Transverse moving type heavy cable crane and construction method

By designing a traversing heavy-duty cable crane and intelligent construction methods, the safety hazards and low efficiency problems of traditional cable hoisting technology in long-span bridge construction have been solved, and efficient and safe 500T-level hoisting and long-span bridge construction have been achieved. Construction quality.

CN118833737APending Publication Date: 2024-10-25CCCC WUHAN HARBOR ENG DESIGN & RES
View PDF 0 Cites 4 Cited by

Patent Information

Application Number
CN202410939786.7
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-15
Publication Date
2024-10-25

AI Technical Summary

Technical Problem

Traditional cable hoisting technology is difficult to meet the needs of long-span bridge construction, especially in deep canyon terrain and harsh weather conditions, resulting in safety hazards and low construction efficiency.

Method used

Design a transverse heavy-duty cable crane, using multiple sets of heavy-duty cable saddles and pulley structures, combined with a traction winch and a lifting winch, to achieve lateral sliding and automatic control of the heavy-duty crane, and equipped with wire rope tension detection and stroke detection The device realizes intelligent construction through surveillance cameras and attitude sensors.

Benefits of technology

It has realized the hoisting of components with a single lifting weight of 500T, improved construction efficiency and safety, reduced construction risks, and ensured the construction quality and safety of long-span bridges.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118833737A_ABST
    Figure CN118833737A_ABST
Patent Text Reader

Abstract

The invention provides a transversely-moving type heavy cable crane which is characterized in that a heavy cable saddle sliding platform is arranged at the top of a cable tower, pulleys corresponding to a traction cable, a bearing cable and a hoisting cable respectively are arranged on a heavy cable saddle, and the heavy cable saddle is connected with a transversely-moving traction device so as to drive the heavy cable saddle to transversely slide; the at least two groups of heavy cable saddles are respectively positioned on two sides of the heavy cable saddle sliding platform; each group of bearing cables correspondingly penetrate through the heavy cable saddles, the two ends of each bearing cable are connected with bearing cable anchors buried in the side slope, one group of two heavy cranes is installed on the bearing cable on one side in a sliding mode, and a crane connecting rope is arranged between the heavy cranes of the other group; a steel cable of the traction winch positioned near the bearing cable anchor is connected with the heavy crane so as to pull the heavy crane to walk; and a steel cable of the hoisting winch positioned near the bearing cable anchor is connected with a hoisting device of the heavy crane. According to the four heavy crane sports car lifting structures, each sports car can bear 125 T, and the requirement that the component lifting weight reaches 500 T is met.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the field of mechanized equipment for bridge construction, and in particular to a transverse heavy-duty cable crane and a construction method. Background Art

[0002] In recent years, with the construction of large-span bridges, the continuous improvement of construction technology, and the overall progress of material production and machinery manufacturing technology, cable hoisting has become the most commonly used arch bridge installation equipment. The cable hoisting technology is developing in the direction of large cable spans, heavy hoists, and significantly improved hoisting system performance.

[0003] A certain project crosses a deep canyon. The span of the main bridge reaches 500m. It is the largest steel tube concrete arch bridge in China. The arch rib structure is complex, and the manufacturing, assembly accuracy, and linear control requirements are high. The weight of a single piece is large. In addition, the bridge site is a deep "V"-shaped canyon. There are more than 300 days of strong winds above level 6. Conventional cable hoisting technology is difficult to meet the needs of bridge construction. It is difficult to control the linear shape of small-segment hoisting construction, and the single hoisting weight of large-segment hoisting reaches 500T, which puts higher requirements on the existing cable crane equipment. Moreover, the cable crane suitable for this project has a high risk factor due to its variable load and huge structure. Improper operation is very likely to cause safety accidents, which may cause damage to equipment components at the least, or cause huge personnel and property losses at the worst. Therefore, the traditional manual control method can no longer meet the development needs of construction technology. Summary of the invention

[0004] The technical problem to be solved by the present invention is to provide a transverse heavy-duty cable crane and a construction method, which can meet the lifting and construction needs of heavy components, that is, it can lift components with a weight of up to 500 tons at a time, and at the same time can meet the needs of rapid lifting and construction of ordinary components, and can monitor the arch rib line shape, steel cable tensile deformation, and steel cable travel, thereby improving the automation and intelligence level of operation and reducing construction safety risks.

[0005] In order to solve the above technical problems, the technical solution of the present invention is: a transverse heavy-duty cable crane, comprising cable towers located at both ends of a bridge, a heavy-duty cable saddle sliding platform is provided on the top of the cable tower, a heavy-duty cable saddle is arranged on the heavy-duty cable saddle sliding platform so as to be laterally movable, the heavy-duty cable saddle is provided with pulleys corresponding to a traction cable, a load-bearing cable and a lifting cable respectively, and the heavy-duty cable saddle is connected to a transverse traction device to drive the heavy-duty cable saddle to slide laterally; There are at least two sets of heavy-duty saddles, which are located on both sides of the heavy-duty saddle sliding platform; Each group of load-bearing cables passes through the heavy-duty cable saddle, and both ends of the load-bearing cables are connected to the load-bearing cable anchors buried in the slope. A group of two heavy-duty cranes are slidably installed on the load-bearing cables on one side, and a crane connecting rope is provided between the heavy-duty cranes in a group; The steel cable of the traction winch located near the anchor of the load-bearing cable is connected to the heavy crane to pull the heavy crane to move; The steel cable of the hoisting winch located near the load-bearing cable anchor is connected to the hoisting device of the heavy crane.

[0006] In a preferred solution, the transverse traction device is a transverse winch or a transverse jack.

[0007] In a preferred solution, the load-bearing cables are arranged in double layers, and the heavy crane is provided with corresponding double-layer pulleys.

[0008] In a preferred solution, a steel cable stretching detection device is provided on the load-bearing cable, and the steel cable stretching detection device is provided with a steel cable stretching detection base which is sleeved on the load-bearing cable, and a plurality of steel cable stretching fixed heads pointing to the center of a circle are provided on the inner wall of the steel cable stretching detection base, and a plurality of steel cable stretching detection heads pointing to the center of a circle are also provided, and a stroke sensor is provided in the steel cable stretching detection head, and the steel cable stretching fixed head is used for fixed connection with the load-bearing cable, and the steel cable stretching detection head is used for detecting the diameter change of the load-bearing cable with a telescopic stroke.

[0009] In a preferred solution, there are two groups of load-bearing cables, which are located on both sides of the cable tower. Two heavy-duty cranes are arranged on the load-bearing cables on each side, and the two heavy-duty cranes are connected by a crane connecting rope.

