Power grid project station selection method, device and equipment and computer readable storage medium

Using remote sensing image data and neural network classification models to generate evaluation maps, combined with multi-source veto condition data and multi-peak optimization algorithms, the problem of flexibility and accuracy of traditional station selection methods is solved, and efficient station selection and control of station construction in power grid projects are realized. cost and improve the quality of site selection.

CN118780476APending Publication Date: 2024-10-15BEIJING NORTH STAR DIGITAL REMOTE SENSING TECH CO LTD +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410824793.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-06-25
Publication Date
2024-10-15

AI Technical Summary

Technical Problem

Traditional power grid engineering site selection methods are difficult to cope with complex and changeable factors, lack flexibility and adaptability, and the site selection results are not specific enough to directly indicate the location of the site.

Method used

Remote sensing image data and neural network classification models are used to generate evaluation maps, and multi-source rejection condition data are used for corrections. A global search is conducted for site selection that meets the preset cost requirements, and a multi-peak optimization algorithm is used to optimize site selection.

Benefits of technology

It improves the flexibility and accuracy of station selection, can quickly screen out suitable areas for station construction, control station construction costs, meet the needs of power grid engineering, and improve economic benefits and the quality of station selection.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118780476A_ABST
    Figure CN118780476A_ABST
Patent Text Reader

Abstract

The invention relates to a power grid engineering station selection method, device and equipment and a computer readable storage medium, and belongs to the technical field of power grid engineering, and the method comprises the steps: obtaining remote sensing image data of a to-be-selected station target area; inputting the remote sensing image data into a preset neural network classification model, generating an evaluation graph of the target area of the station to be selected, and identifying a plurality of different areas in the evaluation graph; based on preset multi-source negative condition data and remote sensing image data, correcting the evaluation graph of the target area of the to-be-selected station to obtain a target negative area graph of the target area of the to-be-selected station, and marking a target station building area in the target negative area graph; global search is conducted on the target station building area, multiple selected stations meeting set conditions are obtained, the selected stations meeting the set conditions serve as target selected stations, and the set conditions are that the selected stations with the manufacturing cost meeting the preset manufacturing cost requirement are selected in the target station building area. The method and the device have the effects that the site selection accuracy is improved, and the searching capability of multiple sites is realized.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power grid engineering, and in particular to a power grid engineering site selection method, device, equipment and computer-readable storage medium. Background Art

[0002] With the rapid development of the power industry, power grid construction has become an important infrastructure to support the sustainable development of the economy and society. In the construction process of power grid projects, site selection is a crucial link, which is directly related to the safe operation, economic benefits and social benefits of the power grid. However, the existing power grid project site selection technology faces many challenges in practical application.

[0003] Since the factors involved in the site selection of power grid projects are numerous and complex, on the one hand, traditional site selection methods often have difficulty in dealing with various uncertainties and dynamic changes, making the site selection process lack flexibility and adaptability. On the other hand, the site selection results formed by traditional site selection methods are usually several planar areas. Although these areas can indicate the potential scope of site construction, they cannot directly provide very specific geographical locations for site construction. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a method for selecting a site for a power grid project, aiming to solve at least one of the above-mentioned technical problems.

[0005] The technical solution of the present invention to solve the above technical problems is as follows:

[0006] In a first aspect, the present application provides a method for selecting a site for a power grid project, which adopts the following technical solution:

[0007] A method for selecting a site for a power grid project, comprising:

[0008] Acquire remote sensing image data of the target area of ​​the station to be selected;

[0009] Inputting the remote sensing image data into a preset neural network classification model to generate an evaluation map of the target area of ​​the station to be selected, wherein the evaluation map identifies a plurality of different areas;

[0010] Based on the preset multi-source rejection condition data and the remote sensing image data, the evaluation map of the target area of ​​the station to be selected is corrected to obtain a target rejection area map of the target area of ​​the station to be selected, wherein the target site establishment area is marked in the target rejection area map;

[0011] A global search is performed on the target site construction area to obtain multiple site selections that meet set conditions, and the site selections that meet the set conditions are used as target site selections. The set conditions are that the cost of the site selection in the target site construction area meets the preset cost requirements.

[0012] The beneficial effect of the present invention is that by utilizing remote sensing image data and a neural network classification model, an evaluation map of the target area of ​​a candidate station can be automatically generated, thereby quickly screening out areas that are suitable for station construction, have conditions for station construction, and are not suitable for station construction.

[0013] The evaluation map is revised through preset multi-source veto condition data, which more comprehensively considers various factors affecting the site selection of substations, such as topography, meteorological conditions, transportation, urban planning, etc., providing a more accurate and comprehensive search basis for the subsequent global search of the target station construction area, thereby improving the efficiency and accuracy of optimization.

[0014] By conducting a global search of the target site construction area, multiple site selections that meet the set conditions are obtained, where the set conditions are mainly that the cost of the site selection meets the preset cost requirements. This can control the site construction cost while meeting the needs of the power grid project, improve economic benefits, and thus improve the quality of site selection.

[0015] Based on the above technical solution, the present invention can also be improved as follows.

[0016] Furthermore, the preset multi-source rejection condition data includes multiple types of prohibited construction area data, and the evaluation map of the target area of ​​the candidate station is corrected based on the preset multi-source rejection condition data and the remote sensing image data, including:

[0017] For each type of prohibited construction area data, the prohibited construction area data is mapped to the remote sensing image data corresponding to the evaluation map based on image processing technology to form corrected remote sensing image data;

[0018] Based on each corrected remote sensing image data, the evaluation map is corrected to obtain a plurality of sub-rejection area maps, each of which identifies a prohibited station construction area determined by the prohibited station construction area data of a corresponding type;

[0019] The multiple sub-rejection area maps are merged to obtain a target rejection area map of the target area of ​​the station to be selected.

