Commercial spaceflight self-hold dual-redundancy power transfer and distribution design method based on high power

By adopting dual-redundant power distribution and sequential circuit design in commercial aerospace rocket aircraft, combined with electromagnetic compatibility and series/parallel hybrid redundancy, the reliability and development cycle problems of power distribution design in the existing technology are solved, and high efficiency is achieved. Design for reliability and rapid iteration.

CN118734772APending Publication Date: 2024-10-01XIAN MICROELECTRONICS TECH INST
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411043523.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-31
Publication Date
2024-10-01

AI Technical Summary

Technical Problem

The power distribution design of existing commercial aerospace rockets adopts a split design with low integration, resulting in poor reliability, long development cycles, and high number of iterations.

Method used

Adopt a high-power commercial aerospace self-sustaining dual-redundant conversion design method for power distribution, including dual-redundant power distribution circuit and timing circuit design. Taking electromagnetic compatibility into consideration, a series/parallel hybrid redundancy design is adopted to ensure power distribution circuits and timing. circuit reliability.

Benefits of technology

It achieves the standardization and reliability of power distribution circuit design, shortens the development cycle, increases the iteration speed, has strict cost control and high reliability, simplifies the management process, reduces flight test risks, and improves flight reliability.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure BDA0004972939470000071
    Figure BDA0004972939470000071
  • Figure BDA0004972939470000101
    Figure BDA0004972939470000101
  • Figure BDA0004972939470000102
    Figure BDA0004972939470000102
Patent Text Reader

Abstract

The invention discloses a commercial spaceflight self-hold dual-redundancy power transfer and distribution design method based on high power, which comprises a power distribution circuit design and a sequential circuit design, in which both a power distribution circuit and a sequential circuit consider the problem of electromagnetic compatibility, the sequential circuit selects a solid state relay withstanding peak voltage, and the sequential circuit selects a solid state relay withstanding peak voltage. A series / parallel hybrid dual-redundancy design is adopted in the design of the power distribution circuit, normalization and reliability of the design of the power distribution circuit are realized, an integration thought, an overall single-mode design and a local redundancy scheme are adopted, power distribution and time sequence are integrated on the basis of the functions of a traditional rocket aircraft, the development period is short, the iteration speed is high, and the development cost is low. Moreover, strict cost control and high reliability guarantee are realized, the management process is simplified, and the design level is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the field of commercial aerospace rockets, and in particular relates to a design method for a high-power commercial aerospace self-sustaining dual-redundant power distribution system. Background Art

[0002] The launch vehicle is a complex and huge system. Different from the traditional space launch field, the commercial aerospace integrated rocket mostly adopts a single-mode highly integrated technology route with a high degree of integration. It generally includes hardware functional modules such as onboard power distribution, onboard timing, GNSS satellite navigation, information processing, interface module, secondary power supply module, flight control navigation calculation, etc., while the traditional rocket only integrates interface modules, flight control navigation calculation unit, secondary power supply and other modules.

[0003] The power distribution design of traditional arrow machines often adopts a split design, which has low integration, poor reliability, long development cycle and many iterations. Summary of the invention

[0004] The purpose of the present invention is to provide a design method for a high-power commercial aerospace self-sustaining dual redundant power distribution system to solve the technical problems that existing rocket engines often adopt a split design, have low integration, poor reliability, long development cycle, and many iterations.

[0005] In order to achieve the above object, the present invention adopts the following technical scheme:

[0006] A design method for high-power commercial aerospace self-sustaining dual redundant power distribution, characterized in that the design includes power distribution circuit design and timing circuit design:

[0007] The power distribution circuit design adopts a dual redundant design and takes electromagnetic compatibility into consideration;

[0008] The power distribution circuit includes ground power distribution and on-board power distribution. When the power distribution circuit supplies power, the power distribution and power transfer of the instrument circuit are firstly performed, and then the power distribution and power transfer of the pyrotechnic circuit are performed; when the power distribution circuit is powered off, the pyrotechnic circuit is powered off first, and then the power supply of the instrument circuit is powered off;

[0009] The distribution circuit takes into account electromagnetic compatibility. Specifically, the electromagnetic compatibility design of the control end and output end of the electromagnetic relay should be considered when designing the distribution circuit. The anti-peak diode and filter capacitor connected in series in the relay coil control loop should take into account the CS106 design requirements, and the derating should not be less than the Class I derating requirements;

[0010] The timing circuit design adopts dual redundant design and takes electromagnetic compatibility into consideration, selects relays that can withstand spike voltage, and adds reverse peak elimination design;

[0011] The dual redundancy design is a series / parallel hybrid redundancy.

