights can be set as needed.
[0055] Of course, those skilled in the art may also determine the target number of slots comprehensively by combining resource consumption information with other information.
[0056] In step S106, the put wall is configured according to the target number of grid cells.
[0057] In some embodiments, a corresponding number of slots are opened in the put wall according to the target number of slots. For example, if the target number of slots is 80, 80 slots in the put wall may be opened.
[0058] There are many ways to configure the open slots in a put wall. For example, you can set the open slots to be available, so that when the system reads the slot information, it only reads the information of the open slots. For another example, for an expandable put wall, you can increase or decrease the actual size of the put wall by removing or adding slot modules.
[0059] The embodiments of the present disclosure can select a target number of slots based on resource consumption information corresponding to multiple slot numbers, and configure a distribution wall, so as to improve the utilization rate of the distribution wall slots while improving processing efficiency, thereby improving the overall efficiency of logistics processing.
[0060] An embodiment of a method for determining resource consumption information corresponding to each grid number is exemplarily described below with reference to FIG. 2 .
[0061] Figure 2 shows a flow chart of a method for determining resource consumption information according to some embodiments of the present disclosure. As shown in Figure 2 , the determination method of this embodiment includes steps S202 to S206.
[0062] In step S202 , the task parameters affected by the number of alternative grid cells are determined.
[0063] In some embodiments, the task parameters affected by the number of alternative slots include at least one of the unit time for changing boxes on the put wall and the unit time for putting goods on shelves.
[0064] The unit time for container exchange refers to the average time required by container exchange personnel to replace a container. This operation involves placing a container in the put wall into a designated location and placing a new empty container in the original slot. Since increasing the number of slots increases the overall length of the put wall, or the available portion of the put wall, the walking time required to place the container in the designated location after the exchange increases. In other words, the unit time for container exchange is positively correlated with the number of available slots.
[0065] The unit time required for a shelving operator to load items from a full container is the time it takes to shelve the items. This includes the average time it takes to reach the aisle and the average time it takes to walk within the aisle. As the number of slots increases, the variety of items in each container decreases, and the distance a shelving operator travels to complete the shelving operation for all items in the container decreases. In other words, the unit time required for a shelving operator to load items from the container is negatively correlated with the number of available slots.
[0066] In step S204, the task parameters are used to determine the representation of the total time for changing boxes and the representation of the total time for putting the goods on the shelves.
[0067] In some embodiments, the total container swap time is determined using the container swap unit time, the number of container swaps, and the number of people swapping. The number of container swaps can be simulated using the distribution order data to be processed. The total container swap time is positively correlated with the container swap unit time and the number of container swaps, and negatively correlated with the number of people swapping. For example, the total container swap time can be calculated by multiplying the product of the container swap unit time and the number of container swaps by the number of people swapping.
[0068] In some embodiments, the total time of shelving is determined by the shelving unit time, the number of shelving times, the shelving walking unit time, and the number of people shelving. The number of box changes can be obtained by simulating the data of the to-be-processed distribution order, or by simulating similar data based on the attribute information of the to-be-processed distribution order. The total time of shelving is positively correlated with the shelving unit time, the number of shelving times, and the shelving walking unit time, and is negatively correlated with the number of people shelving. For example, the sum of the shelving unit time and the shelving walking unit time is calculated, multiplied by the number of shelving times, and then the product is compared with the number of people shelving to obtain the total time of shelving.
[0069] The unit time for shelving travel includes the average time to reach the aisle and the average time to travel within the aisle. The average time to travel to the aisle can be considered a constant. The average time to travel within the aisle can be determined based on the average number of types of goods (e.g., SKUs) in the turnover box. In some embodiments, the average time to travel within the aisle is the difference between the average number of types of goods in the turnover box minus 1, divided by 3, and then multiplied by the aisle length.
[0070] In step S206, resource consumption information corresponding to the number of slots is determined with the constraint that the total distribution duration is not less than the total box-changing duration and the total shelf-putting duration.
[0071] The logistics processing process can be exemplarily divided into three stages: distribution, box changing, and shelving, and these three stages can be executed in parallel. The total distribution time is mainly affected by the mechanical operating efficiency of the distribution wall and is therefore relatively fixed. The total distribution time can be determined by simulating the distribution orders to be processed. The total box changing time and the total shelving time will be affected by the resources invested, for example, the manpower invested. Therefore, by making the total distribution time the maximum among the total distribution time, the total box changing time, and the total shelving time, the task parameters and resource consumption information that maximize the overall efficiency can be solved.
[0072] An embodiment of a method for determining the target number of grid openings will be described below with reference to FIG. 3 .