[0020] The beneficial effect of adopting the above further scheme is that by introducing multiple types of prohibited area data and mapping them to the remote sensing image data corresponding to the evaluation map, areas that are not suitable for substation construction can be identified more accurately. This avoids ignoring certain important limiting factors in the site selection process, thereby improving the accuracy of site selection. By fusing multiple sub-veto area maps to form a comprehensive target veto area map, all prohibited areas can be clearly displayed. This allows decision makers to more intuitively understand which areas are not selectable, thereby enhancing the reliability of site selection decisions.

[0021] Furthermore, the preset multi-source veto condition data includes data on prohibited construction areas in national land space planning, data on prohibited construction areas in road and water systems, data on prohibited construction areas with slopes greater than a set slope, data on prohibited construction areas in earthquake zones, and data on prohibited construction areas with pollution.

[0022] The beneficial effect of adopting the above further scheme is that the multi-source veto condition data may include data on prohibited construction areas with slopes greater than the set slope, prohibited construction areas in earthquake zones, environmental protection areas for prohibited construction in pollution areas, military restricted areas, flood-prone areas, urban planning red lines, and other types of prohibited construction areas. By comprehensively considering these constraints, it can be ensured that the selected site not only meets the technical and economic requirements, but also meets the requirements of laws, regulations, and social environment.

[0023] Further, the global search of the target site establishment area to obtain multiple site selections that meet the set conditions includes:

[0024] Acquire substation parameter information of the target area of ​​the to-be-selected station, wherein the substation parameter information includes substation outline, cost information and substation geographical condition information, wherein the cost information includes earthwork cost data and access road cost data, and the substation geographical condition information includes road slope restriction data;

[0025] Based on the target rejection map, obtaining geographic data corresponding to the target site establishment area in the target rejection map;

[0026] Based on the substation parameter information, the geographic data and a preset multi-peak optimization algorithm, a global search is performed on the target station construction area to obtain multiple selected stations that meet the set conditions.

[0027] The beneficial effect of adopting the above further scheme is that by obtaining various parameter information such as substation outline, cost information and substation geographical condition information, the actual needs and restrictions of the substation can be fully considered in the global search process. Ensure that the selected site can not only meet the technical and economic requirements of the power grid project, but also adapt to the specific geographical environment and construction conditions. In the global search process, the geographical data corresponding to the target station area in the target rejection map is combined to avoid invalid searches in areas that are not suitable for station construction. The efficiency and accuracy of the search are improved, making the selected site more in line with the actual situation and project needs.

[0028] The multi-peak optimization algorithm is used to perform a global search of the target site construction area, and multiple possible site locations can be found. Through the automated global search process, multiple optional site locations and related information can be quickly obtained. This enables decision makers to compare and evaluate multiple options, improving the efficiency and reliability of site selection decisions.

[0029] Further, based on the substation parameter information, the geographic data and the preset multi-peak optimization algorithm, a global search is performed on the target station construction area to obtain multiple station selections that meet the set conditions, including:

[0030] Based on the substation parameter information and the geographic information data, a preset number of particle swarms are initialized, each particle swarm includes a plurality of particles, each particle swarm represents a set of different substation site selection schemes, and each particle of each particle swarm represents a power grid project site selection scheme calculated according to a cost calculation rule;

[0031] For each of the particle swarms, based on a preset fitness function, updating the individual optimal value of each particle in the particle swarm of the current iteration and the group optimal value of the particle swarm;

[0032] For each of the particle groups, based on the current position, current speed, individual optimal value of each particle and the group optimal value of the particle group, updating the speed and position of each particle;

[0033] For each of the particle swarms, the updated speed and position of each particle are used as the current speed and current position of each particle of the particle swarm of the next iteration for a cycle until the number of iterations is met, and the substation site selection scheme corresponding to the particle with the smallest group optimal value in the particle swarm within the current iteration cycle is used as the target site selection of the target station construction area.

[0034] The beneficial effect of adopting the above further scheme is that through the preset multi-peak optimization algorithm, multiple particle swarms can be searched globally at the same time, effectively avoiding the problem of falling into the local optimal solution. Each particle swarm continuously updates the speed and position of the particles to explore different potential sites in the target site construction area, thereby finding the global optimal site location, improving the comprehensiveness and accuracy of the site selection results.

[0035] During the search process, the substation outline, cost information, geographic condition data and other parameter information are combined to make the search process more in line with the actual situation. At the same time, the location of the particles is constrained and adjusted using geographic data to ensure the rationality and feasibility of the selected site. By continuously updating the individual optimal value and group optimal value of the particles and adjusting the speed and position of the particles according to the convergence function, the dynamic adjustment of the search strategy is realized. This dynamic adjustment can adjust the search direction and step size according to the actual situation, improving the efficiency and accuracy of the search.

[0036] Further, for each particle swarm, based on a preset fitness function, updating the individual optimal value of each particle in the particle swarm of the current iteration and the group optimal value of the particle swarm includes:

[0037] For each particle in the particle group, determining a current substation area corresponding to each particle of the current iteration;

[0038] For each particle in the particle group, based on a preset cost calculation rule, geographical data of the current substation area corresponding to each particle, the earthwork cost data and the access road cost data, a target cost of the current substation area corresponding to each particle is calculated;

[0039] For each particle in the particle group, the target cost of the current substation area corresponding to the particle in the current iteration cycle is compared with the cost of the substation area corresponding to the historical iteration cycle to determine the individual optimal value of each particle;

[0040] For each of the particle groups, a group optimal value of the particle group is determined based on the individual optimal value of each of the particles in the particle group.

[0041] The beneficial effect of adopting the above further scheme is that when calculating the cost of earthwork and access road, the influence of geographical factors is fully considered. For example, factors such as terrain undulation and slope will affect the size of earthwork and the difficulty of excavation, and thus affect the cost; and the distance from the particle position to the nearest road point determines the length and cost of the access road. By comprehensively considering geographical factors, the actual situation and cost requirements of substation construction can be more realistically reflected. By calculating the target cost of the current substation area corresponding to each particle, an economic basis can be provided for site selection decisions.

