Steel slag secondary processing treatment system

By designing a multi-stage iron selection process and a closed processing system, the problems of simplified equipment, environmental pollution and low metal recovery in the existing secondary processing of steel slag are solved, and efficient steel slag tailings are achieved, meeting the standards of the building materials industry. Improve the comprehensive utilization rate of steel slag.

CN118926109APending Publication Date: 2024-11-12SHAOGUAN QUJIANG SHENGDA EQUIP & MATERIALS

Patent Information

Application Number
CN202411214924.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-02
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

The existing secondary processing methods of steel slag have problems such as simplified equipment, serious environmental pollution, low metal recovery rate, and the particle size and metal iron content of steel slag do not meet the standards of the building materials industry, resulting in low steel slag utilization rate.

Method used

A steel slag secondary processing and treatment system was designed, including a feeding station, a first magnetic selection screening station, a purification station, a second magnetic selection screening station and a finished product station, using multi-stage iron selection process and a closed belt corridor Conduct material transfer, combine wet and dry dust removal systems to ensure that the processing process is pollution-free and meets national standards.

Benefits of technology

It improves metal recovery rate, reduces the free calcium oxide content of steel slag tails, meets the application standards of the building materials industry, improves the production environment, and significantly improves the utilization rate of steel slag.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118926109A_ABST
    Figure CN118926109A_ABST
Patent Text Reader

Abstract

The invention discloses a steel slag secondary processing treatment system which is sequentially provided with a raw material plant, a feeding station, a first magnetic separation screening station, a purification station, a second magnetic separation screening station and a finished product station according to a process sequence, and low-temperature solid steel slag subjected to primary treatment is conveyed into the closed raw material plant by a belt conveyor or a dumper; after the low-temperature solid steel slag is pretreated, materials are conveyed by the belt conveyor in the closed belt vestibule in the whole process from the feeding station, the first magnetic separation screening station, the purification station and the second magnetic separation screening station to the finished product station in sequence, so that centralized dust collection and point type dust collection are combined, and secondary pollution cannot be generated in the whole processing process. A multi-stage iron separation process is adopted, it is ensured that magnetic powder and slag steel of steel-making of return ironmaking are higher than current national or industrial related standard requirements, the granularity of the steel slag tailings is small, the content of metal iron and f-CaO (free calcium oxide) is greatly reduced, and a foundation is laid for large-scale application of the steel slag tailings to the building material industry.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the technical field of resource utilization of metallurgical solid waste, relates to a secondary processing technology of steel slag, and in particular to a secondary processing system of steel slag. Background Art

[0002] Steel slag is a solid waste generated during the steelmaking process, accounting for a large proportion of metallurgical solid waste, and its utilization rate is only about 40%. According to different types of steelmaking, steel slag is divided into desulfurization slag, converter slag, electric furnace slag and refined slag. The process of cooling, solidifying and pre-crushing steel slag from high-temperature liquid is called the primary treatment of steel slag. Steel slag contains about 10% of metallic iron. The low-temperature solid steel slag after primary treatment is finely crushed, graded and magnetically separated to remove ferromagnetic materials in order to fully recover the metallic iron therein and create conditions for the resource utilization of steel slag tailings. This is called the secondary treatment of steel slag.

[0003] At present, after the steel slag is processed once, it is transported to the secondary processing site for secondary processing. The existing steel slag secondary processing methods mainly have the following problems:

[0004] (1) The existing secondary processing lines have extensive production processes and simple equipment, and cannot effectively recover the metal resources in the steel slag;

[0005] (2) The existing secondary processing lines are operated outdoors, which creates dust during the processing process, creates a poor production environment, and causes atmospheric pollution;

[0006] (III) The particle size composition, MFe (metallic iron) content and free calcium oxide (f-CaO) content of the steel slag tailings discharged from the existing secondary processing lines are all relatively high, and cannot be used on a large scale in the building materials industry. This is the main reason for the low utilization rate of steel slag.

[0007] Therefore, there is an urgent need to propose a new type of steel slag secondary processing solution with low environmental pollution, high metal recovery rate, and the particle size composition, metallic iron (MFe) content and free calcium oxide (f-CaO) content of the produced steel slag tailings all meet the current national or industry standards and specifications. This is extremely urgent at a time when steel slag cannot be used as a mixed material in the production of general-purpose silicate cement. Summary of the invention

[0008] The purpose of the present invention is to provide a new type of steel slag secondary processing system, which has reasonable and excellent equipment configuration, pollution-free production, high metal recovery rate, and the particle size composition, MFe (metallic iron) content and f-CaO (free calcium oxide) content of the output steel slag tailings all meet the current national or industry standards and specifications, so as to solve the problems existing in the above-mentioned existing secondary processing lines and greatly improve the utilization rate of steel slag.

