Integrated plumpness easily-detected grouting sleeve and detection method thereof

By designing tensile fractures with increasing tensile breaks in the steel sleeve, non-destructive testing of grouting fullness is achieved, the detection accuracy and economic problems in the prior art are solved, and the safety of the structure is improved. Construction efficiency.

CN119041633APending Publication Date: 2024-11-29EAST CHINA CONSTR GRP CO LTD SHANGHAI SCI & TECH DEV BRANCH
View PDF 0 Cites 0 Cited by

Patent Information

Application Number
CN202411153011.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-21
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing detection technology for grouting connections of steel bar sleeves has many problems in terms of accuracy, reliability, standardization and economics, which limits its wide application and structural reliability, especially the quantitative detection capability of grouting fullness, and High testing cost and time.

Method used

Using an integrated fullness and easy-to-check grout sleeve, a tensile fracture with increasing tensile fracture is designed, and arranged along the grout height direction. After grouting is solidified, the tensile fracture is measured by manual or mechanical operation. length to evaluate grout fullness, combined with surface roughness design to improve bonding performance and anchoring force.

Benefits of technology

Non-destructive testing of grouting material filling conditions is realized, the accuracy and efficiency of testing are improved, the inspection cost is reduced, and the connection quality of prefabricated components and the safety and reliability of the structure are ensured.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119041633A_ABST
    Figure CN119041633A_ABST
Patent Text Reader

Abstract

The invention provides an integrated plumpness easily-detected grouting sleeve and a detection method thereof, and belongs to the field of prefabricated building detection.The integrated plumpness easily-detected grouting sleeve structurally comprises a grouting sleeve body and a tensile fracture object, and the tensile fracture force of the tensile fracture object is gradually increased from bottom to top in the grouting height direction of a grouting cavity of the grouting sleeve body; according to the design, the tensile fracture object can be pulled out through simple manual or mechanical operation after the grouting material is solidified, and fractures at the interface of the grouting material and air, so that nondestructive testing of the filling condition of the grouting material is realized, and the grouting material can be accurately detected by measuring the length of the pulled tensile fracture object. A constructor can quickly and accurately evaluate the grouting fullness in the sleeve, the connection quality of the prefabricated part is ensured, and the overall safety and reliability of the structure are improved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention belongs to the field of prefabricated building detection, and in particular relates to an integrated fullness easy-to-detect grouting sleeve and a detection method thereof. Background Art

[0002] As a key connection technology for prefabricated concrete structures, the quality of steel sleeve grouting connection is directly related to the safety and durability of the entire structure. However, there are many problems in the existing detection technology of steel sleeve grouting connection, which to some extent limit the wide application of the technology and the reliability of the structure.

[0003] First, although non-destructive testing technology has the advantages of not destroying the structure and being easy to operate, its accuracy and reliability still need to be improved. For example, although the ultrasonic testing method can quickly detect defects in the grouting material, it has limited ability to identify the displacement of the steel bars and the complex conditions inside the sleeve. Although the X-ray testing method has clear imaging, there are radiation problems and the detection ability of thicker components is limited. In addition, although the impact echo method has a fast detection speed, it has limitations in the detection of small-sized specimens and deep defects.

[0004] Secondly, although the results of destructive testing methods such as core sampling are intuitive and reliable, they will cause certain damage to the structure, and the operation is complicated and costly, making them unsuitable for large-scale application. The core sampling method has high technical requirements when sampling in areas with dense steel bars, and the slightest carelessness may cause irreversible damage to the structure.

[0005] As a detection technology for detecting the fullness of grouting of steel sleeves, the pre-embedded wire drawing method has been widely used in engineering, but there are still some problems that need to be solved.

[0006] First, this method can only detect the density of the grouting material near the grouting outlet, but cannot detect the grouting deeper inside the sleeve, which limits its ability to evaluate the overall grouting quality. Second, the pre-embedded wire drawing method may be disturbed or damaged by the construction site in actual operation, especially in areas with dense steel bars, which increases the uncertainty of detection.

[0007] Although the detection results of the pre-embedded wire drawing and endoscope method are stable and reliable, there are certain limitations, such as limited field of view and blind spots, which may lead to the inability to effectively identify grouting defects in certain areas. In addition, this method has high requirements for the imaging and mobility of the endoscope, which also limits its application in some special environments.

[0008] Finally, although the pre-embedded wire drawing method is simple to operate, its detection cost is relatively high, especially when it needs to be combined with an endoscope for more accurate detection, the cost will increase further. Moreover, the quantitative analysis capability of this method is limited, and there is a certain error in the quantitative analysis of the defect size, which also limits its application in situations with higher precision requirements.

