Steel arch mounting trolley for tunnel construction and mounting method

By using a steel arch frame with a scissor lifting platform and a rotating mechanism to install a trolley in tunnel construction, the problem of low installation efficiency of the steel arch frame is solved, and efficient position adjustment and installation of the steel arch frame is achieved.

CN118933920APending Publication Date: 2024-11-12CHINA RAILWAY FIRST GROUP FIFTH ENGINEERING CO LTD +1
View PDF 0 Cites 3 Cited by

Patent Information

Application Number
CN202410937375.4
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-12
Publication Date
2024-11-12

AI Technical Summary

Technical Problem

During tunnel construction, staff need to manually adjust the position of the steel arch frame during the installation process, resulting in inefficient installation.

Method used

A steel arch frame installation trolley for tunnel construction is designed, using a scissor lifting platform and a rotating mechanism to achieve micro-rotation and position adjustment of the steel arch frame through a lifting mechanism to reduce manual intervention.

Benefits of technology

The installation efficiency of steel arch frames is improved, the need to manually adjust the position of steel arch frames is reduced, and a more efficient construction process is achieved.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118933920A_ABST
    Figure CN118933920A_ABST
Patent Text Reader

Abstract

The invention relates to the technical field of tunnel steel arch construction, in particular to a steel arch mounting trolley for tunnel construction, which comprises a trolley body and an auxiliary supporting device, and the auxiliary supporting device comprises a lifting mechanism, a rotating mechanism and a lifting mechanism; the lifting mechanism comprises a platform base and a shear fork type lifting platform, the shear fork type lifting platform is located under the platform base, and the trolley body is fixedly connected with the platform base through the shear fork type lifting platform; the rotating mechanism comprises a rotating platform, a rotating assembly and a platform base, the rotating assembly and the rotating platform are sequentially arranged from low to high, and the rotating platform is connected with the platform base through the rotating assembly; the invention further relates to a steel arch mounting method for tunnel construction. The steel arch mounting method comprises the steps of measuring and positioning, steel arch pre-assembling, steel arch initial assembling, steel arch fine adjusting, steel arch fixing, reinforcing mesh laying and concrete spraying. The installation position of the steel arch is convenient to adjust in the installation process of the steel arch, and the installation efficiency of the steel arch is improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the technical field of tunnel steel arch construction, and in particular to a steel arch installation trolley and an installation method for tunnel construction. Background Art

[0002] During the construction of tunnels, subway projects and other projects, the excavation section is large, so it is necessary to support the excavation section. At present, the sprayed anchor support structure is often used for support in the process of tunnel or subway project section support. The sprayed anchor support structure includes a steel arch frame and a soil nail wall. The soil nail wall is inserted into the tunnel or subway project section, and then the tunnel or subway project section is supported by the steel arch frame, thereby achieving the section support of the tunnel or subway project.

[0003] The prior art discloses a steel arch frame installation trolley, comprising a traveling device and a portal-type load-bearing frame installed above the traveling device, wherein a plurality of symmetrically arranged first working platforms are respectively arranged on the left and right sides of the portal-type load-bearing frame, a guardrail is arranged on the first working platform, a second working platform is arranged on the top surface of the portal-type load-bearing frame, a lifting device for operating the steel arch frame to a high position is arranged on the second working platform, two groups of lifting devices are arranged, and the two groups of lifting devices are symmetrically distributed about the center line in the extension direction of the portal-type load-bearing frame, the lifting device comprises a hydraulic cylinder and a lifting gripper for lifting the steel arch frame, the hydraulic cylinder is installed on the second working platform, and the lifting gripper is fixedly connected to the piston rod of the hydraulic cylinder; in the process of installing the steel arch frame, the steel arch frame is lifted onto the lifting gripper by a crane, and then the lifting gripper and the steel arch frame are driven to rise to the installation height by the hydraulic cylinder, and then the staff manually installs the steel arch frame.

[0004] In the process of installing the steel arch frame according to the above-mentioned related technologies, the staff is required to make slight adjustments to the position of the steel arch frame according to the installation position of the steel arch frame, which makes the installation of the steel arch frame inconvenient and affects the installation efficiency of the steel arch frame. Summary of the invention

[0005] In order to improve the installation efficiency of the steel arch frame, the present application provides a steel arch frame installation trolley and an installation method for tunnel construction.

[0006] In a first aspect, the present application provides a steel arch installation trolley for tunnel construction, which adopts the following technical solution: A steel arch frame installation trolley for tunnel construction, comprising a trolley body and an auxiliary support device for lifting the steel arch frame, wherein the auxiliary support device is installed on the trolley body; The auxiliary support device includes a lifting mechanism, a rotating mechanism and a lifting mechanism; The lifting mechanism includes a platform base installed above the trolley body and a scissor-type lifting platform for adjusting the height of the platform base, the scissor-type lifting platform is located directly below the platform base, and the trolley body and the platform base are fixedly connected through the scissor-type lifting platform; The rotating mechanism includes a rotating platform installed directly above the platform base and a rotating assembly for driving the rotating platform to rotate, the platform base, the rotating assembly and the rotating platform are arranged in sequence from low to high, and the rotating platform is connected to the platform base through the rotating assembly; The lifting mechanism is installed on the rotating platform, and the lifting mechanism is used to lift the steel arch frame.

