Construction method for in-water pile sinking based on mobile piling platform

By adopting auxiliary platforms and pile delivery track systems on the mobile pile driving platform, the accuracy and transportation difficulties of the traditional water pile sinking method under harsh conditions are solved, and efficient and stable water pile sinking construction is achieved.

WO2024244090A1PCT designated stage expired Publication Date: 2024-12-05CHINA HARBOUR ENGINEERING

Patent Information

Application Number
PCT/CN2023/103944
Authority / Receiving Office
WO · WO
Patent Type
Applications
Current Assignee / Owner
Priority Date
2023-06-02
Filing Date
2023-06-29
Publication Date
2024-12-05

AI Technical Summary

Technical Problem

The traditional method of water pile sinking is difficult to ensure the accuracy of pile driving under harsh hydrological and geological conditions. As the mobile pile driving platform advances, the transportation of steel pipe piles is difficult, affecting the construction efficiency.

Method used

Using the construction method based on the mobile pile driving platform, through the auxiliary platform and pile delivery track system, the pile delivery trolley and detachable connecting track beams and supporting tracks can be used to achieve efficient conveying and sinking of steel pipe piles, ensuring construction stability and advancement .

Benefits of technology

It has achieved efficient water pile sinking under harsh conditions, improved pile driving accuracy and construction efficiency, and ensured the stable conveying of steel pipe piles and the forward-looking platform.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN2023103944_05122024_PF_FP_ABST
    Figure CN2023103944_05122024_PF_FP_ABST
Patent Text Reader

Abstract

Disclosed in the present invention is a construction method for in-water pile sinking based on a mobile piling platform, which comprises the following steps: S1, constructing an auxiliary platform, assembling a mobile piling platform on the auxiliary platform, arranging a rail pile group on one side of the auxiliary platform, mounting a pile sending rail on the rail pile group, and mounting a pile sendind trolley on the pile sending rail; S2, sending, by the pile sending trolley, a single steel pipe pile loaded therein to a pile hoisting range, hoisting the steel pipe pile, and placing the steel pipe pile into a corresponding pile holding device for pile sinking, wherein after the steel pipe pile is hoisted, the pile sending trolley returns to a starting point to continue next pile sending operation; S3, repeating step S2 until the mobile piling platform completes construction of all the steel pipe piles in this span section, and extending the pile sending rail; S4, driving the mobile piling platform to move forwards by one span section, and repeating steps S2-S3 to carry out pile sinking construction of steel pipe piles in the next span section; and S5, repeating step S4 until the construction of all the steel pipe piles is completed. The present invention has the beneficial effect that constructing the pile sending rail depending on the steel pipe piles facilitates a conveying rail.
Need to check novelty before this filing date? Find Prior Art

Description

Construction method of underwater pile sinking based on mobile piling platform Technical Field

[0001] The present invention relates to the technical field of underwater pile driving, and more particularly to a construction method for underwater pile driving based on a mobile piling platform. Background Art

[0002] Water-based steel pipe piles are widely used in coastal water structures such as bridges and ports. Water-based pile sinking projects are often subject to the effects of waves year-round, especially when waves are high, turbulent, and severe. Traditional pile sinking methods, using a pile-driving vessel and a pile hammer, are difficult to operate and guarantee accurate pile driving. A Chinese patent application, Publication Number: CN107653858A, Publication Date: February 2, 2018, entitled "Water-Based Self-Elevating Pile-Top Movable Piling Platform and Construction Method Thereof," discloses a movable piling platform that utilizes pre-assembled steel pipe piles in place of the legs of the self-elevating platform and utilizes a jacking device to propel the platform forward. This platform allows for efficient steel pipe pile construction regardless of adverse hydrological and geological conditions. However, the platform faces challenges in transporting the steel pipe piles as the mobile piling platform advances.

[0003] Summary of the Invention

[0004] An object of the present invention is to solve at least the above problems and to provide at least the advantages which will be described hereinafter.

[0005] Another object of the present invention is to provide a construction method for sinking piles on water based on a mobile piling platform. The method is based on the mobile piling platform. While sinking piles underwater, the method relies on newly sunk steel pipe piles to construct a pile delivery track to facilitate the transportation of the track.

