A robot material box grabbing control device and method

By combining visual sensors and counters in the robot box grabbing control system to automatically calculate the number of workpiece layers, combined with detection and slow movement methods, the problems of slow speed and collision risk in the existing technology are solved, and fast and safe Workpiece grabbing improves equipment efficiency and safety.

CN114952851BActive Publication Date: 2024-10-01CHINA FAW CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202210642752.2
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2022-06-08
Publication Date
2024-10-01
Estimated Expiration
2042-06-08

AI Technical Summary

Technical Problem

The existing robot box grabbing control device is slow in handling changes caused by workpiece layers and manual intervention, and there is a risk of collision, affecting equipment efficiency and safety.

Method used

A system including robots, visual sensors, ranging switches, production line PLCs and safety door switches is used to automatically calculate the number of workpiece layers through visual detection and counters, and combines detection and slow movement to achieve fast and safe grabbing operations.

Benefits of technology

It improves the running speed of the equipment, reduces the failure rate, avoids collision problems caused by incorrect workpiece layers, and improves usage efficiency.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN114952851B_ABST
    Figure CN114952851B_ABST
Patent Text Reader

Abstract

The present invention relates to a robot material box grasping control device and method, the device includes a robot, a robot gripper, a material box, an in-place detection switch, a distance measuring switch, a visual sensor, a safety door switch, a production line PLC, a robot controller and a visual controller; the robot gripper is installed at the end of the industrial robot, and the visual sensor and the distance measuring switch are installed on the robot gripper; sheet metal parts are placed in the material box; the robot controller communicates with the production line PLC and the visual controller via Ethernet, the visual sensor is connected to the visual controller, the distance measuring switch is connected to the robot controller, and the in-place detection switch and the safety door switch are connected to the production line PLC. The present invention can realize the automatic calculation of the number of layers of workpieces under specific circumstances, and use a counter to quickly grasp the workpiece, which not only solves the problem of too slow running speed caused by workpiece detection affecting the efficiency of equipment use, but also avoids the collision problem caused by the wrong number of layers of grasped workpieces due to the artificial placement of workpieces.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of welding, and in particular relates to a robot material box grasping control device and method. Background Art

[0002] With the continuous increase in labor costs and the reduction in the manufacturing costs of industrial robots, the use of box loading to replace manual work in the welding field has become an inevitable trend in the development of the manufacturing industry. Robot box loading can detect the position deviation of the workpiece through vision, but the number of layers of the workpiece in the box needs to be known in advance.

[0003] When a robot grabs a workpiece from a material box, if detection is used, changes in the workpiece caused by human intervention can be discovered in a timely manner. However, this solution reduces the robot's operating speed and affects its operating efficiency. A solution without detection at all poses a risk of collision due to changes in the workpiece caused by human intervention.

[0004] The prior art discloses a robot control device and method for grabbing parts from a material box. The control device includes a material box, a fixed bracket, multiple detection switches and a robot gripper. The fixed bracket is arranged on both sides of the material box. Multiple detection switches are installed on the fixed bracket and connected to the robot control device. The robot gripper is provided with a proximity switch and a photoelectric distance sensor and connected to the robot control device. The device is applied to robot material box grabbing. The workpiece counting method cannot cope with the workpieces being taken out or added from the material box. The workpiece detection method one by one reduces the speed and increases the equipment operation time.

[0005] Based on this, there is an urgent need to develop a robot material box grabbing control device and method to solve the above problems. Summary of the invention

[0006] The purpose of the present invention is to provide a robot material box grabbing control device and a robot material box grabbing control method to solve the problem of collision caused by the robot material box grabbing quickly and the placing of items due to human intervention, thereby reducing the failure rate of the equipment, improving the operating speed of the equipment, and improving the use efficiency of the equipment.

[0007] The objective of the present invention is achieved through the following technical solutions:

[0008] A robot material box grasping control device, comprising a robot 1, a robot gripper 2, a material box 3, an in-position detection switch 4, a distance measuring switch 5, a visual sensor 6, a safety door switch 9, a production line PLC, a robot controller and a visual controller;

[0009] The robot gripper 2 is installed at the end of the industrial robot 1, and the visual sensor 6 and the distance measuring switch 5 are installed on the robot gripper 2;

[0010] The sheet metal parts are placed in the material box 3;

[0011] The robot controller communicates with the production line PLC and the visual controller via Ethernet. The visual sensor 6 is connected to the visual controller, the distance measuring switch 5 is connected to the robot controller, and the in-place detection switch 4 and the safety door switch 9 are connected to the production line PLC.

