A recyclable prestressed support system and construction method

The recyclable prestressed support system solves the problems of difficult recycling of support components and resource waste in foundation pit engineering, reduces construction efficiency and costs, and ensures load-bearing reliability and bending stiffness. It is suitable for foundation pit construction in municipal utility tunnel projects.

CN113529746BActive Publication Date: 2024-11-08SHENZHEN YJY BUILDING TECH +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202110986047.X
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2021-08-26
Publication Date
2024-11-08
Estimated Expiration
2041-08-26

AI Technical Summary

Technical Problem

In existing foundation pit projects, the use of concrete materials for support piles and internal bracing leads to long construction periods, resource waste, and high construction costs, and is difficult to recycle. Especially in the construction of foundation pits with long longitudinal lengths in municipal utility tunnel projects, the deformation of support components is difficult to control, affecting construction efficiency and resource utilization.

Method used

A recyclable prestressed support system is adopted, including two rows of retaining structures, a cap beam, and a bridge-type prestressed support system. Recyclable support piles and cap beams are connected, and prestress is provided through the first and second prestressed structures, realizing the recycling of the support system and the local treatment of the soil.

Benefits of technology

It reduced construction costs and time, improved construction efficiency and resource utilization, reduced carbon emissions, ensured the reliability of load-bearing capacity and bending stiffness, and optimized the design flexibility of support piles and cap beams.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN113529746B_ABST
    Figure CN113529746B_ABST
Patent Text Reader

Abstract

The present invention discloses a recyclable prestressed support system and a construction method, and relates to the technical field of foundation pit engineering. The recyclable prestressed support system includes two rows of enclosure structures, two crown beams and a bridge-type prestressed support system. The two rows of enclosure structures are arranged at intervals on both sides of the foundation pit, and each row of enclosure structures includes a plurality of recyclable support piles that are interlocked in sequence, and a first prestressed structure is arranged in each recyclable support pile. A crown beam is connected to the plurality of recyclable support piles of each row of enclosure structures, and a first prestressed structure is arranged in the crown beam. The two ends of the bridge-type prestressed support system are respectively arranged on a crown beam and connected to the crown beam, the bridge-type prestressed support system is provided with a bearing surface for bearing soil, and a second prestressed structure is arranged in the bridge-type prestressed support system. The recyclable prestressed support system can reduce construction costs and improve construction efficiency and construction quality.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of foundation pit engineering, and in particular to a recyclable prestressed support system and a construction method. Background Art

[0002] The support system of support piles + internal supports is one of the most common and widely used support types in foundation pit engineering. Both support piles and internal supports are made of concrete materials. Although they are highly applicable and can control the deformation of foundation pits well, concrete requires curing time and a long construction period. After the foundation pit project is completed, the supports must be removed, generating construction waste and causing a waste of resources. In some municipal pipeline corridor projects, it is often necessary to excavate a foundation pit with a certain width and a long longitudinal length, and the longitudinal construction needs to be divided into sections.

[0003] During the construction of the pipeline corridor, it is necessary to construct a concrete support structure on both sides of the pipeline corridor to achieve the support effect. The support components cannot be recovered after the construction is completed, and the existing support components are often passive supports, and their deformation is difficult to control. In order to ensure that they have a good support effect, the cross-section of the support components is often designed to be larger, which further increases the cost of being difficult to recover. At the same time, during the construction of the foundation pit, the earth needs to be excavated and transported out of the site. After the construction of the pipeline corridor is completed, part of the earth needs to be transported back for backfilling, which reduces the construction efficiency and increases the construction cost and carbon emissions.

[0004] Therefore, there is an urgent need for a recyclable prestressed support system and construction method to solve the above problems. Summary of the invention

[0005] The purpose of the present invention is to provide a recyclable prestressed support system and a construction method, which can reduce construction costs and improve construction efficiency and construction quality.

[0006] In order to achieve the above technical effects, the technical solution of the present invention is as follows:

[0007] A recyclable prestressed support system comprises: two rows of retaining structures, the two rows of retaining structures are arranged at intervals on both sides of a foundation pit, each row of the retaining structures comprises a plurality of recyclable retaining piles interlocked in sequence, each of the recyclable retaining piles is provided with a first prestressed structure; two crown beams, one crown beam is connected to a plurality of the recyclable retaining piles in each row of the retaining structures, the first prestressed structure is provided in the crown beam; a bridge-type prestressed support system, the two ends of the bridge-type prestressed support system are respectively arranged on one of the crown beams and connected to the crown beams, the bridge-type prestressed support system is provided with a bearing surface for bearing soil, and the bridge-type prestressed support system is provided with a second prestressed structure.

[0008] Furthermore, the bridge-type prestressed support system includes a plurality of bearing components, and the plurality of bearing components are distributed along the length direction of the crown beam, and both ends of the bearing components are respectively connected to the crown beam through support components, and the second prestressed structure is arranged on the bearing components.