[0073] Figure 3 shows a flow chart of a method for determining a target number of openings according to some embodiments of the present disclosure. As shown in Figure 3 , the method for determining a target number of openings in this embodiment includes steps S302 to S306.
[0074] In step S302, the total broadcasting time is constrained to be no less than the total time for changing boxes and the total time for putting items on the shelves, and the number of people changing boxes in the representation of the total time for changing boxes and the number of people putting items on the shelves in the representation of the total time for putting items on the shelves are solved. Among them, the total time for changing boxes is also represented by the number of people changing boxes, and the total time for putting items on the shelves is also represented by the number of people putting items on the shelves.
[0075] In step S304, the total distribution time and total shelf time corresponding to the number of slots are determined using the calculated number of people changing boxes and the number of people putting items on shelves. That is, the number of people changing boxes and the number of people putting items on shelves are substituted into the representation of the total box changing time and the representation of the total shelf time, respectively.
[0076] In step S306, the task completion time is determined according to the maximum value among the total broadcasting time, the total box changing time and the total shelf-loading time.
[0077] This allows us to obtain resource consumption information, including total broadcast duration, total shelf time, and task completion time. This information allows us to comprehensively evaluate the resource consumption of each slot, thereby comprehensively predicting the effectiveness of each slot in terms of both manpower and efficiency.
[0078] In some embodiments, the put wall can be dynamically configured based on the actual broadcast task. For example, after reading the current pending broadcast task data from a database, the resource consumption information corresponding to each slot is calculated based on this data, and the target number of slots is determined, and the put wall is configured accordingly. As the broadcast task changes, the target number of slots can be re-determined. This allows the put wall configuration to adapt to the current broadcast task, further improving the processing efficiency of the broadcast task.
[0079] An embodiment of a configuration device for a put wall according to the present disclosure will be described below with reference to FIG4 .
[0080] Figure 4 illustrates a schematic diagram of a put wall configuration device according to some embodiments of the present disclosure. As shown in Figure 4 , the put wall configuration device 40 of this embodiment includes: a determination module 410 configured to determine resource consumption information corresponding to multiple candidate numbers of slots for the put wall; a selection module 420 configured to select a target number of slots from the multiple candidate numbers of slots based on the resource consumption information corresponding to each candidate number of slots; and a configuration module 430 configured to configure the put wall based on the target number of slots.
[0081] The configuration device 40 of the put wall can be configured in the software system of the put wall, or deployed in an independent computer system.
[0082] In some embodiments, the resource consumption information includes at least one of the number of people changing boxes, the number of people putting boxes on shelves, and the duration of the task.
[0083] In some embodiments, the determination module 410 is further configured to determine the task parameters affected by the alternative number of slots; use the task parameters to determine the representation of the total box change time and the representation of the total shelving time; and determine the resource consumption information corresponding to the number of slots with the constraint that the total broadcast time is not less than the total box change time and the total shelving time.
[0084] In some embodiments, the task parameters affected by the number of alternative slots include at least one of the unit time for changing boxes on the put wall and the unit time for putting goods on shelves.
[0085] In some embodiments, the unit time for changing containers is positively correlated with the number of available slots; the unit time for loading and unloading goods is negatively correlated with the number of available slots.
[0086] In some embodiments, the task parameters include the unit time of box change of the broadcast wall; the resource consumption information includes the number of people changing boxes; the representation of the total box change time is determined by the unit time of box change, the number of box changes and the number of people changing boxes.
[0087] In some embodiments, the total time for changing boxes is positively correlated with the unit time for changing boxes and the number of box changes, and negatively correlated with the number of people changing boxes.
[0088] In some embodiments, the task parameters include the unit time for putting goods on the shelves; the resource consumption information includes the number of people putting goods on the shelves; the representation of the total shelving time is determined by the unit time for putting goods on the shelves, the number of shelving times, the unit time for putting goods on the shelves and the number of people putting goods on the shelves.
[0089] In some embodiments, the total time of shelving is positively correlated with the unit time of shelving, the number of shelving times, and the unit time of shelving walking, and is negatively correlated with the number of people shelving.
[0090] In some embodiments, the unit time for walking to the rack includes the average time for walking to the aisle and the average time for walking in the aisle.
[0091] In some embodiments, the average time spent traveling within an aisle is determined based on the average number of types of goods in a tote.
[0092] In some embodiments, the total time for changing boxes is also represented by the number of people changing boxes, and the total time for putting boxes on the shelves is also represented by the number of people putting boxes on the shelves, and the determination module 410 is further configured to make the total broadcasting time not less than the total time for changing boxes and the total time for putting boxes on the shelves as constraints, and solve the number of people changing boxes in the representation of the total time for changing boxes, and the number of people putting boxes on the shelves in the representation of the total time for putting boxes on the shelves; use the solved number of people changing boxes and the number of people putting boxes on the shelves to determine the total broadcasting time and the total time for putting boxes on the shelves corresponding to the number of grids; and determine the task completion time based on the maximum value of the total broadcasting time, the total time for changing boxes and the total time for putting boxes on the shelves.