[0012] Furthermore, the power distribution circuit design includes power distribution schematic design and PCB design.

[0013] Furthermore, when designing the power distribution schematic, the relay position number in the schematic should be consistent with the relay wire package naming in the logic diagram, and the reliability design of the relay control should be combined with the mechanical simulation design requirements.

[0014] Furthermore, in the PCB design, the corresponding pad identification is clear and unique, and is consistent with the wiring table, assembly Figure 1 To.

[0015] Furthermore, the power distribution circuit includes an instrument circuit and an pyrotechnic circuit.

[0016] Furthermore, the design for increasing the anti-reflection peak is to connect a diode and a resistor in reverse parallel in the relay circuit, and the diode and the resistor are connected in series.

[0017] Furthermore, the design for increasing the anti-reflection peak is to connect a diode, a resistor and a voltage-stabilizing diode in parallel on the relay circuit, and the diode, the resistor and the voltage-stabilizing diode in series.

[0018] Furthermore, when the sequential circuit takes electromagnetic compatibility into consideration, an external peak signal is directly injected into the solid relay load of the sequential circuit, and the relay tolerates the peak voltage.

[0019] Furthermore, the connection reliability formula of the series / parallel hybrid redundant system is:

[0020] R AB+CD =1-(1-R1 2 ) 2

[0021] Among them, R AB+CD It represents the connection reliability of the series / parallel hybrid redundant system, and R1 represents the connection reliability of one system.

[0022] Furthermore, the disconnect reliability formula of the series / parallel hybrid redundant system is:

[0023] R (A+B)(C+D) =[1-(1-R2 2 )] 2

[0024] Among them, R (A+B)(C+D) It represents the disconnection reliability of the series / parallel hybrid redundant system, and R2 represents the disconnection reliability of one system.

[0025] Compared with the prior art, the present invention has the following beneficial technical effects:

[0026] The present invention provides a method for designing a high-power commercial aerospace self-sustaining dual-redundant power distribution, including a power distribution circuit design and a timing circuit design, wherein both the power distribution circuit and the timing circuit take electromagnetic compatibility issues into consideration, the timing circuit uses a solid-state relay that can withstand spike voltages, and the power distribution circuit design adopts a series / parallel hybrid dual-redundancy design, thereby achieving the standardization and reliability of the power distribution circuit design. The present invention adopts an integrated approach, an overall single-mode design, and a local redundancy solution, and integrates power distribution and timing on the basis of traditional rocket functions, thereby ensuring a short development cycle and fast iteration speed, and having strict cost control and a high reliability guarantee, thereby simplifying the management process and improving the design level.

[0027] Preferably, the present invention provides all-round functional guarantee for the large current power distribution and timing control of the rocket electrical system, reduces the risk of flight test, improves flight reliability, and saves costs. The design has a wide range of applications and strong versatility, and can be directly applied to most rocket-borne computers, which is of great significance for improving the reliability and safety of rocket-borne computers.

[0028] Preferably, during the design stage of the power distribution schematic diagram of the power distribution circuit, the relay position numbers in the schematic diagram should be consistent with the relay wire package naming in the logic diagram to facilitate the review of the functional correctness of the schematic diagram.

[0029] Preferably, the corresponding pads in the PCB design are clearly marked and unique, consistent with the wiring diagram, assembly Figure 1 To avoid ambiguity.

[0030] Preferably, when the power distribution circuit is powered, the power distribution and power transfer of the instrument circuit is performed first, and then the power distribution and power transfer of the pyrotechnic circuit is performed; when the power distribution circuit is powered off, the pyrotechnic circuit is powered off first, and then the power supply circuit is powered off. This design can effectively enhance the reliability and safety of the system and effectively avoid the mis-activation of pyrotechnics due to system failure or design defects.