[0006] In order to achieve these purposes and other advantages according to the present invention, a construction method for sinking piles on water based on a mobile piling platform is provided, comprising the following steps:

[0007] S1. Build an auxiliary platform, assemble a mobile piling platform on the auxiliary platform, set up a track pile group on one side of the auxiliary platform, install a pile delivery track on the track pile group, and install a pile delivery trolley on the pile delivery track;

[0008] S2. A single steel pipe pile is loaded on a pile delivery trolley and transported to the pile hoisting range of a mobile piling platform. The mobile piling platform lifts the steel pipe pile and delivers it to the corresponding pile gripper for sinking. After the steel pipe pile is lifted, the pile delivery trolley returns to the starting point to continue the next pile delivery operation.

[0009] S3, repeat S2 until the mobile piling platform completes the construction of all steel pipe piles in the span, and extend the pile delivery track;

[0010] S4, driving the mobile piling platform forward one span, and repeating S2-S3 to sink the steel pipe piles of the next span;

[0011] S5. Repeat step S4 until all steel pipe piles are constructed.

[0012] Preferably, the auxiliary platform comprises 5 rows of platform piles, the 5 rows of platform piles are arranged at intervals along the moving direction of the mobile piling platform, and each row comprises 3 auxiliary piles arranged at intervals;

[0013] The track pile group is arranged in parallel with the auxiliary platform, including 5 track piles arranged at intervals, and the 5 track piles are arranged in a row with the five rows of platform piles.

[0014] Preferably, installing the pile delivery track on the track pile group includes the following steps:

[0015] A1. Install a steel pile cap on each track pile and a pedestrian walkway on one side of the track pile group;

[0016] A2. Installing track beams on top of the steel pile caps along the length of the track pile group, wherein the track beams include two rows arranged in parallel along the width of the track pile group, and each row of track beams includes multiple detachably connected I-beams;

[0017] A3. Install rails at the top of each track beam. A pair of rails constitutes a pile delivery track, wherein each track includes multiple detachably connected branch rails.

[0018] The butt joints of adjacent I-beams and adjacent branch rails are staggered.

[0019] Preferably, the butt joints of adjacent I-beams are located in the middle of two adjacent track piles, and the butt joints of adjacent branch rails are located above the steel pile caps.

[0020] Preferably, the ends of adjacent I-beams are detachably connected via an I-beam connector, wherein the I-beam connector comprises:

[0021] The I-shaped head is connected to the end of the adjacent I-beam, and its two ends are respectively matched with the corresponding I-beam ends. The I-shaped head includes a bottom plate, a vertical plate, and a top plate from bottom to top. The ends of the bottom plate and the top plate are both provided with docking blocks, and the ends of the I-beam corresponding to the I-shaped head are provided with docking grooves that match the docking blocks.

[0022] A pair of clamping plates are arranged on both sides of the vertical plate to match and form a pair of clamping parts. The pair of clamping parts are respectively docked and clamped with the middle plate bodies of the I-beams at both ends and fixed through bolts.

[0023] Preferably, adjacent branch rails are detachably connected via a branch rail connector, and the branch rail connector comprises:

[0024] The rail head is connected to the end of the adjacent branch rail, and its two ends are respectively abutted and matched with the corresponding branch rail ends. The rail head includes a rail plate, a connecting plate, and a base from bottom to top. The ends of the rail plate and the base are both provided with plug blocks, and the end of the branch rail corresponding to the rail head is provided with a slot that matches the plug block;

[0025] A pair of pressure plates are arranged on both sides of the vertical plate to match and form a pair of clamping grooves to clamp and fix the bases at both ends of the support rail connector. A pair of pressure plates extend to be pressed on the top of the track beam and are fixed to the track beam by bolts.

[0026] Preferably, the steel pipe piles constructed in each span include two track piles of the extended track pile group. After all the steel pipe piles in one span are constructed, a pile delivery track is extended based on the two track piles of the extended track pile group.

[0027] Preferably, the pile delivery trolley comprises a pair of electric flat cars arranged at intervals, the two electric flat cars are fixedly connected, wherein a receiving block with an arc-shaped groove is fixedly connected to the top of each electric flat car for limiting the load-bearing steel pipe piles.

[0028] Preferably, the steel pile cap is of jacket type, comprising a cylindrical pile sleeve and a pile plate provided on the top of the pile sleeve.