[0007] By adopting the above technical scheme, the arch frame of the middle unit of the steel arch frame is installed on the lifting mechanism, and the arch frame of the arch foot unit of the steel arch frame is temporarily fixed on the wing plate of the trolley body, and the arch frame of the arch foot unit and the arch frame of the middle unit are assembled, and the scissor-type lifting platform is adjusted, and the scissor-type lifting platform drives the platform base to rise, and rises until the arch frame of the middle unit of the steel arch frame is close to the rock wall of the excavation section. The staff detects whether the installation position of the arch frame of the middle unit of the steel arch frame is aligned with the marked position. If it is aligned, the scissor-type lifting platform continues to drive the platform base to rise until the arch frame of the middle unit of the steel arch frame fits the rock wall of the excavation section; if the installation position of the arch frame of the middle unit of the steel arch frame is misaligned with the marked position, the rotating component is adjusted, the rotating component drives the rotating platform to rotate, the rotating platform drives the lifting mechanism to rotate, and the lifting mechanism drives the steel arch frame to rotate, The angle of the frame is adjusted until the installation position of the arch frame of the middle unit of the steel arch frame is aligned with the marked position, and then the wing plate angle of the trolley body is adjusted to make the arch frame of the arch foot unit fit with the surrounding rock, and then the arch frame of the middle unit and the arch frame of the arch foot unit are fixed to the rock wall of the excavation section, and the scissor-type lifting platform is adjusted to make the platform base drop to the initial height, and then, the steel mesh is laid, and concrete is sprayed in the gap between the arch frame and the surrounding rock to form a whole, and the remaining steel arch frame installation operations are completed in a cycle according to the above steps; the steel arch frame installation trolley designed for tunnel construction, through the scissor-type lifting platform and the rotating mechanism, is convenient for driving the steel arch frame to rotate slightly according to the construction requirements of the steel arch frame, and then it is convenient to adjust the installation position of the steel arch frame, avoiding the manual adjustment of the steel arch frame position by the staff during the installation of the steel arch frame in the prior art, and improving the installation efficiency of the steel arch frame.

[0008] Optionally, the rotating assembly includes a gear ring, a driven gear, a driving gear and a driving motor, and the gear ring, driving gear and output shaft of the driving motor are coaxially arranged; the driving motor is installed in the inner cavity of the platform base, and the driving gear is coaxially installed on the output shaft of the driving motor extending from the platform base; the driven gear is rotatably connected to the platform base, the driven gear is located between the driving gear and the gear ring, and the driven gear is meshed with the driving gear and the driven gear is meshed with the gear ring; the gear ring is fixedly connected to the rotating platform.

[0009] By adopting the above technical solution, the driving motor is adjusted, and the output shaft of the driving motor drives the active gear to rotate, the active gear drives the driven gear to rotate, the driven gear drives the gear ring to rotate, the gear ring drives the rotating platform to rotate, the rotating platform drives the lifting mechanism to rotate, and then drives the steel arch frame to rotate slightly, so as to achieve the angle adjustment of the steel arch frame; the designed rotating component is convenient for applying force to the lifting mechanism to achieve the angle adjustment of the steel arch frame.

[0010] Optionally, a plurality of driven gears are provided, and the plurality of driven gears are evenly distributed along the circumferential direction of the driving gear.

[0011] By adopting the above technical solution, multiple driven gears are provided, which facilitates the linkage engagement between the driving gear and the gear ring. At the same time, the driven gears evenly distributed along the circumferential direction of the driving gear facilitate uniform force application to the gear ring, avoiding excessive local force on the gear ring and extending the service life of the rotating component.

[0012] Optionally, the lifting mechanism includes a horizontal adjustment component and a lifting component; The horizontal adjustment assembly includes a horizontal support plate and a driving member for driving the horizontal support plate to slide along the length direction of the tunnel, the horizontal support plate is located directly above the rotating platform, and the horizontal support plate is slidably connected to the rotating platform; The jacking assembly is installed on the horizontal support plate, and the steel arch frame is installed on the jacking assembly.

[0013] By adopting the above technical solution, the driving member is adjusted, the driving assembly drives the horizontal support plate to move, and the horizontal support plate drives the steel arch frame to move, so that the steel arch frame moves along the length direction of the tunnel, thereby realizing the position adjustment of the steel arch frame; the designed horizontal adjustment assembly facilitates driving the horizontal support plate to move along the length direction of the tunnel through the driving member, thereby facilitating the steel arch frame to move along the length direction of the tunnel, thereby realizing the position adjustment of the steel arch frame.

[0014] Optionally, two groups of driving members are provided, a symmetry line is set on one of the diameter lines of the rotating platform, and the two groups of driving members are symmetrically distributed about the symmetry line. The driving member includes a spherical slider, a mounting seat and a horizontal hydraulic cylinder. An adjustment groove for the sliding of the mounting seat is provided on the bottom wall of the horizontal support plate, and the length direction of the adjustment groove is perpendicular to the length direction of the symmetry line; the spherical slider is rotatably connected to the mounting seat, and a spherical groove for the sliding of the spherical slider is provided on the rotating platform, and the spherical groove is set along the length direction of the symmetry line. The horizontal hydraulic cylinder is installed on the rotating platform, and the horizontal hydraulic cylinder drives the spherical slider to slide along the spherical groove.

[0015] By adopting the above technical scheme, the horizontal hydraulic cylinder is adjusted, and the piston rod of the horizontal hydraulic cylinder applies force to the mounting seat, and the mounting seat drives the spherical slider to slide along the spherical slide groove. At the same time, the mounting seat drives the horizontal support plate to move, and the horizontal support plate drives the steel arch frame to move; the designed driving member drives the horizontal support plate to move along the length direction of the spherical slide groove through the horizontal hydraulic cylinder, so that a single end of the arch frame of the middle unit of the steel arch frame can move along the length direction of the spherical slide groove, thereby achieving a fixed position of one end of the arch frame of the middle unit of the steel arch frame and an angle adjustment of the other end, and also can achieve the synchronous movement of the two ends of the arch frame of the middle unit of the steel arch frame along the length direction of the spherical slide groove, thereby achieving the overall position adjustment of the steel arch frame along the horizontal direction.