[0042] Furthermore, after performing a global search on the target site construction area to obtain multiple site selections that meet the set conditions and taking the site selections that meet the set conditions as target site selections, the method further includes:

[0043] Based on the preset fitness function, the substation site selection scheme corresponding to the particle with the smallest group optimal value in each particle swarm in the current iteration cycle is output as the target station selection information of the target station construction area, and the station selection information includes cost information, substation center position, rotation angle of substation outline and distance from the substation center position to the nearest road point;

[0044] Wherein, the preset fitness function is:

[0045] f = cost min (volume)+cost min (road);

[0046] f = cost min (x,y,θ,h)+cost mi (x,y,x1,y1);

[0047] Among them, cost min (volume) is the earth and rock volume cost of the substation area, cost min (road) is the road construction cost in the substation area, (x, y) is the center position of the substation, θ is the rotation angle of the substation outline, h is the height above sea level of the substation, and (x, y, x1, y1) is the distance from the center position of the substation to the nearest road point.

[0048] The beneficial effect of adopting the above further scheme is that the fitness function comprehensively considers factors such as the earthwork cost of the substation area, the road cost, and the distance from the substation center to the nearest road point. By optimizing these key factors, a station location that is both economical and convenient can be selected, thereby optimizing the site selection result.

[0049] In a second aspect, the present application provides a power grid engineering station selection device, which adopts the following technical solution:

[0050] A station selection device for a power grid project, characterized in that the training method of the preset neural network model comprises:

[0051] An acquisition module is used to acquire remote sensing image data of the target area of ​​the station to be selected;

[0052] A generation module, used for inputting the remote sensing image data into a preset neural network classification model to generate an evaluation map of the target area of ​​the station to be selected, wherein the evaluation map identifies a plurality of different areas;

[0053] A correction module, for correcting the evaluation map of the target area of ​​the station to be selected based on the preset multi-source rejection condition data and the remote sensing image data, to obtain a target rejection area map of the target area of ​​the station to be selected, wherein the target rejection area map has a target station establishment area marked therein;

[0054] The search module is used to perform a global search on the target site construction area to obtain multiple site selections that meet set conditions, and use the site selections that meet the set conditions as target site selections. The set conditions are that the cost of the site selection in the target site construction area meets the preset cost requirements.

[0055] By utilizing remote sensing image data and neural network classification models, evaluation maps of target areas for candidate stations are automatically generated, thereby quickly screening out areas that are suitable for station construction, areas with conditions for station construction, and areas that are not suitable for station construction.

[0056] The evaluation map is revised through the preset multi-source veto condition data, which more comprehensively considers various factors affecting the substation site selection, such as topography, meteorological conditions, transportation, load distribution, power grid structure, and urban planning, providing a more accurate and comprehensive search basis for the subsequent multi-peak optimization algorithm, and improving the efficiency and accuracy of optimization.

[0057] By conducting a global search of the target site construction area, multiple site selections that meet the set conditions are obtained, where the set conditions are mainly that the cost of the site selection meets the preset cost requirements. This can control the site construction cost while meeting the needs of the power grid project, improve economic benefits, and thus improve the quality of site selection.

[0058] In a third aspect, the present application provides an electronic device, which adopts the following technical solution:

[0059] An electronic device comprises a memory and a processor, wherein the memory stores a computer program that can be loaded by the processor and executes the power grid engineering site selection method described in any one of the first aspects.

[0060] The beneficial effect of the present invention is that the processor executes the power grid engineering site selection method stored in the memory, and automatically generates an evaluation map of the target area for the selected station by utilizing remote sensing image data and a neural network classification model, thereby quickly screening out areas that are suitable for station construction, conditionally suitable for station construction, and unsuitable for station construction.

[0061] The evaluation map is revised through the preset multi-source veto condition data, which more comprehensively considers various factors affecting the substation site selection, such as topography, meteorological conditions, transportation, load distribution, power grid structure, and urban planning, providing a more accurate and comprehensive search basis for the subsequent multi-peak optimization algorithm, and improving the efficiency and accuracy of optimization.

[0062] By conducting a global search of the target site construction area, multiple site selections that meet the set conditions are obtained, where the set conditions are mainly that the cost of the site selection meets the preset cost requirements. This can control the site construction cost while meeting the needs of the power grid project, improve economic benefits, and thus improve the quality of site selection.

[0063] In a fourth aspect, the present application provides a computer-readable storage medium, which adopts the following technical solution:

[0064] A computer-readable storage medium stores a computer program that can be loaded by a processor and execute the power grid engineering site selection method described in any one of the first aspects.

[0065] The beneficial effects of the present invention are: the processor loads and executes the computer program stored in the computer-readable storage medium, and the electronic device automatically generates an evaluation map of the target area of ​​the candidate station by utilizing the remote sensing image data and the neural network classification model, thereby quickly screening out areas that are suitable for station construction, conditionally suitable for station construction, and unsuitable for station construction.

[0066] The evaluation map is revised through the preset multi-source veto condition data, which more comprehensively considers various factors affecting the substation site selection, such as topography, meteorological conditions, transportation, load distribution, power grid structure, and urban planning, providing a more accurate and comprehensive search basis for the subsequent multi-peak optimization algorithm, and improving the efficiency and accuracy of optimization.

[0067] By conducting a global search of the target site construction area, multiple site selections that meet the set conditions are obtained, where the set conditions are mainly that the cost of the site selection meets the preset cost requirements. This can control the site construction cost while meeting the needs of the power grid project, improve economic benefits, and thus improve the quality of site selection. BRIEF DESCRIPTION OF THE DRAWINGS

[0068] Figure 1 A schematic diagram of a flow chart of a power grid station selection method provided by an embodiment of the present invention;

[0069] Figure 2 A schematic diagram of a plurality of sub-rejection regions of a target region of a station to be selected provided by an embodiment of the present invention;

[0070] Figure 3 A schematic diagram of a target rejection area map of a target area of ​​a station to be selected provided by an embodiment of the present invention;

[0071] Figure 4 A schematic diagram of cost convergence results provided for one embodiment of the present invention;

[0072] Figure 5 A schematic diagram of a site search result provided by an embodiment of the present invention;

[0073] Figure 6 A structural block diagram of a power grid station selection device provided by an embodiment of the present invention;

[0074] Figure 7 A structural block diagram of an electronic device provided by an embodiment of the present invention; DETAILED DESCRIPTION

[0075] The present application is further described in detail below in conjunction with the accompanying drawings.

