Urban road paving filler optimization method and system

The cloud optimization platform obtains soil and climate characteristic information and optimizes material ratios, which solves the problem of insufficient correlation between urban road paving fillers and geological environment in the existing technology, and improves the performance and quality of road paving.

CN117131773BActive Publication Date: 2024-11-08JIANGSU RUIYILONG CONSTR ENG CO LTD
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202311103607.8
Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
Filing Date
2023-08-30
Publication Date
2024-11-08
Estimated Expiration
2043-08-30

AI Technical Summary

Technical Problem

In the prior art, urban road paving fillers have low correlation with the geological environment, resulting in lower road paving performance and quality.

Method used

The soil and climate characteristic information of the target road is obtained through the cloud optimization platform, and the material ratio optimization analysis is carried out to prepare highly targeted prefillings for laying.

Benefits of technology

The performance and quality of road paving have been improved and the material matching is achieved in the actual conditions of the geological environment.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN117131773B_ABST
    Figure CN117131773B_ABST
Patent Text Reader

Abstract

The present invention discloses a method and system for optimizing urban road paving fillers, which are applied in the field of data processing technology. The method comprises: obtaining target paved information of a target road. Determining a target paving stage according to the paved materials, matching the target paving materials of the target paving stage in combination with a preset filler database, obtaining target soil characteristic information, and obtaining target climate characteristic information. Optimizing and analyzing the target soil characteristic information and the target climate characteristic information through a cloud optimization platform in a cloud computer, obtaining target material ratio optimization information of the target paving material. Mixing and preparing the target paving material according to the target material ratio optimization information to obtain a pre-filler, which is used to pave the target road. The method solves the technical problem in the prior art that the acquisition of urban road paving fillers has a low correlation with the geological environment, resulting in low performance and quality of road paving.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of data processing, and in particular to a method and system for optimizing urban road paving fillers. Background Art

[0002] Commonly used paving fillers during road paving include: sand, stone, asphalt, etc., and the paving fillers used in different road construction stages are different. However, in the prior art, since road paving fillers are mostly obtained using a unified formula, the relevance of the fillers to the geological environment is low, resulting in low performance and quality of road paving.

[0003] Therefore, in the prior art, the acquisition of urban road paving fillers has a low correlation with the geological environment, resulting in technical problems of low performance and quality of road paving. Summary of the invention

[0004] The present application provides a method and system for optimizing urban road paving filling materials, thereby solving the technical problem in the prior art that the acquisition of urban road paving filling materials has a low correlation with the geological environment, resulting in low performance and quality of road paving.

[0005] The present application provides a method for optimizing fillers for urban road paving, and the method is applied to an optimization system for fillers for urban road paving, the system comprising a cloud optimization platform, and the cloud optimization platform is stored in a cloud computer, and the method comprises: obtaining target paved information of a target road, wherein the target paved information comprises material type and material ratio of paved materials; determining a target paving stage according to the material type and material ratio of paved materials, and matching target paving materials of the target paving stage in combination with a preset filler database; obtaining target soil characteristic information, wherein the target soil characteristic information is obtained by detecting geological soil characteristics corresponding to the target road by a soil detector; obtaining target climate characteristic information, wherein the target climate characteristic information is obtained by detecting climate environment characteristics of the target road by a climate detector; optimizing and analyzing the target soil characteristic information and the target climate characteristic information by the cloud optimization platform in the cloud computer, and obtaining target material ratio optimization information of the target paving material; mixing and preparing the target paving material according to the target material ratio optimization information to obtain pre-fillers, and the pre-fillers are used to pave the target road.

[0006] The present application also provides an urban road paving filling optimization system, the system includes a cloud optimization platform, and the cloud optimization platform is stored in a cloud computer, the system includes: a paving information acquisition module, used to obtain target paved information of the target road, wherein the target paved information includes the material type and material ratio of the paved material; a paving stage acquisition module, used to determine the target paving stage according to the material type and material ratio of the paved material, and match the target paving material of the target paving stage in combination with a preset filling database; a soil feature acquisition module, used to obtain target soil feature information, the target soil feature information is obtained through soil detection The instrument detects the geological soil characteristics corresponding to the target road; the environmental characteristics acquisition module is used to obtain target climate characteristic information, and the target climate characteristic information is obtained by detecting the climate environment characteristics of the target road through the climate detector; the material ratio optimization module is used to optimize and analyze the target soil characteristic information and the target climate characteristic information through the cloud optimization platform in the cloud computer to obtain the target material ratio optimization information of the target paving material; the pre-filler acquisition module is used to mix and prepare the target paving material according to the target material ratio optimization information to obtain a pre-filler, and the pre-filler is used to pave the target road.

[0007] The present application also provides an electronic device, including:

[0008] A memory for storing executable instructions;

[0009] The processor is used to implement a method for optimizing urban road paving filling materials provided in the present application when executing executable instructions stored in the memory.

