Gas film building isolation bin capable of being quickly built
Through innovative design of the fixed base assembly, sealing membrane assembly, and sliding block assembly, the problem of long installation time for air-supported membrane building isolation chambers has been solved, enabling rapid assembly and disassembly, improving installation efficiency, and ensuring the equipment's airtightness.
Patent Information
- Application Number
- CN202411260847.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-09-10
- Publication Date
- 2024-11-08
AI Technical Summary
The existing air-supported membrane structure isolation chambers require a significant amount of time to position the air-supported membrane against the building walls during installation, resulting in slow construction.
The design employs a fixed base assembly, a sealing membrane assembly, a sliding block assembly, and a fan assembly. Through a hydraulic system and a sealing structure, it achieves rapid positioning and sealing of the air membrane with the fixed base. The guide rails and ball bearing structure of the sliding block assembly improve installation efficiency.
It enables the rapid assembly and disassembly of air-supported membrane structure isolation chambers, reducing installation time, improving equipment utilization efficiency, and preventing gas leakage through a sealed structure, thus ensuring the normal operation of the equipment.
Smart Images

Figure CN118911283A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of air film buildings, and more specifically to an air film building isolation chamber that can be quickly constructed. Background Art
[0002] The air-supported building isolation chamber is a special building structure. It is a new type of building structure supported by air. The entire building is supported by the pressure difference between the inside and the outside. It has the characteristics of large span, no beams and no columns, which makes the internal space more flexible. It uses special building membrane materials as the outer shell. This membrane material usually has excellent light transmittance, self-cleaning, fire resistance and corrosion resistance. It is equipped with intelligent electromechanical equipment inside to support the top of the building by providing positive air pressure. The air-supported building isolation chamber can be quickly built on any flat site as needed.
[0003] There are some shortcomings in the use of existing air-film building isolation warehouses, as follows:
[0004] During the construction of existing air-film building isolation warehouses, in order to ensure the effective use of the space in the warehouse and the stability of the building, the air film is often fixed on the building wall panel. During installation, it is first necessary to position the building wall on the ground, and then lay the air film on the top of the building. Then, the edge of the air film and the top of the building wall are positioned and sealed through the positioning plate. Then, air is blown into the warehouse through a fan to create an air pressure difference between the internal and external air pressures, so that the air film is inflated to complete the installation. However, during the installation of existing air-film building isolation warehouses, it takes a lot of time to position the air film and the building wall. Therefore, it takes a lot of time to install the isolation warehouse, which is not convenient for the rapid construction of the isolation warehouse. Summary of the invention
[0005] In order to overcome the above-mentioned defects of the prior art, the present invention provides an air-film building isolation chamber that can be quickly constructed to solve the problems existing in the above-mentioned background technology.
[0006] The present invention provides the following technical solution: an air-supported building isolation chamber that can be quickly constructed, comprising a fixed base assembly, the top of the fixed base assembly is fixedly connected to a conveying assembly, the top of the inner side of the fixed base assembly is movably clamped with a sealing block, the top of the fixed base assembly is movably clamped with a sealing membrane cloth assembly, the top of the fixed base assembly is fixedly connected to a fan assembly, the top of the fan assembly is fixedly connected to an air intake pipe, the sealing membrane cloth assembly comprises a membrane cloth body, the top of the inner side of the membrane cloth body is installed with a first T-shaped sealing strip, the top of the membrane cloth body is installed with a second T-shaped sealing strip, and the bottom of the membrane cloth body is fixedly installed with a sliding block assembly.
[0007] Furthermore, the fixed base assembly includes a positioning base, a first positioning auxiliary plate is fixedly connected to the bottom outer side of the positioning base, a second positioning auxiliary plate is fixedly connected to the bottom outer side of the positioning base, the top of the positioning base is fixedly connected to the building wall, a first convex groove is opened on the outer side of the top of the building wall, second convex grooves are opened on both sides of the front notch of the positioning base, circular grooves are opened in the middle of both sides of the front notch of the positioning base, a sliding notch is opened on the top of the circular groove, a third convex groove is opened on the inner side of the top of the positioning base, and the bottom of the inner side of the circular groove is fixedly connected to the first guide rail.
