Electromagnet system, electromagnet system calculation method, method for manufacturing electromagnet system, and electromagnet system arithmetic device
By calculating and installing a second electromagnet with a specific magnetic pole shape, the method addresses the inefficiency of electromagnet systems in rental services, enabling efficient reuse and reducing costs by adjusting magnetic field distributions to meet various application needs.
Patent Information
- Application Number
- PCT/JP2024/002775
- Authority / Receiving Office
- WO · WO
- Patent Type
- Applications
- Current Assignee / Owner
- Priority Date
- 2023-05-29
- Filing Date
- 2024-01-30
- Publication Date
- 2024-12-05
AI Technical Summary
Existing electromagnet systems are inefficient in rental services due to the difficulty in adjusting magnetic fields to meet varying application requirements, leading to idle equipment and high manufacturing costs for each specific application.
A method that involves using a first electromagnet, a sensor to measure its magnetic field distribution, and a calculation unit to determine the current distribution for a second electromagnet, allowing for the adjustment of magnetic pole shapes to generate different magnetic field distributions, enabling the same electromagnet system to be reused for different applications by installing a second electromagnet with a calculated magnetic pole shape.
This approach enhances the efficiency of electromagnet system rental services by allowing for quick and cost-effective adjustments to meet diverse magnetic field requirements, reducing the need for new equipment and minimizing idle time.
Smart Images

Figure JP2024002775_05122024_PF_FP_ABST
Abstract
Description
Electromagnet system, electromagnet system calculation method, electromagnet system manufacturing method, and electromagnet system calculation device
[0001] The present invention relates to an electromagnet system, an electromagnet system calculation method, an electromagnet system manufacturing method, and an electromagnet system calculation device.
[0002] Background art in this technical field is found in International Publication WO 2016 / 133204 (Patent Document 1), which states: "A shimming method is provided in which, based on magnetic field measurement values, a virtual current plane is assumed that surrounds the measurement position, and a current distribution (or magnetic moment distribution) that reproduces the measured magnetic field is reproduced through a current potential, and the reproduced magnetic field distribution is reproduced. A magnetic moment or current distribution that reproduces the magnetic field distribution acquired by a magnetic field measurement device is estimated on a predetermined closed surface, and the magnetic field distribution of an arbitrary point within the closed surface is estimated from the estimated magnetic moment or current distribution. Then, based on the estimated magnetic field distribution, a distribution of shim magnetic bodies that generates a correction magnetic field that corrects the magnetic field distribution at the arbitrary point is output" (see Abstract).
[0003] Another background art is Japanese Patent Laid-Open Publication No. 2021-26695 (Patent Document 2), which states, "A management server of a rental equipment management system has a processor and memory, and manages rented equipment. The processor collects operation information for each piece of equipment, extracts equipment whose operation information does not meet specified operation conditions as equipment that can be borrowed, and generates borrowed equipment information that includes geographic information on the use of the extracted equipment. The processor receives demand information for the use of the equipment, compares the geographic information included in the demand information with the geographic information included in the borrowed equipment information, and generates borrowability information for equipment in the borrowed equipment information that meets specified geographic conditions" (see abstract).
[0004] International Publication No. 2016 / 133204 Japanese Patent Application Laid-Open No. 2021-26695
[0005] However, the techniques disclosed in Patent Documents 1 and 2 have room for improvement in terms of increasing the efficiency of an electromagnet system rental system. Therefore, an object of the present invention is to provide an electromagnet system, an electromagnet system calculation method, an electromagnet system manufacturing method, and an electromagnet system calculation device that can increase the efficiency of an electromagnet system rental service.
[0006] In order to solve the above problem, the present invention comprises a first electromagnet, a sensor that measures the magnetic field distribution of the magnetic field generated by the first electromagnet, and a calculation unit that uses data regarding the magnetic pole shape of the first electromagnet to calculate a current distribution that indicates the magnetic pole shape of a second electromagnet that, when used in combination with the first electromagnet, generates a required magnetic field distribution that is a magnetic field distribution different from the magnetic field distribution.
[0007] According to the present invention, it is possible to improve the efficiency of the rental service of the electromagnet system. Problems, configurations, and effects other than those described above will become apparent from the following description of the embodiments.
[0008] FIG. 1 is a block diagram illustrating the flow of a rental service for an electromagnet system according to a first embodiment of the present invention. FIG. 2 is a system configuration diagram illustrating an example of the configuration of an electromagnet system according to a first embodiment of the present invention. FIG. 3 is a block diagram illustrating the electrical connections of a control device and the like of an electromagnet system according to a first embodiment of the present invention. FIG. 4 is a flowchart illustrating processing executed by a calculation unit in a control device and the like of an electromagnet system according to a first embodiment of the present invention. FIG. 5 is a system configuration diagram illustrating an example of the configuration of an electromagnet system according to a first embodiment of the present invention in which a second electromagnet is installed. FIG. 6 is a block diagram illustrating the flow of a rental service for an electromagnet system according to a second embodiment of the present invention.
