Underwater tunnel deformation joint anti-seepage structure adopting weir building method and construction method
By using the combination of M corrugated stainless steel corrugated plate water stop and high-modulus polyurethane sealant in the deformation joint of the underwater tunnel, the problem of waterproof performance failure caused by staggered deformation under uneven settlement is solved, and the different The effect of uniform deformation in the direction ensures the waterproof performance of underwater tunnels in the weir construction method.
Patent Information
- Application Number
- CN202410965621.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-18
- Publication Date
- 2024-11-22
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The existing weir construction method underwater tunnel deformation joint anti-seepage structure cannot effectively withstand staggered deformation under uneven settlement conditions, resulting in waterproofing performance failure, especially the inconsistent arrangement direction of the anti-seepage structure of the tunnel top and bottom plates and side walls, and traditional water stopping The staggered deformation ability of the belt in different directions varies greatly.
Using M corrugated stainless steel corrugated plate water stop belt (middle buried or built-in type) combined with high-modulus polyurethane sealant and PE foam rod, combined with quick-cooling rubber asphalt waterproof spray coating and waterproof coil material, a kind of weir building is designed The anti-seepage structure of the deformed joint of the method underwater tunnel improves the staggered deformation ability through embedded steel pads and Ω-type water stops, and uniformly withstands deformation in different directions.
Improve the staggered deformation capability of the deformation joints of the underwater tunnel in different directions of the weir construction method, ensure the maintenance of waterproof performance, especially the sealing effect of stainless steel corrugated plates and the edge walls of the deformation joints under high water pressure, and extend the waterproof structure service life.
Smart Images

Figure CN118997231A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to an anti-seepage structure and a construction method for a deformation joint of an underwater tunnel under uneven settlement conditions, and is applicable to the field of underwater tunnels using a weir construction method. Background Art
[0002] Under the condition of coordinated uneven deformation, the anti-seepage performance of underwater tunnel deformation joints will directly affect the reliability of tunnel engineering. Once the waterproof function is lost, seepage water will flow into the tunnel along the deformation joints. Tunnel leakage will not only reduce the durability of the tunnel concrete structure, but also threaten the normal use of various electromechanical facilities in the tunnel, and will deteriorate the driving environment in the tunnel, and even cause traffic interruption in the tunnel. Therefore, the anti-seepage performance of deformation joints is the weak link of underwater tunnel waterproofing and the key link to ensure the safe operation of underwater tunnel engineering.
[0003] Patent 201510459568.4 discloses an airbag-type open-cut tunnel deformation joint sealing structure, in which a groove is provided along the circumference of the inner wall of the tunnel at the position of the deformation joint inside the tunnel, and an airbag-type waterstop is provided in the groove, and a baffle fixed to the inner wall of the tunnel is provided at the open end of the groove. The post-installed waterstop is adopted, so it is not restricted by the conditions of the construction site, and does not require high-standard protection on site. The airbag-type waterstop can be replaced without affecting the use function, meeting the durability requirements. However, the airbag-type waterstop cannot guarantee its waterproof performance under the premise of bearing dislocation deformation.
[0004] Patent 201911045184.2 discloses a waterproof structure for deformation joints in open-cut tunnels. The deformation joints of the bottom plate are composed of waterproof rolls, waterproof roll reinforcement layers, external waterstops, and embedded steel-edge rubber waterstops. The caulking materials are PE foam rods and high-modulus polyurethane sealants. The deformation joints of the top plate are composed of linoleum isolation layers, waterproof rolls and waterproof roll reinforcement layers, and embedded steel-edge rubber waterstops. The caulking materials are PE foam rods and low-modulus polyurethane sealants and high-modulus polyurethane sealants. The deformation joints of the side walls are composed of waterproof rolls, waterproof roll reinforcement layers, external waterstops, and embedded steel-edge rubber waterstops. The caulking materials are high-modulus polyurethane sealants, low-modulus polyurethane sealants, and nitrile cork rubber. This invention limits structural deformation by changing the deformation joints of the top plate from through seams to folded plate seams, but it still cannot guarantee its waterproof performance under the premise of bearing dislocation deformation.
