Large spiral stirring shaft mounting and dismounting device and method
Through the combination of support body, mobile car and hydraulic cylinder, the installation and disassembly and dismantling process of large spiral agitating shaft is simplified, the complexity of replacement and maintenance of spiral agitating shaft in the prior art is solved, and the rapid and convenient operation and Continuity of mixing drum operation.
Patent Information
- Application Number
- CN202411049702.9
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-01
- Publication Date
- 2024-11-12
AI Technical Summary
The installation and disassembly of existing large spiral agitator shafts is complex and difficult, especially when the spiral blades are worn or need to be replaced, the entire set of equipment needs to be removed for replacement and installation, especially when the spiral blades are large or heavy, operation becomes very difficult. .
A device including a support body, a moving car and a hydraulic cylinder is designed. The support body is fixedly connected to the mixing drum cylinder, and the moving car suspends the spiral agitating shaft. The hydraulic cylinder lifts the coupling to couple it to the drive end, which simplifies the The installation and removal process of the spiral agitator shaft is assisted by cranes and hoists.
The spiral agitator shaft is quickly moved and conveniently installed and disassembled, saving the replacement and maintenance process, avoiding the removal of the drive end equipment, ensuring the continuity of the operation of the mixing drum, and suitable for different models of mixing drums.
Smart Images

Figure CN118929436A_ABST
Abstract
Description
Technical Field
[0001] The invention belongs to the technical field of spiral stirring devices, and in particular relates to a large spiral stirring shaft installation and removal device and method. Background Art
[0002] The principle of the spiral stirring device is based on the rotational motion of the spiral blades. The materials are stirred and mixed through the friction and pushing action of the spiral blades and the materials. When the spiral blades rotate, stirring force is applied to the materials, causing the materials to shear and fold, thereby achieving the stirring and mixing effect. Usually, the spiral stirring device is a vertical structure. For the first installation, the spiral stirring shaft needs to be placed in the installation position in the mixing drum in advance. The coupling, reducer, and motor can only be installed after the spiral stirring shaft is fixed. After a period of installation and operation, the spiral blades on the spiral stirring shaft will inevitably wear or require maintenance. At this time, it will be very difficult to replace the spiral stirring shaft. The entire set of equipment needs to be dismantled from top to bottom. After replacement, the entire set of equipment needs to be installed from bottom to top. When the spiral blades are too large and too heavy, this installation method will be very difficult. Summary of the invention
[0003] In order to solve the problems existing in the above-mentioned existing large-scale spiral stirring shaft installation and disassembly methods, the present invention provides a large-scale spiral stirring shaft installation and disassembly device and method which can be easily installed and disassembled during use.
[0004] A large-scale spiral stirring shaft installation and disassembly device comprises a support body, a mobile trolley, a spiral stirring shaft and a hydraulic cylinder; the support body is fixedly connected to a mixing drum body, the mobile trolley is placed on a trolley track above the support body, the spiral stirring shaft is fixed below the mobile trolley, the mobile trolley suspends the spiral stirring shaft and moves it to below the driving end of the mixing drum body, a stirring shaft coupling is fixedly connected to the top of the spiral stirring shaft, the stirring shaft coupling and the spiral stirring shaft are an integrated structure, and the hydraulic cylinder lifts the stirring shaft coupling to connect it to the coupling at the driving end of the mixing drum body.
[0005] The support body comprises two sets of support frames, each set of support frames comprises a transverse section and a longitudinal section, one end of the longitudinal section is welded to the side wall of the transverse section to form an integrated structure, one end of the transverse section is provided with a barrel fixing seat, the barrel fixing seat is fixedly connected to the reserved connecting seat of the mixing barrel, the other end of the transverse section is connected to the barrel door of the mixing barrel, a lifting lug 1 and a lifting lug 2 are provided above the transverse section, the lifting lug 1 and the lifting lug 2 are used to connect with the crane when the support body is installed, a counterweight box is provided on the transverse section, and a counterweight is filled in the counterweight box to adjust the level of the support body when the support body is hoisted;
[0006] The longitudinal section is provided with hanging ears, horizontal connecting holes of the cylinder door, and vertical connecting holes of the cylinder door. The hanging ears are hung on the upper edge of the cylinder door of the mixing drum. The horizontal connecting holes of the cylinder door and the vertical connecting holes of the cylinder door are respectively fixedly connected to the flanges of the cylinder door of the mixing drum, forming an integral body with the transverse section to jointly support the spiral mixing shaft.