[0010] The present application provides a computer-readable storage medium storing a computer program. When the program is executed by a processor, an urban road paving filling optimization method provided by the present application is implemented.

[0011] The present application proposes an urban road paving filling optimization method and system, which obtains the target paved information of the target road. The target paving stage is determined based on the paved materials, and the target paving materials of the target paving stage are matched in combination with the preset filling database to obtain the target soil characteristic information and the target climate characteristic information. The target soil characteristic information and the target climate characteristic information are optimized and analyzed by the cloud optimization platform in the cloud computer to obtain the target material ratio optimization information of the target paving material. The target paving material is mixed and prepared according to the target material ratio optimization information to obtain the pre-filled material, and the pre-filled material is used to pave the target road. The material ratio used for paving is obtained in a targeted manner according to the actual conditions of the road geological environment, thereby improving the performance and quality of road paving. The technical problem that the acquisition of urban road paving filling materials in the prior art has a low correlation with the geological environment, resulting in low performance and quality of road paving is solved.

[0012] The above description is only an overview of the technical solution of the present application. In order to more clearly understand the technical means of the present application, it can be implemented in accordance with the contents of the specification. In order to make the above and other purposes, features and advantages of the present application more obvious and easy to understand, the specific implementation methods of the present application are listed below. BRIEF DESCRIPTION OF THE DRAWINGS

[0013] In order to more clearly illustrate the technical solutions of the embodiments of the present disclosure, the following briefly introduces the drawings of the embodiments of the present disclosure. Obviously, the drawings described below only relate to some embodiments of the present disclosure, and are not intended to limit the present disclosure.

[0014] Figure 1 A schematic diagram of a flow chart of a method for optimizing urban road paving filler provided in an embodiment of the present application;

[0015] Figure 2 A schematic diagram of a flow chart of obtaining a preset filler database for an urban road paving filler optimization method provided in an embodiment of the present application;

[0016] Figure 3 A schematic diagram of a process for obtaining target material ratio optimization information in a method for optimizing urban road paving fillers provided in an embodiment of the present application;

[0017] Figure 4 A schematic diagram of the structure of a system for optimizing a method for paving fillers for urban roads provided in an embodiment of the present application;

[0018] Figure 5 A schematic diagram of the structure of a system electronic device for an urban road paving filler optimization method provided by an embodiment of the present invention.

[0019] Explanation of the reference numerals: laying information acquisition module 11, laying stage acquisition module 12, soil characteristic acquisition module 13, environmental characteristic acquisition module 14, material ratio optimization module 15, pre-filling material acquisition module 16, processor 31, memory 32, input device 33, output device 34. DETAILED DESCRIPTION

[0020] Embodiment 1

[0021] In order to make the purpose, technical solutions and advantages of the present application clearer, the present application will be further described in detail below in conjunction with the accompanying drawings. The described embodiments should not be regarded as limiting the present application. All other embodiments obtained by ordinary technicians in the field without making creative work are within the scope of protection of this application.

[0022] In the following description, reference is made to “some embodiments”, which describe a subset of all possible embodiments, but it will be understood that “some embodiments” may be the same subset or different subsets of all possible embodiments and may be combined with each other without conflict.

[0023] In the following description, the terms "first\second\third" involved are merely used to distinguish similar objects and do not represent a specific ordering of the objects. It can be understood that "first\second\third" can be interchanged with a specific order or sequence where permitted, so that the embodiments of the present application described herein can be implemented in an order other than that illustrated or described herein.

[0024] Unless otherwise defined, all technical and scientific terms used herein have the same meaning as those commonly understood by those skilled in the art to which this application belongs. The terms used herein are only for the purpose of describing the embodiments of this application.

[0025] Although the present application makes various references to certain modules in the system according to the embodiments of the present application, any number of different modules may be used and run on the user terminal and / or server, the modules are illustrative only, and different aspects of the system and method may use different modules.

[0026] Flowcharts are used in the present application to illustrate the operations performed by the system according to the embodiments of the present application. It should be understood that the preceding or following operations are not necessarily performed accurately in order. On the contrary, various steps may be processed in reverse order or simultaneously as required. At the same time, other operations may also be added to these processes, or a certain step or several steps of operations may be removed from these processes.