[0005] Patent CN 100591867C discloses a method for constructing an anti-seepage structure for deformation joints in ground fissure strata tunnels, which achieves an anti-seepage effect by filling and sealing the deformation joints with asphalt concrete. This invention can withstand displacement deformation and maintain waterproof performance, but only considers displacement deformation in the direction of the vertical lining inner and outer walls, and does not consider that if the tunnel deformation joint opens, the filler will have a gap with the side wall of the deformation joint, and the anti-seepage structure will fail.
[0006] Patent CN 100507164C discloses a waterproofing method for open-cut tunnels that can adapt to large-scale uneven settlement or dislocation of strata. The deformation joint adopts a buried waterstop and a double-channel Ω waterstop, and a grouting pipe is reserved; it has the ability to adapt to large deformations and maintain waterproof performance under certain water pressure conditions. The invention can withstand dislocation deformation and maintain waterproof performance, but only considers the dislocation deformation in the direction of the inner and outer walls of the vertical lining, and does not consider that the dislocation deformation direction relative to the deformation joint waterproof structure in the top and bottom plates of the tunnel structure is inconsistent with the waterproof structure relative to the deformation joint in the side wall at this time. The waterproof structure needs to adapt to the dislocation deformation direction and cannot only be perpendicular to the inner and outer walls of the lining.
[0007] Patent 202211477071.1 discloses a tunnel deformation joint structure and construction method, including a tunnel structure precast section and a tunnel structure postcast section, wherein a viscous waterproof material is provided in the deformation joint between the tunnel structure precast section and the tunnel structure postcast section; a steel sleeve with an opening toward the tunnel structure postcast section is embedded in the tunnel structure precast section, a steel bar is inserted in the steel sleeve, and one end of the steel bar passes through the viscous waterproof material and is anchored in the tunnel structure postcast section. The present invention does not consider whether the deformation joint can withstand the displacement deformation and ensure its waterproof performance.
[0008] Patent CN 101748755B discloses a tunnel deformation joint asphalt mastic flexible connection sealing anti-seepage structure and construction method to ensure the normal use of subway tunnels under ground fissure stratum activity. The technical solution adopted by the present invention is: first lay a modified asphalt anti-seepage board composite layer, then pour reinforced concrete lining, set deformation joints, install retractable baffles in the deformation joints, close the baffle gaps with glass fiber cloth, pour asphalt mastic, and fill the deformation joint gaps. This invention can withstand displacement deformation and maintain waterproof performance, but only considers the displacement deformation in the direction of the inner and outer walls of the vertical lining, and does not consider that if the tunnel deformation joint opens, the filler will have a gap with the side wall of the deformation joint, and the anti-seepage structure will fail. Summary of the invention
[0009] Technical problem: The present invention discloses an anti-seepage structure and construction method for underwater tunnel deformation joints using the weir construction method. Deformation joints are important structures for coordinating uneven deformation of underwater tunnels, and are also the weakest link in tunnel waterproofing. Deformation joint anti-seepage structures need to withstand displacement deformation and still ensure good waterproofing performance. However, the arrangement directions of the anti-seepage structures of the tunnel roof and floor plates and the side walls are inconsistent, and the ability of traditional waterstops to withstand displacement deformation in different directions varies greatly. The existing anti-seepage structure technology for underwater tunnel deformation joints using the weir construction method does not take into account that under the action of uneven settlement, the displacement deformation direction of the tunnel structure roof and floor plates relative to the deformation joint waterproof structure is inconsistent with that of the side walls relative to the deformation joint waterproof structure at this time. The tunnel deformation joint waterproof structure needs to adapt to the displacement deformation direction and cannot be simply perpendicular to the inner and outer walls of the lining.
[0010] Technical solution: The present invention is a weir-built underwater tunnel deformation joint anti-seepage structure. When the tunnel deformation joint anti-seepage structure is located on the bottom plate, polypropylene waterproof membrane, reverse-adhesive quick-setting rubber asphalt waterproof spray coating, and external rubber waterstop are sequentially arranged from the water-facing side to the water-receiving side; a low-modulus polyurethane sealant is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop, a corrugated plate waterstop is arranged on the upper part of the low-modulus polyurethane sealant, a high-modulus polyurethane sealant is arranged inside the corrugated plate waterstop, a PE foam rod is arranged on the upper part of the high-modulus polyurethane sealant, a water collecting box is arranged on the upper part of the PE foam rod, embedded steel pads are arranged on the upper part of the left concrete structure and the right concrete structure, and an Ω-type waterstop is arranged on the uppermost part, and the Ω-type waterstop is fixed by screws and nuts.