[0007] The trolley track is welded to the upper surface of the transverse section, and a limit baffle is arranged on the trolley track.
[0008] The bottom of the mobile trolley is provided with traveling wheels, and the grooves of the four traveling wheels are embedded in the trolley track in pairs, so that the mobile trolley can move on the trolley track together. A front traction device is provided in front of the mobile trolley, and a winch drives the front traction device so that the mobile trolley drives the spiral stirring shaft to move to the driving end of the mixing drum body. A rear traction device is provided on the rear side of the mobile trolley, and a winch drives the rear traction device so that the mobile trolley drives the spiral stirring shaft away from the driving end of the mixing drum body. A trolley lifting lug is provided on the top of the mobile trolley, which is convenient for a crane to lift the mobile trolley onto the trolley track.
[0009] A U-shaped opening is opened at one end of the mobile trolley, and the spiral stirring shaft is placed in the mobile trolley through the U-shaped opening; a spiral stirring shaft fixing hole that passes through the mobile trolley is provided on the mobile trolley, and the spiral stirring shaft is fixed on the mobile trolley through the spiral stirring shaft fixing hole.
[0010] Two hydraulic cylinders are provided. When the spiral stirring shaft is installed, the hydraulic cylinder lifts the spiral stirring shaft coupling and connects it with the driving end coupling through bolts. When the spiral stirring shaft is removed, after the bolts are removed, the hydraulic cylinder slowly lowers the spiral stirring shaft onto the mobile trolley.
[0011] A method for installing and disassembling a large spiral stirring shaft is implemented using the above device, and specifically comprises the following steps:
[0012] Step 1: Install the support frame
[0013] First install one of the support frames of the support body. The crane hook is connected to the first and second lifting ears through steel wire ropes. Check whether the horizontal section is level. If it is not level, add counterweights in the counterweight box to keep the horizontal section level. When the support frame is lifted to the installation height, first cross the vertical section's hanging ears on the upper edge of the mixing drum body door, and then connect the horizontal section. Connect the drum body fixing seat at one end of the horizontal section with the reserved connection seat of the mixing drum body through bolts. The other end of the horizontal section is fixed to the mixing drum body door. Then connect the vertical section. Connect the horizontal connection hole of the drum body door and the vertical connection hole of the drum body door with the flange of the mixing drum body door through bolts. After the connection is completed, unhook the crane and install the second support frame according to this step.
[0014] Step 2: Install the mobile cart
[0015] After the two support frames are installed, use a crane to install the mobile trolley, lift the mobile trolley using the trolley lifting lugs, and drop the grooves of the four running wheels into the trolley tracks;
[0016] Step 3: Install the spiral agitator shaft
[0017] After the installation of the mobile trolley is completed, the spiral stirring shaft is installed. The spiral stirring shaft is lifted vertically by a crane. The coupling at the top of the spiral stirring shaft passes through the U-shaped opening of the mobile trolley and is placed on the mobile trolley. The spiral stirring shaft is fixed on the trolley through the fixing hole of the spiral stirring shaft. After fixing, the front traction device is driven by a winch to drive the mobile trolley to drive the spiral stirring shaft to move toward the driving end of the mixing drum. When the spiral stirring shaft and the driving end are coaxial, it stops. The spiral stirring shaft is lifted by two hydraulic cylinders. The hydraulic rod of the hydraulic cylinder passes through the bolt holes corresponding to the coupling at the driving end of the mixing drum and the coupling of the stirring shaft. The front end of the hydraulic rod is tightened with a nut. The hydraulic rods of the two hydraulic cylinders are contracted synchronously to raise the spiral stirring shaft. When the coupling of the stirring shaft fits the end face of the coupling at the driving end of the mixing drum, the remaining bolt holes are connected with bolts respectively. After the remaining bolts are connected, the hydraulic cylinder is removed, and the bolt holes are connected with bolts. After the installation is completed, the support body is removed, and the mobile trolley is lifted away from the mixing drum by a crane.
[0018] Step 4: Remove the spiral agitator shaft
[0019] When the spiral stirring shaft is removed, fix the support body and the mobile trolley in advance according to steps 1 to 2, use the winch to drive the front traction device to drive the mobile trolley to the driving end of the mixing drum, symmetrically remove the two bolts connecting the stirring shaft coupling and the driving end coupling of the mixing drum, insert and fix the hydraulic rod of the hydraulic cylinder, input oil pressure into the hydraulic cylinder to hold the spiral stirring shaft, remove the remaining bolts, extend the hydraulic rod, and slowly lower the spiral stirring shaft. Finally, fix it on the mobile trolley through the fixing hole of the spiral stirring shaft, use the winch to pull the rear traction device to take the spiral stirring shaft away from the driving end of the mixing drum, and the removal is completed. Use a crane to take the spiral stirring shaft away from the mixing drum and replace or repair the spiral stirring shaft.