[0027] like Figure 1As shown, an embodiment of the present application provides a method for optimizing urban road paving fillers, the method is applied to an urban road paving filler optimization system, the system includes a cloud optimization platform, and the cloud optimization platform is stored in a cloud computer, the method includes:

[0028] Acquire target paved information of the target road, wherein the target paved information includes material type and material ratio of the paved material;

[0029] Determine the target paving stage according to the material type and the material ratio analysis of the paved material, and match the target paving material of the target paving stage in combination with the preset filler database;

[0030] Acquiring target soil characteristic information, wherein the target soil characteristic information is obtained by detecting geological soil characteristics corresponding to the target road using a soil detector;

[0031] Commonly used paving materials in the road paving process include: sand, stone, asphalt, etc., and the paving fillers used in different road construction stages are not the same. However, in the prior art, since road paving fillers are mostly paved in a unified filler ratio, the correlation between the filler and the geological environment is low, resulting in low performance and quality of road paving. Obtain the target paved information of the target road, wherein the target paved information includes the material type and material ratio of the paved material. According to the material type and material ratio of the paved material, the target paving stage is determined, and the target paving material of the target paving stage is matched in combination with the road paving material type in the preset filler database and the corresponding material applicable paving stage. Further, the target soil characteristic information is obtained, and the target soil characteristic information is obtained by detecting the geological soil characteristics corresponding to the target road through a soil detector, wherein the soil characteristics include: geological environment, collapsibility, swelling, corrosiveness, etc.

[0032] like Figure 2 As shown, the method provided in the embodiment of the present application also includes:

[0033] The urban road paving is divided into N paving stages, where N is an integer greater than 1;

[0034] Establishing a road paving material type set, wherein the road paving material type set includes asphalt material, concrete material, brick material, stone material, and wood material;

[0035] The asphalt materials include impermeable asphalt, permeable asphalt and colored asphalt; the concrete materials include plain concrete, permeable concrete and colored concrete; the brick materials include permeable bricks, sintered bricks, cement bricks, square bricks and grass bricks; the stone materials include granite, marble, bluestone, pebbles, shale, sandstone, rubble, rough stone and rice washing stone; the wood materials include antiseptic wood, plastic wood and bamboo wood;

[0036] Based on the N paving stages, the paving stages applicable to each material in the road paving material type set are analyzed in sequence to generate a material-stage correspondence relationship;

[0037] The preset filler database is constructed according to the material-stage correspondence.

[0038] The urban road paving is divided into N paving stages, where N is an integer greater than 1, and the material type and material ratio corresponding to each paving stage are different. A road paving material type set is formed, and the road paving material type set includes asphalt materials, concrete materials, brick materials, stone materials, and wood materials. Among them, the asphalt materials include impermeable asphalt, permeable asphalt and colored asphalt, the concrete materials include plain concrete, permeable concrete and colored concrete, the brick materials include permeable bricks, sintered bricks, cement bricks, square bricks and grass bricks, the stone materials include granite, marble, bluestone, pebbles, shale, sandstone, stone, rough stone and rice washing stone, and the wood materials include antiseptic wood, plastic wood and bamboo wood. Based on the N paving stages, the paving stages applicable to each material in the road paving material type set are analyzed in turn, and the road paving material type and the corresponding material applicable paving stage are obtained, and the material-stage correspondence relationship is generated. Finally, the preset filler database is formed according to the material-stage correspondence relationship.

[0039] The method provided in the embodiment of the present application also includes:

[0040] Performing dynamic image acquisition of the target road by the CCD image sensor to obtain a target road image time sequence;

[0041] The first frame road image in the target road image time sequence is used as a registration reference, and the non-first frame road image in the target road image time sequence is used as the image to be registered to perform registration fusion processing to obtain the target road image;

[0042] Displaying the target road image in real time via the display;

[0043] When the display shows that the target road is currently in a paved and flat state, a paving start instruction is issued, and the paving start instruction is used to remind the paving of the next stage of the target road.

[0044] The target road is dynamically imaged by the CCD image sensor to obtain a target road image sequence, wherein the target road image sequence includes road images acquired based on a time series. Subsequently, the first frame road image in the target road image sequence is used as a registration reference, and the non-first frame road image in the target road image sequence is used as the image to be registered for registration and fusion processing to obtain the target road image, wherein image registration is a method for aligning two or more images in space. The target road image is displayed in real time by the display, and image recognition is performed based on the display result to obtain uneven areas, and a paved flat state is obtained, wherein there are no uneven areas in the paved flat state. When the display shows that the target road is currently in a paved flat state, that is, there are no uneven areas, the current paving stage has been completed, and a paving start instruction is issued, and the paving start instruction is used to remind the paving of the next stage of the target road.

[0045] The method provided in the embodiment of the present application also includes:

[0046] When the display shows that the target road is not currently in a paved and flat state, a rolling start instruction is issued;

[0047] According to the rolling start instruction, the paved materials on the target road based on the target paved information are rolled until the road is flat.

[0048] When the display shows that the target road is not currently in a paved and flat state, there is an uneven area at this time, and the current stage has not yet been completely completed, a rolling start instruction is issued to continue rolling until the road requirements for the next paving stage are met. Finally, according to the rolling start instruction, the paving materials of the target road based on the target paved information are rolled until the road is flat.

[0049] Acquiring target climate characteristic information, wherein the target climate characteristic information is obtained by detecting the climate environment characteristics of the target road through a climate detector;

[0050] Optimizing and analyzing the target soil characteristic information and the target climate characteristic information through the cloud optimization platform in the cloud computer to obtain target material ratio optimization information of the target paving material;

[0051] The target paving material is mixed and prepared according to the target material ratio optimization information to obtain a pre-filling material, and the pre-filling material is used to pave the target road.

