Assembled installation structure and construction method of rail-top air duct in subway station

By decomposing the rail air duct into upper and lower structures of the air duct, and using the combined connection method of hanging beams and assembly bolts, the problems of weakening structural strength and high cost in the prior art are solved, and safer and more economical installation is achieved method.

CN112343640BActive Publication Date: 2024-11-26CHINA RAILWAY SIYUAN SURVEY & DESIGN GRP CO LTD

Patent Information

Application Number
CN202011076944.9
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2020-10-10
Publication Date
2024-11-26
Estimated Expiration
2040-10-10

AI Technical Summary

Technical Problem

During the installation of subway station rail top air ducts, the prior art requires opening or embedding components in the middle plate of the station, resulting in weakening of structural strength and rigidity, and the cost and installation difficulty of prefabricated rail top air ducts are relatively high.

Method used

Adopting a prefabricated installation structure, the rail top air duct is broken down into the upper and lower air duct structures. The upper air duct structure is integrally formed with the station structural plate, and is spliced ​​through the segments of the prefabricated air duct bottom plate and the lower side plate, and the hanging beams and assembly bolts are used. The combined connection method realizes reliable connection between the upper and lower structures of the air duct.

Benefits of technology

It improves the connection reliability of the rail duct and the station structural plate, avoids the weakening of structural strength and stiffness, reduces installation difficulty and cost, and improves operational safety.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN112343640B_ABST
    Figure CN112343640B_ABST
Patent Text Reader

Abstract

The present invention relates to an assembled installation structure of a rail-top air duct of a subway station and a construction method thereof. The installation structure includes a station structural plate, an air duct upper structure and an air duct lower structure. The air duct upper structure includes two upper side panels integrally formed with the station structural plate, and the air duct lower structure includes an air duct bottom plate and two lower side panels connected to the two ends of the air duct bottom plate. The air duct bottom plate and the lower side panels are both prefabricated components, and the two lower side panels are assembled and connected with the two upper side panels in a one-to-one correspondence. The present invention decomposes the rail-top air duct into an air duct upper structure and an air duct lower structure. The air duct upper structure is integrally formed with the station structural plate to ensure a reliable connection between the rail-top air duct and the station structural plate, and avoids opening holes or pre-embedded components on the station structural plate, which leads to weakening of the station structural plate's structural strength and stiffness and other properties; only the air duct lower structure needs to be prefabricated, transported and installed, and the prefabrication production cost, transportation cost and installation cost are significantly reduced.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of subway engineering, and in particular relates to an assembled installation structure of a rail top air duct of a subway station and a construction method thereof. Background Art

[0002] The rail-top air duct of a subway station is a U-shaped structure suspended under the middle plate. As a secondary structure of a subway station, it is often necessary to re-erect scaffolding and formwork after the station structure construction is completed. During construction, it is necessary to reserve steel bars at the bottom of the middle plate in advance to achieve the connection between the rail-top air duct and the middle plate structure. Due to the small construction space and the influence of the middle plate on formwork and pouring, the construction is time-consuming and labor-intensive, and the construction quality is usually difficult to guarantee.

[0003] Some subway stations also use prefabricated track-top air ducts, such as patent application CN201910628296.4, which opens a hole on the station mid-plate, hoists the prefabricated track-top air duct in place, and then casts concrete to fix the track-top air duct to the station mid-plate; patent applications CN208702444U, CN201911341313.2, etc. pre-embed bolts on the station mid-plate to fix the track-top air duct to the station mid-plate. The installation structures of these track-top air ducts will weaken the structural strength and rigidity of the station mid-plate because they need to open holes or pre-embed components on the station mid-plate; in addition, the prefabricated track-top air ducts have relatively high costs for prefabrication, transportation, and installation. Summary of the invention

[0004] The invention relates to an assembled installation structure of a rail top air duct in a subway station and a construction method thereof, which can at least solve some defects of the prior art.

