Distribution transformer life prolonging method and system based on flexible resource collaborative optimization
By constructing active and reactive models of flexible resources, adjusting the load rate of the distribution network, the problem of neglecting the impact of flexible resources in the existing technology is solved, extending the life of the distribution transformer and improving the operating stability and energy of the distribution network. Utilization.
Patent Information
- Application Number
- CN202411091826.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-11-22
AI Technical Summary
When extending the life of distribution transformers, the existing technology ignores the impact of flexible resources on the operating performance of the power grid, and only improves it from the aspects of insulating materials, resulting in limited service life of the distribution transformer and inability to effectively protect the distribution network. safety and stability.
By obtaining the predicted load data of the distribution network within the next day, establishing flexible resource active and reactive models, building a distribution network scheduling model with measuring and dynamic weights, adjusting the load rate of the distribution transformer, reducing the hot spot temperature, and thus extending power distribution The service life of the transformer.
It realizes dynamic extension of the life of the distribution transformer, takes into account the operating economy and safety stability of the distribution network, improves energy utilization, reduces calculation difficulty, and improves calculation efficiency.
Smart Images

Figure CN119010212A_ABST
Abstract
Description
Technical Field
[0001] The present invention relates to the technical field of power distribution systems, and in particular to a method and system for extending the life of a distribution transformer based on flexible resource collaborative optimization. Background Art
[0002] The factors affecting the life of distribution transformers usually include operating environment factors, power quality factors, equipment maintenance factors, operating load factors, internal materials and structural factors, etc. However, the current research on extending the life of distribution transformers usually only improves the insulation materials of the transformer itself, and extends the life of the transformer by improving the quality of transformer insulation. For example: in some related technologies, molecular sieve adsorption technology is used to control the micro-water content of transformer oil to improve insulation performance and extend the life of the transformer, but it needs to monitor the micro-water content in the transformer oil. At present, there are very few domestic equipment that integrates online monitoring and treatment of transformer micro-water in the power system, and it is necessary to introduce transformer micro-water online monitoring and control systems based on molecular sieve adsorption technology. Its principle and operation process are relatively complicated, and the equipment cost is high, which is not conducive to promotion and application; in other related technologies, an anti-aging ternary mixed new insulating oil has been developed to extend the life of the transformer. It delays the aging of the "oil-paper" insulation system, thereby improving the high temperature resistance of the transformer and extending the life of the transformer, but it and molecular sieve adsorption technology are both improved from the insulation material aspect.
[0003] However, with the high proportion of distributed energy and a large number of dynamic loads (such as electric vehicles) in the new distribution network, the power flow of the distribution transformer is prone to frequent and violent fluctuations in both directions, and the load rate of the distribution transformer has a great impact on the life of the distribution transformer. However, in the current research on the new distribution network, the load rate of the distribution transformer has not been well controlled, and the distribution network has a large number of adjustable flexible resources. The existing research ignores the impact of the access point and capacity of the flexible resources on the operation performance of the power grid and the distribution transformer, and only improves the insulation material of the transformer itself, which not only limits the extension of the service life of the distribution transformer, but also leads to the waste of these flexible resources, and cannot well guarantee the safety and stability of the distribution network operation. Summary of the invention
[0004] In order to solve the deficiencies in the prior art, the present invention provides a method and system for extending the life of a distribution transformer based on collaborative optimization of flexible resources. While taking into account the operating economy and safety and stability of the distribution network, the load rate of the distribution transformer is adjusted by collaborative scheduling and optimization of flexible resources in the distribution network to reduce the life loss of the distribution transformer and extend the service life of the distribution transformer.
[0005] The present invention adopts the following technical solution.
[0006] In a first aspect, the present invention provides a method for extending the life of a distribution transformer based on flexible resource collaborative optimization, the method comprising:
[0007] Obtain the forecast load data of the distribution network in the next day;
[0008] Establish active and reactive models of flexible resources in distribution network;
[0009] Based on the active power model and the reactive power model, a distribution network dispatching model taking into account dynamic weights is constructed;
[0010] In combination with the predicted load data and the formulated distribution network operation constraints, the distribution network dispatching model is solved to obtain the operating load rate of the distribution transformer in the next day after the coordinated adjustment of flexible resources, so as to reduce the hot spot temperature of the distribution transformer and extend the service life of the distribution transformer.
[0011] Optionally, the established flexible resource active model includes an energy storage device model, and its expression is as follows:
[0012]
[0013] SOC i,1 =SOC i,24
[0014]
[0015] β c,i,t +β d,i,t ≤1
[0016] {β c,i,t ,β d,i,t}∈{0,1}
[0017]
[0018] In the formula, SOC i,t+1 and SOC i,t They represent the charge state of the energy storage device at node i at time t+1 and time t respectively; P ESSc,i,t and P ESSd,i,t They represent the charging active power and discharging active power of the energy storage device at node i at time t respectively; η c and η d They represent the charging efficiency and discharging efficiency of the energy storage device respectively; Indicates the maximum state of charge of the energy storage device invested and built in the distribution network; SOC i,1 and SOC i,24 are the charge states of the energy storage device at node i at time t=1 and time t=24 respectively; is the investment capacity of flexible active resources; c,i,tand β d,i,t are two different variables ranging from 0 to 1, representing the charging state and discharging state of the energy storage device at node i at time t; B ESS represents the node set of energy storage devices in the distribution network; t = 1, 2…T; T represents the total number of scheduling optimization periods.