[0052] Obtain target climate characteristic information, which is obtained by detecting the climate environment characteristics of the target road through a climate detector, wherein the target climate characteristic information includes detection data such as temperature and humidity. Subsequently, the target soil characteristic information and the target climate characteristic information are optimized and analyzed by the cloud optimization platform in the cloud computer to obtain target material ratio optimization information of the target paving material. According to the target material ratio optimization information, the target paving material is mixed and prepared to obtain a prefiller, and the prefiller is used to pave the target road. Finally, the target road is paved based on the prefiller, and the road is subjected to an emulsified asphalt slurry seal treatment after paving. By obtaining the target material ratio optimization information and mixing and preparing the paving materials to obtain the prefiller, it is possible to obtain the material ratio used for paving in a targeted manner according to the actual conditions of the road geological environment, thereby improving the performance and quality of road paving.

[0053] like Figure 3 As shown, the method provided in the embodiment of the present application also includes:

[0054] The cloud computer stores historical urban road paving records that are the same as the target paving stage of the target road;

[0055] According to the first historical record in the historical urban road paving record, a first data group is formed, wherein the first data group includes first historical soil characteristic information, first historical climate characteristic information and first historical material ratio;

[0056] Performing supervised learning and testing on the historical data group formed based on the first data group to obtain an initial model of material ratio, and storing the initial model of material ratio in the cloud optimization platform;

[0057] Analyzing the target soil characteristic information and the target climate characteristic information through the material ratio initial model to obtain initial material ratio information;

[0058] The initial material ratio information is optimized based on preset optimization rules to obtain the target material ratio optimization information.

[0059] When obtaining the target material ratio optimization information of the target paving material, based on the historical urban road paving records stored in the cloud computer that are the same as the target paving stage of the target road. A first data group is formed according to the first historical record in the historical urban road paving record, wherein the first data group includes first historical soil characteristic information, first historical climate characteristic information and first historical material ratio. All data groups in the historical urban road paving record are obtained to form a historical data group. The historical data group formed based on the first data group is supervised for learning and verification to obtain an initial material ratio model, and the initial material ratio model is stored in the cloud optimization platform. The initial material ratio model is obtained by using the historical data group as training data to supervise the learning of the neural network model, and then verifying until the initial material ratio information result output by the model meets the preset accuracy rate. Furthermore, the target soil characteristic information and the target climate characteristic information detected at present are analyzed by the initial material ratio model. When the laying stage, soil, climate, etc. are similar to the historical ones, the historical ratio is used as the initial ratio of this laying to obtain the initial material ratio information. Finally, the initial material ratio information is optimized based on the preset optimization rules to obtain the target material ratio optimization information.

[0060] The method provided in the embodiment of the present application also includes:

[0061] Determine a first ratio neighborhood of the initial material ratio information based on the preset optimization rule, wherein the first ratio neighborhood includes a plurality of neighborhood ratio information;

[0062] Obtaining an initial ratio index of the initial material ratio information according to a preset optimization metric, wherein the preset optimization metric is stored in the preset optimization rule;

[0063] According to the preset optimization benchmark, the plurality of neighborhood matching information are measured and analyzed in turn to obtain a plurality of neighborhood matching information indexes;

[0064] Obtaining neighborhood matching information corresponding to an optimal neighborhood matching information index among the plurality of neighborhood matching information indexes, and recording the index as optimal neighborhood matching information;

[0065] When the optimal neighborhood ratio information index is greater than the initial ratio index, the optimal neighborhood ratio information is used as the target material ratio optimization information.

[0066] Specifically, when optimizing the initial material ratio information and obtaining the target material ratio optimization information, the first ratio neighborhood of the initial material ratio information is determined based on the preset optimization rule, and the first ratio neighborhood includes multiple neighborhood ratio information. Among them, the preset optimization rule includes a rule for expanding the initial material ratio information to obtain multiple neighborhood ratio information and a preset optimization metric. When obtaining multiple neighborhood ratio information, the initial material ratio information can be expanded according to a preset adjustment range to obtain multiple neighborhood ratio information. Subsequently, the initial ratio index of the initial material ratio information is obtained according to the preset optimization metric, and the preset optimization metric is stored in the preset optimization rule. Subsequently, the multiple neighborhood ratio information is measured and analyzed in turn according to the preset optimization metric to obtain multiple neighborhood ratio information indices. The neighborhood ratio information corresponding to the optimal neighborhood ratio information index among the multiple neighborhood ratio information indices is obtained, that is, the neighborhood ratio information with the highest optimal neighborhood ratio information index is obtained, and recorded as the optimal neighborhood ratio information. Finally, when the optimal neighborhood ratio information index is greater than the initial ratio index, the optimal neighborhood ratio information is used as the target material ratio optimization information. When the optimal neighborhood ratio information index is less than the initial ratio index, the initial ratio is used as the target material ratio optimization information.

