Prefabricated assembled space grid support structure for tunnel support and construction method thereof

Through the rapid assembly of prefabricated space grid structure, the problems of long construction time and insufficient load capacity of traditional tunnel support structures are solved, and the safety and efficiency of tunnel construction are improved. It is suitable for tunnel construction with complex geology and strict deformation.

CN110529154BActive Publication Date: 2024-11-05CHINA RAILWAY 11TH BUREAU GRP CORP LTD +3
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN201910868684.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2019-09-16
Publication Date
2024-11-05
Estimated Expiration
2039-09-16

AI Technical Summary

Technical Problem

Traditional tunnel support structures have a long construction time and insufficient load capacity, which is difficult to meet the tunnel construction needs of complex geology and strict deformation, especially in mining tunnel construction, the construction efficiency is low, and the welding connection of steel arch frames leads to slow construction speed and quality. It's hard to guarantee.

Method used

Using prefabricated assembled space grid structure, the closed support structure is quickly assembled through prefabricated grid support members and connectors. It can be undertaken before spraying concrete with the three-dimensional stress characteristics and high-order ultra-static static qualities of the space grid. All tunnel loads reduce the alternation of construction processes and improve construction efficiency.

Benefits of technology

The safety and stability of tunnel construction have been improved, the construction time has been reduced, the construction efficiency has been improved, the construction speed has been avoided, and the construction is difficult to guarantee due to welding has been achieved, and the construction is good and the asymmetric load bearing capacity has been achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN110529154B_ABST
    Figure CN110529154B_ABST
Patent Text Reader

Abstract

The present invention provides a prefabricated and assembled space grid structure and construction method for tunnel support. The prefabricated and assembled space grid support structure includes at least two prefabricated grid support components, and the grid support components are connected by connecting components to form a closed support structure with a cross-section that is the same as the cross-section of the supported tunnel; during its construction, the internal force parameters of the tunnel support structure are calculated according to the parameter setting values ​​of the tunnel support structure and the tunnel model, and the construction parameter values ​​of the final tunnel support structure are obtained, and the grid support components of each ring of the prefabricated and assembled space grid support structure are prepared. After the tunnel is excavated, the prefabricated grid support components are quickly assembled in the completed excavation section to form a tunnel support closed ring, and the assembly of multiple ring grid components is completed before spraying concrete. The present invention has a simple structure and is easy to assemble. It does not require spraying concrete, and the grid structure itself can bear all tunnel loads, thereby improving construction efficiency.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of tunnel engineering construction, and in particular relates to a prefabricated assembled space grid structure for tunnel support and a construction method thereof. Background Art

[0002] Due to the complex and changeable terrain and geological conditions, tunnel construction is prone to disasters of varying degrees, resulting in deformation of the tunnel support structure, threatening the stability of the tunnel to varying degrees, and seriously failing to meet the requirements of the designed lining section, affecting the safe construction of the tunnel, especially for tunnels with large spans, complex structures, and strict deformation requirements. At present, the traditional initial support structures of tunnels include anchor spraying structures, grid support, reinforced concrete support structures, etc. The existing support structures cannot meet the requirements in terms of bearing capacity and support time. Taking the most common grid support structure as an example, the grid support structure is a grid steel frame, a steel frame with spraying, anchor rods, and a steel mesh. The steel frame is in units of 1 / 3, and the longitudinal spacing is generally 0.5 to 1.5 m / 1 / 3. Due to its discreteness along the longitudinal direction and the weak bearing capacity of the grid steel frame itself, the steel frame has a weak ability to withstand the surrounding rock load before spraying concrete, and the next process can only be carried out after spraying concrete, which will extend the construction period and reduce the construction efficiency of the support structure.

[0003] With the development of component prefabrication and assembly technology, the prefabrication and assembly of support structures in tunnel construction has gradually become inevitable. It is the main measure to improve engineering quality and construction speed and reduce costs. The shield method tunnel construction project is a typical representative of prefabricated lining support. However, due to the high cost of shield method tunnel construction, the mining method construction tunnel still accounts for a considerable proportion. However, there is little research on the prefabrication and assembly technology of the mining method tunnel support structure. At present, the most commonly used mining method tunnel support is a combined support system composed of shotcrete, anchor rods, steel arch frames, etc. The commonly used steel arch frames have greater support strength and rigidity, which can enhance the initial support structure capacity. However, the traditional steel arch frame longitudinal connection steel bars and lock feet are welded to the steel frame, which has a slow construction speed and does not meet the "early closure" requirements of tunnel construction. The on-site overhead welding operation space is small and the quality cannot be guaranteed. Moreover, although the steel arch frame support technology is mature, it is prone to weak axis torsional instability due to low lateral stiffness. On the premise of ensuring safety and reliability, it is necessary to learn from the current tunnel section shield segment assembly technology and develop a prefabricated assembled support structure to reduce the alternating operation time of each process and improve construction efficiency.

[0004] As for the space grid structure, as a space bar system structure, it has three-dimensional force characteristics and can withstand the effects of all directions. In addition, the grid structure is generally a high-order hyperstatic structure. If a bar fails locally, it only loses one hyperstatic number, and the internal force can be readjusted. The entire structure generally does not fail, and has a high safety reserve. Due to its good integrity, good stability, and large spatial stiffness, it can effectively withstand asymmetric loads, concentrated loads, and dynamic loads, and has good seismic performance. Its space grid structure has been widely used in the roofs of buildings such as gymnasiums, theaters, exhibition halls, waiting halls, stadium stand awnings, hangars, and two-way large column spacing workshops. However, the number of bars that converge at the node of the space grid structure is large, and the production and installation are more complicated than the plane structure. In addition, due to the particularity of the tunnel support structure, the limitations of the construction space, and the calculation and requirements of the tunnel support for its bearing capacity, the space grid structure has not been applied to tunnel construction at present. Summary of the invention

[0005] In order to solve the problems of long construction time and insufficient bearing capacity of traditional support types, the present invention proposes a prefabricated assembled space grid structure suitable for tunnel support and a construction method thereof. The support structure gives full play to the good stress-bearing performance of the space grid structure and the convenience of rapid assembly construction, which can ensure the safety of tunnel construction and improve construction efficiency.

[0006] The present invention provides a prefabricated and assembled space grid structure for tunnel support, which is characterized in that: the prefabricated and assembled space grid support structure includes at least two prefabricated grid support components, and both ends of each grid support component are respectively provided with connecting components connected to adjacent grid support components, and at least two grid support components are connected head to tail by connecting components to form a closed support structure with a cross-section that is the same as the cross-section of the supported tunnel; each grid support component is a grid support structure composed of an upper chord, a lower chord and a web, wherein the upper chord forms the soil-facing mesh surface of the grid support component in contact with the inner wall of the tunnel, the lower chord forms the soil-repelling mesh surface of the grid support component, the web is connected between the upper chord and the lower chord, and is separated between the upper chord and the lower chord to form a plurality of grid units, and a metal mesh is provided on the soil-facing mesh surface of each grid support component.

[0007] A more preferred technical solution of the present invention is as follows: the soil-facing and soil-repelling surfaces of the grid unit of the grid support component are triangular, square, rectangular, pentagonal or hexagonal, and the vertical surface is triangular.