[0008] Furthermore, the conveying assembly includes a hydraulic cylinder, a hydraulic rod is fixedly connected to the top of the hydraulic cylinder, a first conveying trough is fixedly connected to the top of the hydraulic rod, a second conveying trough is fixedly connected to one side of the front notch of the first conveying trough, a steering conveying trough is fixedly connected to the other side of the second conveying trough, a second guide rail is fixedly connected to the bottom of the inner side of the first conveying trough, a fourth guide rail is fixedly connected to the top of the second conveying trough, a fifth guide rail is fixedly connected to the back of the fourth guide rail, a third guide rail is fixedly connected to one side of the fifth guide rail, a first arc-shaped notch is opened on the top of the steering conveying trough, and a sealing baffle is fixedly connected to the other side of the front notch of the first conveying trough.
[0009] Furthermore, the sealing block includes a fixed baffle, the bottom of the fixed baffle is fixedly connected to the sealing baffle, both sides of the fixed baffle are fixedly connected to fourth convex sliding blocks, a second arc-shaped notch is opened on the back side of the bottom of the sealing baffle, the bottom of the second arc-shaped notch is fixedly connected to a special-shaped sealing baffle plate, both sides of the bottom of the second arc-shaped notch are fixedly connected to special-shaped sealing baffle plates, and the top of the fixed baffle is fixedly connected to a sealing connecting strip.
[0010] Furthermore, a sealing airbag is fixedly connected to the outer side of the membrane cloth body, fourth convex grooves are provided on both sides of the notch on the front side of the sealing airbag, the bottom of the sealing airbag is fixedly connected to a first convex track, the top of the sealing airbag is fixedly connected to an air pump assembly, the inner side of the membrane cloth body is fixedly connected to an L-shaped sealing plate, and the bottom of the L-shaped sealing plate is fixedly connected to a second convex track.
[0011] Furthermore, the sliding block assembly includes a spherical sliding block, a first ball is movably connected to the bottom of the spherical sliding block, a second ball is movably connected to the bottom of the spherical sliding block, a membrane cloth positioning groove is provided on the top of the second ball, a threaded rod is movably sleeved on the front of the spherical sliding block, a hexagonal rotating block is fixedly connected to the front of the threaded rod, a positioning clamp is fixedly connected to the back of the threaded rod, and guide blocks are fixedly connected to both sides of the front of the positioning clamp.
[0012] Furthermore, the second conveying groove is connected to the steering conveying groove to form a herringbone channel, and the fourth guide rail, the third guide rail and the fifth guide rail form a herringbone guide rail. The two sides of the steering conveying groove are fitted with the two sides of the notch opened on the front of the positioning base. The diameter of the circular groove is the same as the diameter of the first arc-shaped notch, and the cross-sectional shape of the fifth guide rail is the same as the cross-sectional shape of the first guide rail.
[0013] Furthermore, the shape of the sealing block cooperates with the shape of the inner top of the second conveying groove near the back side and fits with the top of the fourth guide rail, the cross-sectional shape of the fourth convex sliding block is tolerance matched with the cross-sectional shape of the second convex groove, the diameter of the second arc-shaped notch is the same as the diameter of the first arc-shaped notch, and the thickness of the sealing strip is the same as the width of the fifth guide rail.
[0014] Furthermore, the diameter of the spherical sliding block is matched with the diameter of the fifth guide rail, the diameter of the first ball is matched with the diameter of the top opening of the third guide rail, and the vertical distance between the bottom of the first ball and the second ball is the same as the vertical distance between the top of the third guide rail and the bottom of the top groove.
[0015] Technical effects and advantages of the present invention:
[0016] 1. After completing the positioning of the sealing membrane cloth assembly and the fixed base assembly, the present invention can insert the fourth convex sliding block along the second convex groove, and make the sealing strip inserted into the fifth guide rail and the special-shaped sealing baffle fit the surface of the second conveying groove and the inner side of the fourth guide rail close to the back side, so as to seal the connection between the second conveying groove and the fourth guide rail and the fifth guide rail, and then install the sealing connecting strip, the first T-shaped sealing strip and the second T-shaped sealing strip on the outer side and the inner side of the membrane cloth body to ensure that the top of the membrane cloth body is completely sealed, and then the air pump assembly is used to inject air into the inner side of the sealing airbag to make it expand and squeeze the membrane cloth body to complete the complete sealing of the membrane cloth body and the positioning base, thereby effectively avoiding the occurrence of gas leakage inside the membrane cloth body and ensuring the normal use of the air film building isolation chamber.