[0067] The method provided in the embodiment of the present application also includes:

[0068] Extracting a first historical paving result from the first historical record, the first historical paving result comprising flatness of the first historical paved road, wear resistance of the first historical paved road, water resistance of the first historical paved road, and skid resistance of the first historical paved road;

[0069] Weighting the first historical paved road flatness, the first historical paved road wear resistance, the first historical paved road water resistance and the first historical paved road skid resistance to obtain a first historical mix index;

[0070] Using the first historical material ratio and the first historical ratio index as a second data set for supervised learning to obtain a road performance prediction model;

[0071] The initial material ratio information is analyzed by the road performance prediction model to obtain the initial ratio index.

[0072] The initial ratio index of the initial material ratio information is obtained according to the preset optimization benchmark, including extracting the first historical paving result from the first historical record, wherein the first historical paving result includes the flatness of the first historical paved road, the wear resistance of the first historical paved road, the water resistance of the first historical paved road, and the skid resistance of the first historical paved road. Among them, the flatness of the first historical paved road, the wear resistance of the first historical paved road, the water resistance of the first historical paved road, and the skid resistance of the first historical paved road are all specific evaluation parameters or evaluation levels. Subsequently, the flatness of the first historical paved road, the wear resistance of the first historical paved road, the water resistance of the first historical paved road, and the skid resistance of the first historical paved road are assigned preset weights, wherein the preset weights are assigned and adjusted by professionals based on the purpose of the road, and the initial weights are the same. Based on the weight assignment result, the flatness of the first historical paved road, the wear resistance of the first historical paved road, the water resistance of the first historical paved road, and the skid resistance of the first historical paved road are weighted calculations to obtain the first historical ratio index. Subsequently, the first historical material ratio and the first historical ratio index are used as the second data set for supervised learning to obtain a road performance prediction model. When obtaining the road performance prediction model, the second data set is constructed by using the obtained multiple first historical material ratios and multiple first historical ratio indexes, and supervised learning of the neural network model is performed until the output accuracy of the model meets the preset accuracy, thereby obtaining the road performance prediction model. Finally, the initial material ratio information is analyzed by the road performance prediction model to obtain the initial ratio index.

[0073] The technical solution provided by the embodiment of the present invention obtains the target paved information of the target road. The target paving stage is determined according to the material type and the material ratio of the paved material, and the target paving material of the target paving stage is matched in combination with the preset filler database. The target soil characteristic information is obtained by detecting the geological soil characteristics corresponding to the target road by a soil detector. The target climate characteristic information is obtained by detecting the climate environment characteristics of the target road by a climate detector. The target soil characteristic information and the target climate characteristic information are optimized and analyzed by the cloud optimization platform in the cloud computer to obtain the target material ratio optimization information of the target paving material. Prefilling material is obtained according to the target material ratio optimization information, and the prefilling material is used to pave the target road. By obtaining the target material ratio optimization information and mixing the paving materials to obtain the prefilling material, the material ratio used for paving is obtained in a targeted manner according to the actual conditions of the road geological environment, thereby improving the performance and quality of road paving. The invention solves the technical problem in the prior art that the acquisition of filling materials for urban road paving has a low correlation with the geological environment, resulting in low performance and quality of road paving.

[0074] Embodiment 2

[0075] Based on the same inventive concept as the method for optimizing urban road paving fillers in the aforementioned embodiment, the present invention also provides a system for optimizing urban road paving fillers. The system can be implemented in hardware and / or software, and can generally be integrated into an electronic device to execute the method provided by any embodiment of the present invention. Figure 4 As shown, the system includes a cloud optimization platform, and the cloud optimization platform is stored in a cloud computer. The system includes:

[0076] The paving information acquisition module 11 is used to acquire the target paved information of the target road, wherein the target paved information includes the material type and material ratio of the paved material;

[0077] A laying stage acquisition module 12 is used to determine a target laying stage according to the material type and the material ratio analysis of the laid materials, and match the target laying material of the target laying stage in combination with a preset filler database;

[0078] A soil characteristic acquisition module 13 is used to acquire target soil characteristic information, wherein the target soil characteristic information is obtained by detecting geological soil characteristics corresponding to the target road through a soil detector;

[0079] The environmental characteristic acquisition module 14 is used to acquire target climate characteristic information, wherein the target climate characteristic information is obtained by detecting the climate environment characteristics of the target road through a climate detector;

[0080] A material ratio optimization module 15 is used to optimize and analyze the target soil characteristic information and the target climate characteristic information through the cloud optimization platform in the cloud computer to obtain target material ratio optimization information of the target paving material;

[0081] The pre-filler acquisition module 16 is used to mix and prepare the target paving material according to the target material ratio optimization information to obtain the pre-filler, and the pre-filler is used to pave the target road.

