Anti-sedimentation underground pipe gallery structure

By setting up a support layer and a heavy layer of foot protection cover in the underground pipe gallery, the load is transferred to the bedrock or hard soil layer, combined with the jet grouting pile and the anchor shotcrete support layer, which solves the settlement problem of the pipe gallery and improves the structural stability. And reduce construction costs.

CN118854979APending Publication Date: 2024-10-29CHINA RAILWAY 24TH BUREAU GROUP CO LTD +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410910874.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-09
Publication Date
2024-10-29

AI Technical Summary

Technical Problem

Underground pipe gallery structures are prone to settlement after bearing loads, affecting their stability and the safety of surrounding buildings.

Method used

An anti-settlement underground pipe gallery structure is designed. By setting a support layer in the pipe gallery and setting a heavy layer of foot protection cover and end-bearing piles at the bottom, the load is transferred to the bedrock or hard soil layer and the stress of the pipe gallery foundation is reduced. Settlement amount, and further share the load pressure through jet grouting piles and anchor grouting support layer.

Benefits of technology

It effectively reduces the settlement of the pipe gallery foundation, improves the stability of the pipe gallery and surrounding buildings, and reduces construction costs and the impact of water flow erosion.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118854979A_ABST
    Figure CN118854979A_ABST
Patent Text Reader

Abstract

The invention discloses an anti-sedimentation underground pipe gallery structure, and relates to the technical field of pipe gallery building construction, the anti-sedimentation underground pipe gallery structure comprises a supporting layer, a gap exists between a pipe gallery and the supporting layer, the supporting layer comprises a top arch, a side wall and a foot protection cover heavy layer located at the bottom of the side wall, the pipe gallery is located on the opposite inner sides of the top arch and the side wall, and the foot protection cover heavy layer is located at the bottom of the side wall. The foot protecting and heavy covering layer is pressed on an anchoring and shotcreting supporting layer of a foundation pit slope where the pipe gallery is located in a covering mode, cushion concrete of the foot protecting and heavy covering layer and cushion concrete of the pipe gallery are mutually independent, and an end bearing pile is arranged at the bottom of the foot protecting and heavy covering layer. The end bearing piles are used for transmitting the upper load borne by the supporting layer to a bed rock bearing layer or a hard soil layer. The pipe gallery bottom foundation has the effect of reducing the settlement amount of the pipe gallery bottom foundation.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of pipe gallery construction, and in particular to an anti-settlement underground pipe gallery structure. Background Art

[0002] Underground pipe gallery is a public tunnel built underground in the city for laying municipal pipelines such as electricity, communication, radio and television, water supply and drainage, heat, gas, etc. Technicians do not need to repeatedly dig and backfill the road surface, and can repair, maintain, expand and renovate various pipelines in the pipe gallery, which shortens the repair time and reduces the cost of pipeline maintenance.

[0003] The normal operation of various pipelines in underground corridors directly affects the normal life of citizens and the production and operation of enterprises. Therefore, in order to prevent the collapse of corridors, concrete pouring is usually used to form underground corridor structures to provide support and protection for various pipelines laid in the corridors.

[0004] However, the underground tunnel formed by pouring concrete has a large structural deadweight. As the tunnel is put into use for a longer time, there is a possibility that the foundation at the bottom of the tunnel will sink. One of the important reasons for the sinking of the tunnel foundation is that the load borne by the tunnel (building load above the tunnel, dynamic load of pedestrians and vehicles, etc.) directly acts on the top of the tunnel, and the tunnel directly transfers the load to the tunnel foundation, causing the tunnel foundation to sink, thereby affecting the stability of the tunnel and surrounding buildings. Summary of the invention

[0005] In order to reduce the settlement of the bottom foundation of the tunnel, the present application provides an anti-settlement underground tunnel structure.

