A combined material, method and system for safety reinforcement and ecological restoration of mine landfills
By adding appropriate amounts of cement, fly ash, etc. to the Yellow River sediment, forming high-flow gelling materials, and combining plant fibers and ecological adhesives, the problems of safe reinforcement and ecological restoration of mine landfills in the Yellow River Basin are solved, and the problem of safe reinforcement and ecological restoration of mine landfills in the Yellow River Basin has been achieved. Resource utilization of the Yellow River sediment and ecological environment governance.
Patent Information
- Application Number
- CN202211717235.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Patents(China)
- Current Assignee / Owner
- Filing Date
- 2022-12-29
- Publication Date
- 2024-11-15
- Estimated Expiration
- 2042-12-29
AI Technical Summary
Due to the silt of the Yellow River in the Yellow River, the problem of safe reinforcement and ecological restoration of mine landfills in the Yellow River Basin has been difficult to effectively use the silt of the Yellow River in the Yellow River for safe reinforcement and ecological restoration of mine landfills. The silt bonding of the Yellow River in the Yellow River is weak. It is difficult to rehabilitate ecologically in arid areas.
Using a combination of self-gel-cured slurry and ecological restoration matrix materials, a high-flow and high-strength gelling material is formed by adding cement, fly ash, water reducing agents, etc. to the Yellow River silt, and combining plant fibers and ecological Adhesives, water retention agents and biological organic fertilizers form substrates suitable for ecological restoration in arid areas, and are used for slope reinforcement and phytolayer restoration of mine landfills.
The strength and adhesion of the Yellow River silt are significantly improved, the safe reinforcement and ecological restoration of the mine landfill site have been ensured, the coordinated management of the ecological environment and sediment in the mining area of the Yellow River Basin has been achieved, the problem of water shortage and soil shortage has been solved, and the The bulk resource utilization of the Yellow River silt.
Smart Images

Figure CN115947573B_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the field of mine ecological restoration and efficient resource utilization of dredged silt, and in particular to a combined material, method and system for safety reinforcement and ecological restoration of mine landfills. Background Art
[0002] The Yellow River carries a huge amount of sediment, with about 400 million tons of sediment deposited in the lower reaches of the Yellow River every year, causing the riverbed to rise and triggering floods. Therefore, the serious sedimentation of the Yellow River has become a major obstacle to the ecological environment protection of the Yellow River Basin, and it is urgent to strengthen the comprehensive management of sediment.
[0003] Due to the rich coal resources in the Yellow River Basin, 9 of the 14 major coal production bases in the country are located in the Yellow River Basin. However, most of the areas where these coal production bases are located are in arid or semi-arid areas, and the land is seriously desertified. Mine ecological restoration projects generally face the huge challenge of "lack of water and soil". The siltation of the Yellow River and the deterioration of the ecological environment in the Yellow River mining area have become the two major ecological and environmental problems facing the Yellow River Basin. Therefore, how to provide a combination of materials for the safety reinforcement and ecological restoration of mine landfills based on the silt dredging of the Yellow River to achieve the coordinated management of the ecological environment of the mining area in the Yellow River Basin and the silt of the Yellow River is a technical problem that needs to be solved urgently. Summary of the invention
[0004] The present application provides a combined material, method and system for safety reinforcement and ecological restoration of mine landfills to fill the gap in the prior art of safety reinforcement and ecological restoration of mine landfills in the Yellow River mining area using silt deposited by the Yellow River.
[0005] In a first aspect, the present application provides a composite material for safety reinforcement and ecological restoration of a mine landfill, the composite material comprising a self-gelling solidifying slurry and an ecological restoration matrix; in parts by weight, the raw materials of the self-gelling solidifying slurry comprise: 100 parts of Yellow River silt, 20 to 25 parts of cement, 8 to 12 parts of fly ash, 0.1 to 0.5 parts of a water reducing agent, and 36 to 42 parts of water;
[0006] In parts by weight, the ecological restoration matrix includes: 100 parts of Yellow River silt, 0.1-0.2 parts of ecological adhesive, 3-5 parts of plant fiber, 0.05-0.1 parts of water retaining agent, 0.5-1 parts of biological organic fertilizer, 0.1-3 parts of compound fertilizer, and 35-40 parts of water.
[0007] Optionally, the fluidity of the self-gelling solidifying slurry is 200 mm±10 mm.
[0008] Optionally, the cement comprises silicate cement and / or aluminate cement; and / or,
[0009] The water reducer includes at least one of lignin sulfonate water reducers, naphthalene high-efficiency water reducers, aminosulfonate high-efficiency water reducers, fatty acid high-efficiency water reducers and polycarboxylate high-efficiency water reducers.
[0010] Optionally, the ecological adhesive comprises at least one of polyanionic cellulose, carboxymethyl cellulose and polyacrylamide; and / or,
[0011] The plant fiber comprises at least one of corn straw, rice straw, wheat straw, rice husk and grass shreds; and / or,
[0012] The water absorption multiple of the water retaining agent is greater than 300 times.