[0010] In the preferred solution, a forward traction winch and a reverse traction winch are respectively provided on the slopes on both sides, and a plurality of traction rope steering anchors are also provided. The traction rope of the forward traction winch is sequentially passed through the heavy saddle, the pulley block composed of the movable pulley of the first heavy crane sports car and the traction rope steering anchor, and then connected to the anchor on the slope; The traction rope of the reverse traction winch passes through the heavy saddle, the pulley block composed of the movable pulley of the second heavy crane sports car and the traction rope steering anchor, and then is connected to the anchor on the slope; The first heavy crane sports car and the second heavy crane sports car are towed by a forward traction winch and a reverse traction winch; Two groups of hoisting winches are also provided, and the hoisting cables of the two groups of hoisting winches are respectively connected to the pulley blocks on the first heavy crane sports car and the second heavy crane sports car and then anchored to the hoisting cables on the slope.

[0011] In the preferred solution, a forward traction winch and a reverse traction winch are provided on one side of the slope, and multiple traction rope steering anchors are also provided on the two side slopes. The traction rope of the forward traction winch passes through the pulley block composed of the movable pulley of the second heavy crane sports car and the traction rope steering anchor, and then is connected to the reverse traction winch, and then passes through the pulley block composed of the movable pulley of the first heavy crane sports car and the traction rope steering anchor, and then is connected to the forward traction winch, forming a circulating traction structure; The first heavy crane sports car and the second heavy crane sports car are towed by a forward traction winch and a reverse traction winch; Two groups of hoisting winches are also provided, and the hoisting cables of the two groups of hoisting winches are respectively connected to the pulley blocks on the first heavy crane sports car and the second heavy crane sports car and then anchored to the hoisting cables on the slope.

[0012] In a preferred solution, a steel cable stretching detection device is provided on the lifting cable.

[0013] In the preferred scheme, the traction rope and the lifting rope are also provided with a steel cable travel detection device, the steel cable travel detection device is provided with a steel cable travel detection base installed in a relatively stationary part, the steel cable travel detection base is hinged to the steel cable travel detection swing arm, and is also provided with a steel cable travel detection spring for pressing the steel cable travel detection swing arm onto the steel cable, a steel cable travel detection detection head is provided at the end of the steel cable travel detection swing arm, and a Hall detection element is provided in the steel cable travel detection detection head.

[0014] In the preferred solution, a ground monitoring camera group is provided on the ground, and a tower top monitoring camera group is provided on the tower top, and the linearity and alignment of the arch rib and the steel box girder are monitored by the ground monitoring camera group and the tower top monitoring camera group; The ground monitoring camera group and the tower top monitoring camera group are electrically connected to the industrial control machine.

[0015] In a preferred solution, an attitude sensor is also provided on the hoisted arch rib main truss and the steel box girder, and the attitude sensor adopts a gyroscope or an acceleration sensor or a combination of a gyroscope and an acceleration sensor; The attitude sensor is electrically connected to the industrial control machine.

[0016] In the preferred solution, a working crane is also provided, and the working crane is located below the heavy crane; The load-bearing cable of the working crane passes through the working cable saddle on the cable tower and the working crane sports car, and the two ends of the load-bearing cable are connected to the load-bearing cable anchors on the slopes on both sides; The traction rope of the forward working winch of the working crane passes through the working rope saddle, the movable pulley at one end of the working crane sports car and the pulley block composed of the traction rope steering anchor anchored on the slope, and is connected to the reverse working winch, and then passes through the movable pulley at the other end of the working crane sports car and another pulley block composed of the traction rope steering anchor anchored on the slope, and is connected to the forward working winch, forming a circulating traction structure; The lifting working winch of the working crane is fixed on the slope. The lifting rope of the lifting working winch passes through the working rope saddle at one end and the lifting pulley block on the working crane sports car, and then passes through the working rope saddle at the other end to be connected with the slope lifting anchor.

[0017] In the preferred solution, there are two groups of working saddles, which are located on both sides of the cable tower and below the heavy saddle; The two sets of working saddles are connected by a sliding screw; There are also two groups of working cranes, load-bearing cables, traction cables and lifting cables.

[0018] In the preferred solution, an industrial computer, a ground monitoring camera group, an aerial monitoring camera group, a positioning data acquisition device, a leveling and positioning acquisition device and a wireline data acquisition device are also provided, and are connected to the industrial computer in a wired or wireless manner; Industrial computers are also used to output device control instructions.

[0019] A construction method using the above-mentioned transverse heavy-duty cable crane comprises the following steps: S1, construct the arch seat and the integrated operation platform simultaneously. The integrated operation platform is located between the two end buckle towers; S2. Construction of anchor foundation; S3. Set up a temporary working crane; S4. Build a temporary road from the maximum lifting area of ​​the temporary crane to the anchor foundation, use the temporary crane to transport equipment and materials, and complete the anchor construction; S5. Use a temporary working crane to transport the materials of the cable tower and tower crane to the abutment location; S6. When the temporary working crane is used to erect the tower crane to its maximum lifting height, the temporary working crane on one side close to the tower crane is removed, and the tower crane is used to complete the cable tower construction; S7. After the cable tower is erected, the temporary working crane is dismantled; S8. Use tower crane to complete the installation of load-bearing cables, traction cables, lifting cables, crane cars and winches for heavy cranes and working cranes; S9. Use the working crane to construct the handover pier body and 0# block, and the side pier foundation and pier body; S10. Use a working crane to construct cable anchors and towers; S11. Construct a sliding construction platform between the cable tower and the buckle tower, and the sliding construction platform also serves as a transverse platform for the steel box girder; S12. Assemble the arch rib trusses on the integrated construction platform, use heavy cranes to hoist the arch rib segments, install cross-connections between arch ribs, and hang corresponding buckle cables and back cables; Monitor the cable tension, arch stress and line shape, and adjust the cable tension according to the monitoring results; Repeat this step until the arch foot section concrete is poured before the closing section is installed.

[0020] S13, adjust the horizontal, transverse and vertical positions of the arch ribs in the mid-span closing section, and close the arch ribs; The outer and inner steel tube concrete of the lower chord, and the outer and inner steel tube concrete of the upper chord are poured in sequence; After the concrete in the pipe reaches the designed strength, remove the cables and back cables of the tower and arch ribs; S14, construct the columns on the arch, and use a heavy crane to hoist the steel diagonal braces of the columns; S15, construction cast-in-place hanging basket; S16. The heavy crane hoists the steel box girder to the sliding construction platform and moves it horizontally. The cable hoist saddle and the anchor end are synchronously moved horizontally to the installation axis position of the steel box girder without load. The steel box girder is hoisted again and moved longitudinally to the installation position to drop the hook, thus completing the installation of the steel box girder. The T-structure concrete beams are cast in situ section by section using a hanging basket; S17, pouring concrete beams on the cast-in-place bracket to complete the jointing of the concrete main beam; S18, construct the bridge deck system and auxiliary structures, dismantle the heavy crane and working crane, and complete the construction of the entire bridge.