[0019] Optionally, the established flexible resource reactive model includes a group switching capacitor bank CB model, and its expression is as follows:
[0020]
[0021] In the formula, represents the total compensation power of the group switching capacitor bank CB at node j at time t, and They represent the number of group switching capacitor banks CB in operation at time t and time t-1 respectively. represents the compensation power of each group switching capacitor bank CB at node j; The upper limit of the number of group switching capacitor banks CB connected to node j; B is the upper limit of the number of operations of group switching capacitor bank CB; CB It represents the node set of group switching capacitor bank CB in the distribution network.
[0022] Optionally, the established flexible resource reactive model also includes a static VAR compensator SVC model, and its expression is as follows:
[0023]
[0024] In the formula, and They respectively represent the lower limit and upper limit of the compensation power of the static VAR compensator SVC; represents the compensation power of the static VAR compensator SVC at node j at time t; B SVC Represents the node set of the static VAR compensator SVC in the distribution network.
[0025] Optionally, the distribution network dispatching model taking into account the dynamic weight is expressed as follows:
[0026] F=min(αf1+f2+f3)
[0027]
[0028] Where F represents the objective function of the dispatch model; f1, f2 and f3 are the peak-shaving and valley-filling power, active network loss and power purchased from the upper grid of the distribution network system respectively; P t represents the active load of the distribution network system at time t; P average,tis the average active load of the distribution network system in the dispatch optimization period T; α is the dynamic weight for adjusting the peak-shaving and valley-filling power of the distribution network system; t represents the index variable of the optimization period, t = 1, 2…T; ζ is the set of distribution network nodes; R ij represents the real part of the impedance between node i and node j; I ij,t is the current value of the line between node i and node j at time t; Δt is the optimization decision time interval; C A,t is the cost of purchasing electricity from the upper power grid at time t; t is the electricity price at time t.
[0029] Optionally, the calculation formula of the dynamic weight α is as follows:
[0030]
[0031] In the formula, K t Represents the operating load rate of the distribution transformer at time t.
[0032] Optionally, the active load P of the distribution network system at time t t The calculation formula is as follows:
[0033] P t =P load,t -P wind,t -P PV,t +P storage,t
[0034] Where P load,t , P wind,t , P PV,t and P storage,t They respectively represent the load of the distribution network system at time t, the active power of the wind turbine, the active power of the photovoltaic unit and the active power of the energy storage device; among them, the active power of the energy storage device is defined as positive during charging and negative during discharging.
[0035] Optionally, the distribution network operation constraints include power flow equation constraints, node voltage amplitude constraints and branch current amplitude constraints.
[0036] Optionally, when solving the distribution network dispatching model, a second-order cone programming method is used to transform the distribution network operation constraint condition from a nonlinear constraint into a linear constraint. The expression of the transformed distribution network operation constraint condition is as follows:
[0037]
[0038] Where: P ij,t and Q ij,t Respectively represent the active power and reactive power of the line between node i and node j at time t; V i,t =|U i,t |2 , V j,t =|U j,t | 2 , U i,t and U j,t Respectively represent the voltage amplitudes of nodes i and j at time t; I ij,t is the current of the line between node i and node j at time t; is the current limit of the line between node i and node j; U max and U min Respectively represent the upper and lower limits of the node voltage amplitude; R ij and X ij Respectively represent the resistance and reactance between node i and node j; Q jh,t and P jh,t They represent the reactive power and active power of the line between node j and node h at time t respectively; P j,t and Q j,t They represent the active power and reactive power injected into node j at time t respectively; ε=6×10 -7 ; ζ is the set of distribution network nodes.
[0039] In a second aspect, the present invention provides a distribution transformer life extension system based on flexible resource collaborative optimization, which runs the steps of any method described in the first aspect of the present invention, and the system includes:
[0040] An acquisition module is used to obtain the predicted load data of the distribution network in the next day;
[0041] Establishing a module for establishing active and reactive models of flexible resources of distribution network;
[0042] A construction module, used to construct a distribution network dispatching model taking into account dynamic weights based on the active power model and the reactive power model;
[0043] The solution module is used to solve the distribution network dispatching model in combination with the predicted load data and the formulated distribution network operation constraints, obtain the operating load rate of the distribution transformer in the next day after the coordinated adjustment of flexible resources, realize the reduction of the hot spot temperature of the distribution transformer, and thus extend the service life of the distribution transformer.