[0076] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of this application.

[0077] In addition, the term "and / or" in this article is only a description of the association relationship of associated objects, indicating that there can be three relationships. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. In addition, the character " / " in this article, unless otherwise specified, generally means that the associated objects before and after are in an "or" relationship.

[0078] An embodiment of the present application provides a method for selecting a site for a power grid project. The method for selecting a site for a power grid project can be executed by an electronic device. The electronic device can be a server or a mobile terminal device. The server can be an independent physical server, a server cluster or a distributed system composed of multiple physical servers, or a cloud server that provides cloud computing services. The mobile terminal device can be a laptop computer, a desktop computer, etc., but is not limited to this.

[0079] The following is a further detailed description of the embodiments of the present application in conjunction with the accompanying drawings. Figure 1 As shown, a method for selecting a site for a power grid project includes:

[0080] Step S1, obtaining remote sensing image data of the target area of ​​the station to be selected;

[0081] In the implementation mode of the present application, remote sensing impact data of the candidate station area is obtained based on the regional scope, time range, resolution, data source and satellite platform, and the remote sensing image data includes spectral data, spatial data, time data, terrain data and atmospheric data, etc.

[0082] After obtaining the remote sensing image data of the target area of ​​the candidate station, the remote sensing image data is preprocessed to improve the quality and availability of the data. Preprocessing includes atmospheric correction, terrain correction, radiation calibration, geometric correction and image registration, which is convenient for eliminating noise and distortion in remote sensing data, making it more suitable for subsequent analysis and application.

[0083] Step S2, inputting the remote sensing image data into a preset neural network classification model to generate an evaluation map of the target area of ​​the station to be selected, wherein the evaluation map identifies a plurality of different areas;

[0084] In the implementation manner of the present application, the evaluation map identifies areas suitable for station construction, areas with conditions for station construction, and areas unsuitable for station construction;

[0085] The preset neural network classification model is trained based on the remote sensing image sample data of the area suitable for station construction and the remote sensing image sample data of the area not suitable for station construction classified by expert experience.

[0086] Specifically, the training method of the preset neural network model includes:

[0087] Obtain remote sensing image sample data from multiple different regions;

[0088] For the remote sensing image sample data of each region, the remote sensing image sample data is cropped according to a preset cropping pixel interval and a preset random cropping principle to generate a plurality of sub-region images, and a training sample library is generated based on the plurality of sub-region images;

[0089] Based on a preset classification rule, the sub-region images in the training sample library are classified to generate a training data set, wherein the training data set includes remote sensing image sample data suitable for station building, remote sensing image sample data with conditional station building, and remote sensing image sample data unsuitable for station building;

[0090] Based on the training data set, the deep learning network classification model is trained to obtain a preset neural network model.

[0091] In the above implementation, the electronic device can obtain remote sensing image sample data of multiple different regions from the remote sensing image database. These batch remote sensing image sample data cover a wide range of regions, terrains and surface cover types. The electronic device then preprocesses the obtained batch remote sensing image sample data to improve the quality and consistency of the data.

[0092] Afterwards, the cropping parameters are determined according to the preset cropping pixel interval and the random cropping principle. In the embodiment of the present application, the cropping is performed according to the principle of random numbers between 200 and 400 pixels in both cropping width and height. After randomly cropping a small area, the remaining area is further cropped to eventually form a training sample library. According to the needs of the site selection decision, classification rules such as suitable for station building, conditional station building, and unsuitable for station building are set. The classification rules can be classified according to expert experience, and classified labels are assigned according to suitable for station building, conditional station building, and unsuitable for station building. The classified sub-region images are organized according to different categories to form a training data set including remote sensing image sample data suitable for station building, remote sensing image sample data conditional for station building, and remote sensing image sample data unsuitable for station building.

[0093] Finally, the preset neural network model is obtained through training based on the VGG16 deep learning network classification model.

[0094] Step S3, based on the preset multi-source rejection condition data and the remote sensing image data, the evaluation map of the target area of ​​the station to be selected is corrected to obtain a target rejection area map of the target area of ​​the station to be selected, wherein the target rejection area map has a target station establishment area marked therein;

[0095] In the implementation manner of the present application, step S2 includes the following sub-steps:

[0096] Step S21, for each type of prohibited construction area data, mapping the prohibited construction area data to the remote sensing image data corresponding to the evaluation map based on image processing technology to form corrected remote sensing image data;

[0097] Step S22, based on each corrected remote sensing image data, the evaluation map is corrected to obtain a plurality of sub-rejection area maps, each of which identifies a prohibited station construction area determined by the prohibited station construction area data of the corresponding type;

[0098] Step S23, multiple sub-rejection area maps are merged to obtain a target rejection area map of the target area to be selected, wherein the target rejection area map identifies the prohibited station construction areas determined by multiple corresponding types of prohibited station construction area data, and the prohibited station construction areas not marked in the target rejection area map are marked as target station construction areas.

[0099] In the above implementation, the preset multi-source rejection condition data may come from different channels and formats. The electronic device converts the data format of each type of prohibited construction area data to ensure the consistency of the prohibited construction area data and the remote sensing image data in format and coordinate system for accurate mapping.

[0100] Afterwards, the image registration technology is used to accurately align the prohibited construction area data to the corresponding remote sensing image data of the assessment map to ensure the spatial position correspondence between the two.

[0101] Then, based on each corrected remote sensing image data, the evaluation map is corrected to obtain a sub-rejection area map corresponding to each type of prohibited construction area data. This map represents the prohibited station construction area determined by this type of prohibited construction area data.

[0102] Finally, the electronic device fuses the multiple sub-rejection area maps to obtain a target veto area map of the target area of ​​the candidate station. The fusion method can be selected according to actual conditions, such as using Boolean operations to merge different sub-rejection area maps.

