Formwork supporting device for building structure transformation and supporting method thereof

By using detectors and force sensors in the formwork support device to monitor deformation and load changes, combined with telescopic trusses and layout methods, real-time adjustment of the formwork support system is achieved, which solves the problems of unstable and deformation of the formwork during construction and improves construction safety Sex and quality.

CN118997465APending Publication Date: 2024-11-22CCFED THE FIRST CONSTR & ENG +1
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411128460.2
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-16
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

The formwork support device has problems such as instability, deformation and slurry leakage during construction, which has affected the construction safety and quality, and the accident is concealed and prone to casualties, and lacks effective monitoring methods.

Method used

Design a formwork support device for building structure renovation, use detectors to monitor the deformation of the formwork support system, monitor the stability and safety of the support system in real time through the data acquisition system, and install detectors and force sensors in key parts, combining telescopicity Trusses and different layout methods realize real-time adjustment and reinforcement of the formwork support system.

Benefits of technology

Through real-time monitoring and data feedback, potential safety hazards can be discovered and adjusted in a timely manner, avoid accidents, improve construction safety and quality, and ensure the quality and progress of concrete solidification.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN118997465A_ABST
    Figure CN118997465A_ABST
Patent Text Reader

Abstract

The invention discloses a formwork supporting device for building structure transformation and a supporting method of the formwork supporting device. The device comprises a template body and a template body, the truss assembly is used for supporting the template and consists of a plurality of groups of truss units; each group of truss units is formed by stacking a plurality of groups of trusses at intervals; wherein a plurality of detectors are arranged between trusses of the first group of truss units in contact with the template; and the plurality of detectors are electrically connected with a data acquisition system. The detector is used for monitoring the deformation condition of the template supporting system. A detector is arranged at a key part of a template supporting system, and the stability and the safety of the supporting system are monitored in real time through data collected by the detector. And if the monitored deformation exceeds a preset safety value, measures can be taken in time for adjustment or reinforcement, so that potential safety accidents are avoided.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of formwork supporting devices, and in particular to a formwork supporting device for building structure reconstruction and a supporting method thereof. Background Art

[0002] Formwork engineering has always been a key and difficult point in the management of the construction process. Formwork engineering plays a vital role in building construction, and it directly affects the quality, safety and progress of the project. Formwork support devices are the basis of formwork engineering. Unreasonable design may lead to problems such as unstable support, deformation or leakage, affecting the quality of the project. The above-mentioned problems of formwork support devices are short-lived and hidden. When accidents occur, they are very likely to cause major casualties. Therefore, by monitoring the formwork support device, mastering the working status of the formwork support system during the construction process, assisting management personnel to promptly discover the abnormal status of the formwork support system, and taking corresponding treatment measures, it has a strong practical significance for ensuring construction safety and quality. Summary of the invention

[0003] In view of this, the purpose of the present invention is to provide a formwork support device and a support method for building structure reconstruction, which can detect the wall surface through a detector to ensure construction safety.

[0004] According to one aspect of the present invention, there is provided a formwork support device for reconstruction of building structures, comprising: a formwork body; a truss assembly supporting the formwork, the truss assembly being composed of a plurality of groups of truss units; each group of truss units being composed of a plurality of groups of trusses stacked at intervals; wherein, a first group of truss units in contact with the formwork has a plurality of detectors disposed between the trusses; and the plurality of detectors being electrically connected to a data acquisition system.

[0005] In the above technical solution, during the construction process, the deformation of the formwork support system is monitored by using geophones. Geophones are installed at key locations of the formwork support system, and the stability and safety of the support system are monitored in real time through the data collected. If the monitored deformation exceeds the preset safety value, timely measures can be taken to adjust or reinforce it, thereby avoiding potential safety accidents.

[0006] In some embodiments, the template is a wooden template.

[0007] In the above technical solution, since the detector of this case is set on the supporting side of the template, a wooden template is used for better detector detection of waveform. The wooden template is more sensitive to small fluctuations, and its natural properties make it more sensitive to environmental changes. Steel templates are easy to shield waveform signals, resulting in uneven data collected by the detector.

[0008] In some embodiments, the detectors are arranged at a density of 1-3 / m3 .

[0009] In the above technical solution, the density of geophone layout was considered to be too high, which would affect the progress and complexity of installation, while too low a density would result in incomplete data collection. This solution estimated the performance parameters by arranging multiple geophones within a range of 1m×1m, and finally determined that the density of geophone layout should be 1-3 / m. 3 When receiving data, the quality of the received data can be ensured.