[0016] Optionally, the jacking assembly includes jacking pallets symmetrically distributed on both sides of the symmetry line and a lifting hydraulic cylinder for driving each of the jacking pallets to rise and fall; the jacking hydraulic cylinder is vertically installed on the horizontal pallet, and the piston rod of the jacking hydraulic cylinder is fixedly connected to the jacking pallet, and a bracket for engaging a steel arch frame is provided on the top wall of the jacking pallet.

[0017] By adopting the above technical solution, the jacking hydraulic cylinder is adjusted, and the piston rod of the jacking hydraulic cylinder drives the horizontal support plate to rise and fall, and the horizontal support plate drives the arch frame of the middle unit of the steel arch frame to rise and fall, thereby realizing the height adjustment of the steel arch frame; the designed jacking component is convenient for driving one or two horizontal support plates to rise and fall through the jacking hydraulic cylinder, so as to facilitate the single-end height adjustment of the arch frame of the middle unit of the steel arch frame, realize the angle adjustment of the steel arch frame in the vertical plane, or facilitate the height adjustment of the arch frame of the middle unit of the steel arch frame in the vertical plane.

[0018] Optionally, the lifting assembly further comprises the base shell covered on each of the lifting hydraulic cylinders, a transmission rack fixedly connected to the piston rod of each of the lifting hydraulic cylinders, a transmission gear located in the inner cavity of each of the base shells, and a transmission rod rotating synchronously with the two transmission gears; A receiving groove for accommodating a transmission rack is provided on the piston rod of the jacking hydraulic cylinder. The transmission rack is arranged along the length direction of the piston rod of the jacking hydraulic cylinder. The transmission gear is meshed with the transmission rack. The end of the transmission rod extends into the inner cavity of the base shell and is coaxially fixed to the transmission gear.

[0019] By adopting the above technical solution, the jacking hydraulic cylinder is adjusted, and the piston rod of the jacking hydraulic cylinder drives the transmission rack to move synchronously. Since the transmission rack is meshed with the transmission gear, the transmission gear rotates, and the transmission gear drives the transmission rod to rotate, and the transmission rod drives another transmission gear to rotate. Since the other transmission gear is meshed with another transmission rack, it drives the piston rod of another jacking hydraulic cylinder to move, thereby realizing the synchronous lifting and lowering of the two horizontal support plates, and then realizing the lifting of the steel arch frame; the designed jacking assembly is convenient for driving the two horizontal support plates to rise and fall synchronously, thereby ensuring the lifting and lowering of the steel arch frame, and realizing fine-tuning of the position of the steel arch frame along the vertical direction.

[0020] Optionally, the transmission rod includes a sleeve portion and two connecting portions, the sleeve portion is sleeved on the ends of the two connecting portions, and the sleeve portion is threadedly connected to the connecting portions.

[0021] By adopting the above technical scheme, the transmission rod arranged in sections is convenient for realizing the detachable connection between the sleeve part and the connecting part through the threaded connection between the sleeve part and the connecting part; when the sleeve part is separated from one of the connecting parts, it is convenient to realize the height adjustment of a single horizontal support plate, and then realize the single-end height adjustment of the arch frame of the steel arch frame middle unit; when the sleeve part is threadedly connected to the two connecting parts, the overall height adjustment of the arch frame of the steel arch frame middle unit is realized.

[0022] In a second aspect, the present application provides a method for installing a steel arch frame for tunnel construction, which adopts the following technical solution: A method for installing a steel arch frame for tunnel construction, using the steel arch frame installation trolley for tunnel construction, comprises the following steps: S1. Measurement and positioning: Check whether there is any under-excavation in the tunnel excavation section. If there is any under-excavation, continue to excavate the under-excavation position to the required size. Then, according to the installation requirements of the steel arch frame, measure and mark the installation position of the steel arch frame; S2. Pre-assembly of the steel arch frame: fix the arch frame of the middle unit on the auxiliary support device, temporarily fix the arch frames of the arch foot units on both sides on the wing plates of the trolley body, and assemble the arch frame of the arch foot unit and the arch frame of the middle unit; S3. Initial installation of the steel arch frame: The trolley body enters the tunnel, the auxiliary support device lifts the steel arch frame, and adjusts the angle of the wing plate of the trolley body to make the steel arch frame fit the rock wall of the excavation section; S4. Fine-tuning of the steel arch frame: According to the installation mark of the steel arch frame, the angle, horizontality and position of the steel arch frame are fine-tuned through the auxiliary support device to make the steel arch frame fit closely with the rock wall of the excavation section; S5. Fixing of steel arch frame: fix the arch frame of the middle unit and the arch frame of the arch foot unit to the rock wall of the excavation section; S6. Laying steel mesh; S7. Concrete spraying: spray concrete in the gap between the steel arch frame and the surrounding rock to form a whole, and repeat the above steps to complete the remaining steel arch frame installation work.