[0103] The preset multi-source rejection condition data includes data on prohibited construction areas in national land space planning, data on prohibited construction areas in road and water systems, data on prohibited construction areas with a slope greater than 15°, data on prohibited construction areas in earthquake zones, and data on prohibited construction areas in pollution areas. Data on prohibited construction areas in national land space planning include, but are not limited to, environmental protection areas, military restricted areas, flood-prone areas, urban planning red lines, etc.

[0104] An example is given by using the data of the prohibited construction area with a slope greater than 15° corresponding to the sub-veto area map.

[0105] like Figure 2 and Figure 3 As shown in FIG. 1 , based on image processing technology (or GIS geographic information technology), each type of veto factor is used as a separate input condition to compare with the remote sensing image data corresponding to the evaluation map. The prohibited construction area is specified in pixels in the image attribute condition, and the computer directly reads and determines whether it is a prohibited construction area. For example, the slope data uses the slope attribute as the judgment value and compares it with 15 to determine whether the area corresponding to the evaluation map is a prohibited construction area. The final output is as follows: Figure 2 The sub-veto area graphs corresponding to the various types of veto condition data shown in the figure are respectively obtained by fusing the multiple sub-veto area graphs as shown in the figure. Figure 3 The target rejection area map of the target area to be selected is shown, wherein the black area in the target rejection area map is the prohibited station construction area mark, and the white area in the target rejection area map is the target station construction area mark.

[0106] Step S4, performing a global search on the target site construction area to obtain multiple site selections that meet set conditions, and taking the site selections that meet the set conditions as target site selections, wherein the set conditions are that the cost of the site selections in the target site construction area meets the preset cost requirements.

[0107] In an embodiment of the present application, an electronic device obtains substation parameter information of the target area of ​​the to-be-selected station, wherein the substation parameter information includes a substation outline, cost information and substation geographical condition information, the cost information includes earthwork cost data and access road cost data, and the substation geographical condition information includes road slope restriction data; the earthwork cost data includes but is not limited to excavation unit price, filling unit price, abandoned soil unit price, and soil purchase unit price, and the access road cost data includes but is not limited to unit road cost.

[0108] Afterwards, the electronic device obtains geographical data corresponding to the target site establishment area in the target rejection map based on the target rejection map, and the geographical data includes but is not limited to topographic elevation, soil type, hydrological conditions, etc.;

[0109] Finally, the electronic device performs a global search on the target station construction area based on the substation parameter information, the geographic data and a preset multi-peak optimization algorithm to obtain station selection information of the target area to be selected, and the preset multi-peak optimization algorithm is an improved PSO algorithm.

[0110] Wherein, the preset multi-peak optimization algorithm is:

[0111] v i =v i +c1×rand()×(pbest i -x i )+c2×rand()×(gbest i -x i );

[0112] x i =x i +v i ;

[0113] Where i is the number of particles in the particle group, v i is the velocity of the particle, x i is the current position of the particle, rand() is a random number between (0,1), and c1 and c2 are learning factors.

[0114] Furthermore, based on the substation parameter information, the geographic data and the preset multi-peak optimization algorithm, a global search is performed on the target station construction area to obtain multiple station selections that meet the set conditions, including:

[0115] Step S11, based on the substation parameter information and the geographic information data, a preset number of particle swarms are initialized, each particle swarm includes a plurality of particles, each particle swarm represents a set of different substation site selection schemes, and each particle of each particle swarm represents a power grid project site selection scheme calculated according to a cost calculation rule;

[0116] Step S12, for each particle swarm, based on a preset fitness function, updating the individual optimal value of each particle in the particle swarm of the current iteration and the group optimal value of the particle swarm;

[0117] Step S13, for each particle swarm, based on the current position, current speed, individual optimal value of each particle, the group optimal value of the particle swarm and a preset convergence function, updating the speed and position of each particle;

[0118] Step S14, for each of the particle swarms, the updated speed and position of each particle are used as the current speed and current position of each particle of the particle swarm of the next iteration, and the cycle is repeated until the number of iterations is met, and the substation site selection scheme corresponding to the particle with the smallest group optimal value in the particle swarm in the current iteration cycle is used as the target site selection of the target station construction area.

[0119] In the above embodiment, step S12 includes:

[0120] For each particle in the particle group, determining a current substation area corresponding to each particle of the current iteration;

[0121] For each particle in the particle group, based on a preset cost calculation rule, geographical data of the current substation area corresponding to each particle, the earthwork cost data and the access road cost data, a target cost of the current substation area corresponding to each particle is calculated;

[0122] For each particle in the particle swarm, the target cost of the current substation area corresponding to the particle in the current iteration cycle is compared with the cost of the substation area corresponding to the historical iteration cycle to determine the individual optimal value of each particle, i.e., pbest i ;

[0123] For each particle swarm, based on the individual optimal value of each particle in the particle swarm, the group optimal value of the particle swarm is determined, i.e., gbest i .

[0124] Furthermore, after performing a global search on the target site construction area to obtain a plurality of site selections satisfying the set conditions and taking the site selections satisfying the set conditions as target site selections, the method further includes:

[0125] Based on the preset fitness function, the substation site selection scheme corresponding to the particle with the smallest group optimal value in each particle swarm in the current iteration cycle is output as the target station selection information of the target station construction area, and the station selection information includes cost information, substation center position, rotation angle of substation outline and distance from the substation center position to the nearest road point;

[0126] Wherein, the preset fitness function is:

[0127] f = cost min (volume)+cost min (road);

[0128] d=cost min (x,y,θ,h)+cost min (x,y,x1,y1);

[0129] Among them, cost mi (volume) is the earth and rock volume cost of the substation area, cost min (road) is the road construction cost in the substation area, (x, y) is the center position of the substation, θ is the rotation angle of the substation outline, h is the height above sea level of the substation, and (x, y, x1, y1) is the distance from the center position of the substation to the nearest road point.

[0130] The following is an example of performing a global search on the target station construction area based on the substation parameter information, the geographic data and a preset multi-peak optimization algorithm to obtain station selection information for the target area to be selected.