[0029] The present invention has at least the following beneficial effects:

[0030] Based on the mobile piling platform, while sinking piles underwater, the newly sunk steel pipe piles are used to construct a pile delivery track to facilitate the transportation of the track; wherein, the pile delivery track includes a track beam and a track that are staggered and docked, and is equipped with an I-beam connector and a support track connector to realize the detachable setting of the track beam and the track, while ensuring the stability of the overall pile delivery track, and at the same time facilitating the forward extension of the pile delivery track in coordination with the mobile piling platform; further, the I-beam connector includes an I-head and a splint, and the support track connector includes a track plate and a pressure plate, so as to realize the long-distance and short-distance coordinated positioning of the two docking ends and improve the positioning connection stability.

[0031] Other advantages, objectives and features of the present invention will be reflected in part from the following description and will be understood by those skilled in the art through study and practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] FIG1 is a schematic structural diagram of an origination platform according to one technical solution of the present invention;

[0033] FIG2 is a diagram showing the arrangement of the mobile piling platform and pile positions according to one technical solution of the present invention;

[0034] FIG3 is a schematic structural diagram of a pile delivery track and a pile delivery trolley according to one technical solution of the present invention;

[0035] FIG4 is a schematic structural diagram of a pile delivery track and a pile delivery trolley according to one technical solution of the present invention;

[0036] FIG5 is a schematic structural diagram of a track beam according to one technical solution of the present invention;

[0037] FIG6 is a schematic structural diagram of a track according to one of the technical solutions of the present invention.

[0038] The accompanying drawings are marked as follows: starting platform 1; auxiliary platform 10; platform pile 11; track pile group 12; track pile 13; pile delivery track 2; pedestrian walkway 20; pile delivery trolley 3; electric flat car 30; receiving block 31; mobile piling platform 4; steel pile cap 5; pile sleeve 50; pile plate 51; track beam 6; I-beam 60; I-beam connector 7; I-head 70; bottom plate 71; vertical plate 72; top plate 73; docking block 74; docking groove 75; clamping plate 76; clamping part 77; track 8; support track 80; support track connector 9; track plate 90; connecting plate 91; plug block 92; slot 93; pressure plate 94; clamping groove 95. DETAILED DESCRIPTION

[0039] The present invention is further described in detail below with reference to the embodiments so that those skilled in the art can implement the invention with reference to the description.

[0040] As shown in Figure 1-6, the construction method of underwater pile sinking based on a mobile piling platform includes the following steps:

[0041] 1. Construction of Departure Platform 1

[0042] As shown in FIG1 , the starting platform 1 includes an auxiliary platform 10 , a track pile group 12 provided on one side of the auxiliary platform 10 , a pile delivery track 2 installed on the track pile group 12 , and a pile delivery trolley 3 installed on the pile delivery track 2 ;

[0043] The auxiliary platform 10 is used to provide auxiliary support for the start of the mobile piling platform 4. The auxiliary platform 10 can be configured to include 5 rows of platform piles 11, which are arranged at intervals along the moving direction of the mobile piling platform 4. Each row of platform piles 11 includes 3 auxiliary piles arranged at intervals, that is, the platform piles 11 of the auxiliary platform 10 constitute 5 rows and 3 columns. In one specific solution, the auxiliary piles can be 1016mm×18mm steel pipe piles. The spacing between two adjacent rows of steel pipe piles can be 9m, and the distance between two adjacent steel pipe piles in the same row can be 8.75m.

[0044] The track pile group 12 is arranged in parallel with the auxiliary platform 10 and is located on one side of the auxiliary platform 10. Specifically, it may include five track piles 13 arranged at intervals along the moving direction of the mobile piling platform 4. The five track piles 13 include three initial 2.0m*2.0m*0.8m concrete piers (used to extend the installation support point of the pile delivery track 2 to facilitate the initial pile delivery of the pile delivery trolley 3) and two steel pipe piles. The spacing between adjacent track piles 13 along the moving direction of the mobile piling platform 4 can be 9m, and the distance between the track piles 13 and the adjacent platform piles 11 (located in the same row) can be 8.75m, that is, the track piles 13 are controlled to correspond one to one with the platform piles 11 in the corresponding row;

[0045] Among them, steel is used for welding between adjacent platform piles 11, between track piles 13, and between platform piles 11 and track piles 13;

[0046] 2. Assembly of Mobile Piling Platform 4

[0047] Assemble the mobile piling platform 4 to the auxiliary platform 10. In one specific solution, the assembly of the mobile piling platform 4 can be divided into chassis assembly structure assembly, platform assembly structure assembly, pile gripper installation, platform 400t crawler crane installation, platform piling equipment installation, platform ancillary facilities installation, etc.