[0008] A more preferred technical solution of the present invention is that the grid support member is a grid-type support frame composed of a plurality of triangular pyramids, a plurality of quadrangular pyramids, or a plurality of hexagonal pyramids.

[0009] A more preferred technical solution of the present invention: the upper chord and the lower chord of the grid support member are arc-shaped rod bodies formed by welding or direct bending or connecting through connectors any one or more of the rods selected from steel pipes, steel sections, steel bars, and steel tube concrete; and the web members are connected between the upper chord and the lower chord by welding or connecting members to form an arc-shaped grid structure, and the web members are any one or more of the rods selected from steel pipes, steel sections, steel bars, and steel tube concrete.

[0010] A better technical solution of the present invention: the connecting members are mutually matching mortise and tenon connectors or sleeve connectors or snap connectors or plug-in or welded connectors, and the mutually matching first connector and second connector of each connecting member are respectively arranged at the butt joints of two adjacent grid support members, and the connecting members at both ends of each grid support member also match each other; at least two grid support members are connected by splicing or welding of the first connector and the second connector or a combination of splicing and welding to form an annular, rectangular, horseshoe or polygonal closed support structure with the same cross-section as the cross-section of the supporting tunnel.

[0011] The present invention provides a construction method for a prefabricated and assembled space grid structure for tunnel support, characterized in that it comprises at least two prefabricated and assembled space grid support structures according to any one of claims 1 to 5, and the specific construction steps are as follows:

[0012] (1) Obtaining various parameter setting values ​​of the tunnel support structure and a tunnel model; and calculating the bearing load of the tunnel support structure and the elastic modulus of the equivalent space shell according to the parameter setting values ​​and the tunnel model; using the bearing load and the elastic modulus as inputs of a finite element algorithm, calculating the internal force parameters of the tunnel support structure, verifying the safety of the tunnel support structure according to the internal force parameters, and obtaining corresponding verification results; and finally adjusting the values ​​of the parameter items according to the verification results to obtain the final construction parameter values ​​of the tunnel support structure;

[0013] (2) according to the construction parameter values ​​of the tunnel support structure calculated in step (1), determining the segmentation of each ring of the prefabricated assembled space grid support structure, and selecting appropriate rods to manufacture the single grid support components of each ring of the prefabricated assembled space grid support structure and the connecting parts of the grid support components in a factory or on site according to the segmentation conditions;

[0014] (3) After tunnel excavation, a single prefabricated grid support member is quickly assembled in the completed excavation section to form a tunnel support closed loop. Two adjacent grid support members are directly and quickly connected through the connectors at their ends. The connectors include mutually matching mortise and tenon connectors, sleeve connectors, snap connectors, disc connectors, or plug connectors. The connectors are directly prefabricated according to the grid support members and then welded to the ends of the grid support members.

[0015] (4) Continue to excavate the tunnel and assemble the next ring of prefabricated and assembled space grid support structure in the excavation section. The two adjacent rings of space grid support structure can be overlapped by longitudinal connecting steel bars;

[0016] (5) According to the actual situation of the project, after the assembly of the multi-ring grid components is completed, concrete is sprayed or poured to form a support structure.

[0017] A preferred technical solution of the present invention: the parameters of the tunnel support structure in step (1) include the longitudinal support length of the monolithic prefabricated and assembled space grid support structure, the number of longitudinal cross-section rods per linear meter of the tunnel support structure, the thickness of the initial support, the material thickness of the rod, the diameter of the connecting parts, the annular spacing of the connecting parts, the materials of the rods and connecting parts, and the geometric dimensions of the rods and connecting parts, all or any number of the parameters.

[0018] A preferred technical solution of the present invention: the bearing load of the tunnel support structure calculated in step (1) includes the deadweight load of the tunnel support structure and the external load of the tunnel support structure;

[0019] The deadweight load f of the tunnel support structure is calculated using formula ①:

[0020] f=γ1bh1; ①

[0021] In formula ①, γ1 represents the concrete weight of the tunnel support structure, b represents the longitudinal width of the calculation unit, and h1 represents the thickness of the tunnel support structure;

[0022] The external load of the tunnel support structure includes the calculation of at least one of the stratum resistance borne by the tunnel support structure and the surrounding rock pressure borne by the tunnel support structure; wherein the surrounding rock pressure borne by the tunnel support structure includes the vertical uniform pressure and the horizontal uniform pressure of the surrounding rock borne by the tunnel support structure;

[0023] After the surrounding rock pressure borne by the tunnel support structure is calculated, the surrounding rock pressure is adjusted according to the load coefficient, wherein the load coefficient is the ratio of the load value passed by the trial calculation to the maximum load value.

[0024] The preferred technical solution of the present invention is as follows: The calculation process of the stratum resistance borne by the tunnel support structure is as follows:

[0025] (1) using the Winkel hypothesis algorithm to calculate the stratum resistance coefficient of the tunnel model;

[0026] (2) Calculating the stratum resistance borne by the tunnel support structure according to the stratum resistance coefficient by means of the chain rod method.

[0027] The preferred technical solution of the present invention is:

[0028] When the tunnel model is a deep buried tunnel:

[0029] The vertical uniform pressure q of the surrounding rock borne by the tunnel support structure is calculated using the following formula ②:

[0030] q=γ2h q ②

[0031] In formula ②, h q =First constant×2 S-1 w, w = the second constant + i (B-the third constant); γ2 represents the weight of the surrounding rock, h q represents the calculated height of the surrounding rock collapse arch, S represents the surrounding rock grade, w represents the width influence coefficient, B represents the tunnel excavation width, and i represents the increase or decrease rate of surrounding rock pressure per unit length increase;

[0032] The horizontal uniform pressure of the surrounding rock borne by the tunnel support structure is the product of the vertical uniform pressure q of the surrounding rock borne by the tunnel support structure calculated above and a specific coefficient; wherein the value of the specific coefficient is related to the grade of the surrounding rock.

[0033] The preferred technical solution of the present invention is:

[0034] When the tunnel model is a shallow buried tunnel:

[0035] The vertical uniform pressure q of the surrounding rock borne by the tunnel support structure is calculated using formula ③:

[0036]

[0037] in,

[0038]

[0039] γ2 represents the weight of the surrounding rock, h2 represents the height of the tunnel top from the ground, λ represents the lateral pressure coefficient, θ represents the friction angle on both sides of the tunnel top, B represents the tunnel excavation width, β represents the rupture angle at the maximum thrust, It represents the calculated friction angle of surrounding rock;

[0040] The horizontal uniform pressure of the surrounding rock borne by the tunnel support structure is i Calculated using formula ④,

[0041] e i =γ2h i λ ④

[0042] Among them, γ2 represents the weight of surrounding rock, h i It represents the distance from any point inside or outside the tunnel to the ground, and λ represents the lateral pressure coefficient.