[0017] 2. After use, the present invention can be operated in the direction of the above steps to complete the disassembly of the air-film building isolation chamber. Since a T-shaped notch is provided on the top of the membrane cloth body, the distance between the middle notch on the top of the membrane cloth body and the surrounding of the membrane cloth body is the same. During the storage of the membrane cloth body, the membrane cloth body can be rolled up, so that the storage space of the membrane cloth body is reduced, which is convenient for storing the air-film building isolation chamber.
[0018] 3. After multiple uses, if some sliding block assemblies of the present invention have problems with the first T-shaped sealing strip, the second T-shaped sealing strip and the membrane cloth body rotating poorly, affecting the installation efficiency of the equipment, the threaded rod can be driven to rotate by rotating the hexagonal rotating block, and then the positioning clamp can be moved away from the membrane cloth body under the positioning of the guide block. Then, the single sliding block assembly can be removed and replaced with a new sliding block assembly for installation, thereby solving the problem of the first T-shaped sealing strip, the second T-shaped sealing strip and the membrane cloth body rotating poorly, affecting the installation efficiency of the equipment.
[0019] 4. In the process of building the air-film building isolation chamber, first, after the fixed base assembly and the conveying assembly are installed and spliced, they are placed on the ground. Then, all the hydraulic cylinders work at the same time to drive the hydraulic rod to shrink synchronously, drive the conveying assembly to descend, and then put the sealing membrane cloth assembly on the top of the fixed base assembly. Then, the sliding block assembly is placed on the top of the conveying assembly, and they are arranged in sequence so that the first ball is stuck in the fifth guide rail, the third convex groove and the inner side of the second guide rail, and the second ball is placed on the fifth guide rail, the third convex groove and the top of the second guide rail. Because the membrane cloth body is placed on the top of the fixed base assembly, the hydraulic cylinder works to extend the hydraulic rod and drive the first conveying groove to rise back to its original position. Then, the front sliding block assembly is aligned. The first convex track and the second convex track are inserted into the first convex groove and the third convex groove. At this time, the interior of the sealing airbag is in a non-inflated state. Then, the first ball and the second ball are rolled by pushing the sliding block assembly in sequence, driving the sliding block assembly to enter the inner side of the circular groove and the top of the first guide rail in sequence. When all the sliding block assemblies are moved to the inner side of the circular groove and the top of the first guide rail, and the sliding block assembly that entered initially is pushed out from the other side and is located at the top of the third guide rail, the positioning of the sealing membrane cloth assembly and the top of the fixed base assembly is completed, and the positioning between the sealing membrane cloth assembly and the fixed base assembly is quickly completed, which effectively shortens the construction time of the air-film building isolation warehouse, and effectively improves the construction efficiency of the air-film building isolation warehouse. BRIEF DESCRIPTION OF THE DRAWINGS
[0020] Figure 1 It is a schematic diagram of the overall structure of the present invention.
[0021] Figure 2 It is a schematic diagram of the structure of the fixed base assembly and the conveying assembly of the present invention.
[0022] Figure 3 For the present invention Figure 2 A is an enlarged structural diagram of FIG.
[0023] Figure 4 It is a schematic diagram of the sealing block structure of the present invention.
[0024] Figure 5It is a schematic diagram of the structure of the sealing membrane cloth assembly of the present invention.
[0025] Figure 6 For the present invention Figure 5 Schematic diagram of the enlarged structure at B.
[0026] Figure 7 It is a schematic diagram of the structure of the sliding block assembly of the present invention.
[0027] Figure 8 It is a schematic diagram of the cross-sectional structure of the sliding block assembly of the present invention.