[0011] When the tunnel deformation joint anti-seepage structure is located on the top plate, SBS waterproof membrane, quick-setting rubber asphalt waterproof spray coating and external rubber waterstop are arranged in sequence from the water-facing side to the water-receiving side; low modulus polyurethane sealant is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop, corrugated plate waterstop is arranged on the upper part of the low modulus polyurethane sealant, high modulus polyurethane sealant is arranged inside the corrugated plate waterstop, PE foam rod is arranged on the upper part of the high modulus polyurethane sealant, water collecting box is arranged on the upper part of the PE foam rod, embedded steel pads are arranged on the upper part of the left concrete structure and the right concrete structure, and Ω-type waterstop is arranged on the upper part, which is fixed by screws and nuts.
[0012] When the tunnel deformation joint anti-seepage structure is located at the side plate, waterproof mortar, reverse-adhesive quick-setting rubber asphalt waterproof spray coating and external rubber waterstop are sequentially arranged from the water-facing side to the water-receiving side; a low-modulus polyurethane sealant is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop, a corrugated plate waterstop is arranged on the upper part of the low-modulus polyurethane sealant, a high-modulus polyurethane sealant is arranged inside the corrugated plate waterstop, a PE foam rod is arranged on the upper part of the high-modulus polyurethane sealant, a water collecting box is arranged on the upper part of the PE foam rod, embedded steel pads are arranged on the upper part of the left concrete structure and the right concrete structure, and an Ω-type waterstop is arranged on the upper part, which is fixed by screws and nuts.
[0013] The corrugated plate waterstop adopts M-corrugated stainless steel corrugated plate waterstop, which improves its ability to withstand displacement deformation in different directions. At the same time, high modulus polyurethane sealant is filled in the deformation joint at the rear end of the M-corrugated stainless steel corrugated plate, so that the stainless steel corrugated plate will squeeze the high modulus polyurethane sealant when subjected to high water pressure, thereby further sealing the gap between the stainless steel corrugated plate and the concrete on the side wall of the deformation joint.
[0014] The corrugated plate water stop adopts an embedded or internal structure.
[0015] The specific steps of the construction method of the underwater tunnel deformation joint anti-seepage structure by the weir construction method of the present invention are as follows:
[0016] Step 1: After the excavation of the open excavation foundation pit project of the weir construction method, pour the foundation cushion layer and the leveling layer, spray a 25-30cm waterproof mortar layer on the side wall of the foundation pit and smooth it; after the foundation leveling layer is dry, clean the base layer, remove the debris that affects the construction, and use cement bonding slurry prepared with cement and polypropylene glue to make an additional layer. Before bonding, try to lay the polypropylene waterproof membrane, then fold the two ends of the membrane in half and roll it up, pour the prepared cement bonding slurry on the base layer, and scrape it evenly with a scraper, then push the membrane forward and lay it, and use a scraper to remove the air left inside the membrane in time, scrape out the excess bonding slurry, and the lap joint of the long and short sides should be no less than 80mm; the joints of adjacent short sides should be staggered by more than 100cm, and the wide sides should be staggered by 40-50cm when double-layered;
[0017] Step 2: Use the pre-spraying anti-adhesive process to spray the quick-setting rubber asphalt waterproof spray coating on the polypropylene waterproof membrane and waterproof mortar. The rubber asphalt waterproof spray coating is a continuous and dense water-based polymer coating formed by the reaction of liquid rubber emulsion component A composed of anionic rubber emulsion and nano-grade asphalt emulsion and special curing agent component B. The A and B component materials are sprayed and atomized through two nozzles in the airless spray system equipment respectively, cross-shaped outside the spray gun, and reach the base surface instantly after being fully mixed. Under the action of the electrolyte, they instantly break the emulsion, precipitate water, condense into a film, and solidify to form a dense, continuous, and complete coating layer. The peeling strength with the post-cast concrete structure reaches 3.0N / mm, and the elongation at break is 1000%;