[0023] By adopting the above technical scheme, firstly, check whether there is under-excavation in the tunnel excavation section. If there is under-excavation, continue to excavate the under-excavation position to the required size. If there is no under-excavation, measure the installation position of the steel arch frame and mark it according to the installation requirements of the steel arch frame; then fix the arch frame of the middle unit on the auxiliary support device, temporarily fix the arch frames of the arch foot units on both sides on the wing plates of the trolley body, and assemble the arch frame of the arch foot unit and the arch frame of the middle unit; then adjust the trolley body so that the trolley body enters the tunnel, adjust the auxiliary support device, the auxiliary support device lifts the steel arch frame, and adjust the trolley body to adjust the wing plate angle of the trolley body so that the steel arch frame fits the rock wall of the excavation section; then, according to the steel The installation mark of the arch frame is used to fine-tune the angle, horizontality and position of the steel arch frame through the auxiliary support device, so that the steel arch frame fits tightly with the rock wall of the excavation section; the arch frame of the middle unit and the arch frame of the arch foot unit are fixed to the rock wall of the excavation section by bolts or welding; then, the steel mesh is laid and fixed on the steel arch frame; concrete is sprayed in the gap between the steel arch frame and the surrounding rock to form a whole, and the remaining steel arch frame installation operations are completed in a cycle according to the above steps; through the installation method of the steel arch frame used for tunnel construction, it is convenient to adjust the installation position of the steel arch frame according to the installation requirements of the steel arch frame, reduce the manpower loss during the installation of the steel arch frame, and improve the installation efficiency of the steel arch frame.

[0024] In summary, the present application includes at least one of the following beneficial technical effects: 1. The steel arch frame installation trolley designed for tunnel construction uses a scissor-type lifting platform and a rotating mechanism to drive the steel arch frame to rotate slightly according to the construction requirements of the steel arch frame, thereby facilitating the adjustment of the installation position of the steel arch frame, avoiding the manual adjustment of the steel arch frame position by workers during the installation of the steel arch frame in the prior art, and improving the installation efficiency of the steel arch frame; 2. The steel arch frame installation trolley designed for tunnel construction facilitates the single end of the arch frame of the middle unit of the steel arch frame to move along the length direction of the tunnel through the lifting mechanism, thereby realizing that one end of the arch frame of the middle unit of the steel arch frame is fixed and the other end is adjusted in angle, and it can also realize that the two ends of the arch frame of the middle unit of the steel arch frame move synchronously along the length direction of the tunnel, thereby realizing the overall position adjustment of the steel arch frame in the horizontal direction; at the same time, it realizes the single-end height adjustment of the arch frame of the middle unit of the steel arch frame, realizes the single-end angle adjustment of the steel arch frame in the vertical plane, and can also realize the height adjustment of the arch frame of the middle unit of the steel arch frame in the vertical plane. BRIEF DESCRIPTION OF THE DRAWINGS

[0025] Figure 1 It is a schematic diagram of the overall structure of a steel arch frame installation trolley used for tunnel construction in Example 1 of the present application; Figure 2 It is a partial schematic diagram of a steel arch frame installation trolley used for tunnel construction in Example 1 of the present application, which is intended to illustrate an auxiliary support device; Figure 3 yes Figure 2 A cross-sectional view of the auxiliary support device is intended to illustrate the rotating assembly; Figure 4 yes Figure 3 A magnified schematic diagram of part A; Figure 5 yes Figure 2 A cross-sectional view of the auxiliary support device is intended to illustrate the driving parts; Figure 6 yes Figure 5 A magnified schematic diagram of part B; Figure 7 yes Figure 2 A cross-sectional view of a local structure in the auxiliary support device is intended to illustrate the adjustment slot; Figure 8 yes Figure 7 An enlarged schematic diagram of the C portion; Fig. 9 yes Figure 2 A partial structural diagram of the auxiliary support device is intended to illustrate the jacking assembly; Fig.10 yes Fig. 9 An enlarged schematic diagram of part D of FIG.

[0026] Explanation of the reference numerals: 1. trolley body; 2. auxiliary support device; 3. lifting mechanism; 31. base; 32. scissor-type lifting platform; 33. platform base; 4. rotating mechanism; 41. rotating platform; 42. rotating assembly; 421. driving motor; 422. driving gear; 423. driven gear; 424. gear ring; 425. annular slide rail; 426. ball bearing; 5. lifting mechanism; 51. horizontal adjustment assembly; 511. horizontal support plate ; 512, driving member; 5121, horizontal hydraulic cylinder; 5122, mounting seat; 5123, spherical slider; 5124, spherical slide; 5125, adjusting groove; 52, lifting assembly; 521, lifting hydraulic cylinder; 522, lifting support plate; 523, base shell; 524, accommodating groove; 525, transmission rack; 526, transmission gear; 527, transmission rod; 5271, connecting part; 5272, socket part; 528, bracket. DETAILED DESCRIPTION

[0027] The following is combined with Figure 1-10 This application is described in further detail.

[0028] In a first aspect, an embodiment of the present application discloses a steel arch frame installation trolley for tunnel construction.

[0029] Reference Figure 1 A steel arch frame installation trolley for tunnel construction includes a trolley body 1 and an auxiliary support device 2 for lifting the steel arch frame. The auxiliary support device 2 is installed on the trolley body 1. The auxiliary support device 2 includes a lifting mechanism 3 for adjusting the height of the steel arch frame, a rotating mechanism 4 for rotating the steel arch frame in the horizontal direction, and a lifting mechanism 5 for lifting the steel arch frame; the lifting mechanism 3, the rotating mechanism 4 and the lifting mechanism 5 are arranged in sequence from low to high.

[0030] Reference Figure 1 and Figure 2 The lifting mechanism 3 includes a base 31 installed on the trolley body 1, a platform base 33 located directly above the base 31, and a scissor-type lifting platform 32 for adjusting the height of the platform base 33. The base 31, the scissor-type lifting platform 32 and the platform base 33 are arranged in sequence from low to high. The base 31 is fixed to the upper surface of the trolley body 1 by bolts. In this embodiment, the scissor-type lifting platform 32 adopts a fixed scissor-type lifting platform 32. The scissor-type lifting platform 32 is fixed to the base 31 by bolts, and the platform base 33 is fixed to the surface of the scissor-type lifting platform 32 by bolts.