[0028] The accompanying drawings are marked as follows: 1. fixed base assembly; 101. positioning base; 102. first positioning auxiliary plate; 103. second positioning auxiliary plate; 104. building wall; 105. first convex groove; 106. second convex groove; 107. circular groove; 108. sliding notch; 109. third convex groove; 1010. first guide rail; 2. conveying assembly; 201. hydraulic cylinder; 202. hydraulic rod; 203. first conveying trough; 204. second conveying trough; 205. steering conveying trough; 206. second guide rail; 207. third guide rail; 208. sealing baffle; 209. fourth guide rail; 2010. first arc notch; 2011. fifth guide rail; 3. sealing block; 301. fixed baffle; 302. sealing baffle ; 303, second arc-shaped notch; 304, special-shaped sealing baffle; 305, sealing strip; 306, sealing connecting strip; 307, fourth convex slider; 4, sealing membrane cloth assembly; 401, membrane cloth body; 402, first T-shaped sealing strip; 403, second T-shaped sealing strip; 404, sliding block assembly; 4041, spherical sliding block; 4042, first ball; 4043, second ball; 4044, membrane cloth positioning groove; 4045, hexagonal rotating block; 4046, threaded rod; 4047, positioning splint; 4048, guide block; 405, sealing airbag; 406, fourth convex groove; 407, first convex track; 408, air pump assembly; 409, L-shaped sealing plate; 4010, second convex track; 5, fan assembly; 6, suction pipe. DETAILED DESCRIPTION
[0029] The technical solution of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the present invention. In addition, the forms of the various structures recorded in the following embodiments are merely illustrative. The rapidly erected air-supported building isolation chamber involved in the present invention is not limited to the various structures recorded in the following embodiments. All other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
[0030] Reference Figures 1 to 8The present invention provides an air-film building isolation chamber that can be quickly constructed, including a fixed base assembly 1, the top of the fixed base assembly 1 is fixedly connected with a conveying assembly 2, the top of the inner side of the fixed base assembly 1 is movably clamped with a sealing block 3, the top of the fixed base assembly 1 is movably clamped with a sealing membrane cloth assembly 4, the top of the fixed base assembly 1 is fixedly connected with a fan assembly 5, the top of the fan assembly 5 is fixedly connected with an air intake pipe 6, the sealing membrane cloth assembly 4 includes a membrane cloth body 401, the top of the inner side of the membrane cloth body 401 is installed with a first T-shaped sealing strip 402, the top of the membrane cloth body 401 is installed with a second T-shaped sealing strip 403, and the bottom of the membrane cloth body 401 is fixedly installed with a sliding block assembly 404.
[0031] In a preferred embodiment, the fixed base assembly 1 includes a positioning base 101, a first positioning auxiliary plate 102 is fixedly connected to the bottom outer side of the positioning base 101, a second positioning auxiliary plate 103 is fixedly connected to the bottom outer side of the positioning base 101, the top of the positioning base 101 is fixedly connected to a building wall 104, a first convex groove 105 is opened on the outer side of the top of the building wall 104, second convex grooves 106 are opened on both sides of the front notch of the positioning base 101, circular grooves 107 are opened in the middle of both sides of the front notch of the positioning base 101, a sliding notch 108 is opened on the top of the circular groove 107, a third convex groove 109 is opened on the inner side of the top of the positioning base 101, and the bottom of the inner side of the circular groove 107 is fixedly connected to the first guide rail 1010.
[0032] In a preferred embodiment, the conveying assembly 2 includes a hydraulic cylinder 201, the top of the hydraulic cylinder 201 is fixedly connected to a hydraulic rod 202, the top of the hydraulic rod 202 is fixedly connected to a first conveying trough 203, one side of the front notch of the first conveying trough 203 is fixedly connected to a second conveying trough 204, the other side of the second conveying trough 204 is fixedly connected to a steering conveying trough 205, the bottom of the inner side of the first conveying trough 203 is fixedly connected to a second guide rail 206, the top of the second conveying trough 204 is fixedly connected to a fourth guide rail 209, the back of the fourth guide rail 209 is fixedly connected to a fifth guide rail 2011, one side of the fifth guide rail 2011 is fixedly connected to a third guide rail 207, a first arc-shaped notch 2010 is opened on the top of the steering conveying trough 205, and the other side of the front notch of the first conveying trough 203 is fixedly connected to a sealing baffle 208.
[0033] In a preferred embodiment, the sealing block 3 includes a fixed baffle 301, the bottom of the fixed baffle 301 is fixedly connected to a sealing baffle 302, both sides of the fixed baffle 301 are fixedly connected to fourth convex sliding blocks 307, a second arc-shaped notch 303 is opened on the back side of the bottom of the sealing baffle 302, the bottom of the second arc-shaped notch 303 is fixedly connected to a special-shaped sealing baffle 304, both sides of the bottom of the second arc-shaped notch 303 are fixedly connected to special-shaped sealing baffles 304, and the top of the fixed baffle 301 is fixedly connected to a sealing connecting strip 306.
