Double-cable bridge type reactor top structure

By adopting a dual-cable tray layout in the reactor top structure, the center of gravity imbalance and laying difficulty caused by a single-sided cable tray is solved, and higher redundancy and safety are achieved, and the operation process is simplified.

CN119008046APending Publication Date: 2024-11-22CHINA NUCLEAR POWER DESIGN COMPANY +1
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202410986186.6
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-07-22
Publication Date
2024-11-22

AI Technical Summary

Technical Problem

In the existing reactor top structure, the single-sided double-layer cable tray scheme leads to too concentrated cables, large structural size, heavy weight, complex lifting, unbalanced center of gravity, high laying risk, and high signal interference, and it cannot meet the nuclear power plant's requirements. The requirement of redundant protection.

Method used

The double-cable bridge structure is adopted, and cable laying is shared by two symmetrically distributed cable trays, which reduces one-sided burden, improves the balance of the center of gravity, and fixes the bridge tray through seismic support components to ensure stability in earthquakes and other working conditions.

Benefits of technology

The center of gravity balance of the pile top structure is achieved, the lifting complexity and laying difficulty is reduced, the redundancy and safety of the cable are improved, the operation process is simplified, and the size and weight of the cable tray are reduced.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119008046A_ABST
    Figure CN119008046A_ABST
Patent Text Reader

Abstract

The invention discloses a reactor top structure of a double-cable bridge type reactor. The reactor top structure comprises a hanging assembly, an anti-seismic assembly, a first cable bridge and a second cable bridge which are arranged above a top cover of a pressure vessel and located on the periphery of a control rod driving mechanism, the hanging assembly comprises a plurality of hanging rods and a supporting frame, the hanging rods are arranged at intervals in the circumferential direction of the top cover and vertically connected to the top cover, and the supporting frame is connected to the tops of the hanging rods; the anti-seismic assembly is arranged above the top cover and located below the supporting frame. The first cable bridge and the second cable bridge are symmetrically distributed on the two sides of the center of the reactor and connected to the anti-seismic assembly in a turnover mode. The gravity center leveling difficulty and time in the hoisting stage during nuclear power plant installation and refueling overhaul are reduced, and the hoisting efficiency and safety are improved; the splitting requirement of the reactor top cable is met, and the safety redundancy allowance of the reactor top cable is ensured; and the convenience and economy of cable laying, maintenance and replacement are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of nuclear power reactors, and in particular to a double-cable bridge type reactor top structure. Background Art

[0002] In a nuclear power plant, the reactor top assembly is one of the important components of the reactor system. It is installed above the reactor pressure vessel (RPV) cover. It is fixed on the RPV cover during normal operation. It is lifted and put back together with the RPV cover and the control rod drive mechanism (CRDM) during shutdown and refueling. The main functions of the reactor top assembly include: (a) During the reactor refueling and maintenance, it is hoisted together with the pressure vessel cover, and the disassembly and assembly operations are simple and fast; (b) It provides seismic support for the CRDM, limits the excessive deformation of the CRDM under earthquake conditions to maintain its normal function, and ensures its functional integrity under accident conditions; (c) It provides a cooling and ventilation channel for the yoke coil of the control rod drive mechanism to ensure the normal operation of the control rod drive mechanism; (d) It leads all the rod control and rod position system (RGL) cables, core measurement system (RIC) cables, loose parts and vibration monitoring system (KIR) cables in the reactor top area to the specified civil engineering interface.

[0003] Among the above functions, item (a) is mainly completed by the hoist assembly. The upper part of the hoist assembly is connected to the ring hoist hook, and the lower part is connected to the pile top and the roof structure. During the refueling overhaul, it plays the role of hoisting. The cable laying function of item (d) is mainly completed by the cable grid, cable bracket and cable bridge on the pile top.

[0004] An existing reactor top assembly adopts a single-sided double-layer cable tray solution, and the RIC measuring cable, RGL measuring cable and KIR cable are laid on the upper cable tray and the upper cable bridge. On the upper cable tray, the RIC cables are laid in two columns, A (Group A & Group B) and B (Group C & Group D); the RGL measuring cables are arranged in four columns, and the columns are separated by partitions with a thickness of not less than 10mm; the RGL low-voltage cables are laid on the lower cable tray and the lower cable tray. The top hanger assembly is a three-hanger structure with an angular spacing of 60° between the hangers, which are diagonally pulled to the center hook. The upper U-shaped wedge of the hanger is connected to the hook by a pin, and the lower U-shaped wedge of the hanger is connected to the annular guide rail connecting block on the star bracket by a pin. The above method has the following defects:

[0005] (1) In the existing single-sided cable tray solution, the cables are relatively concentrated and the number is large (generally, the number of RIC measurement cables in a pressurized water reactor nuclear power plant is 10-50, the number of RGL rod position measurement cables is 60-90, the number of RGL rod control low-voltage cables is 60-90, and there are 2-10 KIR cables), which makes the overall structure of the cable tray larger and heavier. Due to the limitation of the cable tray size during laying, it may be necessary to stack multiple layers, which increases the difficulty of maintenance and replacement. And with the increasing importance of nuclear power safety, the measurement cables need to assume more measurement functions. Therefore, the size of the new measurement cables is larger than that of the previous cables, which further increases the burden on the cable tray.