[0009] Furthermore, the load-bearing assembly includes: a plurality of bridge deck main beams, the plurality of bridge deck main beams are distributed along the length direction of the crown beam, both ends of each of the bridge deck main beams are connected to the crown beam via an inclined support, and the second prestressed structure is arranged on the bridge deck main beams; a support plate, the support plate is arranged on the plurality of bridge deck main beams, and the top wall of the support plate forms the load-bearing surface.

[0010] Furthermore, the bridge deck main beam includes: two H-shaped steels, the side surfaces of the two H-shaped steels are connected by a connecting plate; and stiffening ribs, which are arranged inside the H-shaped steels.

[0011] Furthermore, the bridge-type prestressed support system also includes: a plurality of high-strength steel rods, both ends of which are respectively connected to the crown beam, and both ends of each of the high-strength steel rods correspond to one of the inclined supports; a displacement regulator, which is arranged on the high-strength steel rod, and is used to control the high-strength steel rod to bear part of the thrust applied to the crown beam by the soil.

[0012] Furthermore, the first prestressed structure includes: two first anchors arranged at intervals, the first anchors being arranged in the recyclable supporting piles and in the cap beam; and a first steel strand, the two ends of the first steel strand being fixedly connected to the two first anchors respectively.

[0013] Furthermore, the second prestressed structure includes: two second anchors arranged at intervals, the second anchors are arranged in the bridge-type prestressed support system; a second steel strand, the two ends of the second steel strand are respectively fixedly connected to the second anchors; and a plurality of support rods distributed at intervals, one end of the support rod is connected to the bridge-type prestressed support system, and the other end is connected to the steel strand.

[0014] Furthermore, a plurality of the first prestressed structures are provided in the crown beam, and a plurality of the second prestressed structures are provided in the bridge-type prestressed support system.

[0015] Furthermore, the recyclable supporting piles include a recyclable steel pipe and plastic concrete arranged on the outside of the recyclable steel pipe, the plastic concrete of two adjacent recyclable supporting piles are interlocked with each other, and the first prestressed structure is arranged in the recyclable steel pipe.

[0016] A construction method for a recyclable prestressed support system, based on the recyclable prestressed support system described above, comprises: S1, respectively setting up retaining structures on both sides of a foundation pit of a construction section; S2, fixing and connecting two crown beams on the inner sides of the tops of two rows of retaining structures; S3, installing a bridge-type prestressed support system on the crown beams; S4, excavating earth in the foundation pit of the construction section, and piling part of the soil on the bearing surface of the bridge-type prestressed support system, and during the excavation process, applying the prestress of the first prestressed structure in the retaining structure and the second prestressed structure in the bridge-type prestressed support system as required; S5, after the construction of the underground structure in the foundation pit of the construction section is completed, backfilling the soil into the foundation pit of the construction section; S6, releasing the prestress of the first prestressed structure and the second prestressed structure, and dismantling the prestressed system, the crown beams and part of the retaining structure; S7, repeating steps S1-S6 in the next construction section until the construction of the entire construction section is completed.

[0017] The beneficial effects of the present invention are as follows: since the recyclable support piles can be recycled, they can be constructed and recycled in each construction section of the pipe gallery project in turn, and can be recycled during the construction process, and can be finally recycled after the construction of the entire pipe gallery project is completed, thereby reducing costs and reducing construction periods, which is conducive to improving construction efficiency and convenience, and effectively improving resource utilization, avoiding the problem of resource waste. At the same time, since the bridge-type prestressed support system is connected to the crown beam, it can also be recycled in each construction section, and when it bears a load, it can transfer the load force to the crown beam and the recyclable support piles, thereby better ensuring its load-bearing reliability. During the construction process of the construction section, the soil excavated in the foundation pit can be piled on the bearing surface of the bridge-type prestressed support system, so that the soil can be processed nearby without being transported out of the foundation pit, and the soil on the bearing surface can be directly used in the later stage of the construction of the construction section for backfilling, thereby avoiding repeated ineffective transportation of the soil, thereby reducing construction costs and carbon emissions. In addition, a second prestressed structure is provided in the bridge-type prestressed support system, which can better guarantee its bending stiffness in the vertical direction and further ensure its reliability when bearing loads. Since the first prestressed structure can actively improve the bending resistance of the recyclable support piles and the crown beam, the cross-sectional size design of the recyclable support piles and the crown beam can be further optimized, so that they do not need to be designed to a larger size according to the bending resistance requirements, thereby improving their design flexibility and reducing their production costs.

[0018] Additional aspects and advantages of the present invention will be given in part in the following description and in part will be obvious from the following description, or will be learned through practice of the present invention. BRIEF DESCRIPTION OF THE DRAWINGS

[0019] Figure 1It is a structural schematic diagram of the recyclable prestressed support system during construction provided by a specific embodiment of the present invention;

[0020] Figure 2 It is a structural schematic diagram of a bridge-type prestressed support system and a second prestressed structure provided in a specific embodiment of the present invention;

[0021] Figure 3 is a front view of a bridge-type prestressed support system, a second prestressed structure and a crown beam provided in a specific embodiment of the present invention;

[0022] Figure 4 It is one of the schematic diagrams of the internal partial structure of the recyclable support pile and the crown beam provided in the specific embodiment of the present invention;

[0023] Figure 5 This is the second schematic diagram of the internal partial structure of the recyclable support pile and the crown beam provided in the specific embodiment of the present invention;

[0024] Figure 6 It is a flow chart of a construction method of a recyclable prestressed support system provided in a specific embodiment of the present invention.