[0020] Compared with the prior art, the advantages and beneficial effects of the present invention are:
[0021] 1. The spiral stirring shaft installation and removal device of the present invention can quickly move the spiral stirring shaft as a whole, which is convenient for the installation and removal of the spiral stirring shaft, and timely repair, maintenance and replacement of the spiral stirring shaft.
[0022] 2. The spiral stirring shaft installation and removal device of the present invention avoids the removal of the driving end equipment when the spiral stirring shaft is replaced, saving the work process, and at the same time avoids the change of the coaxiality of the driving end, and does not affect the subsequent operation of the mixing drum.
[0023] 3. The spiral stirring shaft installation and removal device of the present invention is not limited by the shape of the stirring drum and has a wide range of applications. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1A front view of a large-scale spiral stirring shaft installation and removal device and method provided by an embodiment of the present invention;
[0025] Figure 2 A left side view of a large-scale spiral stirring shaft installation and removal device and method provided by an embodiment of the present invention;
[0026] Figure 3 A top view of a large-scale spiral stirring shaft installation and removal device and method provided by an embodiment of the present invention;
[0027] Figure 4 A schematic diagram of lifting a spiral stirring shaft of a large spiral stirring shaft installation and removal device and method provided in an embodiment of the present invention;
[0028] Explanation of symbols in the figure: 1. Support body; 11. Horizontal section; 111. Cylinder fixing seat; 112. Trolley track; 113. Lifting ear one; 114. Lifting ear two; 115. Counterweight box; 12. Longitudinal section; 121. Hanging ear; 122. Horizontal connecting hole of cylinder door; 123. Vertical connecting hole of cylinder door; 2. Mobile trolley; 21. Traveling wheel; 22. Front traction device; 23. Rear traction device; 24. Trolley lifting ear; 25. Fixing hole of spiral stirring shaft; 3. Spiral stirring shaft; 4. Hydraulic cylinder; 5. Driving end coupling. DETAILED DESCRIPTION
[0029] The present invention will be further described below with reference to the embodiments.
[0030] A large-scale spiral stirring shaft installation and disassembly device according to an embodiment of the present invention, such as Figure 1 , Figure 2 , Figure 3 , Figure 4 As shown, it includes a support body 1, a moving trolley 2, a spiral stirring shaft 3, and a hydraulic cylinder 4. The support body 1 is fixedly connected to the mixing drum body by bolts, the moving trolley 2 is placed on the trolley track 112 above the support body 1, the spiral stirring shaft 3 is fixed under the moving trolley 2, the moving trolley 2 suspends the spiral stirring shaft 3 and moves it to the bottom of the driving end of the mixing drum body, the top of the spiral stirring shaft 3 is fixedly connected with a stirring shaft coupling, the stirring shaft coupling and the spiral stirring shaft 3 are an integrated structure, and the hydraulic cylinder 4 lifts the stirring shaft coupling to connect it with the coupling 5 at the driving end of the mixing drum body.
[0031] The support body 1 includes 2 sets of support frames, each set of support frames includes a transverse section 11 and a longitudinal section 12, one end of the longitudinal section 12 is welded to the side wall of the transverse section 11 to form an integrated structure, one end of the transverse section 11 is provided with a barrel fixing seat 111, the barrel fixing seat 111 is fixedly connected to the reserved connecting seat of the mixing drum barrel by bolts, the other end of the transverse section 11 is connected to the mixing drum barrel door, and a lifting lug 113 and a lifting lug 114 are provided above the transverse section 11, the lifting lug 113 and the lifting lug 114 are used to connect the support body 1 with a crane when installing, and a counterweight box 115 is provided on the transverse section 11, and the counterweight box 115 is filled with counterweights for adjusting the level of the support body 1 when the support body 1 is hoisted;
[0032] The longitudinal section 12 is provided with a hanging ear 121, a horizontal connecting hole 122 of the cylinder door, and a vertical connecting hole 123 of the cylinder door. The hanging ear 121 is hung on the upper edge of the cylinder door of the mixing drum. The horizontal connecting hole 122 of the cylinder door and the vertical connecting hole 123 of the cylinder door are respectively fixedly connected to the flange of the cylinder door of the mixing drum, forming an integral body with the transverse section 11 to jointly support the spiral stirring shaft 3.