[0031] Reference Figure 3 and Figure 4The rotating mechanism 4 includes a rotating platform 41 installed directly above the platform base 33 and a rotating assembly 42 for driving the rotating platform 41 to rotate. The platform base 33, the rotating assembly 42 and the rotating platform 41 are arranged in sequence from low to high, and the rotating platform 41 is connected to the platform base 33 through the rotating assembly 42; the rotating assembly 42 includes a gear ring 424, a driven gear 423, a driving gear 422 and a driving motor 421. The driving motor 421 is installed in the inner cavity of the platform base 33, and the driving gear 422 is installed on the output shaft of the driving motor 421 extending out of the platform base 33, and the driving gear 422 rotates synchronously with the output shaft of the driving motor 421 In this embodiment, the output shaft of the driving motor 421 is key-connected with the driving gear 422, and the output shaft of the driving motor 421 is coaxially connected with the driving gear 422; the driven gear 423 is rotatably connected with the platform base 33, and the driven gear 423 and the driving gear 422 as well as the driven gear 423 and the gear ring 424 are all meshed; the driven gear 423 is located between the driving gear 422 and the gear ring 424, and the driving gear 422 is driven to rotate by the output shaft of the driving motor 421. Since the driving gear 422 is meshed with the driven gear 423, the driving gear 422 drives the driven gear 423 to rotate. Since the driven gear 423 is meshed with the gear ring 424, the driven gear 423 is driven to rotate by the driven gear 423. The driven gear 423 drives the gear ring 424 to rotate, thereby realizing the rotation of the gear ring 424; in addition, a plurality of driven gears 423 may also be provided. In the present application, the driven gears 423 may be two, three, or four, as long as the gear ring 424 is driven to rotate by the driving gear 422. In the present embodiment, three driven gears 423 are provided, and the three driven gears 423 are evenly distributed along the circumferential direction of the driving gear 422, and the gear ring 424 is sleeved on the outer circumference of the three driven gears 423. The installation circle formed by the centers of the three driven gears 423, the piston rod of the driving motor 421, the installation circle, the driving gear 422, and the gear ring 424 are concentrically arranged The gear ring 424 is fixedly connected to the rotating platform 41, the gear ring 424 is coaxially arranged with the rotating platform 41, and the gear ring 424, the driving gear 422 and the driven gear 423 are located on the same horizontal plane, an annular slide rail 425 is welded on the platform base 33, the annular slide rail 425 is located directly below the gear ring 424, a plurality of balls 426 are rotatably connected to the annular slide rail 425, and a plurality of balls 426 are located on the side of the annular slide rail 425 close to the gear ring 424, so as to reduce the friction between the annular slide rail 425 and the gear ring 424, so as to facilitate the gear ring 424 to drive the rotating platform 41 to rotate, realize the rotation of the steel arch frame, and then realize the angle adjustment of the steel arch frame.

[0032] Reference Figure 2 The lifting mechanism 5 is installed on the rotating platform 41 , and the lifting mechanism 5 includes a horizontal adjustment component 51 and a jacking component 52 .

[0033] Reference Figure 5 and Figure 6 The horizontal adjustment component 51 includes a horizontal support plate 511 and a driving member 512 for driving the horizontal support plate 511 to slide along the length direction of the tunnel. The horizontal support plate 511 is located directly above the rotating platform 41, and the horizontal support plate 511 is slidably connected to the rotating platform 41; two groups of driving members 512 are provided, and a symmetry line is set on one diameter line of the rotating platform 41, and the two groups of driving members 512 are symmetrically distributed about the symmetry line.

[0034] Reference Figure 7 and Figure 8 The driving member 512 includes a spherical slider 5123, a mounting seat 5122 and a horizontal hydraulic cylinder 5121. An adjusting groove 5125 for sliding the mounting seat 5122 is provided on the bottom wall of the horizontal support plate 511. The length direction of the adjusting groove 5125 is perpendicular to the length direction of the symmetry line. A spherical slide groove 5124 for sliding the spherical slider 5123 is provided on the rotating platform 41. In addition, the spherical slider 5123 in the present application extends out of the spherical slide groove 5124. The extension of the spherical slider 5123 extending out of the spherical slide groove 5124 is rotatably connected to the mounting seat 5122. The spherical slide groove 5124 is distributed along the length direction of the symmetry line. The spherical slider 5123 and the spherical slide groove 5124 facilitate the single horizontal support plate 511 moves along the length direction of the spherical slide 5124, thereby realizing single-end horizontal adjustment of the steel arch frame. At the same time, it is also convenient for the two horizontal support plates 511 to be adjusted synchronously, thereby realizing the adjustment of the steel arch frame along the length direction of the spherical slide 5124; the horizontal hydraulic cylinder 5121 is installed on the rotating platform 41. In this embodiment, the horizontal hydraulic cylinder 5121 is fixed to the rotating platform 41 by bolts, and the piston rod of the horizontal hydraulic cylinder 5121 is arranged along the length direction of the symmetry line. The piston rod of the horizontal hydraulic cylinder 5121 is fixedly connected to the mounting seat 5122. In this embodiment, the piston rod of the horizontal hydraulic cylinder 5121 is connected to the mounting seat 5122 by bolts to facilitate driving the spherical slider 5123 to slide along the spherical slide 5124.