[0043] The parameters of the tunnel support structure in step (1) include all or any of the following parameters: the longitudinal support length of the monolithic prefabricated spatial grid support structure, the number of longitudinal cross-section rods per meter of the tunnel support structure, the thickness of the initial support, the material thickness of the rods, the diameter of the connectors, the circumferential spacing of the connectors, the materials of the rods and the connecting members, and the geometric dimensions of the rods and the connecting members, wherein the connection form of the rods, the material of the rods, the geometric dimensions (length, diameter or thickness, etc.), the material and geometric dimensions of the connecting members

[0044] Beneficial effects of the present invention:

[0045] (1) The support structure of the present invention makes full use of the good stress-bearing performance of the spatial grid structure and the convenience of rapid assembly construction, and changes the traditional "line support" such as steel arch frames into "surface support", thereby improving the safety and stability of the tunnel;

[0046] (2) The prefabricated and assembled spatial grid support structure of the present invention does not require shotcrete, and the grid structure itself can bear the entire tunnel load. It is fast to assemble, and can be shotcrete after multiple cycles of excavation and assembly, which reduces the alternation of construction processes, improves construction efficiency, and ensures tunnel construction safety. It is particularly suitable for tunnel excavation sections with complex geology and strict deformation control.

[0047] (3) The spatial grid support structure of the present invention is formed by connecting multiple arc-shaped support structures through quick assembly joints. The arc-shaped support structure can be directly processed in advance or on-site according to tunnel parameters, and then quickly assembled to form an integral ring structure, thereby avoiding problems such as slow tunnel construction and difficulty in ensuring quality caused by welding, thereby improving construction efficiency;

[0048] (4) The spatial grid support structure in the present invention is composed of a plurality of pyramid structures, one side of each pyramid structure is in the form of a surface and the other side is in the form of a point. The surface and the point are connected by a plurality of tie rods. Under the action of the node load, each rod mainly bears the axial tension and pressure, which can give full play to the strength of the material. The plurality of pyramid components are regularly combined together, which has good integrity, good stability, large spatial rigidity, can effectively bear asymmetric loads, concentrated loads and dynamic loads, and has good seismic performance;

[0049] (5) In the present invention, the parameters of the grid support structure are calculated and designed in advance according to the bearing capacity required by the tunnel before spraying concrete during the construction process, so as to ensure that the designed support structure can meet the construction safety and ensure that the prefabricated support structure can provide a large bearing capacity before spraying concrete, so that the next process can be carried out within a certain working range without spraying concrete, thereby improving the construction efficiency.

[0050] (6) The spatial grid structure of the present invention is regularly combined, a large number of nodes and rods have the same shape and size, and the rods and nodes have fewer specifications, which is convenient for production and has high product quality.

[0051] The present invention can complete the assembly of multi-ring grid components according to actual conditions and then carry out shotcrete spraying. The support components in the structure and construction method are prefabricated in a factory, which is convenient for production and quality control. The on-site assembly and construction are convenient, and there is no need to spray concrete. The grid structure itself can bear all tunnel loads, which greatly reduces the alternation time of each process, can realize the rapid construction of tunnel support, and improve construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] Figure 1 It is a structural schematic diagram of the prefabricated assembled space grid support structure of the present invention;

[0053] Figure 2 It is a structural schematic diagram of the grid support component in the present invention;

[0054] Figure 3 It is a schematic diagram of the splicing of the grid support components in the present invention;

[0055] Figures 4a to 4e Structural schematic diagrams of different connecting components in the present invention;

[0056] Figure 5 It is a plan view of the grid support member of the present invention;

[0057] Figure 6 is a cross-sectional schematic diagram of a grid support member of the present invention;

[0058] 7a to 7c are schematic structural diagrams of different grid units of the grid support member;

[0059] 8a to 8c are schematic diagrams of assembling the grid units in FIGS. 7a to 7c , respectively.

[0060] Fig. 9 It is a schematic diagram of the support width and distance of the grid structure;

[0061] Fig.10 It is a schematic diagram of the construction state of the present invention.

[0062] In the figure: 1—grid support member, 2—tunnel to be supported, 3—upper chord, 4—lower chord, 5—web member, 6—metal mesh, 7—connecting member, 7-1—first connecting member, 7-2—second connecting member, 8—concrete lining, a—width of grid support member, b—distance between two adjacent rings of grid support structure. DETAILED DESCRIPTION

[0063] The present invention will be further described below in conjunction with the accompanying drawings and embodiments. Figure 1 Figures 1 to 8 are all drawings of the embodiments, which are drawn in a simplified manner and are only used for the purpose of clearly and concisely illustrating the embodiments of the present invention. The following technical solutions shown in the drawings are specific solutions of the embodiments of the present invention and are not intended to limit the scope of the invention claimed for protection. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0064] In the description of the present invention, it should be understood that the terms "upper", "lower", "inside", "outside", "left", "right", etc. indicate directions or positional relationships based on the directions or positional relationships shown in the accompanying drawings, or are directions or positional relationships in which the utility model product is usually placed when in use, or are directions or positional relationships commonly understood by those skilled in the art. These directions or positional relationships are only for the convenience of describing the present invention and simplifying the description, and do not indicate or imply that the device or element referred to must have a specific direction, be constructed and operated in a specific direction, and therefore should not be understood as a limitation on the present invention.

[0065] like Figures 1 to 6 As shown, the present invention provides a prefabricated assembled space grid structure for tunnel support, which specifically includes at least two prefabricated grid support components 1, and each grid support component 1 is provided with connecting components 7 connected to adjacent grid support components 1 at both ends, and the connecting components 7 are mutually matching mortise and tenon connectors (such as Figure 4a and Figure 4b ) or sleeve connector or snap connector (such as Figure 4c and Figure 4d ) or plug-in connector or buckle connection (such as Figure 4e ), the first connecting member 7-1 and the second connecting member 7-2 of each connecting member 7 are respectively arranged at the joint position of two adjacent grid support members 1, and the connecting members 7 at both ends of each grid support member 1 are also matched with each other; at least two grid support members 1 are spliced ​​into a ring-shaped, rectangular, horseshoe-shaped or polygonal closed support structure with the same cross-section shape as the supporting tunnel 2 through the first connecting member 7-1 and the second connecting member 7-2. The prefabricated grid support member 1 is prefabricated in sections according to the cross-sectional shape of the tunnel and is adapted to the cross-sectional shape of the tunnel, and the specific shape of the assembly is not limited.

[0066] In the prefabricated and assembled space grid support structure for tunnel support provided in the present invention, each grid support member 1 is a grid support structure composed of an upper chord 3, a lower chord 4 and a web 5, wherein the upper chord 3 forms the soil-facing mesh surface of the grid support member 1 in contact with the inner wall of the tunnel 6, the lower chord 4 forms the soil-repelling mesh surface of the grid support member 1, the web 5 is connected between the upper chord 3 and the lower chord 4, and is separated between the upper chord 3 and the lower chord 4 to form a plurality of grid units, and a metal mesh 6 is provided on the soil-facing mesh surface of each grid support member 1. The soil-facing mesh surface and the soil-repelling mesh surface of the grid support member 1 respectively form the outer ring structure and the inner ring structure of the entire bracket, and since the rod bodies on the outer ring structure and the inner ring structure are evenly arranged, the force on the outer ring structure and the inner ring structure can be ensured to be uniform.

[0067] In the present invention, the soil-facing and soil-repelling surfaces of the grid unit of the grid support component 1 are triangles, squares, rectangles, pentagons or hexagons, and their facades are all triangles, ensuring that the smallest shape unit surrounded by the rods in the soil-facing and soil-repelling grids through the webs 5 is a triangle, and the support strength of the prefabricated components can be further improved through the triangular stable structure. The upper chord 3 and the lower chord 4 of the grid support component 1 are arc-shaped rod bodies formed by welding or direct bending or connecting through connectors any one or more of the rods selected from steel pipes, steel sections, steel bars, and steel tube concrete; and the webs 5 are connected between the upper chord 3 and the lower chord 4 by welding or connecting pieces to form an arc-shaped grid structure, and the webs 5 are any one or more of the rods selected from steel pipes, steel sections, steel bars, and steel tube concrete.