[0021] In a preferred solution, in step 12, monitoring cameras are provided on the ground and on the top of the tower to monitor the line shape of the arch ring, including the following steps: S121. Establish a virtual model according to the design data, simulate a model consistent with the construction progress in the virtual model, and set a monitoring camera corresponding to the reality in the virtual model; S122, calibrating the direction and field of view of the surveillance camera in the virtual model to be consistent with the actual surveillance camera; S122, collecting monitoring images of various real monitoring cameras, obtaining monitoring images of monitoring cameras in the virtual model, comparing the contours of the arch ring part, and obtaining adjustment feedback data of the arch ring line type.

[0022] In a preferred solution, a steel cable tensile detection device is provided on the buckle cable to monitor the tension of the buckle cable, including the following steps: S1201, sleeve the steel cable stretching detection device onto the steel cable of the buckle cable, so that the buckle cable is naturally vertical, at this time, calibrate the stroke of the steel cable stretching detection head to zero, stretch multiple preset weights, calibrate the stroke of the steel cable stretching detection head to the corresponding weight, and establish a functional relationship between the stretching weight and the stroke of the steel cable stretching detection head; S1202, installing a steel cable tensile testing device on each buckle cable and back cable; According to the design requirements, the preset tension of each buckle cable and back cable is obtained, compared with the measured tension data of the steel cable tensile test head, and the buckle cable tension is adjusted according to the difference with the preset tension.

[0023] In a preferred solution, a steel cable tensile testing device is provided on the load-bearing cable to compare the test data with the preset load-bearing data. If the preset data is exceeded, an alarm is sounded and the machine is shut down for inspection.

[0024] In a preferred solution, during traction, a steel cable travel detection device is arranged on a fixed part of a traction winch, a cable saddle, a crane runner or a steering anchor of the traction cable, and a steel cable travel detection head is pressed against the traction cable to obtain travel data of the traction cable, and the travel data is compared with preset traction data to realize automatic traction control.

[0025] In the preferred solution, the lifting operation includes the following steps: Sa01. Install the wire rope travel detection device on the fixed part of the hoisting winch, cable saddle or fixed pulley of the sports car, press the wire rope travel detection head on the hoisting rope, thereby obtaining the travel data of the hoisting rope, compare the travel data with the preset hoisting data, and realize the automatic control of hoisting; At the same time, the steel cable tensile testing device is sleeved on the lifting cable to obtain the tension data of the lifting cable. When the tension data exceeds the preset value, an alarm is sounded and the machine is shut down for inspection. At the same time, a posture sensor is set on the component to be lifted to obtain the lifting posture of the component; Sa02, when lifting, first check whether the tension of the lifting cable exceeds the expectation, otherwise proceed to the next step; Sa03. Calculate the travel of each lifting rope according to the design data, and adjust the aerial posture of the component by adjusting the travel of each lifting rope before dropping the hook; Correct the posture and position of the component using data obtained from posture sensors and surveillance cameras; Through the above steps, the automatic lifting of components can be achieved.

[0026] The present invention provides a transverse heavy-duty cable crane and a construction method, which can achieve the following beneficial effects by adopting the above structure: 1. The present invention provides four heavy-duty crane carriage lifting structures, each of which has a load-bearing capacity of 125 tons, meeting the requirement that the component lifting weight reaches 500 tons.

[0027] 2. The double-layer load-bearing rope and the corresponding heavy-duty rope saddle structure provided in the present invention ensure that the load-bearing requirements of the heavy-duty crane sports car are met in a relatively small space.

[0028] 3. The working crane provided in the present invention meets the hoisting requirements of other lighter components, can assist the installation of heavy cranes, and ensure construction efficiency.

[0029] 4. The monitoring camera, attitude sensor, cable travel detection device and cable tension detection device provided in the present invention, in conjunction with the information, automation and intelligent system, can assist in monitoring and adjusting the arch rib line shape, monitoring load-bearing safety, monitoring traction accuracy, monitoring lifting attitude, lifting accuracy and lifting safety. The information, automation and intelligent control are realized, and the construction quality is ensured under the premise of ensuring the safety of large-span bridge construction under harsh construction conditions.

[0030] 5. The construction method of the present invention improves the construction efficiency of long-span bridges, reduces the number of personnel, lowers the quality requirements for operators, and reduces construction risks. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] The present invention will be further described below in conjunction with the accompanying drawings and embodiments: Figure 1 It is the overall structural front view of the present invention.

[0032] Figure 2 It is a top view of the overall structure of the present invention.

[0033] Figure 3 It is the front view of the load-bearing cable in the present invention.

[0034] Figure 4 It is a top view of the load-bearing cable in the present invention.

[0035] Figure 5 It is a schematic diagram of the connection structure of the traction rope and the lifting rope of the heavy crane in the present invention.

[0036] Figure 6 It is a schematic diagram of the connection structure of the traction rope and the lifting rope of the working crane in the present invention.

[0037] Figure 7 It is a structural schematic diagram of the cable tower in the present invention.

[0038] Figure 8 It is a front view schematic diagram of the present invention when multiple heavy-duty cranes are lifting the arch rib truss.

[0039] Fig. 9 It is a side view schematic diagram of the present invention when multiple heavy-duty cranes are lifting the arch rib truss.

[0040] Fig.10 It is a front view schematic diagram of the present invention when multiple heavy-duty cranes are lifting a steel box girder.

[0041] Fig.11 It is a schematic diagram of the main structure of the temporary working crane in the present invention.

[0042] Fig.12 It is a schematic diagram of the main structure of the working saddle of the temporary working crane in the present invention.

[0043] Fig.13 It is a schematic diagram of the side view structure of the working saddle of the temporary working crane in the present invention.

[0044] Fig.14 It is a structural block diagram of the control system in the present invention.

[0045] Fig.15 It is a structural schematic diagram of the wire rope travel detection device in the present invention.

[0046] Fig.16 It is a schematic diagram of the structure of the steel cable tensile testing device in the present invention.

[0047] Fig.17 It is a construction step diagram of a temporary working crane for a bridge in the present invention.

[0048] Fig.18 It is a construction step diagram of the heavy crane of the bridge in the present invention.

[0049] Fig.19 It is a construction step diagram of the arch rib of the bridge in the present invention.

[0050] Fig. 20 It is a construction step diagram of closing the arch ribs and erecting the columns of the bridge in the present invention.

[0051] Fig.21 It is a construction step diagram of the steel box girder of the bridge in the present invention.