[0013] In a second aspect, the present application provides a system for safety reinforcement and ecological restoration of a mine landfill to achieve safety reinforcement and ecological restoration of a mine landfill, the system comprising:
[0014] A slope reinforcement unit, the slope reinforcement unit comprising a slope hardening layer and a slope lattice beam, the slope hardening layer covers the surface of the mine landfill, the slope lattice beam is fixed on the surface of the slope hardening layer, and the slope lattice beam is distributed in gaps;
[0015] Slope repair unit; the slope repair unit comprises a vegetation layer and a slope maintenance layer, the vegetation layer is located in the gap between two adjacent slope lattice beams, and the slope maintenance layer is arranged on the surface of the vegetation layer;
[0016] Wherein, the slope hardening layer is prepared from the gelled solidified slurry in the combined material described in the first aspect;
[0017] The vegetation layer is prepared from the ecological restoration matrix in the combined material described in the first aspect.
[0018] Optionally, the thickness of the slope hardening layer is 2 cm to 3 cm; and / or,
[0019] The thickness of the vegetation layer is 15 cm to 20 cm.
[0020] Optionally, a grass seed layer is provided between the vegetation layer and the slope maintenance layer, and the thickness of the grass seed layer is 1 cm to 3 cm.
[0021] Optionally, the mine landfill includes multiple slopes, the slope of the slope is 45° to 60°, and the slope length of the slope is 30m to 50m.
[0022] In a third aspect, the present application provides a method for safety reinforcement and ecological restoration of a mine landfill, the method being used to prepare the system described in the second aspect, the method comprising:
[0023] The slope of the mine landfill is segmented, compacted and leveled to obtain a mine landfill body;
[0024] The self-gelling solidifying slurry in the combined material of the first aspect is used to perform high-pressure spraying on the mine landfill to obtain a slope hardening layer;
[0025] Digging grooves on the surface of the slope hardening layer and constructing a plurality of slope lattice beams to obtain a plurality of slope lattice beams;
[0026] Spraying the mixture of the ecological restoration matrix and grass seeds into the gap between two adjacent slope lattice beams to obtain a vegetation layer;
[0027] Slope maintenance materials are laid on the surface of the vegetation layer, and watering and maintenance are carried out regularly to form a slope maintenance layer, thereby obtaining a system of safety reinforcement and ecological restoration.
[0028] Optionally, the pressure of the high-pressure injection is greater than 20 MPa.
[0029] The above technical solution provided by the embodiment of the present application has the following advantages compared with the prior art:
[0030] The embodiment of the present application provides a composite material for the safety reinforcement and ecological restoration of a mine landfill. By introducing a self-gelling solidifying slurry, the silt deposited in the Yellow River is used as a base material, a small amount of cement and fly ash cementitious materials are added to the Yellow River silt, and a water reducing agent is used in combination to significantly increase the fluidity of the slurry, and at the same time greatly improve the strength of the Yellow River silt slurry. A part of the self-gelling solidifying slurry can penetrate into the pores of the soil particles in the mine landfill by itself, and the other part can adhere to the surface of the mine landfill and after a hydration reaction, the self-gelling solidifying slurry will gel and harden, so that the self-gelling solidifying slurry can be used to complete the reinforcement of the slope of the mine landfill, and then an ecological restoration matrix is introduced, using the Yellow River silt as a matrix, and by adding plant short fibers It has multiple beneficial effects of "reinforcing steel, reducing weight, and fertilizing soil", and provides sufficient carbon source, nitrogen source and a large amount of trace elements for plant growth and development. Ecological adhesives are used to increase the bonding force between the Yellow River silt particles, further improving the strength and overall stability of the Yellow River silt substrate and ensuring the stable existence of plant short fibers. Water retaining agents are used to ensure the water content of the ecological restoration matrix, enabling the ecological restoration matrix to ensure plant growth in arid areas. Finally, compound fertilizers and biological organic fertilizers are used to provide nutrients for the ecological restoration matrix without affecting the adhesion of the Yellow River silt, accelerating plant growth. The combined materials can effectively complete the reinforcement and ecological restoration of mine landfills, thereby achieving coordinated management of the ecological environment of mining areas in the Yellow River Basin and silt in the Yellow River Basin. BRIEF DESCRIPTION OF THE DRAWINGS
[0031] The accompanying drawings, which are incorporated in and constitute a part of this specification, illustrate embodiments consistent with the present application and, together with the description, serve to explain the principles of the present application.
[0032] In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, for ordinary technicians in this field, other drawings can be obtained based on these drawings without paying any creative labor.
[0033] Figure 1 A schematic diagram of the structure of a system for safety reinforcement and ecological restoration of a mine landfill provided in an embodiment of the present application;
[0034] Figure 2 A schematic flow chart of a method for safety reinforcement and ecological restoration of a mine landfill provided in an embodiment of the present application;
[0035] Among them, 1- mine landfill, 2- slope hardening layer, 3- slope lattice beam, 4- vegetation layer, 5- slope maintenance layer, 6- step drainage ditch, 7- step road. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0037] Unless otherwise specified, various raw materials, reagents, instruments and equipment used in this application can be purchased from the market or prepared by existing methods.