[0033] The trolley track 112 is welded to the upper surface of the cross section 11, and a limit baffle is provided on the trolley track 112 to prevent the mobile trolley 2 from scratching the trolley track 112; the bottom of the mobile trolley 2 is provided with a running wheel 21, and the grooves of the four running wheels 21 are embedded in the trolley track 112 in pairs, so that the mobile trolley 2 can move on the trolley track 112 together, and a front traction device 22 is provided in front of the mobile trolley 2, and the winch drives the front traction device 22 to make the mobile trolley 2 drive the spiral stirring shaft 3 to move to the driving end of the mixing drum body; a rear traction device 23 is provided on the rear side of the mobile trolley 2, and the winch drives the rear traction device 23 to make the mobile trolley 2 drive the spiral stirring shaft 3 away from the driving end of the mixing drum body, and a trolley lifting lug 24 is provided on the top of the mobile trolley 2 to facilitate the crane to lift the mobile trolley 2 onto the trolley track 112.
[0034] A U-shaped opening is provided at one end of the mobile trolley 2, and the spiral stirring shaft 3 is placed in the mobile trolley 2 through the U-shaped opening; a spiral stirring shaft fixing hole 25 is provided on the mobile trolley 2 and passes through the mobile trolley 2, and the spiral stirring shaft 3 is fixed to the mobile trolley 2 through the spiral stirring shaft fixing hole 25 to prevent the spiral stirring shaft 3 from shaking when the mobile trolley 2 moves; the spiral stirring shaft 3 is an installed equipment, and it moves in a spiral motion during operation for stirring.
[0035] The hydraulic cylinder 4 is a spiral stirring shaft lifting device, and two of them are provided. When the spiral stirring shaft 3 is installed, the hydraulic cylinder 4 lifts the spiral stirring shaft coupling and connects it with the driving end coupling 5 through bolts. When the spiral stirring shaft 3 is removed, after the bolts are removed, the hydraulic cylinder 4 slowly lowers the spiral stirring shaft 3 onto the mobile trolley 2.
[0036] A method for installing and disassembling a large spiral stirring shaft is implemented using the above device, and specifically comprises the following steps:
[0037] Step 1: Install the support frame
[0038] First install one of the support frames of the support body 1, and the crane hook is connected to the first lifting lug 113 and the second lifting lug 114 through steel wire ropes. The hook is slowly raised to check whether the horizontal section 11 is horizontal. If it is not horizontal, add a counterweight block in the counterweight box 115 to keep the horizontal section 11 horizontal. When the support frame is lifted to the installation height, first cross the lug 121 of the longitudinal section 12 on the upper edge of the mixing drum body door, and then connect the horizontal section 11. Connect the drum body fixing seat 111 at one end of the horizontal section 11 with the connection seat reserved for the mixing drum body by bolts, and fix the other end of the horizontal section 11 on the mixing drum body door. Then connect the longitudinal section 12. Connect the horizontal connection hole 122 and the vertical connection hole 123 of the drum body door to the flange of the mixing drum body door by bolts. After the connection is completed, unhook the crane and install the second support frame according to this step;
[0039] Step 2: Install the mobile cart
[0040] After the two support frames are installed, the mobile trolley 2 is installed using a crane, the mobile trolley 2 is lifted using the trolley lifting lugs 24, and the grooves of the four running wheels 21 are dropped into the trolley track 112;
[0041] Step 3: Install the spiral agitator shaft
[0042] After the installation of the mobile trolley 2 is completed, the spiral stirring shaft 3 is installed. The spiral stirring shaft 3 is lifted vertically by a crane. The stirring shaft coupling at the top of the spiral stirring shaft 3 passes through the U-shaped opening of the mobile trolley 2 and is placed on the mobile trolley 2. The spiral stirring shaft 3 is fixed on the trolley through the spiral stirring shaft fixing hole 25. After fixing, the front traction device 22 is driven by the winch to drive the mobile trolley 2 to move the spiral stirring shaft 3 toward the driving end of the mixing drum. When the spiral stirring shaft 3 is coaxial with the driving end, it stops. The spiral stirring shaft 3 is moved by two hydraulic cylinders 4. The shaft 3 is lifted, and the hydraulic rod of the hydraulic cylinder 4 passes through the bolt holes corresponding to the coupling 5 at the driving end of the mixing drum and the mixing shaft coupling. The front end of the hydraulic rod is fastened with a nut. The hydraulic rods of the two hydraulic cylinders 4 are contracted synchronously to make the spiral mixing shaft 3 rise. When the end faces of the mixing shaft coupling and the coupling 5 at the driving end of the mixing drum are fitted, the remaining bolts are connected with bolts respectively. After the remaining bolts are connected, the hydraulic cylinder 4 is removed, and the bolt holes are connected with bolts. After the installation is completed, the support body 1 is removed, and the mobile trolley 2 is lifted off the mixing drum by a crane.