[0009] To achieve the above object, the present invention provides the following solutions:

[0010] The present invention provides a steel slag secondary processing system, comprising a feeding station, a first magnetic separation and screening station, a purification station, a second magnetic separation and screening station and a finished product station which are arranged in sequence according to the process sequence, wherein:

[0011] The loading station includes a first-level particle size classifier, a first feeder and a belt conveyor which are connected in sequence according to the process sequence;

[0012] The first magnetic separation and screening station comprises a first belt-type iron remover, a second-level particle size classifier, a third-level particle size classifier and a magnetic separator which are sequentially connected in the process sequence; the first belt-type iron remover is arranged on the first belt conveyor;

[0013] The purification station includes a belt conveyor 3, a three-way distributor, a second feeder, an intermediate bin and a slag fine crusher which are connected in sequence according to the process sequence;

[0014] The second magnetic separation and screening station includes a Class IV particle size classifier, a third belt iron remover and a magnetic separator which are sequentially connected in the process sequence;

[0015] The finished product station includes a magnetic powder bin and a non-magnetic tailings bin;

[0016] Each adjacent two stations among the loading station, the first magnetic separation and screening station, the purification station, the second magnetic separation and screening station and the finished product station are interconnected through a closed belt corridor, and materials are transported by a belt conveyor.

[0017] Preferably, the magnetic separators of the first magnetic separation and screening station and the second magnetic separation and screening station are both roller magnetic separators; and the steel slag fine crusher is a rod mill or an inertial cone crusher.

[0018] Preferably, the Class I particle size classifier is a horizontal screen, a rod-type vibrating feeder or a shaftless rotary screen; the sieve hole size of the Class I particle size classifier is 120 mm to 200 mm; the Class III particle size classifier is a single-layer vibrating screen or a double-layer vibrating screen; the Class II particle size classifier and the Class IV particle size classifier are both vibrating screens or shaftless rotary screens, and the sieve hole sizes are both 10 mm to 20 mm.

[0019] Preferably, the first feeder and the second feeder are both reciprocating feeders, vibrating feeders, belt feeders or vibrating conveyor troughs.

[0020] Preferably, the magnetic powder bin is a steel plate bin or a concrete bin; the non-magnetic tailings bin is a steel plate bin group or a steel-concrete structure tent-type bin.

[0021] Preferably, the III-level particle size classifier is the double-layer vibrating screen, and a belt conveyor nine is provided at the screen material outlet of the double-layer vibrating screen, and a second belt-type iron remover is provided on the belt conveyor nine.

[0022] Preferably, the steel slag secondary processing system also includes a raw material plant, which is arranged in front of the loading station and is used to temporarily store steel slag to be processed for secondary processing; the raw material plant is equipped with lifting equipment for transferring materials in the raw material plant; the loading station is arranged in the raw material plant.

[0023] Preferably, the raw material plant is a closed raw material plant.

[0024] Preferably, a fog cannon is also provided in the raw material plant, and the fog cannon is used to spray dust reduction in the raw material plant; the loading station, the first magnetic separation and screening station to the purification station share a set of HDC wet dust removal system, and centralized wet dust collection is carried out on each dust producing point; a pulse bag dust removal system is provided at each belt transfer point from the second magnetic separation and screening station to the finished product station for dry dust collection; a silo top dust collector is provided in the finished product station for dust collection or a fog cannon is provided for dust reduction.

[0025] Preferably, a silo top dust collector is used to collect dust in the magnetic powder silo of the finished product station, and a fog cannon is used to reduce dust in the non-magnetic tailings silo.

[0026] Preferably, the steel slag secondary processing system also includes a PLC control system, and the PLC control system is communicatively connected to the loading station, the first magnetic separation and screening station, the purification station, the second magnetic separation and screening station and the finished product station.