[0038] The creative thinking of this application is:
[0039] At present, the utilization of Yellow River silt and sand is to fill and reclaim the coal mining subsidence area, but there is no relevant report on the use of Yellow River silt and sand in mine landfills. The reason is that the Yellow River silt and sand are silty sand with low clay mineral content (generally less than 5%) and poor water and fertilizer retention performance, making it difficult to use them directly in mine ecological restoration. In addition, the Yellow River silt and sand itself has weak cohesion and loose particles, which is prone to instability and damage when used on mine slopes, affecting the safety of the project.
[0040] Therefore, this application takes into account the safety stability and ecological restoration effect of the mine landfill at the same time, and uses different methods to modify the Yellow River sediment to form two new materials: a Yellow River sediment-based self-gelling grouting curing agent and a Yellow River bottom mud-based ecological restoration matrix, which are respectively used in the safety reinforcement of mine landfills and ecological restoration projects, to achieve large-scale resource utilization of the Yellow River sediment, and then construct a composite technical system for the coordinated ecological management of the Yellow River sediment and mines.
[0041] like Figure 1 As shown, the embodiment of the present application provides a composite material for safety reinforcement and ecological restoration of a mine landfill, the composite material comprising a self-gelling solidifying slurry and an ecological restoration matrix; in parts by weight, the raw materials of the self-gelling solidifying slurry comprise: Yellow River silt: 100 parts, cement: 20-25 parts, fly ash: 8-12 parts, water reducer: 0.1-0.5 parts, water: 36-42 parts;
[0042] In parts by weight, the ecological restoration matrix includes: 100 parts of Yellow River silt, 0.1-0.2 parts of ecological adhesive, 3-5 parts of plant fiber, 0.05-0.1 parts of water retaining agent, 0.5-1 parts of biological organic fertilizer, 0.1-3 parts of compound fertilizer, and 35-40 parts of water.
[0043] In the embodiment of the present application, in the self-gelling solidifying slurry, the positive effect of limiting the weight proportion of cement to 20 to 25 parts is that within this weight proportion range, it can interact with fly ash to form a cementitious material while increasing the fluidity of the ecological restoration matrix, ensuring that the Yellow River silt can cover the surface of the mine landfill, and through the hydration reaction between the cementitious material and water, the strength of the Yellow River silt is increased, thereby ensuring the effect of subsequent reinforcement.
[0044] The positive effect of the fly ash content of 8 to 12 parts by weight is that within this weight range, it can interact with cement to form a cementitious material while increasing the fluidity of the ecological restoration matrix, ensuring that the Yellow River silt can cover the surface of the mine landfill, and through the hydration reaction between the cementitious material and water, the strength of the Yellow River silt is increased, thereby ensuring the effect of subsequent reinforcement.
[0045] The positive effect of the water reducing agent being 0.1 to 0.5 parts by weight is that within this weight range, the fluidity of the cementitious material formed by cement and fly ash can be further improved, thereby ensuring that the Yellow River silt can cover the surface of the mine landfill and ensuring sufficient reaction between the Yellow River silt, cementitious material and water, thereby improving the strength of the Yellow River silt and further ensuring the effect of subsequent reinforcement.
[0046] The positive effect of the water weight ratio of 36 to 42 parts is that within this weight ratio range, the fluidity of the self-gelling solidifying slurry can be guaranteed, thereby ensuring the fluidity of the gelling material and the Yellow River silt, and ensuring the permeability of the gelling material and the Yellow River silt, and ensuring the reinforcement effect of the self-gelling solidifying slurry on the mine landfill.
[0047] The positive effect of the ecological adhesive having a weight proportion of 0.1 to 0.2 parts in the ecological restoration matrix is that within this weight proportion range, it can increase the bonding force between the Yellow River sediment particles, thereby improving the strength and overall stability of the ecological restoration matrix and reducing the risk of wind erosion, sliding and soil erosion in the ecological restoration matrix.
[0048] The positive effect of 3 to 5 parts by weight of plant fiber is that within this weight range, the plant fiber can be utilized to achieve multiple beneficial effects of "reinforcing steel, reducing weight, and fertilizing the soil", which can effectively reduce the bulk density of the ecological restoration base, increase the pore structure of the Yellow River sediment, improve the water holding capacity and shear strength of the Yellow River sediment, and facilitate plant rooting and growth.
[0049] In order to ensure the effect of plant fibers, the length of plant fibers is generally less than 3 cm.
[0050] The positive effect of the water retaining agent being 0.05 to 0.1 parts by weight is that within this weight range, the water absorption and water retention properties of the Yellow River sediment can be improved, which is beneficial to the growth of plants in arid areas and ensures the normal growth of plants in the vegetation layer.
[0051] The positive effect of the bio-organic fertilizer being 0.5 to 1 part by weight is that within this weight range, the bio-organic fertilizer can improve the nutrition of the ecological restoration matrix, ensure the normal growth of plants on the ecological restoration matrix, and ensure the ecological restoration effect.