[0044] Optionally, the flexible resource active model in the establishment module includes an energy storage device model, and the flexible resource reactive model includes a group switching capacitor bank CB model and a static VAR compensator SVC model.
[0045] Optionally, the expression of the distribution network dispatching model taking into account the dynamic weight in the construction module is as follows:
[0046] F=min(αf1+f2+f3)
[0047]
[0048] Where F represents the objective function of the dispatch model; f1, f2 and f3 are the peak-shaving and valley-filling power, active network loss and power purchased from the upper grid of the distribution network system respectively; P t represents the active load of the distribution network system at time t; P average,t is the average active load of the distribution network system in the dispatch optimization period T; α is the dynamic weight for adjusting the peak load and valley load of the distribution network system; t represents the index variable of the optimization period, t = 1, 2…T; ζ is the set of distribution network nodes; R ij represents the real part of the impedance between node i and node j; I ij,t is the current value of the line between node i and node j at time t; Δt is the optimization decision time interval; C A,t is the cost of purchasing electricity from the upper power grid at time t; t is the electricity price at time t.
[0049] Optionally, the calculation formula of the dynamic weight α in the construction module is as follows:
[0050]
[0051] In the formula, K t Represents the operating load rate of the distribution transformer at time t.
[0052] In a third aspect, the present invention provides a terminal, including a processor and a storage medium;
[0053] The storage medium is used to store instructions;
[0054] The processor is used to operate according to the instructions to execute the steps of any one of the methods described in the first aspect of the present invention.
[0055] In a fourth aspect, the present invention provides a computer-readable storage medium having a computer program stored thereon, which, when executed by a processor, implements the steps of any one of the methods described in the first aspect of the present invention.
[0056] The beneficial effects of the present invention are as follows:
[0057] 1. The present invention fully considers the great influence of the load rate of the distribution transformer on its service life, constructs a distribution network dispatching model taking into account dynamic weights, adjusts the dynamic weights in the objective function according to the load rate of the distribution transformer, regulates the flexible resources in the distribution network, reduces the peak load rate of the distribution transformer, thereby reducing the maximum hot spot temperature of the distribution transformer, reducing the life loss of the distribution transformer, and realizing the dynamic extension of the life of the distribution transformer.
[0058] 2. The objective function of the distribution network dispatching model constructed by the present invention simultaneously considers the active network loss of the distribution network and the cost of purchasing electricity from the distribution network to the superior power grid, and optimizes the dispatching of flexible resources under the operating constraints of the distribution network, so that the distribution network dispatching is more reasonable, taking into account the economy and safety and stability of the distribution network operation, and can make full use of the flexible resources in the distribution network and improve energy utilization.
[0059] 3. The present invention adopts the second-order cone programming method to transform the distribution network operation constraints from nonlinear constraints to linear constraints, which reduces the calculation difficulty when solving the model, has a fast convergence speed, is easy to obtain the global optimal solution, and has high calculation efficiency. BRIEF DESCRIPTION OF THE DRAWINGS
[0060] Figure 1 It is a flow chart of the method for extending the life of a distribution transformer based on flexible resource collaborative optimization in the present invention;
[0061] Figure 2 The improved IEEE33 node system diagram is used in the simulation experiment of the present invention;
[0062] Figure 3 A load rate comparison curve diagram of the distribution transformer before and after the flexible resource adjustment by the method of the present invention;
[0063] Figure 4 A comparison curve diagram of the life loss of the distribution transformer before and after the flexible resource adjustment by the method of the present invention;
[0064] Figure 5 It is a structural principle block diagram of the distribution transformer life extension method system based on flexible resource collaborative optimization in the present invention. DETAILED DESCRIPTION
[0065] In order to make the purpose, technical solution and advantages of the present invention clearer, the technical solution of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. The embodiments described in the present invention are only part of the embodiments of the present invention, not all of the embodiments. Based on the spirit of the present invention, other embodiments obtained by ordinary technicians in this field without creative work are all within the scope of protection of the present invention.
[0066] Embodiment 1:
[0067] Reference Figure 1 The embodiment of the present invention provides a method for extending the life of a distribution transformer by flexible resource collaborative optimization, which specifically includes the following steps:
[0068] Step S1: Obtain the forecast load data of the distribution network in the next day;
[0069] In this embodiment, the predicted load data is the load data of the distribution network within 24 hours a day, including adjustable loads such as industrial power load, electric vehicle charging load and air conditioning load, etc., non-adjustable loads such as commercial power load, residential household power load and public facility power load, etc., and distributed power supply prediction data such as wind power generation and photovoltaic power generation within 24 hours a day.
[0070] Step S2: Establishing the flexible resource active model and reactive model of the distribution network;
[0071] In a preferred but non-limiting embodiment, the flexible resources include energy storage devices in the flexible active resources, and group switching capacitor banks CB and SVC static VAR compensators in the flexible reactive resources.