[0018] Step 3: Determine the position of the expansion joint, set up the formwork for the tunnel lining concrete structure on the expansion joint half side, hot weld and fix the EB external rubber waterstop on the rubber asphalt waterproof spray coating at the expansion joint corresponding to the bottom plate and the side wall, and cold glue and fix the EB external rubber waterstop at the expansion joint corresponding to the top plate formwork; connect the embedded belt of the M corrugated stainless steel corrugated plate waterstop at the corresponding position of the steel bar layout; fix and weld the embedded steel pad to the steel bar; then cast the tunnel lining concrete structure on the expansion joint half side;
[0019] Step 4: Set up the formwork for the other half of the tunnel lining concrete structure of the deformation joint; connect the embedded belt of the M corrugated stainless steel corrugated plate waterstop belt at the corresponding position of the steel bar layout; fix and weld the embedded steel pad to the steel bar; then pour the tunnel lining concrete structure of the deformation joint half;
[0020] Step 5: Fill low modulus polyurethane sealant between the M corrugated stainless steel corrugated plate waterstop and the external rubber waterstop, press a PE foam rod into the inner side of the seam opening on the back surface of the deformation joint to play a temporary sealing and buffering role, and fill high modulus polyurethane sealant between the M corrugated stainless steel corrugated plate waterstop and the PE foam rod;
[0021] Step 6: After the tunnel lining concrete reaches the demoulding strength, the formwork is removed; the airless spray system equipment is used to spray the quick-setting rubber asphalt waterproof spray coating on the water-facing surface of the top plate, and then the national standard type II SBS waterproof membrane is laid on the waterproof spray coating;
[0022] Step 7: Install a water collection box on the back water surface of the inner side of the tunnel lining, rivet an Ω-type waterstop strip with screws and nuts on the outside of the water collection box, and spray quick-setting rubber asphalt waterproof spray paint on the joints between the screws and nuts.
[0023] Beneficial effects: Expansion joints are important structures for coordinating uneven deformation of underwater tunnels, and are also the weakest link in the waterproofing of underwater tunnels. The anti-seepage structure of the expansion joint needs to withstand settlement and displacement deformation to ensure its waterproofing performance. However, the layout directions of the anti-seepage structures of the tunnel top and bottom plates and the side walls are inconsistent, and their ability to withstand displacement deformation varies greatly. The present invention proposes an M-corrugated stainless steel corrugated plate waterstop (buried or built-in). The M-corrugated stainless steel corrugated plate replaces the traditional buried steel-edged rubber waterstop, and its ability to withstand displacement deformation in different directions is improved both in terms of material and morphological structure. At the same time, high modulus polyurethane sealant is filled in the expansion joint at the rear end of the M-corrugated stainless steel corrugated plate, so that the stainless steel corrugated plate will squeeze the high modulus polyurethane sealant when subjected to high water pressure, thereby further sealing the gap between the stainless steel corrugated plate and the concrete of the deformation joint side wall. The elongation at break of the quick-setting rubber asphalt waterproof spray coating is 1000% and the peel strength reaches 3.0N / mm, which can make the waterproof membrane tightly wrap the lining concrete structure and withstand the large deformation magnitude of the deformation joint. The outermost side of the top and bottom plates is the membrane, and the outermost side of the side wall is the waterproof mortar, which fully utilizes the flexibility of the membrane to waterproof but is not wear-resistant. If it is waterproof for the outer wall of the side wall, it will cause settlement and wear, while the waterproof mortar is rigid and waterproof, but it is easy to break as the outer wall of the top and bottom plates. BRIEF DESCRIPTION OF THE DRAWINGS
[0024] Figure 1 This is a schematic diagram of the anti-seepage structure at the top plate of the deformation joint of the underwater tunnel built by the weir method;
[0025] Figure 2 This is a schematic diagram of the anti-seepage structure at the bottom plate of the deformation joint of the underwater tunnel built by the weir method;
