Energy-saving and environment-friendly rail transit turnout snow melting system
Through data collection and analysis, the snowmelt opening and closing time of the rail transit turnout snowmelt system is dynamically adjusted, which solves the heating impact of the snowmelt system on the track in the existing system, reduces the temperature difference when the train passes, and improves safety, energy conservation and environmental protection. .
Patent Information
- Application Number
- CN202410893608.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-04
- Publication Date
- 2024-10-01
AI Technical Summary
The existing rail transit turnout snow melting intelligent control system fails to effectively reduce the temperature difference between the heating temperature generated by the snow melting system and the wheel track of the snowy train when the train passes, resulting in increased track deformation and failure risks.
Through the combination of data acquisition module, data classification module, data matching module and feedback adjustment module, the random forest integration method and logistic regression method are used to evaluate train risks and turnout quality, dynamically adjust the snowmelt opening and closing time, and match the best snowmelt time to Reduce the temperature difference.
It effectively reduces the wheel-rail temperature difference when the train passes through the switch, improves safety, reduces the risk of failure, and achieves an energy-saving and environmentally friendly snow melting effect.
Smart Images

Figure CN118735120A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the field of intelligent control technology, and more specifically, to an energy-saving and environment-friendly rail transit turnout snow melting system. Background Art
[0002] Intelligent control technology is mainly used to automate the control of various complex systems and processes, so that they can achieve efficient, reliable and intelligent operation. It is widely used in various fields such as industrial production, transportation, energy management, etc. The application of intelligent control technology in rail transit turnout snow melting system can improve snow melting efficiency and reduce track risks.
[0003] The prior art has the following deficiencies: In the past, the intelligent snow-melting control system for rail transit turnouts would start the snow-melting system in advance when the train was about to enter the turnout area, ensuring that there was less snow on the turnout before the train arrived. After the train left, the snow-melting system would be shut down later to ensure that the snow-melting effect continued. The system did not take into account the temperature difference between the heating temperature of the turnout generated by the train passing through the snow-melting system during the snow-melting process and the temperature difference between the wheels and rails of the train on snowy days, resulting in track deformation when the train passed through the turnout and an increased risk of failure.
[0004] In view of the above problems, the present invention proposes a solution. Summary of the invention
[0005] In order to overcome the above-mentioned defects of the prior art, an embodiment of the present invention provides an energy-saving and environmentally friendly rail transit turnout snow melting system, which solves the problems raised in the above-mentioned background technology by adjusting the snow melting opening and closing time when the train passes through different turns.
[0006] To achieve the above object, the present invention provides the following technical solutions: An energy-saving and environmentally friendly rail transit turnout snow melting system, comprising: a data acquisition module, a data classification module, a data matching module and a feedback adjustment module, and signal connections between the modules; The data acquisition module is used to collect the train speed, train wheel maintenance time, turnout curvature and turnout thermal efficiency and send them to the data classification module for classification processing; after the classification is completed in the data classification module, the snowfall speed and the corresponding turnout snow accumulation are collected and sent to the data matching module, the classification and matching results are received, and the train speed after passing the turnout is collected and sent to the feedback adjustment module; The data classification module uses the random forest integration method to screen abnormal data of train speed and train wheel maintenance time, calculates the average speed of the train before passing the turnout and sends it to the feedback adjustment module, and uses the logistic regression method to calculate the train risk coefficient and the turnout quality coefficient to classify the train and turnout; the trains of different classifications are marked respectively, and the snow-melting opening and closing times of different turnouts are calculated according to the turnout quality coefficient, and the train marking results and the snow-melting opening and closing times of different turnouts are sent to the data matching module for classification and matching; The data matching module uses fuzzy reasoning to analyze the matching accuracy between the current train and the snowmelt opening and closing time of each turnout with the received snowfall speed and snow accumulation of the turnout. According to the fuzzy set output result, the train mark input by the data classification module and the snowmelt opening and closing time of different turnouts are classified and matched, and the classification and matching results are sent to the data acquisition module; The feedback adjustment module receives the average speed of the train before passing the switch and the speed of the train after passing the switch for analysis, and sets different time points for the speed of the train after passing the switch, recording the difference between the train speed and the average speed before passing the switch to obtain the current train speed change, and adjusts the corresponding switch snow melting opening and closing time according to the current train speed change.