[0006] (2) The single-sided bridge causes the overall center of gravity of the pile top to be unbalanced. During hoisting, the center of gravity needs to be leveled, which increases the complexity and time of the operation.

[0007] (3) All cables must be led out from the stack test tube or the top of the CRDM to the cable tray in the same direction. Some cables that are far away from the cable tray are longer and more difficult to lay.

[0008] (4) The cables are relatively concentrated and not physically separated (the AB group of the RIC measurement cable is not separated, and the CD group is not separated; although the RGL measurement cables are separated, they are only separated on the bridge with partitions and the distance is still relatively close). There may be a risk of signal interference, and it is difficult to fully meet the single fault criterion requirements in emergency situations such as fire (that is, when a fire or other emergency occurs on one side of the factory building, half of the cables can still be used).

[0009] (5) According to the latest nuclear power plant core control mode requirements, the RIC measurement cable on the top of the pile needs to be laid in four redundant protection sequences on the cable tray on the top of the pile. The existing solution is limited by the size of the cable tray and can no longer fully meet the requirements.

[0010] (6) The existing upper hanger structure occupies a large space size range because the hanger rods are arranged radially from the hook to the star-shaped bracket ring rail connection block. If the cable tray is enlarged (the width is increased), it is easy to interfere with the cable tray when it is erected. In addition, the operating space on the top of the pile is small, which is not conducive to installation and maintenance operations.

[0011] (7) Under the existing three-hanger assembly structure, the bridge can only be arranged between two hangers, and because the three hangers are a non-axisymmetric structure, the choice of bridge layout position is limited. If the size or number of bridges is to be increased, it may be difficult to find a suitable location.

[0012] (8) When the original cable tray is laid flat, it is simply placed on the reactor pool without any displacement restriction measures. Under earthquake or other transient conditions, the cable tray will move, and even cause the entire reactor top and reactor to vibrate, posing a safety risk. Summary of the invention

[0013] The technical problem to be solved by the present invention is to provide a double cable tray type reactor top structure in which cable laying is shared by two cable trays.

[0014] The technical solution adopted by the present invention to solve the technical problem is: to provide a double cable tray type reactor top structure, including a hanging assembly arranged above the top cover of the pressure vessel and outside the control rod driving mechanism, a seismic assembly, a first cable tray for laying cables and a second cable tray;

[0015] The hanging assembly includes a plurality of hanging rods and a support frame, wherein the plurality of hanging rods are arranged at intervals along the circumference of the top cover and vertically connected to the top cover, and the support frame is connected to the tops of the plurality of hanging rods; the anti-seismic assembly is arranged above the top cover and below the support frame; the first cable tray and the second cable tray are symmetrically distributed on both sides of the center of the reactor and are flippably connected to the anti-seismic assembly;

[0016] When the reactor is in operation, the first cable tray and the second cable tray are in a flat state and overlapped on the top platform of the reactor pool; when the reactor is shut down for refueling, the first cable tray and the second cable tray are in an upright state.

[0017] In some embodiments, when the first cable tray and the second cable tray are in a flat state, the angle between them and the horizontal plane is -20° to 40°;

[0018] When the first cable tray and the second cable tray are in an upright state, the angle between them and the vertical plane is -20° to 40°.

[0019] In some embodiments, a horizontal distance between a center line of the first cable tray and a center line of the second cable tray is 0 to 1000 mm.

[0020] In some embodiments, the hanging assembly includes four hanging rods; the support frame is a cross-shaped support frame or an I-shaped support frame.

[0021] In some embodiments, the double cable tray type reactor top structure further includes at least one set of first seismic support assemblies and at least one set of second seismic support assemblies;

[0022] The first anti-seismic support assembly is arranged between the first cable tray and the top platform of the reactor pool, and connects the first cable tray in a flat state to the top platform of the reactor pool;

[0023] The second anti-seismic support assembly is arranged between the second cable tray and the top platform of the reactor pool, and connects the second cable tray in a flat state to the top platform of the reactor pool.

[0024] In some embodiments, the first anti-seismic support assembly includes a perforated plate arranged on the side of the first cable tray facing the reactor pool top platform, a connecting seat fixed on the reactor pool top platform, and connecting bolts;

[0025] When the first cable tray is laid flat, the perforated plate is fitted onto the connection seat, and the connecting bolts are passed through the connection seat and the perforated plate to connect the perforated plate onto the connection seat.

[0026] In some embodiments, the first cable tray has a length of 2000 mm to 8000 mm and a width of 500 mm to 2000 mm;

[0027] The second cable tray has a length of 2000 mm to 8000 mm and a width of 500 mm to 2000 mm.