[0009] Although the embedded sensor method can achieve construction process control, the hardening of residual slurry on the sensor core element may lead to misjudgment. In addition, the degree of standardization of detection technology is not high, and there are no unified standard requirements for details such as the interface of the grouting sleeve, which leads to inconsistency in the construction and detection process.

[0010] Finally, testing cost and time are also important factors that restrict the application of testing technology. On the premise of ensuring the quality of testing, how to reduce testing costs and improve testing efficiency is an issue that needs to be considered in the development of testing technology. Especially in large-scale testing, how to balance the comprehensiveness and economy of testing is a difficult problem that testing technology needs to solve.

[0011] In summary, the existing detection technology of steel sleeve grouting connection has many problems in terms of accuracy, reliability, standardization, innovation, economy, etc. These problems restrict the wide application of technology and the reliability of structure. Therefore, it is urgent to promote the development of detection technology through technological innovation and standard formulation to meet the demand for high-quality connection technology in prefabricated buildings.

[0012] It should be noted that the information disclosed in the background technology section of the invention is only intended to deepen the understanding of the general background technology of the invention, and should not be regarded as an admission or suggestion in any form that the information constitutes prior art already known to those skilled in the art. Summary of the invention

[0013] One purpose of the present invention is to provide a grouting sleeve that is cost-effective and can quantitatively detect the grouting fullness;

[0014] The second object of the present invention is to provide a cost-effective and quantitative method for detecting the grouting fullness.

[0015] In order to solve the above-mentioned first purpose, the present invention first provides an integrated fullness easy-to-detect grouting sleeve, which is characterized by comprising:

[0016] A grouting sleeve body, wherein the grouting sleeve body has a grouting cavity inside;

[0017] A tensile fracture object extends into the grouting cavity at the top of the grouting sleeve body, and is at least partially arranged along the grouting height direction of the grouting cavity. The tensile fracture object gradually increases in tensile strength from bottom to top along the grouting height direction of the grouting cavity; the place where the tensile fracture object is broken by external force after the grouting and curing of the grouting sleeve body is defined as the full filling interface of the grouting cavity.

[0018] Preferably, the grouting sleeve body has a grouting port and a grouting outlet connected to the grouting cavity, and the grouting port is located below the grouting outlet; the grouting sleeve body also has an opening for the tensile fracture object to extend into the grouting cavity, and the opening is located above the grouting outlet.

[0019] Preferably, the tensile fracture object is implemented as a wire-shaped object, a strip-shaped object, a tube-shaped object or a rod-shaped object.

[0020] Preferably, the cross-section of the tensile fractured object gradually increases from bottom to top along the grouting height direction of the grouting cavity.

[0021] Preferably, the surface of the tensile fracture object is rough.

[0022] Preferably, the tensile fractured object is pre-fixed in the grouting cavity of the grouting sleeve body before grouting.

[0023] Preferably, at least the pre-fixation of the tensile fracture object and the grouting sleeve body is covered during grouting.

[0024] The technical effects produced by the above technical solution of the present invention come from one or more of the following combinations:

[0025] The grouting sleeve design of the present invention adopts an innovative tensile fracture material with gradually increasing tensile breaking force. Its anti-fracture stress gradually increases along the grouting height direction. This design allows the tensile fracture material to be pulled out by simple manual or mechanical operation after the grouting material solidifies, and it is easy to break at the interface between the grouting material and the air, thereby realizing non-destructive detection of the grouting material filling condition. By measuring the length of the pulled out tensile fracture material, construction personnel can quickly and accurately evaluate the grouting fullness inside the sleeve, ensure the connection quality of prefabricated components, and improve the overall safety and reliability of the structure.

[0026] This structure is integrally formed with the grouting sleeve body, which is different from the traditional pre-buried steel wire pulling method. The traditional steel wire pulling method requires that the steel wire is not broken, but is directly pulled out from the grouting material, and can only qualitatively judge whether the grouting is dense; while the present invention requires that the wire be broken (the bottom of the tensile fracture is pre-fixed), and the density of the grouting material is judged by the fracture position, which can not only qualitatively judge whether the grouting is dense, but also quantitatively analyze the degree of density.

[0027] The cost is low. The pre-buried steel wire pulling method requires professional equipment for pulling and testing, and also has extremely high requirements for operation. Large-scale construction sites generally have thousands or even tens of thousands of grouting sleeves that need to be tested, resulting in high costs. The present invention only needs to set up tensile breaking objects of linear objects, strip objects, tubular objects or rod-shaped objects. By considering that they are pulled apart, the fullness of the internal grouting can be known by comparing the length after breaking with the theoretical length under full conditions.

