Power distribution network post-disaster recovery method and system

By generating diversified response behavior models and power flow constraint models for industrial building loads and intelligent soft switches, we optimize the post-disaster recovery decision of distribution networks, and solve the lack of power flow constraints and underutilized industrial building load response behaviors of intelligent soft switches. The problem has improved the recovery efficiency and economicality of the distribution network.

CN119029878APending Publication Date: 2024-11-26SOUTHEAST UNIV
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411283812.1
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-11-26

AI Technical Summary

Technical Problem

In the existing post-disaster recovery research of distribution networks, the intelligent soft switch model lacks power flow constraints, which leads to the possibility of double-end outputting active power to the outside at the same time during the recovery process, which affects the recovery efficiency and does not fully consider the diversification of industrial building loads. Responsive behavior affects the effectiveness of decisions.

Method used

By obtaining data related to industrial building load and intelligent soft switches, a diversified response behavior model and power flow constraint model are generated after-disaster, a two-layer model is built to consider the uniformity of the island scale as the objective function, accurately constrain the power flow direction of the intelligent soft switches, and optimize the configuration. Power grid post-disaster recovery decision.

Benefits of technology

It has achieved the uniformity of the scale of electrical islands and the benefits of demand response projects while maximizing the recovery load, reducing economic losses for users' electricity consumption, and improving the economical and effective recovery capabilities of the distribution network.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119029878A_ABST
    Figure CN119029878A_ABST
Patent Text Reader

Abstract

The invention discloses a power distribution network post-disaster recovery method and system, and relates to the technical field of power system optimization operation, and the method comprises the steps: obtaining industrial building load related data, and generating an industrial building load post-disaster diversified response behavior model based on the industrial building load related data; obtaining intelligent soft switch related constraint data, and generating an intelligent soft switch operation model considering power flow constraint and control mode conversion after a disaster based on the intelligent soft switch related constraint data; based on an industrial building load post-disaster diversified response behavior model and an intelligent soft switch operation model considering power flow constraint and control mode conversion after a disaster, taking power distribution network post-disaster sequence recovery considering island scale uniformity as a target function, and obtaining a double-layer model of power distribution network post-disaster sequence recovery; and solving the double-layer model of the post-disaster sequence recovery of the power distribution network based on the post-disaster sequence recovery constraint condition of the power distribution network considering the island scale uniformity to obtain a power distribution network system recovery decision sequence.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention relates to the technical field of power system optimized operation, and in particular to a distribution network post-disaster recovery method and system. Background Art

[0002] The concept of "power system resilience" is used to characterize the system's ability to prevent, resist and recover from extreme events. Compared with the transmission network, the distribution network has a low level of automation and limited control and protection means, making it more vulnerable to extreme events. According to statistics, more than 85% of the faults in the power system are distribution network faults. Therefore, the resilience of the distribution network is an important part of the resilience of the power system, and rapid and effective post-disaster recovery is a key link in improving the resilience of the distribution network. In a large number of studies on post-disaster recovery of distribution networks, loads are only regarded as objects to be restored and are often modeled as rigid. With the continuous advancement of the construction of new power systems, load characteristics are gradually shifting towards flexibility, and buildings have become an important carrier of flexible loads in distribution networks. Among many types of buildings, industrial buildings have become an important flexible and adjustable resource for distribution networks with their large load capacity, stability, and high level of automation. However, current research mainly focuses on the adjustable potential of industrial building loads under normal operation of the power system, and releases its flexible adjustment capabilities based on demand response mechanisms. Few studies consider its ability to assist distribution networks in post-disaster recovery. In addition, the response behavior of industrial building loads is closely related to the power supply decision of the distribution network, showing diverse characteristics. On the one hand, it provides more flexible and adjustable space for the post-disaster recovery of the distribution network, and on the other hand, it will also put forward higher requirements for power supply recovery. In order to ensure the effectiveness of the decision-making of the post-disaster recovery of the distribution network, it is necessary to accurately quantify the complex and diverse post-disaster response characteristics of the load.

[0003] The intelligent soft switch is a flexible power electronic device used to replace the traditional tie switch. It can optimize the power flow of the distribution network and improve the network voltage level by controlling the power between two adjacent feeders. When a fault occurs in the distribution network, the intelligent soft switch can prevent the fault current from crossing due to its DC isolation function and quickly lock to avoid the expansion of the fault range; then, the intelligent soft switch will switch to different control modes to provide power support and expand the recovery range. However, the intelligent soft switch model used in the current distribution network post-disaster recovery research often lacks power flow constraints, which may cause the two ends to output active power at the same time during the recovery process, that is, it is called as a two-terminal power supply during the recovery, resulting in recovery decision errors and affecting the recovery efficiency of the distribution network. Summary of the invention

[0004] In order to solve the deficiencies mentioned in the above background technology, the purpose of the present invention is to provide a distribution network post-disaster recovery method and system, which simultaneously considers the impact of industrial building loads and intelligent soft switches on them in the distribution network post-disaster recovery process, and incorporates island scale uniformity indicators and the like into the distribution network recovery goals.

[0005] In a first aspect, the purpose of the present invention can be achieved by the following technical solution: a method for post-disaster recovery of a distribution network, the method comprising the following steps:

[0006] Obtain relevant data on industrial building loads, and generate a diversified post-disaster response behavior model for industrial building loads based on the relevant data;

[0007] Obtaining constraint data related to the intelligent soft switch, and generating an intelligent soft switch operation model that considers power flow constraints and control mode conversion after a disaster based on the constraint data related to the intelligent soft switch;

[0008] Based on the diversified response behavior model of industrial building load after disaster and the intelligent soft switch operation model considering power flow constraints and control mode conversion after disaster, the post-disaster sequence recovery of distribution network considering the uniformity of island scale is taken as the objective function, and a two-layer model of post-disaster sequence recovery of distribution network is obtained.

[0009] The post-disaster sequence recovery constraint conditions of the distribution network considering the uniformity of island scale are obtained. Based on the post-disaster sequence recovery constraint conditions of the distribution network considering the uniformity of island scale, the two-layer model of post-disaster sequence recovery of the distribution network is solved to obtain the distribution network system recovery decision sequence.

[0010] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: the diversified post-disaster response behavior model of industrial building load includes an industrial building fixed load model, an industrial building time memory load model, an industrial building active response load model and an industrial building demand response load model.