[0007] In a preferred embodiment, when the data classification module processes the train speed and train wheel maintenance time input from the data acquisition module, it selects a sample time to divide it into multiple time points to record the same train speed, and takes the average value as the average train speed. The data acquisition module collects the train travel uniformity, train wheel maintenance time, turnout curvature, and turnout thermal efficiency of multiple trains, normalizes them, and then merges them into a travel speed data set, a maintenance time data set, a curvature data set, and a thermal efficiency data set.
[0008] In a preferred embodiment, when the data classification module processes the train speed and train wheel maintenance time input from the data acquisition module, it selects a sample time to divide it into multiple time points to record the same train speed, and takes the average value as the average train speed. The data acquisition module collects the train travel uniformity, train wheel maintenance time, turnout curvature, and turnout thermal efficiency of multiple trains, normalizes them, and then merges them into a travel speed data set, a maintenance time data set, a curvature data set, and a thermal efficiency data set.
[0009] In a preferred embodiment, the specific processing process of the random forest ensemble method involved in the data classification module is as follows: The driving speed data set, maintenance time data set, curvature data set and thermal efficiency data set are divided into multiple small sample data sets according to the sample ratio, and a decision tree is constructed with the small sample data set as a node. A data is randomly selected in each decision tree node, and the average values of various types of data are calculated and recorded. Then, different sample ratios are selected to re-divide the driving speed data set, maintenance time data set, curvature data set and thermal efficiency data set into multiple small sample data sets. The operation is repeated multiple times to obtain several average values of driving speed data, average values of maintenance time data, average values of curvature and average values of thermal efficiency; The median of the recorded average driving speed data is selected as the driving speed threshold, and the median of the recorded average maintenance time data is selected as the maintenance time threshold; the median of the recorded average curvature data is selected as the curvature threshold, and the median of the recorded average thermal efficiency data is selected as the thermal efficiency threshold.
[0010] In a preferred embodiment, the specific processing process of the logistic regression method involved in the data classification module is as follows: The speed threshold and the maintenance time threshold are weighted and summed to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the risk threshold. The current train speed and the current train wheel maintenance time sent by the data acquisition module are normalized and then the same weighted summation formula is used to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the current train risk coefficient; The curvature threshold and the thermal efficiency threshold are weighted and summed to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the quality threshold. The current turnout curvature and the current turnout thermal efficiency sent by the data acquisition module are normalized and then the same weighted summation formula is used to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the current turnout quality coefficient; The current train is classified by comparing the current train risk coefficient with the risk threshold, and the current turnout is classified by comparing the current turnout quality coefficient with the quality threshold.
[0011] In a preferred embodiment, the specific process of classifying the current train and the current turnout is as follows: If the risk factor of the current train exceeds the risk threshold, the current train is marked as a high-risk train; if the risk factor of the current train is lower than the risk threshold, the current train is marked as a low-risk train; If the quality coefficient of the current turnout exceeds the quality threshold, the current turnout is marked as a low-quality turnout; if the quality coefficient of the current turnout is lower than the quality threshold, the current turnout is marked as a high-quality turnout.
[0012] In a preferred embodiment, the specific process of calculating the snow-melting opening and closing time of different turnouts according to the turnout quality coefficient is as follows: The turnout quality coefficients of all turnouts that the train passes through are calculated separately and merged into a quality coefficient data set. The time proportional coefficient is obtained by taking the current turnout quality coefficient and the average value of the quality coefficient data set as the quotient. The current turnout snow melting opening and closing time is obtained by multiplying the initial snow melting opening and closing time by the time proportional coefficient. The maximum snowmelt opening and closing time is obtained by taking the maximum value of several snowmelt opening and closing times calculated by the quality coefficient of each turnout.
[0013] In a preferred embodiment, the snowfall speed and turnout snow accumulation are defined as input variables in the data matching module, which are divided into fuzzy sets; The matching accuracy is defined as the output variable and divided into fuzzy sets; Fuzzy rules are formulated to describe the effects of snowfall speed and turnout snow accumulation on matching accuracy; Perform fuzzy reasoning based on fuzzy rules to determine the matching accuracy.