[0043] Step 4: Remove the spiral agitator shaft
[0044] When the spiral stirring shaft 3 is removed, the support body 1 and the mobile trolley 2 are fixed in advance according to the installation steps 1 to 2, the mobile trolley 2 is moved to the vicinity of the driving end of the mixing drum body, the U-shaped mouth of the trolley passes through the spiral stirring shaft 3, and the two bolts connecting the stirring shaft coupling and the driving end coupling of the mixing drum body are symmetrically removed, the hydraulic rod of the hydraulic cylinder 4 is inserted and fixed, and the hydraulic cylinder 4 is supplied with oil pressure to hold the spiral stirring shaft 3, and the remaining bolts are removed. The hydraulic rod is extended, and the spiral stirring shaft 3 slowly descends and is finally fixed on the mobile trolley 2 through the spiral stirring shaft fixing hole. The rear traction device 23 is pulled by a winch to take the spiral stirring shaft 3 away from the driving end of the mixing drum body. The removal is completed, and the spiral stirring shaft 3 is taken away from the mixing drum by a crane to replace or repair the spiral stirring shaft 3.
Claims
1. A large-scale spiral stirring shaft installation and removal device, characterized in that: It includes a support body, a mobile trolley, a spiral stirring shaft, and a hydraulic cylinder; the support body is fixedly connected to the mixing drum body, the mobile trolley is placed on the trolley track above the support body, the spiral stirring shaft is fixed under the mobile trolley, the mobile trolley suspends the spiral stirring shaft and moves it to the bottom of the driving end of the mixing drum body, the top of the spiral stirring shaft is fixedly connected with a stirring shaft coupling, the stirring shaft coupling and the spiral stirring shaft are an integrated structure, and the hydraulic cylinder lifts the stirring shaft coupling to connect it with the coupling at the driving end of the mixing drum body.
2. A large-scale spiral stirring shaft installation and removal device according to claim 1, characterized in that: The support body comprises two sets of support frames, each set of support frames comprises a transverse section and a longitudinal section, one end of the longitudinal section is welded to the side wall of the transverse section to form an integrated structure, one end of the transverse section is provided with a barrel fixing seat, the barrel fixing seat is fixedly connected to the reserved connecting seat of the mixing barrel, the other end of the transverse section is connected to the barrel door of the mixing barrel, a lifting lug 1 and a lifting lug 2 are provided above the transverse section, the lifting lug 1 and the lifting lug 2 are used to connect with the crane when the support body is installed, a counterweight box is provided on the transverse section, and a counterweight is filled in the counterweight box to adjust the level of the support body when the support body is hoisted; The longitudinal section is provided with hanging ears, horizontal connecting holes of the cylinder door, and vertical connecting holes of the cylinder door. The hanging ears are hung on the upper edge of the cylinder door of the mixing drum. The horizontal connecting holes of the cylinder door and the vertical connecting holes of the cylinder door are respectively fixedly connected to the flanges of the cylinder door of the mixing drum, forming an integral body with the transverse section to jointly support the spiral mixing shaft.
3. A large-scale spiral stirring shaft installation and removal device according to claim 2, characterized in that: The trolley track is welded to the upper surface of the transverse section, and a limit baffle is arranged on the trolley track.
4. A large-scale spiral stirring shaft installation and removal device according to claim 3, characterized in that: The bottom of the mobile trolley is provided with traveling wheels, and the grooves of the four traveling wheels are embedded in the trolley track in pairs, so that the mobile trolley can move on the trolley track together. A front traction device is provided in front of the mobile trolley, and a winch drives the front traction device so that the mobile trolley drives the spiral stirring shaft to move to the driving end of the mixing drum body. A rear traction device is provided on the rear side of the mobile trolley, and a winch drives the rear traction device so that the mobile trolley drives the spiral stirring shaft away from the driving end of the mixing drum body. A trolley lifting lug is provided on the top of the mobile trolley, which is convenient for a crane to lift the mobile trolley onto the trolley track.