[0052] In the figure: wind cable 1, cable tower 2, heavy-duty saddle sliding platform 201, working saddle sliding platform 202, sliding screw 203, working saddle 204, heavy-duty saddle 205, transverse jack 206, traction cable 3, load-bearing cable 4, upper load-bearing cable 401, lower load-bearing cable 402, lifting cable 5, first lifting cable 51, second lifting cable 52, traction winch 6, forward traction winch 601, reverse traction winch 602, lifting winch 7, load-bearing cable anchor 8, buckle cable anchor 9, buckle tower 10, heavy-duty crane 11, first heavy-duty crane sports car 111, crane connecting rope 112, second heavy-duty crane sports car 113, heavy-duty crane fixed pulley block 114, heavy-duty crane movable pulley block 115, heavy-duty crane sling 116, working crane 12, comprehensive construction platform 13, Sliding construction platform 14, lifting cable anchor 15, traction cable steering anchor 16, transverse wind cable 17, cable tower top beam 18, working winch 19, forward working winch 191, reverse working winch 192, lifting working winch 20, working crane sports car 21, working crane sling 22, arch seat 23, arch rib truss 24, steel box girder 25, tower crane 26, steel cable travel detection device 27, steel cable travel detection base 271, steel cable travel detection spring 272, steel cable travel detection swing arm 273, steel cable travel detection head 274, steel cable travel cushion 275, steel cable tension detection device 28, steel cable tension detection base 281, steel cable tension detection head 282, steel cable tension fixed head 283, buckle cable 29, hanging basket 30, arch upper column 31, steel box girder 32. DETAILED DESCRIPTION

[0053] Embodiment 1: like Figure 1 , 2 In the invention, a transverse heavy-duty cable crane comprises a cable tower 2 located at both ends of a bridge, a heavy-duty cable saddle sliding platform 201 is arranged on the top of the cable tower 2, a heavy-duty cable saddle 205 is arranged on the heavy-duty cable saddle sliding platform 201 so as to be laterally movable, the heavy-duty cable saddle 205 is provided with pulleys corresponding to a traction cable 3, a load-bearing cable 4 and a lifting cable 5 respectively, and the heavy-duty cable saddle 205 is connected to a transverse traction device to drive the heavy-duty cable saddle 205 to slide laterally; like Figure 5 , 7 In the embodiment, there are at least two groups of heavy-duty saddles 205, which are respectively located on both sides of the heavy-duty saddle sliding platform 201; like Figure 3 , 4 In the figure, each group of load-bearing cables 4 passes through the heavy-duty saddle 205, and both ends of the load-bearing cables 4 are connected to the load-bearing cable anchors 8 buried in the slope. A group of two heavy-duty cranes 11 are slidably installed on the load-bearing cables 4 on one side, and a crane connecting rope 112 is provided between the heavy-duty cranes 11 in a group; in this example, the lifting capacity of each heavy-duty crane 11 is 125T, and the total lifting capacity can reach 500T.

[0054] like Figure 5 In the figure, the steel cable of the traction winch 6 located near the load-bearing cable anchor 8, that is, the traction cable 3 is connected to the heavy crane 11 to pull the heavy crane 11 to travel; like Figure 5 In the embodiment, the steel cable of the hoisting winch 7 located near the load-bearing cable anchor 8 is connected to the hoisting device of the heavy crane 11.

[0055] The preferred solution is Figure 7 In the embodiment, the lateral traction device is a lateral winch or a lateral jack 206. In this embodiment, the lateral jack 206 is preferably used, and the reaction seat of the lateral jack 206 is connected to the heavy-duty saddle sliding platform 201 through a pin shaft, so as to drive the heavy-duty saddle 205 to slide laterally in a creeping manner. The creeping in this embodiment means that after a certain distance of lateral movement, continuous movement is achieved by switching the connection position between the reaction seat and the heavy-duty saddle sliding platform 201.

[0056] The preferred solution is Figure 3 In the embodiment, the load-bearing cable 4 is arranged in double layers, and the heavy crane 11 is provided with corresponding double-layer pulleys. The double-layer structure can reduce the installation position and make the structure more compact.

[0057] The preferred solution is Fig.16 In the embodiment, a steel cable stretch detection device 28 is provided on the load-bearing cable 4. The steel cable stretch detection device 28 is provided with a steel cable stretch detection base 281 sleeved on the load-bearing cable 4. A plurality of steel cable stretch fixing heads 283 pointing to the center of the circle are provided on the inner wall of the steel cable stretch detection base 281. The end of the steel cable stretch fixing head (283) is provided with an elastic element, such as a rubber sleeve, which is used to adapt to the diameter deformation of the steel cable and ensure a reliable fixed connection with the steel cable. A plurality of steel cable stretch detection heads 282 pointing to the center of the circle are also provided. A travel sensor is provided in the steel cable stretch detection head 282. The steel cable stretch fixing head 283 is used to be fixedly connected to the load-bearing cable 4. The steel cable stretch detection head 282 is used to detect the diameter change of the load-bearing cable 4 with a telescopic travel. The principle of the steel cable stretch detection device 28 is that when the load-bearing cable 4 is subjected to tension, the load-bearing cable 4 will be stretched and deformed, and the diameter of the load-bearing cable 4 will be reduced. The degree of diameter change is linearly related to the weight borne. Different from the prior art which mainly relies on steel cable tensile testing and setting a high degree of redundancy to ensure safety, the present invention adopts a steel cable tensile detection device 28 which can detect the tensile condition of the load-bearing cable 4 in real time, thereby ensuring the safety of the entire cable crane system, especially the safety during lifting, transportation and assembly.

[0058] The preferred solution is Figure 4In the embodiment, there are two groups of load-bearing cables 4, which are located on both sides of the cable tower 2. Two heavy cranes 11 are arranged on the load-bearing cables 4 on each side, and the two heavy cranes 11 are connected by a crane connecting rope 112. In the preferred solution, each steel cable of each group of load-bearing cables 4 is provided with a steel cable tensile detection device 28.

[0059] The preferred solution is Figure 5 In the embodiment, a forward traction winch 601 and a reverse traction winch 602 are respectively provided on the slopes on both sides, and a plurality of traction rope steering anchors 16 are also provided. The traction rope 3 of the forward traction winch 601 is sequentially passed around the heavy saddle 205, the pulley block composed of the movable pulley of the first heavy crane carriage 111 and the traction rope steering anchor 16, and then connected to the anchor on the slope; The traction rope 3 of the reverse traction winch 602 is passed through the heavy saddle 205, the pulley block composed of the movable pulley of the second heavy crane carriage 113 and the traction rope steering anchor 16 in sequence, and then connected to the anchor on the slope; The first heavy crane sports car 111 and the second heavy crane sports car 113 are towed by the forward traction winch 601 and the reverse traction winch 602; Two groups of hoisting winches 7 are also provided, and the hoisting ropes 5 of the two groups of hoisting winches 7 are respectively connected to the pulley blocks on the first heavy crane carriage 111 and the second heavy crane carriage 113 and then connected to the hoisting rope anchors 15 on the slope.