[0031] Preferably, the reverse peak elimination design adopts the design of connecting a diode, a resistor and a Zener diode in parallel in the relay circuit, connecting a diode, a resistor and a Zener diode in series, and connecting a diode and a resistor in reverse parallel in the relay circuit, and connecting a diode and a resistor in series, and gives an accurate calculation formula, which solves the problem of design selection based on experience in previous design processes.

[0032] Preferably, the power distribution circuit adopts series / parallel hybrid redundancy, which has higher connection reliability and disconnection reliability than traditional simple parallel redundancy, and is suitable for circuits that need to ensure both connection and disconnection. BRIEF DESCRIPTION OF THE DRAWINGS

[0033] Figure 1 This is a schematic diagram of the principle of the high current flexible connecting wire experiment.

[0034] Figure 2This is a simple parallel redundancy diagram.

[0035] Figure 3 This is a schematic diagram of relay parallel redundancy.

[0036] Figure 4 This is a schematic diagram of parallel / series mixed redundancy.

[0037] Figure 5 This is a schematic diagram of series / parallel mixed redundancy.

[0038] Figure 6 This is a schematic diagram of relay parallel / series mixed redundancy.

[0039] Figure 7 This is a schematic diagram of relay series / parallel mixed redundancy.

[0040] Figure 8 This is a schematic diagram of the diode + resistor reverse peak elimination circuit structure.

[0041] Fig. 9 This is the equivalent circuit diagram of diode + resistor to eliminate reverse peak.

[0042] Fig.10 It is the reverse peak voltage waveform of resistor + diode.

[0043] Fig.11 Schematic diagram of the relationship between the reverse peak elimination resistance and the reverse peak voltage.

[0044] Fig.12 This is the circuit diagram of resistor + diode + Zener diode to eliminate reverse peak.

[0045] Fig.13 This is the circuit diagram of resistor + diode + Zener diode to eliminate reverse peak. DETAILED DESCRIPTION

[0046] In order to enable those skilled in the art to better understand the scheme of the present invention, the technical scheme in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work should fall within the scope of protection of the present invention.

[0047] It should be noted that the terms "first", "second", etc. in the specification and claims of the present invention and the above-mentioned drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the data used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in an order other than those illustrated or described herein. In addition, the terms "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions, for example, a process, method, system, product or device that includes a series of steps or units is not necessarily limited to those steps or units that are clearly listed, but may include other steps or units that are not clearly listed or inherent to these processes, methods, products or devices.

[0048] The present invention is further described in detail below in conjunction with the accompanying drawings:

[0049] A design method for high-power commercial aerospace self-sustaining dual redundant power distribution includes power distribution circuit design and timing circuit design, wherein electromagnetic compatibility is considered in the design of both the power distribution circuit and the timing circuit; in addition, a dual redundant design of series / parallel mixed redundancy is also adopted in the design of the power distribution circuit.

[0050] The present invention is a commercial aerospace self-sustaining dual redundant power distribution design method based on high power, which adopts an integrated approach, an overall single-mode design, and a local redundancy solution. On the basis of the traditional rocket engine functions, the power distribution and timing are integrated, which not only ensures a short development cycle and a fast iteration speed, but also has strict cost control and a high reliability guarantee, simplifies the management process, and improves the design level.

[0051] Example

[0052] Power distribution schematic design and PCB design methods

[0053] a) When detailed design is carried out based on the power distribution logic diagram, during the schematic drawing stage: the relay position number in the schematic diagram should be consistent with the relay line package naming in the logic diagram, so that the logic diagram and the schematic diagram are consistent. Figure 1 One-to-one correspondence is used to facilitate the review of the correctness of the schematic function; the reliability design of the relay control is combined with the mechanical simulation design requirements; for horizontally mounted relays and other devices, the schematic package is presented in the form of pads. When laying out the PCB, the horizontal relay should be modeled with the actual placement size, which is the same as the physical placement in the space, so that the PCB design is consistent with the object. The PCB model and the schematic pad package are independent of each other, and the pad position can be flexibly adjusted during PCB wiring;

[0054] b) In PCB design, when soft wire interconnection is involved, the corresponding pad identification should be clear and unique, consistent with the wiring table, assembly Figure 1 Pay special attention to the situation where the silk screen and the part number appear at the same time to avoid ambiguity.