[0014] In a preferred embodiment, the specific steps of classifying and matching the train mark and the opening and closing time of different turnouts for snow melting according to the fuzzy set output result are as follows: If the current train is marked as a low-risk train, all switches that the train passes through will use the initial snowmelt opening and closing time; if the current train is marked as a high-risk train, when the matching accuracy is judged to be low, the current train will match the maximum snowmelt opening and closing time through the corresponding switch; when the matching accuracy is judged to be high, the current train will match the snowmelt opening and closing time calculated by each switch through each switch.
[0015] In a preferred embodiment, the feedback regulation module adjusts the snow melting opening and closing time as follows: The feedback adjustment module receives the current train average speed transmitted by the data classification module and the real-time speed of the current train after passing a switch transmitted by the data acquisition module, selects the sample time after the current train passes the switch, and selects time point, record the speed of the current train at each time point after it passes the switch, subtract the speed of the current train at each time point after it passes the switch from the current train's average speed to get the speed change of the current train before and after it passes a switch, and combine all speed changes into a speed change data set; The train variation coefficient is calculated by taking the mean value and standard deviation in the speed variation data set. The train variation coefficient can be obtained by taking the mean value and the sum of the standard deviation and the mean value as the quotient. The corresponding switch snow melting opening and closing time is adjusted according to the train variation coefficient.
[0016] The technical effects and advantages of the energy-saving and environmentally friendly rail transit turnout snow melting system of the present invention are as follows: The present invention collects train data and turnout data, evaluates train risks according to train data, classifies trains according to train risks, evaluates turnout quality according to turnout data, calculates snowmelt opening and closing times of different turnouts according to quality evaluation, collects environmental data, analyzes matching accuracy according to environmental data, and if the matching accuracy is high, the classified trains are matched with different snowmelt opening and closing times; otherwise, the trains are all matched with snowmelt opening and closing times calculated by low-quality turnouts. Matching feedback data is collected, and the snowmelt opening and closing times are adjusted according to the matching feedback data. By matching trains with different snowmelt opening and closing times, the temperature difference between wheels and rails caused by different snowmelt times and when trains pass through turnouts is reduced, thereby improving the safety of tourists. BRIEF DESCRIPTION OF THE DRAWINGS
[0017] Figure 1 This is a schematic diagram of the structure of an energy-saving and environmentally friendly rail transit turnout snow melting system of the present invention. Figure 2 The present invention is a flow chart of an energy-saving and environmentally friendly rail transit turnout snow melting system. DETAILED DESCRIPTION
[0018] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0019] The present invention collects train data and turnout data, evaluates train risks according to train data, classifies trains according to train risks, evaluates turnout quality according to turnout data, calculates snowmelt opening and closing times of different turnouts according to quality evaluation, collects environmental data, analyzes matching accuracy according to environmental data, and if the matching accuracy is high, the classified trains are matched with different snowmelt opening and closing times; otherwise, the trains are all matched with snowmelt opening and closing times calculated by low-quality turnouts. Matching feedback data is collected, and the snowmelt opening and closing times are adjusted according to the matching feedback data. By matching trains with different snowmelt opening and closing times, the temperature difference between wheels and rails caused by different snowmelt times and when trains pass through turnouts is reduced, thereby improving the safety of tourists.
[0020] Example The present invention discloses an energy-saving and environmentally friendly rail transit turnout snow melting system. Figure 1 , Figure 2 As shown, it includes: a data acquisition module, a data classification module, a data matching module and a feedback adjustment module, and the signals between the modules are connected.