[0060] The preferred solution is Figure 5 In the embodiment, a forward traction winch 601 and a reverse traction winch 602 are provided on one side of the slope, and a plurality of traction rope steering anchors 16 are provided on the two side slopes. The traction rope 3 of the forward traction winch 601 passes through a pulley block composed of a movable pulley of the second heavy crane sports car 113 and the traction rope steering anchor 16, and then is connected to the reverse traction winch 602. Then, the traction rope 3 passes through a pulley block composed of a movable pulley of the first heavy crane sports car 111 and the traction rope steering anchor 16, and then is connected to the forward traction winch 601, forming a circulating traction structure. The first heavy crane sports car 111 and the second heavy crane sports car 113 are towed by the forward traction winch 601 and the reverse traction winch 602; Two groups of hoisting winches 7 are also provided, and the hoisting ropes 5 of the two groups of hoisting winches 7 are respectively connected to the pulley blocks on the first heavy crane carriage 111 and the second heavy crane carriage 113 and then connected to the hoisting rope anchors 15 on the slope.

[0061] In a preferred solution, a steel cable stretching detection device 28 is provided on the lifting cable 5 .

[0062] The preferred solution is Fig.15In the embodiment, the traction rope 3 and the lifting rope 5 are also provided with a cable travel detection device 27, which is provided with a cable travel detection base 271 installed in a relatively stationary part, the cable travel detection base 271 is hinged with a cable travel detection swing arm 273, and is also provided with a cable travel detection spring 272 for pressing the cable travel detection swing arm 273 against the cable, and a cable travel detection detection head 274 is provided at the end of the cable travel detection swing arm 273, and a Hall detection element is provided in the cable travel detection detection head 274. When a relative displacement occurs between the cable travel detection detection head 274 and the cable, such as the traction rope 3 and the lifting rope 5, the Hall detection element can detect the texture change on the surface of the cable, form an electric pulse, and obtain the cable travel according to the electric pulse. The cable travel detection device 27 can more accurately control the spatial position and posture of the lifting component.

[0063] The preferred solution is Fig.14 In the process, a ground monitoring camera group is provided on the ground, and a tower top monitoring camera group is provided on the tower top, and the line type and alignment of the arch rib and the steel box girder 25 are monitored by the ground monitoring camera group and the tower top monitoring camera group; The ground monitoring camera group and the tower top monitoring camera group are electrically connected to the industrial control machine.

[0064] The preferred solution is Figure 8 , 10 In the embodiment, an attitude sensor is also provided on the hoisted arch rib main truss 24 and the steel box girder 25. The attitude sensor adopts a gyroscope or an acceleration sensor or a combination of a gyroscope and an acceleration sensor; The posture sensor is electrically connected to the industrial control machine. According to this scheme, the posture of the lifting component, that is, the arch rib truss 24 or the steel box girder 25, can be corrected by controlling the traction cable 3 and the lifting cable 5 through the posture data obtained, which can assist in alignment and assembly and ensure assembly accuracy.

[0065] The preferred solution is Fig.11 In the embodiment, a working crane 12 is also provided, and the working crane 12 is located below the heavy crane 11; The load-bearing cable 4 of the working crane 12 passes through the working cable saddle 204 on the cable tower 2 and the working crane sports car 21, and both ends of the load-bearing cable 4 are connected to the load-bearing cable anchors 8 on the slopes on both sides; like Figure 6In the embodiment, the traction rope of the forward working winch 191 of the working crane 12 passes through the working rope saddle 204, the movable pulley at one end of the working crane sports car 21 and the traction rope steering anchor 16 anchored on the slope, and is connected to the reverse working winch 192, and then passes through the movable pulley at the other end of the working crane sports car 21 and another set of pulleys consisting of the traction rope steering anchor 16 anchored on the slope, and is connected to the forward working winch 191, forming a circulating traction structure; the working crane 12 is used to lift or transport lighter accessories. In this example, the lifting weight of the working crane 12 is 60T.

[0066] like Figure 6 In the figure, the lifting working winch 20 of the working crane 12 is fixed on the slope, and the lifting rope of the lifting working winch 20 passes through the working rope saddle 204 at one end and the lifting pulley block on the working crane sports car 21, and then passes through the working rope saddle 204 at the other end to be connected with the slope lifting anchor.

[0067] The preferred solution is Figure 7 In the figure, there are two groups of working saddles 204, which are respectively located on both sides of the cable tower 2 and below the heavy saddle 205; Two sets of working saddles 204 are connected by a sliding screw 203; The working crane 12, the load-bearing rope 4, the traction rope and the lifting rope are also two groups.

[0068] The preferred solution is Fig.14 In the system, there is also an industrial computer, a ground monitoring camera group, an aerial monitoring camera group, a positioning data acquisition device, a leveling and positioning acquisition device and a wireline data acquisition device connected to the industrial computer in a wired or wireless manner; The industrial computer is also used to output device control instructions. Based on the data from the ground monitoring camera group, the aerial monitoring camera group, the alignment data acquisition device, and the leveling and positioning acquisition device, the industrial computer outputs instructions to control the forward traction winch 601, the reverse traction winch 602, the forward working winch 191, the reverse working winch 192, the hoisting winch 7 or the hoisting working winch 20, thereby realizing intelligent auxiliary assembly. Taking the posture as an example, the advantage of the heavy crane is that it can easily adjust the posture of the lifting component. Taking the arch rib truss 24 as an example, according to the detected posture data of the arch rib truss 24, the position along the bridge direction is adjusted by controlling the traction cable 3, and the stroke of the first hoisting cable 51 or the second hoisting cable 52 is adjusted by controlling the two groups of hoisting winches 7 respectively, thereby controlling the aerial posture of the arch rib truss 24.

[0069] Embodiment 2: like Figures 17 to 21 A construction method using the above-mentioned transverse heavy cable crane comprises the following steps: S1, construct the arch seat and simultaneously construct the integrated working platform, which is located between the buckle towers 10 at both ends; S2. Construction of anchor foundation; S3. Set up a temporary working crane; the piers of the temporary working crane are as follows: Fig.12 , 13 as shown in .

[0070] S4. Build a temporary road from the maximum lifting area of ​​the temporary crane to the anchor foundation, use the temporary crane to transport equipment and materials, and complete the anchor construction; S5, using a temporary working crane to transport the materials of the cable tower 2 and the tower crane 26 to the abutment position; S6. When the temporary working crane is used to erect the tower crane 26 to the maximum lifting height of the temporary working crane, the temporary working crane on the side close to the tower crane 26 is removed, and the tower crane 26 is used to complete the construction of the cable tower 2; S7. After the erection of cable tower 2 is completed, the temporary working crane is removed; S8, using the tower crane 26 to complete the installation of the load-bearing cable 4, the traction cable 3, the lifting cable 5, the crane sports car and the winch of the heavy crane 11 and the working crane 12; S9. Use the working crane 12 to construct the handover pier body and 0# block, and construct the side pier foundation and pier body; S10, using the working crane 12 to construct the cable anchor 9 and the anchor tower 10; S11, constructing a sliding construction platform 14 between the cable tower 2 and the buckle tower 10, the sliding construction platform 14 also serves as a transverse platform for the steel box girder 25; S12, assembling the arch rib truss 24 on the integrated construction platform 13, using the heavy crane 11 to hoist the arch rib segments and install the cross-connections between the arch ribs, and hanging the corresponding buckle cables 29 and back cables; Monitor the cable tension, arch stress and line shape, and adjust the cable tension according to the monitoring results; Repeat this step until the arch foot section concrete is poured before the closing section is installed.