[0005] The present invention relates to an assembled installation structure of a rail-top air duct in a subway station, comprising a station structural plate, an air duct upper structure and an air duct lower structure, wherein the air duct upper structure comprises two upper side panels integrally formed with the station structural plate, and the air duct lower structure comprises an air duct bottom plate and two lower side panels connected to both ends of the air duct bottom plate, wherein both the air duct bottom plate and the lower side panels are prefabricated components, and the two lower side panels are assembled and connected with the two upper side panels in a one-to-one correspondence.

[0006] As one of the embodiments, a hanging beam is embedded in the bottom end of the upper side panel, and a plurality of assembly bolts are embedded in the top end of the lower side panel. The hanging beam is provided with a mounting groove extending along the longitudinal direction of the air duct and a plurality of insertion holes connected to the mounting groove and capable of accommodating the assembly bolts to be inserted. The groove width of the mounting groove is smaller than the head diameter of the assembly bolt. The bolt head is inserted from the insertion hole and slides along the mounting groove to a preset position so as to be mounted on the hanging beam.

[0007] As one of the embodiments, a locking nut is disposed on the assembly bolt, and the locking nut abuts against the hanging beam.

[0008] As one of the implementation modes, the hanging beam is a hollow rectangular beam, the top end of which is pre-buried in the bottom end of the upper side plate and is connected to a plurality of anchor bolts anchored in the upper side plate.

[0009] As one of the implementation modes, the assembly bolt is a stud bolt, including a first head mounted on the hanging beam and a second head anchored in the lower side plate.

[0010] As one of the implementation modes, the air duct bottom plate and the two lower side plates are prefabricated as one piece.

[0011] As one of the implementation modes, the air duct bottom plate and the lower side plates are prefabricated in sections, and adjacent prefabricated sections are spliced.

[0012] As one of the implementation modes, the two upper side panels are integrally prefabricated or integrally cast with the station structure panel.

[0013] The present invention also relates to a construction method of the assembled installation structure of the rail top air duct of the subway station as described above, comprising:

[0014] Complete the integrated construction of the station structure slab and the two upper side slabs;

[0015] The prefabrication of the lower structure of the air duct is carried out offline; the prefabricated lower structure of the air duct is transported to the site, and the corresponding assembly connection between the two lower side panels and the two upper side panels is completed.

[0016] As one of the implementation modes, the above construction method further includes:

[0017] When the upper side plate is constructed, a hanging beam is pre-buried at the bottom end of the upper side plate, and the hanging beam is provided with a mounting groove extending along the longitudinal direction of the air duct and a plurality of insertion holes connected to the mounting groove and capable of accommodating the assembly bolts to be inserted, and the groove width of the mounting groove is smaller than the head diameter of the assembly bolt;

[0018] The lower structure of the air duct is prefabricated in sections, and in each prefabricated section, a plurality of assembly bolts are embedded at the top of the side plate of the lower section;

[0019] The prefabricated segments of the lower structure of the air duct are installed in sequence. Specifically, the assembly bolts on the lower side plates of the prefabricated segments are inserted from the insertion holes and slid along the mounting channels to the preset positions so as to be mounted on the hanging beams.

[0020] Seal the gap between the upper structure and the lower structure of the duct.

[0021] The present invention has at least the following beneficial effects:

[0022] The assembled installation structure of the rail-top air duct of the subway station provided by the present invention decomposes the rail-top air duct into an air duct upper structure and an air duct lower structure. The air duct upper structure is integrally formed with the station structure plate, thereby ensuring a reliable connection between the rail-top air duct and the station structure plate, avoiding opening holes or pre-embedded components on the station structure plate, thereby preventing the weakening of the station structure plate's structural strength and rigidity, and other properties, thereby improving the operational safety of the subway station. In actual engineering, only the air duct lower structure needs to be prefabricated, transported, and installed, and the prefabrication production cost, transportation cost, and installation cost are significantly reduced, and the installation difficulty of the rail-top air duct can be significantly reduced. BRIEF DESCRIPTION OF THE DRAWINGS

