Ground gas control well fracturing interference rapid recovery gas production method
By washing the pressure well and blowing the fracturing well, the bottom pressure is reduced synergistically, and the problem that the pressure well cannot recover gas production due to fracturing interference is solved. After recovery, the gas production volume is greatly increased, saving the transformation cost. It has wide practicality and significant economic benefits.
Patent Information
- Application Number
- CN202411128116.3
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-16
- Publication Date
- 2024-11-29
- Estimated Expiration
- 2044-08-16
AI Technical Summary
Due to the failure of the equilibrium of the pressure-fed well during the fracturing process, the pressure-fed well cannot produce normally, has low gas production or no longer produces gas.
By washing the pressure well and discharging the fracturing well, the regional bottom-hole pressure is achieved to optimize the pressure well discharge and production system, including the rapid pressure reduction stage, the pressure profile recovery stage and the normal discharge and production stage. Gradually restore bottom-hole pressure and gas production.
The gas production of the pressurized well was successfully restored, and the gas production volume after recovery was far exceeding that before the interference, avoiding the secondary transformation project and equipment investment, achieving better economic, environmental and social benefits, and changing the traditional shale The concept and cognition of gas and coalbed methane wells.
Smart Images

Figure CN119041878A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to the technical field of coal mine gas control, and in particular to a method for quickly recovering gas production in a ground gas control well after fracturing interference. Background Art
[0002] Coalbed methane is an important clean energy in today's society. According to relevant investigations and studies, my country's coalbed methane geological resources are very rich, but due to many factors, it is difficult to develop. In today's society, for coal mining areas, the rich reserves of coalbed methane (coal mine gas) are not a favorable factor. It not only increases the safety hazards in the coal production process, but also increases the difficulty and cost investment of gas control above and below the well at different times. Therefore, the coordinated development of coal mine coalbed methane and coal, and the co-mining of coal and coalbed methane are of great significance to improving the level of coal mine methane resource development and utilization in coal mining areas, reducing greenhouse gas emissions, preventing and controlling coal mine gas disasters, and ensuring normal production of mines.
[0003] The surface development and management of coalbed methane in unmined areas of coal mining areas has begun to shift from the previous ground vertical fracturing well development technology to the efficient development technology of staged fracturing of horizontal wells in the roof of broken soft and low-permeability coal seams. However, with the gradual deepening of coalbed methane development and the limitation of the width of the underground working face, when the new wells in the old well area (hereinafter referred to as fracturing wells) are fracturing and reformed, since the horizontal section spacing between each well is about 200m, when the fracturing wells press the formation during the fracturing process, it will affect the old wells next to them. The fracturing seams sometimes extend up to more than 100 meters in the formation. Since the old wells have been in production for a period of time, the gas and water flow in the formation has formed a balanced state. The fracturing of the new wells has connected the formation, resulting in a rapid increase in pressure on the old well side, the destruction of balance, the blocking of gaps between coal seams, the influx of groundwater, and the influx of fracturing sand. As a result, the old wells (hereinafter referred to as fracturing wells) cannot be produced normally, the horizontal section of the wellbore is blocked, and the gas production level before the interference cannot be restored or even no longer produced, resulting in low resource recovery rate and other problems.
[0004] The information disclosed in this background technology section is only intended to enhance the understanding of the overall background of the invention and should not be regarded as an acknowledgment or any form of suggestion that the information constitutes the prior art known to a person skilled in the art. Summary of the invention
[0005] The technical problem to be solved by the present invention is how to solve the problem that the balance of the fracturing well is destroyed during the fracturing process, resulting in the failure of normal production, low gas production or no gas production of the fracturing well.
[0006] The present invention solves the above technical problems through the following technical means:
[0007] A method for quickly restoring gas production in a ground gas treatment well after fracturing interference, comprising the following steps
[0008] Step S1: flushing the pressure channeling well;
[0009] Step S2: performing blowout treatment on the fracturing well and depressurizing the pressure channeling well;
[0010] The blowout treatment of the fracturing well is to gradually open the valve opening of the wellhead of the fracturing well to blowout;
[0011] The pressure reduction treatment of pressure-channeling wells includes the rapid pressure reduction stage, the pressure profile recovery stage, and the normal drainage and production stage.
[0012] The present invention not only successfully restores gas production in the pressure-channeling wells, but also further breaks through the gas production rate after restoration, far exceeding the gas production rate before the interference, through a series of field operations and technical means such as flushing the pressure-channeling wells, rapid blowout of the fracturing wells, coordinated reduction of regional bottom hole pressure, and optimization of the pressure-channeling well drainage system, thereby solving the technical difficulties and traditional cognition that the pressure-channeling wells cannot be restored, saving the engineering and equipment investment required for secondary transformation of the pressure-channeling wells, and obtaining better economic, environmental and social benefits. The method is simple and easy to operate, and has wide practicability in the industry. The present invention changes the traditional concepts and cognitions of shale gas and coalbed methane wells, and effectively avoids the situation where the pressure-channeling wells are difficult to restore or even unable to restore gas production after being disturbed by the fracturing of adjacent wells.
[0013] Preferably, in step S1, the process of washing the pressure channeling well includes:
[0014] Before the operation, all components in the pressure channeling well shall be removed;
[0015] Lower the oil pipe into the casing of the wellbore of the pressure channeling well, and lower the oil pipe to the horizontal section in the wellbore;
[0016] Circulating fluid is pumped into the annular space between the tubing and the casing, and suction is performed from the top of the tubing.