[0027] Compared with the prior art, the present invention has achieved the following technical effects:

[0028] The steel slag secondary processing system proposed by the present invention has a reasonable structural design. By sequentially arranging a raw material plant, a feeding station, a first magnetic separation and screening station, a purification station, a second magnetic separation and screening station and a finished product station in a process sequence, a novel steel slag secondary processing production line is formed. The low-temperature solid steel slag after the primary processing is transported into a closed raw material plant by a belt conveyor or a dump truck. After the low-temperature solid steel slag is pre-treated, the material is transported by a belt conveyor in a closed belt corridor from the feeding station, the first magnetic separation and screening station, the purification station and the second magnetic separation and screening station to the finished product station. The material is transported by a belt conveyor in a closed belt corridor, realizing the combination of centralized dust collection and point dust collection, which is conducive to achieving standard emission and can fundamentally improve the dust flying problem in the secondary processing of steel slag, ensuring that no secondary pollution will be generated in the whole processing process.

[0029] The above-mentioned steel slag secondary processing system, by setting up the first magnetic separation and screening station and the second magnetic separation and screening station, can adopt a multi-stage iron separation process in the secondary processing of steel slag, ensuring that the magnetic powder and slag steel for returning iron and steelmaking are higher than the current national or industry-related standard requirements, and the steel slag tailings have fine particle size, and the MFe (metallic iron) content and f-CaO (free calcium oxide) content are greatly reduced, laying the foundation for the large-scale application of steel slag tailings in the building materials industry.

[0030] In some technical schemes disclosed in the present invention, the non-magnetic tailings bin of the finished product station adopts a large-capacity steel-concrete tent-type bin with the function of digesting f-CaO in the non-magnetic tailings, which can reduce the f-CaO content therein to less than 3%. After particle size classification according to relevant standards and specifications, it meets the technical requirements of GB / T 24765-2009 "Steel Slag for Wear-Resistant Asphalt Pavement" and JC / T2735-2023 "Steel Slag Asphalt Mixture", and can replace part of natural aggregates (such as basalt) for paving high-grade roads.

[0031] In some technical solutions disclosed in the present invention, considering that steel slag is piled in the open air in existing secondary processing sites, causing dust on sunny days and leakage on rainy days, which can easily cause environmental pollution and groundwater pollution, this embodiment preferably sets the raw material plant as a closed reinforced concrete plant. BRIEF DESCRIPTION OF THE DRAWINGS

[0032] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0033] Figure 1 The overall process flow chart of the steel slag secondary processing system disclosed in the embodiment of the present invention;

[0034] Figure 2 It is a plan view of the slag secondary processing system disclosed in an embodiment of the present invention;

[0035] Figure 3 for Figure 1 Section Ⅰ-Ⅰ of

[0036] Figure 4 for Figure 1 Section II-II of the

[0037] Figure 5 for Figure 1 The III-III section diagram;

[0038] Figure 6 for Figure 1 Section IV-IV of the

[0039] Figure 7 for Figure 1 Ⅴ-V section view of

[0040] Figure 8 for Figure 1 VI-VI cross-section diagram.

[0041] In the figure, the reference numerals are:

[0042] 100. Secondary processing system of steel slag; 101. Raw material workshop; 102. Loading station; 103. First magnetic separation and screening station; 104. Purification station; 105. Second magnetic separation and screening station; 106. Finished product station;

[0043] 1. Electric double-beam crane; 2. Grade I particle size classifier; 3. Belt conveyor one; 4. First belt type iron remover; 5. Grade II particle size classifier; 6. Grade III particle size classifier; 7. First roller type magnetic separator; 8. Belt conveyor two; 9. Belt conveyor three; 10. Belt conveyor four; 11. Vibrating feeder; 12. Slag crusher; 13. Belt conveyor five; 14. Belt conveyor six; 15. Second roller type magnetic separator; 16. Grade IV particle size classifier; 17. Belt conveyor seven; 18. Belt conveyor eight; 19. Mist cannon; 20. Belt conveyor nine; 21. Second belt type iron remover; 22. Reciprocating feeder; 23. Third belt type iron remover; 24. Belt conveyor ten; 25. Belt conveyor eleven; 26. Three-way distributor. DETAILED DESCRIPTION

[0044] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0045] The purpose of the present invention is to provide a novel steel slag secondary processing system, which has reasonable and excellent equipment configuration, pollution-free production, high metal recovery rate, and the particle size composition, MFe (metallic iron) content and f-CaO (free calcium oxide) content of the produced steel slag tailings all meet the current national or industry standards and specifications, and can solve the problems of simple equipment, serious environmental pollution, low metal recovery rate, and the particle size composition, MFe content and f-CaO content of the produced steel slag tailings that cannot meet the requirements of the current national or industry-related standards and specifications of the existing secondary processing lines.