[0028] By setting the surface of the tensile fracture object to be rough, the structure not only optimizes the bonding performance between the grouting material and the tensile fracture object, but also significantly improves the anchoring force of the wire drawing in the grouting material through the surface roughness design.

[0029] In order to solve the above two purposes, the present invention provides a method for detecting an integrated fullness easy-to-detect grouting sleeve, which is characterized by comprising the following steps:

[0030] The grouting sleeve body and the tensile fracture object are integrally arranged, and the tensile fracture object is extended into the grouting cavity at the top of the grouting sleeve body, and at least partially arranged along the grouting height direction of the grouting cavity; the tensile fracture object is implemented so that the tensile fracture resistance gradually increases from bottom to top along the grouting height direction of the grouting cavity;

[0031] Performing grouting in the grouting cavity until the grouting is completed and solidified;

[0032] The tensile fractured object is broken by external force, and the breaking point of the tensile fractured object corresponds to the full filling interface of the grouting cavity. The fullness of the grouting cavity is detected by measuring the length of the tensile fractured object pulled out of the grouting sleeve body.

[0033] Preferably, when the grouting sleeve body and the tensile fracture object are integrally arranged, the tensile fracture object is pre-fixed in the grouting cavity of the grouting sleeve body.

[0034] Preferably, the bottom of the tensile fracture is pre-fixed inside the grouting sleeve body.

[0035] The technical effects produced by the above technical solution of the present invention come from one or more of the following combinations:

[0036] The grouting sleeve design of the present invention adopts an innovative tensile fracture material with gradually increasing tensile breaking force. Its anti-fracture stress gradually increases along the grouting height direction. This design allows the tensile fracture material to be pulled out by simple manual or mechanical operation after the grouting material solidifies, and it is easy to break at the interface between the grouting material and the air, thereby realizing non-destructive detection of the grouting material filling condition. By measuring the length of the pulled out tensile fracture material, construction personnel can quickly and accurately evaluate the grouting fullness inside the sleeve, ensure the connection quality of prefabricated components, and improve the overall safety and reliability of the structure.

[0037] This structure is integrally formed with the grouting sleeve body, which is different from the traditional pre-buried steel wire pulling method. The traditional steel wire pulling method requires that the steel wire is not broken, but is directly pulled out from the grouting material, and can only qualitatively judge whether the grouting is dense; while the present invention requires that the wire be broken (the bottom of the tensile fracture is pre-fixed), and the density of the grouting material is judged by the fracture position, which can not only qualitatively judge whether the grouting is dense, but also quantitatively analyze the degree of density.

[0038] The cost is low. The pre-buried steel wire pulling method requires professional equipment for pulling and testing, and also has extremely high requirements for operation. Large-scale construction sites generally have thousands or even tens of thousands of grouting sleeves that need to be tested, resulting in high costs. The present invention only needs to set up tensile breaking objects of linear objects, strip objects, tubular objects or rod-shaped objects. By considering that they are pulled apart, the fullness of the internal grouting can be known by comparing the length after breaking with the theoretical length under full conditions.

[0039] By setting the surface of the tensile fracture object to be rough, the structure not only optimizes the bonding performance between the grouting material and the tensile fracture object, but also significantly improves the anchoring force of the wire drawing in the grouting material through the surface roughness design.

[0040] The detection method of the present invention effectively solves the drawbacks of the traditional pull-out test and provides a more accurate and efficient means for detecting the fullness of the grouting sleeve. At the same time, the sleeve produced in an integrated manner reduces the complexity in construction and improves the construction efficiency. BRIEF DESCRIPTION OF THE DRAWINGS

[0041] Figure 1 The schematic diagram of the structure of the integrated fullness easy-to-detect grouting sleeve in the present invention is expressed.

[0042] Figure 2 The axial cross-sectional view of the integrated fullness easy-to-detect grouting sleeve of the present invention is expressed.

[0043] Figure 3 Expressed Figure 2 Stereoscopic perspective diagram.

[0044] Figure 4 The schematic diagram shows the principle of the integrated grouting sleeve with easy fullness inspection.

[0045] Figure 5 A flow chart of the method of the present invention is presented. DETAILED DESCRIPTION

[0046] The following description is given to enable those skilled in the art to implement and use the invention and incorporate it into a specific application context. Various modifications, as well as various uses in different applications will be readily apparent to those skilled in the art, and the general principles defined herein are applicable to a wide range of embodiments. Thus, the present invention is not limited to the embodiments given herein, but should be granted the broadest scope consistent with the principles and novel features disclosed herein.