[0034] In a preferred embodiment, a sealing airbag 405 is fixedly connected to the outer side of the membrane cloth body 401, and fourth convex grooves 406 are provided on both sides of the front notch of the sealing airbag 405, and a first convex track 407 is fixedly connected to the bottom of the sealing airbag 405, and an air pump assembly 408 is fixedly connected to the top of the sealing airbag 405, and an L-shaped sealing plate 409 is fixedly connected to the inner side of the membrane cloth body 401, and a second convex track 4010 is fixedly connected to the bottom of the L-shaped sealing plate 409; the fourth convex slider 307 is inserted along the second convex groove 106, and the sealing strip 305 is inserted into the fifth guide rail 2011 and the special-shaped sealing baffle 304 is fitted between the second conveying groove 204 and the fourth guide rail. The surface on the inner side of the slide rail 209 close to the back side is sealed at the connection between the second conveying groove 204 and the fourth guide slide rail 209 and the fifth guide slide rail 2011205, and then the sealing connecting strip 306, the first T-shaped sealing strip 402 and the second T-shaped sealing strip 403 are installed on the outer and inner sides of the membrane cloth body 401 to ensure that the top of the membrane cloth body 401 is completely sealed. Then, the air pump assembly 408 is used to inject air into the inside of the sealing airbag 405 to expand and squeeze the membrane cloth body 401 to complete the sealing of the membrane cloth body 401 and the positioning base 101, thereby effectively avoiding gas leakage inside the membrane cloth body 401 and ensuring the normal use of the air film building isolation chamber.
[0035] In a preferred embodiment, the sliding block assembly 404 includes a spherical sliding block 4041, the bottom of the spherical sliding block 4041 is movably connected to a first ball 4042, the bottom of the spherical sliding block 4041 is movably connected to a second ball 4043, the top of the second ball 4043 is provided with a membrane cloth positioning groove 4044, the front of the spherical sliding block 4041 is movably sleeved with a threaded rod 4046, the front of the threaded rod 4046 is fixedly connected to a hexagonal rotating block 4045, the back of the threaded rod 4046 is fixedly connected to a positioning clamping plate 4047, and both sides of the front of the positioning clamping plate 4047 are fixedly connected to guide blocks 4048; in the process of building the air film building isolation chamber, first install the fixed base assembly 1 and the conveying assembly 2 After the splicing is completed, it is placed on the ground, and then all the hydraulic cylinders 201 work at the same time to drive the hydraulic rod 202 to shrink synchronously, drive the conveying assembly 2 to descend, and then put the sealing membrane cloth assembly 4 on the top of the fixed base assembly 1, and then place the sliding block assembly 404 on the top of the conveying assembly 2, and arrange them in sequence so that the first ball 4042 is stuck in the fifth guide rail 2011, the third convex groove 109 and the inner side of the second guide rail 206, and the second ball 4043 is placed on the top of the fifth guide rail 2011, the third convex groove 109 and the second guide rail 206, and because the membrane cloth body 401 is placed on the top of the fixed base assembly 1, at this time, the hydraulic cylinder 201 works to drive the hydraulic rod 202 to extend and drive the first conveying assembly 2 to descend. The feeding groove 203 rises back to its original position, and then the first convex track 407 and the second convex track 4010 corresponding to the front sliding block assembly 404 are inserted into the first convex groove 105 and the third convex groove 109. At this time, the interior of the sealing airbag 405 is not inflated, and then the sliding block assembly 404 is pushed in turn to make the first ball 4042 and the second ball 4043 roll, driving the sliding block assembly 404 to enter the inner side of the circular groove 107 and the top of the first guide rail 1010 in turn. When all the sliding block assemblies 404 move to the inner side of the circular groove 107 and the top of the first guide rail 1010, and the sliding block assembly 404 that enters initially is pushed out from the other side and is located at the top of the third guide rail 207 When the sealing membrane cloth component 4 is positioned with the top of the fixed base component 1, the positioning between the sealing membrane cloth component 4 and the fixed base component 1 is quickly completed, which effectively shortens the construction time of the air-membrane building isolation warehouse and effectively improves the construction efficiency of the air-membrane building isolation warehouse. After use, the disassembly of the air-membrane building isolation warehouse can be completed according to the above-mentioned steps. Since a T-shaped notch is provided on the top of the membrane cloth main body 401, the distance between the notch in the middle of the top of the membrane cloth main body 401 and the surrounding of the membrane cloth main body 401 is the same. During the process of storing the membrane cloth main body 401, the membrane cloth main body 401 can be rolled up, so that the storage space of the membrane cloth main body 401 is reduced, which is convenient for storing the air-membrane building isolation warehouse.After multiple uses, if some sliding block assemblies 404 have problems with the first T-shaped sealing strip 402, the second T-shaped sealing strip 403 and the membrane cloth body 401 rotating unsmoothly, affecting the installation efficiency of the equipment, then the threaded rod 4046 can be rotated by rotating the hexagonal rotating block 4045, and then the positioning clamping plate 4047 is moved away from the membrane cloth body 401 under the positioning of the guide block 4048, and then the single sliding block assembly 404 can be removed and replaced with a new sliding block assembly 404, which can solve the problem of the first T-shaped sealing strip 402, the second T-shaped sealing strip 403 and the membrane cloth body 401 rotating unsmoothly, affecting the installation efficiency of the equipment. ;
[0036] In a preferred embodiment, the second conveying groove 204 is connected to the turning conveying groove 205 to form a herringbone channel, the fourth guide rail 209, the third guide rail 207 and the fifth guide rail 2011 form a herringbone guide rail, the two sides of the turning conveying groove 205 are fitted with the two sides of the notch opened on the front of the positioning base 101, the diameter of the circular groove 107 is the same as the diameter of the first arc-shaped notch 2010, and the cross-sectional shape of the fifth guide rail 2011 is the same as the cross-sectional shape of the first guide rail 1010.