[0023] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0024] Figure 1 A schematic plan view of an assembled installation structure of a rail-top air duct in a subway station provided by an embodiment of the present invention;

[0025] Figure 2 A schematic diagram of the integrated structure of the station structural plate and the air duct upper structure provided by an embodiment of the present invention;

[0026] Figure 3 for Figure 1 Sectional view of AA in the middle;

[0027] Figure 4 for Figure 3 Schematic diagram of the assembly process of Part I;

[0028] Figure 5-Figure 6 for Figure 1 Schematic diagram of the construction process of the medium BB. DETAILED DESCRIPTION

[0029] The technical solutions in the embodiments of the present invention are described clearly and completely below. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0030] like Figure 1-Figure 6An embodiment of the present invention provides an assembled installation structure of a rail-top air duct in a subway station, comprising a station structure plate 1, an air duct upper structure and an air duct lower structure 22, wherein the air duct upper structure comprises two upper side panels 21 integrally formed with the station structure plate 1, and the air duct lower structure 22 comprises an air duct bottom plate 222 and two lower side panels 221 connected to both ends of the air duct bottom plate 222, wherein the air duct bottom plate 222 and the lower side panels 221 are both prefabricated components, and the two lower side panels 221 are assembled and connected to the two upper side panels 21 in a one-to-one correspondence.

[0031] The station structure panel 1 is generally a station middle panel. For a cast-in-place station structure panel 1, the two upper side panels 21 are cast-in-place together with the station structure panel 1; for a prefabricated station structure panel 1, the two upper side panels 21 are prefabricated together with the station structure panel 1.

[0032] In one embodiment, the air duct lower structure 22 is an integrated prefabricated structure, that is, the air duct bottom plate 222 is prefabricated integrally with the two lower side plates 221. Generally, the upper side plates 21, the lower side plates 221 and the air duct bottom plate 222 are all reinforced concrete components. The integrated molding method between the upper side plates 21 and the station structure plate 1 and the integrated prefabrication method between the lower side plates 221 and the air duct bottom plate 222 are conventional engineering methods, which will not be described in detail here.

[0033] In one embodiment, if Figure 5 and Figure 6 The air duct bottom plate 222 and the lower side plate 221 are prefabricated in sections, and adjacent prefabricated sections 220 are spliced; the prefabrication in sections can facilitate the prefabrication, transportation and installation of the air duct lower structure 22. For the splicing between adjacent prefabricated sections 220, it is preferred to adopt a tongue-and-groove splicing structure, which is a prior art in the field and will not be described in detail here. In the above-mentioned solution of cast-in-place molding of the two upper side plates 21 and the station structure plate 1, the two upper side plates 21 can be cast in one time to ensure structural strength.

[0034] The assembled installation structure of the rail-top air duct of the subway station provided in this embodiment decomposes the rail-top air duct into an air duct upper structure and an air duct lower structure 22. The air duct upper structure is integrally formed with the station structure plate 1 to ensure a reliable connection between the rail-top air duct and the station structure plate 1, avoiding opening holes or pre-embedded components on the station structure plate 1, which may weaken the structural strength and rigidity of the station structure plate 1, thereby improving the operational safety of the subway station. In actual engineering, only the air duct lower structure 22 needs to be prefabricated, transported and installed, and the prefabrication production cost, transportation cost and installation cost are significantly reduced, and the installation difficulty of the rail-top air duct can be significantly reduced.