[0046] In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, the present invention is further described in detail below with reference to the accompanying drawings and specific embodiments.

[0047] Example 1

[0048] like Figures 1 to 8 As shown, this embodiment proposes a secondary processing system 100 for steel slag, in which a raw material plant 101, a loading station 102, a first magnetic separation and screening station 103, a purification station 104, a second magnetic separation and screening station 105 and a finished product station 106 are arranged in sequence according to the process sequence, wherein: the raw material plant 101 is used to temporarily store the steel slag to be processed for secondary processing; considering that the steel slag in the existing secondary processing field is piled in the open air, dust is raised on sunny days, and leakage occurs on rainy days, which is easy to cause environmental and groundwater pollution, this embodiment preferably sets the raw material plant 101 as a closed reinforced concrete plant, and a lifting device with an electromagnetic sucker is provided in the plant, and the lifting device preferably adopts an electric double-beam crane 1. The loading station 102 is arranged in the raw material plant 101, and the loading station 102 specifically includes a Class I particle size classifier 2, a first feeder and a belt conveyor 3. The first magnetic separation and screening station 103 specifically includes a first belt iron remover 4, a second-level particle size classifier 5, a third-level particle size classifier 6 and a magnetic separator. The purification station 104 specifically includes a three-way distributor 26, a second feeder, an intermediate bin, a vibrating feeder 11 and a slag crusher 12. The second magnetic separation and screening station 105 specifically includes a fourth-level particle size classifier 16, a third belt iron remover 23 and a magnetic separator. The finished product station 106 specifically includes a magnetic powder bin and a non-magnetic tailings bin. In the above-mentioned loading station 102, the first magnetic separation and screening station 103, the purification station 104, the second magnetic separation and screening station 105 and the finished product station 106, each adjacent one is interconnected through a closed belt corridor, and the materials are transported by a belt conveyor.

[0049] Specifically, in this embodiment, the raw material plant 101 preferably includes 1 to 3 closed reinforced concrete plants, and different closed reinforced concrete plants can be used to temporarily store steel slag to be processed from different sources, and each plant is equipped with the aforementioned lifting equipment and loading station 102. The screened materials of the loading station 102 in each plant are transferred to the same belt conveyor through the corresponding belt conveyor 3 for collection, and finally transported to the first magnetic separation screening station 103 for iron selection and particle size classification.

[0050] Specifically, in this embodiment, the function of the first-level particle size classifier 2 is to pre-classify the particle size of the pre-treated raw material, which can be a ground screen (a fixed grid screen with a screen surface level with the ground), or a bar-type vibrating feeder with a particle size classification function, or a shaftless rotary screen with a self-cleaning screen hole function, wherein the bar-type vibrating feeder is preferred, and the shaftless rotary screen is more preferred. The screen hole size of the first-level particle size classifier 2 can be 120 mm to 200 mm, preferably 160 mm, and more preferably 200 mm.

[0051] Specifically, in this embodiment, the Class III particle size classifier 6 is preferably a vibrating screen. When it is a single-layer vibrating screen, its mesh size is 10mm-60mm, preferably 12mm; when it is a double-layer vibrating screen, its lower mesh size is 10mm-20mm, and the upper mesh size is 35mm-60mm, preferably the lower mesh size is 12mm, and the upper mesh size is 50mm. The main function of the Class III particle size classifier 6 is to divide the raw materials pre-classified by the Class I particle size classifier 2 into 2-3 particle sizes again, and the steel slag raw materials of different particle sizes enter different processing or utilization links.

[0052] Furthermore, in this embodiment, the II-level particle size classifier 5 and the IV-level particle size classifier 16 are preferably vibrating screens or shaftless rotary screens, and the mesh size thereof is 10 mm to 20 mm, preferably 12 mm. The II-level particle size classifier 5 and the IV-level particle size classifier 16 are used to classify the ferromagnetic slag steel into two particle sizes, and the slag steel of different particle sizes enters different processing or utilization links.

[0053] Furthermore, in this embodiment, the first feeder and the second feeder can both be reciprocating feeders 22, vibrating feeders, belt feeders or vibrating conveyor troughs, and different feeder types can be used for steel slag raw materials in different sections of the production line.

[0054] Further, in this embodiment, the three-way distributor 26 of the purification station 104 can be an electro-hydraulic three-way distributor or a tray-type flap double-door three-way valve, and the tray-type flap double-door three-way valve can specifically adopt the "a tray-type flap double-door three-way valve" disclosed in the Chinese patent application number 202321303401.5. In this solution, the three-way distributor 26 is preferably a tray-type flap double-door three-way valve.