[0131] The number of particle swarms is set to 3, the search area is 60km×45km, and the substation outline is 400m×400m. First, the electronic device initializes three particle swarms based on the substation parameter information and the geographic information data, and randomly initializes particles of three groups in the search area (60km×45km) to obtain the speed, position and fitness value of each particle. Each particle represents a potential substation construction location.

[0132] For example, each particle group contains 10 particles, and the position of each particle can be randomly generated to represent the potential substation location within the target area of ​​the candidate station. The speed and initial direction of the particle can also be randomly set.

[0133] Afterwards, for each particle, the substation outline (400m×400m) is rotated with its location as the center, and the minimum earthwork cost at this location is calculated. At the same time, the distance from the particle location to the nearest road point is calculated, and the cost of the access road is calculated. The earthwork cost and the cost of the access road are added together to obtain the total cost of the particle, that is, its fitness value.

[0134] For each particle, the cost of the current substation area is compared with the previously recorded optimal cost to determine the individual optimal value of the particle. At the same time, for each particle group, the cost of all particles is compared to determine the group optimal value of the particle group.

[0135] After that, the particle speed and position are updated based on the preset convergence function. According to the update mechanism of the improved PSO multi-peak optimization algorithm, the speed and position of each particle are updated using the inertia weight, individual optimal solution and global optimal solution, and the above steps are repeated until a group that meets the preset convergence conditions is obtained.

[0136] The optimal value, output as attached Figure 4 The cost convergence results shown in the attached Figure 5 The site search results are shown.

[0137] During the updating process, improved strategies such as adaptive inertia weight, compression factor or multi-group PSO are introduced to improve the search efficiency and accuracy.

[0138] This method can automatically generate an evaluation map of the target area for the station to be selected by using remote sensing image data and a neural network classification model, thereby quickly screening out areas that are suitable for station construction, conditional for station construction, and unsuitable for station construction. The evaluation map is corrected by using preset multi-source rejection condition data, and multiple factors affecting the site selection of substations, such as topography, meteorological conditions, transportation, and urban planning, are considered more comprehensively, providing a more accurate and comprehensive search basis for the subsequent multi-peak optimization algorithm, and improving the efficiency and accuracy of optimization. By using a multi-peak optimization algorithm to perform a global search of the target station construction area, multiple possible station locations can be found. This method overcomes the problem of falling into a local optimal solution in traditional site selection methods and improves the overall quality of the site selection plan.

[0139] Figure 6 A structural block diagram of a power grid station selection device 200 provided in one embodiment of the present invention.

[0140] like Figure 6 As shown, a power grid engineering station selection device 200 mainly includes:

[0141] An acquisition module 201 is used to acquire remote sensing image data of a target area of ​​a station to be selected;

[0142] A generating module 202 is used to input the remote sensing image data into a preset neural network classification model to generate an evaluation map of the target area of ​​the station to be selected, wherein the evaluation map identifies a plurality of different areas;

[0143] A correction module 203 is used to correct the evaluation map of the target area of ​​the station to be selected based on the preset multi-source rejection condition data and the remote sensing image data to obtain a target rejection area map of the target area of ​​the station to be selected, wherein the target rejection area map has a target station establishment area marked therein;

[0144] The search module 204 is used to perform a global search on the target site construction area to obtain multiple site selections that meet set conditions, and use the site selections that meet the set conditions as target site selections. The set conditions are that the cost of the site selection in the target site construction area meets the preset cost requirements.

[0145] Optionally, the correction module 203 is specifically used for:

[0146] For each type of prohibited construction area data, the prohibited construction area data is mapped to the remote sensing image data corresponding to the evaluation map based on image processing technology to form corrected remote sensing image data;

[0147] Based on each corrected remote sensing image data, the evaluation map is corrected to obtain a plurality of sub-rejection area maps, each of which identifies a prohibited station construction area determined by the prohibited station construction area data of a corresponding type;

[0148] The multiple sub-rejection area maps are merged to obtain a target rejection area map of the target area of ​​the station to be selected.

[0149] Optionally, the preset multi-source veto condition data includes data on prohibited construction areas in national land space planning, data on prohibited construction areas in road and water systems, data on prohibited construction areas with slopes greater than a set slope, data on prohibited construction areas in earthquake zones, and data on prohibited construction areas with pollution.

[0150] Optionally, the search module 204 includes:

[0151] A first acquisition submodule is used to acquire substation parameter information of the target area of ​​the to-be-selected station, wherein the substation parameter information includes substation outline, cost information and substation geographical condition information, wherein the cost information includes earthwork cost data and access road cost data, and the substation geographical condition information includes road slope restriction data;

[0152] A second acquisition submodule, based on the target rejection map, acquires geographic data corresponding to the target site establishment area in the target rejection map;

[0153] The global search submodule is used to perform a global search on the target station construction area based on the substation parameter information, the geographic data and a preset multi-peak optimization algorithm to obtain multiple selected stations that meet the set conditions.

[0154] Optional, global search submodules include:

[0155] An initialization unit, configured to initialize a preset number of particle swarms based on the substation parameter information and the geographic information data, each particle swarm comprising a plurality of particles, each particle swarm representing a set of different substation site selection schemes, and each particle of each particle swarm representing a power grid project site selection scheme calculated according to a cost calculation rule;

[0156] A fitness value calculation unit, used for updating, for each particle swarm, the individual optimal value of each particle in the particle swarm of the current iteration and the group optimal value of the particle swarm based on a preset fitness function;

[0157] A particle speed and position updating unit, for each particle group, based on the current position, current speed, individual optimal value of each particle, the group optimal value of the particle group and a preset convergence function, updates the speed and position of each particle;

[0158] The loop unit is used for, for each particle group, taking the updated speed and position of each particle as the current speed and current position of each particle of the particle group of the next iteration to loop until the number of iterations is met, and taking the substation site selection scheme corresponding to the particle with the smallest group optimal value in the particle group in the current iteration cycle as the target site selection of the target station construction area.