[0009] An embodiment of the present invention will be described below with reference to the drawings. First, the problem of this embodiment will be described. In this embodiment, a system equipped with an electromagnet and configured to achieve a predetermined purpose by generating a magnetic field by this electromagnet will be referred to as an "electromagnet system." In an electromagnet system, a magnetic field is generated by passing current through an electromagnet having a coil-shaped winding. In recent years, electromagnet systems have been used in research and development in various fields, such as the medical field, nuclear fusion field, and electrification field. Until now, electromagnet systems used in this research and development have been individually designed and manufactured to generate the required magnetic field for the application. Furthermore, depending on the research application, a highly accurate magnetic field is required for the electromagnet system, and the magnetic field must be adjusted to take into account variations between systems, such as manufacturing errors.
[0010] Here, Patent Document 1 discloses a technology aimed at adjusting variations in the magnetic field of an electromagnet system due to manufacturing errors. Thus, when manufacturing an electromagnet system, it is necessary to adjust the magnetic field taking into account variations in each device, such as manufacturing errors. However, because electromagnet systems are manufactured for specific research purposes, once the research purpose is achieved, the electromagnet system that was previously in use may become idle and be held by the relevant research institution.
[0011] In response to this issue, in order to avoid such idleness of general equipment, efforts have been made to avoid idle equipment through rental services, etc. The technology of Patent Document 2 aims to improve the utilization rate of construction equipment in rental services by managing operation information and location information of construction equipment. However, in electromagnet systems, the magnetic field required often differs depending on the application, and with existing rental services that provide equipment with the same equipment configuration, it is often difficult to reuse an electromagnet system that has finished being used for one application for another. To address this issue, until now, the only option has been to manufacture each electromagnet system individually for each application.
[0012] However, it is desirable to provide a rental service for electromagnet systems as well, so that an electromagnet system that has completed rental for a certain purpose can be offered for rental for the next purpose simply by adjusting the electromagnet system in a short time and at low cost. Below, a description will be given of a technology that makes it possible to provide an electromagnet system for rental service by simply adjusting it in a short time and at low cost, thereby improving the efficiency of the electromagnet system rental service. Embodiment 1
[0013] FIG. 1 is a block diagram illustrating the flow of an electromagnet system rental service according to the first embodiment. As shown in FIG. 1 , the service is used by a manufacturer 11 that manufactures and adjusts an electromagnet system 101 ( FIG. 2 ) and an owner 12 (such as a leasing company or rental company for the electromagnet system 101) of the electromagnet system 101 manufactured and adjusted (including maintenance and inspection) by the manufacturer 11. The service is also used by users A and B who rent the electromagnet system 101 from the owner 12 (hereinafter, "rental" includes various forms of lending, such as leasing). While only two users, users A and B, are described here, there may be more users. Below, consider a situation in which user A's use of the electromagnet system 101 provided by owner 21 to user A ends, and then owner 21 next rents the same electromagnet system 101 to user B. Here, the magnetic field (required magnetic field) required by user B from the electromagnet system 101 is typically different from the magnetic field required by user A. Therefore, if the owner 21 were to rent the electromagnetic system 101 that the user A had been using to the user B, the owner 21 would not be able to meet the needs of the user B.
[0014] First, the manufacturer 11 "provides" the electromagnet system 101 to the owner 21 and also provides a service of "maintenance and inspection" of the electromagnet system 101 (step S11). The owner 21 of the electromagnet system 101 provides the manufacturer 11 with information necessary for maintaining the electromagnet system 101, such as "operation information" of the electromagnet system 101 (information on the magnetic field when the electromagnet system 101 is operating, the cooling time of the cooling device of the superconducting system, etc.) (step S12). This is because the manufacturer 11 knows the product information of the electromagnet system 101, but does not know how the electromagnet system 101 is used, and this information can only be known by the user of the electromagnet system 101.
[0015] The owner 21 lends the electromagnet system 101 to user A (device lending) (step S13). When user A of the electromagnet system 101 uses the electromagnet system 101, magnetic field data measured by the magnetic field distribution measuring sensor (sensor) 103 ( FIG. 2 ) of the electromagnet system 101 and operation data (magnetic field / operation data) of the electromagnet system 101 are stored in the control device 104 ( FIG. 2 ) of the electromagnet system 101 (S15). For user B who requests a different magnetic field (requested magnetic field) from the same electromagnet system 101, the manufacturer 11 "proposes" a magnetic pole shape for a second electromagnet 321 ( FIG. 5 ) to be installed in addition to the first electromagnet (superconducting electromagnets 110, 114 ( FIG. 2 )) originally installed in the electromagnet system 101 (step S14). In other words, user B's requested magnetic field from the electromagnet system 101 is different from that of user A. Therefore, the manufacturer 11 proposes a magnetic pole shape for a second electromagnet 321 that can be additionally installed in the electromagnet system 101 to realize the magnetic field required by user B, manufactures the second electromagnet 321, and "installs" it additionally in the electromagnet system 101 (step S14).
[0016] The manufacturer 11 may also include an electromagnet system calculation device 311. As will be described later, the manufacturer 11 performs predetermined calculation processing, and this calculation may be performed by a control device 104 (FIG. 2) of the electromagnet system 101, which will be described later, or by the electromagnet system calculation device 311.
[0017] FIG. 2 is a system configuration diagram showing an example of the configuration of an electromagnet system according to the first embodiment. The electromagnet system 101 meets demands such as, for example, verifying a specific object in a magnetic field environment or providing a large space with a uniform magnetic field that can accommodate a specific device. The example shown in FIG. 2 is an example in which superconducting electromagnets 110 and 114 are installed as first electromagnets. In this example, the superconducting electromagnets 110 and 114 are arranged one above the other. The superconducting electromagnets 110 and 114 have basically the same configuration, and the same reference numerals are used to designate common components. The superconducting electromagnet 110 is arranged inside a cryostat 160 arranged above and below, via a load support 161. The superconducting electromagnet 110 includes a winding core 112, a superconducting coil winding 111, and a cooling member 113. The superconducting electromagnet 114 also has a similar configuration.