[0052] The positive effect of the compound fertilizer being 0.1 to 3 parts by weight is that within this weight range, the compound fertilizer can improve the nutrition of the ecological restoration matrix, ensure the normal growth of plants on the ecological restoration matrix, and ensure the ecological restoration effect.
[0053] The positive effect of 35 to 40 parts by weight of water is that within this range of parts by weight, it can ensure that the high water content in the ecological restoration matrix is sufficient, thereby ensuring the normal growth of plants on the ecological restoration matrix and ensuring the ecological restoration effect.
[0054] In some optional embodiments, the fluidity of the self-gelling solidifying slurry is 200 mm±10 mm.
[0055] In the embodiment of the present application, the positive effect of limiting the fluidity of the self-gelling solidifying slurry to 200mm±10mm is that within the range of this fluidity, it can ensure that the cementitious material and Yellow River silt in the self-gelling solidifying slurry cover the surface of the mine landfill and form a hardened layer on the slope, thereby ensuring the reinforcement of the mine landfill.
[0056] In some optional embodiments, the cement comprises silicate cement and / or aluminate cement; and / or,
[0057] The water reducer includes at least one of lignin sulfonate water reducers, naphthalene high-efficiency water reducers, aminosulfonate high-efficiency water reducers, fatty acid high-efficiency water reducers and polycarboxylate high-efficiency water reducers.
[0058] In the embodiments of the present application, the specific types of cement are limited, which can cover most types of cement, and both silicate cement and aluminate cement have good fluidity, so the flow of cementitious materials can be further improved to ensure the curing effect of the self-gelling solidifying slurry on the surface of the mine landfill.
[0059] Limiting the specific types of water reducing agents can ensure the fluidity of cement and fly ash-type cementitious materials, ensure the overall fluidity of self-gelling solidifying slurry, and thus improve the solidification effect of the self-gelling solidifying slurry.
[0060] In some optional embodiments, the ecological adhesive comprises at least one of polyanionic cellulose, carboxymethyl cellulose and polyacrylamide; and / or,
[0061] The plant fiber comprises at least one of corn straw, rice straw, wheat straw, rice husk and grass shreds; and / or,
[0062] The water absorption multiple of the water retaining agent is greater than 300 times.
[0063] In the embodiments of the present application, the specific types of ecological adhesives are limited to ensure that the ecological adhesives are composed of a variety of natural polymer materials, and that the molecular structure surfaces of the ecological adhesives have a large number of amide and carboxyl hydrophilic groups, which can interact with salt ions and water molecules in the solution, thereby improving the moisture retention effect of the Yellow River silt, reducing the water evaporation rate, solving the problem that the Yellow River silt cannot retain water, and providing a good living environment for plant growth and development.
[0064] Limiting the specific types of plant fibers can ensure that the plant fibers have multiple beneficial effects on the Yellow River silt, including "reinforcing the soil, reducing weight, and fertilizing the soil". Not only can they significantly reduce the bulk density of the Yellow River silt and increase the pore structure of the Yellow River silt in the early stage of grass seed spraying, but they can also improve the water holding capacity and shear strength of the Yellow River silt, making it easier for plants to take root and grow. In the later stage, the plant fibers will slowly turn into nutrients after being decomposed by microorganisms, providing sufficient carbon sources, nitrogen sources and a large amount of trace elements for plant growth and development.
[0065] The positive effect of limiting the water absorption multiple of the water retaining agent to >300 times is that within this multiple range, the water retaining agent can absorb sufficient water, thereby ensuring sufficient moisture content in the ecological restoration matrix, ensuring normal growth of plants in the vegetation layer, and even being used for plant growth in arid areas.
[0066] like Figure 1 Based on a general inventive concept, the present application also provides a system for safety reinforcement and ecological restoration of a mine landfill to achieve safety reinforcement and ecological restoration of a mine landfill. The system includes:
[0067] A slope reinforcement unit, the slope reinforcement unit comprising a slope hardening layer and a slope lattice beam, the slope hardening layer covers the surface of the mine landfill, the slope lattice beam is fixed on the surface of the slope hardening layer, and the slope lattice beam is distributed in gaps;
[0068] Slope repair unit; the slope repair unit comprises a vegetation layer and a slope maintenance layer, the vegetation layer is located in the gap between two adjacent slope lattice beams, and the slope maintenance layer is arranged on the surface of the vegetation layer;
[0069] Wherein, the slope hardening layer is prepared from the gelling and solidifying slurry in the combined material;
[0070] The vegetation layer is prepared from the ecological restoration matrix in the combined material.
[0071] In the embodiment of the present application, a specific system composition is defined, and a slope reinforcement unit including a slope hardening layer and a slope lattice beam is used to ensure the stability of the mine landfill and protect its stability. Then, a slope repair unit including a vegetation layer and a slope maintenance layer is used to form vegetation using the vegetation layer, and then the slope maintenance layer is used to regularize and protect the vegetation, thereby preventing the vegetation layer from being damaged and dying during the forming stage.