[0159] Optionally, the fitness value calculation unit is specifically used for:

[0160] For each particle in the particle group, determining a current substation area corresponding to each particle of the current iteration;

[0161] For each particle in the particle group, based on a preset cost calculation rule, geographical data of the current substation area corresponding to each particle, the earthwork cost data and the access road cost data, a target cost of the current substation area corresponding to each particle is calculated;

[0162] For each particle in the particle group, the target cost of the current substation area corresponding to the particle in the current iteration cycle is compared with the cost of the substation area corresponding to the historical iteration cycle to determine the individual optimal value of each particle;

[0163] For each of the particle groups, a group optimal value of the particle group is determined based on the individual optimal value of each of the particles in the particle group.

[0164] Optionally, the global search submodule further includes an output unit, and the output unit is specifically used for:

[0165] Based on the preset fitness function, the substation site selection scheme corresponding to the particle with the smallest group optimal value in each particle swarm in the current iteration cycle is output as the target station selection information of the target station construction area, and the station selection information includes cost information, substation center position, rotation angle of substation outline and distance from the substation center position to the nearest road point;

[0166] Wherein, the preset fitness function is:

[0167] f = cost min (volume)+cost min (road);

[0168] f = cost min (x,y,θ,h)+cost min (x,y,x1,y1);

[0169] Among them, cost min (volume) is the earth and rock volume cost of the substation area, costmin (road) is the road construction cost in the substation area, (x, y) is the center position of the substation, θ is the rotation angle of the substation outline, h is the height above sea level of the substation, and (x, y, x1, y1) is the distance from the center position of the substation to the nearest road point.

[0170] Figure 7 This is a structural block diagram of an electronic device 300 according to an embodiment of the present application.

[0171] like Figure 7 As shown, the electronic device 300 includes a processor 301 and a memory 302 , and may further include one or more of an information input / information output (I / O) interface 303 and a communication component 304 .

[0172] The processor 301 is used to control the overall operation of the electronic device 300 to complete all or part of the steps in the above-mentioned power grid engineering station selection method; the memory 302 is used to store various types of data to support the operation of the electronic device 300, and these data may include, for example, instructions for any application or method used to operate on the electronic device 300, and data related to the application. The memory 302 can be implemented by any type of volatile or non-volatile storage device or a combination thereof, such as static random access memory (Static Random Access Memory, SRAM), electrically erasable programmable read-only memory (Electrically Erasable Programmable Read-Only Memory, EEPROM), erasable programmable read-only memory (Erasable Programmable Read-Only Memory, EPROM), programmable read-only memory (Programmable Read-Only Memory, PROM), read-only memory (Read-Only Memory, ROM), magnetic memory, flash memory, magnetic disk or optical disk.

[0173] The I / O interface 303 provides an interface between the processor 301 and other interface modules, and the above-mentioned other interface modules can be keyboards, mice, buttons, etc. These buttons can be virtual buttons or physical buttons. The communication component 304 is used to test the wired or wireless communication between the electronic device 300 and other devices. Wireless communication, such as Wi-Fi, Bluetooth, Near Field Communication (NFC), 2G, 3G or 4G, or a combination of one or more of them, so the corresponding communication component 304 can include: Wi-Fi components, Bluetooth components, NFC components.

[0174] The communication bus 305 may include a path to transmit information between the above components. The communication bus 305 may be a PCI (Peripheral Component Interconnect) bus or an EISA (Extended Industry Standard Architecture) bus, etc. The communication bus 305 may be divided into an address bus, a data bus, a control bus, etc.

[0175] The electronic device 300 can be implemented by one or more application specific integrated circuits (ASIC), digital signal processors (DSP), digital signal processing devices (DSPD), programmable logic devices (PLD), field programmable gate arrays (FPGA), controllers, microcontrollers, microprocessors or other electronic components to execute the power grid engineering site selection method given in the above embodiment.

[0176] The electronic device 300 may include but is not limited to mobile terminals such as digital broadcast receivers, PDAs (personal digital assistants), PMPs (portable multimedia players), etc., and fixed terminals such as digital TVs, desktop computers, etc., and may also be servers, etc.

[0177] The computer-readable storage medium provided in the embodiment of the present application is introduced below. The computer-readable storage medium described below and the power grid engineering site selection method described above can be referenced to each other.

[0178] The present application also provides a computer-readable storage medium, on which a computer program is stored. When the computer program is executed by a processor, the steps of the above-mentioned power grid engineering site selection method are implemented.

[0179] The computer-readable storage medium may include: a USB flash drive, a mobile hard disk, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, and other media that can store program codes.

[0180] The terms "comprises," "comprising," or any other variations thereof are intended to cover non-exclusive inclusion such that a process, method, article, or apparatus that includes a list of elements includes not only those elements but also other elements not expressly listed, or also includes elements inherent to such process, method, article, or apparatus.

[0181] The above description is only a preferred embodiment of the present application and an explanation of the technical principles used. Those skilled in the art should understand that the scope of application involved in the present application is not limited to the technical solution formed by a specific combination of the above technical features, but should also cover other technical solutions formed by any combination of the above technical features or their equivalent features without departing from the aforementioned application concept. For example, the above features are replaced with (but not limited to) technical features with similar functions applied in the present application.

Claims

1. A method for selecting a site for a power grid project, characterized in that: include: Acquire remote sensing image data of the target area of ​​the station to be selected; Inputting the remote sensing image data into a preset neural network classification model to generate an evaluation map of the target area of ​​the station to be selected, wherein the evaluation map identifies a plurality of different areas; Based on the preset multi-source rejection condition data and the remote sensing image data, the evaluation map of the target area of ​​the station to be selected is corrected to obtain a target rejection area map of the target area of ​​the station to be selected, wherein the target site establishment area is marked in the target rejection area map; A global search is performed on the target site construction area to obtain multiple site selections that meet set conditions, and the site selections that meet the set conditions are used as target site selections. The set conditions are that the cost of the site selection in the target site construction area meets the preset cost requirements.