[0048] 3. Construction of Pile Track 2

[0049] As shown in FIG3-4 , the installation of the pile delivery track 2 on the track pile group 12 includes the following steps:

[0050] A1. Install a steel pile cap 5 on each track pile 13 and install a pedestrian walkway 20 on one side of the track pile group 12. Specifically:

[0051] Installing the steel pile cap 5: A steel pile cap 5 is fixedly installed on each track pile 13. The steel pile cap 5 is of outer sleeve type, comprising a cylindrical pile sleeve 50 and a pile plate 51 provided at the top of the pile sleeve 50. The pile sleeve 50 can be specifically made of a 9.65 mm thick and 50 cm high steel plate rolled into a circular shape. The pile plate 51 can be specifically made of a 10 mm thick square steel plate with a size of 200 cm*200 cm. The pile plate 51 is fixed in a closed manner to the top of the pile sleeve 50.

[0052] Install the pedestrian walkway 20: The pedestrian walkway 20 is installed on the side of the steel pile cap 5 away from the platform pile 11. Specifically, it can be made of a 60 cm wide and 3 mm thick checkered steel plate. The pedestrian walkway 20 is equipped with 1.2 m high guardrails on both sides along the width direction for daily commuting and emergency escape of staff;

[0053] A2. Track beams 6 are installed at the top of the steel pile caps 5 along the length of the track pile group 12. The track beams 6 include two rows arranged in parallel along the width of the track pile group 12. Each row of track beams 6 includes multiple detachably connected I-beams 60. In one specific technical solution, the ends of adjacent I-beams 60 are detachably connected via an I-beam connector 7. As shown in FIG5 , the I-beam connector 7 includes:

[0054] The I-beam 70 is connected to the end of the adjacent I-beam 60, and its two ends are respectively abutted and matched with the corresponding ends of the I-beam 60. The I-beam 70 includes a bottom plate 71, a vertical plate 72, and a top plate 73 from bottom to top. The ends of the bottom plate 71 and the top plate 73 are both provided with docking blocks 74. The ends of the I-beam 60 corresponding to the I-beam 70 are provided with docking grooves 75 that match the docking blocks 74.

[0055] A pair of clamping plates 76 are provided on both sides of the vertical plate 72 to form a pair of clamping portions 77. The clamping portions 77 are respectively connected to the middle plates of the I-beam 60 at both ends and fixed with bolts;

[0056] A3. A track 8 is installed at the top of each row of track beams 6. A pair of tracks 8 constitutes the pile delivery track 2. Each track 8 includes a plurality of detachably connected branch tracks 80. In one specific technical solution, adjacent branch tracks 80 are detachably connected via a branch track connector 9. As shown in FIG6 , the branch track connector 9 includes:

[0057] The rail head is connected to the end of the adjacent branch rail 80, and its two ends are respectively abutted and matched with the corresponding ends of the branch rail 80. The rail head includes a rail plate 90, a connecting plate 91, and a base from bottom to top. The ends of the rail plate 90 and the base are both provided with plug blocks 92. The end of the branch rail 80 corresponding to the rail head is provided with a slot 93 that matches the plug block 92.

[0058] A pair of pressure plates 94 are provided on both sides of the vertical plate 72 to match and form a pair of clamping grooves 95 to clamp and fix the bases at both ends of the support rail connector 9. The pair of pressure plates 94 extend to press on the top of the track beam 6 and are fixed to the track beam 6 by bolts;

[0059] The docking points of adjacent I-beams 60 and adjacent branch rails 80 are staggered. Preferably, the docking points of adjacent I-beams 60 (I-beam connectors 7) are located in the middle of two adjacent track piles 13, and the docking points of adjacent branch rails 80 (branch rail connectors 9) are located above the steel pile caps 5.

[0060] 4. Installation of pile delivery trolley 3

[0061] The pile delivery trolley 3 is hoisted to the pile delivery track 2. The pile delivery trolley 3 can be composed of two 20t electric flat cars 30 in the front and rear. The motor model is YVPEJ3.0, the operating speed is 20m / min, and the buffer stroke is 118mm. The two pile delivery trolleys 3 are welded together with steel. The top of each electric flat car 30 is fixed with a receiving block 31 with an arc-shaped groove for limiting the load-bearing steel pipe pile. The front end of the steel pipe pile protrudes from the front electric flat car 30 to facilitate the subsequent tying of the end cable. The two electric flat cars 30 are spaced apart in the middle, which is also conducive to the subsequent tying of the middle cable.