[0012] Furthermore, the visual sensor 6 and the distance measuring switch 5 are installed at the bottom of the robot gripper 2 .

[0013] Furthermore, the sheet metal parts are placed in the material box 3 in layers, with each layer being placed at an equal distance.

[0014] Furthermore, a production line fence 7 is arranged outside the robot 1 , on which a fence safety door 8 and a safety door switch 9 are provided.

[0015] Furthermore, the production line PLC can record the power-off information of the arrival detection switch 4 of the material box 3 and the safety door switch 9, and send it to the robot 1.

[0016] Furthermore, the robot 1 is capable of recording power failure information and receiving detection sensor status.

[0017] A robot material box grasping control method, characterized in that it includes the following steps:

[0018] A. Read the information of production line PLC power failure, safety door switch 9, change of material box 3 in-place detection switch 4, and power failure of robot 1;

[0019] B. Determine the power failure of the production line PLC, the safety door switch 9, the change of the material box 3 in-place detection switch 4, and the power failure information of the robot 1. If there has been a power failure or the switch has changed, jump to step 5;

[0020] C. Determine the power failure of the production line PLC, the safety door switch 9, the change of the material box 3 in-place detection switch 4, and the power failure information of the robot 1. If there has been a power failure or the switch has not changed, read the material box counter value M;

[0021] D. Determine whether the workpiece counter M is greater than 0 and less than the maximum number of layers, if not, proceed to the next step;

[0022] E. Move robot 1 to the topmost layer and read the detection switch status. If it is not ON, an alarm is given. Otherwise, the robot moves and detects layer by layer slowly from the topmost layer. If the detection switch is OFF during the movement, the robot stops running and calculates the number of layers M of the workpiece according to the current position of the robot.

[0023] F. Move robot 1 to the visual inspection position on the M floor and take visual photos;

[0024] G. Adjust the position of the gripper according to the position deviation detected by visual inspection and grab the workpiece.

[0025] Furthermore, step B is specifically as follows: determine whether the production line PLC is powered off, the safety door switch 9, the material box 3 arrival detection switch 4 changes, and the robot 1 power off information. If the power is off, the express is moved to the Mmax layer detection position; if the power is not off, determine whether its safety door has been opened.

[0026] Further, step D is specifically as follows: if it has moved, expressly move to the Mmax layer detection position; if it has not moved, determine whether M is greater than 0 and less than Nmax.

[0027] Furthermore, step G is specifically as follows: according to the position deviation calculated by taking photos, correct the grasping position, move the robot to the grasping position, grasp the workpiece, M=M-1, and move the robot.

[0028] Compared with the prior art, the present invention has the following beneficial effects:

[0029] The present invention adopts a conditional detection method, which can realize the automatic calculation of the number of workpiece layers under specific circumstances in a simple way. Under normal circumstances, a counter is used to quickly grab the workpiece, which not only solves the problem of slow running speed caused by workpiece detection affecting the efficiency of equipment use, but also avoids the collision problem caused by the wrong number of workpiece layers grabbed due to manual placement of the workpiece. BRIEF DESCRIPTION OF THE DRAWINGS

[0030] In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings required for use in the embodiments are briefly introduced below. It should be understood that the following drawings only show certain embodiments of the present invention and therefore should not be regarded as limiting the scope. For ordinary technicians in this field, other related drawings can be obtained based on these drawings without creative work.

[0031] Figure 1 This is the connection diagram of the robot box grabbing control device;

[0032] Figure 2 This is a flow chart of the robot’s material box grabbing control method.

[0033] In the figure: 1. Robot 2. Robot gripper 3. Material box 4. In-place detection switch 5. Distance measuring switch 6. Visual sensor 7. Production line fence 8. Fence safety door 9. Safety door switch. DETAILED DESCRIPTION

[0034] The present invention will be further described below in conjunction with embodiments:

[0035] The present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It is to be understood that the specific embodiments described herein are only used to explain the present invention, rather than to limit the present invention. It should also be noted that, for ease of description, only parts related to the present invention, rather than all structures, are shown in the accompanying drawings.