[0037] In a preferred embodiment, the shape of the sealing block 3 cooperates with the shape of the inner top of the second conveying groove 204 near the back side and fits with the top of the fourth guide rail 209, the cross-sectional shape of the fourth convex sliding block 307 and the cross-sectional shape of the second convex groove 106 have a tolerance match, the diameter of the second arc-shaped notch 303 is the same as the diameter of the first arc-shaped notch 2010, and the thickness of the sealing strip 305 is the same as the width of the fifth guide rail 2011.
[0038] In a preferred embodiment, the diameter of the spherical sliding block 4041 is tolerance matched with the diameter of the fifth guide rail 2011, the diameter of the first ball 4042 is tolerance matched with the diameter of the top opening of the third guide rail 207, and the vertical distance between the bottom of the first ball 4042 and the second ball 4043 is the same as the vertical distance between the top of the third guide rail 207 and the bottom of the top groove.
[0039] The working principle of the present invention is as follows: in the process of building the air-film building isolation chamber, first, the fixed base assembly 1 and the conveying assembly 2 are installed and spliced and placed on the ground, and then all the hydraulic cylinders 201 work and drive the hydraulic rod 202 to shrink synchronously, drive the conveying assembly 2 to descend, and then put the sealing membrane cloth assembly 4 on the top of the fixed base assembly 1, and then place the sliding block assembly 4 on the top of the conveying assembly 2, and arrange them in sequence so that the first ball 4042 is stuck in the fifth guide rail 2011, the third convex groove 109 and the inner side of the second guide rail 206, and the second ball 4043 is placed on the top of the fifth guide rail 2011, the third convex groove 109 and the second guide rail 206, and because the membrane cloth body 401 is placed on the top of the fixed base assembly 1, at this time, the hydraulic cylinder 201 works to drive the hydraulic rod 202 to extend and drive the first conveying groove 203 to rise back to its original position, and then the front sliding block assembly The first convex track 407 and the second convex track 4010 corresponding to the component 404 are inserted into the first convex groove 105 and the third convex groove 109. At this time, the interior of the sealing airbag 405 is not inflated. Then, the sliding block assembly 404 is pushed in sequence to make the first ball 4042 and the second ball 4043 roll, driving the sliding block assembly 404 to enter the inner side of the circular groove 107 and the top of the first guide rail 1010 in sequence. When all the sliding block assemblies 404 are moved to the inner side of the circular groove 107 and the top of the first guide rail 1010, and the sliding block assembly 404 that initially enters is pushed out from the other side and is located at the top of the third guide rail 207, the positioning of the sealing membrane cloth assembly 4 and the top of the fixed base assembly 1 is completed, and the positioning between the sealing membrane cloth assembly 4 and the fixed base assembly 1 is quickly completed, which effectively shortens the construction time of the air-film building isolation warehouse and effectively improves the construction efficiency of the air-film building isolation warehouse.