[0062] 5. Pile driving construction

[0063] 5.1. Hoist the steel pipe piles onto the pile delivery trolley 3. Specifically, a 150t crawler crane can be used to hoist the steel pipe piles shipped from the steel pipe pile processing plant by a gun carriage (which can simultaneously transport 3 steel pipe piles) onto the pile delivery trolley 3.

[0064] 5.2. The driver of the pile delivery trolley 3 follows the pile delivery trolley 3 at a safe distance of more than 5m, and controls the pile delivery trolley 3 to carry a single steel pipe pile forward on the pile delivery track 2 by remote control until it is within the pile lifting range of the mobile piling platform;

[0065] 5.3. Tie the mooring cables to the front end and the middle of the steel pipe pile on the pile delivery trolley 3, then move the other end of the mooring cables to the mobile piling platform 4 and fix the other ends of the two mooring cables to the piling platform. Then, use a 400t crawler crane to fix the automatic unhooking device to the top end of the steel pipe pile and lift it. The lifted steel pipe pile is then hoisted into the corresponding pile gripper and sunk. During the lifting process of the steel pipe pile, the mooring cables are tightened and loosened to ensure that the steel pipe pile does not swing or rotate excessively when leaving the trolley and when it is suspended.

[0066] 5.4. After the pile hoisting operation is completed, the driver of the pile delivery vehicle 3 shall maintain a safe distance of more than 5m behind the vehicle and walk on the pedestrian walkway 20 to follow the vehicle back to the starting point;

[0067] 5.5. Repeat steps 5.1-5.4 until the mobile piling platform completes the construction of all steel pipe piles in the span. As shown in FIG2 , the mobile piling platform needs to complete the construction of 7 steel pipe piles in each span, including 2 track piles 13 of the extended track pile group 12.

[0068] 5.6. Extending and setting the pile delivery track 2 based on the two track piles 13 of the extended track pile group 12 specifically includes the following steps:

[0069] 5.6.1. Install the steel pile cap 5 on the new track pile 13 and extend the pedestrian walkway 20 on one side of the track pile group 12;

[0070] 5.6.2. Install the track beam 6 on top of the newly installed steel pile cap 5 along the length of the track pile group 12;

[0071] 5.6.3. Install the track at the top of each newly installed track beam 6;

[0072] 5.7. Drive the mobile piling platform forward one span and repeat steps 5.1-5.6 to sink the steel pipe piles for the next span.

[0073] 5.8. Repeat step 5.7 until all steel pipe piles are constructed.

[0074] Although the embodiments of the present invention have been disclosed above, they are not limited to the applications listed in the description and implementation methods. They can be fully applied to various fields suitable for the present invention. For those familiar with the art, additional modifications can be easily implemented. Therefore, without departing from the general concept defined by the claims and the scope of equivalents, the present invention is not limited to the specific details and illustrations shown and described herein.

Claims

1. A construction method for sinking piles on water based on a mobile piling platform, characterized in that: The following steps are involved: S1. construct an auxiliary platform, assemble a mobile piling platform on the auxiliary platform, set a track pile group on one side of the auxiliary platform, install a pile delivery track on the track pile group, and install a pile delivery trolley on the pile delivery track; S2, a single steel pipe pile is carried by a pile delivery trolley and transported to the pile lifting range of a mobile piling platform, the steel pipe pile is lifted by the mobile piling platform, and sent into a corresponding pile gripper for pile sinking, wherein, after the lifting of the steel pipe pile is completed, the pile delivery trolley returns to the starting point to continue the next pile delivery operation; S3, repeat S2 until the mobile piling platform completes the construction of all steel pipe piles in the span, and extend the pile delivery track; S4, driving the mobile piling platform forward one span, and repeating S2-S3 to carry out pile sinking construction of the next span of steel pipe piles; S5. Repeat step S4 until all steel pipe piles are constructed.

2. The method for constructing piles on water based on a mobile piling platform according to claim 1, characterized in that: The auxiliary platform includes 5 rows of platform piles, which are arranged at intervals along the moving direction of the mobile piling platform, and each row includes 3 auxiliary piles arranged at intervals; The track pile group is arranged in parallel with the auxiliary platform, including 5 track piles arranged at intervals, and the 5 track piles are arranged in a row with the five rows of platform piles.