5. A large-scale spiral stirring shaft installation and removal device according to claim 4, characterized in that: A U-shaped opening is opened at one end of the mobile trolley, and the spiral stirring shaft is placed in the mobile trolley through the U-shaped opening; a spiral stirring shaft fixing hole that passes through the mobile trolley is provided on the mobile trolley, and the spiral stirring shaft is fixed on the mobile trolley through the spiral stirring shaft fixing hole.
6. A large-scale spiral stirring shaft installation and removal device according to claim 5, characterized in that: Two hydraulic cylinders are provided. When the spiral stirring shaft is installed, the hydraulic cylinder lifts the spiral stirring shaft coupling and connects it with the driving end coupling through bolts. When the spiral stirring shaft is removed, after the bolts are removed, the hydraulic cylinder slowly lowers the spiral stirring shaft onto the mobile trolley.
7. A method for installing and disassembling a large spiral stirring shaft, using the device according to claim 6, characterized in that: The specific steps include: Step 1: Install the support frame First install one of the support frames of the support body. The crane hook is connected to the first and second lifting ears through steel wire ropes. Check whether the horizontal section is level. If it is not level, add counterweights in the counterweight box to keep the horizontal section level. When the support frame is lifted to the installation height, first cross the vertical section's hanging ears on the upper edge of the mixing drum body door, and then connect the horizontal section. Connect the drum body fixing seat at one end of the horizontal section with the reserved connection seat of the mixing drum body through bolts. The other end of the horizontal section is fixed to the mixing drum body door. Then connect the vertical section. Connect the horizontal connection hole of the drum body door and the vertical connection hole of the drum body door with the flange of the mixing drum body door through bolts. After the connection is completed, unhook the crane and install the second support frame according to this step. Step 2: Install the mobile cart After the two support frames are installed, use a crane to install the mobile trolley, lift the mobile trolley using the trolley lifting lugs, and drop the grooves of the four running wheels into the trolley tracks; Step 3: Install the spiral agitator shaft After the installation of the mobile trolley is completed, the spiral stirring shaft is installed. The spiral stirring shaft is lifted vertically by a crane. The coupling at the top of the spiral stirring shaft passes through the U-shaped opening of the mobile trolley and is placed on the mobile trolley. The spiral stirring shaft is fixed on the trolley through the fixing hole of the spiral stirring shaft. After fixing, the front traction device is driven by a winch to drive the mobile trolley to drive the spiral stirring shaft to move toward the driving end of the mixing drum. When the spiral stirring shaft and the driving end are coaxial, it stops. The spiral stirring shaft is lifted by two hydraulic cylinders. The hydraulic rod of the hydraulic cylinder passes through the bolt holes corresponding to the coupling at the driving end of the mixing drum and the coupling of the stirring shaft. The front end of the hydraulic rod is tightened with a nut. The hydraulic rods of the two hydraulic cylinders are contracted synchronously to raise the spiral stirring shaft. When the coupling of the stirring shaft fits the end face of the coupling at the driving end of the mixing drum, the remaining bolt holes are connected with bolts respectively. After the remaining bolts are connected, the hydraulic cylinder is removed, and the bolt holes are connected with bolts. After the installation is completed, the support body is removed, and the mobile trolley is lifted away from the mixing drum by a crane. Step 4: Remove the agitator shaft When the spiral stirring shaft is removed, fix the support body and the mobile trolley in advance according to steps 1 to 2, use the winch to drive the front traction device to drive the mobile trolley to the driving end of the mixing drum, symmetrically remove the two bolts connecting the stirring shaft coupling and the driving end coupling of the mixing drum, insert and fix the hydraulic rod of the hydraulic cylinder, input oil pressure into the hydraulic cylinder to hold the spiral stirring shaft, remove the remaining bolts, extend the hydraulic rod, and slowly lower the spiral stirring shaft. Finally, fix it on the mobile trolley through the fixing hole of the spiral stirring shaft, use the winch to pull the rear traction device to take the spiral stirring shaft away from the driving end of the mixing drum, and the removal is completed. Use a crane to take the spiral stirring shaft away from the mixing drum and replace or repair the spiral stirring shaft.
Citation Information
Cited By
Large stirring shaft installation protection device and method
CN119347367A
Mounting device and mounting method for lower spiral shaft of vertical spiral stirring mill