[0068] The grid support member 1 provided in the present invention is a grid support frame composed of a plurality of triangular pyramids or a plurality of quadrangular pyramids or a plurality of hexagonal pyramids, wherein the triangular pyramids are shown in Figures 7a and 8a, wherein the triangular base surfaces of two adjacent triangular pyramids are connected to form a curved surface, which is the facing surface of the grid support member 1, and the three support rods constituting the triangular base surfaces of the triangular pyramids are the upper chord rods of the grid support member 1, and the cone tips of two adjacent triangular pyramids are connected as a whole through an inner chord rod 4, and the three support rods constituting the cone body of the triangular pyramid after connection are the web rods of the grid support member 1. The four-sided pyramid is shown in Figures 7b and 8b. Like the three-sided pyramid, its four-sided bottom surface is connected to form a curved surface, which is the soil-facing surface of the grid support member 1. The four support rods constituting the four corner bottom surfaces of the four-sided pyramid are the upper chord rods of the grid support member 1. The cone tips of two adjacent four-sided pyramids are connected as a whole through the inner chord rod 4. After being connected, the four support rods constituting the four-sided pyramid body are the web rods of the grid support member 1. The hexagonal pyramid is shown in Figures 7c and 8c. Its hexagonal bottom surface is connected to form a curved surface, which is the soil-facing surface of the grid support member 1. The six support rods constituting the hexagonal bottom surface of the hexagonal pyramid are the upper chord rods of the grid support member 1. The cone tips of two adjacent hexagonal pyramids are connected as a whole through the inner chord rod 4. After being connected, the six support rods constituting the six-sided pyramid body are the web rods of the grid support member 1.

[0069] The present invention is further described below in conjunction with embodiments. The parameter value determination scheme calculation in the embodiments of the present invention can be implemented in various computer languages, for example, object-oriented programming language Java and interpreted scripting language JavaScript.

[0070] The embodiment provides a construction method for a prefabricated assembled space grid structure for tunnel support. The construction method is mainly for a grid support frame composed of a plurality of quadrangular pyramids. The spacing b between two adjacent ring grid support structures can be taken as 0 according to actual conditions. Figure 1 As shown, the tunnel section circumference Where n is the number of tunnel section components, Li is the length of the i-th component, the connecting components 7 on the grid support component 1 are mortise and tenon connectors that can be spliced ​​together, and the specific construction steps of the support structure are as follows:

[0071] (1) Determine the construction parameter values ​​of the tunnel support structure:

[0072] a. Obtain the parameter setting values ​​and tunnel model of the tunnel support structure; the parameters include but are not limited to: the longitudinal support length of each space grid support structure, the number of steel bars (tubes) per meter of the longitudinal section of the space grid support structure (single side), the thickness of the initial support, the material thickness of the rod (such as the diameter of the steel bar, the wall thickness of the steel pipe), the diameter of the connector, and the circumferential spacing of the connector. The setting values ​​of these parameters can be empirical parameter values ​​or design values. The tunnel model of the embodiment of the present invention is used to simulate the actual tunnel conditions and is related to the tunnel engineering geology, hydrogeological conditions, and existing tunnel design and construction experience. The tunnel conditions are related to parameters such as the surrounding rock grade at the tunnel, the tunnel extension method, the tunnel depth, and the tunnel cross-sectional shape;

[0073] b. According to the set values ​​of the parameter items and the tunnel model, the bearing load of the tunnel support structure and the elastic modulus of the equivalent space shell are calculated. The bearing load mainly includes self-weight load and external load. The external load mainly includes: stratum resistance and surrounding rock pressure, etc. The tunnel support structure can be equivalent to the space shell structure, and the elastic modulus of the equivalent space shell is calculated using the set values ​​of each parameter item of the tunnel support structure. This method can better simulate the tunnel support structure, and the calculated elastic modulus can be equivalent to the elastic modulus of the entire tunnel support structure;

[0074] c. Take the bearing load and elastic modulus as the input of the finite element algorithm to calculate the internal force parameters of the tunnel support structure, which include: bending moment, axial force (axial force) and shear force, etc.; verify the safety of the tunnel support structure based on the internal force parameters, and obtain the corresponding verification results. According to the verification results, adjust the values ​​of the parameter items. If the verification results indicate that the safety requirements are not met, it is necessary to adjust the values ​​of each parameter item and continue to verify to determine the parameter items that meet the safety requirements. If the verification results indicate that the safety requirements are met and exceed the safety requirements by a large margin, it is necessary to adjust the values ​​of each parameter item and continue to verify to save materials and reduce costs;

[0075] d. Finally, according to the verification results, adjust the value of the parameter item to obtain the final construction parameter value of the tunnel support structure;

[0076] (2) according to the construction parameter values ​​of the tunnel support structure calculated in step (1), determining the segmentation of each ring of the prefabricated assembled space grid support structure, selecting appropriate rods and connectors, and manufacturing the single grid support components and connectors of the grid support components of each ring of the prefabricated assembled space grid support structure in a factory or on site according to the segmentation conditions;

[0077] (3) After tunnel excavation, a single prefabricated grid support member is quickly assembled in the completed excavation section to form a tunnel support closed loop. Two adjacent grid support members are connected by a connecting member 7, and the connecting member 7 includes a mutually matching mortise and tenon connector, a sleeve connector, a snap connector, a disc connector, or a plug connector. When the connecting member is a mortise and tenon connector, such as Figure 4a and Figure 4b As shown, the first connecting member 7-1 and the second connecting member 7-2 constituting the connecting member 7 are mutually matching protrusions and grooves. When connecting, it is only necessary to directly connect the two parts and embed their protrusions into each other's grooves to clamp them. When the connecting member is a snap connector, such as Figure 4c and Figure 4d As shown, it includes a first connecting member with a bayonet and a second connecting member with a lock hole, the second connecting member is correspondingly inserted into the first connecting member and locked by a lock; when the connecting member is a buckle connection, as shown Figure 4eAs shown, a disc-type opening is provided on the first connecting member, and the second connecting member is locked by a locking block after being clamped with the first connecting member; the connecting member 7 in the embodiment is directly prefabricated according to the grid support member and then welded to the end of the grid support member; when installing the grid support member, the present invention adopts an electric multifunctional arch frame installation machine to replace the traditional vertical frame trolley, and automatically installs it through the multifunctional arch frame installation trolley lifting and arm grabbing and other operating means. The multifunctional arch frame installation machine has a multifunctional arch frame installation trolley with an automatic walking and automatic positioning system, and adopts a combination of an arm and a hanging basket to realize the omnidirectional movement of the multifunctional arch frame trolley and the precise lifting of the arch frame, so as to complete the arch frame installation construction process. The overall movement is fast and convenient, and the applicability is wide. The arch frame can be moved in all directions and placed in any position. The whole equipment is controlled by a safe hydraulic and electric control system;

[0078] (4) Continue to excavate the tunnel and continue to use the multifunctional arch frame installation machine to assemble the next ring of prefabricated and assembled space grid support structure in the excavation section; the two adjacent rings of space grid support structure can be overlapped by longitudinal connecting steel bars;

[0079] (5) According to the actual situation of the project, after the completion of a single-ring prefabricated and assembled space grid support structure or after the completion of several rings of prefabricated and assembled space grid support structure, concrete is sprayed or poured on the grid support structure, and the prefabricated and assembled space grid support structure is wrapped to form a lining structure; since the space grid support structure has strong rigidity and can bear the loose load of the surrounding rock during construction, the next process can be carried out without spraying concrete immediately. In order to speed up the excavation progress, the application of sprayed concrete is delayed within a certain distance from the heading, and only the space grid support structure can be used as the bearing structure for the initial support.