[0011] In combination with the first aspect, in certain implementations of the first aspect, the method further includes: the fixed load model of the industrial building is as follows:

[0012]

[0013] in, is the total power of the fixed load on node i at time t, Z F1 is the steady-state value of the fixed load, Z F2 is the power at the moment of power supply restoration, t1 is the moment of power supply restoration after the disaster, and t2 is the moment when the impact load power in the fixed load drops from the peak value to the steady-state value;

[0014] Time memory load model for industrial buildings:

[0015] Assuming that the distribution network recovery process is evenly divided into NT time periods, there are NT different possibilities for the power outage duration of the time memory load of the industrial building, corresponding to NT different cooling load return power curves, and the sampling data of the rth power curve is stored in the matrix c i,r In, ci,r The time memory cluster power on node i when the power outage duration is r is established for these NT different power outage durations. i for:

[0016] C i =[c i,1 ,c i,2 ,…,c i,r ,…,c i,NT ] T (2)

[0017] The cooling load return power curve of node i when it is restored to power at a specific time is expressed as:

[0018] P i CLPU =[s i,1 ,…,s i,NT -s i,NT-1 ]·C i (3)

[0019] The power of the industrial building time memory load at node i at time t is:

[0020]

[0021] in, is the time memory load power of the industrial building at node i at time t, (A) t represents the tth item in the matrix A;

[0022] Active response load model for industrial buildings:

[0023]

[0024] in, and They represent the maximum and minimum values ​​allowed for active response load power regulation of industrial buildings at node i at time t, It is the actual power consumption of active response load in industrial buildings. Day-ahead power forecasting for active response loads in industrial buildings;

[0025] Industrial Building Demand Response Load Model:

[0026]

[0027] in, is the power value of the demand response load before power outage; is the load value on node i after the demand response project is started at time t; and They are the upper and lower limits of the load that can be adjusted respectively; is a 0-1 variable indicating whether a demand response instruction has been issued; ΔT is the single duration of demand response; t DR.max is the maximum duration of demand response; T on.max The maximum number of adjustments allowed.

[0028] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: the generation of a smart soft switch operation model based on smart soft switch related constraint data that considers power flow constraints and control mode conversion after a disaster includes constructing smart soft switch active power transmission constraints, constructing smart soft switch capacity constraints, constructing smart soft switch fault side control mode constraints, and constructing smart soft switch active power flow direction constraints.

[0029] In combination with the first aspect, in some implementations of the first aspect, the method further includes: constructing the active power transmission constraint of the intelligent soft switch:

[0030]

[0031]

[0032] in, is the active and reactive power injected into both ends of the intelligent soft switch at time t; is the active power loss of the intelligent soft switch at time t; is the loss coefficient of the intelligent soft switch;

[0033] Constructing intelligent soft switching capacity constraints:

[0034]

[0035] in, is the reactive power injected into both ends of the intelligent soft switch at time t;

[0036] Constructing intelligent soft switch fault side control mode constraints:

[0037]

[0038] in, is the voltage of SOP on the fault side, U0 is the minimum limit of the voltage per unit value of the node on the fault side;

[0039] Constructing intelligent soft-switching active power flow constraints:

[0040] α i,t +α j,t =1 (14)

[0041]

[0042] Among them, αi,t With α j,t is a 0-1 variable representing the active power flow direction of the intelligent soft switch at time t; It is the upper limit of the output power of the VSC at both ends of the SOP.

[0043] In combination with the first aspect, in certain implementations of the first aspect, the method further includes: the distribution network post-disaster sequence recovery considering the uniformity of island scale as an objective function includes an upper-layer distribution network operator objective function and a lower-layer industrial building objective function;

[0044] Among them, the upper distribution network operator objective function;

[0045]

[0046] The first item represents the total amount of node load recovery, NT is the total number of recovery periods; NB is the total number of nodes in the system, s i,t is a 0-1 variable representing the on / off state of node i at time t. If the node is powered on, the value is 1, otherwise it is 0. The amount of load cuts for demand response projects, is the base value of load at load node i at time t, which is composed of the base values ​​of fixed load, time memory load, active response load and demand response load of industrial buildings;

[0047] The second term represents the uniformity of the size of the electrical islands formed during the distribution network restoration process, where NS is the number of islands formed and γ is the coefficient. is a 0-1 variable representing the affiliation between node i and island s at time t. If the black-start distributed generator set in island s supplies power to node i, then node i is said to belong to island s. otherwise is the number of nodes in the island s at time t; is the mean number of nodes contained in a single island at time t;

[0048] The third term is the revenue of the distribution network operator from calling the demand response load, where β is the coefficient; E i,t is the real-time electricity price; is the actual demand response load power at node i at time t during the recovery process; C DRC,t Compensation for demand-responsive loads on the distribution network;

[0049] Lower industrial building objective function;

[0050]

[0051] in, and They are the economic expenditures of fixed load, time memory load and active response load in a single distribution network restoration period.

[0052] In combination with the first aspect, in certain implementations of the first aspect, the method also includes: the distribution network post-disaster sequence recovery constraints that take into account the uniformity of island scale include: demand response load constraints, intelligent soft switch operation constraints, island division constraints, network connectivity constraints, network radial constraints, system flow constraints, distributed generator output constraints, photovoltaic unit output constraints, industrial building fixed load constraints, industrial building time memory load constraints, and industrial building active response load constraints.

[0053] In combination with the first aspect, in some implementations of the first aspect, the method further includes: a process of solving the two-layer model for post-disaster sequence recovery of the distribution network:

[0054] The Karush-Kuhn-Tucker condition is used to transform the two-layer model of distribution network post-disaster sequence recovery, and the Lagrangian dual multiplier is introduced. With μ b,t , the two-layer model of distribution network post-disaster sequence recovery is converted into a single-layer mixed integer programming model, and then the model is solved by the solver to obtain the distribution network node recovery decision sequence under the optimal objective function, as well as the output of distributed generator sets in each period, and the active response and demand response load power consumption curves of industrial buildings as the distribution network system recovery decision sequence.

[0055] In a second aspect, in order to achieve the above-mentioned object, the present invention discloses a distribution network post-disaster recovery system, comprising:

[0056] The first processing module is used to obtain industrial building load related data and generate a post-disaster diversified response behavior model of industrial building load based on the industrial building load related data;

[0057] The second processing module is used to obtain the constraint data related to the intelligent soft switch, and generate the intelligent soft switch operation model considering the power flow constraint and control mode conversion after the disaster based on the constraint data related to the intelligent soft switch;

[0058] The upper and lower layer combination module is used to obtain a two-layer model of distribution network post-disaster sequence recovery based on the diversified response behavior model of industrial building loads after disasters and the intelligent soft switch operation model considering power flow constraints and control mode conversion after disasters, taking the distribution network post-disaster sequence recovery considering the uniformity of island scale as the objective function;

[0059] The model solving module is used to obtain the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale, and solve the two-layer model of distribution network post-disaster sequence recovery based on the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale to obtain the distribution network system recovery decision sequence.