[0018] The cryostat 160 can be a known cryogenic vacuum vessel or the like, and is made of, for example, metal such as stainless steel or aluminum alloy, or fiber-reinforced plastics (FRP). The load support 161 is not limited in its configuration, but is required to reduce heat penetration and support a powerful electromagnetic force, so it is desirable to use a material with low thermal conductivity and relatively high strength. For example, FRP is preferable.
[0019] The superconducting coil winding 111 is connected to the lead-in terminals 121a and 121b via superconducting power leads 122a and 122b, and further to a conductor 174. The conductor 174 connects the excitation power supply 120 to the superconducting electromagnets 114 and 110, and a control signal for operating the excitation power supply 120 is sent from the control device 104 to the excitation power supply 120 via a signal line 172. Meanwhile, the current value, voltage value, etc. during operation of the excitation power supply 120 are sent to the control device 104 via the signal line 172 and stored.
[0020] The wire material used for the superconducting coil winding 111 is not particularly limited in its composition, but may be, for example, a copper oxide-based high-temperature superconducting material (YBa 2 Cu 3 O7-δ , Bi 2 Sr 2 Ca 2 Cu 3 O 10 wire rods made of niobium titanium (NbTi) material, niobium tritin (Nb 3 Sn) material, magnesium diboride (MgB 2 It is preferable that the wire material used for the superconducting coil winding 111 is made of a material such as a ferroelectric material. The surface of the wire material used for the superconducting coil winding 111 may be coated with a heat-resistant material such as glass or an insulating material.
[0021] The cooling member 113 is connected to the cooling device 130 via a good thermal conductor 170. The cooling device 130 is connected to the control device 104 via a signal line 173, and its operation is controlled by the control device 104, with its operation data being transmitted to the control device 104 and stored. The good thermal conductor 170, which is a member that transmits cool air, is preferably made of, for example, copper, silver, aluminum, or the like. The good thermal conductor 170 may be made of a single good thermal conductor or may be made of a combination of multiple good thermal conductors, and can take any form as needed.
[0022] The cooling device 130 may be one having a known configuration, such as a Ginzburg-McMahon refrigerator, a Stirling refrigerator, or a pulse tube refrigerator. The cooling device 130, the good thermal conductor 170, or the cooling member 113 may be provided with a heater or a temperature measuring element for adjusting the temperature. In this case, the measurement results obtained by the heater 331 or the temperature measuring element 332 are transmitted to the control device 104, and the cooling of the cooling device 130 or the heating of the heater is feedback-controlled by the control device 104.
[0023] Furthermore, a temperature measuring element 50 is disposed on the surface of the first electromagnet, such as the superconducting coil winding 111, and the detected temperature transmitted via a signal line 171 is stored in a memory device 142. Based on this detected temperature, the current of the superconducting coil winding 111 is feedback-controlled by a control device 104. The temperature measuring element 50 is preferably bonded to the superconducting coil winding 111 to be measured with a resin or the like to reduce thermal resistance, but the bonding method is not particularly limited, and pressure bonding by pressing with a spring or the like may also be used. The temperature measuring element 50 may have a known configuration, and for example, a chromel-constantan thermocouple, a gold-iron thermocouple, a resistance measurement temperature sensor, or the like may be used.
[0024] In the electromagnet system 101, a magnetic field can be generated from the superconducting electromagnets 110, 114 by energizing them with an excitation power supply 120. This generated magnetic field is measured using a magnetic field distribution measurement sensor (sensor) 103 in a required magnetic field space 115 (a space in which a user wants to generate a desired magnetic field). The magnetic field distribution measurement sensor 103 can be realized by a plurality of Hall elements, NMR sensors, etc., arranged at intervals. The measured magnetic field measurement data is transmitted to the control device 104 via a signal line 116 and stored.
[0025] The magnetic field distribution measurement sensor 103 is fastened to a drive mechanism 106 and a shaft 109, and can be moved by the drive mechanism 106 to move within the required magnetic field space 115 to measure the magnetic field distribution. The drive mechanism 106 is supported, for example, via a support 107 below the cryostat 160 of the superconducting electromagnet 110. This drive mechanism 106 can also be controlled by the control device 104 via a signal line 175. Because the drive mechanism 106 must operate in a magnetic field, it is preferable to use a known ultrasonic motor or the like that is less susceptible to magnetic fields. Because the shaft 109 is also used in a magnetic field, it is preferable to use a shaft made of a non-magnetic, general metal material or FRP.
[0026] Next, the configuration of the control device 104 that controls the electromagnet system 101 will be described. FIG. 3 is a block diagram schematically illustrating the electrical connections of the control device. As described above, the control device 104 can communicate with the excitation power supply 120, cooling device 130, temperature measuring element 50, magnetic field distribution measuring sensor 103, and the like of the electromagnet system 101 via the respective signal lines. As shown in FIG. 3 , a central processing unit (CPU) 141 incorporated as the core of the control device 104 reads a program 301 stored in a storage device 142, expands it in a work area, and executes the program 301 to control each component (control unit 302). Furthermore, as described below, the CPU 141 executes the program 301 to perform various calculations (calculation unit 303).