[0080] In an embodiment of the present invention, Fig.10 As shown, at least two space grid support structures are required, and the longitudinal support length L of each space grid support structure, the number of steel bars (tubes) per linear meter of the longitudinal section of the space grid support structure (single side) n, the thickness h of the initial support and other structural parameters are preliminarily formulated. These parameter items can take industry experience values. For other parameter items, a set value can be assumed, such as the thickness of the rod material, to perform structural mechanics analysis and check whether the structural safety factor meets the requirements. By calculating these parameter items, the values ​​of the parameter items that meet the safety requirements are obtained.

[0081] In the above embodiment, the deadweight load and the external load are determined as the bearing load of the tunnel support structure, and the calculation process for the bearing load is specifically as follows:

[0082] 1. Calculation of self-weight load

[0083] Wherein, according to the set value of the parameter item, the step of calculating the self-weight load of the tunnel support structure includes: using formula ① to calculate the self-weight load f of the tunnel support structure; wherein formula ① is:

[0084] f = γ1bh1;

[0085] Among them, γ1 represents the concrete weight of the tunnel support structure, b represents the longitudinal width of the calculation unit, and h1 represents the thickness of the tunnel support structure.

[0086] 2. Calculation of external loads

[0087] The step of calculating the external load of the tunnel support structure according to the tunnel model includes at least one of the following: calculating the stratum resistance borne by the tunnel support structure according to the tunnel model; calculating the surrounding rock pressure borne by the tunnel support structure according to the type of the tunnel model.

[0088] 1. Calculation of formation resistance

[0089] The step of calculating the ground resistance borne by the tunnel support structure according to the tunnel model includes: using the Winkel assumption algorithm to calculate the ground resistance coefficient of the tunnel model; and calculating the ground resistance borne by the tunnel support structure according to the ground resistance coefficient by the chain rod method. Specifically, in the chain rod method, the ground resistance is simulated by ground springs. The ground resistance coefficient is determined according to soil conditions and calculated according to the Winkel assumption. In the calculation, the tension spring is eliminated.

[0090] 2. Calculation of surrounding rock pressure

[0091] According to the type of tunnel model, the step of calculating the surrounding rock pressure borne by the tunnel support structure includes: according to the type of tunnel model, respectively calculating the vertical uniform pressure and the horizontal uniform pressure of the surrounding rock borne by the tunnel support structure. Among them, the calculation methods of the vertical uniform pressure and the horizontal uniform pressure under the tunnel model are different. The type of tunnel model is different, the calculation method of the vertical uniform pressure is different, and the calculation method of the horizontal uniform pressure is also different. The following embodiment will further illustrate the calculation of the surrounding rock pressure in combination with deep buried tunnels and shallow buried tunnels.

[0092] 2-1. Deep buried tunnel situation

[0093] The deep buried tunnel situation refers to the situation where the distance between the center line, top or bottom of the tunnel and the ground surface exceeds a certain value. In this embodiment, it refers to the situation other than the shallow buried tunnel situation. For the calculation of vertical uniform pressure: when the tunnel model is a deep buried tunnel, formula ② is used to calculate the vertical uniform pressure q (in kPa) of the surrounding rock borne by the tunnel support structure; where formula ② is:

[0094] q=γ2h q

[0095] Among them, h q =First constant×2 S-1 w, w=second constant+i(B-third constant);

[0096] Among them, γ2 represents the weight of the surrounding rock (the unit can be kN / m 3 ), h q It represents the calculated height of the surrounding rock collapse arch (in m), S represents the surrounding rock grade, w represents the width influence coefficient, B represents the tunnel excavation width (in m), and i represents the increase or decrease rate of surrounding rock pressure per unit length increase.

[0097] Optionally, the first constant may be 0.45, the second constant may be 1, and the third constant may be 5. Accordingly, h q =0.45×2 S-1 w, w = 1 + i (B-5). When B < 5 m, i = 0.2, and when B ≥ 5 m, i = 0.1.

[0098] For the calculation of horizontal uniform pressure: when the tunnel model is a deep buried tunnel, the product of the vertical uniform pressure of the surrounding rock borne by the tunnel support structure and the specific coefficient is determined as the horizontal uniform pressure of the surrounding rock borne by the tunnel support structure, where the value of the specific coefficient is related to the surrounding rock grade. For example, in this case, the horizontal uniform pressure can be determined by the following Table 1:

[0099] Table 1

[0100] Surrounding rock level Ⅰ~Ⅱ Ⅲ Ⅳ Ⅴ Horizontal uniform pressure 0 <0.15q (0.15~0.30)q (0.30~0.50)q

[0101] 2-2. Deep buried tunnel situation

[0102] Shallow tunnel refers to the situation where the distance between the center line, top or bottom of the tunnel and the ground surface is less than a certain value, such as the tunnel depth is greater than h q And less than 2.5h q situation.

[0103] Calculation of vertical uniform pressure: When the tunnel model is a shallow tunnel, use formula ③ to calculate the vertical uniform pressure q of the surrounding rock borne by the tunnel support structure; formula ③ is:

[0104]

[0105] in,

[0106]

[0107] γ2 represents the weight of the surrounding rock (unit can be kN / m 3), h2 represents the height of the tunnel top from the ground (in m), λ represents the lateral pressure coefficient, θ represents the friction angle on both sides of the tunnel top (in °, usually an empirical value), B represents the tunnel excavation width or tunnel span (in m), β represents the rupture angle at maximum thrust (in °), Indicates the calculated friction angle of the surrounding rock (in degrees).

[0108] Optionally, the fourth constant may be 1, the fifth constant may be 1, and the sixth constant may be 1. Accordingly,

[0109]

[0110]

[0111] Calculation of horizontal uniform pressure: When the tunnel model is a shallow buried tunnel, use formula ④ to calculate the horizontal uniform pressure e of the surrounding rock borne by the tunnel support structure. i ; Among them, formula ④ is:

[0112] e i =γ2h i λ

[0113] Among them, γ2 represents the weight of the surrounding rock (the unit can be kN / m 3 ), h i It represents the distance from any point inside or outside the tunnel to the ground (in meters), and λ represents the lateral pressure coefficient.