[0060] In conjunction with the second aspect, in some implementations of the second aspect, the system further includes: the industrial building load post-disaster diversified response behavior model of the first processing module includes an industrial building fixed load model, an industrial building time memory load model, an industrial building active response load model, and an industrial building demand response load model;

[0061] The fixed load model of industrial buildings in the first processing module is as follows:

[0062]

[0063] in, is the total power of the fixed load on node i at time t, Z F1 is the steady-state value of the fixed load, Z F2 is the power at the moment of power supply restoration, t1 is the moment of power supply restoration after the disaster, and t2 is the moment when the impact load power in the fixed load drops from the peak value to the steady-state value;

[0064] Time memory load model for industrial buildings:

[0065] Assuming that the distribution network recovery process is evenly divided into NT time periods, there are NT different possibilities for the power outage duration of the time memory load of the industrial building, corresponding to NT different cooling load return power curves, and the sampling data of the rth power curve is stored in the matrix c i,r In, c i,r The time memory cluster power on node i when the power outage duration is r is established for these NT different power outage durations. i for:

[0066] C i =[c i,1 ,c i,2 ,…,c i,r ,…,c i,NT ] T (2)

[0067] The cooling load return power curve of node i when it is restored to power at a specific time is expressed as:

[0068] P i CLPU =[s i,1 ,…,s i,NT -s i,NT-1 ]·C i(3)

[0069] The power of the industrial building time memory load at node i at time t is:

[0070]

[0071] in, is the time memory load power of the industrial building at node i at time t, (A) t represents the tth item in the matrix A;

[0072] Active response load model for industrial buildings:

[0073]

[0074] in, and They represent the maximum and minimum values ​​allowed for active response load power regulation of industrial buildings at node i at time t, It is the actual power consumption of active response load in industrial buildings. Day-ahead power forecasting for active response loads in industrial buildings;

[0075] Industrial Building Demand Response Load Model:

[0076]

[0077] in, is the power value of the demand response load before power outage; is the load value on node i after the demand response project is started at time t; and They are the upper and lower limits of the load that can be adjusted respectively; is a 0-1 variable indicating whether a demand response instruction has been issued; ΔT is the single duration of demand response; t DR.max is the maximum duration of demand response; T on.max is the maximum number of adjustments allowed;

[0078] The second processing module generates a post-disaster intelligent soft switch operation model that considers power flow constraints and control mode conversion based on intelligent soft switch related constraint data, including constructing intelligent soft switch active power transmission constraints, constructing intelligent soft switch capacity constraints, constructing intelligent soft switch fault side control mode constraints, and constructing intelligent soft switch active power flow constraints;

[0079] Among them, the second processing module constructs the intelligent soft switch active power transmission constraint:

[0080]

[0081] in, is the active and reactive power injected into both ends of the intelligent soft switch at time t; is the active power loss of the intelligent soft switch at time t; is the loss coefficient of the intelligent soft switch;

[0082] Constructing intelligent soft switching capacity constraints:

[0083]

[0084] in, is the reactive power injected into both ends of the intelligent soft switch at time t;

[0085] Constructing intelligent soft switch fault side control mode constraints:

[0086]

[0087] in, is the voltage of SOP on the fault side, U0 is the minimum limit of the voltage per unit value of the node on the fault side;

[0088] Constructing intelligent soft-switching active power flow constraints:

[0089] α i,t +α j,t =1 (14)

[0090]

[0091] Among them, α i,t With α j,t is a 0-1 variable representing the active power flow direction of the intelligent soft switch at time t; The output power limit of the VSC at both ends of the SOP;

[0092] Among them, the post-disaster sequence recovery of the distribution network considering the uniformity of island scale in the upper and lower layer combined module as the objective function includes the upper layer distribution network operator objective function and the lower layer industrial building objective function;

[0093] Among them, the upper distribution network operator objective function;

[0094]

[0095] The first item represents the total amount of node load recovery, NT is the total number of recovery periods; NB is the total number of nodes in the system, s i,t is a 0-1 variable representing the on / off state of node i at time t. If the node is powered on, the value is 1, otherwise it is 0. The amount of load cuts for demand response projects, is the base value of load at load node i at time t, which is composed of the base values ​​of fixed load, time memory load, active response load and demand response load of industrial buildings;

[0096] The second term represents the uniformity of the size of the electrical islands formed during the distribution network restoration process, where NS is the number of islands formed and γ is the coefficient. is a 0-1 variable representing the affiliation between node i and island s at time t. If the black-start distributed generator set in island s supplies power to node i, then node i is said to belong to island s. otherwise is the number of nodes in the island s at time t; is the mean number of nodes contained in a single island at time t;

[0097] The third term is the revenue of the distribution network operator from calling the demand response load, where β is the coefficient; E i,t is the real-time electricity price; is the actual demand response load power at node i at time t during the recovery process; C DRC,t Compensation for demand-responsive loads on the distribution network;

[0098] Lower industrial building objective function;

[0099]

[0100] in, and They are the economic expenditures of fixed load, time memory load and active response load in a single distribution network restoration period;

[0101] The distribution network post-disaster sequence recovery constraints of the model solution module that consider the uniformity of island scale include: demand response load constraints, intelligent soft switch operation constraints, island division constraints, network connectivity constraints, network radial constraints, system flow constraints, distributed generator output constraints, photovoltaic unit output constraints, industrial building fixed load constraints, industrial building time memory load constraints, and industrial building active response load constraints;

[0102] The model solving module solves the two-layer model of distribution network post-disaster sequence recovery:

[0103] The Karush-Kuhn-Tucker condition is used to transform the two-layer model of distribution network post-disaster sequence recovery, and the Lagrangian dual multiplier is introduced. With μ b,t , the two-layer model of distribution network post-disaster sequence recovery is converted into a single-layer mixed integer programming model, and then the model is solved by the solver to obtain the distribution network node recovery decision sequence under the optimal objective function, as well as the output of distributed generator sets in each period, and the active response and demand response load power consumption curves of industrial buildings as the distribution network system recovery decision sequence.

[0104] Beneficial effects of the present invention:

[0105] The present invention analyzes the diversity of post-disaster response behaviors of industrial building loads, classifies and models them, quantifies their impact on the recovery of distribution networks, and helps to safely and efficiently recover distribution networks. In view of the problem of bidirectional power output that may occur in the post-disaster operation of intelligent soft switches, precise constraints are placed on the power flow direction of intelligent soft switches to avoid incorrect use and affect the recovery efficiency of distribution networks. The proposed distribution network post-disaster sequence recovery strategy considering industrial building loads and intelligent soft switches can maximize the recovery of loads while taking into account the uniformity of the scale of electrical islands and the benefits of demand response projects, and reduce the economic losses of users' electricity consumption, thereby achieving economical and efficient recovery of distribution networks without power supply from the upper power grid. BRIEF DESCRIPTION OF THE DRAWINGS

[0106] In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the following briefly introduces the drawings required for use in the embodiments or the description of the prior art. Obviously, for those skilled in the art, other drawings can be obtained based on these drawings without creative work.