[0028] In some embodiments, the first cable tray includes at least one first bridge layer; the first bridge layer includes a first bridge and at least one first partition; one end of the first bridge is connected to the seismic assembly through a first support assembly, and the other end of the first bridge is provided with a first arc plate; the first partition is arranged on the first bridge and extends along the length direction of the first bridge, dividing the space on the first bridge into at least two rows of channels for laying cables;

[0029] The second cable tray includes at least one second tray layer; the second tray layer includes a second tray and at least one second partition; one end of the second tray is connected to the seismic anti-seismic assembly through a second supporting assembly, and the other end of the second tray is provided with a second arc plate; the second partition is arranged on the second tray and extends along the length direction of the second tray, dividing the space on the second tray into at least two columns for laying cables.

[0030] In some embodiments, the first cable tray further comprises a first protective railing disposed on at least two sides of the first cable tray;

[0031] The second cable tray also includes second protective railings arranged on at least two sides of the second cable tray.

[0032] In some embodiments, the lifting assembly further includes a hook unit connected to the center of the support frame, and a working platform disposed on the support frame and located outside the hook unit.

[0033] In some embodiments, the anti-seismic assembly includes an anti-seismic ring; each of the suspension rods of the suspension assembly vertically passes through the anti-seismic ring and is connected to the top cover.

[0034] In some embodiments, the seismic-resistant assembly further comprises at least one seismic-resistant tie rod; one end of the seismic-resistant tie rod is connected to the seismic-resistant ring, and the other end of the seismic-resistant tie rod is connected to the wall of the reactor water pool.

[0035] In some embodiments, the double cable bridge type reactor top structure further comprises a cable bracket unit connected to the seismic resistant assembly and located on the top of the control rod drive mechanism;

[0036] The first cable tray is provided with a first connecting frame, and the second cable tray is provided with a second connecting frame;

[0037] When the first cable tray is in an erected state, the end of the first connecting frame is connected to the cable bracket unit; when the second cable tray is in an erected state, the end of the second connecting frame is connected to the cable bracket unit.

[0038] In some embodiments, the double cable tray type reactor top structure further includes a cable grid; the cable grid is disposed on the top cover and below the seismic resistant assembly.

[0039] The beneficial effects of the present invention are as follows: through the symmetrical arrangement of the two cable trays on both sides of the pile top, the overall center of gravity of the pile top is relatively balanced, reducing the difficulty and time of center of gravity leveling in the hoisting stage during the installation and refueling overhaul of the nuclear power plant, and improving the hoisting efficiency and safety; the arrangement of the two cable trays on the pile top can lay the pile top cables separately on the two cable trays, realize the columnar requirements of the pile top cables, reduce the number, weight, number of layers and length of some cables laid on the cable tray on one side, and ensure the safety redundancy margin of the pile top cables; the staff can work on both sides at the same time, thereby improving the convenience and economy of cable laying, maintenance and replacement. BRIEF DESCRIPTION OF THE DRAWINGS

[0040] The present invention will be further described below with reference to the accompanying drawings and embodiments, in which:

[0041] Figure 1 It is a structural schematic diagram of a double cable tray type reactor top structure in an embodiment of the present invention when the cable tray is in a flat state;

[0042] Figure 2 yes Figure 1 Schematic diagram of the symmetrical arrangement of the two cable trays;

[0043] Figure 3 yes Figure 1 Structural schematic diagram of the middle support frame;

[0044] Figure 4 yes Figure 1 Schematic diagram of the structure in which the cable tray is connected to the platform on top of the reactor pool;

[0045] Figure 5 yes Figure 4 A schematic diagram of the structure of the first seismic support assembly (the second seismic support assembly);

[0046] Figure 6 It is a structural schematic diagram of a double cable tray type reactor top structure in an embodiment of the present invention when the cable tray is in an erected state;

[0047] Figure 7 It is a structural schematic diagram of a double-cable bridge type reactor top structure in another embodiment of the present invention when the cable bridge is in a flat state;

[0048] Figure 8 yes Figure 7 Schematic diagram of the structure of the middle support frame. DETAILED DESCRIPTION

[0049] In order to have a clearer understanding of the technical features, purposes and effects of the present invention, specific embodiments of the present invention are now described in detail with reference to the accompanying drawings.

[0050] The double cable bridge type reactor top structure of the present invention is located at the top of the reactor as a whole, and is specifically arranged above the top cover of the pressure vessel.

[0051] like Figure 1 As shown, a double cable tray type reactor top structure according to an embodiment of the present invention may include a hanging assembly 30, a seismic assembly 40, a first cable tray 10, and a second cable tray 20. The hanging assembly 30, the seismic assembly 40, the first cable tray 10, and the second cable tray 20 are all arranged above the top cover 100 of the pressure vessel and are located at the periphery of the control rod drive mechanism.