[0026] Figure 3 This is a schematic diagram of the anti-seepage structure at the side wall of the deformation joint of the underwater tunnel built by the weir method;
[0027] The figure includes: polypropylene waterproof membrane 1; reverse-adhesive quick-setting rubber asphalt waterproof spray coating 2; external rubber waterstop 3; low modulus polyurethane sealant 4; corrugated plate waterstop 5; high modulus polyurethane sealant 6; PE foam rod 7; water collection box 8; Ω-type waterstop 9; embedded steel pad 10; screw 11; nut 12; quick-setting rubber asphalt waterproof spray coating 13; SBS waterproof membrane 14, waterproof mortar 15, concrete structure A on the left, concrete structure B on the right. DETAILED DESCRIPTION
[0028] The technical solution of the present invention is described in detail with examples below:
[0029] When a weir-built underwater tunnel deformation joint anti-seepage structure of the present invention is located on the bottom plate, a polypropylene waterproof coiled material 1, a reverse-adhesive quick-setting rubber asphalt waterproof spray coating 2, and an external rubber waterstop 3 are sequentially arranged from the water-facing surface to the water-receiving surface; a low-modulus polyurethane sealant 4 is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop 3, an M-corrugated stainless steel corrugated plate waterstop 5 (buried or internally installed) is arranged on the upper part of the low-modulus polyurethane sealant 4, a high-modulus polyurethane sealant 6 is arranged inside the corrugated plate waterstop 5, a PE foam rod 7 is arranged on the upper part of the high-modulus polyurethane sealant 6, a water receiving box 8 is arranged on the upper part of the PE foam rod 7, a pre-buried steel pad 10 is arranged on the upper part of the left concrete structure A and the right concrete structure B, and an Ω-type waterstop 9 is arranged on the uppermost part, and the Ω-type waterstop 9 is fixed by a screw 11 and a nut 12.
[0030] When the tunnel deformation joint anti-seepage structure is located on the top plate, SBS waterproof membrane 14 is arranged in sequence from the water-facing surface to the water-receiving surface; quick-setting rubber asphalt waterproof spray coating 13 and external rubber waterstop 3; low modulus polyurethane sealant 4 is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop 3, corrugated plate waterstop 5 is arranged on the upper part of the low modulus polyurethane sealant 4, high modulus polyurethane sealant 6 is arranged inside the corrugated plate waterstop 5, PE foam rod 7 is arranged on the upper part of the high modulus polyurethane sealant 6, water collecting box 8 is arranged on the upper part of the PE foam rod 7, embedded steel pads 10 are arranged on the upper part of the left concrete structure A and the right concrete structure B, and Ω-type waterstop 9 is arranged on the upper part, and the Ω-type waterstop 9 is fixed by screw 11 and nut 12.
[0031] When the tunnel deformation joint anti-seepage structure is located at the side plate, waterproof mortar 15, reverse-adhesive quick-setting rubber asphalt waterproof spray coating 2, and external rubber waterstop 3 are sequentially arranged from the water-facing surface to the water-receiving surface; a low-modulus polyurethane sealant 4 is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop 3, a corrugated plate waterstop 5 is arranged on the upper part of the low-modulus polyurethane sealant 4, a high-modulus polyurethane sealant 6 is arranged inside the corrugated plate waterstop 5, a PE foam rod 7 is arranged on the upper part of the high-modulus polyurethane sealant 6, a water receiving box 8 is arranged on the upper part of the PE foam rod 7, an embedded steel pad 10 is arranged on the upper part of the left concrete structure A and the right concrete structure B, and an Ω-type waterstop 9 is arranged on the upper part, and the Ω-type waterstop 9 is fixed by a screw 11 and a nut 12.
[0032] The corrugated plate water stop 5 adopts an M-corrugated stainless steel corrugated plate water stop, so that its ability to withstand displacement deformation in different directions is improved. At the same time, a high modulus polyurethane sealant is filled in the deformation joint at the rear end of the M-corrugated stainless steel corrugated plate, so that the stainless steel corrugated plate will squeeze the high modulus polyurethane sealant when it is subjected to high water pressure, and further seal the gap between the stainless steel corrugated plate and the concrete of the deformation joint side wall. The corrugated plate water stop 5 adopts an embedded or built-in structure.