[0021] The functions of each module are as follows: In the data acquisition module, the train speed is monitored in real time by accessing the traffic safety monitoring system, and the vehicle management system is accessed to obtain the train wheel maintenance time. The corresponding turnout curvature is obtained by accessing the current transportation operating company, and then the thermal efficiency of the track turnout is measured. The actual heat transfer and snow melting efficiency of the track turnout is determined by measuring the thermal efficiency of the turnout. The collected train speed, wheel maintenance time, turnout curvature and turnout thermal efficiency are sent to the data classification module for analysis and processing. After classification in the data classification module, the meteorological station is accessed to obtain the snowfall speed when the train passes through the turnout, and the corresponding turnout snow accumulation is detected using equipment such as acoustic wave reflection sensors, and the snowfall speed and turnout snow accumulation are sent to the data matching module. After classification and matching, the real-time driving speed of the current train after passing the turnout is monitored through the traffic safety monitoring system and transmitted to the feedback adjustment module.
[0022] The data classification module will use the random forest integration method to preliminarily screen the train speed and train wheel maintenance time based on the train data, calculate the current train average speed and send it to the feedback adjustment module. The train speed data set and the maintenance time data set are merged through the sufficient train average speed and train wheel maintenance time, and then the risk threshold is set and the current train risk coefficient is calculated using the logistic regression method. The current train risk level is analyzed by comparing the calculated train risk coefficient with the risk threshold to classify and mark the current train. Similarly, the turnout data is used to calculate the turnout quality coefficient and quality threshold, and the turnout quality is evaluated by comparison. The snow melting opening and closing time of different turnouts is calculated based on the quality evaluation results. The marking results of the current train and the snow melting opening and closing time of different turnouts are sent to the data matching module for classification and matching.
[0023] The data matching module receives the snowfall speed and turnout snow accumulation from the data acquisition module and uses fuzzy reasoning to analyze the matching accuracy between the current train and the snowmelt opening and closing time of each turnout. According to the fuzzy set output result, the train mark transmitted by the data classification module and the snowmelt opening and closing time of different turnsouts are classified and matched, and the results of classification and matching are sent to the data acquisition module.
[0024] The feedback adjustment module receives the real-time speed of the current train after passing through the turnout and the current average speed of the train transmitted from the data acquisition module and the data classification module, analyzes them, and adjusts the corresponding turnout snow melting opening and closing time. The current average speed of the train is the average speed of the current train before passing through the turnout. The real-time speed of the current train after passing through the turnout is used to set the speed recorded at different time points and the difference between the average speed of the current train before passing through the turnout to obtain the current train speed change, and the corresponding turnout snow melting opening and closing time is adjusted according to the current train speed change.
[0025] It should be noted that the train speed affects the degree of wear of various parts of the train. When the train speed is higher, the degree of wear of various parts of the train is also greater, and the train risk is relatively high. The wheel maintenance interval is the maintenance time interval of the train wheels. Failure to maintain the train wheels for a long time will lead to increased train risk.
[0026] Turnout curvature refers to the degree of curvature of the track turnout. The greater the turnout curvature, the greater the curvature of the track turnout, and the more likely it is to roll over. The turnout thermal efficiency is the ratio of the actual snow melting heat of the turnout to the input heat in the turnout snow melting system. The higher the turnout thermal efficiency, the faster the turnout snow melting rate.
[0027] In the same weather, different track switch structures lead to different amounts of snow accumulation on the switch. Switches with more snow accumulation require relatively longer time to melt the snow. However, at the same track switch temperature, the snow falls faster when the train passes through the switch, and the temperature difference of the train wheels on the switch is large, resulting in greater wear on the train.
[0028] The data collection methods of the data collection module are conventional means and will not be repeated here.
[0029] The specific processing process of the random forest ensemble method and logistic regression method involved in the data classification module is as follows: In the data classification module, the train speed and train wheel maintenance time input from the data acquisition module are processed, a period of time is divided into multiple time points to record the same train speed, and the average train speed is calculated. The train travel average and train wheel maintenance time of a sufficient number of trains are collected through the data acquisition module, and then normalized and merged into a speed data set and a maintenance time data set respectively. Taking the normalization of train speed as an example, the normalization formula can be used Normalization formula: ,in is the normalized result, is the train speed before normalization, is the maximum speed of the train with sufficient trains, It is the minimum train speed for sufficient trains.