[0114] Furthermore, the surrounding rock pressure calculated above is the maximum relaxation load borne by the tunnel lining. However, considering the supporting effect of the surrounding rock in front of the face and the primary support and secondary lining at the rear, there is a certain spatial effect. In the actual construction process, the spatial grid support structure will not bear such a large load. Therefore, the above load is reduced in the design. Specifically, after calculating the surrounding rock pressure, the surrounding rock pressure is adjusted according to the load coefficient, where the load coefficient is the ratio of the load value passed by the trial calculation to the maximum load value. For example, assuming that the surrounding rock load is q, q = μq', where μ represents the load coefficient, which is the ratio of the load value passed by the trial calculation to the maximum load value, and q' represents the relaxation load acting on the tunnel support structure (spatial grid support structure).

[0115] It is worth pointing out that during the stage of erecting the space grid support structure and the shotcrete stage, different load coefficients μ are used to adjust the load acting on the tunnel support structure to obtain a load that meets the actual stress condition of the support structure.

[0116] The above introduces the calculation methods of bearing loads in different scenarios. The following will further explain the example of calculating the elastic modulus of the tunnel support structure in step 1 in combination with the application scenario.

[0117] Specifically, Figure 1 Taking the horseshoe-shaped cross-section structural lining of the dark-excavated tunnel shown in the figure as an example, the structural stress mode is mainly eccentric compression. According to the principle of equivalent tension and compression stiffness, the support structure in the erection support structure stage and the shotcrete spraying stage is equivalent to a spatial shell structure with a certain thickness.

[0118] In the stage of erecting the supporting structure, EA=E g (A g +A' g ), A=Lh, accordingly, step 13 comprises: using formula ⑤ to calculate the elastic modulus E of the equivalent spatial shell of the tunnel support structure; wherein formula ⑤ is:

[0119]

[0120] Among them, A g , A' g Indicates the cross-sectional area of ​​the rod in the tension and compression zones (units can be m 2 ), E g represents the material modulus of the rod, L represents the longitudinal length of a grid support structure in the tunnel support structure, and h represents the thickness of the equivalent space shell.

[0121] Among them, when the rod body is a steel bar, Among them, n represents the number of rods contained in the longitudinal section of a linear meter grid support structure, and D represents the diameter of the steel bar.

[0122] When the rod body is a steel pipe, n represents the number of rods contained in the longitudinal section of one meter of grid support structure, D represents the diameter of the steel pipe, and t represents the wall thickness of the steel pipe.

[0123] The above introduces the calculation of elastic modulus in the steel frame erection stage. For the shotcrete stage, according to existing design experience, the contribution of steel stiffness to the equivalent stiffness of the section is almost negligible at this stage. Therefore, the stiffness of shotcrete can be directly used as the stiffness of the equivalent section at this stage.

[0124] The calculation of internal force parameters is based on the calculation results of the above-mentioned bearing load and the elastic modulus of the equivalent space shell. According to the basic principles of elastic mechanics, the problem of solving the internal force of the tunnel section can be simplified to a plane strain problem. The finite element method is used to calculate the internal forces (bending moment M, axial force N and shear force Q) of the support structure in the steel frame erection stage and the shotcrete spraying stage.

[0125] After the internal force parameters are obtained, the safety of the tunnel support structure can be verified based on the internal force parameters. In the following embodiments of the present invention, the safety will be verified in combination with different construction stages to obtain appropriate design values ​​of the structural parameters.

[0126] In the stage of erecting the space grid support structure, the corresponding verification result is calculated using formula ⑥; when the verification result is that the safety factor is greater than or equal to the first value, it is determined that the safety of the tunnel support structure meets the requirements. Assuming that the first value is 2.4, then when K is greater than or equal to 2.4, the value of the parameter item of the tunnel support structure meets the safety requirements; otherwise, step 16 is executed to adjust the value of the parameter item and perform the next trial calculation until a suitable value is obtained.

[0127] Among them, formula ⑥ is: KN=αR g A, where K is the safety factor, N is the axial force, α is the eccentricity influence coefficient of the axial force, and R g It represents the ultimate tensile and compressive strength of the material of the grid support structure, and A represents the cross-sectional area of ​​the equivalent space shell.

[0128] Optionally, the eccentricity influence coefficient of the axial force is related to the eccentricity of the axial force and the thickness of the equivalent space shell. Among them, e0 represents the axial force eccentricity, and h represents the thickness of the equivalent spatial shell.

[0129] After the step of obtaining the verification result, the step of calculating other parameter values ​​may also be included. Specifically, the safety of the tunnel support structure is verified according to the internal force parameters to obtain the corresponding verification results. Then, the structural parameters of the connector are calculated using formula ⑦; wherein formula ⑦ is:

[0130]

[0131] K represents the safety factor, Q represents the shear force, R g Indicates the ultimate tensile and compressive strength of the material of the grid support structure, A k Indicates the cross-sectional area of ​​the connection between the connector and the rod, l e represents the length of the beam element selected in the finite element algorithm, θ represents the friction angle on both sides of the tunnel top, and c represents the circumferential spacing of the connector. Optionally, the seventh constant can be 0.8, and accordingly,

[0132] In this way, through shear strength calculation, the diameter d of the connector and the annular spacing c can meet the shear strength requirements of the structure.

[0133] The above introduces the safety verification method during the stage of erecting the space grid support structure. The following will further introduce the safety verification method after the shotcrete stage.

[0134] After the shotcrete stage, when the height of the concrete compression zone is less than or equal to the threshold, the corresponding verification result is calculated using formula ⑧; when the verification result shows that the safety factor is greater than or equal to the first value, it is determined that the safety of the tunnel support structure meets the requirements.

[0135] Among them, the formula ⑧ is:

[0136] KNe≤R w bx(h0-x / 2)+R g A' g (h0-a')

[0137] in,

[0138] K represents the safety factor, N represents the axial force, e, e ’ Indicates the distance from the center of gravity of the rod to the point of action of the axial force in the tension and compression zone, R w represents the ultimate compressive strength of concrete, b represents the longitudinal width of the calculation unit, x represents the height of the concrete compression zone (in meters), R g Indicates the ultimate tensile and compressive strength of the material of the grid support structure, A g , A' g Indicates the cross-sectional area of ​​the rod in the tension and compression zone (unit can be m 2 ), a and a' represent the shortest distances from the center of gravity of the rod in the tension and compression zones to the edge of the cross section of the equivalent space shell (in m), and h0 represents the effective height of the cross section of the equivalent space shell, h0 = ha.

[0139] Specifically, in the stress stage after the shotcrete stage, the moment at the point of action of the axial force is R g (A g eA' g e')=R w bx(e-h0-x / 2), from which we can deduce: Among them, R w represents the ultimate compressive strength of concrete, x represents the height of the concrete compression zone, R g , R' g Indicates the tensile and compressive strength of the material of the grid support structure, A g , A' g represents the cross-sectional area of ​​the rod in the tension and compression zone, e and e' represent the distance from the center of gravity of the rod in the tension and compression zone to the axial force application point, and a and a' represent A g , A' g The closest distance from the center of gravity to the edge of the cross section of the equivalent space shell, h0 represents the effective height of the cross section of the equivalent space shell.

[0140] Accordingly, assuming that the threshold is 0.55h0, when x is less than or equal to 0.55h0, it is a large eccentric compression member and is calculated according to the eighth formula, that is, KNe≤R w bx(h0-x / 2)+R g A' g (h0-a'), the calculation must satisfy x≥2a'. If it does not meet the requirement, that is, when x<2a', follow KNe'≤R g A g (h0-a') calculation.