[0025] Reference numerals

[0026] 1. Recyclable support piles; 11. Recyclable steel pipes; 12. Plastic concrete;

[0027] 2. first prestressed structure; 21. first anchor; 22. first steel strand;

[0028] 3. Crown beam;

[0029] 4. Bridge prestressed support system; 41. Bearing assembly; 411. Bridge deck main beam; 4111. H-shaped steel; 4112. Connecting plate; 4113. Stiffening rib; 412. Oblique support; 413. Support plate; 414. Connecting beam; 42. High-strength steel rod; 43. Displacement regulator;

[0030] 5. second prestressed structure; 51. second anchor; 52. second steel strand; 53. support rod;

[0031] 101. Base plate; 102. Pipe gallery; 103. Soil. DETAILED DESCRIPTION

[0032] In order to make the technical problem solved by the present invention, the technical solution adopted and the technical effect achieved more clearly, the technical solution of the present invention is further explained below with reference to the accompanying drawings and through specific implementation methods.

[0033] In the description of the present invention, unless otherwise clearly specified and limited, the terms "connected", "connected", and "fixed" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection or an indirect connection through an intermediate medium, it can be the internal connection of two elements or the interaction relationship between two elements. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0034] In the present invention, unless otherwise clearly specified and limited, a first feature being "above" or "below" a second feature may include that the first and second features are in direct contact, or may include that the first and second features are not in direct contact but are in contact through another feature between them. Moreover, a first feature being "above", "above" and "above" a second feature includes that the first feature is directly above and obliquely above the second feature, or simply indicates that the first feature is higher in level than the second feature. A first feature being "below", "below" and "below" a second feature includes that the first feature is directly below and obliquely below the second feature, or simply indicates that the first feature is lower in level than the second feature.

[0035] It should be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "up", "down", "front", "back", "left", "right", "vertical", "horizontal", "top", "bottom", "inside", "outside", "clockwise", "counterclockwise", "axial", "radial", "circumferential" and the like indicate positions or positional relationships based on the positions or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present invention. In the description of the present invention, unless otherwise specified, "multiple" means two or more. In addition, the terms "first" and "second" are only used to distinguish in the description and have no special meaning.

[0036] Reference below Figure 1-Figure 6 The invention describes a recyclable prestressed support system and a construction method according to an embodiment of the invention.

[0037] like Figure 1-Figure 5 As shown, Figure 1Disclosed is a recyclable prestressed support system, which includes two rows of retaining structures, two crown beams 3 and a bridge-type prestressed support system 4. The two rows of retaining structures are arranged at intervals on both sides of a foundation pit, and each row of retaining structures includes a plurality of recyclable retaining piles 1 that are interlocked in sequence, and a first prestressed structure 2 is arranged in each recyclable retaining pile 1. A crown beam 3 is connected to the plurality of recyclable retaining piles 1 of each row of retaining structures, and a first prestressed structure 2 is arranged in the crown beam 3. The two ends of the bridge-type prestressed support system 4 are respectively arranged on a crown beam 3 and connected to the crown beam 3, a bearing surface for bearing soil 103 is provided on the bridge-type prestressed support system 4, and a second prestressed structure 5 is arranged in the bridge-type prestressed support system 4.

[0038] It can be understood that since the recyclable support piles 1 can be recycled, they can be constructed and recycled in each construction section of the tunnel project in turn, which can achieve a recycling effect during the construction process and can be finally recycled after the completion of the entire tunnel project, thereby reducing costs and shortening construction period, which is beneficial to improving construction efficiency and convenience, and effectively improving resource utilization and avoiding resource waste problems.

[0039] At the same time, the bridge-type prestressed support system 4 can be recycled in each construction section because it is connected to the crown beam 3, and when it bears a load, it can transfer the load force to the crown beam 3 and the recyclable support pile 1, thereby better ensuring its load-bearing reliability. During the construction process of the construction section, the soil 103 excavated in the foundation pit can be piled on the bearing surface of the bridge-type prestressed support system 4, so that the soil 103 can be processed nearby without being transported out of the foundation pit, and the soil 103 on the bearing surface can be directly used in the later stage of the construction of the construction section for backfilling, thereby avoiding repeated and ineffective transportation of the soil 103, thereby reducing construction costs and carbon emissions, and improving construction efficiency. In addition, a second prestressed structure 5 is provided in the bridge-type prestressed support system 4, which can better ensure its bending stiffness in the vertical direction and further ensure its reliability when bearing loads.