[0027] The CPU 141 generates a control signal and controls target devices (such as the excitation power supply 120, the cooling device 130, the temperature measuring element 50, and the magnetic field distribution measuring sensor 103) via a communication unit 145, which is a communication interface. Examples of control information include a relational expression for an operation command for the target devices based on the difference between a target current and a measured current value, and information on a gain used during feedback control. In addition, data sensed by the measuring elements (such as the temperature measuring element 50 and the magnetic field distribution measuring sensor 103) is stored in the storage device 142 via the communication unit 145. The sensed data and operating data generated through communication with each control device are displayed on a display device 144.
[0028] The storage device 142 has stored data relating to the arrangement of line currents of the superconducting electromagnets 110 and 114 (first electromagnets) (i.e., data relating to the magnetic pole shape of the first electromagnets) since the manufacture of the electromagnet system 101. Here, the magnetic fields of the superconducting electromagnets 110 and 114 are calculated from the currents. When calculating the magnetic field, the currents are calculated as lines. In other words, the line current is a current regarded as a line in this case, and serves as the basis for calculating the magnetic fields of the superconducting electromagnets 110 and 114. The storage device 142 also stores the magnetic field distribution calculated by the CPU 141 from the arrangement of the line currents of the superconducting electromagnets 110 and 114 (first electromagnets). The control device 104 does not have the function of displaying the arrangement of the line currents of the superconducting electromagnets 110 and 114 (first electromagnets) on the display device 144, but does have the function of displaying the calculated magnetic field distribution, as described below. Data regarding the arrangement of the line currents of the superconducting electromagnets 110, 114 (first electromagnets) may be stored in the memory device 142, or may be stored in an external memory device (such as a server) rather than in the memory device 142.
[0029] The storage device 142 includes a RAM (Random Access Memory) that serves as the work area for the CPU 141 to execute the program 301. The storage device 142 includes, for example, a main storage device and an auxiliary storage device such as a ROM (Read Only Memory), a RAM, an SSD (Solid State Drive), or an HDD (Hard Disk Drive). The communication unit 145 includes, for example, an Ethernet port, a USB port, a GPIB port, a D-sub port, etc.
[0030] The control device 104 further includes an input device 143, an output device 146, and a display device 144. The input device 143 serves as an input unit and has a function of accepting input operations by an operator, and is composed of, for example, a keyboard, a camera, a mouse, a touch panel, a microphone for accepting voice input, etc. By operating the input device 143, the operator of the control device 104 can display a desired image on the display device 144, and can display the magnetic field distribution calculated from the line current of the superconducting electromagnets 110 and 114 (first electromagnets), the measured magnetic field distribution, other measurement data such as temperature, operation data of the control equipment, etc.
[0031] The display device 144 is, for example, a liquid crystal display, an organic EL display, or the like. The output device 146 is, for example, composed of an Ethernet port, a USB (Universal Serial Bus) port, or the like. The display device 144 and the output device 146 each serve as an output unit, and output data related to the magnetic pole shape of the second electromagnet 321 ( FIG. 5 ), enabling a proposal of the magnetic pole shape of the second electromagnet 321 to be made to user B. The electromagnet system calculation device 311 also has the same hardware configuration as the control device 104, except that it is not connected to the main body of the electromagnet system 101 by the signal line. However, the electromagnet system calculation device 311 does not have the functions of the control unit 302, and only has the functions of the calculation unit 303.
[0032] Next, the work performed by the manufacturer 11 will be described. The manufacturer 11 executes an electromagnet system calculation method and an electromagnet system manufacturing method. The electromagnet system calculation method includes the following first and second steps, and the electromagnet system manufacturing method includes the following first to fourth steps.
[0033] (1) First Step The manufacturer 11 uses the control device 104 or the electromagnet system calculation device 311 to calculate a current distribution indicating the magnetic pole shape of the second electromagnet 321 (FIG. 5) (described later).
[0034] (2) Second Step The current distribution indicating the magnetic pole shape of the second electromagnet 321 calculated in the first step is outputted by the display device 144 and the output device 146 .
[0035] (3) Third Step: The second electromagnet 321 is manufactured based on the current distribution data that indicates the magnetic pole shape of the second electromagnet 321 calculated in the first step and that is output in the second step.
[0036] (4) Fourth Step: The second electromagnet 321 manufactured in the third step and its peripheral devices are appropriately installed in the electromagnet system 101.
[0037] Next, the content of the calculation in the first step will be described in detail. The control device 104 or the electromagnet system calculation device 311 stores data related to the magnetic pole shape of the first electromagnet (superconducting electromagnets 110, 114) in the storage device 142. The calculation unit 303 uses the data related to the magnetic pole shape of the first electromagnet (superconducting electromagnets 110, 114) stored in the storage device 142 to calculate a current distribution indicating the magnetic pole shape of the second electromagnet 321 that will be used in combination with the first electromagnet (superconducting electromagnets 110, 114) to generate a required magnetic field distribution (a magnetic field distribution required by user B), which is a magnetic field distribution in the first electromagnet that differs from the initial magnetic field distribution (the magnetic field distribution used by user A).