[0107] Figure 1 It is a schematic flow chart of the method of the present invention;

[0108] Figure 2 It is a schematic diagram of the distribution network post-disaster sequence recovery framework of the present invention;

[0109] Figure 3 Schematic diagram of IEEE 33-node distribution network improvement according to an embodiment of the present invention

[0110] Figure 4 This is a schematic diagram of load recovery in a distribution network according to an embodiment of the present invention;

[0111] Figure 5 It is a schematic diagram of the system structure of the present invention. DETAILED DESCRIPTION

[0112] The following will be combined with the drawings in the embodiments of the present invention to clearly and completely describe the technical solutions in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0113] Embodiment 1:

[0114] The following is an introduction to the relevant terms involved in the embodiments of the present application:

[0115] Distribution network: Distribution network refers to the power grid that receives electric energy from the transmission network or regional power plants and distributes it locally or step by step according to voltage to various users through distribution facilities. It is composed of overhead lines, cables, towers, distribution transformers, disconnectors, reactive power compensators and some ancillary facilities, and plays an important role in distributing electric energy in the power grid.

[0116] Power system: A unified whole consisting of power generation, power supply (transmission, transformation, distribution), power consumption facilities, and secondary facilities such as regulation and control, relay protection and safety automatic devices, metering devices, dispatching automation, power communications, etc. required to ensure their normal operation.

[0117] The power system is an electric energy production and consumption system consisting of power plants, power transmission and transformation lines, power distribution stations and power consumption. Its function is to convert primary energy in nature into electric energy through power generation devices, and then supply electric energy to various users through transmission, transformation and distribution. To achieve this function, the power system also has corresponding information and control systems at various links and levels to measure, regulate, control, protect, communicate and dispatch the production process of electric energy to ensure that users obtain safe and high-quality electric energy.

[0118] like Figure 1 As shown, a method for post-disaster recovery of a distribution network includes the following steps:

[0119] S101: Acquire industrial building load related data, and generate a post-disaster diversified response behavior model of industrial building load based on the industrial building load related data;

[0120] The post-disaster diversified response behavior model of industrial building loads includes a fixed load model for industrial buildings, a time memory load model for industrial buildings, an active response load model for industrial buildings, and a demand response load model for industrial buildings;

[0121] (1.1) Construct a fixed load model for industrial buildings;

[0122]

[0123] in, is the total power of the fixed load on node i at time t, Z F1 is the steady-state value of the fixed load, Z F2 is the power at the moment of power supply restoration, t1 is the moment of power supply restoration after the disaster, and t2 is the moment when the impact load power in the fixed load drops from the peak value to the steady-state value;

[0124] (1.2) Construct a time memory load model for industrial buildings;

[0125] Assuming that the distribution network recovery process is evenly divided into NT time periods, there are NT different possibilities for the power outage duration of the time memory load of the industrial building, corresponding to NT different cooling load return power curves. The sampling data of the rth power curve is stored in the matrix c i,r In, c i,r The time memory cluster power on node i when the power outage duration is r is established for these NT different power outage durations. i for:

[0126] C i =[c i,1 ,c i,2 ,…,c i,r ,…,c i,NT ] T (2)

[0127] The cooling load return power curve of node i when it is restored to power at a specific time can be expressed as:

[0128] P i CLPU =[s i,1 ,…,s i,NT -s i,NT-1 ]·C i (3)

[0129] The power of the industrial building time memory load at node i at time t is:

[0130]

[0131] in, is the time memory load power of the industrial building at node i at time t, (A) t represents the tth item in the matrix A;

[0132] (1.3) Construct an active response load model for industrial buildings;

[0133]

[0134] in, and They represent the maximum and minimum values ​​allowed for active response load power regulation of industrial buildings at node i at time t, The actual power consumption of active response loads in industrial buildings. Day-ahead power forecasting for active response loads in industrial buildings;

[0135] (1.4) Construct a demand-responsive load model for industrial buildings;

[0136]

[0137] in, is the power value of the demand response load before power outage; is the load value on node i after the demand response project is started at time t; and They are the upper and lower limits of the load that can be adjusted respectively; is a 0-1 variable indicating whether a demand response instruction has been issued; ΔT is the single duration of demand response; t DR.max is the maximum duration of demand response; T on.max is the maximum number of adjustments allowed;

[0138] S102: Acquire constraint data related to the smart soft switch, and generate a smart soft switch operation model that considers power flow constraints and control mode conversion after a disaster based on the constraint data related to the smart soft switch;

[0139] Construct an intelligent soft-switching operation model that considers power flow constraints and control mode conversion after disasters;

[0140] (2.1) Constructing active power transmission constraints for intelligent soft switching;

[0141]

[0142] in, is the active and reactive power injected into both ends of the intelligent soft switch at time t; is the active power loss of the intelligent soft switch at time t; is the loss coefficient of the intelligent soft switch;

[0143] (2.2) Construct intelligent soft switch capacity constraints;

[0144]

[0145] in, is the reactive power injected into both ends of the intelligent soft switch at time t;

[0146] (2.3) Construct the fault-side control mode constraints of intelligent soft switch;

[0147]

[0148] in, is the voltage of SOP on the fault side, U0 is the minimum limit of the voltage per unit value of the node on the fault side;

[0149] (2.4) Construct active power flow constraints for intelligent soft switches;

[0150] α i,t +α j,t =1 (14)

[0151]

[0152] Among them, α i,t With α j,t is a 0-1 variable representing the active power flow direction of the intelligent soft switch at time t; The output power limit of the VSC at both ends of the SOP;

[0153] S103: Based on the diversified response behavior model of industrial building loads after disasters and the intelligent soft switch operation model considering power flow constraints and control mode conversion after disasters, the post-disaster sequence recovery of the distribution network considering the uniformity of island scale is taken as the objective function, and a two-layer model of post-disaster sequence recovery of the distribution network is obtained;

[0154] The post-disaster sequential recovery of the distribution network considering the uniformity of island size as the objective function includes:

[0155] (3.1) Set the objective function of the upper distribution network operator;

[0156]

[0157] The first item represents the total amount of node load recovery, NT is the total number of recovery periods; NB is the total number of nodes in the system, s i,t is a 0-1 variable representing the on / off state of node i at time t. If the node is powered on, the value is 1, otherwise it is 0. The amount of load cuts for demand response projects, is the base value of load at load node i at time t, which is composed of the base values ​​of fixed load, time memory load, active response load and demand response load of industrial buildings;

[0158] The second term represents the uniformity of the size of the electrical islands formed during the distribution network restoration process, where NS is the number of islands formed and γ is the coefficient. is a 0-1 variable representing the affiliation between node i and island s at time t. If the black-start distributed generator set in island s supplies power to node i, then node i is said to belong to island s. otherwise is the number of nodes in the island s at time t; is the mean number of nodes contained in a single island at time t;

[0159] The third term is the revenue of the distribution network operator from calling the demand response load, where β is the coefficient; E i,t is the real-time electricity price; is the actual demand response load power at node i at time t during the recovery process; C DRC,t Compensation for demand-responsive loads on the distribution network;

[0160] (3.2), set the objective function of the lower industrial building;

[0161]

[0162] in, and They are the economic expenditures of fixed load, time memory load and active response load in a single distribution network restoration period;

[0163] S104: Obtain distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale, solve the two-layer model of distribution network post-disaster sequence recovery based on the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale, and obtain the distribution network system recovery decision sequence.