[0033] The specific steps of the construction method of the underwater tunnel deformation joint anti-seepage structure by weir construction method of the present invention are as follows:
[0034] Step 1: After the excavation of the open excavation foundation pit project of the weir construction method, pour the foundation cushion layer and the leveling layer, spray a 25cm waterproof mortar layer on the side wall of the foundation pit and smooth it. After the foundation leveling layer is dry, clean the base layer and remove the debris that affects the construction. Use cement adhesive slurry prepared with cement and polypropylene glue to make an additional layer. Before bonding, first try to lay the polypropylene waterproof membrane (specification is 800g, thickness 1.5mm, width 1500mm), then fold the two ends of the membrane and roll it up, pour the prepared cement adhesive slurry on the base layer, and scrape it evenly with a scraper, then push the membrane forward and use a scraper to remove the air left inside the membrane in time, scrape out the excess adhesive slurry, the lap joint of the long and short sides should be no less than 80mm; the joints of adjacent short sides should be staggered by more than 100cm, and the wide side should be staggered by 50cm when double-layered.
[0035] Step 2: Use the pre-spraying anti-adhesive process to spray quick-setting rubber asphalt waterproof spray coating (thickness 2.0mm) on the polypropylene waterproof membrane and waterproof mortar. The rubber asphalt waterproof spray coating is a continuous and dense water-based polymer coating formed by the reaction of liquid rubber emulsion (component A) composed of anionic rubber emulsion and special nano-grade asphalt emulsion and a special curing agent (component B). The A and B component materials are sprayed and atomized through two nozzles in the airless spray system equipment respectively, and cross in a fan shape outside the spray gun nozzle. After being fully mixed, they reach the base surface instantly, and under the action of the electrolyte, they instantly break the emulsion, precipitate water, condense into a film, and solidify to form a dense, continuous, and complete coating layer. The peeling strength with the post-cast concrete structure reaches 3.0N / mm, and the elongation at break is 1000%.
[0036] Step 3: Determine the position of the expansion joint, set up the formwork for the concrete structure of the tunnel lining on one side of the expansion joint, hot-weld and fix the EB external rubber waterstop (specification 400mm×8mm) on the rubber asphalt waterproof spray coating at the corresponding expansion joints between the bottom plate and the side wall, and cold-glue and fix the EB external rubber waterstop (specification 400mm×8mm) at the corresponding expansion joints of the top plate formwork; connect the embedded belt of the M corrugated stainless steel corrugated plate waterstop at the corresponding position of the steel bar layout; fix and weld the embedded steel pad to the steel bar; and then cast the concrete structure of the tunnel lining on one side of the expansion joint.
[0037] Step 4: Set up the formwork for the other half of the tunnel lining concrete structure at the expansion joint; connect the embedded belt of the M corrugated stainless steel corrugated plate waterstop belt at the corresponding position of the steel bar layout; fix and weld the embedded steel pad to the steel bar; and then cast the expansion joint half of the tunnel lining concrete structure.
[0038] Step 5: Fill low modulus polyurethane sealant between the M corrugated stainless steel corrugated plate waterstop and the external rubber waterstop, press a PE foam rod (30mm in diameter) into the inner side of the seam on the back water surface of the deformation joint to play a temporary sealing and buffering role, and fill high modulus polyurethane sealant between the M corrugated stainless steel corrugated plate waterstop and the PE foam rod.
[0039] Step 6: After the tunnel lining concrete reaches the demoulding strength, remove the formwork; use the airless spray system to spray the quick-setting rubber asphalt waterproof spray coating (thickness 2.0mm) on the water-facing surface of the top plate, and then lay the national standard type II SBS waterproof membrane (thickness 4mm, width 1000mm) on the waterproof spray coating.
[0040] Step 7: Install a water collection box on the back water surface of the inner side of the tunnel lining, rivet an Ω-type waterstop strip with screws and nuts on the outside of the water collection box, and spray quick-setting rubber asphalt waterproof spray paint (thickness 2.0mm) on the joints between the screws and nuts.