[0006] The present application provides an anti-settlement underground pipe gallery structure, which adopts the following technical solutions: An anti-settlement underground pipe gallery structure comprises a supporting layer, with a gap between the pipe gallery and the supporting layer, the supporting layer comprising a top arch, side walls and a toe guard cover weight layer located at the bottom of the side walls, the pipe gallery is located on the inner sides of the top arch and the side walls, the toe guard cover weight layer is pressed on the anchor spraying supporting layer of the foundation pit slope where the pipe gallery is located, and the cushion concrete of the toe guard cover weight layer and the pipe gallery are independent of each other, and end bearing piles are arranged at the bottom of the toe guard cover weight layer, and the end bearing piles are used to transfer the upper load borne by the supporting layer to the bedrock bearing layer or the hard soil layer.

[0007] Through the above technical solution, since the pipeline corridor is located on the inner side of the supporting layer and there is a gap between the pipeline corridor and the supporting layer, the load above the pipeline corridor will directly act on the supporting layer, that is, the supporting layer bears the upper load that should have been borne by the pipeline corridor instead of the pipeline corridor, and the supporting layer transfers the load to the bedrock bearing layer or the hard soil layer through the toe guard weight layer and the end bearing piles, so as to reduce the settlement of the pipeline corridor foundation caused by the vertical load.

[0008] The gap between the pipe gallery and the supporting layer allows operators to walk inside to check and repair cracks in the supporting layer and the pipe gallery. The supporting layer can be cast with concrete with anti-seepage properties, and the pipe gallery is located on the inner side of the supporting layer. Therefore, the pipe gallery can be cast with relatively conventional concrete, or made of other materials with a long service life (such as hard PVC) to reduce construction costs.

[0009] In addition, since the heavy layer of the toe guard is overlaid on the anchor-sprayed support layer of the foundation pit, the upper load borne by the top arch is divided into two parts when it is transferred to the heavy layer of the toe guard. One part of the load is transferred to the anchor-sprayed support layer to share the load pressure for the end-bearing piles, and the other part of the load is transferred to the bedrock bearing layer or hard soil layer through the end-bearing piles.

[0010] In a preferred example, the present application can be further configured as follows: jet grouting piles are provided at the bottom of the cushion concrete of the tunnel, and the steel bars of the jet grouting piles and the steel bars of the cushion concrete of the tunnel are integrally tied to each other.

[0011] Through the above technical scheme, during the jet grouting pile construction process, the jet grouting slurry will fill the soil and rock gaps around the pile hole to form a more integrated soil and slurry consolidation, thereby improving the integrity of the corridor foundation and further reducing the settlement of the corridor.

[0012] In a preferred example, the present application can be further configured as follows: a covering surface and an abutment surface are provided on the foot guard cover layer, the covering surface is pressed on the anchor sprayed support layer of the foundation pit slope where the pipeline gallery is located, and the bottom end of the anchor sprayed support layer abuts on the abutment surface.

[0013] Through the above technical scheme, the covering surface is used to transfer part of the load to the anchor-sprayed support layer to share the load pressure of the end-bearing piles, while the abutment surface is used to bear the pressure of the anchor-sprayed support layer and transfer it to the bedrock bearing layer or hard soil layer by the end-bearing piles, thereby reducing the pressure transmitted from the anchor-sprayed support layer to the bottom foundation of the tunnel, thereby further reducing the settlement of the tunnel foundation.

[0014] In a preferred example, the present application can be further configured as follows: a connecting rib is provided on the exposed end of the anchor rod in the anchor spray support layer, the connecting rib extends into the side wall at one end away from the anchor rod, a connecting piece 1 is provided between the connecting rib and the corresponding anchor rod, and the connecting rib and the corresponding anchor rod are connected via the connecting piece 1.

[0015] Through the above technical solution, the side wall on the supporting layer is connected to the anchor rod of the anchor spraying supporting layer through the connecting ribs and the connecting piece, that is, the supporting layer uses the anchor rod to improve the stability of the supporting layer. At the same time, part of the load can be transferred to the slope of the foundation pit through the connecting ribs and the anchor rod to further share the load pressure of the end bearing pile.