[0055] It should be noted that the aforementioned vibrating screen, rod-type vibrating feeder, shaftless rotary screen, belt iron remover, magnetic separator, belt conveyor, vibrating conveyor trough, vibrating feeder and reciprocating feeder are all conventional equipment that are easily available in the market and are mature and reliable. The specific structure and working principle will not be repeated here.

[0056] Furthermore, in this embodiment, the slag crusher 12 can be a rod mill or an inertial cone crusher, preferably a rod mill.

[0057] Furthermore, in the present embodiment, the functions of the belt iron removers in the aforementioned first magnetic separation and screening station 103 and the second magnetic separation and screening station 105 are to magnetically separate the magnetic slag from the undersize material of the grade I particle size classifier 2 and the oversize material of the grade IV particle size classifier 16, respectively. The obtained magnetic slags are large slag steel and medium slag steel, respectively, and their MFe is greater than 85%.

[0058] Furthermore, in this embodiment, the magnetic powder bin of the finished product station 106 may be a steel plate bin or a concrete bin, preferably a steel plate bin.

[0059] Furthermore, in this embodiment, the non-magnetic tailings bin of the finished product station 106 can be a steel plate bin group, or a large capacity (single bin volume> 3000m 3 ) and a steel-concrete structure tent-type silo with the function of digesting f-CaO in non-magnetic tailings, preferably a steel-concrete structure tent-type silo.

[0060] Furthermore, in this embodiment, dust removal facilities are also provided, and the dust removal facilities specifically include spray dust removal equipment, HDC wet dust removal system, pulse bag dust removal system, silo top dust collector and fog cannon, etc. Specifically: fog cannon is provided in the raw material plant 101 to spray dust reduction in the raw material plant; the feeding station 102, the first magnetic separation and screening station 103 to the purification station 104 share a set of HDC wet dust removal system to collect dust from each dust generating point in a centralized wet method; each belt transfer point from the second magnetic separation and screening station 105 to the finished product station 106 is provided with a pulse bag dust removal system for dry dust collection; if the magnetic powder bin of the finished product station 106 is a steel plate bin, a silo top dust collector is provided above the magnetic powder bin, and if the non-magnetic tailings bin of the finished product station 106 is a steel-concrete structure tent-type bin, a fog cannon 19 is provided in the non-magnetic tailings bin to reduce dust. The above dust removal facilities are all mature technologies and are not shown in the figure.

[0061] When the steel slag secondary processing system 100 is used for steel slag secondary processing, the process is as follows:

[0062] like Figure 1 and Figure 2 As shown, the low-temperature solid steel slag after the primary treatment is transported into the raw material plant 101 by a dump truck (or a belt conveyor), and after pretreatment, it is sent to the loading station 102 by a forklift or an electric double-beam crane 1 (the other loading stations 102 and their transfer belt conveyors are not shown in the figure). The loading station 102 is used for loading and pre-screening the steel slag transported by the dump truck in the secondary processing production line. A ground screen with a sieve hole size of 200×200mm is used as the first-level particle size classifier 2. The steel slag with a particle size of more than 200mm on the screen is short-distance transported to the open space near the first-level particle size classifier 2 (ground screen) by tools such as an electric double-beam crane 1, and the steel slag with a particle size of ≤200mm under the screen is temporarily stored through the under-screen transition hopper and then fed into the belt conveyor 3 by the reciprocating feeder 22 to enter the first magnetic separation screening station 103.

[0063] The first magnetic separation and screening station 103 is a centralized disposal facility for the first magnetic separation and screening in the secondary processing process of steel slag (before the fine crushing process), and is equipped with a first belt iron remover 4, a second-level particle size classifier 5, a third-level particle size classifier 6, a first roller magnetic separator 7, a belt conveyor and other process equipment. Specifically: the first belt iron remover 4 absorbs and selects magnetic slag steel from the material layer continuously passing through the belt conveyor 3, and sends it to the second-level particle size classifier 5 (vibrating screen). The screened material with a particle size of >12mm is a large slag steel with MFe>85%, which automatically falls into the large slag steel material pool and is regularly returned to steelmaking for scrap steel. The screened material with a particle size of ≤12mm automatically falls into the belt conveyor 3 9; the steel slag on the continuous material layer on the belt conveyor 3 is sent to the third-level particle size classifier after being absorbed by the first belt iron remover 4. 6 (vibrating screen), the screened material with a particle size of more than 12 mm automatically falls into the belt conveyor three 9, the screened material with a particle size of ≤12 mm is fed into the first roller magnetic separator 7 by the feeder, and the magnetic slag discharged from the first roller magnetic separator 7 automatically falls into the belt conveyor three 9, while the non-magnetic slag is successively conveyed through the belt conveyor two 8, the belt conveyor five 13 and the belt conveyor seven 17 into the non-magnetic slag steel plate silo group (the non-magnetic slag tailings silo in the figure is a steel-concrete structure tent-type silo, not a steel plate silo group) for export.

