A floating slab and prefabricated technology, which is applied in the field of rail transit, can solve the problems of affecting the construction progress, long time-consuming leveling, slow construction speed, etc., and achieve the effect of improving construction speed, improving applicability, and simple operation
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0038] Taking each prefabricated floating slab in the floating slab track bed as an example, the prefabricated floating slab in the floating slab track bed of the present invention is jointly supported by four plate end vibration isolation devices and four built-in elastic vibration isolators as an example. The operation process of the installation jacking and leveling method shall be given specific instructions. For the convenience of understanding the method of the present invention, the basic structure of the involved floating slab ballast bed is firstly explained. The typical structure of the floating slab track bed is as follows figure 1 and figure 2 As shown, taking the prefabricated floating slab 2 as an example, it is jointly supported by four plate end vibration isolators 4 and four built-in elastic vibration isolators 8, separated from the surface of the foundation 6, and the elastic vibration isolators 8 are placed on the prefabricated In the coupling sleeve 5 fi...
Embodiment 2
[0077] Still taking the floating slab track bed described in Embodiment 1 as an example, each prefabricated floating slab is jointly supported by four plate end vibration isolation devices 4 and four built-in elastic vibration isolators 8, which is different from Embodiment 1. In the installation, lifting and leveling method of the prefabricated floating slab in the floating slab track bed of the present invention described in this example, when placing the prefabricated floating slab in step (1), follow the method described in step (1), and proceed sequentially Place and adjust the plane positions of multiple prefabricated floating slabs to form at least one installation section, and then implement the first lifting and leveling, the second lifting and leveling and precise jacking for each prefabricated floating slab in the installation section Lifting and leveling, so as to realize the installation, lifting and leveling of the prefabricated floating slab in the floating slab ...
Embodiment 3
[0081] Still taking the floating slab track bed with the structure described in Embodiment 1 as an example, based on the technical principles of Embodiment 1 and Embodiment 2, the method of jacking up and leveling the prefabricated floating slab in the floating slab track bed of the present invention can also be used as The evolution is as follows, and the specific operation process is as follows:
[0082] (1) According to the plane position of the prefabricated floating slab and the vibration isolator at the end of the slab marked by the line on the ballast bed foundation, place the vibration isolator at the end of the slab at the predetermined position, and then place the prefabricated floating slab in advance Use hoisting and transportation equipment to place on the plate end vibration isolation device, adjust the plane position of the prefabricated floating slab, and place and adjust the plane position of multiple prefabricated floating slabs in sequence according to the ab...