[0016] In a preferred example, the present application can be further configured as follows: the connecting member 1 includes a connecting sleeve 1 and a connecting sleeve 2, the ends of the connecting sleeve 1 and the connecting sleeve 2 that are close to each other are ball-jointed to each other, and the connecting rib and the anchor rod are respectively threadedly connected to the inner walls of the connecting sleeve 1 and the connecting sleeve 2.

[0017] Through the above technical solution, during the process of installing the connecting reinforcement, the operator first rotates the connecting sleeve 2 to complete the connection between the connecting sleeve 2 and the anchor rod; then, rotates the connecting sleeve 1 so that the connecting sleeve 1 is in a horizontal state; then, inserts the connecting reinforcement into the connecting sleeve 1, and rotates the connecting sleeve 1 so that the connecting reinforcement is threadedly connected to the connecting sleeve 1, thereby completing the connection between the connecting sleeve 1 and the connecting reinforcement.

[0018] In a preferred example, the present application may be further configured as follows: an expansion water-stopping sleeve is embedded in the side wall, and the expansion water-stopping sleeve is sleeved on the connecting rib.

[0019] Through the above technical solution, since the expansion water-stop sleeve is sleeved on the connecting reinforcement, when the foundation pit is completely backfilled, if the water in the soil flows to the junction of the side wall and the connecting reinforcement, the expansion water-stop sleeve expands in volume when it meets water, thereby reducing the possibility of moisture entering the side wall, and also reducing the impact of water erosion on the side wall.

[0020] In a preferred example, the present application can be further configured as follows: a steel arch frame is arranged in the supporting layer, the steel arch frame includes a top frame and a side frame, the top frame is located in the top arch, the side frame is located in the side wall, a second connecting member is arranged between the top frame and the side frame, and the top frame and the side frame are connected via the second connecting member.

[0021] Through the above technical solution, since a steel arch frame is built into the interior of the supporting layer, the load-bearing capacity of the supporting layer is improved, thereby strengthening the protective effect of the supporting layer on the pipeline corridor.

[0022] In addition, since the steel arch frame is divided into a top frame and a side frame, the operator can install the side frame and the top frame separately in turn to reduce the difficulty of installing the steel arch frame.

[0023] In a preferred example, the present application can be further configured as follows: the connecting member 2 includes a connecting plate 1 and a connecting plate 2, the connecting plate 1 is arranged at the end of the top frame, the connecting plate 2 is arranged at the end of the side frame, and the connecting plate 1 and the connecting plate 2 are connected by bolts and nuts.

[0024] Through the above technical solution, after the operator installs the side frame, the top frame is placed on the side frame so that the connecting plate 1 and the connecting plate 2 are abutted against each other, and the connecting plate 1 and the connecting plate 2 are connected by bolts and nuts, thereby completing the connection between the side frame and the top frame, and finally completing the installation of the steel arch frame.

[0025] In a preferred example, the present application may be further configured as follows: a bending rib is provided at one end of the connecting rib extending into the side wall, and the bending rib is installed on the side frame.

[0026] Through the above technical solution, the connecting reinforcement is anchored in the side wall with the help of the bending reinforcement, and because the bending reinforcement can be welded and fixed to the side frame, the anchoring effect of the connecting reinforcement is further improved, and the possibility of the connecting reinforcement detaching from the side wall is fully reduced.

[0027] In a preferred example, the present application can be further configured as follows: the support layer is divided into a plurality of unit sections along the length direction of the pipe gallery, a settlement joint is provided between two adjacent unit sections, and the inspection well of the pipe gallery is provided between two adjacent unit sections.

[0028] Through the above technical solution, operators can divide the supporting layer into several unit sections according to the actual geological conditions and the unit length of the tunnel. The unit sections here are not standard sections, and the length of the unit sections can be adjusted according to actual conditions.

[0029] A settlement joint is provided between two adjacent unit sections. When one of the unit sections settles, the settlement joint can reduce the impact of the settled unit section on the adjacent unit section.