[0055] High current overcurrent capability design and method

[0056] When busbars are used in combination with terminal blocks, the busbars should be implemented according to the standards for surface mount components. The position numbers should be clearly marked during the schematic design stage. When making the summary table, the busbars should be marked to prevent the busbars from being missed during the soldering of surface mount components.

[0057] Among them, the bus bar, also known as the laminated bus bar, is a multi-layer laminated structure of the power module electrical connection component, which can connect the power distribution of multiple circuits. It has the characteristics of repeatable electrical performance, low inductance, anti-interference, good reliability, space saving, simple and quick assembly, etc. As a component of the power conversion device, the bus bar is widely used in aviation power systems, communication base stations, military industry, transportation systems, energy and other fields.

[0058] a) When laying out and routing the timing and power distribution components, attention should be paid to the uniformity of the copper coating on the top and bottom and on the left and right sides of the printed board, and the uniformity of the quality distribution of the printed board should be ensured as much as possible;

[0059] b) For the high current soft wiring method, through a lot of research, experiments and theoretical analysis, the experimental principle is as follows Figure 1 shown.

[0060] The results obtained through calculation and data analysis are shown in Table 1:

[0061] Table 1

[0062]

[0063] Standardization of power distribution circuit design

[0064] During the design phase, the power distribution module uses two power distribution methods: ground power distribution and spring power distribution. The power distribution, power transfer, and power cut-off timing of the power distribution path are standardized. When supplying power, the instrument circuit (control circuit) should be distributed and transferred first, and then the pyrotechnic circuit should be distributed and transferred; when powering off, the pyrotechnic circuit must be cut off first, and then the instrument circuit (control circuit) must be cut off. This normative design can effectively enhance the reliability and safety of the system. It can effectively avoid the mis-activation of pyrotechnics due to system failures or design defects.

[0065] The logic diagram specifies the instrument circuit (control circuit) and the pyrotechnic circuit power-off control module. The two power-off modules should be designed with two completely independent circuits, namely instrument power-off and pyrotechnic power-off, which are both implemented by hard instructions in the order of pyrotechnic power-off->instrument power-off. The pyrotechnic busbar and ground wire must be isolated from the power supply busbar and ground wire of other single machines, and cannot be used as the primary power input of other single machines. It is forbidden to design any energy storage devices such as filter capacitors and filter inductors at the pyrotechnic battery input terminal and the pyrotechnic busbar power distribution output terminal.

[0066] During the power distribution circuit design phase, the self-holding circuit design in the logic diagram should be standardized, and the electrical interface form connected to the self-holding circuit should be clearly defined with the user to ensure that the interface logic of both parties is transparent and the interface form is clearly defined.

[0067] The power distribution and timing circuits should be designed with electromagnetic compatibility in mind, especially for the CS106 (power line spike signal transmission sensitivity) project. The CS106 test requirements are: E = 200V, t = 10μs ± 2μs. In the power distribution design stage of traditional missile-borne and arrow-borne computers, the input filter circuit in the power board consists of two-stage common-mode filtering and one-stage differential-mode filtering, which fully considers the CS106 design; but in the design of a highly integrated arrow machine that integrates power distribution and timing, the CS106 design must also be considered in the power distribution circuit and timing circuit, because the integrated arrow machine power distribution circuit is the input end of the primary power supply, and the power distribution and transfer relays will directly receive various high-frequency spike signals input from the external interface. Therefore, the electromagnetic compatibility design of the control end and output end of the electromagnetic relay should be considered when designing the power distribution circuit. The anti-peak diode and filter capacitor connected in series in the relay coil control circuit should consider the CS106 design requirements, and the derating should not be lower than the Class I derating requirements. In the sequential circuit, the sequential bus is the distribution output of the distribution circuit. When an external spike signal is input, it will be directly injected into the load end of the sequential circuit relay. Therefore, the CS106 design must be considered in the sequential circuit design stage, and the relay selection must be selected with specifications verified by the CS106 test, which can withstand the CS106 spike voltage without breakdown.