[0035] For the connection between the air duct upper structure and the air duct lower structure 22, preferably, as Figure 2-Figure 6 A hanging beam 211 is embedded in the bottom end of the upper side plate 21, and a plurality of assembly bolts 2211 are embedded in the top end of the lower side plate 221. The hanging beam 211 is provided with a mounting groove extending along the longitudinal direction of the air duct and a plurality of insertion holes 2111 connected to the mounting groove and capable of accommodating the assembly bolts 2211 to be inserted. The groove width of the mounting groove is smaller than the head diameter of the assembly bolt 2211. The bolt head is inserted from the insertion hole 2111 and slides along the mounting groove to a preset position so as to be mounted on the hanging beam 211. It can be understood that the length direction of the above-mentioned hanging beam 211 is parallel to the longitudinal direction of the air duct; the above-mentioned hanging beam 211 can be a hollow structure, so that the head of the assembly bolt 2211 can move in the hollow cavity thereof, and the above-mentioned mounting groove is a strip groove, and its groove width is preferably slightly larger than the rod diameter of the assembly bolt 2211, so that the clearance between the two is appropriate; the above-mentioned multiple insertion holes 2111 can be expanded on the basis of the above-mentioned mounting groove to ensure that after the head of the assembly bolt 2211 is inserted into the insertion hole 2111, the rod of the assembly bolt 2211 can slide in the mounting groove.

[0036] In one embodiment, the hanging beam 211 is a hollow rectangular beam, the top of which is pre-buried in the bottom of the upper side plate 21, and the mounting channel is opened at the bottom of the hollow rectangular beam. Figure 2-Figure 6 The top of the hanging beam 211 is connected with a plurality of anchor bolts 212, each anchor bolt 212 is anchored in the upper side plate 21, which can ensure the stability and reliability of the embedded structure of the hanging beam 211, so as to provide reliable mounting conditions for the lower structure 22 of the air duct. Figure 3-Figure 6 The assembly bolt 2211 is a double-headed bolt, including a first head mounted on the hanging beam 211 and a second head anchored in the lower side plate 221. Therefore, the assembly bolt 2211 not only serves as a mounting component, but also serves as an anchoring component, ensuring the stability and reliability of the embedded structure of the assembly bolt 2211 in the lower side plate 221, and avoiding separation between the assembly bolt 2211 and the lower side plate 221 to affect the structural safety of the rail top air duct.

[0037] More preferably, if Figure 4 The assembly bolt 2211 is provided with a locking nut 2212, and the locking nut 2212 abuts against the hanging beam 211. The assembly bolt 2211 can be locked on the hanging beam 211 through the locking nut 2212, thereby ensuring the stability and reliability of the assembly structure between the lower structure 22 of the air duct and the upper structure of the air duct, and avoiding the shaking of the lower structure 22 of the air duct during operation.

[0038] Further preferably, the gap between the upper side plate 21 and the lower side plate 221 is preferably sealed to ensure the sealing of the rail top air duct. For example, it can be sealed by grouting through the tube holes, which is a conventional method in the field and will not be described in detail here.

[0039] The embodiment of the present invention also relates to a construction method of the assembled installation structure of the rail top air duct of the subway station as described above, comprising:

[0040] Complete the integrated construction of the station structure slab 1 and the two upper side slabs 21;

[0041] The prefabrication of the lower structure 22 of the air duct is performed offline; the prefabricated lower structure 22 of the air duct is transported to the site, and the corresponding assembly connection between the two lower side panels 221 and the two upper side panels 21 is completed.

[0042] Furthermore, the above construction method comprises:

[0043] When the upper side plate 21 is constructed, a hanging beam 211 is pre-buried at the bottom of the upper side plate 21. The hanging beam 211 is provided with a mounting groove extending along the longitudinal direction of the air duct and a plurality of insertion holes 2111 connected to the mounting groove and capable of accommodating the assembly bolts 2211 to be inserted. The groove width of the mounting groove is smaller than the head diameter of the assembly bolts 2211.

[0044] The lower structure 22 of the air duct is prefabricated in sections, and in each prefabricated section 220, a plurality of assembly bolts 2211 are pre-embedded at the top of the lower section side plate 221;

[0045] The prefabricated segments 220 of the lower structure 22 of the air duct are installed in sequence. Specifically, the assembly bolts 2211 on the lower side plates 221 of the prefabricated segments 220 are inserted from the insertion holes 2111 and slide along the mounting grooves to the preset positions so as to be mounted on the hanging beams 211.