[0064] The steel slag with a particle size of 0 to 200 mm is fed into the three-way distributor 26 by the belt conveyor 3 9, and the steel slag material flow is divided into two paths by the three-way distributor 26: one path directly flows into the feed bin of the first steel slag fine crusher 12, and the other path enters the feed bin of the second steel slag fine crusher 12 via the belt conveyor 4 10. The steel slag in the two feed bins is evenly fed into the steel slag fine crusher (rod mill) 12 below it by the vibrating feeder 11 located below each, and finely crushed; the finely crushed steel slag discharged from the two steel slag fine crushers 12 is fed into the IV-level particle size classifier 16 (vibrating screen) by the belt conveyor 6 14, and the screened material with a particle size of more than 12 mm automatically falls into the belt conveyor 10 24, and the magnetic slag therein is suspended on the third belt iron removal device above it. The slag is sucked out by the device 23 to obtain medium slag steel with MFe>85%. The medium slag steel automatically falls into the medium slag steel pool and is regularly returned to steelmaking for scrap steel use. The steel slag that is not magnetic is sent to the feed bins of the two steel slag fine crushers 12 by a belt conveyor (not shown in the figure), thereby forming a closed-circuit fine crushing; the undersize material with a particle size of ≤12mm is sent to the second roller magnetic separator 15 by the reciprocating feeder 22, and the magnetic slag (TFe>50%) discharged from the second roller magnetic separator 15 is directly sent to the magnetic powder bin by the belt conveyor 8 18, and is regularly sent to the sintering or pelletizing production line by a dump truck. The non-magnetic slag (particle size ≤12mm, MFe<2%) discharged from the second roller magnetic separator 15 is directly sent to the non-magnetic steel plate bin group (not shown in the figure) by the belt conveyor 7 17 for export.

[0065] The above-mentioned steel slag secondary processing system 100 forms a new type of steel slag secondary processing production line by sequentially setting up a raw material plant 101, a loading station 102, a first magnetic separation and screening station 103, a purification station 104, a second magnetic separation and screening station 105 and a finished product station 106 in the process sequence; the low-temperature solid steel slag after the primary processing is transported into the closed raw material plant 101 by a belt conveyor or a dump truck, and the low-temperature solid steel slag is pre-treated, and the whole process from the loading station 102, the first magnetic separation and screening station 103, the purification station 104, the second magnetic separation and screening station 105 to the finished product station 106 is carried out by a belt conveyor in a closed belt corridor, realizing the combination of centralized dust collection, point-type and dry and wet dust collection, collecting and treating the dust generated during the operation, and achieving standard emission, which can fundamentally improve the dust flying problem in the secondary processing of steel slag, and ensure that the whole processing process will not generate secondary pollution.

[0066] The above-mentioned steel slag secondary processing system 100 uses a special belt iron remover to continuously and automatically remove magnetic iron from the undersize material of the level I particle size classifier 2 and the oversize material of the level IV particle size classifier 16, ensuring that the metallic iron (MFe) in the slag steel returned to steelmaking is not less than 85%.

[0067] The particle size of non-magnetic tailings is ≤12mm, and the metallic iron (MFe) is <2%, which is conducive to exporting it to patented chemical factories to produce "Steel Slag Powder for Cement and Concrete" according to GB / T 20491-2017 or "Steel Slag Powder" according to GB / T28293-2012 for use as mineral admixtures in commercial concrete mixing plants.

[0068] The entire slag secondary processing system 100 realizes the centralized closed disposal of low-temperature solid slag, and adopts a reduced and clean production line with roughing first and then fine selection. Not only does the production process run smoothly, it will not cause process accidents such as material blocking and machine jamming, and the product quality is stable and controllable. The whole system can be centrally controlled by the PLC control system, and the whole line can be managed by zoning according to the actual production situation, and the related equipment can be started and stopped with one button, and intelligent early warning, switching, and control can be realized according to the process logic, and it can be operated by few or no people.