[0038] An example of such calculation will be described in more detail. FIG. 4 is a flowchart illustrating the processing executed by the calculation unit. First, the calculation unit 303 receives input of a required magnetic field (a target magnetic field required by user B) for the second required magnetic field space 117 (a magnetic field space required by user B in the electromagnet system 101; FIG. 5) of user B32 via the input device 143 (step S201). This "target magnetic field" is a value that indicates the magnetic field at each location in the second required magnetic field space 117. Here, the second required magnetic field space 117 may be a space different from the required magnetic field space 115 of the superconducting electromagnets 110 and 114 (first magnets). For example, the size of the required magnetic field space may differ between user A and user B.
[0039] The calculation unit 303 measures the magnetic field distribution generated by the first electromagnet (superconducting electromagnets 110, 114) in the second required magnetic field space 117 using the magnetic field distribution measurement sensor 103 (step S202). Note that when the electromagnet system calculation device 311 is used for this calculation, such measurement is not possible, so data measured by the electromagnet system 101 can be input in step S202. It is desirable that the measurement positions of the magnetic field distribution are the same as the distribution of the target magnetic field, but the number of measurement positions may be fewer than the number of measurement positions of the distribution of the target magnetic field because the distribution of the measured magnetic field can be interpolated using the arrangement of the line currents of the first magnetic poles (data related to the magnetic pole shapes of the superconducting electromagnets 110, 114 of the first electromagnets) stored in the storage device 142.
[0040] Here, the method of interpolating the distribution of the measured magnetic field will be described below. In the following explanation, symbols I, B, A, etc., written in bold italics, represent a matrix that associates position information with values such as current values and magnetic field values. (current value by the excitation power supply), the magnetic field at any position teeth, Here, is a coefficient determined by the arrangement of the line current and the distance of the required magnetic field space. Then the magnetic field at the point where it cannot be measured is This can be obtained by correcting the calculated value.
[0041] Next, the calculation unit 303 calculates the difference (the difference between the measured magnetic field and the required magnetic field at the same position) between the distribution of the measured magnetic field generated by the first magnet (superconducting electromagnets 110, 114) in the second required magnetic field space 117 and the distribution of the target magnetic field (the difference between the measured magnetic field and the required magnetic field at the same position) at each position (step S203). Next, the calculation unit 303 takes into consideration the shapes of the superconducting electromagnets 110, 114 (first electromagnets) and inputs from the input device 143 the positions at which the line current can be arranged for the magnetic pole shape (hereinafter sometimes referred to as the "second magnetic pole shape") of the second electromagnet 321 (FIG. 5), and limits the positions at which the line current can be arranged for the magnetic pole shape of the second electromagnet 321 (step S204).
[0042] Next, the calculation unit 303 solves the inverse problem of the differential magnetic field calculated in S203 (calculates the line current distribution of the second magnetic pole shape from the required magnetic field) (step S205) using the locations where the line current of the second magnetic pole shape limited in S204 can be arranged as limiting conditions. A known solution method for calculating the matrix distribution of the line current from the matrix distribution of the magnetic field, such as Tikhonov regularization, can be used to solve the inverse problem. The matrix distribution of the line current obtained from the inverse problem cannot be uniquely determined depending on the solution method. However, since the storage device 142 stores the line current arrangement of the magnetic poles of the superconducting electromagnets 110 and 114 (first electromagnets) (data related to the magnetic pole shapes of the first electromagnets (superconducting electromagnets 110 and 114)), a more accurate solution of the line current distribution of the second magnetic pole shape can be obtained.
[0043] Next, the calculation unit 303 calculates the magnetic field distribution (modified magnetic field) created by the line current distribution of the magnetic pole shape of the first electromagnet (superconducting electromagnets 110, 114) and the line current distribution of the second magnetic pole shape calculated in S205 (step S206). Next, the calculation unit 303 calculates the square of the difference between the modified magnetic field and the target magnetic field, and if this value is less than a preset tolerance (Yes in step S207), the series of processes ends. If the tolerance is exceeded (No in step S207), the calculation unit 303 returns to S204, where the arrangement of the second magnetic pole shape is considered, and repeats the following processes. That is, the magnetic field position is shifted until it becomes less than the tolerance, and the processes from S204 onwards are tried.
[0044] In this way, the first step is completed by "Yes" in step S207, and the magnetic field distribution (modified magnetic field) created by the line current distribution of the second magnetic pole shape is obtained. After that, this second magnetic pole shape is output as electronic data or printed matter in the second step, and the result of the second magnetic pole shape is proposed to user B. Then, once user B approves the proposed result, the third and fourth steps are executed.
[0045] Next, the electromagnet system 101 shown in FIG. 2 will be described in a state in which the second electromagnet 204 manufactured through the above steps has been additionally installed. FIG. 5 is a system configuration diagram showing an example of the configuration of the electromagnet system according to the first embodiment, in which the second electromagnet has been installed. The second electromagnet 204 supports the winding 151, which constitutes the line current arrangement of the second magnetic pole shape determined in S205, with a load support 152. The winding 151, which constitutes the line current arrangement of the second magnetic pole shape, is made of a conductor and is connected to an excitation power supply 150 different from the excitation power supply 120 for power supply. The wire material constituting the winding 151 is not particularly limited in its configuration, and may be, for example, a copper wire or a superconducting wire. However, when a superconducting wire is used, cooling is required, and therefore the winding 151 must be housed in a container such as a cryostat 160.