[0036] It should be noted that similar reference numerals and letters represent similar items in the following drawings, so once an item is defined in one drawing, it does not need to be further defined and explained in the subsequent drawings. At the same time, in the description of the present invention, the terms "first", "second", etc. are only used to distinguish the description and cannot be understood as indicating or implying relative importance.

[0037] like Figure 1 As shown, the robot material box grabbing control device of the present invention includes a robot 1, a robot gripper 2, a material box 3, an in-place detection switch 4, a distance measuring switch 5, a visual sensor 6, a production line fence 7, a fence safety door 8, a safety door switch 9, a production line PLC, a robot controller and a visual controller.

[0038] The robot gripper 2 is installed at the end of the industrial robot 1 , and the visual sensor 6 and the distance measuring switch 5 are installed at the bottom of the robot gripper 2 .

[0039] The sheet metal parts are placed in the material box 3 in layers, with equal distances between the layers.

[0040] The robot controller communicates with the production line PLC and the visual controller via Ethernet. The visual sensor 6 is connected to the visual controller, the distance measuring switch 5 is connected to the robot controller, and the in-place detection switch 4 and the safety door switch 9 are connected to the production line PLC.

[0041] The present invention sets a production line fence 7 on the robot 1 and other equipment, and the production line fence 7 is provided with a fence safety door 8 and a safety door switch 9. Only when the safety door switch 9 is in the ON state, can personnel enter the fence to move the workpiece in the material box 3; another state of the workpiece in the mobile material box 3 is outside the fence of the mobile material box 3, and at this time the material box detection switch will be OFF.

[0042] Robot 1 selects the corresponding grabbing program according to the vehicle model from the production line PLC. The production line PLC records the power-off information of the in-place detection switch 4 of the material box 3 and the safety door switch 9, and sends them to robot 1; robot 1 records the power-off information and receives the distance measuring switch 5, that is, the detection sensor status; when there is no change in the position of the material box 3, no change in the safety door switch 9, and no power failure, the robot 1 is quickly moved to the corresponding counting layer detection position, the position deviation is visually detected, and then the position is adjusted to grab the workpiece; if the position of the material box 3 changes, the safety door switch 9 changes, or there has been a power failure, the robot 1 is slowly moved from the first position to detect the workpiece layer by layer until the workpiece is detected, and the number of workpiece layers is calculated according to the current robot position.

[0043] Specifically, the robot material box grabbing control device and method of the present invention include the following steps:

[0044] Step 1: Read the information of production line PLC power failure, safety door switch, material box arrival detection switch change, and robot power failure;

[0045] Step 2: Determine the power failure of the production line PLC, the safety door switch, the change of the material box arrival detection switch, and the power failure information of the robot. If there has been a power failure or the switch has changed, jump to step 5;

[0046] Step 3: Determine the power failure of the production line PLC, the safety door switch, the change of the material box in-place detection switch, and the power failure information of the robot. If there has been a power failure or the switch has not changed, read the material box counter value M;

[0047] Step 4: Determine whether the workpiece counter M is greater than 0 and less than the maximum number of layers, if not, proceed to the next step;

[0048] Step 5: Move the robot to the topmost layer and read the detection switch status. If it is not ON, an alarm is given. Otherwise, the robot moves and detects layer by layer slowly from the topmost layer. If the detection switch is OFF during the movement, the robot stops running and calculates the number of layers M of the workpiece according to the current position of the robot.

[0049] Step 6: Move the robot to the M-layer visual inspection position and take visual photos;

[0050] Step 7: Adjust the position of the gripper according to the position deviation detected by visual inspection, and grab the workpiece.

[0051] Example 1

[0052] A robot material box grasping control device comprises a robot 1, a robot gripper 2, a material box 3, an in-position detection switch 4, a distance measuring switch 5, a visual sensor 6, a production line fence 7, a fence safety door 8, a safety door switch 9, a production line PLC, a robot controller and a visual controller. The robot gripper 2 is installed at the end of the industrial robot 1, and a visual sensor 6 and a distance measuring switch 5 are installed at the bottom. The sheet metal parts are placed in the material box 3 in layers, and each layer is placed at an equal distance. A production line fence 7 is set outside the robot 1, and a fence safety door 8 and a safety door switch 9 are provided on it. The robot controller communicates with the production line PLC and the visual controller via Ethernet, the visual sensor 6 is connected to the visual controller, the distance measuring switch 5 is connected to the robot controller, and the in-position detection switch 4 and the safety door switch 9 are connected to the production line PLC.