[0068] When designing an integrated arrow machine that integrates power distribution and timing, the risks of power distribution input, output voltage, and current monitoring design must be considered. During the design phase, it is necessary to clarify with the user whether the battery on the arrow is a non-activated direct output type or an activated output type. For non-activated batteries, the battery voltage cannot be recovered, or the leakage current cannot be calculated. Subsequent design can only be carried out after clear communication with the user. When there is a risk of hidden channels caused by long-distance transmission of large currents from distribution output, and multiple devices are interconnected through long lines (especially long-distance power supply transmission), this problem should be identified during the product solution design phase, the user's large electrical system planning for busbars and ground lines should be understood, the location and distance of distribution output equipment should be understood, and various hidden channels that may be generated by large current transmission should be evaluated. It is necessary to identify in advance whether the risk affects the normal use of the system. In the detailed design phase, such problems should be avoided as much as possible through technologies such as hidden channel isolation, and improved in the solution design report.

[0069] In order to solve the reverse electromotive force generated when the relay coil is powered off, it is necessary to add a reverse peak elimination design. The main purpose of adding a diode to the electromagnetic relay control line package is to prevent the reverse electromotive force generated when the relay coil is powered off from damaging the circuit. When the relay coil is powered off, a reverse high-voltage pulse will be generated due to electromagnetic induction, and this pulse may damage other electronic components connected to it. By connecting a diode in reverse parallel to the relay coil, when the reverse electromotive force is generated, the current can form a loop through the diode, thereby releasing the reverse electromotive force and protecting other components in the circuit; specifically:

[0070] 1. Analysis of "diode + resistor" anti-peak elimination circuit:

[0071] Depend on Figure 8 It can be seen that when switch k is closed, the relay coil is energized, and when k is disconnected, the relay coil, resistor R, and diode V form a reverse peak voltage discharge circuit. Assume that the relay coil resistance is r, the inductance is L, the reverse peak elimination resistor is R, and the reverse peak voltage generated by the coil is U1. The reverse peak elimination resistor is used to discharge the energy of the inductive load of the solenoid valve and withstands large transient power. There are three parameters that need to be paid attention to for the reverse peak elimination resistor: transient overload power, transient overload time, and average power consumption.

[0072] The equivalent circuit of the coil disconnected moment is as follows Fig. 9 shown.

[0073] The C-K equation is:

[0074]

[0075] Ignoring the voltage drop across the diode, solve this differential equation:

[0076]

[0077] According to the principle that the current of an inductor cannot change suddenly, when t = 0, that is, the moment the coil is powered off, the current in the circuit i = U / r. Substituting this relationship into the above formula, we get e = U / r. Therefore, Let L / (r+R) = τ, τ is called the discharge constant. The discharge current expression after the electromagnetic relay is disconnected is:

[0078]

[0079] Depend on Figure 5 It can be seen that the expression of the reverse peak voltage U1 generated when the relay is disconnected is:

[0080]

[0081] The reverse peak voltage U1 curve is as follows Fig.10As shown in the figure, from the expression of the discharge constant τ, it can be seen that the larger the resistance of the anti-reverse peak resistor R, the smaller τ is, and the faster the reverse peak voltage decreases. However, from formula (2), it can be seen that the highest reverse peak voltage at the moment when the relay coil is disconnected will increase with the increase of R. The influence of R resistance on the reverse peak voltage is as follows: Fig.11 As shown;

[0082] From the perspective of circuit design, of course, we hope that the reverse peak voltage can drop quickly, but the price is that the reverse peak resistance will increase, which is an undesirable result in the control system circuit design. Therefore, how to choose the resistance value of the reverse peak elimination resistor R is a process of weighing the pros and cons. In actual engineering, more attention is paid to the amplitude of the reverse peak voltage, which is generally controlled within 10V, and there are no excessive requirements for its drop speed. Then, according to formula (2), the resistance value of the resistor R can be basically determined.

[0083] R=U1 / U×r

[0084] 2 "Resistor + diode + Zener diode" anti-peak elimination circuit analysis:

[0085] In some specific cases, it is required to speed up the discharge of the reverse peak voltage without increasing the reverse peak voltage. In this case, the reverse peak elimination circuit of "resistor + diode + Zener diode" can be used, such as Fig.11 shown.