[0069] In summary, the steel slag secondary processing system line proposed in the present invention is equipped with a raw material plant, and various steel slags are pre-treated in the raw material plant before being processed online; the process equipment is mature and reliable, the entire production line is fully enclosed, and the dust generated during the operation is centrally treated by a process method combining dry and wet dust removal to achieve standard emissions; the particle size is ≤12mm and the metallic iron (MFe) content is <2%, which is conducive to the production of steel slag powder or steel slag powder in specialized factories, thereby improving the comprehensive utilization rate of steel slag; the whole system has the significant advantages of small investment, stable operation, high degree of automation, low operating cost, environmental friendliness, and high steel slag utilization rate.

[0070] Example 2

[0071] The differences from Example 1 are:

[0072] 1. The first-level particle size classifier 2 of this embodiment is a rod-type vibrating feeder.

[0073] 2. The III-level particle size classifier 6 of this embodiment is a double-layer vibrating screen, the size of the lower screen hole is 12 mm, and the size of the upper screen hole is 50 mm. The slag with a particle size of more than 50 mm is medium steel slag, and the large slag steel is sucked out by the second belt iron remover 21 and transported to the temporary storage yard of medium steel slag by the belt conveyor 9 20. The medium steel slag can be exported to customers with special purposes (such as counterweight concrete). When the medium steel slag is not selling well, it can also be sent to the belt conveyor 3 9 together with the medium screen material with a particle size of 12 mm to 50 mm and enter the purification station 104.

[0074] 3. The three-way distributor 26 of this embodiment is a tray-type flap double-door three-way valve.

[0075] 4. The belt conveyor 10 of this embodiment is replaced by a vibrating conveyor trough.

[0076] 5. In the present embodiment, the slag steel is selected from the sieve material with a particle size of >12 mm by the third belt iron remover 23, and the non-magnetic slag is transported to the temporary slag storage yard of China Steel by the belt conveyor 24 for export.

[0077] 6. This embodiment uses a 3500m3 reactor with the function of digesting f-CaO in non-magnetic tailings. 3 The large-capacity steel-concrete tent-type silo replaces the steel silo group, and the f-CaO content in the non-magnetic tailings is greatly reduced, and it can be dry-ground on site (the production process and equipment of dry-grinding steel slag powder are not shown in the figure) into a specific surface area of ​​420-460m 2 / kg of steel slag powder〖During the dry grinding process, an admixture accounting for about 2% of the mass of non-magnetic tailings entering the mill is added simultaneously (which has both cement concrete hardening and steel slag grinding aid effects)〗, and then 30% of the steel slag powder and 70% of the granulated blast furnace slag powder are mixed to make "Steel Slag Powder" with performance better than G95 grade in GB / T 28293-2012, and its initial setting time ratio is <160%, and the strength index is slightly lower than S95 grade granulated blast furnace slag powder. Because it contains a certain amount of f-CaO, it has a micro-expansion effect, thereby overcoming a series of technical problems such as drying shrinkage of granulated blast furnace slag powder in cement concrete, low strength of pure steel slag powder, and steel slag powder not only has low strength but also seriously slows down the setting of cement concrete, so that all steel slag tailings can be utilized with high value.

[0078] Example 3

[0079] The differences from Example 2 are:

[0080] 1. The first-level particle size classifier 2 of this embodiment is a shaftless rotary screen.

[0081] 2. The non-magnetic tailings bin of this embodiment has a volume of 4000m 3 Tent-type warehouses are set up according to patented technology (such as the steel slag aggregate aging warehouse disclosed in the Chinese patent application number 202223240899.3) with a capacity of 5000m 3 The slag aggregate aging warehouse (not shown in the figure) will store 4000m 3 The steel slag tailings after preliminary digestion (f-CaO) in the tent-type warehouse are transported to the steel slag aggregate aging warehouse by dump trucks or belt conveyors to ensure that its aging and digestion time and technical indicators meet the requirements of JTG F40-2004 "Technical Specifications for Highway Asphalt Pavement Construction" and JC / T2735-2023 "Steel Slag Asphalt Mixture" (aging time is not less than 6 months, and f-CaO <3%), and then used as the raw material of steel slag asphalt mixture after particle size classification through probability sieve, thereby greatly improving the utilization rate of steel slag.