[0072] The flexible resource active model includes the energy storage device model:
[0073]
[0074] SOC i,1 =SOC i,24
[0075]
[0076] β c,i,t +β d,i,t ≤1
[0077] {β c,i,t ,β d,i,t}∈{0,1}
[0078]
[0079] In the formula, SOC i,t+1 and SOC i,t They represent the charge state of the energy storage device at node i at time t+1 and time t respectively; P ESSc,i,t and P ESSd,i,t They represent the charging active power and discharging active power of the energy storage device at node i at time t respectively; η c and η d They represent the charging efficiency and discharging efficiency of the energy storage device respectively; Indicates the maximum state of charge of the energy storage device invested and built in the distribution network; SOC i,1 and SOC i,24 are the charge states of the energy storage device at node i at time t=1 and time t=24 respectively; is the investment capacity of flexible active resources; c,i,t and β d,i,t are two different variables ranging from 0 to 1, representing the charging state and discharging state of the energy storage device at node i at time t; BESS represents the node set of energy storage devices in the distribution network; t = 1, 2…T; T represents the total number of scheduling optimization periods.
[0080] The flexible resource reactive model includes the group switching capacitor bank CB model:
[0081]
[0082] In the formula, represents the total compensation power of the group switching capacitor bank CB at node j at time t, and They represent the number of group switching capacitor banks CB in operation at time t and time t-1 respectively. represents the compensation power of each group switching capacitor bank CB at node j; The upper limit of the number of group switching capacitor banks CB connected to node j; B is the upper limit of the number of operations of group switching capacitor bank CB; CB It represents the node set of group switching capacitor bank CB in the distribution network.
[0083] The flexible resource reactive model also includes the static VAR compensator SVC model:
[0084]
[0085] In the formula, and They respectively represent the lower limit and upper limit of the compensation power of the static VAR compensator SVC; represents the compensation power of the static VAR compensator SVC at node j at time t; B SVC Represents the node set of the static VAR compensator SVC in the distribution network
[0086] Step S3: Based on the active power model and the reactive power model, a distribution network dispatching model taking into account dynamic weights is constructed:
[0087] F=min(αf1+f2+f3)
[0088]
[0089] Where F represents the objective function of the dispatch model; f1, f2 and f3 are the peak-shaving and valley-filling power, active network loss and power purchased from the upper grid of the distribution network system respectively; P t represents the active load of the distribution network system at time t; P average,t is the average active load of the distribution network system in the dispatch optimization period T; T = 24; α is the dynamic weight for adjusting the peak load and valley load of the distribution network system; t represents the index variable of the optimization period, t = 1, 2…T; ζ is the set of distribution network nodes; Rij represents the real part of the impedance between node i and node j; I ij,t is the current value of the line between node i and node j at time t; Δt is the optimization decision time interval; C A,t is the cost of purchasing electricity from the upper power grid at time t; t is the electricity price at time t.
[0090] In a preferred but non-limiting embodiment, the calculation formula of the dynamic weight α in the distribution network dispatching model is as follows:
[0091]
[0092] In the formula, K t Represents the operating load rate of the distribution transformer at time t.
[0093] Furthermore, the active load P of the distribution network system at time t is t The calculation formula is as follows:
[0094] P t =P load,t -P wind,t -P PV,t +P storage,t
[0095] Where P load,t , P wind,t , P PV,t and P storage,t They respectively represent the load of the distribution network system at time t, the active power of the wind turbine, the active power of the photovoltaic unit and the active power of the energy storage device; among them, the active power of the energy storage device is defined as positive during charging and negative during discharging.
[0096] Step S4: In combination with the predicted load data and the formulated distribution network operation constraints, the distribution network dispatching model is solved to obtain the operating load rate of the distribution transformer in the next day after the coordinated adjustment of flexible resources, so as to reduce the hot spot temperature of the distribution transformer and thus extend the service life of the distribution transformer.
[0097] In a preferred but non-limiting embodiment, in step S4, this embodiment calls the solver CPLEX to optimize and solve the distribution network scheduling model.
[0098] In this embodiment, the operation constraints of the distribution network include power flow equation constraints, node voltage amplitude constraints, and branch current amplitude constraints, and their expressions are as follows:
[0099]
[0100] Furthermore, when solving the distribution network dispatching model, in order to reduce the computational difficulty and improve the computational efficiency, this embodiment uses a second-order cone programming method to transform the distribution network operation constraints from nonlinear constraints to linear constraints. The transformation process is as follows:
[0101] Based on the second-order cone programming principle, let: V it =|U it | 2 、V j,t =|U j,t | 2 ;
[0102] definition: get Then further relax it to get Its equivalent form can be expressed as According to the ε relaxation method, we get The expression of the transformed distribution network operation constraint condition is as follows:
[0103]
[0104] Where: P ij,t and Q ij,t Respectively represent the active power and reactive power of the line between node i and node j at time t; V i,t =|U i,t 2 , V j,t =|U j,t 2 , U i,t and U j,t Respectively represent the voltage amplitudes of nodes i and j at time t; I ij,t is the current of the line between node i and node j at time t; is the current limit of the line between node i and node j; U max and U min Respectively represent the upper and lower limits of the node voltage amplitude; R ij and X ij Respectively represent the resistance and reactance between node i and node j; Q jh,t and P jh,t They represent the reactive power and active power of the line between node j and node h at time t respectively; P j,t and Q j,t They represent the active power and reactive power injected into node j at time t respectively; ε=6×10 -7 ; ζ is the set of distribution network nodes.