[0086] A voltage regulator diode, also known as a Zener diode, is a junction-type silicon semiconductor diode manufactured using a special process. When the reverse voltage is applied to a certain value, the reverse current increases sharply, resulting in reverse breakdown. When the reverse current is less than a certain value, the voltage regulator diode enters a reverse cutoff state [3]. When the switch k is disconnected, Fig.12 The reverse peak current in the circuit shown is Fig.13 shown.

[0087] Fig.13 Where V1 is the reverse breakdown voltage of the Zener diode. When the coil is powered off, the C-K equation is:

[0088]

[0089] Solve this differential equation:

[0090] Ldi2+i2(r+R)dt-V1dt=0

[0091]

[0092]

[0093] When t = 0, Substituting this relationship into the above formula, we get:

[0094]

[0095] therefore, make tidy

[0096]

[0097] Comparing formula (3) with formula (1), we can find that formula (3) has one more term on the basis of formula (1): because Therefore, at the same time t, the reverse peak current in the reverse peak elimination circuit with the addition of a Zener diode will be larger.

[0098] The reverse peak voltage U2 is expressed as:

[0099]

[0100] After finishing, we get:

[0101]

[0102] Comparing formula (4) with formula (2), we can find that formula (4) has one more term on the basis of formula (2): because So this item must be a negative value. Therefore, at the same time t, the reverse peak voltage in the reverse peak elimination circuit with the Zener diode added is smaller, and the reverse peak voltage is discharged faster.

[0103] Dual redundancy reliability design for power distribution

[0104] Combined with the characteristics of the launch vehicle and its cost requirements, the power distribution system function is analyzed for protection or disconnection. Commonly used fault-tolerant redundant architectures are parallel redundancy and hybrid redundancy. Fault tolerance means that when one or more key parts of the equipment fail, it can automatically detect and diagnose, and take corresponding measures to ensure that the equipment maintains its specified functions. Redundancy is to add redundant equipment to ensure that the system works more reliably and safely. According to the position in the system, redundancy can be divided into component level, component level and system level; according to the degree of redundancy, it can be divided into 1:1 redundancy, 1:2 redundancy, 1:n redundancy and other forms. Improving the reliability of the system requires the exchange of redundant resources for reliability, thereby reducing the possibility of fault tolerance.

[0105] Parallel redundancy of power distribution circuits

[0106] Parallel redundancy such as Figure 2 As shown in Figure 1, this redundancy can provide fault protection for continuously working equipment and improve mission reliability. Figure 3 , from the function of connecting the circuit, the circuit has "OR logic", that is, JA or J B If connected, the circuit is connected. The system connection reliability is:

[0107] R A+B =R A +R B -R A R B =1-(1-R A )(1-R B )

[0108] Where, R A , R B J A and J B The connection reliability is A =R B =R, the formula is simplified to:

[0109] R A+B =1-(1-R) 2

[0110] If R = 0.9, the system reliability R A+B =0.99, it can be seen that the connection reliability has been greatly improved.

[0111] Then analyze the function of disconnecting the circuit. At this time, it has "AND logic", that is, J A With J B The circuit is disconnected only when all the resistors are disconnected. The reliability formula is simplified to:

[0112] R AB =R 2

[0113] If R = 0.9, the system reliability R AB =0.81, it can be seen that the disconnection reliability has decreased.

[0114] 2) Hybrid redundancy of power distribution circuits

[0115] Hybrid redundancy such as Figure 4 , Figure 5 As shown in the figure, the series connection of redundant units can prevent the network from being directly short-circuited due to unit short-circuit. The parallel connection of redundant units can prevent the network from being open-circuited. Similarly, taking the on-off of relays as an example, when the system is parallel / series mixed redundancy, the specific Figure 6 shown.

[0116] The system connection reliability formula is:

[0117] R (A+B)(C+D) =[1-(1-R 2 )] 2

[0118] When R = 0.9, R (A+B)(C+D) =0.980;

[0119] The disconnect reliability formula of the system is:

[0120] R AB+CD =1-(1-R 2 ) 2

[0121] When R = 0.9, R AB+CD =0.964;

[0122] When the system is a series / parallel mixed redundancy, the specific Figure 7 shown.