[0040] Since the first prestressed structure 2 can actively improve the bending resistance of the recyclable supporting piles 1 and the crown beam 3, the cross-sectional design of the recyclable supporting piles 1 and the crown beam 3 can be further optimized, so that they do not need to be designed to a larger size according to the bending resistance requirements, thereby improving their design flexibility and reducing their production costs.

[0041] In some embodiments, Figure 1-Figure 3 As shown, the bridge-type prestressed support system 4 includes a plurality of bearing components 41 , which are distributed along the length direction of the crown beam 3 , and both ends of the bearing components 41 are connected to the crown beam 3 through support components respectively, and the second prestressed structure 5 is arranged on the bearing components 41 .

[0042] It can be understood that the bearing component 41 can provide a bearing surface for bearing the soil 103, thereby greatly improving the bearing performance. At the same time, the supporting component can provide a stable supporting effect for the bearing component 41, which can not only bear the pressure of the soil 103, but also transfer it to the recyclable supporting pile 1. Compared with conventional supporting structures, its bearing capacity is better.

[0043] In some embodiments, Figure 1-Figure 3 As shown, the bearing assembly 41 includes a plurality of bridge deck main beams 411 and a support plate 413. The plurality of bridge deck main beams 411 are distributed along the length direction of the crown beam 3, and both ends of each bridge deck main beam 411 are connected to the crown beam 3 through an inclined support 412, and the second prestressed structure 5 is arranged on the bridge deck main beam 411. The support plate 413 is arranged on the plurality of bridge deck main beams 411, and the top wall of the support plate 413 forms a bearing surface.

[0044] It can be understood that the bridge deck main beam 411 has good strength and rigidity, so it is convenient to provide stable support. The bridge deck main beam 411 is connected to the crown beam 3 through the inclined support 412, so that the pressure of the soil 103 borne by the support plate 413 can be transmitted to the inclined support 412, and the inclined support 412 can divide the pressure of the soil 103 into horizontal thrust and vertical pressure, which can not only form a supporting force for the recyclable supporting piles 1 on both sides, but also regulate the horizontal displacement of the recyclable supporting piles 1, thereby better ensuring the reliable bearing of the soil 103 and the reliable support effect of the recyclable supporting piles 1.

[0045] In some specific embodiments, Figure 2 As shown, the bearing assembly 41 further includes a plurality of connecting beams 414, which are arranged at intervals on the bridge deck main beam 411, and a support plate 413 is arranged between two adjacent connecting beams 414. It can be understood that the connecting beams 414 can further strengthen the strength of the bearing assembly 41, so that the support plate 413 can more reliably support the excavated soil 103.

[0046] In some embodiments, Figure 2 As shown, the bridge deck main beam 411 includes two H-shaped steels 4111 and stiffening ribs 4113. The sides of the two H-shaped steels 4111 are connected by connecting plates 4112. The stiffening ribs 4113 are arranged inside the H-shaped steels 4111.

[0047] It is understandable that the H-shaped steel 4111 is easy to connect with the crown beam 3, and also has good strength and rigidity, so as to facilitate reliable support of the soil 103. The connecting plate 4112 can facilitate the fixed connection of two adjacent H-shaped steels 4111 to improve the connection stability of the two adjacent H-shaped steels 4111, thereby improving the reliability of the bridge deck main beam 411. Since the H-shaped steel 4111 has a large space inside, the provision of multiple stiffening ribs 4113 can further improve the strength and rigidity of the H-shaped steel 4111, thereby further improving the reliability of the bridge deck main beam 411.

[0048] In some embodiments, Figure 1-Figure 3 As shown, the bridge-type prestressed support system 4 also includes a plurality of high-strength steel bars 42 and a displacement regulator 43. The two ends of the high-strength steel bars 42 are respectively connected to the crown beam 3, and the two ends of each high-strength steel bar 42 correspond to an inclined support 412. The displacement regulator 43 is arranged on the high-strength steel bar 42, and the displacement regulator 43 is used to control the part of the thrust applied to the crown beam 3 by the soil 103 carried by the high-strength steel bar 42.

[0049] It is understandable that when the bearing assembly 41 does not bear soil 103 or bears a small amount of soil 103, the pile tops of the recyclable support piles 1 on both sides of the foundation pit have a tendency to horizontally displace into the foundation pit under the lateral pressure outside the foundation pit, and at this time the displacement controller can control the high-strength steel rod 42 to be free of force. When the soil 103 carried by the bearing assembly 41 gradually increases, the soil 103 will exert a force on the bearing assembly 41, and at the same time, the bearing assembly 41 is connected to the recyclable support pile 1, so that the pile body of the recyclable support pile 1 has a tendency to undergo a large horizontal displacement toward the outside of the foundation pit under the force. In this embodiment, since a high-strength steel rod 42 is further provided between the two crown beams 3, the high-strength steel rod 42 is connected to the two relatively arranged recyclable supporting piles 1 through the crown beam 3. At this time, under the action of the displacement regulator 43, the high-strength steel rod 42 can withstand part of the thrust of the soil 103, thereby effectively controlling the displacement of the top of the recyclable supporting pile 1 toward the outside of the foundation pit, avoiding the bearing component 41 from pushing the top of the recyclable supporting pile 1 outward, and further ensuring the reliability of the recyclable supporting pile 1 and the bridge-type prestressed support system 4.