[0046] The magnetic field generated by the superconducting electromagnets 110, 114 (first electromagnets) is generally assumed to be a strong magnetic field of several tesla, and therefore, when current is passed through the winding 151 constituting the second magnetic pole-shaped line current arrangement of the second electromagnet 204 disposed in that space, a powerful electromagnetic force acts. Therefore, it is desirable that the load support 152 has a strength sufficient to support the electromagnetic force formed by the product of the magnetic field strength and the current value. The configuration of the load support 152 is not particularly limited, but as long as the winding 151 and the load support 152 are insulated from each other by an electrical insulator such as resin, a non-magnetic metal such as stainless steel or aluminum alloy can be used.
[0047] The memory device 142 stores data regarding the excitation current of the first and second electromagnets and temperature data of the first and second electromagnets (in the above example, the second electromagnet 321 is not provided with a temperature detection element, but one may be provided), and the calculation unit 303 calculates the recommended operating time of the cooling device 130 of the first and second electromagnets (in the above example, the second electromagnet 321 is not provided with a cooling device, but one may be provided) based on this data regarding the excitation current and temperature data, and the output device 146 and display device 144, which serve as output units, output the recommended operating time.
[0048] According to the electromagnet system 101 and electromagnet system calculation device 311 of this embodiment described above, the calculation unit 303 uses data related to the magnetic pole shape of the first electromagnet to calculate a current distribution indicating the magnetic pole shape of the second electromagnet 321 that, when used in combination with the first electromagnet (superconducting electromagnets 110, 114), generates a requested magnetic field distribution that is different from the magnetic field distribution requested by user A. Therefore, by proposing this second electromagnet 321 to user B, manufacturing it, and additionally installing it in the electromagnet system 101, it is possible to provide an electromagnet system 101 that meets the needs of user B. Therefore, a rental service for the electromagnet system 101 can also be provided.
[0049] In this case, when the use of electromagnet system 101 is changed from user A to user B, there is no need to completely replace superconducting electromagnets 110 and 114 with new electromagnets. The request of user C is met simply by manufacturing a second electromagnet 321 and additionally attaching it to electromagnet system 101. Therefore, since there is no need to completely replace superconducting electromagnets 110 and 114, preparing electromagnet system 101 with new specifications does not require large manufacturing costs or a long preparation process.
[0050] Therefore, the electromagnet system 101 can be provided for rental services by simply making adjustments in a short time and at low cost, thereby improving the efficiency of the rental service of the electromagnet system 101. Furthermore, since data regarding the magnetic pole shape of the first electromagnet is stored in the storage device 142 in advance, the second electromagnet 321 can be proposed, manufactured, and installed in the electromagnet system 101 with high precision and speed.
[0051] The electromagnet system 101 and the electromagnet system calculation device 311 are provided with an output device 146, which serves as an output unit that outputs the magnetic pole shape of the second electromagnet 321 calculated by the calculation unit 303, and a display device 144. Therefore, the second electromagnet 321 can be proposed, manufactured, and installed in the electromagnet system 101 with high precision and speed.
[0052] The electromagnet system 101 and the electromagnet system calculation device 311 are provided with an input device 143 that serves as an input unit that receives input of the magnetic field distribution required by user B. Therefore, the magnetic field distribution required by user B can be input into the electromagnet system 101 and the electromagnet system calculation device 311, and the electromagnet 321 can be proposed, manufactured, and installed in the electromagnet system 101.
[0053] Furthermore, the calculation unit 303 can determine the recommended operating time of the cooling device (cooling device 130, etc.) for the first and second electromagnets, and can therefore suggest the recommended operating time to users A and B.
[0054] Furthermore, a temperature measuring element 50 is arranged on the surface of the first electromagnet (superconducting electromagnets 110, 114), the detected temperature transmitted by signal line 171 is stored in memory device 142, and the current of the superconducting coil winding 111 is feedback-controlled by control device 104 based on this detected temperature (in the above example, the second electromagnet 321 is not provided with a temperature measuring element and is not subjected to such control, but similar control may be performed for the second electromagnet 321 as well). Therefore, the operations of the first and second electromagnets can be appropriately controlled.
[0055] Furthermore, since the magnetic field distribution measuring sensor 103 can measure the magnetic field at various positions in the magnetic field space by varying its position using the drive mechanism 106, it is possible to appropriately design the second electromagnet 321 and appropriately control the first and second magnets. Furthermore, the second electromagnet 321 is excited by an excitation power supply 150 that is different from the excitation power supply 120 for the first electromagnet. Therefore, it is possible to supply appropriate power to each of the first electromagnet and the second electromagnet 321. Embodiment 2
[0056] 6 is a block diagram illustrating the flow of a rental service for an electromagnet system according to the second embodiment. In the second embodiment, common reference numerals are used for components and the like that are common to the first embodiment, and detailed descriptions thereof will be omitted.
[0057] As shown in Fig. 6, the parties involved in this service are the manufacturer 11, owner 12, user C, etc. of the electromagnet system 201 (Fig. 7). In the first embodiment, a second electromagnet 321 is additionally installed in the electromagnet system 101 that user A no longer uses, and the electromagnet system 101 is newly rented to a new user B. In the second embodiment, user C has been using the electromagnet system 201, but the method of using the electromagnet system 201 has changed, and a second electromagnet 322 is additionally installed in the electromagnet system 201 to accommodate the change, and the electromagnet system 201 continues to be rented to user C.