[0164] The post-disaster sequence recovery constraints of the distribution network considering the uniformity of island size include:

[0165] (4.1) Set demand response load constraint conditions;

[0166]

[0167] Among them, e is the profit coefficient, which is determined by negotiation between the demand response load and the DSO; k1 and k2 are compensation coefficients;

[0168] (4.2) Set the operating constraints of the intelligent soft switch;

[0169]

[0170] (4.3) Set up island partitioning constraints;

[0171]

[0172] Among them, SB, SL, SI, and SG are the nodes, lines, isolated islands formed, and the collection of black-start distributed generators in the distribution network, respectively. is a 0-1 variable representing the affiliation relationship between line l and island s, represents line l belongs to island s, otherwise s l,t is a 0-1 variable indicating the line power recovery status, s l,t =1 indicates that the line has restored power supply, otherwise s l,t =0, m and n are the source node and sink node of line l respectively;

[0173] (4.4) Set network connectivity constraints;

[0174]

[0175] in, is the virtual injected power on DG node i during period t; FPL l,t is the virtual power flow on line l during period t; SL i is the set of lines connected to node i;

[0176] (4.5) Set network radial constraints;

[0177]

[0178] Where K is the number of connected lines;

[0179] (4.6) Set system power flow constraints;

[0180] Introduce auxiliary variable r l,t =V i,t V j,t cos(θ i,t -θ j,t ), w l,t =V i,t V j,t sin(θ i,t -θ j,t ),

[0181]

[0182]

[0183] in, are the active output of distributed generators and photovoltaic units, P l.t is the branch active power flow, is the total active power of the load fed back by the lower model, is the active power of the demand response load, is the reactive power output of distributed generators, Q l.t is the branch reactive power flow, is the total reactive power of the load fed back by the lower model, is the reactive power of the demand response load, is the voltage value at node i at one end of line l at time t, g l , b l , They represent the series conductance, susceptance and susceptance to ground of line l respectively;

[0184] (4.7) Set the output constraints of distributed generators;

[0185]

[0186] in, and are the upper and lower limits of DG output respectively; R i.min With R i.max are the upper and lower limits of DG climbing ability respectively;

[0187] (4.8) Set the output constraints of the photovoltaic units;

[0188]

[0189] in, and are the active output and output upper limit of PV node i at time t, respectively, and SPV is the set of PV nodes in the distribution network;

[0190] (4.9) Set fixed load constraints for industrial buildings;

[0191]

[0192] Among them, E i,t is the real-time electricity price at node i at time t, is the utility of fixed load user energy consumption behavior, α f,i,t With δ f,i,t is the load utility coefficient;

[0193] (4.10) Set time memory load constraints for industrial buildings;

[0194]

[0195] in, is the utility of the energy consumption behavior of time memory load users, α c,i,t With δ c,i,t is the utility function coefficient, η c,i,t is the conversion efficiency of the electric refrigeration equipment;

[0196] (4.11) Set active response load constraint conditions for industrial buildings;

[0197]

[0198] in, is the economic loss caused by each unit of power consumption loss to the active response load user i, is the unit power value of the load;

[0199] Based on the distribution network post-disaster recovery model and constraints, the Karush-Kuhn-Tucker condition is used to transform the two-layer model and introduce the Lagrange dual multiplier With μ b,t, the two-layer model is transformed into a single-layer mixed integer programming model, and then the proposed model can be solved by a commercial solver to obtain the distribution network restoration decision sequence under the optimal objective function, the output of distributed generators in each period, and the active response and demand response load power consumption curves of industrial buildings.

[0200] In this embodiment, the improved IEEE 33-node distribution network is adopted. Figure 3 As shown in Table 1, the system reference voltage is 12.66 kV, and the voltage tolerance range of the system nodes is [0.95, 1.05] (standard value). The recovery of the distribution network nodes is shown in Table 1, and the recovery of the industrial building load of the distribution network is shown in Table 1. Figure 4 The economic losses of industrial building load users in the distribution network are shown in Table 2;

[0201] Table 1. Recovery status of distribution network nodes

[0202]

[0203] Table 2 Economic losses of industrial building load users in distribution network

[0204]

[0205] Embodiment 2: Figure 5 As shown, in a second aspect, in order to achieve the above-mentioned purpose, the present invention discloses a distribution network post-disaster recovery system, comprising:

[0206] The first processing module 11 is used to obtain industrial building load related data, and generate a post-disaster diversified response behavior model of industrial building load based on the industrial building load related data;

[0207] The second processing module 12 is used to obtain the constraint data related to the intelligent soft switch, and generate the intelligent soft switch operation model considering the power flow constraint and control mode conversion after the disaster based on the constraint data related to the intelligent soft switch;

[0208] The upper and lower layer combination module 13 is used to obtain a two-layer model of distribution network post-disaster sequence recovery based on the diversified response behavior model of industrial building loads after disasters and the intelligent soft switch operation model considering power flow constraints and control mode conversion after disasters, taking the distribution network post-disaster sequence recovery considering the uniformity of island scale as the objective function;

[0209] The model solving module 14 is used to obtain the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale, and solve the two-layer model of distribution network post-disaster sequence recovery based on the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale to obtain the distribution network system recovery decision sequence.

[0210] In combination with the second aspect, in some implementations of the second aspect, the system further includes: the industrial building load post-disaster diversified response behavior model of the first processing module 11 includes an industrial building fixed load model, an industrial building time memory load model, an industrial building active response load model, and an industrial building demand response load model;

[0211] The industrial building fixed load model of the first processing module 11 is as follows:

[0212]

[0213] in, is the total power of the fixed load on node i at time t, Z F1 is the steady-state value of the fixed load, Z F2 is the power at the moment of power supply restoration, t1 is the moment of power supply restoration after the disaster, and t2 is the moment when the impact load power in the fixed load drops from the peak value to the steady-state value;

[0214] Time memory load model for industrial buildings:

[0215] Assuming that the distribution network recovery process is evenly divided into NT time periods, there are NT different possibilities for the power outage duration of the time memory load of the industrial building, corresponding to NT different cooling load return power curves, and the sampling data of the rth power curve is stored in the matrix c i,r In, c i,r The time memory cluster power on node i when the power outage duration is r is established for these NT different power outage durations. i for:

[0216] C i =[c i,1 ,c i,2 ,…,c i,r ,…,c i,NT ] T (2)

[0217] The cooling load return power curve of node i when it is restored to power at a specific time is expressed as:

[0218] P i CLPU =[s i,1 ,…,s i,NT -s i,NT-1 ]·C i (3)

[0219] The power of the industrial building time memory load at node i at time t is:

[0220]

[0221] in, is the time memory load power of the industrial building at node i at time t, (A) t represents the tth item in the matrix A;

[0222] Active response load model for industrial buildings:

[0223]

[0224] in, and They represent the maximum and minimum values ​​allowed for active response load power regulation of industrial buildings at node i at time t, It is the actual power consumption of active response load in industrial buildings. Day-ahead power forecasting for active response loads in industrial buildings;

[0225] Industrial Building Demand Response Load Model:

[0226]

[0227] in, is the power value of the demand response load before power outage; is the load value on node i after the demand response project is started at time t; and They are the upper and lower limits of the load that can be adjusted respectively; is a 0-1 variable indicating whether a demand response instruction has been issued; ΔT is the single duration of demand response; t DR.max is the maximum duration of demand response; T on.max is the maximum number of adjustments allowed;

[0228] The second processing module 12 generates a post-disaster intelligent soft switch operation model that considers power flow constraints and control mode conversion based on intelligent soft switch related constraint data, including constructing intelligent soft switch active power transmission constraints, constructing intelligent soft switch capacity constraints, constructing intelligent soft switch fault side control mode constraints, and constructing intelligent soft switch active power flow constraints;

[0229] The second processing module 12 constructs the intelligent soft switch active power transmission constraint:

[0230]

[0231] in, is the active and reactive power injected into both ends of the intelligent soft switch at time t; is the active power loss of the intelligent soft switch at time t; is the loss coefficient of the intelligent soft switch;

[0232] Constructing intelligent soft switching capacity constraints:

[0233]

[0234] in, is the reactive power injected into both ends of the intelligent soft switch at time t;

[0235] Constructing intelligent soft switch fault side control mode constraints:

[0236]

[0237] in, is the voltage of SOP on the fault side, U0 is the minimum limit of the voltage per unit value of the node on the fault side;

[0238] Constructing intelligent soft-switching active power flow constraints:

[0239] α i,t +α j,t =1 (14)

[0240]

[0241] Among them, α i,t With α j,t is a 0-1 variable representing the active power flow direction of the intelligent soft switch at time t; The output power limit of the VSC at both ends of the SOP;

[0242] Among them, the upper and lower layer combined module 13 considers the distribution network post-disaster sequence recovery of the island scale uniformity as the objective function including the upper layer distribution network operator objective function and the lower layer industrial building objective function;

[0243] Among them, the upper distribution network operator objective function;

[0244]

[0245] The first item represents the total amount of node load recovery, NT is the total number of recovery periods; NB is the total number of nodes in the system, s i,t is a 0-1 variable representing the on / off state of node i at time t. If the node is powered on, the value is 1, otherwise it is 0. The amount of load cuts for demand response projects, is the base value of load at load node i at time t, which is composed of the base values ​​of fixed load, time memory load, active response load and demand response load of industrial buildings;

[0246] The second term represents the uniformity of the size of the electrical islands formed during the distribution network restoration process, where NS is the number of islands formed and γ is the coefficient. is a 0-1 variable representing the affiliation between node i and island s at time t. If the black-start distributed generator set in island s supplies power to node i, then node i is said to belong to island s. otherwise is the number of nodes in the island s at time t; is the mean number of nodes contained in a single island at time t;

[0247] The third term is the revenue of the distribution network operator from calling the demand response load, where β is the coefficient; E i,t is the real-time electricity price; is the actual demand response load power at node i at time t during the recovery process; C DRC,t Compensation for demand-responsive loads on the distribution network;

[0248] Lower industrial building objective function;

[0249]

[0250] in, and They are the economic expenditures of fixed load, time memory load and active response load in a single distribution network restoration period;

[0251] The distribution network post-disaster sequence recovery constraints considering the uniformity of island scale in the model solution module 14 include: demand response load constraints, intelligent soft switch operation constraints, island division constraints, network connectivity constraints, network radial constraints, system flow constraints, distributed generator output constraints, photovoltaic unit output constraints, industrial building fixed load constraints, industrial building time memory load constraints and industrial building active response load constraints;

[0252] The model solving module 14 solves the two-layer model of distribution network post-disaster sequence recovery:

[0253] The Karush-Kuhn-Tucker condition is used to transform the two-layer model of distribution network post-disaster sequence recovery, and the Lagrangian dual multiplier is introduced. With μ b,t , the two-layer model of distribution network post-disaster sequence recovery is converted into a single-layer mixed integer programming model, and then the model is solved by the solver to obtain the distribution network node recovery decision sequence under the optimal objective function, as well as the output of distributed generator sets in each period, and the active response and demand response load power consumption curves of industrial buildings as the distribution network system recovery decision sequence.

[0254] Based on the same inventive concept, the present invention also provides a computer device, which includes: one or more processors, and a memory for storing one or more computer programs; the program includes program instructions, and the processor is used to execute the program instructions stored in the memory. The processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), field-programmable gate arrays (FPGA) or other programmable logic devices, discrete gates or transistor logic devices, discrete hardware components, etc. It is the computing core and control core of the terminal, which is used to implement one or more instructions, specifically for loading and executing one or more instructions in a computer storage medium to implement the above method.

[0255] It needs to be further explained that, based on the same inventive concept, the present invention also provides a computer storage medium, on which a computer program is stored, and the computer program is executed by a processor to execute the above method. The storage medium can adopt any combination of one or more computer-readable media. The computer-readable medium can be a computer-readable signal medium or a computer-readable storage medium. The computer-readable storage medium can be, for example, but not limited to, an electrical, magnetic, optical, electrical, magnetic, infrared, or semiconductor system, device or device, or any combination of the above. More specific examples (non-exhaustive list) of computer-readable storage media include: an electrical connection with one or more wires, a portable computer disk, a hard disk, a random access memory (RAM), a read-only memory (ROM), an erasable programmable read-only memory (EPROM or flash memory), an optical fiber, a portable compact disk read-only memory (CD-ROM), an optical storage device, a magnetic storage device, or any suitable combination of the above. In the present invention, a computer-readable storage medium can be any tangible medium containing or storing a program, which can be used by an instruction execution system, device or device or used in combination with it.

[0256] In the description of this specification, the description with reference to the terms "one embodiment", "example", "specific example", etc. means that the specific features, structures, materials or characteristics described in conjunction with the embodiment or example are included in at least one embodiment or example of the present disclosure. In this specification, the schematic representation of the above terms does not necessarily refer to the same embodiment or example. Moreover, the specific features, structures, materials or characteristics described can be combined in any one or more embodiments or examples in a suitable manner.