[0052] Among them, the lifting assembly 30 is connected to the top cover 100 and can be integrated with the top cover 100. When the reactor is shut down for refueling, the lifting assembly 30 can be connected through the lifting equipment, and the lifting assembly 30, the top cover 100 and the control rod drive mechanism on the top cover 100 and other mechanisms can be lifted away from the pressure vessel, or lifted back to the pressure vessel. The earthquake-resistant assembly 40 can be connected and supported above the top cover 100 through the lifting assembly 30, which plays a role in strengthening the structure and earthquake resistance of the entire reactor top structure. The first cable tray 10 and the second cable tray 20 are symmetrically distributed on both sides of the center of the reactor (also on both sides of the center of the top cover). The first cable tray 10 and the second cable tray 20 are both used for cable laying, so that various cables led out from the top of the reactor can be laid separately on the two cable trays, reducing the number, weight, number of layers, etc. of cables laid on a single cable tray.

[0053] The reactor top is provided with two cable trays, the first cable tray 10 and the second cable tray 20, which can not only share the laying of cables, but also can reduce the weight and size required by only a single cable tray, thereby reducing the requirements for the strength of the cable tray and ensuring the safety of the reactor top equipment. The staff can work on the cable trays on both sides in parallel, saving time for cable laying.

[0054] refer to Figure 2 The first cable tray 10 and the second cable tray 20 are symmetrically distributed on both sides of the center of the reactor, and the center of gravity is as close to the center of the reactor as possible, reducing the complexity and time of the center of gravity leveling operation during operation and maintenance. The horizontal distance h between the center line of the first cable tray 10 and the center line of the second cable tray 20 is 0 to 1000 mm; when the horizontal distance h between the center line of the first cable tray 10 and the center line of the second cable tray 20 is 0, the two are completely symmetrical.

[0055] Specifically, combined Figure 1 and Figure 3 The suspension assembly 30 may include a plurality of suspension rods 31 and a support frame 32. The plurality of suspension rods 31 are arranged at intervals along the circumference of the top cover 100 and are vertically connected to the top cover 100. The top cover 100 is provided with a suspension ring for connecting with the suspension rods 31. For a circular top cover 100, the plurality of suspension rods 31 are evenly arranged along the circumference of the top cover 100. The support frame 32 may be connected to the top of the plurality of suspension rods 31 away from the top cover 100 by means of a pin or welding, so as to connect the plurality of suspension rods 31 together. The support frame 32 is supported and connected to the top cover 100 by the suspension rods 31, and is also located above the control rod drive mechanism.

[0056] According to actual needs, the number of the suspension rods 31 can be two, three, four or more.

[0057] The suspension rod 31 is preferably a round rod with a diameter of 50 mm to 300 mm.

[0058] exist Figure 1 and Figure 3 In the illustrated embodiment, the hanging assembly 30 includes four hanging rods 31, and the four hanging rods 31 are evenly arranged along the circumference of the top cover 100, and the angle between each two adjacent hanging rods 31 is 90°. The support frame 32 is a cross-shaped support frame, and the four ends of the cross-shaped support frame are respectively connected to the tops of the four hanging rods 31. The cross-shaped support frame can be specifically formed by two cross beams 321 that are perpendicularly cross-connected, and each cross beam 321 can be made of an I-beam or a flat steel plate. Alternatively, the cross-shaped support frame can be formed by four cross beams 321 connected in a reflective shape on the central column, and each cross beam 321 can be made of an I-beam or a flat steel plate.

[0059] It can be understood that in other embodiments, the hanging assembly 30 includes three hanging rods 31, and the support frame 32 is a triangular support frame connected to the top of the three hanging rods 31; the triangular support frame can be specifically formed by three cross beams 321 vertically cross-connected.

[0060] In some embodiments, the lifting assembly 30 may further include a hook unit 33 and a work platform 34. The hook unit 33 is connected to the center of the support frame 32 as a lifting point for connecting with the lifting equipment. The work platform 34 is arranged on the support frame 32 and is located outside the hook unit 33. The operator can perform related operations on the work platform 34, such as installing and removing the hook, equipment maintenance, etc.

[0061] The anti-seismic assembly 40 is disposed above the top cover 100 and below the support frame 32. The anti-seismic assembly 40 may further include an anti-seismic ring 41, which is supported by the suspension rod 31 of the suspension assembly 30 and connected to the top of the top cover 100. Figure 1 In the illustrated embodiment, each suspension rod 31 of the suspension assembly 30 vertically passes through the anti-seismic ring 31 and is relatively fixed to the anti-seismic ring 31, so that the anti-seismic ring 41 is connected to the four suspension rods 31. The anti-seismic ring 41 is close to the support frame 32 in the axial direction of the suspension rod 31 and is located below the support frame 32.

[0062] In some embodiments, the seismic assembly 40 further includes at least one seismic tie rod (not shown). One end of the seismic tie rod is connected to the seismic ring 41, and the other end is connected to the wall of the reactor pool. There are preferably 4 to 5 seismic tie rods, which are arranged at intervals along the circumference of the seismic ring 41 to generate radial tension on the seismic ring 41, tightening it to the wall of the reactor pool, improving stability, and improving seismic effect.