[0030] In summary, this application includes the following beneficial technical effects: 1. Since the pipe gallery is located inside the supporting layer and there is a gap between the pipe gallery and the supporting layer, the supporting layer bears the upper load that should have been borne by the pipe gallery instead of the pipe gallery. The supporting layer transfers the load to the bedrock bearing layer or hard soil layer through the foot guard weight layer and the end bearing piles, thereby reducing the settlement of the pipe gallery foundation caused by the vertical load; 2. The rotary jet slurry fills the soil and rock gaps around the pile hole to form a more integrated consolidation of soil and slurry, thereby improving the integrity of the corridor foundation and further reducing the settlement of the corridor; 3. The side wall improves the stability of the supporting layer through connecting bars and anchor rods. At the same time, part of the load is transferred to the slope of the foundation pit through connecting bars and anchor rods to further share the load pressure of the end bearing piles; 4. Since a steel arch frame is built inside the supporting layer, the load-bearing capacity of the supporting layer is improved, which also strengthens the protective effect of the supporting layer on the pipeline corridor. BRIEF DESCRIPTION OF THE DRAWINGS

[0031] Figure 1 It is a schematic diagram of the overall structure of an embodiment of the present application, mainly illustrating the location of the support layer and the pipe gallery.

[0032] Figure 2 yes Figure 1 A schematic diagram of the overall structure from another angle, mainly illustrating the structure of end-bearing piles and rotary jet grouting piles.

[0033] Figure 3 It is a schematic diagram of the partial structure of an embodiment of the present application, mainly illustrating the structure of the top arch, side walls and toe guard cover layers.

[0034] Figure 4 It is a schematic diagram of the local structure of an embodiment of the present application, mainly illustrating the structure of the steel arch frame.

[0035] Figure 5 yes Figure 4 The enlarged schematic diagram of part A mainly illustrates the structure of connecting sleeve 1, connecting sleeve 2 and expansion water-stop sleeve.

[0036] Description of reference numerals: 1. Support layer; 101. Gap; 102. Unit section; 103. Settlement joint; 11. Top arch; 12. Side wall; 13. Footing cover weight layer; 131. End bearing pile; 132. Covering surface; 133. Abutment surface; 2. Pipe gallery; 21. Anchor spraying support layer; 211. Anchor rod; 22. Cushion concrete; 221. Jet jet pile; 3. Connecting rib; 31. Expansion water stop sleeve; 32. Bending rib; 4. Connecting piece one; 41. Connecting sleeve one; 42. Connecting sleeve two; 5. Steel arch frame; 51. Top frame; 52. Side frame; 6. Connecting piece two; 61. Connecting plate one; 611. Bolt; 612. Nut; 62. Connecting plate two. DETAILED DESCRIPTION

[0037] The following is combined with Figure 1 -Attached Figure 5 This application is described in further detail.

[0038] In the attached Figure 1 and attached Figure 2 In order to facilitate observation of the jet grouting piles 221, the end bearing piles 131 and the anchor rods 211, the foundation of the pipe gallery 2 and the foundation pit slope where the pipe gallery 2 is located are simplified into a "U"-shaped thin plate with a larger upper opening.

[0039] An anti-settlement underground pipe gallery structure is disclosed in an embodiment of the present application.

[0040] See attached Figure 1 and attached Figure 2 As shown, an anti-subsidence underground pipe gallery structure includes a support layer 1, the length direction of the support layer 1 is consistent with the length direction of the pipe gallery 2, the longitudinal section of the support layer 1 is an inverted "U" shape, and there is a gap 101 between the pipe gallery 2 and the support layer 1, and the two do not contact each other.

[0041] See attached Figure 1 The support layer 1 is divided into a plurality of unit sections 102 along the length direction of the pipe gallery 2. The unit sections 102 can be divided according to geological conditions and the unit length of the pipe gallery 2. A settlement joint 103 is arranged between two adjacent unit sections 102. The settlement joint 103 can reduce the impact of the settled unit section 102 on the adjacent unit section 102. The inspection well of the pipe gallery 2 is arranged between two adjacent unit sections 102.