[0257] The above shows and describes the basic principles, main features and advantages of the present disclosure. Those skilled in the art should understand that the present disclosure is not limited by the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present disclosure. Without departing from the spirit and scope of the present disclosure, the present disclosure may have various changes and improvements, and these changes and improvements fall within the scope of the present disclosure to be protected.

Claims

1. A method for post-disaster recovery of a distribution network, It is characterized in that The method comprises the following steps: Obtain relevant data on industrial building loads, and generate a diversified post-disaster response behavior model for industrial building loads based on the relevant data; Obtaining constraint data related to the intelligent soft switch, and generating an intelligent soft switch operation model that considers power flow constraints and control mode conversion after a disaster based on the constraint data related to the intelligent soft switch; Based on the diversified response behavior model of industrial building load after disaster and the intelligent soft switch operation model considering power flow constraints and control mode conversion after disaster, the post-disaster sequence recovery of distribution network considering the uniformity of island scale is taken as the objective function, and a two-layer model of post-disaster sequence recovery of distribution network is obtained. The post-disaster sequence recovery constraint conditions of the distribution network considering the uniformity of island scale are obtained. Based on the post-disaster sequence recovery constraint conditions of the distribution network considering the uniformity of island scale, the two-layer model of post-disaster sequence recovery of the distribution network is solved to obtain the distribution network system recovery decision sequence.

2. A method for post-disaster recovery of a distribution network according to claim 1, It is characterized in that The post-disaster diversified response behavior model of industrial building loads includes an industrial building fixed load model, an industrial building time memory load model, an industrial building active response load model and an industrial building demand response load model.

3. A method for post-disaster recovery of a distribution network according to claim 2, It is characterized in that The fixed load model of the industrial building is as follows: in, is the total power of the fixed load on node i at time t, Z F1 is the steady-state value of the fixed load, Z F2 The power at the moment of power restoration, t 1 The time for power supply restoration after a disaster, t 2 It is the moment when the impact load power in the fixed load drops from the peak value to the steady-state value; Time memory load model for industrial buildings: Assuming that the distribution network recovery process is evenly divided into NT time periods, there are NT different possibilities for the power outage duration of the time memory load of the industrial building, corresponding to NT different cooling load return power curves, and the sampling data of the rth power curve is stored in the matrix c i,r In, c i,r The time memory cluster power on node i when the power outage duration is r is established for these NT different power outage durations. i for: C i =[c i,1 ,c i,2 ,…,c i,r ,…,c i,NT ] T (2) The cooling load return power curve of node i when it is restored to power at a specific time is expressed as: P i CLPU=[s i,1 ,…,s i,NT -s i,NT-1 ]·C i (3) The power of the industrial building time memory load at node i at time t is: in, is the time memory load power of the industrial building at node i at time t, (A) t represents the tth item in the matrix A; Active response load model for industrial buildings: in, and They represent the maximum and minimum values ​​allowed for active response load power regulation of industrial buildings at node i at time t, It is the actual power consumption of active response load in industrial buildings. Day-ahead power forecasting for active response loads in industrial buildings; Industrial Building Demand Response Load Model: in, is the power value of the demand response load before power outage; is the load value on node i after the demand response project is started at time t; and They are the upper and lower limits of the load that can be adjusted respectively; is a 0-1 variable indicating whether a demand response instruction has been issued; ΔT is the single duration of demand response; t DR.max is the maximum duration of demand response; T on.max The maximum number of adjustments allowed.

4. A method for post-disaster recovery of a distribution network according to claim 1, It is characterized in that The smart soft switch operation model based on the smart soft switch related constraint data that considers power flow constraints and control mode conversion after a disaster includes constructing smart soft switch active power transmission constraints, constructing smart soft switch capacity constraints, constructing smart soft switch fault side control mode constraints, and constructing smart soft switch active power flow direction constraints.

5. A method for post-disaster recovery of a distribution network according to claim 4, It is characterized in that The active power transmission constraints of the intelligent soft switch are constructed as follows: in, The active and reactive power injected into both ends of the intelligent soft switch at time t; is the active power loss of the intelligent soft switch at time t; is the loss coefficient of the intelligent soft switch; Constructing intelligent soft switching capacity constraints: in, is the reactive power injected into both ends of the intelligent soft switch at time t; Constructing intelligent soft switch fault side control mode constraints: in, is the voltage of SOP on the fault side, U 0 is the minimum limit of the fault side node voltage per unit value; Constructing intelligent soft-switching active power flow constraints: α i,t +α j,t =1 (14) Among them, α i,t With α j,t is a 0-1 variable representing the active power flow direction of the intelligent soft switch at time t; It is the upper limit of the output power of the VSC at both ends of the SOP.

6. A method for post-disaster recovery of a distribution network according to claim 1, It is characterized in that The distribution network post-disaster sequence recovery considering the uniformity of island scale as an objective function includes an upper distribution network operator objective function and a lower industrial building objective function; Among them, the upper distribution network operator objective function; The first item represents the total amount of node load recovery, NT is the total number of recovery periods; NB is the total number of nodes in the system, s i,t is a 0-1 variable representing the on / off state of node i at time t. If the node is powered on, the value is 1, otherwise it is 0. The amount of load cuts for demand response projects, is the base value of load at load node i at time t, which is composed of the base values ​​of fixed load, time memory load, active response load and demand response load of industrial buildings; The second term represents the uniformity of the size of the electrical islands formed during the distribution network restoration process, where NS is the number of islands formed and γ is the coefficient. is a 0-1 variable representing the affiliation between node i and island s at time t. If the black-start distributed generator set in island s supplies power to node i, then node i is said to belong to island s. otherwise is the number of nodes in the island s at time t; is the mean number of nodes contained in a single island at time t; The third term is the revenue of the distribution network operator from calling the demand response load, where β is the coefficient; E i,t is the real-time electricity price; is the actual demand response load power at node i at time t during the recovery process; C DRC,t Compensation for demand-responsive loads on the distribution network; Lower industrial building objective function; in, and They are the economic expenditures of fixed load, time memory load and active response load in a single distribution network restoration period.

7. A method for post-disaster recovery of a distribution network according to claim 1, It is characterized in that The distribution network post-disaster sequence recovery constraints that consider the uniformity of island scale include: demand response load constraints, intelligent soft switch operation constraints, island division constraints, network connectivity constraints, network radial constraints, system flow constraints, distributed generator output constraints, photovoltaic unit output constraints, industrial building fixed load constraints, industrial building time memory load constraints, and industrial building active response load constraints.