[0072] The system is implemented based on the above-mentioned combined materials. The specific composition and proportion of the combined materials can refer to the above-mentioned embodiments. Since the system adopts part or all of the technical solutions of the above-mentioned embodiments, it has at least all the beneficial effects brought by the technical solutions of the above-mentioned embodiments, which will not be described one by one here.
[0073] In some optional embodiments, the thickness of the slope hardening layer is 2 cm to 3 cm; and / or,
[0074] The thickness of the vegetation layer is 15 cm to 20 cm.
[0075] In the embodiment of the present application, the positive effect of limiting the thickness of the slope hardening layer to 2 cm to 3 cm is to prevent the thickness of the slope hardening layer from being too large and affecting the fixation of the slope lattice beams, thereby ensuring the stability of the mine landfill.
[0076] The positive effect of limiting the thickness of the vegetation layer to 15 cm to 20 cm is that within this thickness range, the grass seeds of the vegetation layer can be guaranteed to grow and form a stable vegetation.
[0077] In some optional implementations, a grass seed layer is provided between the vegetation layer and the slope maintenance layer, and the thickness of the grass seed layer is 1 cm to 3 cm.
[0078] In the embodiment of the present application, the positive effect of limiting the thickness of the grass seed layer to 1 cm to 3 cm is that the thickness of the grass seed layer can be ensured to be sufficient within this thickness range, thereby ensuring that the plants have a sufficient height and ensuring the effect of ecological restoration.
[0079] In some optional embodiments, the mine landfill includes multiple slopes, the slope of the slope is 45° to 60°, and the slope length of the slope is 30m to 50m.
[0080] In the embodiment of the present application, the slope and slope length of the mine landfill are limited, which can ensure the stability of the surface slope of the mine landfill, ensure the stability of the subsequent slope hardening layer and slope lattice beam, and thus ensure the stability of the vegetation layer and slope maintenance layer.
[0081] like Figure 2 As shown, based on a general inventive concept, an embodiment of the present application provides a method for safety reinforcement and ecological restoration of a mine landfill, the method is used to prepare the system, and the method includes:
[0082] S1. The slope of the mine landfill is segmented, compacted and leveled to obtain a mine landfill;
[0083] S2. Using the self-gelling solidifying slurry in the combined material to spray the mine landfill under high pressure to obtain a slope hardening layer;
[0084] S3. Excavating grooves on the surface of the slope hardened layer and constructing multiple slope lattice beams to obtain multiple slope lattice beams;
[0085] S4. Spraying a mixture of the ecological restoration matrix and grass seeds into the gap between two adjacent slope lattice beams to obtain a vegetation layer;
[0086] S5. Laying slope maintenance materials on the surface of the vegetation layer and watering and maintaining it regularly to form a slope maintenance layer to obtain a safety reinforcement and ecological restoration system.
[0087] In the embodiment of the present application, the self-gelling solidifying slurry is sprayed under high pressure to ensure that the components in the gelling solidifying slurry can better penetrate into the mine landfill, and at the same time ensure that the gelling solidifying slurry is evenly distributed on the surface of the mine landfill. At the same time, grass seeds are mixed in the ecological restoration matrix to ensure the normal reproduction of grass seeds in the vegetation layer, thereby ensuring the coordinated implementation of the safe reinforcement of the mine landfill and the ecological restoration.
[0088] The slope lattice includes at least one of a beam mortar stone lattice, a cast-in-place reinforced concrete lattice and a precast concrete lattice.
[0089] This method is a preparation method for the above-mentioned system. The specific composition and connection relationship of the system can refer to the above-mentioned embodiment. Since this method adopts part or all of the technical solutions of the above-mentioned embodiment, it at least has all the beneficial effects brought by the technical solutions of the above-mentioned embodiment, which will not be described one by one here.
[0090] In some optional embodiments, the pressure of the high-pressure injection is greater than 20 MPa.
[0091] In the embodiment of the present application, the positive effect of limiting the pressure of high-pressure injection to >20MPa is that within this pressure range, it can ensure that the components in the gelled solidified slurry can better penetrate into the mine landfill, and at the same time, it can ensure that the gelled solidified slurry is evenly distributed on the surface of the mine landfill, thereby achieving the solidification of the mine landfill.
[0092] The present application will be further described below in conjunction with specific embodiments. It should be understood that these embodiments are intended only to illustrate the present application and are not intended to limit the scope of the present application. The experimental methods for which specific conditions are not specified in the following examples are usually measured according to national standards. If there is no corresponding national standard, then the conditions recommended by the manufacturer are followed.
[0093] Example 1
[0094] A composite material for safety reinforcement and ecological restoration of a mine landfill, comprising a self-gelling solidifying slurry and an ecological restoration matrix; in parts by weight, the raw materials of the self-gelling solidifying slurry include: 100 parts of Yellow River silt, 20 parts of cement, 10 parts of fly ash, 0.1 parts of a water reducing agent, and 38 parts of water;
[0095] Calculated in parts by weight, the ecological restoration matrix includes: Yellow River silt: 100 parts, ecological adhesive: 0.1 parts, plant fiber: 5 parts, water retaining agent: 0.1 parts, biological organic fertilizer: 0.5 parts, compound fertilizer: 0.3 parts, and water: 38 parts.