[0042] See attached Figure 2 and attached Figure 3 As shown, the support layer 1 includes a top arch 11, two top arches 11 and two toe guards 13, and the top arch 11, the top arch 11 and the toe guards 13 are all cast with concrete. The top arch 11 is in an arc shape, and two side walls 12 are vertically arranged, and the two side walls 12 are respectively located on both sides of the top arch 11, and the pipe gallery 2 is located on the inner side of the top arch 11 and the side wall 12. The two toe guards 13 are respectively located at the bottom of the two side walls 12, and the two toe guards 13 are respectively arranged on the slopes on both sides of the foundation pit, and the toe guards 13 and the cushion concrete 22 of the pipe gallery 2 are independent of each other, and there is a distance between the two.

[0043] See attached Figure 2 and attached Figure 3 As shown, since the relevant structures of each foot guard cover layer 13 are basically the same, only one of the foot guard cover layers 13 will be described in detail below, and the other foot guard cover layer 13 will not be described in detail here.

[0044] See attached Figure 2 and attached Figure 3As shown, each foot guard weight layer 13 is provided with an end bearing pile 131 at the bottom, and the end bearing pile 131 is used to transfer the upper load on the supporting layer 1 to the bedrock bearing layer or hard soil layer. The foot guard weight layer 13 is provided with a pressure surface 132 and an abutment surface 133, and the pressure surface 132 is pressed on the anchor spraying support layer 21 of the foundation pit slope where the pipe gallery 2 is located to share the load pressure of the end bearing pile 131. The bottom end of the anchor spraying support layer 21 abuts on the abutment surface 133, reducing the pressure of the anchor spraying support layer 21 on the foundation of the pipe gallery 2.

[0045] The support layer 1 bears the upper load (building load, dynamic load of people and vehicles, etc.) that should have been borne by the pipeline corridor 2 instead of the pipeline corridor 2. The support layer 1 transfers the load to the bedrock bearing layer or hard soil layer through the foot cover weight layer 13 and the end bearing piles 131, thereby reducing the settlement of the foundation of the pipeline corridor 2 caused by the vertical load.

[0046] The operator can walk in the gap 101 between the pipe gallery 2 and the supporting layer 1 to facilitate the inspection and repair of cracks in the supporting layer 1 and the pipe gallery 2.

[0047] See attached Figure 1 and attached Figure 2 As shown, a plurality of jet grouting piles 221 are arranged at the bottom of the cushion concrete 22 of the pipe gallery 2, and the jet grouting fills the soil and rock gaps around the pile holes of the jet grouting piles 221 to form a soil and grout consolidation with better integrity, thereby improving the integrity of the foundation of the pipe gallery 2 and further reducing the settlement of the pipe gallery 2. The steel bars of the jet grouting piles 221 and the steel bars of the cushion concrete 22 of the pipe gallery 2 are integrally tied to each other.

[0048] See attached Figure 2 and attached Figure 4 As shown, a connecting rib 3 is installed on the exposed end of the anchor rod 211 in the anchor spraying support layer 21. The connecting rib 3 is arranged horizontally, and the end of the connecting rib 3 away from the anchor rod 211 is extended into the side wall 12. With the help of the anchor rod 211, the support layer 1 can not only improve the stability of the support layer 1, but also transfer part of the load to the slope of the foundation pit through the connecting rib 3 and the anchor rod 211, so as to further share the load pressure of the end bearing pile 131.

[0049] See attached Figure 4 and attached Figure 5 As shown, a connecting piece 4 is provided between the connecting rib 3 and the corresponding anchor rod 211, and the connecting rib 3 and the corresponding anchor rod 211 are connected through the connecting piece 4, and the connecting piece 4 includes a connecting sleeve 1 41 and a connecting sleeve 2 42, and the ends of the connecting sleeve 1 41 and the connecting sleeve 2 42 that are close to each other are ball-jointed, the connecting rib 3 is threadedly connected to the inner wall of the connecting sleeve 1 41, and the anchor rod 211 is threadedly connected to the inner wall of the connecting sleeve 2 42.