[0093] In some embodiments, the configuration module 430 is further configured to open a corresponding number of slots in the put wall according to the target number of slots.
[0094] An embodiment of a put wall configuration system disclosed herein will be described below with reference to FIG. 5 .
[0095] Figure 5 shows a schematic diagram of a put wall configuration system according to some embodiments of the present disclosure. As shown in Figure 5 , put wall configuration system 5 in this embodiment includes: a put wall configuration device 51, the specific implementation of which can refer to the put wall configuration device in any embodiment of the present disclosure; and a put wall 52.
[0096] In some embodiments, when the push wall 52 includes a software system, the configuration device 51 of the push wall can be deployed in an independent computing device outside the push wall; when the push wall 52 does not include a software system, the configuration device 51 of the push wall can be deployed in an independent computing device outside the push wall, or deployed in a software system that is compatible with the push wall 52.
[0097] Figure 6 shows a schematic diagram of a put wall configuration device according to other embodiments of the present disclosure. As shown in Figure 6 , the put wall configuration device 60 of this embodiment includes a memory 610 and a processor 620 coupled to the memory 610. The processor 620 is configured to execute the put wall configuration method of any of the aforementioned embodiments based on instructions stored in the memory 610.
[0098] The memory 610 may include, for example, a system memory, a fixed non-volatile storage medium, etc. The system memory may store, for example, an operating system, application programs, a boot loader, and other programs.
[0099] FIG7 shows a schematic diagram of the structure of a configuration device for a broadcast wall according to yet another embodiment of the present disclosure. As shown in FIG7 , the configuration device 70 for the broadcast wall of this embodiment includes: a memory 710 and a processor 720, and may also include an input / output interface 730, a network interface 740, a storage interface 750, and the like. These interfaces 730, 740, 750, as well as the memory 710 and the processor 720, can be connected, for example, via a bus 770. The input / output interface 730 provides a connection interface for input / output devices such as a display, mouse, keyboard, and touch screen. The network interface 740 provides a connection interface for various networked devices. The storage interface 750 provides a connection interface for external storage devices such as SD cards and USB flash drives.
[0100] An embodiment of the present disclosure further provides a computer-readable storage medium having a computer program stored thereon, wherein the program, when executed by a processor, implements any of the aforementioned methods for configuring a put wall.
[0101] Those skilled in the art will appreciate that embodiments of the present disclosure may be provided as methods, systems, or computer program products. Therefore, the present disclosure may take the form of a complete hardware embodiment, a complete software embodiment, or an embodiment combining software and hardware. Furthermore, the present disclosure may take the form of a computer program product implemented on one or more computer-usable non-transient storage media (including but not limited to magnetic disk storage, CD-ROM, optical storage, etc.) containing computer-usable program code.
[0102] The present disclosure is described with reference to the flowcharts and / or block diagrams of the methods, devices (systems), and computer program products according to the embodiments of the present disclosure. It should be understood that each process and / or box in the flowchart and / or block diagram, as well as the combination of the processes and / or boxes in the flowchart and / or block diagram, can be implemented by computer program instructions. These computer program instructions can be provided to a processor of a general-purpose computer, a special-purpose computer, an embedded processor, or other programmable data processing device to produce a machine, so that the instructions executed by the processor of the computer or other programmable data processing device produce a device for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.
[0103] These computer program instructions may also be stored in a computer-readable memory that can direct a computer or other programmable data processing device to operate in a specific manner, so that the instructions stored in the computer-readable memory produce a product including an instruction device that implements the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.
[0104] These computer program instructions can also be loaded onto a computer or other programmable data processing device so that a series of operating steps are executed on the computer or other programmable device to produce a computer-implemented process, so that the instructions executed on the computer or other programmable device provide steps for implementing the functions specified in one or more processes in the flowchart and / or one or more boxes in the block diagram.
[0105] The above description is only a preferred embodiment of the present disclosure and is not intended to limit the present disclosure. Any modifications, equivalent replacements, improvements, etc. made within the spirit and principles of the present disclosure should be included in the scope of protection of the present disclosure.
Claims
1. A method for configuring a place wall, comprising: For multiple candidate numbers of slots of the place wall, determine resource consumption information corresponding to each number of slots; Selecting a target number of grid cells from the plurality of candidate numbers of grid cells according to resource consumption information corresponding to each candidate number of grid cells; and The placement wall is configured according to the target number of grid openings.