[0082] Furthermore, the laying phase acquisition module 12 is also used for:

[0083] The urban road paving is divided into N paving stages, where N is an integer greater than 1;

[0084] Establishing a road paving material type set, wherein the road paving material type set includes asphalt material, concrete material, brick material, stone material, and wood material;

[0085] The asphalt materials include impermeable asphalt, permeable asphalt and colored asphalt; the concrete materials include plain concrete, permeable concrete and colored concrete; the brick materials include permeable bricks, sintered bricks, cement bricks, square bricks and grass bricks; the stone materials include granite, marble, bluestone, pebbles, shale, sandstone, rubble, rough stone and rice washing stone; the wood materials include antiseptic wood, plastic wood and bamboo wood;

[0086] Based on the N paving stages, the paving stages applicable to each material in the road paving material type set are analyzed in sequence to generate a material-stage correspondence relationship;

[0087] The preset filler database is constructed according to the material-stage correspondence.

[0088] Furthermore, the laying phase acquisition module 12 is also used for:

[0089] Performing dynamic image acquisition of the target road by the CCD image sensor to obtain a target road image time sequence;

[0090] The first frame road image in the target road image time sequence is used as a registration reference, and the non-first frame road image in the target road image time sequence is used as the image to be registered to perform registration fusion processing to obtain the target road image;

[0091] Displaying the target road image in real time via the display;

[0092] When the display shows that the target road is currently in a paved and flat state, a paving start instruction is issued, and the paving start instruction is used to remind the paving of the next stage of the target road.

[0093] Furthermore, the laying phase acquisition module 12 is also used for:

[0094] When the display shows that the target road is not currently in a paved and flat state, a rolling start instruction is issued;

[0095] According to the rolling start instruction, the paved materials on the target road based on the target paved information are rolled until the road is flat.

[0096] Furthermore, the material ratio optimization module 15 is also used for:

[0097] The cloud computer stores historical urban road paving records that are the same as the target paving stage of the target road;

[0098] According to the first historical record in the historical urban road paving record, a first data group is formed, wherein the first data group includes first historical soil characteristic information, first historical climate characteristic information and first historical material ratio;

[0099] Performing supervised learning and testing on the historical data group formed based on the first data group to obtain an initial model of material ratio, and storing the initial model of material ratio in the cloud optimization platform;

[0100] Analyzing the target soil characteristic information and the target climate characteristic information through the material ratio initial model to obtain initial material ratio information;

[0101] The initial material ratio information is optimized based on preset optimization rules to obtain the target material ratio optimization information.

[0102] Furthermore, the material ratio optimization module 15 is also used for:

[0103] Determine a first ratio neighborhood of the initial material ratio information based on the preset optimization rule, wherein the first ratio neighborhood includes a plurality of neighborhood ratio information;

[0104] Obtaining an initial ratio index of the initial material ratio information according to a preset optimization metric, wherein the preset optimization metric is stored in the preset optimization rule;

[0105] According to the preset optimization benchmark, the plurality of neighborhood matching information are measured and analyzed in turn to obtain a plurality of neighborhood matching information indexes;

[0106] Obtaining neighborhood matching information corresponding to an optimal neighborhood matching information index among the plurality of neighborhood matching information indexes, and recording the index as optimal neighborhood matching information;

[0107] When the optimal neighborhood ratio information index is greater than the initial ratio index, the optimal neighborhood ratio information is used as the target material ratio optimization information.

[0108] Furthermore, the material ratio optimization module 15 is also used for:

[0109] Extracting a first historical paving result from the first historical record, the first historical paving result comprising flatness of the first historical paved road, wear resistance of the first historical paved road, water resistance of the first historical paved road, and skid resistance of the first historical paved road;

[0110] Weighting the first historical paved road flatness, the first historical paved road wear resistance, the first historical paved road water resistance and the first historical paved road skid resistance to obtain a first historical mix index;

[0111] Using the first historical material ratio and the first historical ratio index as a second data set for supervised learning to obtain a road performance prediction model;

[0112] The initial material ratio information is analyzed by the road performance prediction model to obtain the initial ratio index.

[0113] Furthermore, the prefill acquisition module 16 is also used for:

[0114] The target road is paved based on the prefiller, and an emulsified asphalt slurry seal treatment is performed on the road after paving.

[0115] The various units and modules included are only divided according to functional logic, but are not limited to the above division, as long as the corresponding functions can be achieved; in addition, the specific names of the functional units are only for the convenience of distinguishing each other and are not used to limit the scope of protection of the present invention.