[0010] In some embodiments, the arrangement of the detector includes:

[0011] Matrix arrangement, and / or, radial arrangement with equal spacing around the template with the template center as the center, and / or, matrix arrangement with unequal row spacing or unequal vertical spacing.

[0012] In the above technical solution, the density of geophone layout is considered to be too high, which will affect the progress and complexity of installation, while too low a density will result in incomplete data collection. This solution sets the above three layout conditions, as follows:

[0013] Matrix layout: The most universal layout solution that can cope with different scenarios.

[0014] With the center of the formwork as the center, the layout is radially arranged at equal intervals around the formwork: for use scenarios with higher quality requirements for the center of the concrete wall.

[0015] Matrix-style unequal row spacing or unequal vertical spacing setting: This is a layout method that takes into account walls of different cross-sections.

[0016] In some embodiments, the interval between the detectors is 0.5m-4.5m.

[0017] In the above technical solution, the density of detector layout is considered to affect the progress and complexity of installation if too many detectors are laid out, and the data collected will be incomplete if too few detectors are laid out. This solution is aimed at three usage scenarios: matrix layout, radial layout with equal spacing around the template as the center of the circle, and matrix layout with unequal row spacing or unequal vertical spacing. Multiple detectors with different spacing are laid out to estimate performance parameters. Finally, it is determined that under these two usage conditions, when the spacing between detectors is within the range of 0.5m-4.5m, the quality of received data can be ensured.

[0018] In some embodiments, the truss is a telescopic truss.

[0019] In the above technical solution, the purpose of using the telescopic truss is to facilitate the adjustment of the supporting force applied to the formwork. Considering that this case requires process monitoring and timely adjustments, the telescopic truss is a good choice.

[0020] In some embodiments, the trusses are spaced apart by a distance greater than or equal to the diameter of two geophones.

[0021] In the above technical solution, this case is based on vibration wave detection. Therefore, in order to prevent the truss from vibrating and affecting the data collection of the detector when the vibration wave is excited, a certain distance should be maintained between the detector and the truss, and a layer of shock-absorbing film, such as bubble film, should be wrapped on the outer surface of the detector when necessary.

[0022] In some embodiments, a force sensor is further provided at the contact point between the truss and the template.

[0023] In the above technical solution, force sensors can also be added at key nodes to assist in monitoring the entire process.

[0024] According to another aspect of the present invention, a supporting method of a formwork supporting device for building structure reconstruction is provided, based on the above-mentioned formwork supporting device for building structure reconstruction; the method comprises the following steps:

[0025] Install templates and truss units, select the detector layout method according to design requirements, install the detectors, and initialize;

[0026] When pouring concrete, 1 day, 3 days, 14 days, and 28 days after solidification, a flat plate vibrator is used to vibrate the edge and center of the formwork to excite vibration signals. The detector receives the signal and transmits it to the data acquisition system.

[0027] The data acquisition system inverts the wall tomography based on the signals collected by the geophone, evaluates the wall load changes based on the wall tomography, and adjusts the truss support according to the load changes.

[0028] In the above technical solution, the early strength of concrete usually refers to the strength obtained within a certain period of time after the concrete is poured. This time range usually includes key time nodes such as 1 day, 3 days, 7 days, 14 days, and the standard curing strength of 28 days. The assessment of early strength plays a vital role in ensuring the quality, safety and progress of the project. For the above considerations, this case makes the time node of process monitoring consistent with the early strength time node, which helps to provide more data to assist construction personnel in determining the solidification quality of concrete. BRIEF DESCRIPTION OF THE DRAWINGS

[0029] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.

[0030] Figure 1 This is one of the structural schematic diagrams of an embodiment of a formwork support device for building structure reconstruction according to the present invention;

[0031] Figure 2 This is a second structural schematic diagram of an embodiment of a formwork support device for building structure reconstruction according to the present invention;

[0032] Figure 3 It is a seismic detector selected for use in an embodiment of a template support device for building structure reconstruction of the present invention;

[0033] Figure 4 It is a schematic diagram of the principle of an embodiment of a formwork support device for building structure reconstruction according to the present invention;

[0034] Figure 5 This is one of the layout schematic diagrams of an embodiment of a formwork support device for building structure reconstruction according to the present invention;

[0035] Figure 6 This is the second layout schematic diagram of an embodiment of a template support device for building structure reconstruction of the present invention;

