Fracturing operation method, mining method and mining system for combustible ice mining
A fracturing and operation technology, which is applied in the development of fluids, earthwork drilling, wellbore/well components, etc., can solve the problems that the effect of fracturing operation cannot be maintained continuously, and high-strength fracturing cannot be used, so as to improve the control range of mining. , the effect of reducing well density and cost
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0049] The present invention has the best effect in horizontal branch wells. Such as Figure 4 and 5 Shown fracturing method, its fracturing steps are:
[0050] 1) Horizontally drill the production branch wellbore 16 at the position of the combustible ice reservoir 4, and horizontally drill the injection branch wellbore 17 in the pore reservoir 5 below the combustible ice reservoir 4; the production branch wellbore 16 and the injection branch A number of perforation tunnels 18 are opened in the center of the wellbore 17 to release the pressure;
[0051] 2) Place the casing well in the vertical shaft 3. Do a good job of cementing and installing the inlet device;
[0052] 3) Put the plug 19 and the booster pipe 13 down along the casing 3, and the booster tube 13 passes through the plug 19 on the path in turn and communicates with the injection branch wellbore 17; the booster tube 13 is connected to the booster pump 11 ;
[0053] The annular space between the booster pipe 13...
Embodiment 2
[0059] Such as Figure 8 The fracturing method shown is performed in multiple wells, two wells are used as an example. Implemented between two wells, the fracturing steps are:
[0060] 1) Two left and right wells are drilled, wherein the left well is drilled to the extraction position of the combustible ice reservoir 4, and the right well is drilled to the injection position of the pore reservoir 5.
[0061] Drill a horizontal production branch wellbore 16 at the position of the combustible ice reservoir 4, and drill a horizontal injection branch wellbore 17 in the pore reservoir 5 below the combustible ice reservoir 4; the production branch wellbore 16 and the injection branch wellbore 17 pipelines are provided with a number of perforation tunnels 18 to penetrate the pressure;
[0062] 2) Place casings in the left and right wells respectively. 3. Complete well cementing and install inlet devices;
[0063] 3) Plugs 19 are installed respectively in the left and right wells, ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