[0116] Embodiment 3

[0117] Figure 5 The schematic diagram of the structure of the electronic device provided in the third embodiment of the present invention shows a block diagram of an exemplary electronic device suitable for implementing the implementation mode of the present invention. Figure 5 The electronic device shown is only an example and should not limit the functions and scope of use of the embodiments of the present invention. Figure 5 As shown, the electronic device includes a processor 31, a memory 32, an input device 33 and an output device 34; the number of processors 31 in the electronic device can be one or more. Figure 5 Taking a processor 31 as an example, the processor 31, memory 32, input device 33 and output device 34 in the electronic device can be connected through a bus or other means. Figure 5 The example of connecting through bus is taken in the following.

[0118] The memory 32 is a computer-readable storage medium that can be used to store software programs, computer executable programs and modules, such as program instructions / modules corresponding to a method for optimizing urban road paving fillers in an embodiment of the present invention. The processor 31 executes various functional applications and data processing of the computer device by running the software programs, instructions and modules stored in the memory 32, that is, implementing the above-mentioned method for optimizing urban road paving fillers.

[0119] Note that the above are only preferred embodiments of the present invention and the technical principles used. Those skilled in the art will understand that the present invention is not limited to the specific embodiments described herein, and that various obvious changes, readjustments and substitutions can be made by those skilled in the art without departing from the scope of protection of the present invention. Therefore, although the present invention has been described in more detail through the above embodiments, the present invention is not limited to the above embodiments, and may include more other equivalent embodiments without departing from the concept of the present invention, and the scope of the present invention is determined by the scope of the appended claims.

Claims

1. A method for optimizing urban road paving fillers, characterized in that: The method is applied to an urban road paving filler optimization system, the system includes a cloud optimization platform, and the cloud optimization platform is stored in a cloud computer. The method includes: Acquire target paved information of the target road, wherein the target paved information includes material type and material ratio of the paved material; Determine the target paving stage according to the material type and the material ratio analysis of the paved material, and match the target paving material of the target paving stage in combination with the preset filler database; Acquiring target soil characteristic information, wherein the target soil characteristic information is obtained by detecting geological soil characteristics corresponding to the target road using a soil detector; Acquiring target climate characteristic information, wherein the target climate characteristic information is obtained by detecting the climate environment characteristics of the target road through a climate detector; Optimizing and analyzing the target soil characteristic information and the target climate characteristic information through the cloud optimization platform in the cloud computer to obtain target material ratio optimization information of the target paving material; The target paving material is mixed and prepared according to the target material ratio optimization information to obtain a pre-filling material, and the pre-filling material is used to pave the target road; The step of obtaining target material ratio optimization information of the target paving material includes: The cloud computer stores historical urban road paving records that are the same as the target paving stage of the target road; According to the first historical record in the historical urban road paving record, a first data group is formed, wherein the first data group includes first historical soil characteristic information, first historical climate characteristic information and first historical material ratio; Performing supervised learning and testing on the historical data group formed based on the first data group to obtain an initial model of material ratio, and storing the initial model of material ratio in the cloud optimization platform; Analyzing the target soil characteristic information and the target climate characteristic information through the material ratio initial model to obtain initial material ratio information; Optimizing the initial material ratio information based on a preset optimization rule to obtain the target material ratio optimization information; The optimizing the initial material ratio information based on the preset optimization rule to obtain the target material ratio optimization information includes: Determine a first ratio neighborhood of the initial material ratio information based on the preset optimization rule, wherein the first ratio neighborhood includes a plurality of neighborhood ratio information; Obtaining an initial ratio index of the initial material ratio information according to a preset optimization metric, wherein the preset optimization metric is stored in the preset optimization rule; According to the preset optimization benchmark, the plurality of neighborhood matching information are measured and analyzed in turn to obtain a plurality of neighborhood matching information indexes; Obtaining neighborhood matching information corresponding to an optimal neighborhood matching information index among the plurality of neighborhood matching information indexes, and recording the index as optimal neighborhood matching information; When the optimal neighborhood ratio information index is greater than the initial ratio index, the optimal neighborhood ratio information is used as the target material ratio optimization information; The initial ratio index of the initial material ratio information is obtained according to the preset optimization benchmark, including: Extracting a first historical paving result from the first historical record, the first historical paving result comprising flatness of the first historical paved road, wear resistance of the first historical paved road, water resistance of the first historical paved road, and skid resistance of the first historical paved road; Weighting the first historical paved road flatness, the first historical paved road wear resistance, the first historical paved road water resistance and the first historical paved road skid resistance to obtain a first historical mix index; Using the first historical material ratio and the first historical ratio index as a second data set for supervised learning to obtain a road performance prediction model; The initial material ratio information is analyzed by the road performance prediction model to obtain the initial ratio index.

2. The method according to claim 1, characterized in that: The method comprises: The urban road paving is divided into N paving stages, where N is an integer greater than 1; Establishing a road paving material type set, wherein the road paving material type set includes asphalt material, concrete material, brick material, stone material, and wood material; The asphalt materials include impermeable asphalt, permeable asphalt and colored asphalt; the concrete materials include plain concrete, permeable concrete and colored concrete; the brick materials include permeable bricks, sintered bricks, cement bricks, square bricks and grass bricks; the stone materials include granite, marble, bluestone, pebbles, shale, sandstone, rubble, rough stone and rice washing stone; the wood materials include antiseptic wood, plastic wood and bamboo wood; Based on the N paving stages, the paving stages applicable to each material in the road paving material type set are analyzed in sequence to generate a material-stage correspondence relationship; The preset filler database is constructed according to the material-stage correspondence.

