Pipeline separation water prevention and heat preservation integrated wall body and building formed by same
A wall and pipeline technology, applied in building structures, buildings, building components, etc., can solve the problems of long decoration cycle, increase the decoration cost of second-hand house buyers, etc., and achieve the effect of convenient daily inspection.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0020] Such as figure 1 As shown, the wall provided by this embodiment includes a wall base 1 and a decorative layer 3, and the outer wall of the wall base 1 is provided with a circuit 4 and / or a waterway 5, and the wall base 1 is provided with a circuit 4 and a waterway. 5 The entry hole 6 for entering the house; the decorative layer 3 can be detachably installed on the wall base 1 to cover the circuit 4 and / or the waterway 5.
[0021] In this embodiment, the decorative layer 3 is installed through the mounting part 7. Here, the metal mounting part is used as the mounting part 7 to realize the detachable installation of the decorative layer 3. The specific structure is as follows image 3 As shown, one end of the installation part 7 is fixedly installed on the wall base 1 , the other end extends out of the protective layer 2 along the direction of the protective layer 2 , and the decorative layer 3 is fastened to the other end of the installation part 7 .
[0022] The mounti...
Embodiment 2
[0024] Such as figure 2 As shown, the wall provided by this embodiment includes a wall base 1 and a decorative layer 3, and the outer wall of the wall base 1 is provided with a circuit 4 and / or a waterway 5, and the wall base 1 is provided with a circuit 4 and a waterway. 5 The entry hole 6 for entering the house; the decorative layer 3 can be detachably installed on the wall base 1 to cover the circuit 4 and / or the waterway 5.
[0025] In order to better insulate the circuit 4 and the waterway 5 and reduce the risk of water pipe bursting when the temperature is low in winter, the wall provided in this embodiment also includes a protective layer 2, which is arranged on the wall base 1 and the decoration Between the layers 3; the first layer of protection for the circuit 4 and the waterway 5 is realized through the protective layer 2, and then the decorative layer 3 is detachably installed.
[0026] The protective layer 2 adopts polyurethane foam here; when polyurethane foam ...