Claims
1. A weir-built underwater tunnel deformation joint anti-seepage structure, characterized in that: When the tunnel deformation joint anti-seepage structure is located at the bottom plate, a polypropylene waterproofing coil (1), a reverse-adhesive quick-setting rubber asphalt waterproofing spray coating (2), and an external rubber waterstop (3) are sequentially arranged from the water-facing surface to the water-receiving surface; a low-modulus polyurethane sealant (4) is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop (3); a corrugated plate waterstop (5) is arranged on the upper part of the low-modulus polyurethane sealant (4); a high-modulus polyurethane sealant (6) is arranged inside the corrugated plate waterstop (5); a PE foam rod (7) is arranged on the upper part of the high-modulus polyurethane sealant (6); a water receiving box (8) is arranged on the upper part of the PE foam rod (7); a pre-buried steel pad (10) is arranged on the upper part of the left concrete structure (A) and the right concrete structure (B); an Ω-shaped waterstop (9) is arranged on the uppermost part; the Ω-shaped waterstop (9) is fixed by a screw rod (11) and a nut (12).
2. The anti-seepage structure of underwater tunnel deformation joints using the weir construction method according to claim 1 is characterized in that: When the tunnel deformation joint anti-seepage structure is located on the top plate, SBS waterproofing coiled material (14); quick-setting rubber asphalt waterproofing spray coating (13); and external rubber waterstop (3) are sequentially arranged from the water-facing surface to the water-retaining surface; a low modulus polyurethane sealant (4) is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop (3); a corrugated plate waterstop (5) is arranged on the upper part of the low modulus polyurethane sealant (4); a high modulus polyurethane sealant (6) is arranged inside the corrugated plate waterstop (5); a PE foam rod (7) is arranged on the upper part of the high modulus polyurethane sealant (6); a water receiving box (8) is arranged on the upper part of the PE foam rod (7); a pre-buried steel pad (10) is arranged on the upper part of the left concrete structure (A) and the right concrete structure (B); and an Ω-shaped waterstop (9) is arranged on the uppermost part, and the Ω-shaped waterstop (9) is fixed by a screw rod (11) and a nut (12).
3. The anti-seepage structure of underwater tunnel deformation joints using the weir construction method according to claim 1 is characterized in that: When the tunnel deformation joint anti-seepage structure is located at the side plate, waterproof mortar (15), reverse-adhesive quick-setting rubber asphalt waterproof spray coating (2), and external rubber waterstop (3) are sequentially arranged from the water-facing surface to the water-receiving surface; a low-modulus polyurethane sealant (4) is arranged in the deformation joint in the middle of the upper part of the external rubber waterstop (3); a corrugated plate waterstop (5) is arranged on the upper part of the low-modulus polyurethane sealant (4); a high-modulus polyurethane sealant (6) is arranged inside the corrugated plate waterstop (5); a PE foam rod (7) is arranged on the upper part of the high-modulus polyurethane sealant (6); a water receiving box (8) is arranged on the upper part of the PE foam rod (7); a pre-buried steel pad (10) is arranged on the upper part of the left concrete structure (A) and the right concrete structure (B); an Ω-shaped waterstop (9) is arranged on the uppermost part; the Ω-shaped waterstop (9) is fixed by a screw rod (11) and a nut (12).
4. The anti-seepage structure of underwater tunnel deformation joint using the weir construction method according to claim 1, 2 or 3, characterized in that: The corrugated plate waterstop (5) adopts an M-corrugated stainless steel corrugated plate waterstop, so that its ability to withstand displacement deformation in different directions is improved. At the same time, a high-modulus polyurethane sealant is filled in the deformation joint at the rear end of the M-corrugated stainless steel corrugated plate, so that the stainless steel corrugated plate will squeeze the high-modulus polyurethane sealant when it is subjected to high water pressure, thereby further sealing the gap between the stainless steel corrugated plate and the concrete of the deformation joint side wall.
5. The anti-seepage structure of underwater tunnel deformation joints using the weir construction method according to claim 4 is characterized in that: The corrugated plate water stop (5) adopts an embedded or internally installed structure.