[0036] Figure 7 This is a third layout diagram of an embodiment of a template support device for building structure reconstruction according to the present invention;

[0037] Figure 8 This is a fourth layout diagram of an embodiment of a template support device for building structure reconstruction according to the present invention;

[0038] Fig. 9 It is a flow chart of an embodiment of a supporting method of a template supporting device for building structure reconstruction according to the present invention;

[0039] Fig.10 It is a schematic diagram of the vibration excitation sequence of an embodiment of a supporting method of a formwork supporting device for building structure reconstruction of the present invention. DETAILED DESCRIPTION

[0040] The present invention will be further described in detail below in conjunction with the accompanying drawings and examples. It is particularly noted that the following examples are only used to illustrate the present invention, but are not intended to limit the scope of the present invention. Similarly, the following examples are only partial embodiments of the present invention rather than all embodiments, and all other embodiments obtained by those of ordinary skill in the art without creative work are within the scope of protection of the present invention.

[0041] The invention provides a template supporting device for building structure reconstruction and a supporting method thereof, which can realize wall surface detection through a detector to ensure construction safety.

[0042] Embodiment 1

[0043] See also Figure 1 , Figure 2 A template support device for building structure reconstruction includes: a template body 1; a truss assembly 2 supporting the template 1, the truss assembly 2 is composed of a plurality of truss units 21; wherein the first group of truss units 21 in contact with the template, each group of truss units 21 is composed of a plurality of truss units stacked at intervals; a plurality of detectors 3 are arranged between the trusses; the plurality of detectors 3 are electrically connected to a data acquisition system (not shown in the figure).

[0044] It should be noted that, as the main element providing supporting force, the truss often adds support rods to assist in the support. However, since the support rod is not the main invention point of this case, it is not drawn for the sake of image simplicity. Those skilled in the art can add it according to actual needs, which is not limited in this embodiment. It should also be noted that the stacking method of the truss can be limited according to actual needs, which is not limited in this embodiment. However, considering that this case is a detection scheme for collecting vibration waves through vibration excitation, the contact surface of the truss and the contact surface between the truss and the template should be appropriately paved with pearl cotton if conditions permit.

[0045] The specific principles of this case are as follows:

[0046] This case is based on the principle of seismic detectors and applies it to the formwork support system. Seismic detectors use vibrations transmitted to the ground or water to drive the coil in the detector to vibrate, and the vibration generates a pulse analog signal, which is transmitted to the acquisition station on the acquisition line through the acquisition line. The acquisition station converts the analog signal into a digital signal and transmits it to the seismic instrument. For this case, the following can be used Figure 3 The dimensions of the seismic detector shown are a core diameter of 25.4 mm and a core height of 36 mm. Figure 4, assuming that the speed of sound wave propagation in the air is v, and the time measured from the emission of the sound wave to the reflection of the echo is t, then the distance L between the detector and the obstacle can be expressed as: L = 1 / 2vt. The basic principle of the seismic detector is similar to this. When the vibration wave propagates to the left wall (the other side), it will encounter the wall on the other side. At this time, a part of the vibration wave will be reflected, and the remaining wave will continue to be transmitted to the deeper strata and then continue to reflect. For this case, the data collected at the first reflection is the data required for this case, and the subsequent data can be discarded. After the data is collected, the internal tomography of the wall can be inverted by the method of seismic wave inversion. Assuming that the concrete is homogeneous after solidification, the collected data should be uniform and there should be no stratification. Otherwise, it means that there are certain defects inside. It should be noted that specific defects require specific analysis, and this case only provides an application method. At the same time, the tomographic inversion method has provided a large number of cases in the study of seismic wave tomography (such as Wan Huanhuan, Han Piaoping. Research on mineral deposit detection technology based on seismic wave method [J]. World Nonferrous Metals, 2024, (09): 190-192.), and this embodiment does not elaborate on this.

[0047] In this embodiment, during the construction process, the deformation of the formwork support system is monitored by using a detector. The detector is installed at the key parts of the formwork support system, and the stability and safety of the support system are monitored in real time through the data collected by the detector. If the monitored deformation exceeds the preset safety value, timely measures can be taken to adjust or reinforce it, thereby avoiding potential safety accidents.

[0048] In this embodiment, the template 1 is a wooden template. Since the detector in this case is set on the supporting side of the template, a wooden template is used for better detector detection of waveforms. The wooden template is more sensitive to small fluctuations, and the natural properties of its material make it more sensitive to environmental changes. Steel templates are easy to shield waveform signals, resulting in uneven data collected by the detector.