[0030] The normalized and merged driving speed dataset and maintenance time dataset are filtered by combining multiple decision trees using the random forest ensemble method. The maintenance time dataset is taken as an example and marked as A certain proportion of samples are selected from them and marked as a small sample data set , the maintenance time dataset according to The ratio is divided into several small sample data sets and marked as , , etc., to ensure that the samples used in each decision tree training are different. Use these small sample data sets as nodes to build a decision tree, and randomly select a sample in each node of the decision tree, such as using a small sample data set As the first node of the decision tree, a normalized maintenance time data is randomly selected and marked as , then at the second node of the decision tree Randomly select a normalized maintenance time data .
[0031] The average of these randomly selected data is marked as , choose to split the maintenance time dataset at a different ratio than before , get a new small sample data set as a new node to rebuild the decision tree, and obtain the average value by random sampling method and mark it as , repeat the operation, build decision trees, forming a random forest, and obtaining some average data , , Etc., arrange these data from small to large, take out the median and mark it as As the repair time threshold and Between 0 and 1.
[0032] The same method is used to process the driving speed data set to calculate the driving speed threshold value marked as b, and the train risk coefficient is calculated using the logistic regression formula: ,in is the train risk coefficient, e is the natural base, , and are the weights of the maintenance time threshold and the travel speed threshold respectively. The train risk coefficient calculated by a and b is used as the risk threshold and marked as .
[0033] The current train speed and the current train wheel maintenance time sent by the receiving data acquisition module are integrated into the speed data set and the maintenance time data set. After the formula is normalized, it is corresponded to the logistic regression formula to calculate the train risk coefficient. For example, the result after normalization of the current train speed is marked as , the normalized result of the current train wheel maintenance time is marked as , then the formula for calculating the current train risk coefficient is: ,in .
[0034] By current train risk factor and risk threshold Compare and classify the current train. If , then the current train is marked as a high-risk train; if , then the current train is marked as a low-risk train. After the current train is classified, the current train mark is sent to the data matching module.
[0035] Similarly, by collecting the turnout curvature and turnout thermal efficiency of each turnout that the current train passes through, normalizing them and merging them into a curvature data set and a thermal efficiency data set respectively, the quality threshold and the turnout quality coefficient of each turnout are calculated using the random forest ensemble method and the logistic regression method, and are marked as and , , etc., among which , , Substitute the turnout curvature and turnout thermal efficiency of each turnout that the current train passes into the normalized curvature data set and thermal efficiency data set to calculate the turnout quality coefficient using the logistic regression formula. Compare the calculated corresponding turnout quality coefficient with the quality threshold to classify each turnout as a high-quality track turnout or a low-quality track turnout. For example, the turnout quality coefficient calculated by the turnout curvature and turnout thermal efficiency of the first turnout is , then if , then the first turnout is classified as a low-quality turnout; if , the first turnout is classified as a high-quality turnout.
[0036] The data classification module combines all the calculated turnout quality coefficients into a quality coefficient data set. The time proportion coefficient can be set by calculating the average value of the quality coefficient data set to calculate the snow melting time of turnouts of different quality to determine the snow melting opening and closing time. This example uses the following example to determine the snow melting opening and closing time: Visit the public information on the railway management department website to obtain the initial snow melting opening and closing time of the current turnout, marked as , by calculating the turnout quality coefficient of the current turnout , the average value of the quality coefficient data set is calculated as , comprehensive turnout quality coefficient of the current turnout The average value of the quality coefficient data set Calculate the time proportional coefficient, the formula can be: ,in, is the time proportional coefficient, and the current turnout snow melting opening and closing time is calculated using the calculated time proportional coefficient: ,Will As the new snow-melting opening and closing time of the current turnout. The maximum value of several snow-melting opening and closing times calculated by each turnout quality coefficient is obtained to obtain the maximum snow-melting opening and closing time marked as , the snow melting opening and closing time calculated for each turnout And the maximum opening and closing time for snow melting Sent to the data matching module.
[0037] It should be noted that when calculating the average speed of the same train, the selection of time periods, the division of time points, and the number of decision trees constructed It can be set according to the actual situation, such as 5 times, 10 times, etc. The switch snow melting opening and closing time is the time interval from the start of snow melting to the end of snow melting, and the normalized formula is not unique.