[0141] After the shotcrete stage, when the height of the concrete compression zone is greater than the threshold, the corresponding verification result is calculated using formula 9; when the verification result shows that the safety factor is greater than or equal to the first value, it is determined that the safety of the tunnel support structure meets the requirements. Formula 9 is: Among them, K represents the safety factor, N represents the axial force, e represents the distance from the center of gravity of the rod to the point of action of the axial force, and R a represents the ultimate compressive strength of concrete, b represents the longitudinal width of the calculation unit, R g Indicates the ultimate tensile and compressive strength of the material of the grid support structure, A' g represents the cross-sectional area of ​​the rod, a' represents the shortest distance from the center of gravity of the rod to the cross-sectional edge of the equivalent space shell, and h0 represents the effective height of the cross-sectional area of ​​the equivalent space shell.

[0142] Accordingly, assuming that the threshold is 0.55h0, when x is greater than 0.55h0, it is a small eccentric compression member, and the section strength is calculated according to the ninth formula. The eighth constant can be 0.5, that is,

[0143] The above introduces the calculation method of the main reinforcement in this construction stage. The following will further introduce the safety factor after reinforcement:

[0144]

[0145] In this embodiment, it is assumed that the first value is 2.4, that is, when K is greater than or equal to 2.4, it indicates that the design value of the parameter item of the tunnel support structure meets the safety requirements.

[0146] The above mainly designs and verifies the values ​​of parameter items of the rods in the tunnel support structure. The following will further design and verify the values ​​of parameter items of the connectors with examples.

[0147] Specifically, after the step of verifying the safety of the tunnel support structure according to the internal force parameters and obtaining the corresponding verification results, the method further includes: using formula ⑩ to calculate the structural parameters of the connector; wherein formula ⑩ is:

[0148]

[0149] K represents the safety factor, Q represents the shear force, R a represents the ultimate compressive strength of concrete, b represents the longitudinal width of the calculation unit, h0 represents the effective height of the cross section of the equivalent space shell, R g Indicates the ultimate tensile and compressive strength of the material of the grid support structure, A k Indicates the cross-sectional area of ​​the connection between the connector and the rod, l e represents the length of the beam element selected in the finite element algorithm, θ represents the friction angle on both sides of the tunnel top, and c represents the circumferential spacing of the connectors. Assuming that the ninth constant is 0.07 and the tenth constant is 0.8, the tenth formula is: Based on this formula, the limit value of the annular spacing of connectors that meets the shear resistance requirements can be calculated.

[0150] In the embodiment of the present invention, when the verification result is that the safety factor is less than the safety requirement threshold, the value of the parameter item is increased; when the verification result is that the safety factor exceeds the safety requirement threshold and reaches a specific value, the value of the parameter item is reduced; when the verification result is that the safety factor exceeds the safety requirement threshold but does not reach a specific value, the set value of the parameter item is kept unchanged. Taking the safety factor K as an example, assuming that the first value is 2.4, if K<2.4, it means that the current design value of the parameter item of the tunnel support structure is unsafe, and the design value needs to be increased and recalculated; if K>>2.4, it means that the bearing capacity of the tunnel support structure is more abundant, and the design value of the parameter item needs to be reduced and recalculated; when K is slightly greater than 2.4, it means that the bearing capacity of the tunnel support structure can meet the requirements and is more economical.

[0151] It is worth pointing out that the initial support is a temporary structure during the construction period, and the proportional coefficient of the surrounding rock load will be improved after the secondary lining is applied. Therefore, it is not necessary to check the crack width during the construction period, but it can be used as a reference indicator during the design. For reinforced concrete tension, bending and eccentric compression members, the crack width does not need to be checked for eccentric compression members with e0≤0.55h0. In other cases, the crack width is calculated according to the following formula:

[0152]

[0153] Among them, ω max represents the maximum crack width (unit can be mm); α represents the component stress characteristic coefficient of the tunnel support structure. The tunnel is an eccentrically compressed component, and α can be 1.9; represents the non-uniform coefficient of strain of longitudinal tensile reinforcement between cracks, when hour, Take 0.2, when hour, Take 0.2, when hour, Take 1.0, for components directly subjected to repeated loads, Take 1.0; ρ te represents the longitudinal tensile reinforcement ratio calculated based on the effective tensile concrete area, ρ te =A s / A ce , when ρ te <0.01, ρ te Take 0.01; A s Represents the cross-sectional area of ​​the longitudinal reinforcement in the tension zone; A ce A represents the effective tensile concrete cross-sectional area, ce =0.5bh; C s It indicates the distance from the outer edge of the outermost longitudinal tensile zone to the bottom edge of the tensile zone (in mm). s <20, C s Take 20, when C s >65, C s Take 65; d represents the diameter of the steel bar (the unit can be mm). When using steel bars of different diameters, d = 4A s / (γμ), μ represents the sum of the cross-sectional perimeters of the longitudinal tensile reinforcement; γ represents the surface characteristic coefficient of the longitudinal tensile reinforcement, which is 1 for deformed reinforcement and 0.7 for smooth reinforcement; E s Represents the elastic modulus of the steel bar (in MPa); σ s represents the stress of the longitudinal tensile reinforcement (in MPa), σ s =N s (ez) / (A s z), N s It indicates the axial force value calculated according to the load combination, z indicates the distance from the tensile force point to the compressive force point, z = [0.87-0.12 (h0 / e) 2 ]h0, and z<0.87h0.

[0154] Before the construction of the spatial grid support structure in the present invention, the stress conditions of the support structure can be calculated according to the geological conditions of the tunnel through the above-mentioned calculation process, and the various parameters of the tunnel support structure can be determined in combination with the assembly capacity of the assembly trolley and the cross-sectional dimensions of the tunnel. The support structure is then prefabricated and assembled into a support structure with the same cross-sectional shape as the tunnel, thereby realizing parameter design of the support structure that can provide a large bearing capacity before spraying concrete, ensuring that the designed support structure can meet construction safety requirements. Since the support structure can provide a large bearing capacity before spraying concrete, the next process can be carried out within a certain operating range without spraying concrete, thereby improving construction efficiency.

[0155] Although the preferred embodiments of the present invention have been described, those skilled in the art may make additional changes and modifications to these embodiments once they are aware of the basic creative concepts. Therefore, the attached claims are intended to be interpreted as including the preferred embodiments and all changes and modifications that fall within the scope of the present invention. It should be noted that for those of ordinary skill in the art, several variations and improvements may be made without departing from the concept of the present invention, which all belong to the scope of protection of the present invention. Therefore, the scope of protection of the present invention shall be subject to the attached claims.