[0049] In this embodiment, the detectors are arranged at a density of 1-3 / m 3 Regarding the density of geophones, it is considered that too many geophones will affect the progress and complexity of installation, while too few geophones will result in incomplete data collection. This solution estimates the performance parameters by arranging multiple geophones within a range of 1m×1m. Finally, it is determined that the density of geophones is 1-3 / m. 3 When receiving data, the quality of the received data can be ensured.

[0050] In this embodiment, as an optional embodiment, the arrangement of the detector includes:

[0051] Matrix layout, and / or, layout with equal spacing around the template from the center of the template, and / or, matrix layout with unequal row spacing or unequal vertical spacing. Regarding the layout density of the detectors, it is considered that too many layouts will affect the progress and the complexity of installation, and too few layouts will result in incomplete data collection. This plan sets the above three layout situations, as follows:

[0052] (1) Please refer to Figure 5 ,Matrix layout: The most universal layout solution that can cope with different scenarios.

[0053] (2) Please refer to Figure 6 , with the center of the template as the center of the circle, radiate at equal intervals around the template: for use scenarios with higher quality requirements for the center of the concrete wall.

[0054] (3) Please refer to Figure 7 , Matrix-type unequal row spacing or unequal vertical spacing setting: This is a layout method that takes into account walls of different cross-sections.

[0055] (4) A hybrid solution can also be used to adapt to different needs, such as Figure 8 shown.

[0056] Based on the above optional embodiments, the interval between the detectors is 0.5m-4.5m. Regarding the layout density of the detectors, it is considered that too many layouts will affect the progress and complexity of the installation, and too few layouts will result in incomplete data collected. This solution targets three usage scenarios: matrix layout, radial layout with equal spacing around the template with the center of the template as the center, and matrix setting with unequal row spacing or unequal vertical spacing. Multiple detectors with different spacings are arranged to estimate performance parameters. Finally, it is determined that under these two usage conditions, when the interval between the detectors is within the range of 0.5m-4.5m, the quality of the received data can be ensured. As the preferred range, the range of 1.5m-2m is the best.

[0057] In this embodiment, as an optional embodiment, the truss adopts a telescopic truss (not shown in the figure, please refer to the prior art, such as CN109736569B, CN118390800A, etc.). The purpose of using a telescopic truss is to facilitate the adjustment of the support force applied to the template. Considering that this case needs to monitor the process and make adjustments in time, the telescopic truss is a good choice. In addition, the use of the truss also takes into account the specific installation of the detector. The truss structure can adapt to different building shapes and functional requirements, and has good adaptability and flexibility. At the same time, the truss structure can be designed into different sizes and shapes, such as triangles, trapezoids, polygons, etc., to meet different detector layout requirements. And the rods and nodes of the truss structure can usually be prefabricated in the factory, and only need to be assembled on site, which can speed up the construction speed and improve the construction quality. Furthermore, the truss node needs to bear the gravity load transmitted by the truss beams and columns, and transmit it to other components through the node, so it must have sufficient strength to resist the effects of various loads. Based on this consideration, the detector can be set between the nodes of adjacent trusses to minimize the impact of truss vibration and avoid damage to the detector due to accidents. That is, the present embodiment uses the detector to monitor the deformation of the formwork support system. The detectors are installed at the key parts of the formwork support system, and the stability and safety of the support system are monitored in real time through the data collected. If the monitored deformation exceeds the preset safety value, timely measures can be taken to adjust or reinforce it, thereby avoiding potential safety accidents. This method is particularly important in the construction of high-rise buildings and large-span structures, because these structures have higher requirements for the support system and greater risks.

[0058] In this embodiment, the distance between the trusses is greater than or equal to the diameter of two geophones. This case is based on vibration wave detection. Therefore, in order to prevent the trusses from being vibrated and affecting the data collection of the geophones during subsequent vibration wave excitation, a certain distance should be maintained between the geophones and the trusses, and if necessary, a layer of shock-absorbing film, such as bubble film, should be wrapped on the outer surface of the geophone.

[0059] In this embodiment, a force sensor is also provided at the contact point between the truss and the formwork. In this case, force sensors can also be added at key nodes to jointly assist in monitoring the entire process. For example, a complete set of visualization solutions can be provided using BIM (see Kang Zan. Research on special construction scheme design and intelligent monitoring of large formwork projects [D]. Hebei University of Engineering, 2020. DOI: 10.27104 / d.cnki.ghbjy.2020.000740. This embodiment is not described in detail).