2. The configuration method according to claim 1, wherein: The resource consumption information includes at least one of the number of people changing boxes, the number of people putting boxes on shelves, and the duration of the task.
3. The configuration method according to claim 1 or 2, wherein: The determination of resource consumption information corresponding to each number of grid cells includes: Determining task parameters affected by the number of alternative grids; Determine, using the task parameters, a representation of the total time for changing boxes and a representation of the total time for putting boxes on shelves; and The resource consumption information corresponding to the number of slots is determined with the constraint that the total broadcasting time is not less than the total box changing time and the total shelf putting time.
4. The configuration method according to claim 3, wherein: The task parameters affected by the number of alternative slots include at least one of a unit time for changing boxes on the distribution wall and a unit time for putting goods on shelves.
5. The configuration method according to claim 4, wherein: The unit time of box change is positively correlated with the number of the alternative slots; The unit time of the goods being put on the shelves is negatively correlated with the number of the alternative slots.
6. The configuration method according to any one of claims 3 to 5, wherein: The task parameters include the unit time of box change of the drop wall; The resource consumption information includes the number of people changing boxes; The total time for changing containers is determined by using the unit time for changing containers, the number of times containers are changed, and the number of people changing containers.
7. The configuration method according to claim 6, wherein: The total time for changing boxes is positively correlated with the unit time for changing boxes and the number of changing boxes, and negatively correlated with the number of people changing boxes.
8. The configuration method according to any one of claims 3 to 7, wherein: The task parameters include the unit time of goods being put on the shelves; The resource consumption information includes the number of people on the shelf; The total time of the shelf is characterized by the shelf unit time, the number of shelves, the shelf walking unit time and the shelf walking unit time. The number of people on the shelves is determined.
9. The configuration method according to claim 8, wherein: The total time for putting on the shelves is positively correlated with the unit time for putting on the shelves, the number of times of putting on the shelves and the unit time of walking on the shelves, and is negatively correlated with the number of people putting on the shelves.
10. The configuration method according to any one of claims 4 to 9, wherein: The unit time of walking to the rack includes the average time of walking to the lane and the average time of walking in the lane.
11. The configuration method according to claim 10, wherein: The average time of walking in the lane is determined according to the average number of types of goods in the turnover box.
12. The configuration method according to any one of claims 3 to 11, wherein: The total time for changing boxes is also characterized by the number of people changing boxes, and the total time for putting on shelves is also characterized by the number of people putting on shelves, and the resource consumption information corresponding to the number of slots is determined based on the constraint that the total time for distribution is not less than the total time for changing boxes and the total time for putting on shelves, including: Assuming that the total broadcasting duration is not less than the total box-changing duration and the total shelf-putting duration as constraints, solve the number of people who change boxes in the representation of the total box-changing duration and the number of people who put boxes in the representation of the total shelf-putting duration; Using the solved number of people changing boxes and number of people putting boxes on shelves, determine the total broadcasting time and total shelf time corresponding to the number of slots; The task completion time is determined according to the maximum value among the total broadcasting time, the total box changing time and the total shelf putting time.
13. The configuration method according to any one of claims 1 to 12, wherein: The configuring the place wall according to the target number of grids includes: In the distribution wall, a corresponding number of slots are opened according to the target number of slots.
14. A configuration device for a distribution wall, comprising: A determination module is configured to determine resource consumption information corresponding to each number of slots for a plurality of candidate numbers of slots of a place wall; A selection module is configured to select a target number of grid openings from a plurality of candidate numbers of grid openings according to resource consumption information corresponding to each candidate number of grid openings; as well as A configuration module is configured to configure the distribution wall according to the target number of grids.
15. A device for configuring a distribution wall, comprising: Memory; as well as A processor coupled to the memory, wherein the processor is configured to execute the method for configuring a put wall according to any one of claims 1 to 13 based on instructions stored in the memory.
16. A configuration system for a placement wall, comprising: The distribution wall configuration device according to claim 14 or 15; as well as Placement Wall.
17. A computer-readable storage medium having a computer program stored thereon, wherein when the program is executed by a processor, the method for configuring a place wall according to any one of claims 1 to 13 is implemented.
18. A computer program comprising: The instructions, when executed by a processor, cause the processor to execute the method for configuring a placement wall according to any one of claims 1 to 13.
Citation Information
Patent Citations
Commodity seeding unshelving and shelving method and device based on path optimization
CN110322069A
Order allocation method and device, equipment and storage medium
CN112967003A
Storage sowing method and sowing system
CN114873129A
Distribution wall configuration method, device and system and storage medium
CN116451957A
Commodity processing method, apparatus and device, warehousing system, and storage medium
WO2023051161A1