2. A method for selecting a station for a power grid project according to claim 1, characterized in that: The preset multi-source rejection condition data includes multiple types of prohibited construction area data, and the evaluation map of the target area of ​​the candidate station is corrected based on the preset multi-source rejection condition data and the remote sensing image data, including: For each type of prohibited construction area data, the prohibited construction area data is mapped to the remote sensing image data corresponding to the evaluation map based on image processing technology to form corrected remote sensing image data; Based on each corrected remote sensing image data, the evaluation map is corrected to obtain a plurality of sub-rejection area maps, each of which identifies a prohibited station construction area determined by the prohibited station construction area data of a corresponding type; The multiple sub-rejection area maps are merged to obtain a target rejection area map of the target area of ​​the station to be selected.

3. A method for selecting a station for a power grid project according to claim 2, characterized in that: The preset multi-source veto condition data includes data on prohibited construction areas in national land space planning, data on prohibited construction areas in road and water systems, data on prohibited construction areas with slopes greater than a set slope, data on prohibited construction areas in earthquake zones, and data on prohibited construction areas with pollution.

4. A method for selecting a station for a power grid project according to claim 1, characterized in that: The globally searching the target site establishment area to obtain multiple selected sites that meet the set conditions includes: Acquire substation parameter information of the target area of ​​the to-be-selected station, wherein the substation parameter information includes substation outline, cost information and substation geographical condition information, wherein the cost information includes earthwork cost data and access road cost data, and the substation geographical condition information includes road slope restriction data; Based on the target rejection map, obtaining geographic data corresponding to the target site establishment area in the target rejection map; Based on the substation parameter information, the geographic data and a preset multi-peak optimization algorithm, a global search is performed on the target station construction area to obtain multiple selected stations that meet the set conditions.

5. A method for selecting a station for a power grid project according to claim 4, characterized in that: The method of performing a global search on the target station construction area based on the substation parameter information, the geographic data and a preset multi-peak optimization algorithm to obtain a plurality of selected stations that meet the set conditions includes: Based on the substation parameter information and the geographic information data, a preset number of particle swarms are initialized, each particle swarm includes a plurality of particles, each particle swarm represents a set of different substation site selection schemes, and each particle of each particle swarm represents a power grid project site selection scheme calculated according to a cost calculation rule; For each of the particle swarms, based on a preset fitness function, updating the individual optimal value of each particle in the particle swarm of the current iteration and the group optimal value of the particle swarm; For each of the particle swarms, based on the current position, current speed, individual optimal value of each particle, the group optimal value of the particle swarm and a preset convergence function, updating the speed and position of each particle; For each of the particle swarms, the updated speed and position of each particle are used as the current speed and current position of each particle of the particle swarm of the next iteration for a cycle until the number of iterations is met, and the substation site selection scheme corresponding to the particle with the smallest group optimal value in the particle swarm within the current iteration cycle is used as the target site selection of the target station construction area.

6. A method for selecting a station for a power grid project according to claim 5, characterized in that: For each particle swarm, based on a preset fitness function, updating the individual optimal value of each particle in the particle swarm of the current iteration and the group optimal value of the particle swarm includes: For each particle in the particle group, determining a current substation area corresponding to each particle of the current iteration; For each particle in the particle group, based on a preset cost calculation rule, geographical data of the current substation area corresponding to each particle, the earthwork cost data and the access road cost data, a target cost of the current substation area corresponding to each particle is calculated; For each particle in the particle group, the target cost of the current substation area corresponding to the particle in the current iteration cycle is compared with the cost of the substation area corresponding to the historical iteration cycle to determine the individual optimal value of each particle; For each of the particle groups, a group optimal value of the particle group is determined based on the individual optimal value of each of the particles in the particle group.

7. A method for selecting a station for a power grid project according to claim 5, characterized in that: After performing a global search on the target site construction area to obtain a plurality of site selections that meet the set conditions, and taking the site selections that meet the set conditions as target site selections, the method further includes: Based on the preset fitness function, the substation site selection scheme corresponding to the particle with the smallest group optimal value in each particle swarm in the current iteration cycle is output as the target station selection information of the target station construction area, and the station selection information includes cost information, substation center position, rotation angle of substation outline and distance from the substation center position to the nearest road point; Wherein, the preset fitness function is: f=cost min (volume)+cost min (road); f=cost min (x,y,θ,h)+cost min (x,y,x1,y1); Among them, cost min (volume) is the earth and rock volume cost of the substation area, cost min (road) is the road construction cost in the substation area, (x, y) is the center position of the substation, θ is the rotation angle of the substation outline, h is the height above sea level of the substation, and (x, y, x1, y1) is the distance from the center position of the substation to the nearest road point.

8. A station selection device for a power grid project, characterized in that: The training method of the preset neural network model includes: An acquisition module is used to acquire remote sensing image data of the target area of ​​the station to be selected; A generation module, used for inputting the remote sensing image data into a preset neural network classification model to generate an evaluation map of the target area of ​​the station to be selected, wherein the evaluation map identifies a plurality of different areas; A correction module, for correcting the evaluation map of the target area of ​​the station to be selected based on the preset multi-source rejection condition data and the remote sensing image data, to obtain a target rejection area map of the target area of ​​the station to be selected, wherein the target rejection area map has a target station establishment area marked therein; The search module is used to perform a global search on the target site construction area to obtain multiple site selections that meet set conditions, and use the site selections that meet the set conditions as target site selections. The set conditions are that the cost of the site selection in the target site construction area meets the preset cost requirements.

9. An electronic device, characterized in that: comprising a processor coupled to a memory; The processor is configured to execute a computer program stored in the memory, so that the electronic device executes the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: The method comprises a computer program or an instruction, and when the computer program or the instruction is executed on a computer, the computer is caused to execute the method according to any one of claims 1 to 7.

Citation Information

Cited By

  • Automatic identification method and system for non-deployable area of wind power plant based on AI visual identification

    CN121259621A

  • A Method and System for Automatic Identification of Non-Deployable Areas in Wind Farms Based on AI Visual Recognition

    CN121259621B

  • Intelligent substation site selection method and system fusing multi-source geospatial data

    CN121352151A