[0071] S13, adjust the horizontal, transverse and vertical positions of the arch ribs in the mid-span closing section, and close the arch ribs; The outer and inner steel tube concrete of the lower chord, and the outer and inner steel tube concrete of the upper chord are poured in sequence; After the concrete in the pipe reaches the designed strength, the buckle tower 10 and the buckle cables 29 and back cables of the arch ribs are removed; S14, construct the upper column of the arch, and the heavy crane 11 hoists the steel diagonal brace of the column; S15, construction cast-in-place hanging basket; S16, the heavy crane 11 lifts the steel box girder 25 to the sliding construction platform 14 and moves it horizontally, the cable saddle and the anchor end are synchronously moved horizontally to the installation axis position of the steel box girder without load, and the steel box girder 25 is lifted again and moved longitudinally to the installation position to drop the hook, thus completing the installation of the steel box girder 25; The T-structure concrete beams are cast in situ section by section using a hanging basket; S17, pouring concrete beams on the cast-in-place bracket to complete the jointing of the concrete main beam; S18, construct the bridge deck system and auxiliary structures, dismantle the heavy crane 11 and working crane 12, and complete the construction of the entire bridge.

[0072] The preferred solution is Fig.14 In step 12, monitoring cameras are provided on the ground and on the top of the tower to monitor the line shape of the arch ring, including the following steps: S121. Establish a virtual model according to the design data, simulate a model consistent with the construction progress in the virtual model, and set a monitoring camera corresponding to the reality in the virtual model; S122, calibrating the direction and field of view of the surveillance camera in the virtual model to be consistent with the actual surveillance camera; S122, collect monitoring images of each monitoring camera in reality, obtain monitoring images of the monitoring camera in the virtual model, compare the contour of the arch ring part, and obtain adjustment feedback data of the arch ring line type. In this step, the image of the model collected by the monitoring camera in the virtual model is consistent with the image collected by the monitoring camera in reality, so that after inputting the image data in reality into the virtual model, the difference between the spatial position and spatial posture of the component in reality and the designed component can be obtained, so as to adjust by controlling the traction rope 3 and the lifting rope 5.

[0073] In a preferred solution, a steel cable tension detection device 28 is provided on the buckle cable 29 to monitor the tension of the buckle cable 29, including the following steps: S1201, the steel cable stretching detection device 28 is sleeved on the steel cable of the buckle cable 29, so that the buckle cable 29 is naturally vertical, at this time, the stroke of the steel cable stretching detection head 282 is calibrated to zero, multiple preset weights are stretched, and the stroke of the steel cable stretching detection head 282 is calibrated to the corresponding weight, and a functional relationship between the stretched weight and the stroke of the steel cable stretching detection head 282 is established; S1202, installing a steel cable tensile testing device 28 on each buckle cable 29 and back cable; According to the design requirements, the preset tension of each buckle cable 29 and back cable is obtained, compared with the measured tension data of the steel cable tensile test head 282, and the buckle cable tension is adjusted according to the difference with the preset tension.

[0074] In a preferred solution, a steel cable stretching detection device 28 is provided on the load-bearing cable 4 to compare the detection data with the preset load-bearing data. If the preset data is exceeded, an alarm is sounded and the machine is shut down for inspection.

[0075] In the preferred solution, the lifting operation includes the following steps: Sa01, the wire rope travel detection device 27 is set on the fixed part of the hoisting winch 7, the cable saddle or the fixed pulley of the sports car, and the wire rope travel detection detection head 274 is pressed tightly on the hoisting rope 5, thereby obtaining the travel data of the hoisting rope 5, and comparing the travel data with the preset hoisting data to realize the automatic control of hoisting; At the same time, the wire rope tensile detection device 28 is sleeved on the lifting rope 5, thereby obtaining the tension data of the lifting rope 5. When the tension data exceeds the preset value, an alarm is sounded and the machine is shut down for inspection; At the same time, a posture sensor is set on the component to be lifted to obtain the lifting posture of the component; Sa02. When lifting, first check whether the tension of the lifting rope 5 exceeds expectations, otherwise proceed to the next step; if it does, an alarm will be sounded and the machine will be shut down for investigation.

[0076] Sa03. Calculate the stroke of each lifting cable 5 according to the design data, and adjust the aerial posture of the component by adjusting the stroke of each lifting cable 5 before dropping the hook; Correct the posture and position of the component using data obtained from posture sensors and surveillance cameras; Through the above steps, the automatic lifting of components can be achieved.

[0077] The above-mentioned embodiments are only preferred technical solutions of the present invention and should not be regarded as limitations of the present invention. The embodiments and features in the embodiments of the present application can be arbitrarily combined with each other without conflict. The protection scope of the present invention shall be the technical solutions recorded in the claims, including the equivalent replacement solutions of the technical features in the technical solutions recorded in the claims. That is, equivalent replacement improvements within this scope are also within the protection scope of the present invention.

Claims

1. A transverse heavy-duty cable crane, characterized in that: The invention comprises cable towers (2) located at both ends of the bridge, a heavy-duty cable saddle sliding platform (201) being provided on the top of the cable tower (2), a heavy-duty cable saddle (205) being arranged on the heavy-duty cable saddle sliding platform (201) so as to be laterally movable, the heavy-duty cable saddle (205) being provided with pulleys respectively corresponding to the traction cable (3), the load-bearing cable (4) and the lifting cable (5), and the heavy-duty cable saddle (205) being connected to a transverse traction device so as to drive the heavy-duty cable saddle (205) to slide laterally; At least two groups of heavy-duty saddles (205) are respectively located on both sides of the heavy-duty saddle sliding platform (201); Each group of load-bearing cables (4) passes through a heavy-duty cable saddle (205) respectively, and both ends of the load-bearing cables (4) are connected to load-bearing cable anchors (8) buried in the slope. A group of two heavy-duty cranes (11) are slidably mounted on the load-bearing cables (4) on one side, and a crane connecting rope (112) is provided between the heavy-duty cranes (11) in a group; The steel cable of the traction winch (6) located near the load-bearing cable anchor (8) is connected to the heavy crane (11) to pull the heavy crane (11) to move; The steel cable of the hoisting winch (7) located near the load-bearing cable anchor (8) is connected to the hoisting device of the heavy crane (11).