[0096] The fluidity of the self-gelling solidifying slurry is 198mm, and its compressive strength is 3.5MPa after 28 days of curing.
[0097] Among them, the Yellow River silt is treated to remove impurities, dried in the sun and then sieved through a 5mm sieve for use.
[0098] The cement is silicate cement with a strength grade of 425;
[0099] The water reducing agent is a polycarboxylate-based high-efficiency water reducing agent.
[0100] The ecological binder is polyanionic cellulose;
[0101] The plant fiber is corn stalks, and the plant fiber length is less than 3 cm;
[0102] The water retaining agent is a super absorbent resin, and the water absorption multiple of the water retaining agent is 360 times.
[0103] A system for safety reinforcement and ecological restoration of mine landfills is provided to achieve safety reinforcement and ecological restoration of mine landfills. The system comprises:
[0104] The slope reinforcement unit includes a slope hardening layer and a slope lattice beam. The slope hardening layer covers the surface of the mine landfill. The slope lattice beam is fixed on the surface of the slope hardening layer. The slope lattice beam is distributed in gaps.
[0105] Slope repair unit; the slope repair unit includes a vegetation layer and a slope maintenance layer, the vegetation layer is located in the gap between two adjacent slope lattice beams, and the slope maintenance layer is located on the surface of the vegetation layer;
[0106] Among them, the slope hardening layer is prepared from the gelling and solidifying slurry in the combined materials;
[0107] The vegetation layer is prepared from the ecological restoration matrix in the combined materials.
[0108] The thickness of the slope hardening layer is 2cm;
[0109] The thickness of the vegetation layer is 15 cm.
[0110] A grass seed layer is provided between the vegetation layer and the slope maintenance layer, and the thickness of the grass seed layer is 1 cm to 3 cm.
[0111] The mine landfill consists of multiple slopes with a slope of 52° and a slope length of 40m.
[0112] A method for safety reinforcement and ecological restoration of a mine landfill, comprising:
[0113] The slope of the mine landfill is divided into sections by an excavator, compacted and leveled to obtain the mine landfill body;
[0114] The self-gelling solidifying slurry in the combined material is used to spray the mine landfill under high pressure to obtain a slope hardening layer;
[0115] After 2 weeks of curing, trenches are excavated on the surface of the slope hardening layer, and multiple slope lattice beams are constructed to obtain multiple slope lattice beams; among them, the slope lattice beams are mortar-laid stone lattice beams.
[0116] A mixture of ecological restoration matrix and grass seeds is sprayed into the empty space between the lattice beams of two adjacent slope lattice beams to obtain a vegetation layer;
[0117] Slope maintenance materials are laid on the surface of the vegetation layer, and watering is carried out regularly to form a slope maintenance layer to obtain a system of safety reinforcement and ecological restoration. Regular watering maintenance includes watering once every 3 days before the grass seeds germinate and once a week during the growth period of the grass seedlings. The amount of irrigation each time should be 20mm.
[0118] The pressure of high-pressure injection is 25 MPa.
[0119] Example 2
[0120] Comparing Example 2 with Example 1, the difference between Example 2 and Example 1 is:
[0121] The raw materials of the self-gelling solidifying slurry include, by weight: Yellow River silt: 100 parts, cement: 25 parts, fly ash: 10 parts, water reducing agent: 0.1 parts, water: 42 parts;
[0122] Calculated by weight, the ecological restoration matrix includes: Yellow River silt: 100 parts, ecological adhesive: 0.2 parts, plant fiber: 5 parts, water retaining agent: 0.1 parts, biological organic fertilizer: 0.5 parts, compound fertilizer: 3 parts, and water: 40 parts.
[0123] The fluidity of the self-gelling solidifying slurry is 193mm, and its compressive strength is 4.8MPa after 28 days of curing.
[0124] The cement is silicate cement with a strength grade of 425;
[0125] The water reducing agent is a polycarboxylate-based high-efficiency water reducing agent.
[0126] The ecological binder is polyanionic cellulose;
[0127] The water absorption multiple of the water retaining agent is 360 times.
[0128] The thickness of the slope hardening layer is 2cm;
[0129] The thickness of the vegetation layer is 20 cm.
[0130] A grass seed layer is provided between the vegetation layer and the slope maintenance layer, and the thickness of the grass seed layer is 1 cm to 3 cm.
[0131] The mine landfill consists of multiple slopes with a slope of 52° and a slope length of 40m.
[0132] The pressure of high-pressure injection is 25 MPa.