6. A construction method for an underwater tunnel deformation joint anti-seepage structure using a weir construction method as claimed in claim 1, characterized in that The specific steps of the construction method are as follows: Step 1: After the excavation of the open excavation foundation pit project of the weir construction method, pour the foundation cushion layer and the leveling layer, spray a 25-30cm waterproof mortar layer on the side wall of the foundation pit and smooth it; after the foundation leveling layer is dry, clean the base layer, remove the debris that affects the construction, and use cement bonding slurry prepared with cement and polypropylene glue to make an additional layer. Before bonding, try to lay the polypropylene waterproof membrane, then fold the two ends of the membrane in half and roll it up, pour the prepared cement bonding slurry on the base layer, and scrape it evenly with a scraper, then push the membrane forward and lay it, and use a scraper to remove the air left inside the membrane in time, scrape out the excess bonding slurry, and the lap joint of the long and short sides should be no less than 80mm; the joints of adjacent short sides should be staggered by more than 100cm, and the wide sides should be staggered by 40-50cm when double-layered; Step 2: Use the pre-spraying anti-adhesive process to spray the quick-setting rubber asphalt waterproof spray coating on the polypropylene waterproof membrane and waterproof mortar. The rubber asphalt waterproof spray coating is a continuous and dense water-based polymer coating formed by the reaction of liquid rubber emulsion component A composed of anionic rubber emulsion and nano-grade asphalt emulsion and special curing agent component B. The A and B component materials are sprayed and atomized through two nozzles in the airless spray system equipment respectively, cross-shaped outside the spray gun, and reach the base surface instantly after being fully mixed. Under the action of the electrolyte, they instantly break the emulsion, precipitate water, condense into a film, and solidify to form a dense, continuous, and complete coating layer. The peeling strength with the post-cast concrete structure reaches 3.0N / mm, and the elongation at break is 1000%; Step 3: Determine the position of the expansion joint, set up the formwork for the tunnel lining concrete structure on the expansion joint half side, hot weld and fix the EB external rubber waterstop on the rubber asphalt waterproof spray coating at the expansion joint corresponding to the bottom plate and the side wall, and cold glue and fix the EB external rubber waterstop at the expansion joint corresponding to the top plate formwork; connect the embedded belt of the M corrugated stainless steel corrugated plate waterstop at the corresponding position of the steel bar layout; fix and weld the embedded steel pad to the steel bar; then cast the tunnel lining concrete structure on the expansion joint half side; Step 4: Set up the formwork for the other half of the tunnel lining concrete structure of the deformation joint; connect the embedded belt of the M corrugated stainless steel corrugated plate waterstop belt at the corresponding position of the steel bar layout; fix and weld the embedded steel pad to the steel bar; then pour the tunnel lining concrete structure of the deformation joint half; Step 5: Fill low modulus polyurethane sealant between the M corrugated stainless steel corrugated plate waterstop and the external rubber waterstop, press a PE foam rod into the inner side of the seam opening on the back surface of the deformation joint to play a temporary sealing and buffering role, and fill high modulus polyurethane sealant between the M corrugated stainless steel corrugated plate waterstop and the PE foam rod; Step 6: After the tunnel lining concrete reaches the demoulding strength, the formwork is removed; the airless spray system equipment is used to spray the quick-setting rubber asphalt waterproof spray coating on the water-facing surface of the top plate, and then the national standard type II SBS waterproof membrane is laid on the waterproof spray coating; Step 7: Install a water collection box on the back water surface of the inner side of the tunnel lining, use screws and nuts to rivet the Ω-type waterstop on the outside of the water collection box, and spray quick-setting rubber asphalt waterproof spray paint on the joints between the screws and nuts.
Citation Information
Patent Citations
Design and construction method of large deformation tunnel cast-in-place structure passing through active fault
CN110005438A
Waterproof structure of deformation joints of open trench tunnel
CN110747909A
Open cut tunnel deformation joint anti-seepage structure capable of bearing multidirectional dislocation and construction method
CN117107825A
Movement joint waterproof construction of reply active fault changing of relative positions
CN208416571U
Embedded rubber waterstop structure for underground engineering
CN215053290U
Cited By
Hinged deformation joint penetrating through movable fracture tunnel structure units and construction process of hinged deformation joint
CN122280619A
Hinged expansion joints between structural units of tunnels traversing active fractures and their construction procedures
CN122280619B