[0047] In the following detailed description, many specific details are set forth to provide a more thorough understanding of the present invention. However, it will be apparent to those skilled in the art that the practice of the present invention need not be limited to these specific details. In other words, known structures and devices are shown in block diagram form without detailed display to avoid obscuring the present invention.

[0048] The reader is reminded of all documents and literature filed simultaneously with this specification and open to public inspection, and the contents of all such documents and literature are incorporated herein by reference. Unless otherwise directly stated, all features disclosed in this specification (including any attached claims, abstracts and drawings) can be replaced by alternative features for achieving the same, equivalent or similar purposes. Therefore, unless otherwise explicitly stated, each feature disclosed is only an example of a group of equivalent or similar features.

[0049] Note that, where used, the symbols left, right, front, back, top, bottom, forward, reverse, clockwise and counterclockwise are used only for convenience and do not imply any specific fixed direction. In fact, they are used to reflect the relative position and / or direction between the various parts of the object. In addition, the terms "first" and "second" are used only for descriptive purposes and should not be understood as indicating or implying relative importance.

[0050] In the description of the present invention, it should be noted that, unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection; it can be a direct connection, or it can be indirectly connected through an intermediate medium, or it can be the internal communication of two components. For ordinary technicians in this field, the specific meanings of the above terms in the present invention can be understood according to specific circumstances.

[0051] Note that, in the case of use, further, preferably, further and more preferably are simple beginnings for explaining another embodiment based on the previous embodiment, and the content of further, preferably, further or more preferably followed by the above embodiment is combined with the previous embodiment as a complete composition of another embodiment. Several further, preferably, further or more preferably settings followed by the same embodiment can be arbitrarily combined to form another embodiment.

[0052] The present invention is described in detail below in conjunction with the accompanying drawings and specific embodiments. Note that the aspects described below in conjunction with the accompanying drawings and specific embodiments are only exemplary and should not be construed as limiting the scope of protection of the present invention in any way.

[0053] Embodiment 1:

[0054] See also Figure 1 to Figure 5 This embodiment provides a grouting sleeve with an integrated fullness easy inspection, including a grouting sleeve body 1 and a tensile fracture 2. The grouting sleeve body 1 has a grouting cavity 10 inside; the tensile fracture 2 extends into the grouting cavity 10 at the top of the grouting sleeve body 1, and is at least partially arranged along the grouting height direction of the grouting cavity 10, and the tensile fracture force of the tensile fracture 2 gradually increases from bottom to top along the grouting height direction of the grouting cavity 10; the tensile fracture 2 is broken by external force after the grouting and curing of the grouting sleeve body 1, which is defined as the full grouting interface 101 of the grouting cavity 10. The grouting sleeve design of this embodiment adopts an innovative tensile fracture object 2 with gradually increasing tensile breaking force. Its anti-fracture stress gradually increases along the grouting height direction. This design allows the tensile fracture object 2 to be pulled out by simple manual or mechanical operation after the grouting material 100 solidifies, and it is easy to break at the interface 101 between the grouting material and the air, thereby realizing non-destructive detection of the filling condition of the grouting material 100. By measuring the length of the pulled-out tensile fracture object, construction personnel can quickly and accurately evaluate the grouting fullness inside the sleeve, ensure the connection quality of prefabricated components, and improve the overall safety and reliability of the structure.

[0055] Grouting sleeve is also called grouting sleeve joint or sleeve grouting joint. When connecting the steel bars, the fast-hardening non-shrinking grouting material 100 is injected to connect the steel bars and sleeves by relying on the bonding and bite action between the materials. Figure 2 and Figure 3 In this embodiment, the grouting sleeve body 1 has a grouting port 11 and a grouting outlet 12 connected to the grouting cavity 10, and the grouting port 11 is located below the grouting outlet 12; the grouting sleeve body 1 also has an opening 13 for the tensile fracture object 2 to extend into the grouting cavity 10, and the opening 13 is located above the grouting outlet 12. Figure 2As shown, a quick-hardening, non-shrinkage grouting material 100 (referred to as grouting material 100 ) is injected into the grouting port 11 , thereby achieving bonding and biting of the upper steel bars 3 and the lower steel bars 4 with the grouting sleeve body 1 , thereby achieving connection of the upper steel bars 3 and the lower steel bars 4 .

[0056] The traditional method of drawing the embedded steel wire is to embed the steel wire into the grouting sleeve from the grouting outlet 12, so a specific plug is generally required at the grouting outlet 12. In this embodiment, only a very small opening 13 is needed at the top to allow the tensile fracture object 2 to be inserted. In addition, the setting of the tensile fracture object 2 can be integrated with the grouting sleeve body 1 and can be completed in the factory.