[0050] In some embodiments, Figure 4 and Figure 5 As shown, the first prestressed structure 2 includes two first anchors 21 and first steel strands 22 that are spaced apart. The first anchors 21 are disposed in the recyclable support pile 1 and the cap beam 3. Both ends of the first steel strands 22 are fixedly connected to the two first anchors 21, respectively.

[0051] It can be understood that the two first anchors 21 are fixedly connected to the recyclable supporting pile 1 or the crown beam 3, so that the steel strands fixedly connected to the two first anchors 21 can be prestressed at one or two first anchors 21, thereby realizing the tensioning effect, thereby improving the bending resistance of the recyclable supporting pile 1, which is beneficial to improving the supporting effect of the recyclable supporting pile 1, and improving the bending resistance of the crown beam 3, thereby facilitating resisting the lateral pressure caused by the soil 103 on the recyclable supporting pile 1, which is beneficial to improving the supporting effect of the recyclable supporting pile 1.

[0052] Specifically, the recyclable supporting pile 1 is extended in the vertical direction, and the crown beam 3 is extended in the horizontal direction. In the actual construction process, the first steel strand 22 can be prestressed by the first anchor 21 located on the upper side of the recyclable supporting pile 1, and the first steel strand 22 can be prestressed at the two first anchors 21 located at both ends of the crown beam 3. Of course, in other construction scenarios, it can also be adjusted according to the actual construction conditions without specific limitations.

[0053] In some embodiments, Figure 2 and Figure 3 As shown, the second prestressed structure 5 includes two second anchors 51 arranged at intervals, a second steel strand 52 and a plurality of support rods 53 distributed at intervals. The second anchor 51 is arranged in the bridge-type prestressed support system 4. Both ends of the second steel strand 52 are fixedly connected to the second anchor 51. One end of the support rod 53 is connected to the bridge-type prestressed support system 4, and the other end is connected to the steel strand.

[0054] It can be understood that the two second anchors 51 are fixedly connected in the bridge-type prestressed support system 4, so that the steel strands fixedly connected to the two second anchors 51 can be prestressed at one or two second anchors 51, thereby realizing the tensioning effect, thereby improving the bending resistance of the bridge-type prestressed support system 4. In addition, the steel strands will also apply pressure to the support rods 53 during the prestressing process to further improve the bending stiffness of the bridge-type prestressed support system 4 in the vertical direction, thereby ensuring the ability of the bridge-type prestressed support system 4 to bear the soil 103.

[0055] Specifically, in this embodiment, the two second anchors 51 are connected by a recyclable steel pipe 11 of a curved section, and the second steel strand 52 is passed through the recyclable steel pipe 11, so as to facilitate the connection between the support rod 53 and the recyclable steel pipe 11, so that the steel strand can also apply pressure to the support rod 53 during prestressing, thereby improving the vertical bending stiffness of the bridge-type prestressed support system 4.

[0056] It should be noted that, in the embodiments of the present invention, the structures of the first prestressed structure 2 and the second prestressed structure are not limited to the above description. For example, the first prestressed structure 2 may also be additionally provided with a plurality of support rods 53, and the second prestressed structure 5 may also only be provided with a second anchor 51 and a second steel strand 52. The specific structures of the first prestressed structure 2 and the second prestressed structure 5 in the recyclable supporting piles 1, the crown beam 3 and the bridge-type prestressed support system 4 can be adjusted according to actual construction requirements, construction difficulty and other on-site reasons without specific limitations.

[0057] In some embodiments, a plurality of first prestressed structures 2 are disposed in the crown beam 3 , and a plurality of second prestressed structures 5 are disposed in the bridge-type prestressed support system 4 .

[0058] It is understandable that in some construction sections, the crown beam 3 and the bridge-type prestressed support system 4 are usually of a relatively long length. Therefore, setting a plurality of first prestressed structures 2 in the crown beam 3 can further improve the prestressed tensioning effect, so as to further improve the bending resistance of the crown beam 3, improve its ability to resist lateral pressure, and further ensure the reliability of the support system. Setting a plurality of second prestressed structures 5 in the bridge-type prestressed support system 4 can also further improve the bending stiffness of the bridge-type prestressed support system 4, thereby better ensuring the ability of the bridge-type prestressed support system 4 to bear the soil 103, preventing the soil 103 from falling during the construction process, and ensuring the safety of the construction.

[0059] In some embodiments, Figure 4 and Figure 5 As shown, the recyclable supporting pile 1 includes a recyclable steel pipe 11 and plastic concrete 12 arranged outside the recyclable steel pipe 11 , the plastic concrete 12 of two adjacent recyclable supporting piles 1 are interlocked with each other, and the prestressed structure is arranged in the recyclable steel pipe 11 .