[0040] After completing the positioning of the sealing membrane cloth assembly 4 and the fixed base assembly 1, the fourth convex sliding block 307 can be inserted along the second convex groove 106, and the sealing strip 305 can be inserted into the fifth guide rail 2011 and the special-shaped sealing baffle 304 can fit the second conveying groove 204 and the inner surface of the fourth guide rail 209 close to the back surface, so as to seal the connection between the second conveying groove 204 and the fourth guide rail 209 and the fifth guide rail 2011205, and then by installing the sealing connecting strip 306, the first T-shaped sealing strip 402 and the second T-shaped sealing strip 403 on the outer side and the inner side of the membrane cloth body 401, it can be ensured that the top of the membrane cloth body 401 is completely sealed, and then the air pump assembly 408 is operated to inject air into the inner side of the sealing airbag 405 to make it expand and squeeze the membrane cloth body 401 to complete the complete sealing of the membrane cloth body 401 and the positioning base 101, effectively avoiding the occurrence of gas leakage inside the membrane cloth body 401, and ensuring the normal use of the air film building isolation chamber;
[0041] After use, the air-film building isolation chamber can be disassembled by following the above-mentioned steps. Since a T-shaped notch is provided on the top of the membrane cloth body 401, the distance between the notch in the middle of the top of the membrane cloth body 401 and the surroundings of the membrane cloth body 401 is the same. During the storage of the membrane cloth body 401, the membrane cloth body 401 can be rolled up, so that the storage space of the membrane cloth body 401 is reduced, which is convenient for storing the air-film building isolation chamber.
[0042] Moreover, if the rotation of some sliding block assemblies 404 between the first T-shaped sealing strip 402, the second T-shaped sealing strip 403 and the membrane cloth body 401 is not smooth after multiple uses of the device, affecting the installation efficiency of the device, at this time, the threaded rod 4046 is driven to rotate by rotating the hexagonal rotating block 4045, and then the positioning clamp 4047 is moved away from the membrane cloth body 401 under the positioning of the guide block 4048. Then, the single sliding block assembly 404 can be removed and replaced with a new sliding block assembly 404 for installation, thereby solving the problem of the rotation of the first T-shaped sealing strip 402, the second T-shaped sealing strip 403 and the membrane cloth body 401, affecting the installation efficiency of the device.
[0043] Finally, a few points should be explained: First, in the description of this application, it should be noted that, unless otherwise specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, which may refer to mechanical connection or electrical connection, or internal communication between two components, or direct connection. "upper", "lower", "left", "right", etc. are only used to indicate relative positional relationships. When the absolute position of the object being described changes, the relative positional relationship may change;
[0044] Secondly: In the drawings of the embodiments disclosed in the present invention, only the structures related to the embodiments disclosed in the present invention are involved, and other structures can refer to the general design. In the absence of conflict, the same embodiment and different embodiments of the present invention can be combined with each other;
[0045] Finally: The above description is only a preferred embodiment of the present invention and is not intended to limit the present invention. Any modifications, equivalent substitutions, improvements, etc. made within the spirit and principles of the present invention should be included in the protection scope of the present invention.
Claims
1. An air-film building isolation chamber that can be quickly erected comprises a fixed base assembly (1), Features: The top of the fixed base assembly (1) is fixedly connected to the conveying assembly (2), the top of the inner side of the fixed base assembly (1) is movably connected to the sealing block (3), the top of the fixed base assembly (1) is movably connected to the sealing membrane cloth assembly (4), the top of the fixed base assembly (1) is fixedly connected to the fan assembly (5), the top of the fan assembly (5) is fixedly connected to the suction pipe (6), the sealing membrane cloth assembly (4) includes a membrane cloth body (401), the top of the inner side of the membrane cloth body (401) is installed with a first T-shaped sealing strip (402), the top of the membrane cloth body (401) is installed with a second T-shaped sealing strip (403), and the bottom of the membrane cloth body (401) is fixedly installed with a sliding block assembly (404).
2. The rapidly erectable air-film building isolation chamber according to claim 1, Features: The fixed base assembly (1) comprises a positioning base (101), the outer bottom of the positioning base (101) is fixedly connected to a first positioning auxiliary plate (102), the outer bottom of the positioning base (101) is fixedly connected to a second positioning auxiliary plate (103), the top of the positioning base (101) is fixedly connected to a building wall (104), the outer side of the top of the building wall (104) is provided with a first convex groove (105), both sides of the front notch of the positioning base (101) are provided with second convex grooves (106), the middle parts of both sides of the front notch of the positioning base (101) are provided with circular grooves (107), the top of the circular groove (107) is provided with a sliding notch (108), the inner side of the top of the positioning base (101) is provided with a third convex groove (109), and the inner bottom of the circular groove (107) is fixedly connected to a first guide rail (1010).