[0046] The gap between the air duct upper structure and the air duct lower structure 22 is sealed, for example, by grouting the tube holes, which is a conventional method in the art and will not be described in detail here.

[0047] The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims

1. An assembled installation structure for the rail top air duct in a subway station. Features: It includes a station structure plate, an air duct upper structure and an air duct lower structure, wherein the air duct upper structure includes two upper side panels integrally formed with the station structure plate, and the air duct lower structure includes an air duct bottom plate and two lower side panels connected to both ends of the air duct bottom plate, wherein the air duct bottom plate and the lower side panels are both prefabricated components, and the two lower side panels are assembled and connected with the two upper side panels in a one-to-one correspondence; A hanging beam is embedded in the bottom end of the upper side plate, and a plurality of assembly bolts are embedded in the top end of the lower side plate. The hanging beam is provided with a mounting groove extending in the longitudinal direction of the air duct and a plurality of insertion holes connected with the mounting groove and capable of inserting the assembly bolts. The groove width of the mounting groove is smaller than the head diameter of the assembly bolt. The bolt head is inserted from the insertion hole and slides along the mounting groove to a preset position so as to be mounted on the hanging beam. The assembly bolt is provided with a locking nut, and the locking nut abuts against the hanging beam; The hanging beam is a hollow rectangular beam, the top end of which is pre-buried in the bottom end of the upper side plate and connected to a plurality of anchor bolts anchored in the upper side plate; The assembly bolt is a stud bolt, comprising a first head mounted on the hanging beam and a second head anchored in the lower side plate.

2. The assembled installation structure of the rail top air duct of a subway station according to claim 1, Features: The air duct bottom plate and the two lower section side plates are prefabricated in one piece.

3. The assembled installation structure of the rail top air duct of a subway station according to claim 1, Features: The air duct bottom plate and the lower side plates are prefabricated in sections, and adjacent prefabricated sections are spliced.

4. The assembled installation structure of the rail top air duct of a subway station according to claim 1, Features: The two upper side panels are integrally prefabricated or integrally cast with the station structure panel.

5. The construction method of the assembled installation structure of the rail top air duct of a subway station according to any one of claims 1 to 4, It is characterized in that include: Complete the integrated construction of the station structure slab and the two upper side slabs; Prefabricate the lower structure of the air duct offline; transport the prefabricated lower structure of the air duct to the site, and complete the corresponding assembly connection between the two lower side panels and the two upper side panels; When the upper side plate is constructed, a hanging beam is pre-buried at the bottom end of the upper side plate, and the hanging beam is provided with a mounting groove extending along the longitudinal direction of the air duct and a plurality of insertion holes connected to the mounting groove and capable of accommodating the assembly bolts to be inserted, and the groove width of the mounting groove is smaller than the head diameter of the assembly bolt; The lower structure of the air duct is prefabricated in sections, and in each prefabricated section, a plurality of assembly bolts are embedded at the top of the side plate of the lower section; The prefabricated segments of the lower structure of the air duct are installed in sequence. Specifically, the assembly bolts on the lower side plates of the prefabricated segments are inserted from the insertion holes and slid along the mounting channels to the preset positions so as to be mounted on the hanging beams. Seal the gap between the upper structure and the lower structure of the duct.

Citation Information

Patent Citations

  • Construction method of assembly type rail-top air ducts

    CN110359671A

  • Rearmounted prefabricated tread wind channel structure

    CN208702444U

  • Wind load resistant connector for unitized curtain walls

    CN102359213A

  • Assembled tread air duct for subway station and connection node with prefabricated middle plate

    CN110042861A

  • Mechanical transportation system and method for fully-composite assembled subway station prefabricated parts

    CN110042867A

Cited By

  • Hanging rail type prefabricated UHPC rail top air duct structure and construction method thereof

    CN121230085A

  • Hanging rail type prefabricated UHPC track top air duct structure

    CN224850664U