3. The method according to claim 2, characterized in that: The system is connected to a CCD image sensor and a display for communication, and the method further comprises: Performing dynamic image acquisition of the target road by the CCD image sensor to obtain a target road image time sequence; The first frame road image in the target road image time sequence is used as a registration reference, and the non-first frame road image in the target road image time sequence is used as the image to be registered to perform registration fusion processing to obtain the target road image; Displaying the target road image in real time via the display; When the display shows that the target road is currently in a paved and flat state, a paving start instruction is issued, and the paving start instruction is used to remind the paving of the next stage of the target road.

4. The method according to claim 3, characterized in that: After the target road image is displayed in real time by the display, the method further includes: When the display shows that the target road is not currently in a paved and flat state, a rolling start instruction is issued; According to the rolling start instruction, the paved materials of the target road are rolled based on the target paved information until the road is flat.

5. The method according to claim 1, characterized in that: The method further comprises: The target road is paved based on the prefiller, and an emulsified asphalt slurry seal treatment is performed on the road after paving.

6. An urban road paving filler optimization system, characterized in that: The system is used to execute the method according to any one of claims 1 to 5, the system comprises a cloud optimization platform, and the cloud optimization platform is stored in a cloud computer, and the system comprises: A paving information acquisition module, used to acquire target paved information of a target road, wherein the target paved information includes material type and material ratio of paved materials; A laying stage acquisition module, used to determine a target laying stage according to the material type and the material ratio analysis of the laid materials, and match the target laying material of the target laying stage in combination with a preset filler database; A soil characteristic acquisition module is used to acquire target soil characteristic information, wherein the target soil characteristic information is obtained by detecting geological soil characteristics corresponding to the target road through a soil detector; An environmental characteristic acquisition module is used to acquire target climate characteristic information, wherein the target climate characteristic information is obtained by detecting the climate environment characteristics of the target road through a climate detector; A material ratio optimization module, used for optimizing and analyzing the target soil characteristic information and the target climate characteristic information through the cloud optimization platform in the cloud computer to obtain target material ratio optimization information of the target paving material; A pre-filler acquisition module, used for mixing and preparing the target paving material according to the target material ratio optimization information to obtain a pre-filler, wherein the pre-filler is used for paving the target road; The material ratio optimization module is also used for: The cloud computer stores historical urban road paving records that are the same as the target paving stage of the target road; According to the first historical record in the historical urban road paving record, a first data group is formed, wherein the first data group includes first historical soil characteristic information, first historical climate characteristic information and first historical material ratio; Performing supervised learning and testing on the historical data group formed based on the first data group to obtain an initial model of material ratio, and storing the initial model of material ratio in the cloud optimization platform; Analyzing the target soil characteristic information and the target climate characteristic information through the material ratio initial model to obtain initial material ratio information; Optimizing the initial material ratio information based on a preset optimization rule to obtain the target material ratio optimization information; The material ratio optimization module is also used for: Determine a first ratio neighborhood of the initial material ratio information based on the preset optimization rule, wherein the first ratio neighborhood includes a plurality of neighborhood ratio information; Obtaining an initial ratio index of the initial material ratio information according to a preset optimization metric, wherein the preset optimization metric is stored in the preset optimization rule; According to the preset optimization benchmark, the plurality of neighborhood matching information are measured and analyzed in turn to obtain a plurality of neighborhood matching information indexes; Obtaining neighborhood matching information corresponding to an optimal neighborhood matching information index among the plurality of neighborhood matching information indexes, and recording the index as optimal neighborhood matching information; When the optimal neighborhood ratio information index is greater than the initial ratio index, the optimal neighborhood ratio information is used as the target material ratio optimization information; The material ratio optimization module is also used for: Extracting a first historical paving result from the first historical record, the first historical paving result comprising flatness of the first historical paved road, wear resistance of the first historical paved road, water resistance of the first historical paved road, and skid resistance of the first historical paved road; Weighting the first historical paved road flatness, the first historical paved road wear resistance, the first historical paved road water resistance and the first historical paved road skid resistance to obtain a first historical mix index; Using the first historical material ratio and the first historical ratio index as a second data set for supervised learning to obtain a road performance prediction model; The initial material ratio information is analyzed by the road performance prediction model to obtain the initial ratio index.

7. An electronic device, characterized in that: The electronic device comprises: A memory for storing executable instructions; The processor is used to implement the urban road paving filling optimization method as described in any one of claims 1 to 5 when executing the executable instructions stored in the memory.