2. The lateral heavy-duty cable crane according to claim 1 is characterized in that: The transverse traction device is a transverse winch or a transverse jack (206).

3. The traverse heavy-duty cable crane according to claim 1 is characterized in that: The load-bearing cables (4) are arranged in double layers, and the heavy crane (11) is provided with corresponding double-layer pulleys.

4. The traverse heavy-duty cable crane according to claim 3 is characterized in that: A steel cable stretch detection device (28) is provided on the load-bearing cable (4). The steel cable stretch detection device (28) is provided with a steel cable stretch detection base (281) sleeved on the load-bearing cable (4). A plurality of steel cable stretch fixing heads (283) pointing to the center of a circle are provided on the inner wall of the steel cable stretch detection base (281). A plurality of steel cable stretch detection heads (282) pointing to the center of a circle are also provided. A travel sensor is provided in the steel cable stretch detection head (282). The steel cable stretch fixing head (283) is used for fixed connection with the load-bearing cable (4). The steel cable stretch detection head (282) is used for detecting a diameter change of the load-bearing cable (4) by a telescopic travel.

5. The traverse heavy-duty cable crane according to any one of claims 1 to 4, characterized in that: There are two groups of load-bearing cables (4), which are located on both sides of the cable tower (2). Two heavy cranes (11) are arranged on the load-bearing cables (4) on each side, and the two heavy cranes (11) are connected via a crane connecting rope (112).

6. The traverse heavy-duty cable crane according to claim 5 is characterized in that: The side slopes on both sides are respectively provided with a forward traction winch (601) and a reverse traction winch (602), and are also provided with a plurality of traction rope steering anchors (16). The traction rope (3) of the forward traction winch (601) is sequentially passed through a heavy saddle (205), a pulley block consisting of a movable pulley of a first heavy crane carriage (111) and the traction rope steering anchor (16), and then connected to the anchor on the side slope; The traction rope (3) of the reverse traction winch (602) is passed through the heavy saddle (205), a pulley block consisting of a movable pulley of the second heavy crane carriage (113) and a traction rope steering anchor (16) in sequence, and then connected to an anchor on the slope; The first heavy crane carriage (111) and the second heavy crane carriage (113) are towed to move by a forward traction winch (601) and a reverse traction winch (602); Two sets of hoisting winches (7) are also provided. The hoisting cables (5) of the two sets of hoisting winches (7) are respectively connected to the pulley blocks on the first heavy crane carriage (111) and the second heavy crane carriage (113), and then connected to the hoisting cable anchors (15) on the slope.

7. The traverse heavy-duty cable crane according to claim 5 is characterized in that: A forward traction winch (601) and a reverse traction winch (602) are provided on one side of the slope, and a plurality of traction rope steering anchors (16) are also provided on the two side slopes. The traction rope (3) of the forward traction winch (601) passes through a pulley block composed of a movable pulley of a second heavy crane carriage (113) and the traction rope steering anchor (16) and is connected to the reverse traction winch (602). The traction rope (3) passes through a pulley block composed of a movable pulley of a first heavy crane carriage (111) and the traction rope steering anchor (16) and is connected to the forward traction winch (601), thereby forming a circulating traction structure. The first heavy crane carriage (111) and the second heavy crane carriage (113) are towed to move by a forward traction winch (601) and a reverse traction winch (602); Two sets of hoisting winches (7) are also provided. The hoisting cables (5) of the two sets of hoisting winches (7) are respectively connected to the pulley blocks on the first heavy crane carriage (111) and the second heavy crane carriage (113), and then connected to the hoisting cable anchors (15) on the slope.

8. The traverse heavy-duty cable crane according to claim 6 or 7, characterized in that: A steel cable tensile detection device (28) is provided on the lifting cable (5).

9. The traverse heavy-duty cable crane according to claim 6 or 7, characterized in that: A cable travel detection device (27) is also provided on the traction cable (3) and the lifting cable (5). The cable travel detection device (27) is provided with a cable travel detection base (271) installed on a relatively stationary portion. The cable travel detection base (271) is hingedly connected to a cable travel detection swing arm (273). A cable travel detection spring (272) is provided for pressing the cable travel detection swing arm (273) against the cable. A cable travel detection detection head (274) is provided at the end of the cable travel detection swing arm (273). A Hall detection element is provided in the cable travel detection detection head (274).

10. The traverse heavy-duty cable crane according to claim 1, characterized in that: A ground monitoring camera group is provided on the ground, and a tower top monitoring camera group is provided on the tower top, and the line type and alignment of the arch rib and the steel box girder (25) are monitored by the ground monitoring camera group and the tower top monitoring camera group; The ground monitoring camera group and the tower top monitoring camera group are electrically connected to the industrial control machine.

11. The traverse heavy-duty cable crane according to claim 1 is characterized in that: The hoisted arch rib main truss (24) and the steel box girder (25) are also provided with an attitude sensor, which adopts a gyroscope or an acceleration sensor or a combination of a gyroscope and an acceleration sensor; The attitude sensor is electrically connected to the industrial control machine.

12. The traverse heavy-duty cable crane according to claim 1, characterized in that: A working crane (12) is also provided, and the working crane (12) is located below the heavy crane (11); The load-bearing cable (4) of the working crane (12) passes through the working cable saddle (204) on the cable tower (2) and the working crane sports car (21), and both ends of the load-bearing cable (4) are connected to the load-bearing cable anchors (8) on the slopes on both sides; The traction rope of the forward working winch (191) of the working crane (12) passes through the working rope saddle (204), the movable pulley at one end of the working crane sports car (21) and the traction rope steering anchor (16) anchored on the slope to form a pulley block, and is connected to the reverse working winch (192), and then passes through another pulley block consisting of the movable pulley at the other end of the working crane sports car (21) and the traction rope steering anchor (16) anchored on the slope to be connected to the forward working winch (191), thereby forming a circulating traction structure; The lifting working winch (20) of the working crane (12) is fixedly arranged on the side slope, and the lifting rope of the lifting working winch (20) passes through the working rope saddle (204) at one end and the lifting pulley block on the working crane sports car (21), and then passes through the working rope saddle (204) at the other end to be connected with the side slope lifting anchor.

13. The traverse heavy-duty cable crane according to claim 12, characterized in that: There are two groups of working saddles (204), which are respectively located on both sides of the cable tower (2) and below the heavy saddle (205); Two sets of working saddles (204) are connected via a sliding screw (203); The working crane (12), the load-bearing rope (4), the traction rope and the lifting rope also form two groups.

14. The traverse heavy-duty cable crane according to claim 1, characterized in that: It is also equipped with an industrial computer, a ground monitoring camera group, an aerial monitoring camera group, a positioning data acquisition device, a leveling and positioning acquisition device, and a wireline data acquisition device connected to the industrial computer in a wired or wireless manner; Industrial computers are also used to output device control instructions.