3. The method for pile sinking on water based on a mobile piling platform as claimed in claim 1, characterized in that: The installation of the pile delivery track on the track pile group includes the following steps: A1. Install a steel pile cap on each track pile and install a pedestrian walkway on one side of the track pile group; A2. Installing a track beam at the top of the steel pile cap along the length direction of the track pile group, wherein the track beam comprises two rows arranged in parallel along the width direction of the track pile group, and each row of track beams comprises a plurality of detachably connected I-beams; A3. Install a track at the top of each track beam, a pair of tracks constitutes a pile delivery track, wherein each track includes a plurality of branch tracks that can be detachably connected; Wherein, the butt joints of adjacent I-beams and adjacent branch rails are staggered.

4. The method for constructing piles on water based on a mobile piling platform as claimed in claim 3, characterized in that: The butt joints of adjacent I-beams are located in the middle of two adjacent track piles, and the butt joints of adjacent branch rails are located above the steel pile caps.

5. The method for sinking piles on water based on a mobile piling platform as claimed in claim 3, characterized in that: The ends of adjacent I-beams are detachably connected via an I-beam connector, and the I-beam connector comprises: An I-shaped head, which is butted against the end of an adjacent I-shaped steel beam, and both ends are respectively butted against the corresponding ends of the I-shaped steel beams. The I-shaped head comprises a bottom plate, a vertical plate, and a top plate from bottom to top. The ends of the bottom plate and the top plate are both provided with butt blocks, and the ends of the I-shaped steel beams corresponding to the I-shaped head are provided with butt grooves matching the butt blocks; A pair of clamping plates are arranged on both sides of the vertical plate to match and form a pair of clamping parts, and the pair of clamping parts are respectively connected and clamped with the middle plate bodies of the I-beams at both ends and fixed by bolts.

6. The method for constructing piles on water based on a mobile piling platform as claimed in claim 3, characterized in that: Adjacent branch rails are detachably connected via a branch rail connector, and the branch rail connector includes: A rail head, which is butted against the end of the adjacent branch rail, and the two ends are respectively abutted and matched with the corresponding end of the branch rail. The rail head comprises a rail plate, a connecting plate, and a base from bottom to top. The ends of the rail plate and the base are both provided with plug blocks, and the end of the branch rail corresponding to the rail head is provided with a slot matching the plug block; A pair of pressing plates are arranged on both sides of the vertical plate to match and form a pair of clamping grooves to clamp and fix the bases at both ends of the support rail connector. The pair of pressing plates extend to be pressed on the top of the rail beam and are fixed to the rail beam by bolts.

7. The method for sinking piles on water based on a mobile piling platform as claimed in claim 6, characterized in that: The steel pipe piles constructed in each span include two track piles of the extended track pile group. After all the steel pipe piles in one span are constructed, a pile delivery track is extended and set based on the two track piles of the extended track pile group.

8. The method for sinking piles on water based on a mobile piling platform as claimed in claim 1, characterized in that: The pile delivery trolley comprises a pair of electric flat cars arranged at intervals, the two electric flat cars are fixedly connected to each other, wherein a receiving block with an arc-shaped groove is fixedly connected to the top of each electric flat car for limiting the load-bearing steel pipe piles.

9. The method for constructing piles on water based on a mobile piling platform as claimed in claim 3, characterized in that: The steel pile cap is of jacket type, comprising a cylindrical pile sleeve and a pile plate arranged at the top of the pile sleeve.

Citation Information

Patent Citations

  • Pile block movable platform steel pipe pile driving construction method

    CN105421453A

  • Construction and installation structure and construction method of trestle-free steel girder sliding rail

    CN115262414A

  • Simple pile supply platform equipment for shore-connected wharf pile foundation construction

    CN212668345U

  • Method for driving piles according to the front construction principle and device for carrying out the method

    DE2163708A1

  • Guide frame apparatus for piling of casing andconstruction of inserting inconcrete Pile on the sea oron the river

    KR100733263B1

Cited By

  • Construction method and system for deepwater port steel pipe pile foundation

    NL2040896A

  • Lug-free pile driving follower for offshore wind power jacket foundation, and installation method

    WO2026091701A1