[0063] The first cable tray 10 and the second cable tray 20 are symmetrically distributed on both sides of the center of the reactor, and are reversibly connected to the seismic assembly 40, specifically to the seismic ring 41 of the seismic assembly 40. The arrangement of the four suspension rods 31 of the suspension assembly 30 can define four uniform spaces on the top of the reactor, which also serve as the accommodation spaces for the first cable tray 10 and the second cable tray 20. Combined with the symmetrical distribution of the first cable tray 10 and the second cable tray 20, the first cable tray 10 and the second cable tray 20 are located in two diagonal spaces among the four spaces, which is conducive to the overall center of gravity balance of the reactor top.

[0064] The first cable tray 10 and the second cable tray 20 are flippable on the reactor top and can be switched back and forth between a flat state and an erected state. When the reactor is in operation, the first cable tray 10 and the second cable tray 20 are in a flat state and overlapped on the reactor pool top platform 200, such as Figure 1 and Figure 4When the reactor is shut down for refueling, the first cable tray 10 and the second cable tray 20 are in an upright state, as shown in FIG. Figure 6 shown.

[0065] In the flat state, the first cable tray 10 and the second cable tray 20 can be at an angle of -20° to 40° with the horizontal plane, such as -10°, -5°, 0°, 10°, etc. In the erected state, the first cable tray 10 and the second cable tray 20 can be at an angle of -20° to 40° with the vertical plane, such as -10°, -5°, 0°, 10°, etc.

[0066] When the first cable tray 10 and the second cable tray 20 are in an erected state, they are accommodated in the space between the cross beams 321 of the support frame 32 and will not interfere with the support frame 32. When the first cable tray 10 and the second cable tray 20 are in a flat state, one end of the first cable tray 10 and the second cable tray 20 extends away from the top of the reactor and overlaps the platform 200 on the top of the reactor pool.

[0067] In order to prevent the first cable tray 10 and the second cable tray 20 from being displaced under earthquake or other transient conditions when they are overlapped on the reactor pool top platform 200 in a flat state, in some embodiments, the double cable tray type reactor top structure also includes at least one group of first seismic support assemblies 50 and at least one group of second seismic support assemblies 60.

[0068] The first anti-seismic support assembly 50 is arranged between the first cable tray 10 and the reactor pool top platform 200, and connects the first cable tray 10 in a flat state to the reactor pool top platform 200, so that the first cable tray 10 and the reactor pool top platform 200 are relatively fixed, and the first cable tray 10 can be supported while limiting the displacement of the first cable tray 10 in the vertical and horizontal directions. The second anti-seismic support assembly 60 is arranged between the second cable tray 20 and the reactor pool top platform 200, and connects the second cable tray 20 in a flat state to the reactor pool top platform 200, so that the second cable tray 20 and the reactor pool top platform 200 are relatively fixed, and the second cable tray 20 can be supported while limiting the displacement of the second cable tray 20 in the vertical and horizontal directions.

[0069] The first anti-seismic support assembly 50 and the second anti-seismic support assembly 60 have the same function, and the two can be implemented using the same structure. Figure 4 and Figure 5The first anti-seismic support assembly 50 may specifically include a perforated plate 51, a connection seat 52 and a connection bolt 53. The perforated plate 51 is arranged on the side of the first cable tray 10 facing the reactor pool top platform 200, the connection seat 52 is fixed on the reactor pool top platform 200, and the connection bolt 53 is matched with the hole of the perforated plate 51 and the connection hole on the connection seat 52. When the first cable tray 10 is laid flat, the perforated plate 51 is matched with the connection seat 52, and the connection bolt 53 is passed through the connection seat 52 and the perforated plate 51 to connect the perforated plate 51 to the connection seat 52.

[0070] A gap is left between the connecting bolt 53 and the hole of the perforated plate 51 and the connecting hole on the connecting seat 52, and the gap is preferably 0.2mm to 5mm. The existence of the gap ensures that the cable tray (the first cable tray 10 and the second cable tray 20) and the water pool can be effectively installed when thermal expansion or contraction occurs under different ambient temperature conditions.

[0071] In a preferred embodiment, the connection seat 52 further includes a bottom plate 521 and two vertical plates 522; the bottom plate 521 is fixed to the reactor pool top platform 200 by expansion bolts, and the two vertical plates 522 are spaced apart and connected to the bottom plate 521 in parallel and vertically, and each of the two vertical plates 522 is provided with a connection hole. When the holed end of the perforated plate 51 is fitted between the two vertical plates 522, the hole on the perforated plate 51 is relatively connected to the connection hole on the vertical plate 522. The connection bolt 53 can be inserted horizontally from the outside of a vertical plate 522 to connect the vertical plate 522 and the perforated plate 51. The connection bolt 53 is detachably connected on the connection seat 52 and the perforated plate 51.

[0072] The second anti-seismic support assembly 60 is the same as the first anti-seismic support assembly 50 and will not be described in detail herein.

[0073] The first cable tray 10 is preferably overlapped on the reactor pool top platform 200 through two or more sets of first seismic support assemblies 50 , and the second cable tray 20 is preferably overlapped on the reactor pool top platform 200 through two or more sets of second seismic support assemblies 60 .