[0057] It should be noted that the tensile breaking object 2 has a variety of implementation forms, and what needs to be satisfied is that the force to resist tensile breaking should be gradually increased, and its shape is not limited here. Therefore, the tensile breaking object 2 is implemented as a linear object, a strip object, a tubular object or a rod-shaped object. For example: the tensile breaking object 2 is a drawn wire, and its diameter gradually increases from bottom to top, so as to meet the requirement of gradually increasing force to resist tensile breaking. Preferably, its material is nylon; or the tensile breaking object 2 is a drawn belt, and its bandwidth gradually increases from bottom to top, so as to meet the requirement of gradually increasing force to resist tensile breaking. Preferably, its material is nylon; or the tensile breaking object 2 is a drawn tube, and its wall thickness gradually increases from bottom to top, so as to meet the requirement of gradually increasing force to resist tensile breaking. Preferably, its material is nylon. Because the tensile fracture object 2 is formed of a homogeneous material (for example, nylon), its tensile fracture resistance gradually increases from bottom to top, so the lower it is, the easier it is to break. When the tensile fracture object 2 is pulled at the interface 101 between the grouting material 100 and the air, it breaks here, and the length that can be pulled out can be used to quantify the fullness of the grouting in the tube.

[0058] In this embodiment, the wire drawing is preferably made of nylon material, and the maximum diameter thereof is 5 mm (corresponding to the size of the opening 13). The length is appropriately designed according to the height of the grouting cavity 10 inside the grouting sleeve body 1, and is not limited.

[0059] As described above, the tensile fracture object 2 is intended to be broken, and the length of the breaking point 21 is used as a quantitative standard to determine the grouting saturation. In summary, the cross-sectional area of ​​the tensile fracture object 2 gradually increases from bottom to top, thereby meeting the requirement of increasing the force to resist breaking. Specifically, the cross-sectional area of ​​the tensile fracture object 2 gradually increases from bottom to top along the grouting height direction of the grouting cavity 10, so when the material of the tensile fracture object 2 is consistent, it is gradually easy to break from top to bottom.

[0060] Furthermore, in order to improve the bonding degree between the tensile fracture object 2 and the grouting material 100, the surface of the tensile fracture object 2 is rough; or the surface of the tensile fracture object 2 is provided with an inverted tooth structure.

[0061] In order to prevent the tensile fracture 2 from floating due to the vertical arrangement of the tensile fracture 2 in the grouting cavity 10 during grouting, as a preferred implementation of this embodiment, the tensile fracture 2 is pre-fixed in the grouting cavity 10 of the grouting sleeve body 1 before grouting. However, in terms of position, at least the tensile fracture 2 and the pre-fixed grouting sleeve body 1 are covered during grouting. This ensures that the tensile fracture 2 is arranged together with the height direction of the grouting. If the top is not fully grouted, an air layer 10A is formed. At this time, please refer to Figure 4 At the interface 101 between the grouting layer 100A and the air layer 10A, the tensile fracture object 2 in the grouting layer 100A has been bonded and cannot be broken, while the tensile fracture resistance in the air layer 10A is gradually increasing. Therefore, the interface 101 between the grouting layer 100A and the air layer 10A is the minimum stress that can be broken, that is, this breaking point 21 (marked by the red line) is broken, and the tensile fracture object 2 located in the air layer 10A is pulled out, and the quantitative fullness can be known by measuring the length.

[0062] Furthermore, the tensile fracture object 2 can be pre-fixed before grouting by gluing, hooking, etc., and fixed inside the grouting sleeve body 1.

[0063] Beneficial effects of this embodiment:

[0064] The grouting sleeve design of the present invention adopts an innovative tensile fracture object 2 with gradually increasing tensile breaking force. Its fracture resistance gradually increases along the grouting height direction. This design allows the tensile fracture object 2 to be pulled out by simple manual or mechanical operation after the grouting material 100 solidifies, and it is easy to break at the interface 101 between the grouting material 100 and the air, thereby realizing non-destructive testing of the filling condition of the grouting material 100. By measuring the length of the pulled out tensile fracture object 2, the inspector can quickly and accurately evaluate the grouting fullness inside the sleeve, ensure the connection quality of the prefabricated components, and improve the overall safety and reliability of the structure.

[0065] This structure is integrally formed with the grouting sleeve body 1, which is different from the traditional pre-buried steel wire pulling method. The traditional steel wire pulling method requires that the steel wire is not broken, but is directly pulled out from the grouting material 100, and can only qualitatively judge whether the grouting is dense; while the present invention requires that the wire be broken (the bottom of the tensile fracture 2 is pre-fixed), and the density of the grouting material 100 is judged by the fracture position, which can not only qualitatively judge whether the grouting is dense, but also quantitatively analyze the degree of density.