[0105] It is further explained that the method for extending the life of a distribution transformer based on flexible resource collaborative optimization provided by the present invention adjusts the dynamic weight in the objective function according to the load rate of the distribution transformer, and regulates the flexible active resources and reactive resources in the distribution system to reduce the peak load rate of the distribution transformer, thereby reducing the maximum hot spot temperature of the distribution transformer; based on the reduction in the hot spot temperature of the distribution transformer, the life loss of the distribution transformer before and after the regulation is calculated and compared, and the experimental results show that the distribution transformer optimized by the method of the present invention can greatly reduce the life loss, thereby realizing dynamic extension of the life of the distribution transformer.
[0106] Specifically, the formula for calculating the life loss of distribution transformers based on hot spot temperature is as follows:
[0107]
[0108] Where L is the total life loss of the distribution transformer in a given period (24h); V n (t) represents the relative insulation aging rate of the distribution transformer in the nth time interval; θ h (t) is the hot spot temperature of the distribution transformer at time t; ΔT is the time of the nth time interval;
[0109] Hot spot temperature θ h (t) When the load rate increases:
[0110]
[0111] Hot spot temperature θ h (t) When the load rate decreases:
[0112]
[0113] In the formula, θ a is the ambient temperature; Δθ or is the steady-state temperature rise of the top oil of the distribution transformer; Δθ oi is the initial temperature rise of the top oil of the distribution transformer; R is the loss ratio; K is the load factor; x and y are the oil index and winding index respectively; H is the hot spot coefficient; g r is the gradient of the average winding temperature to the average oil (inside the oil tank) temperature at rated current; f1(t) and f2(t) are the relative increase of the top oil temperature rise and the relative increase of the hot spot to the top oil temperature gradient when the total temperature rise value is 1, respectively; f3(t) is the relative decrease of the top oil to the ambient temperature gradient when the total decrease value is 1.
[0114] The effectiveness of the distribution transformer life extension method based on flexible resource collaborative optimization provided by the present invention is verified through specific implementation data.
[0115] By simulating the impact of the load rate of the distribution transformer on the life loss of the transformer, and then optimizing the load operation of the distribution network by adjusting the flexible active resources and flexible reactive resources, the output plan of the optimal flexible active resources and flexible reactive resources is established, which provides a reference for the operation of the distribution network; the data of this embodiment are as follows:
[0116] like Figure 2 As shown in the figure, this experiment uses the improved IEEE33 node system for testing. The reference voltage of the improved IEEE33 node system is 12.66kV. One photovoltaic unit PV and one wind turbine unit WT are connected to the system. Considering the impact of the access of distributed power sources DG, three static VAR compensators SVC, two group switching capacitor groups CB and two energy storage devices (lead-acid batteries ESS) are connected to the system. The specific parameter configuration is shown in Table 1:
[0117] Table 1
[0118]
[0119] The change of transformer load rate before and after flexible resource adjustment is as follows: Figure 3 As shown, k0 is the load rate of the distribution transformer before adjustment, and k is the load rate of the distribution transformer after adjustment; Figure 3 It can be seen that after the flexible resource collaborative optimization, the maximum load rate and the minimum load rate of the distribution transformer are reduced by 7.315% and 15% respectively.
[0120] Reference Figure 4 The figure is a comparison curve of the life loss of the distribution transformer before and after the adjustment by the method of the present invention; in addition, the changes in the operating parameters of the distribution transformer after the flexible resource collaborative optimization are shown in Table 2:
[0121] Table 2
[0122]
[0123] From Table 2 and Figure 4 It can be seen that after adopting the distribution transformer life extension method based on flexible resource collaborative optimization provided by the present invention, the maximum load rate of the distribution transformer in one day is reduced from 1.244 to 1.153, the minimum load rate is reduced from 0.740 to 0.629, and the average load rate is basically the same, but the total life loss in one day is reduced from 2.816 days before optimization to 0.801 days, which greatly reduces the life loss of the distribution transformer and greatly extends the service life of the distribution transformer. In addition, during the peak load period before optimization, the distribution transformer is heavily overloaded, reaching more than 1.2, and its life loss is too high. After optimization, this part of life loss can be greatly reduced.