[0060] Embodiment 2

[0061] See also Fig. 9A supporting method for a formwork supporting device for building structure reconstruction is based on the above-mentioned formwork supporting device for building structure reconstruction; the method comprises the following steps:

[0062] S1. Install templates and truss units, select the detector layout method according to design requirements, install the detectors, and initialize;

[0063] S2, pouring concrete, and using a flat plate vibrator to vibrate and excite vibration signals at the edge and center of the formwork 1 day, 3 days, 14 days, and 28 days after solidification. The detector receives the signal and transmits it to the data acquisition system;

[0064] In this embodiment, the specific excitation method can be found in Fig.10 , the signal can be stimulated in different regions sequentially.

[0065] S3. The data acquisition system inverts the wall tomography based on the signals collected by the detector, evaluates the wall load changes based on the wall tomography, and adjusts the truss support according to the load changes.

[0066] In this embodiment, the early strength of concrete generally refers to the strength obtained within a certain period of time after the concrete is poured. This time range generally includes key time nodes such as 1 day, 3 days, 7 days, 14 days, and 28 days of standard curing strength. The assessment of early strength plays a vital role in ensuring the quality, safety and progress of the project. For the above considerations, this case makes the time node of process monitoring consistent with the early strength time node, which helps to provide more data to assist construction personnel in determining the solidification quality of concrete. The principle part of other technical features of this scheme has been described in one of the embodiments and will not be repeated here.

[0067] In this embodiment, the problem of missing and irregular data collection is considered. The higher the density of geophones arranged on the template, the more sampled data and the higher the accuracy of tomography; conversely, the lower the density of geophones arranged on the template, the less sampled data and the lower the accuracy of tomography. For this reason, the density of geophones arranged on the template is 1 / m 3 , and reconstructed the data using the convex set projection algorithm, and found that it also has a good compensation effect. (See: Wang Dongnian. Research on seismic data reconstruction and noise suppression based on convex set projection algorithm [D]. East China University of Technology, 2019. This embodiment will not be repeated)

[0068] The above descriptions are only some embodiments of the present invention, and are not intended to limit the protection scope of the present invention. Any equivalent device or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A formwork support device for building structure reconstruction, characterized in that: include: A template body; a truss assembly supporting the template, the truss assembly being composed of a plurality of truss units; each truss unit being composed of a plurality of truss units stacked at intervals; wherein the first truss unit in contact with the template has a plurality of detectors arranged between the trusses; and the plurality of detectors being electrically connected to a data acquisition system.

2. A formwork support device for building structure reconstruction as claimed in claim 1, characterized in that: The template adopts a wooden template.

3. A formwork support device for building structure reconstruction as claimed in claim 1, characterized in that: The layout density of the detectors is 1-3 / m 3 .

4. A formwork support device for building structure reconstruction as claimed in claim 1, characterized in that: The layout of the detector includes: Matrix arrangement, and / or, radial arrangement with equal spacing around the template with the template center as the center, and / or, matrix arrangement with unequal row spacing or unequal vertical spacing.

5. A formwork support device for building structure reconstruction as claimed in claim 4, characterized in that: The interval between the detectors is 0.5m-4.5m.

6. A formwork support device for building structure reconstruction as claimed in claim 1, characterized in that: The truss is a telescopic truss.

7. A formwork support device for building structure reconstruction as claimed in claim 1, characterized in that: The spacing distance between the trusses is greater than or equal to the diameter of two detectors.

8. A formwork support device for building structure reconstruction as claimed in claim 1, characterized in that: A force sensor is also provided at the contact point between the truss and the template.

9. A supporting method for a formwork supporting device for building structure reconstruction, characterized in that: A formwork support device for building structure reconstruction according to any one of claims 1 to 8; the method comprises the following steps: Install templates and truss units, select the detector layout method according to design requirements, install the detectors, and initialize; When pouring concrete, 1 day, 3 days, 14 days, and 28 days after solidification, a flat plate vibrator is used to vibrate the edge and center of the formwork to excite vibration signals. The detector receives the signal and transmits it to the data acquisition system. The data acquisition system inverts the wall tomography based on the signals collected by the geophone, evaluates the wall load changes based on the wall tomography, and adjusts the truss support according to the load changes.