[0066] The cost is low. The pre-buried steel wire pulling method requires professional equipment for pulling and testing, and also has extremely high requirements for operation. Large construction sites generally have thousands or even tens of thousands of grouting sleeves that need to be tested, resulting in high costs. The present invention only needs to set a tensile breaking object 2 of a linear object, a strip object, a tubular object or a rod-shaped object. By considering that it is pulled apart, the fullness of the internal grouting can be known by comparing the length after breaking with the theoretical length under full conditions.

[0067] By setting the surface of the tensile fracture object 2 to be rough, the structure not only optimizes the bonding performance between the grouting material 100 and the tensile fracture object 2, but also significantly improves the anchoring force of the wire drawing in the grouting material 100 through the surface roughness design.

[0068] Embodiment 2:

[0069] See also Figure 5 Combined with Figure 1 to Figure 4 This embodiment provides a method for detecting an integrated fullness easy-to-detect grouting sleeve, comprising the following steps:

[0070] S1: The grouting sleeve body 1 and the tensile fracture object 2 are integrated.

[0071] Specifically, the tensile fracture object 2 is extended into the grouting cavity 10 at the top of the grouting sleeve body 1, and at least partially arranged along the grouting height direction of the grouting cavity 10; the tensile fracture object 2 is implemented so that the tensile fracture resistance gradually increases from bottom to top along the grouting height direction of the grouting cavity 10.

[0072] At least part of the arrangement along the grouting height direction of the grouting cavity 10 is interpreted as: Figure 2 As shown, the tensile fracture object 2 extends from the side of the grouting sleeve body 1, so the vertical part of the tensile fracture object 2 is arranged along the grouting height direction of the grouting cavity 10. If the tensile fracture object 2 extends from the top of the grouting sleeve body 1, the whole is arranged vertically and arranged along the grouting height direction of the grouting cavity 10.

[0073] Furthermore, the grouting sleeve body 1 has a grouting cavity 10 inside; the tensile fracture object 2 extends into the grouting cavity 10 at the top of the grouting sleeve body 1, and the tensile fracture force of the tensile fracture object 2 gradually increases from bottom to top along the grouting height direction of the grouting cavity 10; the tensile fracture object 2 is broken by external force at 21 after the grouting and curing of the grouting sleeve body 1, which is defined as the full filling interface 101 of the grouting cavity 10.

[0074] The grouting sleeve is also called a grouting sleeve joint or a sleeve grouting joint. When connecting the steel bars, the fast-hardening non-shrinkage grouting material 100 is injected to connect the steel bars and the sleeve by relying on the bonding and biting effect between the materials. In this embodiment, the grouting sleeve body 1 has a grouting port 11 and a grouting outlet 12 connected to the grouting cavity 10, and the grouting port 11 is located below the grouting outlet 12; the grouting sleeve body 1 also has an opening 13 for the tensile fracture 2 to extend into the grouting cavity 10, and the opening 13 is located above the grouting outlet 12. Figure 1 As shown, quick-hardening non-shrinkage grouting material 100 (referred to as grouting material 100 ) is injected into the grouting port 11 , thereby achieving bonding and biting of the upper steel bars 3 and the lower steel bars 4 with the grouting sleeve body 1 , thereby achieving connection of the upper steel bars 3 and the lower steel bars 4 .

[0075] It should be noted that the tensile breaking object 2 has a variety of implementation forms, and what needs to be satisfied is that the force to resist tensile breaking should be gradually increased, and its shape is not limited here. Therefore, the tensile breaking object 2 is implemented as a linear object, a strip object, a tubular object or a rod-shaped object. For example: the tensile breaking object 2 is a drawn wire, and its diameter gradually increases from bottom to top, so as to meet the requirement of gradually increasing force to resist tensile breaking. Preferably, its material is nylon; or the tensile breaking object 2 is a drawn belt, and its bandwidth gradually increases from bottom to top, so as to meet the requirement of gradually increasing force to resist tensile breaking. Preferably, its material is nylon; or the tensile breaking object 2 is a drawn tube, and its wall thickness gradually increases from bottom to top, so as to meet the requirement of gradually increasing force to resist tensile breaking. Preferably, its material is nylon.

[0076] In this embodiment, the wire drawing is preferably made of nylon material, and the maximum diameter thereof is 5 mm (corresponding to the size of the opening 13). The length is appropriately designed according to the height of the grouting cavity 10 inside the grouting sleeve body 1, and is not limited.