[0038] The specific processing process of the data matching module is as follows: The data matching module receives the train mark transmitted by the data classification module and the snow melting opening and closing time calculated by each branch track. And the maximum opening and closing time for snow melting Before classification matching, it is necessary to determine the matching accuracy between each turnout and the current train.
[0039] The snowfall speed and turnout snow accumulation sent from the data acquisition module are used and defined as input variables, which are divided into different fuzzy sets.
[0040] For example, "Fast", "Slow" for snowfall speed, "High", "Low" for turnout snow accumulation.
[0041] Define the matching accuracy as the output variable and divide it into fuzzy sets, e.g., "High" , "Low" for matching accuracy.
[0042] A set of fuzzy rules can be formulated based on professional knowledge or through data analysis to describe the impact of different input variables on output variables. For example: The snowfall speed is marked as V, the turnout snow accumulation is marked as J, and the matching accuracy is marked as P. Rule 1: IF (V is Fast) AND (J is High) THEN (P is Low) Rule 2: IF (V is Slow) AND (J is Low) THEN (P is High) If the current train is marked as a low-risk train, all switches that the train passes through use the initial snowmelt opening and closing time; if the current train is marked as a high-risk train, when the output result is "Low", it is judged that the matching accuracy is low, and the current train matches the maximum snowmelt opening and closing time through the corresponding switch; when the output result is "High", it is judged that the matching accuracy is high, and the current train matches the snowmelt opening and closing time calculated by each switch through each switch.
[0043] It should be noted that the faster the snowfall speed, the higher the snow accumulation on the switch, and the corresponding snow melting time is relatively long. At this time, if the high-risk train is matched according to the snow melting opening and closing time calculated by the corresponding switch, the snow on the switch will not melt completely or will accumulate again after melting, leading to more serious consequences. Therefore, the faster the snowfall speed and the higher the snow accumulation on the switch, the lower the matching accuracy.
[0044] The division of fuzzy sets can be adjusted according to the actual situation. For example, this example takes two fuzzy sets as an example. In fact, the snowfall speed, turnout snow accumulation and matching accuracy can also be divided into three or more sets, so as to better adjust according to different situations. In addition, for the judgment of snowfall speed and turnout snow accumulation, thresholds can be set according to the actual situation. For example, when the snowfall speed exceeds When the snow accumulation at the turnout exceeds 3 cm per hour, it is marked as "Fast". When it is, it is marked as "High" etc., which will not be elaborated here.
[0045] The specific processing of adjusting the snow melting opening and closing time in the feedback regulation module is exemplified as follows: Receive the current train average speed transmitted by the data classification module and the real-time speed of the current train after passing a certain switch transmitted by the data acquisition module, select a period of time after the current train passes a certain switch as the sample time, and then select time point, record the speed of the current train at each time point after it passes a switch, subtract the speed of the current train at each time point after it passes a switch from the current train's average speed to get the speed change of the current train before and after it passes a switch, and merge all speed changes into a speed change data set.
[0046] The mean and standard deviation of the speed change data set are marked as and , calculate the train variation coefficient ,in is the train variation coefficient, and the corresponding turnout snow melting opening and closing time can be adjusted according to the train variation coefficient q. It can be adjusted by the following formula: ,in To correspond to the snowmelt opening and closing time after the adjustment of the branch road, The snow-melting opening and closing time of the corresponding turnout that matches the current train; otherwise, the snow-melting opening and closing time of the corresponding turnout will not be adjusted. It should be explained that, considering the slippage problem caused by excessive snow accumulation, when the average value in the speed change data set is 0, the train change coefficient is 0, and the corresponding turnout snow-melting opening and closing time does not need to be adjusted; when the average value in the speed change data set is less than 0, the overall speed of the current train after passing the corresponding turnout is lower than the average speed of the current train, the corresponding turnout has a low degree of slippage, and the corresponding turnout snow-melting opening and closing time does not need to be adjusted; when the average value in the speed change data set is greater than 0, the train change coefficient If it is greater than 0, the overall speed of the current train after passing the corresponding switch is greater than the average speed of the current train, and the corresponding switch has a high degree of slippage, that is, there is a lot of snow on the corresponding switch, and the snow melting opening and closing time needs to be increased.