[0035] Reference Fig. 9 and Fig.10The lifting assembly 52 includes lifting plates 522 symmetrically distributed on both sides of the symmetry line, a lifting hydraulic cylinder 521 for driving each lifting plate 522 to rise and fall, a base shell 523 covered on each lifting hydraulic cylinder 521, a transmission rack 525 fixedly connected to the piston rod of each lifting hydraulic cylinder 521, a transmission gear 526 located in the inner cavity of each base shell 523, and a transmission rod 527 that rotates synchronously with the two transmission gears 526. The lifting hydraulic cylinder 521 is vertically installed on the horizontal support plate 511, and the piston rod of the lifting hydraulic cylinder 521 is bolted to the lifting plate 522. A bracket for engaging the steel arch frame is opened on the top wall of the lifting plate 522 528, in this embodiment, the width of the bracket 528 is greater than the width of the steel arch frame, so as to facilitate the single-end adjustment of the steel arch frame, and the groove wall of the bracket 528 is provided with anti-slip grooves, so as to increase the friction between the lifting support plate 522 and the steel arch frame and reduce the possibility of position deviation of the steel arch frame; and, the piston rod of the lifting hydraulic cylinder 521 is provided with a receiving groove 524 for accommodating the transmission rack 525. In this embodiment, the thickness of the transmission rack 525 is less than the thickness of the receiving groove 524, so as to prevent the piston rod of the lifting hydraulic cylinder 521 from moving along the cylinder body of the lifting hydraulic cylinder 521, and the receiving groove 524 is along the length direction of the piston rod of the lifting hydraulic cylinder 521. The transmission gear 526 is meshed with the transmission rack 525, the end of the transmission rod 527 extends into the inner cavity of the base shell 523 and is coaxially fixed to the transmission gear 526, and the transmission rod 527 is rotatably connected to the base shell 523. In this embodiment, the transmission gear 526 and the transmission rod 527 are key-connected to facilitate the synchronous rotation of the transmission gear 526 and the transmission rod 527; the transmission rod 527 includes a sleeve portion 5272 and two connecting portions 5271, the sleeve portion 5272 is sleeved on the ends of the two connecting portions 5271, and the sleeve portion 5272 is threadedly connected to the connecting portion 5271, and the connecting portion 5271 is rotatably connected to the base shell 523. In this embodiment, the two connecting portions 5271 The thread rotation direction is the same to avoid relative displacement of the two connecting parts 5271 during the rotation of the sleeve part 5272, and the sleeve part 5272 is located between the two base shells 523, so that the staff can adjust the position of the sleeve part 5272 to achieve the connection and separation of the sleeve part 5272 and one of the connecting parts 5271; in addition, when the sleeve part 5272 is connected to the connecting part 5271, a limiting bolt can be passed through the sleeve part 5272 and inserted into the connecting part 5271 to fix the position of the sleeve part 5272 and the connecting part 5271, so as to avoid separation of the sleeve part 5272 and the connecting part 5271 during the rotation of the transmission gear 526.

[0036] The implementation principle of the steel arch frame installation trolley for tunnel construction in the embodiment of the present application is as follows: first, check whether there is under-excavation in the tunnel excavation section. If there is under-excavation, continue to excavate the under-excavation position to the required size. If there is no under-excavation, measure the installation position of the steel arch frame according to the installation requirements of the steel arch frame and mark it; install the arch frame of the middle unit of the steel arch frame on the bracket 528, and temporarily fix the arch frame of the arch foot unit of the steel arch frame on the wing plate of the trolley body 1, and assemble the arch foot unit arch frame and the middle unit arch frame to complete the assembly of the steel arch frame; then, adjust the scissor-type lifting platform 32, and the scissor-type lifting platform 32 drives the platform base 33 to rise, and rises to the rock wall where the arch frame of the middle unit of the steel arch frame is close to the excavation section, and the staff checks the installation of the arch frame of the middle unit of the steel arch frame. Check whether the installation position is aligned with the marked position. If so, the scissor-type lifting platform 32 continues to drive the platform base 33 to rise until the arch frame of the middle unit of the steel arch frame fits the rock wall of the excavation section; if the installation position of the arch frame of the middle unit of the steel arch frame is misaligned with the marked position, adjust the auxiliary support device 2 according to the position deviation of the steel arch frame, and the auxiliary support device 2 drives the steel arch frame to move until the installation position of the arch frame of the middle unit of the steel arch frame is aligned with the marked position; then, fix the arch frame of the middle unit and the arch frame of the arch foot unit to the rock wall of the excavation section, adjust the scissor-type lifting platform 32, so that the platform base 33 is lowered to the initial height; then lay the steel mesh, spray concrete in the gap between the arch frame and the surrounding rock to form a whole, and repeat the above steps to complete the remaining steel arch frame installation operations.

[0037] The embodiment of the present application also discloses a method for installing a steel arch frame used in tunnel construction.