[0060] It is understandable that the recyclable steel pipe 11 can be easily removed after a construction section is completed, so as to be used in the construction of the next section of recyclable support piles 1, so as to improve the turnover rate of construction materials and reduce construction costs. At the same time, since the plastic concrete 12 of two adjacent recyclable support piles 1 bites each other, multiple recyclable support piles 1 can overlap each other, achieving a better water-stopping effect. The recyclable steel pipe 11 can provide resistance for the recyclable support piles 1 to bear the pressure on both sides of the foundation pit, ensuring the safe construction of the pipe gallery 102 in the foundation pit.

[0061] In addition, the support system formed by the recyclable steel pipe 11 and the plastic concrete 12 has the characteristics of modular assembly, recyclability and fast construction speed, so it is suitable for the segmented construction of each construction section in the pipeline corridor project, so that it is convenient to dismantle and move to the next construction section for construction after the previous construction section is completed. And the foundation pit depth of the pipeline corridor project is usually 6-7m, which is also conducive to the construction of the support system formed by the recyclable steel pipe 11 and the plastic concrete 12, and better guarantees the support quality.

[0062] In some specific embodiments, Figure 4 and Figure 5 As shown, the cross section of the recyclable steel pipe 11 is rectangular, the crown beam 3 is made of steel, and the cross section of the crown beam 3 is rectangular.

[0063] It can be understood that since the cross-sections of the crown beam 3 and the recyclable steel pipe 11 are both rectangular, it is convenient to chisel out the local plastic concrete 12 on the inner side of the top of the recyclable supporting pile 1 during the construction process to expose the recyclable steel pipe 11 of the recyclable supporting pile 1, which can facilitate the crown beam 3 to fit the recyclable steel pipe 11 and fix them with bolts, and can also facilitate the formation of steps on the recyclable supporting pile 1, thereby providing partial support for the crown beam 3 and ensuring the reliable connection between the crown beam 3 and the recyclable supporting pile 1.

[0064] like Figure 6 As shown, the present invention also discloses a construction method of a recyclable prestressed support system, which is based on the recyclable prestressed support system described above, and includes: S1, respectively arranging enclosure structures on both sides of the foundation pit of the construction section; S2, fixing and connecting two crown beams on the inner sides of the tops of the two rows of enclosure structures; S3, installing a bridge-type prestressed support system 4 on the crown beam; S4, excavating the earthwork in the foundation pit of the construction section, and stacking part of the soil 103 on the bearing surface of the bridge-type prestressed support system 4, and during the excavation process, applying the prestress of the first prestressed structure 2 in the enclosure structure and the second prestressed structure 5 in the bridge-type prestressed support system 4 as required; S5, after the construction of the underground structure in the foundation pit of the construction section is completed, backfilling the soil 103 into the foundation pit of the construction section; S6, releasing the prestress of the first prestressed structure 2 and the second prestressed structure 5, and dismantling the bridge-type prestressed support system 4, the crown beam 3 and part of the enclosure structure; S7, repeating steps S1-S6 in the next construction section until the construction of the entire construction section is completed.

[0065] It should be noted that in the construction method of this embodiment, the first prestressed structure 2 is preset in the enclosure structure and the crown beam 3, and the second prestressed structure 5 is preset in the bridge-type prestressed support system 4. The enclosure structure and the crown beam 3 are installed with the first prestressed structure 2 when the components leave the factory, and the second prestressed structure 5 in the bridge-type prestressed support system 4 is assembled on site. The first prestressed structure 2 in the crown beam 3 is prestressed when it leaves the factory, and the first prestressed structure 2 in the enclosure structure and the second prestressed structure 5 in the bridge-type prestressed support system 4 are prestressed as needed on site as the construction progresses. Of course, in other embodiments of the present invention, the specific processing, application method and sequence of the prestressed structure in each component can be determined according to actual needs.

[0066] In addition, in the construction method of this embodiment, the crown beam 3 includes a plurality of standard sections, each of which is provided with a second prestressed structure 2, so that the site only needs to sequentially connect the plurality of standard sections to which prestress has been applied to form the crown beam 3. Of course, in other embodiments of the present invention, the crown beam 3 may also be pre-connected with a plurality of standard sections, and the specific processing and connection sequence may be determined according to actual needs.

[0067] Example:

[0068] Reference below Figure 1-Figure 6 A recyclable prestressed support system and a construction method according to a specific embodiment of the present invention are described.

[0069] The recyclable prestressed support system of this embodiment includes two rows of enclosure structures, two crown beams 3 , a bridge-type prestressed support system 4 , a first prestressed structure 2 and a second prestressed structure 5 .