[0050] The operator sleeves the connecting sleeve 2 42 on the anchor rod 211 and rotates the connecting sleeve 2 42 so that the connecting sleeve 2 42 and the anchor rod 211 are threadedly connected, then rotates the connecting sleeve 1 41 to a horizontal state, and then inserts the connecting bar 3 into the connecting sleeve 1 41, and rotates the connecting sleeve 1 41 so that the connecting bar 3 is threadedly connected to the connecting sleeve 1 41, completing the connection between the connecting sleeve 1 41 and the connecting bar 3, and finally buries the connecting bar 3 in the concrete of the side wall 12 so as to improve the stability of the side wall 12 with the help of the anchor rod 211.

[0051] See attached Figure 4 and attached Figure 5 As shown, a plurality of expansion water-stop sleeves 31 are embedded in the side wall 12, and the expansion water-stop sleeves 31 are sleeved on the connecting ribs 3. The working principle of the expansion water-stop sleeves 31 is similar to that of the expansion water-stop strips. When the water in the soil flows to the junction of the side wall 12 and the connecting ribs 3, the expansion water-stop sleeves 31 expand in volume when encountering water, thereby reducing the possibility of water entering the side wall 12, and also reducing the impact of water erosion on the side wall 12.

[0052] See attached Figure 4 and attached Figure 5 As shown, a plurality of steel arch frames 5 are buried in the support layer 1 to improve the load bearing capacity of the support layer 1, thereby strengthening the protective effect of the support layer 1 on the pipe gallery 2. The steel arch frames 5 are made of I-beams, and a plurality of steel arch frames 5 are evenly distributed along the length direction of the support layer 1. Since the relevant structures of each steel arch frame 5 are basically the same, only the relevant structures of one of the steel arch frames 5 are described below, and the remaining steel arch frames 5 are not described.

[0053] See attached Figure 3 , Attachment Figure 4 And attached Figure 5 As shown, the steel arch frame 5 includes a top frame 51 and two side frames 52. The top frame 51 is buried in the top arch 11, and the side frames 52 are buried in the side walls 12. The bottom ends of the side frames 52 are pre-buried in the foot guard cover layer 13. The top frame 51 is in an arc shape, and the center angle of the top arch 11 is equal to the center angle of the top frame 51. The two side frames 52 are vertically arranged, and the two side frames 52 are respectively located on both sides of the top frame 51. The operator can install the side frames 52 and the top frame 51 separately in sequence to reduce the difficulty of installing the steel arch frame 5.

[0054] See attached Figure 4 and attached Figure 5As shown, a connecting member 2 6 is provided between the top frame 51 and the side frame 52, and the top frame 51 and the side frame 52 are connected by the connecting member 2 6. The connecting member 2 6 includes a connecting plate 1 61 and a connecting plate 2 62, the connecting plate 1 61 is welded and fixed to the end of the top frame 51, and the connecting plate 2 62 is welded and fixed to the end of the side frame 52, and the connecting plate 1 61 and the connecting plate 2 62 are connected by bolts 611 and nuts 612.

[0055] See attached Figure 4 and attached Figure 5 As shown, one end of the connecting rib 3 extending into the side wall 12 is provided with a bending rib 32, the axis of the bending rib 32 and the axis of the connecting rib 3 are perpendicular to each other, and the bending rib 32 is welded and fixed to the side frame 52, which improves the anchoring effect of the connecting rib 3 and fully reduces the possibility of the connecting rib 3 detaching from the side wall 12.

[0056] The implementation principle of this embodiment is: since the pipeline corridor 2 is located on the inner side of the supporting layer 1, and the pipeline corridor 2 and the supporting layer 1 do not contact each other, the supporting layer 1 bears the upper load that should be borne by the pipeline corridor 2 instead of the pipeline corridor 2, and the supporting layer 1 transfers the load to the bedrock bearing layer or the hard soil layer through the foot guard cover weight layer 13 and the end bearing piles 131, so as to reduce the settlement of the foundation of the pipeline corridor 2 caused by the vertical load, thereby reducing the influence of the settlement on the stability of the pipeline corridor 2 and the surrounding buildings.