[0074] Alternatively, the length of the first cable tray 10 may be, but not limited to, 2000 mm to 8000 mm, and the width may be, but not limited to, 500 mm to 2000 mm. The length of the second cable tray 20 may be, but not limited to, 2000 mm to 8000 mm, and the width may be, but not limited to, 500 mm to 2000 mm.

[0075] like Figure 1As shown, above the top cover 100, the first cable tray 10 has two opposite ends in its length direction, one end of which can be connected to the anti-seismic ring 41 through the first support assembly 15, and the other end can extend away from the center of the reactor. In addition, the first cable tray 10 can be rotated relative to the anti-seismic ring 41 through the first support assembly 15, from an erected state to a flat state, or from a flat state to an erected state.

[0076] The first cable tray 10 includes at least one first cable tray layer. The first cable tray layer may further include a first cable tray 11 and at least one first partition 12; one end of the first cable tray 11 is connected to the anti-seismic assembly 40 through a first support assembly 15; the first partition 12 is arranged on the first cable tray 11 and extends along the length direction of the first cable tray 11, dividing the space on the first cable tray 11 into at least two rows of channels for laying cables.

[0077] The number of the first partitions 12 is 1 to 8, so that the cables can be arranged or laid on the first bridge 11, and the spacing between the first partitions 12 is 10 mm to 200 mm.

[0078] A first arc plate 13 is provided at the other end of the first bridge 11 to allow the cables to be led out from the end of the first bridge 11, so as to avoid the cables from sagging at right angles after leaving the first bridge 11, which would affect the availability of the cables. The first arc plate 13 may preferably be an arc plate with a radius of 50 mm to 350 mm.

[0079] To prevent the cables from falling off the side of the first cable tray 11, the first cable tray 10 further includes a first protective railing 14, which is disposed on at least two sides of the first cable tray 11, for example, on both sides in the length direction of the first cable tray 11. The first protective railing 14 can be formed by a plurality of rods arranged on the first cable tray 11.

[0080] Another example Figure 1 As shown, above the top cover 100, the second cable tray 20 has two opposite ends in its length direction, one end of which can be connected to the anti-seismic ring 41 through the second support assembly 25, and the other end can extend away from the center of the reactor. In addition, the second cable tray 20 can be rotated relative to the anti-seismic ring 41 through the second support assembly 25, from the erected state to the flat state, or from the flat state to the erected state.

[0081] The second cable tray 20 includes at least one second cable tray layer. The second cable tray layer may further include a second cable tray 21 and at least one second partition plate 22; one end of the second cable tray 21 is connected to the anti-seismic assembly 40 through a second support assembly 25; the second partition plate 22 is arranged on the second cable tray 21 and extends along the length direction of the second cable tray 21, dividing the space on the second cable tray 21 into at least two rows of channels for laying cables.

[0082] The number of the second partitions 22 is 1 to 8, so that the cables can be arranged or laid on the second bridge 21, and the spacing between the second partitions 22 is 10 mm to 200 mm.

[0083] A second arc plate 23 is provided at the other end of the second bridge 21 to allow the cables to be led out from the end of the second bridge 21, so as to avoid the cables from sagging at right angles after leaving the second bridge 21, which would affect the availability of the cables. The second arc plate 23 may preferably be an arc plate with a radius of 50 mm to 350 mm.

[0084] To prevent the cables from falling off the side of the second cable tray 21, the second cable tray 20 further includes a second protective railing 24, which is disposed on at least two sides of the second cable tray 21, for example, on both sides in the length direction of the second cable tray 21. The second protective railing 24 can be formed by a plurality of rods arranged on the second cable tray 21.

[0085] exist Figure 1 In the illustrated embodiment, the double cable bridge type reactor top structure may further include a cable bracket unit 70 and a cable grid 80. The cable bracket unit 70 is connected to the anti-seismic assembly 40 and is located on the top of the control rod drive mechanism; the cable grid 80 is arranged on the top cover 100 and is located below the anti-seismic assembly 40.

[0086] Specifically, the cable bracket unit 70 may include at least one layer of cable brackets, which is laterally arranged below the support frame 32 and at the top of the control rod drive mechanism. Cable brackets of different layers can be used to support different types of cables. The cable grid 80 is vertically connected below the seismic ring 41 to support cables.

[0087] In order to keep the first cable tray 10 and the second cable tray 20 stable when in the erected state, the first cable tray 10 is provided with a first connecting frame 16, and the second cable tray 20 is provided with a second connecting frame 26. When the first cable tray 10 is in the erected state, the end of the first connecting frame 16 is connected to the cable bracket unit 70; when the second cable tray 20 is in the erected state, the end of the second connecting frame 26 is connected to the cable bracket unit 70.

[0088] The first connecting frame 16 can be connected to the first bridge frame 11 or the first partition board 12 of the first cable bridge frame 10 so as not to interfere with cable laying. The second connecting frame 26 can be connected to the second bridge frame 21 or the second partition board 22 of the second cable bridge frame 20 so as not to interfere with cable laying.

[0089] Alternatively, the first connecting frame 16 and the second connecting frame 26 may each be a rectangular or triangular frame, with connecting members such as U-shaped members provided at the ends to connect the cable bracket units.