[0070] Two rows of retaining structures are arranged at intervals on both sides of the foundation pit, and each row of retaining structures includes a plurality of recyclable retaining piles 1 interlocked in sequence, and a first prestressed structure 2 is arranged in each recyclable retaining pile 1. A crown beam 3 is connected to the plurality of recyclable retaining piles 1 in each row of retaining structures, and a first prestressed structure 2 is arranged in the crown beam 3. The recyclable retaining piles 1 include a recyclable steel pipe 11 and plastic concrete 12 arranged outside the recyclable steel pipe 11, and the plastic concrete 12 of two adjacent recyclable retaining piles 1 interlock with each other, and the prestressed structure is arranged in the recyclable steel pipe 11.

[0071] The first prestressed structure 2 includes two first anchors 21 and first steel strands 22 arranged at intervals. The first anchors 21 are arranged in the recyclable support pile 1 and the cap beam 3. Both ends of the first steel strands 22 are fixedly connected to the two first anchors 21 respectively.

[0072] The two ends of the bridge-type prestressed support system 4 are respectively arranged on a crown beam 3 and connected to the crown beam 3. The bridge-type prestressed support system 4 is provided with a bearing surface for bearing the soil 103, and a second prestressed structure 5 is provided in the bridge-type prestressed support system 4. The bridge-type prestressed support system 4 includes a plurality of bearing components 41, and the plurality of bearing components 41 are distributed along the length direction of the crown beam 3. The two ends of the bearing components 41 are respectively connected to the crown beam 3 through the support components, and the second prestressed structure 5 is arranged on the bearing components 41. The bearing components 41 include a plurality of bridge deck main beams 411 and a support plate 413. The plurality of bridge deck main beams 411 are distributed along the length direction of the crown beam 3, and the two ends of each bridge deck main beam 411 are respectively connected to the crown beam 3 through an inclined support 412, and the second prestressed structure 5 is arranged on the bridge deck main beam 411. The support plate 413 is arranged on the plurality of bridge deck main beams 411, and the top wall of the support plate 413 forms a bearing surface. The bridge deck main beam 411 includes two H-shaped steels 4111 and stiffening ribs 4113. The sides of the two H-shaped steels 4111 are connected by connecting plates 4112. The stiffening ribs 4113 are arranged inside the H-shaped steels 4111. The bridge prestressed support system 4 also includes a plurality of high-strength steel bars 42 and a displacement regulator 43. The two ends of the high-strength steel bars 42 are respectively connected to the crown beam 3, and the two ends of each high-strength steel bar 42 correspond to an inclined support 412. The displacement regulator 43 is arranged on the high-strength steel bar 42, and the displacement regulator 43 is used to control the part of the thrust applied to the crown beam 3 by the high-strength steel bar 42 bearing the soil 103.

[0073] The second prestressed structure 5 includes two second anchors 51 arranged at intervals, a second steel strand 52 and a plurality of support rods 53 distributed at intervals. The second anchor 51 is arranged in the bridge-type prestressed support system 4. Both ends of the second steel strand 52 are fixedly connected to the second anchor 51. One end of the support rod 53 is connected to the bridge-type prestressed support system 4, and the other end is connected to the steel strand.

[0074] The construction method of the recyclable prestressed support system of this embodiment includes:

[0075] S1. In a construction section of the pipe gallery project, a hole-making process is carried out along the edge of the foundation pit, a recyclable steel pipe 11 is hoisted in the hole, and plastic concrete 12 is poured to form a mutually interlocking enclosure structure.

[0076] S2. Chisel away part of the plastic concrete 12 at the top of the recyclable supporting pile 1 close to the inner side of the foundation pit to expose the recyclable steel pipe 11, and fix the crown beam 3 on the exposed recyclable steel pipe 11 to form a whole of the recyclable supporting pile 1 and the crown beam 3.

[0077] S3, assembling the bridge-type prestressed support system 4 on site, and connecting the two ends of the bridge-type prestressed support system 4 to the two crown beams 3.

[0078] S4. As the foundation pit is excavated, part of the excavated soil 103 is covered on the bridge-type prestressed support system 4, and the prestress of the bridge-type prestressed support system 4 and the prestress of the recyclable support piles 1 are applied according to demand.

[0079] S5. Excavate the foundation pit to the bottom, and construct the bottom plate 101 and the pipe gallery 102 therein. After the construction is completed, the soil 103 on the bridge-type prestressed support system 4 is backfilled into the foundation pit.

[0080] S6. Release the prestress of the first prestressed structure 2 in the enclosure structure and the second prestressed structure 5 in the bridge-type prestressed support system 4, dismantle the bridge-type prestressed support system 4 and the crown beam 3, pull out the recyclable steel pipe 11 in the recyclable supporting pile 1, and backfill the plastic concrete 12 with earth to make it dense.

[0081] S7. Repeat steps S1-S6 until the entire construction section is completed, and recycle the recyclable prestressed support system after the construction is completed.

[0082] In the description of this specification, the description with reference to the terms "some embodiments", "other embodiments", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present invention. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0083] The above contents are only preferred embodiments of the present invention. For ordinary technicians in this field, according to the concept of the present invention, there will be changes in the specific implementation methods and application scopes. The content of this specification should not be understood as limiting the present invention.