[0047] It should be noted that the formulas and methods for calculating the train variation coefficient and adjusting the snow-melting opening and closing times are only examples and can be adjusted according to actual conditions.
[0048] The above formulas are all dimensionless and numerical calculations. The formula is a formula for the most recent real situation obtained by collecting a large amount of data and performing software simulation. The preset parameters in the formula are set by technicians in this field according to actual conditions.
[0049] The above embodiments may be implemented in whole or in part by software, hardware, firmware or any other combination. When implemented by software, the above embodiments may be implemented in whole or in part in the form of a computer program product.
[0050] Those of ordinary skill in the art will appreciate that the modules and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, or a combination of computer software and electronic hardware. Whether these functions are performed in hardware or software depends on the specific application of the technical solution and the invention constraints. Professional and technical personnel can use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of this application.
[0051] In addition, each functional module in each embodiment of the present application may be integrated into one processing module, or each module may exist physically separately, or two or more modules may be integrated into one module.
[0052] The above is only a specific implementation of the present application, but the protection scope of the present application is not limited thereto. Any person skilled in the art who is familiar with the present technical field can easily think of changes or substitutions within the technical scope disclosed in the present application, which should be included in the protection scope of the present application. Therefore, the protection scope of the present application should be based on the protection scope of the claims.
[0053] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An energy-saving and environmentally friendly rail transit turnout snow melting system, characterized in that: include: Data acquisition module, data classification module, data matching module and feedback adjustment module, and signal connections between modules; The data acquisition module is used to collect the train speed, train wheel maintenance time, turnout curvature and turnout thermal efficiency and send them to the data classification module for classification processing; after the classification is completed in the data classification module, the snowfall speed and the corresponding turnout snow accumulation are collected and sent to the data matching module, the classification and matching results are received, and the train speed after passing the turnout is collected and sent to the feedback adjustment module; The data classification module uses the random forest integration method to screen abnormal data of train speed and train wheel maintenance time, calculates the average speed of the train before passing the turnout and sends it to the feedback adjustment module, and uses the logistic regression method to calculate the train risk coefficient and the turnout quality coefficient to classify the train and turnout; the trains of different classifications are marked respectively, and the snow-melting opening and closing times of different turnouts are calculated according to the turnout quality coefficient, and the train marking results and the snow-melting opening and closing times of different turnouts are sent to the data matching module for classification and matching; The data matching module uses fuzzy reasoning to analyze the matching accuracy between the current train and the snowmelt opening and closing time of each turnout with the received snowfall speed and snow accumulation of the turnout. According to the fuzzy set output result, the train mark input by the data classification module and the snowmelt opening and closing time of different turnouts are classified and matched, and the classification and matching results are sent to the data acquisition module; The feedback adjustment module receives the average speed of the train before passing the switch and the speed of the train after passing the switch for analysis, and sets different time points for the speed of the train after passing the switch, recording the difference between the train speed and the average speed before passing the switch to obtain the current train speed change, and adjusts the corresponding switch snow melting opening and closing time according to the current train speed change.
2. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1 is characterized by: When the data classification module processes the train speed and train wheel maintenance time input from the data acquisition module, it selects the sample time to divide it into multiple time points to record the same train speed, and takes the average value as the average train speed. The data acquisition module collects the train travel uniformity, train wheel maintenance time, turnout curvature, and turnout thermal efficiency of multiple trains, normalizes them, and then merges them into a speed data set, a maintenance time data set, a curvature data set, and a thermal efficiency data set.
3. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1 is characterized by: The specific processing process of the random forest integration method involved in the data classification module is as follows: The driving speed data set, maintenance time data set, curvature data set and thermal efficiency data set are divided into multiple small sample data sets according to the sample ratio, and a decision tree is constructed with the small sample data set as a node. A data is randomly selected in each decision tree node, and the average values of various types of data are calculated and recorded. Then, different sample ratios are selected to re-divide the driving speed data set, maintenance time data set, curvature data set and thermal efficiency data set into multiple small sample data sets. The operation is repeated multiple times to obtain several average values of driving speed data, average values of maintenance time data, average values of curvature and average values of thermal efficiency; The median of the recorded average driving speed data is selected as the driving speed threshold, and the median of the recorded average maintenance time data is selected as the maintenance time threshold; the median of the recorded average curvature data is selected as the curvature threshold, and the median of the recorded average thermal efficiency data is selected as the thermal efficiency threshold.
4. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1 is characterized in that ; The specific processing process of the logistic regression method involved in the data classification module is as follows: The speed threshold and the maintenance time threshold are weighted and summed to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the risk threshold. The current train speed and the current train wheel maintenance time sent by the data acquisition module are normalized and then the same weighted summation formula is used to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the current train risk coefficient; The curvature threshold and the thermal efficiency threshold are weighted and summed to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the quality threshold. The current turnout curvature and the current turnout thermal efficiency sent by the data acquisition module are normalized and then the same weighted summation formula is used to obtain the intermediate variable, which is then calculated using the logistic regression formula, and the calculation result is used as the current turnout quality coefficient; The current train is classified by comparing the current train risk coefficient with the risk threshold, and the current turnout is classified by comparing the current turnout quality coefficient with the quality threshold.
5. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 4 is characterized by: The specific process of classifying the current train and the current turnout is as follows: If the risk factor of the current train exceeds the risk threshold, the current train is marked as a high-risk train; if the risk factor of the current train is lower than the risk threshold, the current train is marked as a low-risk train; If the quality coefficient of the current turnout exceeds the quality threshold, the current turnout is marked as a low-quality turnout; if the quality coefficient of the current turnout is lower than the quality threshold, the current turnout is marked as a high-quality turnout.
6. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1 is characterized by: The specific process of calculating the snow-melting opening and closing time of different turnouts according to the turnout quality coefficient is as follows: The turnout quality coefficients of all turnouts that the train passes through are calculated separately and merged into a quality coefficient data set. The time proportional coefficient is obtained by taking the current turnout quality coefficient and the average value of the quality coefficient data set as the quotient. The current turnout snow melting opening and closing time is obtained by multiplying the initial snow melting opening and closing time by the time proportional coefficient. The maximum snowmelt opening and closing time is obtained by taking the maximum value of several snowmelt opening and closing times calculated by the quality coefficient of each turnout.
7. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1 is characterized by: In the data matching module, snowfall speed and turnout snow accumulation are defined as input variables and divided into fuzzy sets; The matching accuracy is defined as the output variable and divided into fuzzy sets; Fuzzy rules are formulated to describe the effects of snowfall speed and turnout snow accumulation on matching accuracy; Perform fuzzy reasoning based on fuzzy rules to determine the matching accuracy.
8. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1 is characterized by: According to the fuzzy set output results, the train marks input by the data classification module and the opening and closing times of different turnouts are classified and matched. The specific steps are as follows: If the current train is marked as a low-risk train, all switches that the train passes through will use the initial snowmelt opening and closing time; if the current train is marked as a high-risk train, when the matching accuracy is judged to be low, the current train will match the maximum snowmelt opening and closing time through the corresponding switch; when the matching accuracy is judged to be high, the current train will match the snowmelt opening and closing time calculated by each switch through each switch.
9. The energy-saving and environmentally friendly rail transit turnout snow melting system according to claim 1, characterized in that: The specific processing of adjusting the snow melting opening and closing time in the feedback regulation module is as follows: The feedback adjustment module receives the current train average speed transmitted by the data classification module and the real-time speed of the current train after passing a switch transmitted by the data acquisition module, selects the sample time after the current train passes the switch, and selects time point, record the speed of the current train at each time point after it passes the switch, subtract the speed of the current train at each time point after it passes the switch from the current train's average speed to get the speed change of the current train before and after it passes a switch, and combine all speed changes into a speed change data set; The train variation coefficient is calculated by taking the mean value and standard deviation in the speed variation data set. The train variation coefficient can be obtained by taking the mean value and the sum of the standard deviation and the mean value as the quotient. The corresponding switch snow melting opening and closing time is adjusted according to the train variation coefficient.
Citation Information
Cited By
Turnout snow melting energy-saving control module system
CN119126649A