[0077] As described above, the tensile fracture object 2 is intended to be broken, and the length of the breaking point 21 is used as a quantitative standard to determine the grouting saturation. In summary, the cross-sectional area of ​​the tensile fracture object 2 gradually increases from bottom to top, thereby meeting the requirement of increasing the force to resist breaking. Specifically, the cross-sectional area of ​​the tensile fracture object 2 gradually increases from bottom to top along the grouting height direction of the grouting cavity 10, so when the material of the tensile fracture object 2 is consistent, it is gradually easy to break from top to bottom.

[0078] Furthermore, in order to improve the bonding degree between the tensile fracture object 2 and the grouting material 100, the surface of the tensile fracture object 2 is rough; or the surface of the tensile fracture object 2 is provided with an inverted tooth structure.

[0079] In order to prevent the tensile fracture 2 from floating due to the vertical arrangement of the tensile fracture 2 in the grouting cavity 10 during grouting, as a preferred implementation of this embodiment, the tensile fracture 2 is pre-fixed in the grouting cavity 10 of the grouting sleeve body 1 before grouting. However, in terms of position, at least the pre-fixation of the tensile fracture 2 and the grouting sleeve body 1 is submerged during grouting. Thereby ensuring that the tensile fracture object 2 is arranged together with the height direction of grouting. If the top is not filled up, an air layer 10A is formed. At this time, at the interface 101 of the grouting layer 100A and the air layer 10A, the part of the tensile fracture object 2 in the grouting layer 100A has been bonded and cannot be pulled out, and the tensile fracture resistance in the air layer 10A is gradually increasing. Therefore, at the interface 101 of the grouting layer 100A and the air layer 10A, the maximum stress that can be broken is reached, that is, this breaking point 21 (marked by the red line) is broken, and the tensile fracture object 2 located in the air layer 10A is pulled out. The quantitative fullness can be known by measuring the length.

[0080] Furthermore, the tensile fracture object 2 can be pre-fixed before grouting by gluing, hooking, etc., and fixed inside the grouting sleeve body 1.

[0081] S2: Grouting is performed in the grouting cavity 10 until the grouting is completed and solidified.

[0082] Grouting equipment is used to fill the grouting port 11 until the grouting port 12 overflows and is sealed. If multiple grouting sleeves form an integral grouting system, the grouting process can be followed to complete the conventional grouting requirements.

[0083] S3: The tensile fractured object 2 is broken by external force, and the breaking point 21 of the tensile fractured object 2 corresponds to the full filling interface 101 of the grouting cavity 10. The fullness of the grouting cavity 10 is detected by measuring the length of the tensile fractured object 2 pulled out of the grouting sleeve body 1.

[0084] The grouting sleeve design adopts an innovative tensile fracture object 2 with gradually increasing tensile breaking force. Its anti-fracture stress gradually increases along the grouting height direction. This design allows the tensile fracture object 2 to be pulled out by simple manual or mechanical operation after the grouting material 100 solidifies, and breaks at the interface 101 between the grouting material 100 and the air, thereby realizing non-destructive testing of the filling condition of the grouting material 100. By measuring the length of the pulled-out tensile fracture object 2, the inspector can quickly and accurately evaluate the grouting fullness inside the sleeve, ensure the connection quality of the prefabricated components, and improve the overall safety and reliability of the structure.

[0085] Specifically, the tensile fracture object 2 is pre-fixed in the grouting cavity 10 of the grouting sleeve body 1 before grouting. If the top is not filled up, an air layer 10A is formed. At this time, at the interface 101 between the grouting layer 100A and the air layer 10A, the tensile fracture object 2 in the grouting layer 100A has been bonded and cannot be pulled apart, and the tensile fracture resistance in the air layer 10A is gradually increased. Therefore, at the interface 101 between the grouting layer 100A and the air layer 10A, the maximum stress that can be pulled apart is reached, that is, it is pulled apart here, and the tensile fracture object 2 in the air layer 10A is pulled out. The quantitative fullness can be known by measuring the length.

[0086] Beneficial effects of this embodiment:

[0087] The grouting sleeve design of the present invention adopts an innovative tensile fracture object 2 with gradually increasing tensile breaking force. Its anti-fracture stress gradually increases along the grouting height direction. This design allows the tensile fracture object 2 to be pulled out by simple manual or mechanical operation after the grouting material 100 solidifies, and breaks at the interface 101 between the grouting material 100 and the air, thereby realizing non-destructive testing of the filling condition of the grouting material 100. By measuring the length of the pulled out tensile fracture object 2, construction personnel can quickly and accurately evaluate the grouting fullness inside the sleeve, ensure the connection quality of prefabricated components, and improve the overall safety and reliability of the structure.