[0057] The embodiments of this specific implementation method are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application in turn. Therefore, all equivalent changes made based on the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. An anti-settlement underground pipe gallery structure, Features: The invention comprises a supporting layer (1), a gap (101) is provided between a pipe gallery (2) and the supporting layer (1), the supporting layer (1) comprises a top arch (11), a side wall (12) and a toe cover weight layer (13) located at the bottom of the side wall (12), the pipe gallery (2) is located at the inner side of the top arch (11) and the side wall (12), the toe cover weight layer (13) is pressed on the anchor spraying supporting layer (21) of the foundation pit slope where the pipe gallery (2) is located, and the toe cover weight layer (13) and the cushion concrete (22) of the pipe gallery (2) are independent of each other, and an end bearing pile (131) is provided at the bottom of the toe cover weight layer (13), and the end bearing pile (131) is used to transfer the upper load borne by the supporting layer (1) to the bedrock bearing layer or hard soil layer.

2. The anti-settlement underground pipe gallery structure according to claim 1, Features: Jet-jet piles (221) are arranged at the bottom of the cushion concrete (22) of the pipe gallery (2), and the steel bars of the jet-jet piles (221) and the steel bars of the cushion concrete (22) of the pipe gallery (2) are integrally bound to each other.

3. The anti-settlement underground pipe gallery structure according to claim 1, Features: The foot protection cover weight layer (13) is provided with a covering surface (132) and a contact surface (133); the covering surface (132) covers the anchor spraying support layer (21) of the foundation pit slope where the pipe gallery (2) is located; and the bottom end of the anchor spraying support layer (21) contacts the contact surface (133).

4. The anti-settlement underground pipe gallery structure according to claim 1, Features: A connecting rib (3) is arranged on the exposed end of the anchor rod (211) in the anchor spraying supporting layer (21); the end of the connecting rib (3) away from the anchor rod (211) extends into the side wall (12); a connecting piece (4) is arranged between the connecting rib (3) and the corresponding anchor rod (211); the connecting rib (3) and the corresponding anchor rod (211) are connected via the connecting piece (4).

5. The anti-settlement underground pipe gallery structure according to claim 4, Features: The connecting member 1 (4) comprises a connecting sleeve 1 (41) and a connecting sleeve 2 (42), the ends of the connecting sleeve 1 (41) and the connecting sleeve 2 (42) close to each other are ball-jointed, and the connecting rib (3) and the anchor rod (211) are respectively threadedly connected to the inner walls of the connecting sleeve 1 (41) and the connecting sleeve 2 (42).

6. The anti-settlement underground pipe gallery structure according to claim 4, Features: An expansion waterproof sleeve (31) is embedded in the side wall (12), and the expansion waterproof sleeve (31) is sleeved on the connecting rib (3).

7. The anti-settlement underground pipe gallery structure according to claim 4, Features: A steel arch frame (5) is arranged in the supporting layer (1), and the steel arch frame (5) comprises a top frame (51) and a side frame (52), wherein the top frame (51) is located in the top arch (11), and the side frame (52) is located in the side wall (12), and a second connecting member (6) is arranged between the top frame (51) and the side frame (52), and the top frame (51) and the side frame (52) are connected via the second connecting member (6).

8. The anti-settlement underground pipe gallery structure according to claim 7, Features: The second connecting member (6) comprises a first connecting plate (61) and a second connecting plate (62), wherein the first connecting plate (61) is arranged at the end of the top frame (51), and the second connecting plate (62) is arranged at the end of the side frame (52), and the first connecting plate (61) and the second connecting plate (62) are connected by bolts (611) and nuts (612).

9. The anti-settlement underground pipe gallery structure according to claim 8, Features: One end of the connecting rib (3) extending into the side wall (12) is provided with a bending rib (32), and the bending rib (32) is mounted on the side frame (52).

10. The anti-settlement underground pipe gallery structure according to claim 1, Features: The support layer (1) is divided into a plurality of unit sections (102) along the length direction of the pipe gallery (2), a settlement joint (103) is provided between two adjacent unit sections (102), and the inspection well of the pipe gallery (2) is provided between two adjacent unit sections (102).

Citation Information

Cited By

  • Combined enclosure pipe gallery foundation pit structure

    CN223607869U