[0038] A method for installing a steel arch frame for tunnel construction, using the above-mentioned steel arch frame installation trolley for tunnel construction, comprises the following steps: S1. Measurement and positioning: Check whether there is any under-excavation in the tunnel excavation section. If there is any under-excavation, continue to excavate the under-excavation position to the required size. Then, according to the installation requirements of the steel arch frame, measure and mark the installation position of the steel arch frame; S2, pre-assembly of the steel arch frame: fix the arch frame of the middle unit on the auxiliary support device 2, and fit the steel arch frame into the bracket 528 of the lifting support plate 522, then temporarily fix the arch frames of the arch foot units on both sides on the wing plates of the trolley body 1, and assemble the arch foot unit arch frame and the middle unit arch frame; S3, initial installation of the steel arch frame: the trolley body 1 enters the tunnel and moves the trolley body 1 to the marked position of the steel arch frame, then the steel arch frame is lifted by the auxiliary support device 2. When the auxiliary support device 2 lifts the steel arch frame, the scissor-type lifting platform 32 is adjusted, and the scissor-type lifting platform 32 drives the platform base 33 to rise until the arch frame of the middle unit of the steel arch frame is close to the rock wall of the excavation section, and the wing plate angle of the trolley body 1 is adjusted to make the steel arch frame fit the rock wall of the excavation section; S4, fine-tuning the steel arch: fine-tuning the angle, levelness and position of the steel arch through the auxiliary support device 2 according to the installation mark of the steel arch; When the height of the steel arch frame is fine-tuned in the vertical plane, the lifting hydraulic cylinder 521 is adjusted, and the piston rod of the lifting hydraulic cylinder 521 drives the transmission rack 525 to move synchronously. Since the transmission rack 525 is meshed with the transmission gear 526, the transmission gear 526 drives the transmission rod 527 to rotate, and the transmission rod 527 drives another transmission gear 526 to rotate. Since another transmission gear 526 is meshed with another transmission rack 525, it drives the piston rod of another lifting hydraulic cylinder 521 to move, and the two horizontal support plates 511 are lifted and lowered synchronously to realize the lifting of the steel arch frame; When the height of the steel arch frame is finely adjusted at one end in the vertical plane, the sleeve joint 5272 is rotated so that the sleeve joint 5272 is separated from one of the connecting parts 5271, and the piston rod of the lifting hydraulic cylinder 521 corresponding to the end of the steel arch frame to be adjusted drives the horizontal support plate 511 to rise and fall, thereby achieving fine adjustment of the height of the steel arch frame at one end; When the position of the steel arch frame in the horizontal plane is fine-tuned, the two horizontal hydraulic cylinders 5121 are adjusted, and the piston rod of the horizontal hydraulic cylinder 5121 applies force to the mounting seat 5122, and the mounting seat 5122 drives the spherical slider 5123 to slide along the spherical slide groove 5124. At the same time, the mounting seat 5122 drives the horizontal support plate 511 to move, and the horizontal support plate 511 drives the lifting support plate 522 and the steel arch frame above it to move, so as to realize the horizontal position adjustment of the steel arch frame; When the single-end position of the steel arch frame is fine-tuned in the horizontal plane, the horizontal hydraulic cylinder 5121 corresponding to the end of the steel arch frame to be adjusted is adjusted, and the piston rod of the horizontal hydraulic cylinder 5121 applies force to the mounting seat 5122, and the mounting seat 5122 drives the spherical slider 5123 to slide along the spherical slide groove 5124. At the same time, the mounting seat 5122 drives the horizontal support plate 511 to move, and the mounting seat 5122 slides along the adjustment groove 5125, and the horizontal support plate 511 drives the jacking support plate 522 and the steel arch frame above it to move, so as to realize the single-end position adjustment of the steel arch frame in the horizontal direction; When the angle of the steel arch frame in the horizontal plane is fine-tuned, the drive motor 421 is adjusted, and the output shaft of the drive motor 421 drives the driving gear 422 to rotate, the driving gear 422 drives the driven gear 423 to rotate, the driven gear 423 drives the gear ring 424 to rotate, the gear ring 424 drives the rotating platform 41 to rotate, and the rotating platform 41 drives the lifting support plate 522 above it and the steel arch frame to rotate slightly, so as to achieve the fine adjustment of the angle of the steel arch frame in the horizontal plane; According to the installation position of the steel arch frame, adjust the steel arch frame to fit closely with the rock wall of the excavation section; S5. Fixing of steel arch frame: fix the arch frame of the middle unit and the arch frame of the arch foot unit to the rock wall of the excavation section; S6. Laying steel mesh; S7. Concrete spraying: spray concrete in the gap between the steel arch frame and the surrounding rock to form a whole, and repeat the above steps to complete the remaining steel arch frame installation work.

[0039] The above are all preferred embodiments of the present application, and the protection scope of the present application is not limited thereto. Therefore, any equivalent changes made according to the structure, shape, and principle of the present application should be included in the protection scope of the present application.

Claims

1. A steel arch installation trolley for tunnel construction, characterized in that: It comprises a trolley body (1) and an auxiliary support device (2) for lifting a steel arch frame, wherein the auxiliary support device (2) is installed on the trolley body (1); The auxiliary support device (2) comprises a lifting mechanism (3), a rotating mechanism (4) and a lifting mechanism (5); The lifting mechanism (3) comprises a platform base (33) installed above the trolley body (1) and a scissor-type lifting platform (32) for adjusting the height of the platform base (33); the scissor-type lifting platform (32) is located directly below the platform base (33), and the trolley body (1) and the platform base (33) are fixedly connected via the scissor-type lifting platform (32); The rotating mechanism (4) comprises a rotating platform (41) installed directly above the platform base (33) and a rotating assembly (42) for driving the rotating platform (41) to rotate, the platform base (33), the rotating assembly (42) and the rotating platform (41) are arranged in sequence from low to high, and the rotating platform (41) is connected to the platform base (33) through the rotating assembly (42); The lifting mechanism (5) is installed on the rotating platform (41), and the lifting mechanism (5) is used to lift the steel arch frame.

2. The steel arch installation trolley for tunnel construction according to claim 1, characterized in that: The rotating assembly (42) comprises a gear ring (424), a driven gear (423), a driving gear (422) and a driving motor (421), wherein the output shafts of the gear ring (424), the driving gear (422) and the driving motor (421) are coaxially arranged; the driving motor (421) is installed in the inner cavity of the platform base (33), and the driving gear (422) is coaxially installed on the output shaft of the driving motor (421) extending from the platform base (33); the driven gear (423) is rotatably connected to the platform base (33), the driven gear (423) is located between the driving gear (422) and the gear ring (424), and the driven gear (423) and the driving gear (422) as well as the driven gear (423) and the gear ring (424) are all meshed; the gear ring (424) is fixedly connected to the rotating platform (41).