[0058] First, the owner 21 of the electromagnet system 201 rents the electromagnet system 201 to the user C (equipment rental) (S13). After the user C has achieved the original purpose of the electromagnet system 201, the user C requests the manufacturer 11 or the owner 21 to change the magnetic field realized by the electromagnet system 201 (magnetic field change request) (S21). In response to the request, the manufacturer 11 "proposes" a magnetic pole shape (second magnetic pole shape) of the second electromagnet 322, and "installs" the second electromagnet 322 additionally to the existing electromagnet system 201 (S24).
[0059] Furthermore, the magnetic field and operating data of user C stored in the control device 244 of the electromagnet system 201 is provided to the manufacturer 11 (S15), and the manufacturer 11 proposes a more efficient operating method of the electromagnet system 201 to user C (S25). For example, if the electromagnet system 201 is an electromagnet that uses a superconducting electromagnet, operating the cooling device in accordance with the timing of generating the magnetic field leads to more efficient operation. In the case of a superconducting electromagnet, the power consumption during cooling is generally several kW (kilowatts) to several tens of kW, whereas a superconducting electromagnet has an electrical resistance of 0 Ω when a steady current is passed through it, so the power consumption of the electromagnet is 0 W. In other words, the power consumption during cooling is overwhelmingly greater than the power consumption during current passing to generate the magnetic field, and therefore, coordinating the operation time of the cooling device with the timing of generating the magnetic field leads to highly efficient operation.
[0060] FIG. 7 is a system configuration diagram showing an example of the configuration of an electromagnet system after the addition of a second electromagnet. When a user C requests a change in the magnetic field generated by the superconducting electromagnets 110 and 114 (first electromagnets), a second electromagnet (magnetic field shield) 204 is proposed and installed in the electromagnet system 201 according to the magnetic field distribution required for the electromagnet system 201. The magnetic field shield is a device that shields the magnetic field and converges the magnetic flux. The magnetic field shield can bring a stronger magnetic field to a narrower area. Although the second embodiment employs the second electromagnet 204, a wound-shaped second electromagnet may be arranged as in the first embodiment depending on the magnetic field distribution required for the magnet system 201.
[0061] The second electromagnet 204 in this example can be made of, for example, a superconducting bulk material or a material having diamagnetic properties, which is a laminate of superconducting thin films. The material is not limited, but for example, a high-temperature superconducting material (YBa 2 Cu 3 O 7-δ , Bi 2 Sr 2 Ca 2 Cu 3 O 10 etc.), niobium titanium (NbTi) material, niobium tritin (Nb 3 Sn) material, magnesium diboride (MgB 2 ) material can be used. If the second electromagnet 204 is a superconductor, it will exhibit the property of shielding a magnetic field when it is cooled to below its superconducting transition temperature and enters a superconducting state. Therefore, the second electromagnet 204 is housed in a cryostat 260 and cooled by a cooling device 230. The second electromagnet 204 is subjected to an electromagnetic force in the magnetic field generated by the superconducting electromagnets 110 and 114 (first electromagnets), and is therefore supported in the cryostat 260 by a load support 261.
[0062] In FIG. 7, the cryostat 160 for the superconducting electromagnets 110 and 114 and the cryostat 260 for the second electromagnet 204 are separate, but depending on the temperature conditions used, the superconducting electromagnets 110 and 114 and the second electromagnet 204 may be housed in the same cryostat 160.
[0063] The second electromagnet 204 converges the magnetic field generated by the superconducting electromagnets 110 and 114 (first electromagnets) and amplifies the magnetic field in the second required magnetic field space 217. The second electromagnet 204 has the characteristic of generating a current so as to shield the magnetic flux in a plane perpendicular to the intruding magnetic flux. The current distribution of the second electromagnet 204 is calculated by the control device 244 using a procedure similar to that of the first embodiment, and the arrangement of the magnetic pole shape of the second electromagnet 204 can be proposed. Note that in FIG. 7, the second required magnetic field space 217 is disposed within the cryostat 260, but this configuration is not particularly limited. A through-hole can be drilled in the center of the cryostat 260, and the second required magnetic field space 217 can also be disposed in a room temperature environment.
[0064] A thermometer or heater can be attached to the thermal conductor 270 connecting the cooling device 230 and the second electromagnet 204, thereby controlling the temperature of the second electromagnet 204. The current density of the shielding current flowing through the second electromagnet 204 takes the value of the superconducting critical current density, and the magnitude of the superconducting critical current density changes depending on the temperature. That is, by feedback-controlling the output of the heater attached to the thermal conductor 270 using the control device 244 based on temperature measurement data, the magnitude of the shielding current can be controlled, and the magnetic field in the second required magnetic field space 217 can be controlled. In this case, a known control method can be applied to control the heater output, and for example, PID (Proportional-Integral-Differential) control can be used.
[0065] As in the second embodiment, the second electromagnet 204, which does not require an excitation power supply and amplifies the magnetic field generated by the first electromagnet by shielding it, can also be used as the second electromagnet. According to the second embodiment, similar to the first embodiment, the electromagnet system 201 can be provided for rental services by simply performing adjustments at low cost in a short time, thereby improving the efficiency of the rental service of the electromagnet system 201. Furthermore, if the second electromagnet 204 has a structure in which superconducting thin films are stacked, the manufacturing cost of the second electromagnet 204 can be reduced. Additionally, in the second embodiment, the same effects as those of the first embodiment can be achieved by using the same components as those of the first embodiment.