[0124] The beneficial effects of the present invention are as follows:
[0125] 1. The present invention fully considers the great influence of the load rate of the distribution transformer on its service life, constructs a distribution network dispatching model taking into account dynamic weights, adjusts the dynamic weights in the objective function according to the load rate of the distribution transformer, regulates the flexible resources in the distribution network, reduces the peak load rate of the distribution transformer, thereby reducing the maximum hot spot temperature of the distribution transformer, reducing the life loss of the distribution transformer, and realizing the dynamic extension of the life of the distribution transformer.
[0126] 2. The objective function of the distribution network dispatching model constructed by the present invention simultaneously considers the active network loss of the distribution network and the cost of purchasing electricity from the distribution network to the superior power grid, and optimizes the dispatching of flexible resources under the operating constraints of the distribution network, so that the distribution network dispatching is more reasonable, taking into account the economy and safety and stability of the distribution network operation, and can make full use of the flexible resources in the distribution network and improve energy utilization.
[0127] 3. The present invention adopts the second-order cone programming method to transform the distribution network operation constraints from nonlinear constraints to linear constraints, which reduces the calculation difficulty when solving the model, has a fast convergence speed, is easy to obtain the global optimal solution, and has high calculation efficiency.
[0128] Embodiment 2:
[0129] like Figure 5 As shown, the present invention provides a distribution transformer life extension system based on flexible resource collaborative optimization, the system is used to implement the steps of the method in the above embodiment 1, and the system specifically includes:
[0130] An acquisition module is used to obtain the predicted load data of the distribution network in the next day;
[0131] Establishing a module for establishing active and reactive models of flexible resources of distribution network;
[0132] A construction module, used to construct a distribution network dispatching model taking into account dynamic weights based on the active power model and the reactive power model;
[0133] The solution module is used to solve the distribution network dispatching model in combination with the predicted load data and the formulated distribution network operation constraints, obtain the operating load rate of the distribution transformer in the next day after the flexible resource collaborative adjustment, realize the reduction of the hot spot temperature of the distribution transformer, and thus extend the service life of the distribution transformer.
[0134] In this embodiment, the flexible resource active model in the establishment module includes an energy storage device model, and the flexible resource reactive model includes a group switching capacitor bank CB model and a static VAR compensator SVC model.
[0135] Furthermore, the expression of the distribution network dispatching model taking into account the dynamic weight in the construction module is as follows:
[0136] F=min(αf1+f2+f3)
[0137]
[0138] Where F represents the objective function of the dispatch model; f1, f2 and f3 are the peak-shaving and valley-filling power, active network loss and power purchased from the upper grid of the distribution network system respectively; P t represents the active load of the distribution network system at time t; P average,t is the average active load of the distribution network system in the dispatch optimization period T; α is the dynamic weight for adjusting the peak-shaving and valley-filling power of the distribution network system; t represents the index variable of the optimization period, t = 1, 2…T; ζ is the set of distribution network nodes; R ij represents the real part of the impedance between node i and node j; I ij,t is the current value of the line between node i and node j at time t; Δt is the optimization decision time interval; C A,t is the cost of purchasing electricity from the upper power grid at time t; t is the electricity price at time t.
[0139] In a preferred but non-limiting embodiment, the calculation formula of the dynamic weight α in the building module is as follows:
[0140]
[0141] In the formula, K t Represents the operating load rate of the distribution transformer at time t.
[0142] The distribution transformer life extension system based on flexible resource collaborative optimization provided in the embodiment of the present invention and the distribution transformer life extension method based on flexible resource collaborative optimization provided in Example 1 are based on the same technical concept, and can produce the beneficial effects described in Example 1. For the contents not described in detail in this embodiment, please refer to Example 1.
[0143] Embodiment three:
[0144] A terminal provided by an embodiment of the present invention includes a processor and a storage medium;
[0145] The storage medium is used to store instructions;
[0146] The processor is used to operate according to the instruction to execute the steps of the method according to any one of the first embodiments.
[0147] Embodiment 4:
[0148] An embodiment of the present invention provides a computer-readable storage medium, on which a computer program is stored. When the program is executed by a processor, the steps of any method described in Embodiment 1 are implemented.
[0149] The present disclosure may be a system, a method and / or a computer program product. The computer program product may include a computer-readable storage medium carrying computer-readable program instructions for causing a processor to implement various aspects of the present disclosure.
[0150] A computer-readable storage medium may be a tangible device that can hold and store instructions used by an instruction execution device. A computer-readable storage medium may be, for example, but not limited to, an electrical storage device, a magnetic storage device, an optical storage device, an electromagnetic storage device, a semiconductor storage device, or any suitable combination of the foregoing. More specific examples of computer-readable storage media (a non-exhaustive list) include: a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), a static random access memory (SRAM), a portable compact disk read-only memory (CD-ROM), a digital versatile disk (DVD), a memory stick, a floppy disk, a mechanical encoding device, such as a punch card or a raised structure in a groove on which instructions are stored, and any suitable combination of the foregoing. As used herein, a computer-readable storage medium is not to be interpreted as a transient signal per se, such as a radio wave or other freely propagating electromagnetic wave, an electromagnetic wave propagating through a waveguide or other transmission medium (e.g., a light pulse through a fiber optic cable), or an electrical signal transmitted through a wire.