3. The steel arch installation trolley for tunnel construction according to claim 2 is characterized in that: A plurality of the driven gears (423) are provided, and the plurality of the driven gears (423) are evenly distributed along the circumferential direction of the driving gear (422).

4. The steel arch installation trolley for tunnel construction according to claim 1, characterized in that: The lifting mechanism (5) comprises a horizontal adjustment component (51) and a lifting component (52); The horizontal adjustment assembly (51) comprises a horizontal support plate (511) and a driving member (512) for driving the horizontal support plate (511) to slide along the length direction of the tunnel, the horizontal support plate (511) is located directly above the rotating platform (41), and the horizontal support plate (511) is slidably connected to the rotating platform (41); The jacking assembly (52) is installed on the horizontal support plate (511), and the steel arch frame is installed on the jacking assembly (52).

5. The steel arch installation trolley for tunnel construction according to claim 4, characterized in that: The driving member (512) is provided with two groups, one of the diameter lines of the rotating platform (41) is provided with a symmetry line, and the two groups of the driving members (512) are symmetrically distributed about the symmetry line. The driving member (512) comprises a spherical slider (5123), a mounting seat (5122) and a horizontal hydraulic cylinder (5121), and an adjustment groove (5125) for sliding of the mounting seat (5122) is provided on the bottom wall of the horizontal support plate (511), and the length direction of the adjustment groove (5125) is parallel to the length direction of the symmetry line. The spherical slider (5123) is rotatably connected to the mounting seat (5122); a spherical slide groove (5124) for the spherical slider (5123) to slide is provided on the rotating platform (41); the spherical slide groove (5124) is arranged along the length direction of the symmetry line; the horizontal hydraulic cylinder (5121) is installed on the rotating platform (41), and the horizontal hydraulic cylinder (5121) drives the spherical slider (5123) to slide along the spherical slide groove (5124).

6. The steel arch installation trolley for tunnel construction according to claim 5, characterized in that: The jacking assembly (52) includes jacking plates (522) symmetrically distributed on both sides of the symmetry line and a jacking hydraulic cylinder (521) for driving each of the jacking plates (522) to rise and fall; the jacking hydraulic cylinder (521) is vertically installed on the horizontal plate (511), and the piston rod of the jacking hydraulic cylinder (521) is fixedly connected to the jacking plate (522), and a bracket (528) for engaging a steel arch frame is provided on the top wall of the jacking plate (522).

7. The steel arch installation trolley for tunnel construction according to claim 6, characterized in that: The lifting assembly (52) further comprises the base shell (523) covered on each of the lifting hydraulic cylinders (521), a transmission rack (525) fixedly connected to the piston rod of each of the lifting hydraulic cylinders (521), a transmission gear (526) located in the inner cavity of each of the base shells (523), and a transmission rod (527) that rotates synchronously with the two transmission gears (526); The piston rod of the lifting hydraulic cylinder (521) is provided with a receiving groove (524) for receiving a transmission rack (525). The transmission rack (525) is arranged along the length direction of the piston rod of the lifting hydraulic cylinder (521). The transmission gear (526) is meshed with the transmission rack (525). The end of the transmission rod (527) extends into the inner cavity of the base shell (523) and is coaxially fixedly connected with the transmission gear (526).

8. The steel arch installation trolley for tunnel construction according to claim 7, characterized in that: The transmission rod (527) comprises a sleeve portion (5272) and two connecting portions (5271), wherein the sleeve portion (5272) is sleeved on the ends of the two connecting portions (5271), and the sleeve portion (5272) is threadedly connected to the connecting portions (5271).

9. A method for installing a steel arch frame for tunnel construction, characterized in that: The steel arch installation trolley for tunnel construction according to any one of claims 1 to 8 comprises the following steps: S1. Measurement and positioning: Check whether there is any under-excavation in the tunnel excavation section. If there is any under-excavation, continue to excavate the under-excavation position to the required size. Then, according to the installation requirements of the steel arch frame, measure and mark the installation position of the steel arch frame; S2, pre-assembly of the steel arch frame: fix the arch frame of the middle unit on the auxiliary support device (2), temporarily fix the arch frames of the arch foot units on both sides on the wing plates of the trolley body (1), and assemble the arch frame of the arch foot unit and the arch frame of the middle unit; S3, initial installation of the steel arch frame: the trolley body (1) enters the tunnel, the auxiliary support device (2) lifts the steel arch frame, and adjusts the angle of the wing plate of the trolley body (1) so that the steel arch frame fits the rock wall of the excavation section; S4, fine-tuning the steel arch frame: fine-tuning the angle, horizontality and position of the steel arch frame by means of the auxiliary support device (2) according to the installation mark of the steel arch frame, so that the steel arch frame fits closely with the rock wall of the excavation section; S5. Fixing of steel arch frame: fix the arch frame of the middle unit and the arch frame of the arch foot unit to the rock wall of the excavation section; S6. Laying steel mesh; S7. Concrete spraying: spray concrete in the gap between the steel arch frame and the surrounding rock to form a whole, and repeat the above steps to complete the remaining steel arch frame installation work.

Citation Information

Cited By

  • Tunnel lagging jack mounting equipment

    CN119712176A

  • A tunnel arch installation device

    CN119712176B

  • Pipeline mounting device based on assistance of lift truck and use method

    CN121493844A