Installation and leveling method of floating slab in prefabricated floating slab track bed
A floating slab and prefabricated technology, which is applied in the field of rail transit, can solve the problems of increasing the number of steps for adjusting the height and leveling of the floating slab, affecting the construction progress, and taking a long time for leveling, so as to achieve broad market application prospects and improve applicability , Improve the effect of construction speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0031] Taking each floating slab in the prefabricated floating slab track bed as an example, the operation process of the method for installing and leveling the floating slabs in the prefabricated floating slab track bed of the present invention will be described in detail below. In order to facilitate the understanding of the method of the present invention, the basic structure of the involved prefabricated floating slab track bed is firstly explained. The typical structure of the prefabricated floating slab track bed is as follows figure 1 and figure 2 As shown, taking the floating plate 2 as an example, it is jointly supported by four plate end vibration isolation devices 10, separated from the surface of the foundation 6, and a height adjustment backing plate 7 is set between the plate end vibration isolation device 10 and the floating plate 2, in order to To ensure the smooth transition load of the floating slabs during the working process and the coordinated force, the...
Embodiment 2
[0046] Still taking the prefabricated floating slab track bed with the structure described in Embodiment 1 as an example, each floating slab is jointly supported by four plate end vibration isolation devices. In the jacking, installation and leveling method of floating slabs in the track bed, when placing the floating slabs in step (1), place and adjust the plane positions of multiple floating slabs in sequence according to the method described in step (1). At least one installation section is formed, and the initial lifting and leveling and precise lifting and leveling are performed on each floating slab in the installation section, so as to realize the installation and leveling of the floating slab in the prefabricated floating slab track bed.
[0047] In the jacking installation and leveling method of the floating slab in the prefabricated floating slab track bed of the present invention described in this example, the initial jacking and leveling and precise jacking and leve...
Embodiment 3
[0050] Still taking the prefabricated floating slab track bed with the structure described in Embodiment 1 as an example, based on the technical principles of Embodiment 1 and Embodiment 2, the method for jacking, installing and leveling the floating slab in the prefabricated floating slab track bed of the present invention is also It can be evolved as follows, and the specific operation process is as follows:
[0051] (1) According to the plane positions of the floating slab and the vibration isolator at the end of the slab marked by the line on the ballast bed foundation, place the vibration isolator at the end of the slab respectively at the predetermined position, and then transport the pre-processed floating slab by hoisting Place the equipment on the plate end vibration isolation device, adjust the plane position of the prefabricated short floating slab, place and adjust the plane position of multiple prefabricated short floating slabs sequentially according to the above ...
PUM