[0053] Example 2

[0054] A robot material box grab control device and method, comprising the following steps:

[0055] 1. Read the information of production line PLC power failure, safety door switch, material box arrival detection switch change, and robot power failure to determine whether the power has been cut off;

[0056] 2. If the power is off, the courier moves to the Mmax detection position; if the power is not off, determine whether the safety door has been opened;

[0057] 3. If it has been opened, the courier moves to the Mmax layer detection position; if it has not been opened, determine whether the material box has been moved and read the material box counter value M;

[0058] 4. If it has been moved, the express is moved to the Mmax layer detection position; if it has not been moved, determine whether M is greater than 0 and less than Nmax;

[0059] 5. If not, the courier moves to the Mmax detection position; if so, it moves directly and quickly to the M-layer photo taking position;

[0060] 6. After the express moves to the Mmax layer detection position, read the detection switch status. If it is not ON, an alarm will be given for the layer counting error. Otherwise, it will move down slowly until the detection switch is OFF and stop. Read the current position of the robot, calculate the workpiece layer M value according to the current position value, and quickly move to the M layer photo taking position;

[0061] 7. According to the position deviation calculated by taking photos, correct the grasping position, move the robot to the grasping position, grab the workpiece, M=M-1, and move the robot.

[0062] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A robot material box grabbing control method, It is characterized in that The following steps are involved: A. Read the information of the production line PLC power failure, the safety door switch (9), the change of the material box (3) arrival detection switch (4), and the robot (1) power failure; B. Determine whether the production line PLC is powered off, the safety door switch (9), the material box (3) in-place detection switch (4) has changed, or the robot (1) has powered off. If there has been a power outage or the switch has changed, jump to step 5. C. Determine whether the production line PLC is powered off, the safety door switch (9), the material box (3) in-place detection switch (4) has changed, and the robot (1) has powered off. If there has been a power outage or the switch has not changed, read the material box counter value M; D. Determine whether the workpiece counter M is greater than 0 and less than the maximum number of layers, if not, proceed to the next step; E. Move the robot (1) to the topmost layer, read the detection switch status, and give an alarm if it is not ON. Then, slowly move and detect each layer from the topmost layer. If the detection switch is OFF during the movement, the robot stops running and calculates the number of layers M of the workpiece based on the current position of the robot. F. Move the robot (1) to the visual inspection position on the M layer and take visual photos; G. Adjust the position of the gripper according to the position deviation of the visual inspection and grab the workpiece; A robot material box grasping control device used in a robot material box grasping control method comprises a robot (1), a robot gripper (2), a material box (3), an in-position detection switch (4), a distance measuring switch (5), a visual sensor (6), a safety door switch (9), a production line PLC, a robot controller and a visual controller; The robot gripper (2) is mounted on the end of the industrial robot (1), and the visual sensor (6) and the distance measuring switch (5) are mounted on the robot gripper (2); The sheet metal parts are placed in the material box (3); The robot controller communicates with the production line PLC and the visual controller via Ethernet, the visual sensor (6) is connected to the visual controller, the distance measuring switch (5) is connected to the robot controller, and the in-position detection switch (4) and the safety door switch (9) are connected to the production line PLC; The sheet metal parts are placed in layers in the material box (3), with each layer being placed at an equal distance from the other; A production line fence (7) is arranged outside the robot (1), and a fence safety door (8) and a safety door switch (9) are arranged on the fence; The production line PLC is capable of recording power-off information of the in-place detection switch (4) and the safety door switch (9) of the material box (3), and sending the information to the robot (1); The robot (1) is capable of recording power failure information and receiving detection sensor status.

2. A robot material box grabbing control method according to claim 1, It is characterized in that Step B specifically includes: determining whether the production line PLC is powered off, the safety door switch (9), the material box (3) in-place detection switch (4) changes, and the robot (1) power off information; if the power is off, quickly move to the Mmax layer detection position; if the power is not off, determine whether the safety door has been opened.

3. A robot material box grabbing control method according to claim 1, It is characterized in that Step G is specifically as follows: according to the position deviation calculated by taking photos, correct the grasping position, move the robot to the grasping position, grasp the workpiece, M=M-1, and move the robot.

4. A robot material box grabbing control method according to claim 1, Features: The visual sensor (6) and the distance measuring switch (5) are installed at the bottom of the robot gripper (2).