[0090] In a preferred embodiment, the first cable tray 10 has a first bridge layer, which can be understood as a single-layer structure; the second cable tray 20 has two upper and lower second bridge layers, which can be understood as a double-layer structure. The cable tray unit 70 includes two upper and lower cable trays. At the top of the reactor, after the RIC measurement cable and the KIR cable are along the cable grid 80, they are supported and separated from the cable tray located on the upper layer of the cable tray unit 70 together with the RGL rod position measurement cable, and then laid on the first bridge layer of the first cable tray 10 and the second bridge layer located above in the second cable tray 20, so as to realize the physical separation and meet the requirements of the single fault criterion for solving emergencies such as fire (that is, when a fire or other emergencies occurs on one side of the plant, half of the cables can still be used), and finally lead out from the ends of the first cable tray 10 and the second cable tray 20 to access the cable cabinet. After the RGL rod-controlled low-voltage cable is supported and separated from the cable tray on the lower layer of the cable tray unit 70, it is laid on the second cable tray layer located below in the second cable tray 20, and finally led out from the end of the second cable tray 20 to the cable cabinet.

[0091] like Figure 7 and Figure 8 As shown, a double cable tray type reactor top structure according to another embodiment of the present invention comprises a hanging assembly 30, a seismic assembly 40, a first cable tray 10 and a second cable tray 20. The hanging assembly 30, the seismic assembly 40, the first cable tray 10 and the second cable tray 20 are all arranged above the top cover 100 of the pressure vessel and are located at the periphery of the control rod drive mechanism.

[0092] Among them, the lifting assembly 30 is connected to the top cover 100 and can be integrated with the top cover 100. When the reactor is shut down for refueling, the lifting assembly 30 can be connected through the lifting equipment, and the lifting assembly 30, the top cover 100 and the control rod drive mechanism on the top cover 100 and other mechanisms can be lifted away from the pressure vessel, or lifted back to the pressure vessel. The earthquake-resistant assembly 40 can be connected and supported above the top cover 100 through the lifting assembly 30, which plays a role in strengthening the structure and earthquake resistance of the entire reactor top structure. The first cable tray 10 and the second cable tray 20 are symmetrically distributed on both sides of the center of the reactor (also on both sides of the center of the top cover). The first cable tray 10 and the second cable tray 20 are both used for cable laying, so that various cables led out from the top of the reactor can be laid separately on the two cable trays, reducing the number, weight, number of layers, etc. of cables laid on a single cable tray.

[0093] The specific configuration of the hanging assembly 30, the anti-seismic assembly 40, the first cable tray 10 and the second cable tray 20 can refer to the above Figures 1 to 6 The illustrated embodiments will not be described in detail here.

[0094] Different from the above Figures 1 to 6The embodiment shown is: in this embodiment, the hanging assembly 30 includes four hanging rods 31; the support frame 32 of the hanging assembly 30 is an I-shaped support frame. The four ends of the I-shaped support frame are respectively connected to the tops of the four hanging rods 31. The I-shaped support frame can be specifically formed by three cross beams 322 connected in an I-shaped arrangement, and each cross beam 322 can be made of I-beam steel or a flat steel plate.

[0095] In the I-shaped support frame, two spaced parallel beams 322 are connected by a relatively vertical beam 322, and the space between the two spaced parallel beams 322 can be used as the accommodation space for the first cable tray 10 and the second cable tray 20. When the first cable tray 10 and the second cable tray 20 are in the erected state, they are accommodated in the space between the two beams 322 and will not interfere with the support frame 32.

[0096] For the cross-shaped support frame and the I-shaped support frame, the cross beams 321 and 322 can be made of steel with a width of 20 mm to 500 mm and a height of 300 mm to 1000 mm.

[0097] In addition, reference Figure 1 and Figure 7 The double cable bridge type reactor top structure of the present invention may further include an outer cover (not shown) and a ventilation cover assembly 90. The outer cover is arranged above the top cover 100 and surrounds the outer side of the control rod drive mechanism. The ventilation cover assembly 90 is arranged above the top cover 100 and surrounds the outer side of the outer cover and is connected to the outer cover, so as to communicate with the space where the control rod drive mechanism is located inside the outer cover.

[0098] When the ventilation hood assembly 90 is working, it can extract the gas in the space where the control rod drive mechanism is located, thereby dissipating heat and reducing the temperature of the space where the control rod drive mechanism is located.

[0099] The above descriptions are merely embodiments of the present invention and are not intended to limit the patent scope of the present invention. Any equivalent structure or equivalent process transformation made using the contents of the present invention specification and drawings, or directly or indirectly applied in other related technical fields, are also included in the patent protection scope of the present invention.