15. A construction method using the transverse heavy-duty cable crane according to any one of claims 1 to 14, characterized in that The following steps are involved: S1, constructing the arch seat and simultaneously constructing the integrated working platform, the integrated working platform is located between the two end buckle towers (10); S2. Construction of anchor foundation; S3. Set up a temporary working crane; S4. Build a temporary road from the maximum lifting area of ​​the temporary crane to the anchor foundation, use the temporary crane to transport equipment and materials, and complete the anchor construction; S5, using a temporary working crane to transport the materials of the cable tower (2) and the tower crane (26) to the abutment position; S6. When the tower crane (26) is erected to the maximum lifting height of the temporary working crane using the temporary working crane, the temporary working crane on the side close to the tower crane (26) is removed, and the construction of the cable tower (2) is completed using the tower crane (26); S7. After the cable tower (2) is erected, the temporary working crane is dismantled; S8, using the tower crane (26) to complete the installation of the load-bearing cables (4), traction cables (3), lifting cables (5), crane carriages and winches of the heavy crane (11) and the working crane (12); S9, using the working crane (12) to construct the handover pier body and 0# block, and to construct the side pier foundation and pier body; S10, using a working crane (12) to construct a cable anchor (9) and a cable tower (10); S11, constructing a sliding construction platform (14) between the cable tower (2) and the buckle tower (10), wherein the sliding construction platform (14) also serves as a transverse platform for the steel box girder (25); S12, assembling the arch rib truss (24) on the integrated construction platform (13), using a heavy crane (11) to hoist the arch rib segments and install the cross-connections between the arch ribs, and hanging corresponding buckle cables (29) and back cables; Monitor the cable tension, arch stress and line shape, and adjust the cable tension according to the monitoring results; Repeat this step until the arch foot section concrete is poured before the closing section is installed. S13, adjust the horizontal, transverse and vertical positions of the arch ribs in the mid-span closing section, and close the arch ribs; The outer and inner steel tube concrete of the lower chord, and the outer and inner steel tube concrete of the upper chord are poured in sequence; After the concrete in the tube reaches the designed strength, the buckle tower (10) and the buckle cables (29) and back cables of the arch ribs are removed; S14, construct the columns on the arch, and use a heavy crane (11) to install the steel diagonal braces on the columns; S15, construction cast-in-place hanging basket; S16, the heavy crane (11) lifts the steel box girder (25) to the sliding construction platform (14) and moves it horizontally, the cable saddle and the anchor end are synchronously moved horizontally without load to the installation axis position of the steel box girder, and the steel box girder (25) is lifted again and moved longitudinally to the installation position and hooked, thereby completing the installation of the steel box girder (25); The T-structure concrete beams are cast in situ section by section using a hanging basket; S17, pouring concrete beams on the cast-in-place bracket to complete the jointing of the concrete main beam; S18: construct the bridge deck system and auxiliary structures, dismantle the heavy crane (11) and the working crane (12), and complete the construction of the entire bridge.

16. The construction method using a transverse heavy-duty cable crane according to claim 15, characterized in that: In step 12, surveillance cameras are provided on the ground and on the top of the tower to monitor the line shape of the arch ring, including the following steps: S121. Establish a virtual model according to the design data, simulate a model consistent with the construction progress in the virtual model, and set a monitoring camera corresponding to the reality in the virtual model; S122, calibrating the direction and field of view of the surveillance camera in the virtual model to be consistent with the actual surveillance camera; S122, collecting monitoring images of various real monitoring cameras, obtaining monitoring images of monitoring cameras in the virtual model, comparing the contours of the arch ring part, and obtaining adjustment feedback data of the arch ring line type.

17. The construction method using a transverse heavy-duty cable crane according to claim 15 is characterized in that: A steel cable tensile detection device (28) is provided on the buckle cable (29) to monitor the tensile force of the buckle cable (29), comprising the following steps: S1201, sleeve the steel cable stretch detection device (28) onto the steel cable of the buckle cable (29), so that the buckle cable (29) is naturally vertical, at this time, calibrate the stroke of the steel cable stretch detection head (282) to zero, stretch a plurality of preset weights, calibrate the stroke of the steel cable stretch detection head (282) to the corresponding weight, and establish a functional relationship between the stretch weight and the stroke of the steel cable stretch detection head (282); S1202, installing a steel cable tensile testing device (28) on each buckle cable (29) and back cable; According to the design requirements, the preset tension of each buckle cable (29) and the back cable is obtained, compared with the measured tension data of the steel cable tensile test head (282), and the buckle cable tension is adjusted according to the difference with the preset tension.

18. The construction method using a transverse heavy-duty cable crane according to claim 17, characterized in that: A steel cable tensile detection device (28) is provided on the load-bearing cable (4) to compare the detection data with the preset load-bearing data. If the preset data is exceeded, an alarm is sounded and the machine is shut down for inspection.

19. The construction method using a transverse heavy-duty cable crane according to claim 15, characterized in that: During traction, the steel cable travel detection device (27) is arranged on a traction winch, a cable saddle, a crane carriage or a fixed part of a traction cable steering anchor (16), and the steel cable travel detection detection head (274) is pressed against the traction cable (3), thereby obtaining travel data of the traction cable (3), and comparing the travel data with preset traction data to realize traction automation control.

20. The construction method using a transverse heavy-duty cable crane according to claim 15, characterized in that: The lifting operation includes the following steps: Sa01, installing the steel cable travel detection device (27) on the fixed part of the lifting winch (7), the cable saddle or the fixed pulley of the carriage, pressing the steel cable travel detection detection head (274) on the lifting cable (5), thereby obtaining the travel data of the lifting cable (5), comparing the travel data with the preset lifting data, and realizing the lifting automatic control; At the same time, a steel cable tensile testing device (28) is sleeved onto the lifting cable (5) to obtain the tension data of the lifting cable (5). When the tension data exceeds a preset value, an alarm is sounded and the machine is shut down for inspection. At the same time, a posture sensor is set on the component to be lifted to obtain the lifting posture of the component; Sa02, when lifting, first check whether the tension of the lifting rope (5) exceeds the expected value, otherwise proceed to the next step; Sa03. Calculate the stroke of each lifting rope (5) according to the design data, and adjust the aerial posture of the component by adjusting the stroke of each lifting rope (5) before the hook is dropped; Correct the posture and position of the component using data obtained from posture sensors and surveillance cameras; Through the above steps, the automatic lifting of components can be achieved.

Citation Information

Cited By

  • Double-transverse-adjustment cable crane system and hoisting method

    CN119263117A

  • A double transverse adjustment cable hoisting system and hoisting method

    CN119263117B

  • Cable crane traction system for suspension bridge

    CN119306128A