8. A method for post-disaster recovery of a distribution network according to claim 1, It is characterized in that The process of solving the two-layer model for distribution network post-disaster sequence recovery is as follows: The Karush-Kuhn-Tucker condition is used to transform the two-layer model of distribution network post-disaster sequence recovery, and the Lagrangian dual multiplier is introduced. With μ b,t , the two-layer model of distribution network post-disaster sequence recovery is converted into a single-layer mixed integer programming model, and then the model is solved by the solver to obtain the distribution network node recovery decision sequence under the optimal objective function, as well as the output of distributed generator sets in each period, and the active response and demand response load power consumption curves of industrial buildings as the distribution network system recovery decision sequence.

9. A distribution network post-disaster recovery system, It is characterized in that include: The first processing module is used to obtain industrial building load related data and generate a post-disaster diversified response behavior model of industrial building load based on the industrial building load related data; The second processing module is used to obtain the constraint data related to the intelligent soft switch, and generate the intelligent soft switch operation model considering the power flow constraint and control mode conversion after the disaster based on the constraint data related to the intelligent soft switch; The upper and lower layer combination module is used to obtain a two-layer model of distribution network post-disaster sequence recovery based on the diversified response behavior model of industrial building loads after disasters and the intelligent soft switch operation model considering power flow constraints and control mode conversion after disasters, taking the distribution network post-disaster sequence recovery considering the uniformity of island scale as the objective function; The model solving module is used to obtain the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale, and solve the two-layer model of distribution network post-disaster sequence recovery based on the distribution network post-disaster sequence recovery constraint conditions considering the uniformity of island scale to obtain the distribution network system recovery decision sequence.

10. A distribution network post-disaster recovery system according to claim 9, It is characterized in that The post-disaster diversified response behavior model of industrial building loads of the first processing module includes an industrial building fixed load model, an industrial building time memory load model, an industrial building active response load model, and an industrial building demand response load model; The fixed load model of industrial buildings in the first processing module is as follows: in, is the total power of the fixed load on node i at time t, Z F1 is the steady-state value of the fixed load, Z F2 The power at the moment of power restoration, t 1 The time for power supply restoration after a disaster, t 2 It is the moment when the impact load power in the fixed load drops from the peak value to the steady-state value; Time memory load model for industrial buildings: Assuming that the distribution network recovery process is evenly divided into NT time periods, there are NT different possibilities for the power outage duration of the time memory load of the industrial building, corresponding to NT different cooling load return power curves, and the sampling data of the rth power curve is stored in the matrix c i,r In, c i,r The time memory cluster power on node i when the power outage duration is r is established for these NT different power outage durations. i for: C i =[c i,1 ,c i,2 ,…,c i,r ,…,c i,NT ] T (2) The cooling load return power curve of node i when it is restored to power at a specific time is expressed as: P i CLPU =[s i,1 ,…,s i,NT -s i,NT-1 ]·C i (3) The power of the industrial building time memory load at node i at time t is: in, is the time memory load power of the industrial building at node i at time t, (A) t represents the tth item in the matrix A; Active response load model for industrial buildings: in, and They represent the maximum and minimum values ​​allowed for active response load power regulation of industrial buildings at node i at time t, It is the actual power consumption of active response load in industrial buildings. Day-ahead power forecasting for active response loads in industrial buildings; Industrial Building Demand Response Load Model: in, is the power value of the demand response load before power outage; is the load value on node i after the demand response project is started at time t; and They are the upper and lower limits of the load that can be adjusted respectively; is a 0-1 variable indicating whether a demand response instruction has been issued; ΔT is the single duration of demand response; t DR.max is the maximum duration of demand response; T on.max is the maximum number of adjustments allowed; The second processing module generates a post-disaster intelligent soft switch operation model that considers power flow constraints and control mode conversion based on intelligent soft switch related constraint data, including constructing intelligent soft switch active power transmission constraints, constructing intelligent soft switch capacity constraints, constructing intelligent soft switch fault side control mode constraints, and constructing intelligent soft switch active power flow constraints; Among them, the second processing module constructs the intelligent soft switch active power transmission constraint: in, The active and reactive power injected into both ends of the intelligent soft switch at time t; is the active power loss of the intelligent soft switch at time t; is the loss coefficient of the intelligent soft switch; Constructing intelligent soft switching capacity constraints: in, is the reactive power injected into both ends of the intelligent soft switch at time t; Constructing intelligent soft switch fault side control mode constraints: in, is the voltage of SOP on the fault side, U 0 is the minimum limit of the fault side node voltage per unit value; Constructing intelligent soft-switching active power flow constraints: α i,t +α j,t =1 (14) Among them, α i,t With α j,t is a 0-1 variable representing the active power flow direction of the intelligent soft switch at time t; The output power limit of the VSC at both ends of the SOP; Among them, the post-disaster sequence recovery of the distribution network considering the uniformity of island scale in the upper and lower layer combined module as the objective function includes the upper layer distribution network operator objective function and the lower layer industrial building objective function; Among them, the upper distribution network operator objective function; The first item represents the total amount of node load recovery, NT is the total number of recovery periods; NB is the total number of nodes in the system, s i,t is a 0-1 variable representing the on / off state of node i at time t. If the node is powered on, the value is 1, otherwise it is 0. The amount of load cuts for demand response projects, is the base value of load at load node i at time t, which is composed of the base values ​​of fixed load, time memory load, active response load and demand response load of industrial buildings; The second term represents the uniformity of the size of the electrical islands formed during the distribution network restoration process, where NS is the number of islands formed and γ is the coefficient. is a 0-1 variable representing the affiliation between node i and island s at time t. If the black-start distributed generator set in island s supplies power to node i, then node i is said to belong to island s. otherwise is the number of nodes in the island s at time t; is the mean number of nodes contained in a single island at time t; The third term is the revenue of the distribution network operator from calling the demand response load, where β is the coefficient; E i,t is the real-time electricity price; is the actual demand response load power at node i at time t during the recovery process; C DRC,t Compensation for demand-responsive loads on the distribution network; Lower industrial building objective function; in, and They are the economic expenditures of fixed load, time memory load and active response load in a single distribution network restoration period; The distribution network post-disaster sequence recovery constraints of the model solution module that consider the uniformity of island scale include: demand response load constraints, intelligent soft switch operation constraints, island division constraints, network connectivity constraints, network radial constraints, system flow constraints, distributed generator output constraints, photovoltaic unit output constraints, industrial building fixed load constraints, industrial building time memory load constraints, and industrial building active response load constraints; The model solving module solves the two-layer model of distribution network post-disaster sequence recovery: The Karush-Kuhn-Tucker condition is used to transform the two-layer model of distribution network post-disaster sequence recovery, and the Lagrangian dual multiplier is introduced. With μ b,t , the two-layer model of distribution network post-disaster sequence recovery is converted into a single-layer mixed integer programming model, and then the model is solved by the solver to obtain the distribution network node recovery decision sequence under the optimal objective function, as well as the output of distributed generator sets in each period, and the active response and demand response load power consumption curves of industrial buildings as the distribution network system recovery decision sequence.