[0088] This structure is integrally formed with the grouting sleeve body 1, which is different from the traditional pre-buried steel wire pulling method. The traditional steel wire pulling method requires that the steel wire is not broken, but is directly pulled out from the grouting material 100, and can only qualitatively judge whether the grouting is dense; while the present invention requires that the wire be broken (the bottom of the tensile fracture 2 is pre-fixed), and the density of the grouting material 100 is judged by the fracture position, which can not only qualitatively judge whether the grouting is dense, but also quantitatively analyze the degree of density.

[0089] The cost is low. The pre-buried steel wire pulling method requires professional equipment for pulling and testing, and also has extremely high requirements for operation. Large construction sites generally have thousands or even tens of thousands of grouting sleeves that need to be tested, resulting in high costs. The present invention only needs to set a tensile breaking object 2 of a linear object, a strip object, a tubular object or a rod-shaped object. By considering that it is pulled apart, the fullness of the internal grouting can be known by comparing the length after breaking with the theoretical length under full conditions.

[0090] By setting the surface of the tensile fracture object 2 to be rough, the structure not only optimizes the bonding performance between the grouting material 100 and the tensile fracture object 2, but also significantly improves the anchoring force of the wire drawing in the grouting material 100 through the surface roughness design.

[0091] The detection method of the present invention effectively solves the drawbacks of the traditional pull-out test and provides a more accurate and efficient means for detecting the fullness of the grouting sleeve. At the same time, the sleeve produced in an integrated manner reduces the complexity in the construction and improves the construction efficiency.

[0092] Furthermore, the present invention is described in detail above in conjunction with the embodiments of the accompanying drawings, and a person skilled in the art can make various variations of the present invention according to the above description. Therefore, certain details in the embodiments should not constitute a limitation of the present invention, and the present invention shall be protected by the scope defined by the attached claims.

Claims

1. Integrated fullness easy-to-check grouting sleeve, characterized by: include: A grouting sleeve body, wherein the grouting sleeve body has a grouting cavity inside; A tensile fracture object extends into the grouting cavity at the top of the grouting sleeve body, and is at least partially arranged along the grouting height direction of the grouting cavity. The tensile fracture object gradually increases in tensile strength from bottom to top along the grouting height direction of the grouting cavity; the place where the tensile fracture object is broken by external force after the grouting and curing of the grouting sleeve body is defined as the full filling interface of the grouting cavity.

2. The integrated fullness easy-to-detect grouting sleeve according to claim 1, characterized in that: The grouting sleeve body has a grouting port and a grouting outlet connected to the grouting cavity, and the grouting port is located below the grouting outlet; the grouting sleeve body also has an opening for the tensile fracture object to extend into the grouting cavity, and the opening is located above the grouting outlet.

3. The integrated fullness easy-to-detect grouting sleeve according to claim 1 or 2, characterized in that: The tensile fracture object is implemented as a wire, a strip, a tube or a rod.

4. The integrated fullness easy-to-detect grouting sleeve according to claim 3, characterized in that: The cross section of the tensile fractured object gradually increases from bottom to top along the grouting height direction of the grouting cavity.

5. The integrated fullness easy-to-check grouting sleeve according to claim 3 is characterized in that: The surface of the tensile fracture object is rough.

6. The integrated fullness easy-to-detect grouting sleeve according to claim 1, characterized in that: The tensile fracture object is pre-fixed in the grouting cavity of the grouting sleeve body before grouting.

7. The integrated fullness easy-to-detect grouting sleeve according to claim 6, characterized in that: At least the pre-fixation of the tensile fracture object and the grouting sleeve body is covered during grouting.

8. The method for detecting an integrated grouting sleeve with easy fullness detection according to any one of claims 1 to 7, characterized in that: The following steps are involved: The grouting sleeve body and the tensile fracture object are integrally arranged; the tensile fracture object is extended into the grouting cavity at the top of the grouting sleeve body, and at least partially arranged along the grouting height direction of the grouting cavity; the tensile fracture object is implemented so that the tensile fracture resistance gradually increases from bottom to top along the grouting height direction of the grouting cavity; Performing grouting in the grouting cavity until the grouting is completed and solidified; The tensile fractured object is broken by external force, and the breaking point of the tensile fractured object corresponds to the full filling interface of the grouting cavity. The fullness of the grouting cavity is detected by measuring the length of the tensile fractured object pulled out of the grouting sleeve body.

9. The detection method according to claim 8, characterized in that: When the grouting sleeve body and the tensile fracture object are integrally arranged, the tensile fracture object is pre-fixed in the grouting cavity of the grouting sleeve body.

10. The detection method according to claim 9, characterized in that: The bottom of the tensile fracture object is pre-fixed inside the grouting sleeve body.