[0066] The present invention is not limited to the above-described embodiments and includes various modifications. For example, the above-described examples have been described in detail to clearly explain the present invention, and are not necessarily limited to those including all of the described configurations. Furthermore, it is possible to replace part of the configuration of one embodiment with the configuration of another embodiment, or to add the configuration of another embodiment to the configuration of one embodiment. Furthermore, it is also possible to add, delete, or replace part of the configuration of each embodiment with other configurations.
[0067] Furthermore, the above-described configurations, functions, processing units, processing means, etc. may be partially or entirely implemented in hardware, for example, by designing them as integrated circuits. Information such as programs, tables, and files that implement each function can be stored in memory, a recording device such as a hard disk or SSD (Solid State Drive), a recording medium such as an IC card, SD card, or DVD, or an internet server. Furthermore, the control lines and information lines shown are those considered necessary for explanation, and do not necessarily represent all control lines and information lines in the product. In reality, it is safe to assume that almost all configurations are interconnected.
[0068] 101, 201 Electromagnet system 103 Magnetic field distribution measurement sensor (sensor) 106 Driving mechanism 110, 114 Superconducting electromagnet (first electromagnet) 120, 150 Excitation power supply 142 Storage device 143 Input device (input unit) 144 Display device (output unit) 146 Output device (output unit) 301 Program 302 Control unit 303 Calculation unit 311 Electromagnet system calculation device 321, 204 Second electromagnet
Claims
1. An electromagnet system comprising: a first electromagnet; a sensor that measures the magnetic field distribution of the magnetic field generated by the first electromagnet; and a calculation unit that uses data regarding the magnetic pole shape of the first electromagnet to calculate a current distribution that indicates the magnetic pole shape of a second electromagnet that, when used in combination with the first electromagnet, generates a required magnetic field distribution, which is a magnetic field distribution different from the magnetic field distribution.
2. The electromagnet system according to claim 1, further comprising an output section for outputting a current distribution indicative of the magnetic pole shape of said second electromagnet calculated by said calculation section.
3. The electromagnet system according to claim 1, further comprising a storage device that stores data relating to the magnetic pole shape of the first electromagnet, the storage device storing current distribution data indicating the magnetic pole shape of the first electromagnet as the data relating to the magnetic pole shape of the first electromagnet.
4. The electromagnet system according to claim 1, further comprising an input unit for receiving an input of the required magnetic field distribution.
5. The electromagnet system according to claim 2, further comprising a memory device, the memory device storing data relating to the excitation current of the first and second electromagnets and temperature data of the first and second electromagnets, the calculation unit determining a recommended operating time of the cooling devices of the first and second electromagnets based on the data relating to the excitation current and the temperature data, and the output unit outputting the recommended operating time.
6. The electromagnet system according to claim 5, characterized in that the storage device stores temperature data of the first and second electromagnets, and is provided with a control unit that controls the output of heaters disposed in the first and second electromagnets.
7. The electromagnet system according to claim 1, further comprising a drive mechanism for varying the position of said sensor.
8. The electromagnet system according to claim 1, further comprising a second electromagnet, the second electromagnet being excited by an excitation power supply different from that of the first electromagnet.
9. The electromagnet system according to claim 1, further comprising a second electromagnet, wherein the second electromagnet does not require an excitation power supply and amplifies the magnetic field generated by the first electromagnet by shielding it.
10. The electromagnet system according to claim 9, wherein the second electromagnet is laminated with a superconducting thin film.
11. An electromagnet system calculation method using an electromagnet system including: a first electromagnet; a sensor that measures the magnetic field distribution of the magnetic field generated by the first electromagnet; and a calculation unit that uses data regarding the magnetic pole shape of the first electromagnet to calculate a current distribution that indicates the magnetic pole shape of a second electromagnet that, when used in combination with the first electromagnet, generates a required magnetic field distribution, which is a magnetic field distribution different from the magnetic field distribution, the method comprising: a first step of calculating the current distribution that indicates the magnetic pole shape of the second electromagnet; and a second step of outputting the current distribution that indicates the magnetic pole shape of the second electromagnet calculated in the first step.
12. A method for manufacturing an electromagnet system, comprising: a third step of manufacturing the second electromagnet based on a current distribution indicating the magnetic pole shape of the second electromagnet calculated by the electromagnet system calculation method described in claim 11; and a fourth step of installing the second electromagnet manufactured in the third step in the electromagnet system.
13. An electromagnet system calculation device comprising: a calculation unit that uses data relating to the magnetic pole shape of a first electromagnet of an electromagnet system to calculate a current distribution indicating the magnetic pole shape of a second electromagnet that, when used in combination with the first electromagnet, generates a required magnetic field distribution in the first electromagnet, which is a magnetic field distribution different from an initial magnetic field distribution; and an output unit that outputs the results of the calculation.
Citation Information
Patent Citations
Uniform magnetic field generator
JP1984211204A
Superconducting equipment for magnetic levitation
JP2001196224A
Method for estimating position and direction of current dipole, and method for estimating active section of brain using the same
JP2006061321A
Superconducting magnet and measuring device
JP2015118997A
Superconducting magnet apparatus and magnetic resonance imaging apparatus
JP2016123802A