[0133] Example 3
[0134] Comparing Example 3 with Example 1, the difference between Example 3 and Example 1 is:
[0135] The raw materials of the self-gelling solidifying slurry include, by weight: Yellow River silt: 100 parts, cement: 22 parts, fly ash: 8 parts, water reducing agent: 0.5 parts, water: 36 parts;
[0136] Calculated by weight, the ecological restoration matrix includes: Yellow River silt: 100 parts, ecological adhesive: 0.2 parts, plant fiber: 3 parts, water retaining agent: 0.05 parts, biological organic fertilizer: 0.5 parts, compound fertilizer: 0.1 parts, and water: 35 parts.
[0137] The fluidity of the self-gelling solidifying slurry is 193mm.
[0138] The cement is silicate cement with a strength grade of 425;
[0139] The water reducing agent is a polycarboxylate-based high-efficiency water reducing agent.
[0140] The ecological adhesive is polyacrylamide;
[0141] The plant fiber is rice straw;
[0142] The thickness of the slope hardening layer is 3cm;
[0143] The thickness of the vegetation layer is 15 cm.
[0144] A grass seed layer is provided between the vegetation layer and the slope maintenance layer, and the thickness of the grass seed layer is 1 cm to 3 cm.
[0145] The mine landfill consists of multiple slopes with a slope of 45° and a slope length of 30m.
[0146] The pressure of high-pressure injection is 25 MPa.
[0147] Comparative Example 1
[0148] Comparative Example 1 and Example 1 are compared. The difference between Comparative Example 1 and Example 1 is:
[0149] The raw materials of the self-gelling solidifying slurry include, by weight: Yellow River silt: 100 parts, cement: 25 parts, fly ash: 10 parts, water reducing agent: 0.2 parts, water: 42 parts;
[0150] In terms of weight, the ecological restoration matrix includes: Yellow River silt: 100 parts, ecological adhesive: 0 parts, plant fiber: 0 parts, water retaining agent: 0 parts, biological organic fertilizer: 0.5 parts, compound fertilizer: 3 parts, and water: 35 parts.
[0151] The fluidity of the self-gelling solidifying slurry is 205mm, and its compressive strength is 5.5MPa after 28 days of curing.
[0152] The cement is sulphoaluminate cement with a strength grade of 425;
[0153] The water reducing agent is a polycarboxylate-based high-efficiency water reducing agent.
[0154] The plant fiber is corn stalks;
[0155] The water absorption multiple of the water retaining agent is greater than 300 times.
[0156] The thickness of the slope hardening layer is 2cm to 3cm;
[0157] The thickness of the vegetation layer is 15cm to 20cm.
[0158] A grass seed layer is provided between the vegetation layer and the slope maintenance layer, and the thickness of the grass seed layer is 1 cm to 3 cm.
[0159] The mine landfill consists of multiple slope sections with a slope of 45° to 60° and a slope length of 30m to 50m.
[0160] The pressure of high-pressure injection is 25 MPa.
[0161] Related experiments and effect data:
[0162] The physical and chemical properties and vegetation indicators of the self-gelling solidified slurry and ecological restoration matrix obtained in Examples 1-2 and Comparative Example 1 were monitored and analyzed, and the results are shown in Table 1.
[0163] Table 1 Physical and chemical properties and vegetation indicators of self-gelling solidifying slurry and ecological restoration matrix
[0164]
[0165] Detailed analysis of Table 1:
[0166] From the data of Examples 1-2 and Comparative Example 1, it can be seen that by adding a certain amount of cement and fly ash to the Yellow River silt, the compressive strength of the self-gelling solidifying slurry can be significantly improved, so that it can meet the requirements of mine landfill slope reinforcement; after adding a certain retarder, the fluidity of the Yellow River silt-based self-gelling solidifying slurry is significantly improved, making it easier to meet the requirements of shotcrete construction. By adding ecological adhesives and water retaining agents to the Yellow River silt, the saturated moisture content and nutrient retention efficiency of the ecological restoration matrix can be greatly improved, thereby improving the water and fertilizer retention performance of the matrix. The modified Yellow River silt-based ecological restoration matrix has significantly improved plant growth rate and shear strength parameters compared to the control group (pure Yellow River bottom mud), indicating that the use of this technical solution to modify the Yellow River silt can transform it into a mine slope ecological restoration matrix that is more suitable for plant growth.
[0167] One or more technical solutions in the embodiments of the present application also have at least the following technical effects or advantages:
[0168] (1) The embodiment of the present application provides a composite material for the safety reinforcement and ecological restoration of a mine landfill, which utilizes the Yellow River silt for the safety reinforcement and ecological restoration of the mine landfill, organically combining the resource disposal of the Yellow River silt with the ecological restoration of the mine landfill in the Yellow River Basin, using local materials, being technically feasible, and cost-controlled, thereby solving or partially solving two important engineering and technical problems, namely, the large-scale siltation of the Yellow River and the water and soil shortage dilemma faced in the ecological restoration of the mine landfill. At the same time, it turns waste into treasure, achieving two goals at one stroke, and can effectively realize the large-scale ecological application of the Yellow River silt, achieving the technical effect of both economic and environmental benefits.