[0151] The computer-readable program instructions described herein can be downloaded from a computer-readable storage medium to each computing / processing device, or downloaded to an external computer or external storage device via a network, such as the Internet, a local area network, a wide area network, and / or a wireless network. The network can include copper transmission cables, optical fiber transmissions, wireless transmissions, routers, firewalls, switches, gateway computers, and / or edge servers. The network adapter card or network interface in each computing / processing device receives the computer-readable program instructions from the network and forwards the computer-readable program instructions for storage in the computer-readable storage medium in each computing / processing device.
[0152] The computer program instructions for performing the operation of the present disclosure may be assembly instructions, instruction set architecture (ISA) instructions, machine instructions, machine-related instructions, microcode, firmware instructions, state setting data, or source code or object code written in any combination of one or more programming languages, including object-oriented programming languages-such as Smalltalk, C++, etc., and conventional procedural programming languages-such as "C" language or similar programming languages. Computer-readable program instructions may be executed completely on a user's computer, partially on a user's computer, executed as an independent software package, partially on a user's computer, partially on a remote computer, or completely on a remote computer or server. In the case of a remote computer, the remote computer may be connected to the user's computer via any type of network-including a local area network (LAN) or a wide area network (WAN), or may be connected to an external computer (e.g., using an Internet service provider to connect via the Internet). In some embodiments, an electronic circuit, such as a programmable logic circuit, a field programmable gate array (FPGA), or a programmable logic array (PLA) may be personalized by utilizing the state information of the computer-readable program instructions, and the electronic circuit may execute the computer-readable program instructions, thereby realizing various aspects of the present disclosure.
[0153] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention rather than to limit it. Although the present invention has been described in detail with reference to the above embodiments, ordinary technicians in the relevant field should understand that the specific implementation methods of the present invention can still be modified or replaced by equivalents, and any modifications or equivalent replacements that do not depart from the spirit and scope of the present invention should be covered within the scope of protection of the claims of the present invention.
Claims
1. A method for extending the life of a distribution transformer based on flexible resource collaborative optimization, characterized in that: Methods include: Obtain the forecast load data of the distribution network in the next day; Establish active and reactive models of flexible resources in distribution network; Based on the active power model and the reactive power model, a distribution network dispatching model taking into account dynamic weights is constructed; In combination with the predicted load data and the formulated distribution network operation constraints, the distribution network dispatching model is solved to obtain the operating load rate of the distribution transformer in the next day after the coordinated adjustment of flexible resources, so as to reduce the hot spot temperature of the distribution transformer and extend the service life of the distribution transformer.
2. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 1 is characterized in that: The established flexible resource active model includes the energy storage device model, and its expression is as follows: SOCIETY i,1 =SOC i,24 β c,i,t +β d,i,t ≤1 {β c,i,t ,β d,i,t}∈{0,1} In the formula, SOC i,t+1 and SOC i,t They represent the charge state of the energy storage device at node i at time t+1 and time t respectively; P ESSc,i,t and P ESSd,i,t They represent the charging active power and discharging active power of the energy storage device at node i at time t respectively; η c and η d They represent the charging efficiency and discharging efficiency of the energy storage device respectively; Indicates the maximum state of charge of the energy storage device invested and built in the distribution network; SOC i,1 and SOC i,24 are the charge states of the energy storage device at node i at time t=1 and time t=24 respectively; is the investment capacity of flexible active resources; c,i,t and β d,i,t are two different variables ranging from 0 to 1, representing the charging state and discharging state of the energy storage device at node i at time t; B ESS represents the node set of energy storage devices in the distribution network; t = 1, 2…T; T represents the total number of scheduling optimization periods.
3. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 1 or 2, characterized in that: The established flexible resource reactive model includes the group switching capacitor group CB model, and its expression is as follows: In the formula, represents the total compensation power of the group switching capacitor bank CB at node j at time t, and They represent the number of group switching capacitor banks CB in operation at time t and time t-1 respectively. represents the compensation power of each group switching capacitor bank CB at node j; The upper limit of the number of group switching capacitor banks CB connected to node j; B is the upper limit of the number of operations of group switching capacitor bank CB; CB It represents the node set of group switching capacitor bank CB in the distribution network.
4. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 3 is characterized in that: The established flexible resource reactive model also includes a static VAR compensator SVC model, which is expressed as follows: In the formula, and They respectively represent the lower limit and upper limit of the compensation power of the static VAR compensator SVC; represents the compensation power of the static VAR compensator SVC at node j at time t; B SVC Represents the node set of the static VAR compensator SVC in the distribution network.
5. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 4 is characterized in that: The expression of the distribution network dispatching model taking into account the dynamic weight is as follows: F=min(αf1+f2+f3) Where F represents the objective function of the dispatch model; f1, f2 and f3 are the peak-shaving and valley-filling power, active network loss and power purchased from the upper grid of the distribution network system respectively; P t represents the active load of the distribution network system at time t; P average,t is the average active load of the distribution network system in the dispatch optimization period T; α is the dynamic weight for adjusting the peak load shaving and valley filling power of the distribution network system; t represents the index variable of the optimization period, t=1,2…T; ζ is the set of distribution network nodes; R ij represents the real part of the impedance between node i and node j; I ij,t is the current value of the line between node i and node j at time t; Δt is the optimization decision time interval; C A,t is the cost of purchasing electricity from the upper power grid at time t; t is the electricity price at time t.
6. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 5 is characterized in that: The calculation formula of the dynamic weight α is as follows: In the formula, K t Represents the operating load rate of the distribution transformer at time t.
7. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 5 is characterized in that: The active load P of the distribution network system at time t is t The calculation formula is as follows: P t =P load,t -P wind,t -P PV,t +P storage,t Where P load,t , P wind,t , P PV,t and P storage,t They respectively represent the load of the distribution network system at time t, the active power of the wind turbine, the active power of the photovoltaic unit and the active power of the energy storage device; among them, the active power of the energy storage device is defined as positive during charging and negative during discharging.
8. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 1, characterized in that: The distribution network operation constraints include power flow equation constraints, node voltage amplitude constraints and branch current amplitude constraints.
9. The method for extending the life of a distribution transformer based on flexible resource collaborative optimization according to claim 8, characterized in that: When solving the distribution network dispatching model, the second-order cone programming method is used to transform the distribution network operation constraints from nonlinear constraints to linear constraints. The expression of the transformed distribution network operation constraints is as follows: Where: P ij,t and Q ij,t Respectively represent the active power and reactive power of the line between node i and node j at time t; V i,t =|U i,t 2 , V j,t =|U j,t 2 , U i,t and U j,t Respectively represent the voltage amplitudes of nodes i and j at time t; I ij,t is the current of the line between node i and node j at time t; is the current limit of the line between node i and node j; U max and U min Respectively represent the upper and lower limits of the node voltage amplitude; R ij and X ij Respectively represent the resistance and reactance between node i and node j; Q jh,t and P jh,t They represent the reactive power and active power of the line between node j and node h at time t respectively; P j,t and Q j,t They represent the active power and reactive power injected into node j at time t respectively; ε=6×10 -7 ; ζ is the set of distribution network nodes.
10. A distribution transformer life extension system based on flexible resource collaborative optimization, running the distribution transformer life extension method based on flexible resource collaborative optimization as claimed in any one of claims 1 to 9, characterized in that: The system includes: An acquisition module is used to obtain the predicted load data of the distribution network in the next day; Establishing a module for establishing active and reactive models of flexible resources of distribution network; A construction module, used to construct a distribution network dispatching model taking into account dynamic weights based on the active power model and the reactive power model; The solution module is used to solve the distribution network dispatching model in combination with the predicted load data and the formulated distribution network operation constraints, obtain the operating load rate of the distribution transformer in the next day after the flexible resource collaborative adjustment, realize the reduction of the hot spot temperature of the distribution transformer, and thus extend the service life of the distribution transformer.
11. The distribution transformer life extension system based on flexible resource collaborative optimization according to claim 10 is characterized in that: The flexible resource active model in the establishment module includes an energy storage device model, and the flexible resource reactive model includes a group switching capacitor group CB model and a static VAR compensator SVC model.
12. The distribution transformer life extension system based on flexible resource collaborative optimization according to claim 10, characterized in that: The expression of the distribution network dispatching model taking into account the dynamic weight in the building module is as follows: F=min(αf1+f2+f3) Where F represents the objective function of the dispatch model; f1, f2 and f3 are the peak-shaving and valley-filling power, active network loss and power purchased from the upper grid of the distribution network system respectively; P t represents the active load of the distribution network system at time t; P average,t is the average active load of the distribution network system in the dispatch optimization period T; α is the dynamic weight for adjusting the peak load shaving and valley filling power of the distribution network system; t represents the index variable of the optimization period, t=1,2…T; ζ is the set of distribution network nodes; R ij represents the real part of the impedance between node i and node j; I ij,t is the current value of the line between node i and node j at time t; Δt is the optimization decision time interval; C A,t is the cost of purchasing electricity from the upper power grid at time t; t is the electricity price at time t.
13. The distribution transformer life extension system based on flexible resource collaborative optimization according to claim 11, characterized in that: The calculation formula of the dynamic weight α in the building module is as follows: In the formula, K t Represents the operating load rate of the distribution transformer at time t.
14. A terminal comprising a processor and a storage medium; characterized in that: The storage medium is used to store instructions; The processor is configured to operate according to the instructions to execute the steps of the method according to any one of claims 1-9.
15. A computer-readable storage medium having a computer program stored thereon, characterized in that: When the program is executed by a processor, the steps of the method according to any one of claims 1 to 9 are implemented.