3. The rapidly erectable air-film building isolation cabin according to claim 2, Features: The conveying assembly (2) comprises a hydraulic cylinder (201), the top of the hydraulic cylinder (201) is fixedly connected to a hydraulic rod (202), the top of the hydraulic rod (202) is fixedly connected to a first conveying trough (203), one side of a front notch of the first conveying trough (203) is fixedly connected to a second conveying trough (204), the other side of the second conveying trough (204) is fixedly connected to a steering conveying trough (205), and the bottom of the inner side of the first conveying trough (203) is fixedly connected to a second guide rail (206), the top of the second conveying trough (204) is fixedly connected to a fourth guide rail (209), the back of the fourth guide rail (209) is fixedly connected to a fifth guide rail (2011), one side of the fifth guide rail (2011) is fixedly connected to a third guide rail (207), the top of the steering conveying trough (205) is provided with a first arc-shaped notch (2010), and the other side of the front notch of the first conveying trough (203) is fixedly connected to a sealing baffle (208).
4. The rapidly erectable air-film building isolation chamber according to claim 3, Features: The sealing block (3) comprises a fixed baffle (301), the bottom of the fixed baffle (301) is fixedly connected to a sealing baffle (302), both sides of the fixed baffle (301) are fixedly connected to fourth convex sliding blocks (307), the back of the bottom of the sealing baffle (302) is provided with a second arc-shaped notch (303), the bottom of the second arc-shaped notch (303) is fixedly connected to a special-shaped sealing baffle (304), both sides of the bottom of the second arc-shaped notch (303) are fixedly connected to special-shaped sealing baffles (304), and the top of the fixed baffle (301) is fixedly connected to a sealing connection strip (306).
5. The rapidly erectable air-film building isolation cabin according to claim 1, Features: The outer side of the membrane cloth body (401) is fixedly connected to a sealing airbag (405), and fourth convex grooves (406) are provided on both sides of the front notch of the sealing airbag (405). The bottom of the sealing airbag (405) is fixedly connected to a first convex track (407), and the top of the sealing airbag (405) is fixedly connected to an air pump assembly (408). The inner side of the membrane cloth body (401) is fixedly connected to an L-shaped sealing plate (409), and the bottom of the L-shaped sealing plate (409) is fixedly connected to a second convex track (4010).
6. The rapidly erectable air-film building isolation cabin according to claim 3, Features: The sliding block assembly (404) includes a spherical sliding block (4041), the bottom of the spherical sliding block (4041) is movably connected to a first ball (4042), the bottom of the spherical sliding block (4041) is movably connected to a second ball (4043), the top of the second ball (4043) is provided with a membrane cloth positioning groove (4044), the front of the spherical sliding block (4041) is movably sleeved with a threaded rod (4046), the front of the threaded rod (4046) is fixedly connected to a hexagonal rotating block (4045), the back of the threaded rod (4046) is fixedly connected to a positioning clamp (4047), and the two sides of the front of the positioning clamp (4047) are fixedly connected to guide blocks (4048).
7. The rapidly erectable air-film building isolation chamber according to claim 3, Features: The second conveying groove (204) is connected with the steering conveying groove (205) to form a herringbone channel, and the fourth guide rail (209), the third guide rail (207) and the fifth guide rail (2011) form a herringbone guide rail. The two sides of the steering conveying groove (205) are in contact with the two sides of the notch on the front of the positioning base (101), the diameter of the circular groove (107) is the same as the diameter of the first arc-shaped notch (2010), and the cross-sectional shape of the fifth guide rail (2011) is the same as the cross-sectional shape of the first guide rail (1010).
8. The rapidly erectable air-film building isolation cabin according to claim 4, Features: The shape of the sealing block (3) matches the shape of the inner top of the second conveying groove (204) near the back side and fits with the top of the fourth guide rail (209). The cross-sectional shape of the fourth convex sliding block (307) matches the cross-sectional shape of the second convex groove (106) with a tolerance. The diameter of the second arc-shaped notch (303) is the same as the diameter of the first arc-shaped notch (2010). The thickness of the sealing strip (305) is the same as the width of the fifth guide rail (2011).
9. The rapidly erectable air-film building isolation cabin according to claim 6, Features: The diameter of the spherical sliding block (4041) is matched with the diameter of the fifth guide rail (2011) in a tolerance match, the diameter of the first ball (4042) is matched with the diameter of the top opening of the third guide rail (207) in a tolerance match, and the vertical distance between the bottom of the first ball (4042) and the second ball (4043) is the same as the vertical distance between the top of the third guide rail (207) and the bottom of the top groove.