[0082] The present invention uses specific examples to illustrate the principles and implementation methods of the present invention. The above examples are only used to help understand the method and core ideas of the present invention. At the same time, for those skilled in the art, according to the ideas of the present invention, there will be changes in the specific implementation methods and application scope. In summary, the content of this specification should not be understood as limiting the present invention.

Claims

1. A steel slag secondary processing system, characterized in that: It includes a loading station, a first magnetic separation and screening station, a purification station, a second magnetic separation and screening station and a finished product station which are arranged in sequence according to the process sequence, wherein: The loading station includes a first-level particle size classifier, a first feeder and a belt conveyor which are connected in sequence according to the process sequence; The first magnetic separation and screening station comprises a first belt-type iron remover, a second-level particle size classifier, a third-level particle size classifier and a magnetic separator which are sequentially connected in the process sequence; the first belt-type iron remover is arranged on the first belt conveyor; The purification station includes a belt conveyor 3, a three-way distributor, a second feeder, an intermediate bin and a slag fine crusher which are connected in sequence according to the process sequence; The second magnetic separation and screening station includes a Class IV particle size classifier, a third belt iron remover and a magnetic separator which are sequentially connected in the process sequence; The finished product station includes a magnetic powder bin and a non-magnetic tailings bin; Each adjacent two stations among the loading station, the first magnetic separation and screening station, the purification station, the second magnetic separation and screening station and the finished product station are interconnected through a closed belt corridor, and materials are transported by a belt conveyor.

2. The steel slag secondary processing system according to claim 1, characterized in that: The magnetic separators of the first magnetic separation and screening station and the second magnetic separation and screening station are both roller magnetic separators; the steel slag fine crusher is a rod mill or an inertial cone crusher.

3. The steel slag secondary processing system according to claim 1, characterized in that: The Class I particle size classifier is a horizontal screen, a rod-type vibrating feeder or a shaftless rotary screen; the sieve hole size of the Class I particle size classifier is 120 mm to 200 mm; the Class III particle size classifier is a single-layer vibrating screen or a double-layer vibrating screen; the Class II particle size classifier and the Class IV particle size classifier are both vibrating screens or shaftless rotary screens, and the sieve hole sizes are both 10 mm to 20 mm.

4. The steel slag secondary processing system according to claim 1, characterized in that: The first feeder and the second feeder are both reciprocating feeders, vibrating feeders, belt feeders or vibrating conveyor troughs.

5. The steel slag secondary processing system according to claim 1, characterized in that: The magnetic powder bin is a steel plate bin or a concrete bin; the non-magnetic tailings bin is a steel plate bin group or a steel-concrete structure tent-type bin.

6. The steel slag secondary processing system according to claim 3, characterized in that: The III-level particle size classifier is the double-layer vibrating screen, and a belt conveyor nine is arranged at the screen material outlet of the double-layer vibrating screen, and a second belt-type iron remover is arranged on the belt conveyor nine.

7. The steel slag secondary processing system according to claim 1, characterized in that: It also includes a raw material plant, which is arranged in front of the loading station and is used to temporarily store steel slag to be processed for secondary treatment; the raw material plant is equipped with lifting equipment for transferring materials in the raw material plant; the loading station is arranged in the raw material plant.

8. The steel slag secondary processing system according to claim 7, characterized in that: The raw material plant is a closed raw material plant.

9. The steel slag secondary processing system according to claim 7 or 8, characterized in that: A fog cannon is also installed in the raw material plant for spraying dust reduction in the raw material plant; the loading station, the first magnetic separation and screening station to the purification station share a set of HDC wet dust removal system to carry out centralized wet dust collection at each dust producing point; a pulse bag dust removal system is installed at each belt transfer point from the second magnetic separation and screening station to the finished product station for dry dust collection; a silo top dust collector is installed in the finished product station to collect dust or a fog cannon is installed to reduce dust.

10. The steel slag secondary processing system according to any one of claims 1 to 8, characterized in that: It also includes a PLC control system, which is communicatively connected with the loading station, the first magnetic separation and screening station, the purification station, the second magnetic separation and screening station and the finished product station.

Citation Information

Patent Citations

  • Steel slag deep treatment technology

    CN108187880A

  • SJCM steel slag treatment device

    CN208661361U

  • Steel slag secondary processing treatment system

    CN223083316U

Cited By

  • Steel slag crushing, magnetic separation and recycling system

    CN119327594A