Claims

1. A recyclable prestressed support system, characterized in that: include: Two rows of retaining structures, the two rows of retaining structures being arranged at intervals on both sides of the foundation pit, each row of retaining structures comprising a plurality of recyclable retaining piles (1) interlocked in sequence, each recyclable retaining pile (1) being provided with a first prestressed structure (2); two crown beams (3), one crown beam (3) being connected to each row of the plurality of recyclable support piles (1) of the enclosure structure, and the first prestressed structure (2) being arranged inside the crown beam (3); A bridge-type prestressed support system (4), wherein two ends of the bridge-type prestressed support system (4) are respectively arranged on one of the crown beams (3) and connected to the crown beam (3), a bearing surface for bearing soil (103) is provided on the bridge-type prestressed support system (4), and a second prestressed structure (5) is provided inside the bridge-type prestressed support system (4); The bridge-type prestressed support system (4) comprises a plurality of bearing components (41), the plurality of bearing components (41) being distributed along the length direction of the crown beam (3), the two ends of the bearing components (41) being connected to the crown beam (3) via support components respectively, and the second prestressed structure (5) being arranged on the bearing components (41); The bearing assembly (41) comprises: A plurality of bridge deck main beams (411), wherein the plurality of bridge deck main beams (411) are distributed along the length direction of the crown beam (3), and both ends of each bridge deck main beam (411) are connected to the crown beam (3) via an inclined support (412), and the second prestressed structure (5) is arranged on the bridge deck main beam (411); A support plate (413), wherein the support plate (413) is arranged on the plurality of bridge deck main beams (411), and the top wall of the support plate (413) forms the bearing surface.

2. The recyclable prestressed support system according to claim 1, characterized in that: The bridge deck main beam (411) comprises: Two H-shaped steels (4111), the sides of the two H-shaped steels (4111) being connected by a connecting plate (4112); A stiffening rib (4113), wherein the stiffening rib (4113) is arranged inside the H-shaped steel (4111).

3. The recyclable prestressed support system according to claim 1, characterized in that: The bridge-type prestressed support system (4) further comprises: A plurality of high-strength steel bars (42), wherein both ends of the high-strength steel bars (42) are respectively connected to the crown beam (3), and both ends of each high-strength steel bar (42) are respectively provided with a corresponding oblique support (412); A displacement regulator (43), wherein the displacement regulator (43) is arranged on the high-strength steel rod (42), and the displacement regulator (43) is used to control the part of the thrust applied to the crown beam (3) by the soil (103) carried by the high-strength steel rod (42).

4. The recyclable prestressed support system according to claim 1, characterized in that: The first prestressed structure (2) comprises: Two first anchors (21) arranged at intervals, wherein the first anchors (21) are arranged in the recyclable support pile (1) and in the cap beam (3); A first steel strand (22), wherein two ends of the first steel strand (22) are respectively fixedly connected to the two first anchors (21).

5. The recyclable prestressed support system according to claim 1, characterized in that: The second prestressed structure (5) comprises: Two second anchors (51) arranged at intervals, wherein the second anchors (51) are arranged in the bridge-type prestressed support system (4); A second steel strand (52), wherein both ends of the second steel strand (52) are respectively fixedly connected to the second anchor (51); A plurality of support rods (53) are distributed at intervals, one end of each support rod (53) is connected to the bridge-type prestressed support system (4), and the other end is connected to the steel strand.

6. The recyclable prestressed support system according to claim 1, characterized in that: A plurality of the first prestressed structures (2) are arranged in the crown beam (3), and a plurality of the second prestressed structures (5) are arranged in the bridge-type prestressed support system (4).

7. The recyclable prestressed support system according to claim 1, characterized in that: The recyclable support pile (1) comprises a recyclable steel pipe (11) and plastic concrete (12) arranged outside the recyclable steel pipe (11), the plastic concrete (12) of two adjacent recyclable support piles (1) are interlocked, and the first prestressed structure (2) is arranged inside the recyclable steel pipe (11).

8. A construction method of a recyclable prestressed support system, based on the recyclable prestressed support system according to any one of claims 1 to 7, characterized in that: include: S1. Set up retaining structures on both sides of the foundation pit in the construction section; S2, fixing and connecting a crown beam (3) on the inner side of the top of the enclosure structure; S3, installing a bridge-type prestressed support system (4) on the crown beam (3); S4, excavating the earthwork in the foundation pit of the construction section, piling part of the earth (103) in the pit on the bearing surface of the bridge-type prestressed support system (4) during the excavation process, and applying prestress to the first prestressed structure (2) in the enclosure structure and the second prestressed structure (5) in the bridge-type prestressed support system (4) as required; S5, after the construction of the underground structure in the construction section is completed, the soil (103) is backfilled into the construction section; S6, releasing the prestress of the first prestressed structure (2) in the enclosure structure and the second prestressed structure (5) in the bridge-type prestressed support system (4), and dismantling the bridge-type prestressed support system (4), the crown beam (3) and part of the enclosure structure; S7. Repeat steps S1-S6 in the next construction section until the construction of the entire construction section is completed.