[0123] The connection reliability formula of the system is:

[0124] R AB+CD =1-(1-R 2 ) 2

[0125] When R = 0.9, R AB+CD =0.964;

[0126] The disconnect reliability formula of the system is:

[0127] R (A+B)(C+D) =[1-(1-R 2 )] 2

[0128] When R = 0.9, R (A+B)(C+D) =0.980;

[0129] Therefore, this redundancy method can be used for circuits that require both continuity and disconnection.

[0130] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit its protection scope. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the field should understand that after reading the present invention, those skilled in the art can still make various changes, modifications or equivalent substitutions to the specific implementation methods of the invention, but these changes, modifications or equivalent substitutions are all within the protection scope of the pending claims of the invention.

Claims

1. A design method for high-power commercial aerospace self-sustaining dual redundant power distribution, characterized in that: The design includes power distribution circuit design and timing circuit design: The power distribution circuit design adopts a dual redundant design and takes electromagnetic compatibility into consideration; The power distribution circuit includes ground power distribution and on-board power distribution. When the power distribution circuit supplies power, the power distribution and power transfer of the instrument circuit are firstly performed, and then the power distribution and power transfer of the pyrotechnic circuit are performed; when the power distribution circuit is powered off, the pyrotechnic circuit is powered off first, and then the power supply of the instrument circuit is powered off; The distribution circuit takes into account electromagnetic compatibility. Specifically, the electromagnetic compatibility design of the control end and output end of the electromagnetic relay should be considered when designing the distribution circuit. The anti-peak diode and filter capacitor connected in series in the relay coil control loop should take into account the CS106 design requirements, and the derating should not be less than the Class I derating requirements; The timing circuit design adopts dual redundant design and takes electromagnetic compatibility into consideration, selects relays that can withstand spike voltage, and adds reverse peak elimination design; The dual redundancy design is a series / parallel hybrid redundancy.

2. According to claim 1, a high-power commercial aerospace self-sustaining dual-redundant power distribution design method is characterized in that: The power distribution circuit design includes power distribution schematic design and PCB design.

3. A design method for high-power commercial aerospace self-sustaining dual redundant power distribution based on claim 2, characterized in that: When designing the power distribution schematic, the relay position number in the schematic should be consistent with the relay wire package naming in the logic diagram, and the reliability design of the relay control should be combined with the mechanical simulation design requirements.

4. According to claim 2, a high-power commercial aerospace self-sustaining dual-redundant power distribution design method is characterized in that: In the PCB design, the corresponding pad identification is clear and unique, and consistent with the wiring table and assembly drawing.

5. A method for designing a high-power commercial aerospace self-sustaining dual-redundant power distribution system according to claim 4, characterized in that: The power distribution circuit includes an instrument circuit and an pyrotechnic circuit.

6. The design method of high-power commercial aerospace self-sustaining dual redundant power distribution system according to claim 1 is characterized in that: The design for increasing the anti-reflection peak is to connect a diode and a resistor in reverse parallel to the relay circuit, and the diode and the resistor are connected in series.

7. A design method for high-power commercial aerospace self-sustaining dual redundant power distribution based on claim 1, characterized in that ,, the design of increasing the anti-reflection peak is to connect a diode, a resistor and a voltage-stabilizing diode in parallel on the relay circuit, and the diode, the resistor and the voltage-stabilizing diode in series.

8. The design method of high-power commercial aerospace self-sustaining dual redundant power distribution system according to claim 1 is characterized in that: When the timing circuit takes electromagnetic compatibility into consideration, the external peak signal is directly injected into the solid relay load of the timing circuit, and the relay tolerates the peak voltage.

9. The design method of high-power commercial aerospace self-sustaining dual redundant power distribution system according to claim 1 is characterized in that: The connection reliability formula of the series / parallel hybrid redundant system is: R AB+CD =1-(1-R1 2 ) 2 Among them, R AB+CD It represents the connection reliability of the series / parallel hybrid redundant system, and R1 represents the connection reliability of one system.

10. The design method of high-power commercial aerospace self-sustaining dual redundant power distribution system according to claim 1 is characterized in that: The disconnect reliability formula of the series / parallel hybrid redundant system is: R (A+B)(C+D) =[1-(1-R2 2 )] 2 Among them, R (A+B)(C+D) It represents the disconnection reliability of the series / parallel hybrid redundant system, and R2 represents the disconnection reliability of one system.