[0169] (2) The embodiment of the present application provides a system for safety reinforcement and ecological restoration of a mine landfill. The slope of the landfill can reduce the infiltration of sulfides and heavy metal ions in gangue and tailings with rainwater through the hardened self-cementing slurry, thereby protecting the groundwater source around the mine landfill. Compared with the traditional method of spraying cement mortar slope reinforcement, this solution has the advantages of convenient construction, low price, energy saving and environmental protection.
[0170] (2) The embodiment of the present application provides a method for safe reinforcement and ecological restoration of a mine landfill, which uses high-pressure spraying to spray the Yellow River silt-based ecological restoration matrix onto the reinforced mine landfill slope. It has the technical advantages of convenient construction, fast germination and growth of grass seeds, and good substrate stability. It can be widely promoted and applied in the ecological restoration of mine landfills in the Yellow River Basin, achieving technical effects of both economic and environmental benefits.
[0171] Various embodiments of the present application may be presented in the form of a range; it should be understood that the description in the form of a range is only for convenience and brevity, and should not be understood as a rigid limitation on the scope of the present application; therefore, the range description should be considered to have specifically disclosed all possible sub-ranges and single numerical values within the range. For example, the range description from 1 to 6 should be considered to have specifically disclosed sub-ranges, such as from 1 to 3, from 1 to 4, from 1 to 5, from 2 to 4, from 2 to 6, from 3 to 6, etc., as well as single numbers within the range, such as 1, 2, 3, 4, 5 and 6, which apply regardless of the range. In addition, whenever a numerical range is indicated herein, it is meant to include any cited number (fractional or integer) within the indicated range.
[0172] In this application, unless otherwise specified, directional words such as "upper" and "lower" used refer specifically to the directions of the drawings in the accompanying drawings. In addition, in the description of the specification of this application, the terms "include", "comprise", etc. mean "including but not limited to".
[0173] In this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply that there is any such actual relationship or order between these entities or operations. In this article, "and / or" describes the association relationship of associated objects, indicating that there can be three relationships, for example, A and / or B, which can represent: A exists alone, A and B exist at the same time, and B exists alone. Wherein A, B can be singular or plural. In this article, "at least one" refers to one or more, and "multiple" refers to two or more. "At least one", "the following at least one (individual)" or similar expressions refer to any combination of these items, including any combination of single (individual) or plural (individual). For example, "at least one (individual) of a, b, or c", or "at least one (individual) of a, b, and c", can all represent: a, b, c, ab (i.e. a and b), ac, bc, or abc, wherein a, b, c can be single or multiple respectively.
[0174] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A method for safety reinforcement and ecological restoration of a mine landfill, characterized in that: The method comprises: The slope of the mine landfill is segmented, compacted and leveled to obtain a mine landfill body; The self-gelling solidifying slurry in the combined material is used to perform high-pressure jet grouting on the mine landfill, wherein the high-pressure jet grouting pressure is greater than 20 MPa; and a slope hardening layer is obtained at the same time; Digging grooves on the surface of the slope hardening layer and constructing a plurality of slope lattice beams to obtain a plurality of slope lattice beams; Spraying a mixture of ecological restoration matrix and grass seeds into the middle gap between two adjacent slope lattice beams to obtain a vegetation layer; Laying slope maintenance materials on the surface of the vegetation layer and watering and maintaining it regularly to form a slope maintenance layer to obtain a safety reinforcement and ecological restoration system; The composite material comprises a self-gelling solidifying slurry and an ecological restoration matrix; the raw materials of the self-gelling solidifying slurry are composed of the following components by weight: Yellow River silt: 100 parts, cement: 20-25 parts, fly ash: 8-12 parts, water reducing agent: 0.1-0.5 parts, water: 36-42 parts; The ecological restoration matrix is composed of the following components by weight: Yellow River sediment: 100 parts, ecological adhesive: 0.1-0.2 parts, plant fiber: 3-5 parts, water retaining agent: 0.05-0.1 parts, biological organic fertilizer: 0.5-1 parts, compound fertilizer: 0.1-3 parts, water: 35-40 parts; The fluidity of the self-gelling solidifying slurry is 200mm±10mm; The ecological adhesive comprises at least one of polyanionic cellulose, carboxymethyl cellulose and polyacrylamide; the plant fiber comprises at least one of corn straw, rice straw, wheat straw, rice husk and grass shreds; the water absorption multiple of the water retaining agent is greater than 300 times, and the length of the plant fiber is less than 3 cm; The thickness of the slope hardening layer is 2cm to 3cm, the thickness of the vegetation layer is 15cm to 20cm, a grass seed layer is provided between the vegetation layer and the slope maintenance layer, the thickness of the grass seed layer is 1cm to 3cm, the mine landfill includes multiple slope sections, the slope of the slope is 45° to 60°, and the slope length of the slope is 30m to 50m.
2. The method according to claim 1, characterized in that: The cement comprises silicate cement and / or aluminate cement; and / or, The water reducer includes at least one of lignin sulfonate water reducers, naphthalene high-efficiency water reducers, aminosulfonate high-efficiency water reducers, fatty acid high-efficiency water reducers and polycarboxylate high-efficiency water reducers.
Citation Information