Claims

1. A double cable bridge type reactor top structure, It is characterized in that It includes a suspension assembly, a seismic assembly, a first cable tray and a second cable tray for laying cables, which are arranged above the top cover of the pressure vessel and outside the control rod drive mechanism; The hanging assembly includes a plurality of hanging rods and a support frame, wherein the plurality of hanging rods are arranged at intervals along the circumference of the top cover and vertically connected to the top cover, and the support frame is connected to the tops of the plurality of hanging rods; the anti-seismic assembly is arranged above the top cover and below the support frame; The first cable tray and the second cable tray are symmetrically distributed on both sides of the center of the reactor and are flippably connected to the seismic resistant assembly; When the reactor is in operation, the first cable tray and the second cable tray are in a flat state and overlapped on the top platform of the reactor pool; When the reactor is shut down for refueling, the first cable tray and the second cable tray are in an erected state.

2. The double cable bridge type reactor top structure according to claim 1, It is characterized in that When the first cable tray and the second cable tray are in a flat state, the angle between them and the horizontal plane is -20° to 40°; When the first cable tray and the second cable tray are in an upright state, the angle between them and the vertical plane is -20° to 40°.

3. The double cable bridge type reactor top structure according to claim 1, It is characterized in that A horizontal distance between a center line of the first cable tray and a center line of the second cable tray is 0 to 1000 mm.

4. The double cable bridge type reactor top structure according to claim 1, It is characterized in that The hanging assembly includes four hanging rods; the support frame is a cross-shaped support frame or an I-shaped support frame.

5. The double cable bridge type reactor top structure according to claim 1, It is characterized in that The double cable bridge type reactor top structure also includes at least one set of first seismic support assemblies and at least one set of second seismic support assemblies; The first anti-seismic support assembly is arranged between the first cable tray and the top platform of the reactor pool, and connects the first cable tray in a flat state to the top platform of the reactor pool; The second anti-seismic support assembly is arranged between the second cable tray and the top platform of the reactor pool, and connects the second cable tray in a flat state to the top platform of the reactor pool.

6. The double cable bridge type reactor top structure according to claim 5, It is characterized in that The first anti-seismic support assembly includes a perforated plate arranged on the side of the first cable tray facing the top platform of the reactor pool, a connecting seat fixed on the top platform of the reactor pool, and connecting bolts; When the first cable tray is laid flat, the perforated plate is fitted onto the connection seat, and the connecting bolts are passed through the connection seat and the perforated plate to connect the perforated plate onto the connection seat.

7. The double cable bridge type reactor top structure according to claim 1, It is characterized in that The first cable tray has a length of 2000 mm to 8000 mm and a width of 500 mm to 2000 mm; The second cable tray has a length of 2000 mm to 8000 mm and a width of 500 mm to 2000 mm.

8. The double cable bridge type reactor top structure according to claim 1, It is characterized in that The first cable tray comprises at least one first bridge layer; the first bridge layer comprises a first bridge and at least one first partition; one end of the first bridge is connected to the anti-seismic assembly through a first support assembly, and a first arc-shaped plate is provided at the other end of the first bridge; the first partition is arranged on the first bridge and extends along the length direction of the first bridge, dividing the space on the first bridge into at least two rows of channels for laying cables; The second cable tray includes at least one second tray layer; the second tray layer includes a second tray and at least one second partition; one end of the second tray is connected to the seismic anti-seismic assembly through a second supporting assembly, and the other end of the second tray is provided with a second arc plate; the second partition is arranged on the second tray and extends along the length direction of the second tray, dividing the space on the second tray into at least two columns for laying cables.

9. The double cable bridge type reactor top structure according to claim 8, It is characterized in that The first cable tray further comprises a first protective railing disposed on at least two sides of the first cable tray; The second cable tray also includes second protective railings arranged on at least two sides of the second cable tray.

10. The double cable bridge type reactor top structure according to claim 1, It is characterized in that The hanging assembly also includes a hook unit connected to the center of the support frame, and a working platform arranged on the support frame and located at the periphery of the hook unit.

11. The double cable bridge type reactor top structure according to claim 1, It is characterized in that The anti-seismic assembly includes an anti-seismic ring; each of the suspension rods of the suspension assembly vertically passes through the anti-seismic ring and is connected to the top cover.

12. The double cable tray type reactor top structure according to claim 11, It is characterized in that The anti-seismic assembly also includes at least one anti-seismic tie rod; one end of the anti-seismic tie rod is connected to the anti-seismic ring, and the other end is connected to the wall of the reactor water pool.

13. The double cable tray type reactor top structure according to any one of claims 1 to 12, It is characterized in that The double cable bridge type reactor top structure also includes a cable bracket unit connected to the seismic resistant assembly and located on the top of the control rod drive mechanism; The first cable tray is provided with a first connecting frame, and the second cable tray is provided with a second connecting frame; When the first cable tray is in an erected state, the end of the first connecting frame is connected to the cable bracket unit; When the second cable tray is in an erected state, the end of the second connecting frame is connected to the cable bracket unit.

14. The double cable tray type reactor top structure according to claim 13, It is characterized in that The double cable bridge type reactor top structure also includes a cable grid; the cable grid is arranged on the top cover and is located below the seismic resistant assembly.

Citation Information

Cited By

  • Dual-cable-tray reactor head structure

    WO2026020692A1