Claims

1. A construction method for a prefabricated assembled space grid support structure for tunnel support, characterized in that: The prefabricated assembled space grid support structure comprises at least two prefabricated grid support components (1), each grid support component (1) is provided with connecting components (7) at both ends thereof for connecting with adjacent grid support components (1), and at least two grid support components (1) are connected head to tail by the connecting components (7) to form a closed support structure having a cross-section having the same shape as the cross-section of the supporting tunnel (2); each grid support component (1) is composed of an upper chord (3), a lower chord ( The mesh support structure is composed of a mesh bar (4) and a web bar (5), wherein the upper chord bar (3) forms a soil-facing mesh surface of the mesh support component (1) in contact with the inner wall of the tunnel (2), the lower chord bar (4) forms a soil-repelling mesh surface of the mesh support component (1), the web bar (5) is connected between the upper chord bar (3) and the lower chord bar (4), and is divided between the upper chord bar (3) and the lower chord bar (4) to form a plurality of mesh units, and a metal mesh (6) is provided on the soil-facing mesh surface of each mesh support component (1); The prefabricated and assembled space grid support structure comprises at least two rings, and the specific construction steps are as follows: S1. Obtain various parameter setting values ​​and a tunnel model of the tunnel support structure; and calculate the bearing load of the tunnel support structure and the elastic modulus of the equivalent space shell according to the parameter setting values ​​and the tunnel model; use the bearing load and the elastic modulus as inputs of the finite element algorithm to calculate the internal force parameters of the tunnel support structure, verify the safety of the tunnel support structure according to the internal force parameters, obtain corresponding verification results, and finally adjust the parameter values ​​according to the verification results to obtain the final construction parameter values ​​of the tunnel support structure; The calculated bearing load of the tunnel support structure includes the deadweight load of the tunnel support structure and the external load of the tunnel support structure; The self-weight load f of the tunnel support structure is calculated using formula ①: f=γ1bh1; ① In formula ①, γ1 represents the concrete weight of the tunnel support structure, b represents the longitudinal width of the calculation unit, and h1 represents the thickness of the tunnel support structure; The external load of the tunnel support structure includes the calculation of at least one of the stratum resistance borne by the tunnel support structure and the surrounding rock pressure borne by the tunnel support structure; wherein the surrounding rock pressure borne by the tunnel support structure includes the vertical uniform pressure and the horizontal uniform pressure of the surrounding rock borne by the tunnel support structure; the calculation process of the stratum resistance borne by the tunnel support structure is as follows: (1) using the Winkel hypothesis algorithm to calculate the stratum resistance coefficient of the tunnel model; (2) calculating the stratum resistance borne by the tunnel support structure according to the stratum resistance coefficient by means of a chain rod method; After the surrounding rock pressure borne by the tunnel support structure is calculated, the surrounding rock pressure is adjusted according to the load coefficient, wherein the load coefficient is the ratio of the load value passed by the trial calculation to the maximum load value; When the tunnel model is a deep-buried tunnel, the vertical uniformly distributed pressure q of the surrounding rock borne by the tunnel support structure is calculated using the following formula ②: q=γ2h q ② In formula ②, h q =First constant×2 S-1 w, w = the second constant + i (B-the third constant); γ2 represents the weight of the surrounding rock, h q represents the calculated height of the surrounding rock collapse arch, S represents the surrounding rock grade, w represents the width influence coefficient, B represents the tunnel excavation width, and i represents the increase or decrease rate of surrounding rock pressure per unit length increase; The horizontal uniform pressure of the surrounding rock borne by the tunnel support structure is the product of the vertical uniform pressure q of the surrounding rock borne by the tunnel support structure calculated above and a specific coefficient; wherein the value of the specific coefficient is related to the grade of the surrounding rock; When the tunnel model is a shallow buried tunnel, the vertical uniformly distributed pressure q of the surrounding rock borne by the tunnel support structure is calculated using formula ③: in, γ2 represents the weight of the surrounding rock, h2 represents the height of the tunnel top from the ground, λ represents the lateral pressure coefficient, θ represents the friction angle on both sides of the tunnel top, B represents the tunnel excavation width, β represents the rupture angle at the maximum thrust, φ c It represents the calculated friction angle of surrounding rock; The horizontal uniform pressure of the surrounding rock borne by the tunnel support structure is i Calculated using formula ④, e i =γ2h i λ ④ Where γ2 represents the weight of surrounding rock, h i represents the distance from any point inside or outside the tunnel to the ground, and λ represents the lateral pressure coefficient; The elastic modulus E of the equivalent spatial shell of the tunnel support structure is calculated using formula ⑤: Among them, A g , A ‘ g Indicates the cross-sectional area of ​​the rod in the tension and compression zones, in m 2 , E g represents the material modulus of the rod, L represents the longitudinal length of a grid support structure in the tunnel support structure, and h represents the thickness of the equivalent space shell; S2. According to the construction parameter values ​​of the tunnel support structure calculated in step S1, determine the segmentation of each ring of prefabricated assembled space grid support structure, and select appropriate rods to produce the single grid support components and the connecting parts of the grid support components of each ring of prefabricated assembled space grid support structure in the factory or on site according to the segmentation; S3. After tunnel excavation, prefabricated single grid support components are quickly assembled in the completed excavation section to form a tunnel support closed loop; S4. Continue to excavate the tunnel and assemble the next ring of prefabricated and assembled space grid support structure in the excavation section; S5. According to the actual situation of the project, after completing a single-ring prefabricated and assembled space grid support structure or completing several rings of prefabricated and assembled space grid support structures, spray or pour concrete on the grid support structure, and wrap the prefabricated and assembled space grid support structure to form a lining structure.

2. The construction method of a prefabricated and assembled space grid support structure for tunnel support according to claim 1 is characterized in that: The grid unit soil-facing and soil-repelling surfaces of the grid support component (1) are in the shape of a triangle, square, rectangle, pentagon or hexagon, and the vertical surface is in the shape of a triangle.

3. The construction method of a prefabricated and assembled space grid support structure for tunnel support according to claim 1, characterized in that: The grid support member (1) is a grid-type support frame composed of a plurality of triangular pyramids, a plurality of quadrangular pyramids or a plurality of hexagonal pyramids.

4. The construction method of a prefabricated and assembled space grid support structure for tunnel support according to claim 1, characterized in that: The upper chord (3) and the lower chord (4) of the grid support member (1) are arc-shaped rod bodies formed by welding or directly bending or connecting through connectors any one or more of the rods selected from the group consisting of steel pipes, steel sections, steel bars, and steel tube concrete; and a web member (5) is connected between the upper chord (3) and the lower chord (4) by welding or connecting through connectors to form an arc-shaped grid structure, wherein the web member (5) is any one or more of the rods selected from the group consisting of steel pipes, steel sections, steel bars, and steel tube concrete.

5. The construction method of a prefabricated and assembled space grid support structure for tunnel support according to claim 1, characterized in that: The connecting members (7) are mutually matching mortise and tenon connectors or sleeve connectors or snap connectors or plug-in or welded connectors, and the mutually matching first connector (7-1) and second connector (7-2) of each connecting member (7) are respectively arranged at the butt joints of two adjacent grid support members (1), and the connecting members (7) at both ends of each grid support member (1) are also mutually matched; at least two grid support members (1) are connected by splicing or welding or a combination of splicing and welding through the first connector (7-1) and the second connector (7-2) to form a ring-shaped, rectangular, horseshoe-shaped or polygonal closed support structure with the same cross-section shape as the support tunnel (2).

6. The construction method of a prefabricated and assembled space grid support structure for tunnel support according to claim 1, characterized in that: The parameters of the tunnel support structure in step S1 include the longitudinal support length of the monolithic prefabricated and assembled space grid support structure, the number of longitudinal cross-section rods per linear meter of the tunnel support structure, the thickness of the initial support, the material thickness of the rod, the diameter of the connecting parts, the annular spacing of the connecting parts, the materials of the rods and connecting parts, and the geometric dimensions of the rods and connecting parts, all or any number of parameters.