[0017] Preferably, the inner diameter of the oil pipe is 40%-60% of the inner diameter of the casing; the circulating fluid is the water produced by the well as a medium.
[0018] Preferably, in step S2, the process of performing blowdown treatment on the fracturing well includes:
[0019] Open the needle valve at the wellhead of the fracturing well and start the spraying. When the spraying starts, the amount of spraying liquid is 30-40m3. 3 / d, observe the drop in wellhead pressure, the daily drop in wellhead pressure is 0.1MPa / d-0.2MPa / d;
[0020] Gradually increase the needle valve opening, increase the daily injection volume, and ensure that the daily drop in wellhead pressure is 0.2MPa / d-0.3MPa / d.
[0021] Preferably, in the rapid pressure reduction stage: before the bottom hole pressure reaches the bottom hole pressure at the time of initial desorption and casing exposure, the production pump operates at Smax to accelerate the drainage and pressure reduction rate to achieve rapid pressure reduction; the average daily pressure reduction during the rapid pressure reduction period is 0.05-0.07MPa / d.
[0022] Preferably, S max 150-250R / min.
[0023] Preferably, in the pressure profile recovery stage, the bottom hole flow pressure is from the bottom hole flow pressure at the time of initial desorption and casing to the bottom hole flow pressure when gas production stops due to interference, and the drainage pump is S mid run.
[0024] Preferably, S mid 80-120R / min.
[0025] Preferably, in the normal drainage stage: when gas production is stopped due to interference and the bottom hole pressure reaches the secondary desorption casing stage, first gradually reduce the operating speed of the drainage pump, observe the daily drop in the return fluid and flow pressure, and adjust the operating speed of the water pump according to the actual liquid production and flow pressure drop. The overall daily drop in flow pressure is 0.02-0.04MPa / d.
[0026] Preferably, after the normal drainage phase is completed, the production increase phase is entered.
[0027] The advantages of the present invention are:
[0028] The present invention uses a series of on-site operations and technical means such as well cleaning of the pressure-channeling well, rapid blowout of the fracturing well, coordinated reduction of regional bottom hole pressure, and optimization of the drainage system of the pressure-channeling well, so that not only the pressure-channeling well can be successfully restored to gas production, but also the gas production after restoration is further broken through, far exceeding the gas production rate before the interference, thus solving the technical difficulties and traditional cognition that the pressure-channeling well cannot be restored, saving the engineering and equipment investment required for secondary transformation of the pressure-channeling well, and obtaining better economic, environmental and social benefits. The method is simple and easy to operate, and has wide practicability in this industry.
[0029] The present invention changes the traditional concepts and cognitions of shale gas and coalbed methane wells, and effectively avoids the situation where the pressure-channeling well is difficult to recover or even unable to recover gas production after being disturbed by the fracturing of adjacent wells. BRIEF DESCRIPTION OF THE DRAWINGS
[0030] Figure 1 2 is a schematic diagram of a structure for washing a pressure channeling well according to an embodiment of the present invention;
[0031] Figure 2 This is a blowout curve diagram of a fracturing well according to an embodiment of the present invention.
[0032] Figure 31 is a drainage curve diagram of three stages of flow pressure recovery of a pressure channeling well according to an embodiment of the present invention;
[0033] Figure 4 It is a curve diagram of a step-by-step production increase and stable production mode after the pressure-channeled well is restored in an embodiment of the present invention;
[0034] Figure 5 : is a comprehensive drainage curve diagram of a pressure channeling well according to an embodiment of the present invention;
[0035] Numbers in the figure:
[0036] 1. YouTube. DETAILED DESCRIPTION
[0037] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0038] A method for quickly restoring gas production after fracturing interference in a ground gas control well comprises the following steps:
[0039] like Figure 1 As shown, step S1: washing the pressure channeling well; mainly to clean the quartz sand, coal powder and other solid sediments in the horizontal section of the pressure channeling well, and restore the normal flow channel of the horizontal section.
[0040] Specifically, before the operation, all components in the wellbore, including the pump, pipe string, pumping rod, etc., are pulled out so that the well cleaning equipment can be lowered into the well for operation; the well cleaning equipment includes pumps, oil pipes, etc.;
[0041] The inner diameter of the oil pipe 1 is 40%-60% of the inner diameter of the casing; usually the diameter of the production casing of a coalbed methane well is 139.7 mm, and the diameter of the oil pipe is 73 mm.
[0042] During the well cleaning operation, water is needed as a medium for transporting deposited solid matter to prevent the underground water from generating complex chemical reactions when it meets the surface water, which may lead to adverse consequences. To avoid this problem, this embodiment uses the water produced by the well as a medium.
[0043] The oil pipe is lowered to the horizontal section, and water is injected from the annulus of the oil pipe and casing through the ground oil cementing truck pump to carry the solid matter deposited in the casing and transport it out of the oil pipe, so as to clean up the fracturing sand, quartz sand, coal powder and other solid deposits in the horizontal section of the wellbore, thereby restoring the normal flow channel of the horizontal section.
[0044] Step S2: performing blowout treatment on the fracturing well and depressurizing the pressure channeling well;
[0045] Strengthen the management of fracturing well blowout to achieve synchronized regional pressure drop. After the fracturing construction of the fracturing well is completed, the bottom flow pressure of the pressure channeling well continues to rise. The main reason is that there is a pressure difference between the bottom of the fracturing well and the pressure channeling well. In order to reduce the continuous impact on the pressure channeling well, the "slow release and slow drainage" blowout mode of the coalbed methane well under the original geological conditions was broken, and a fast blowout method was adopted to reduce the bottom pressure of the fracturing well as soon as possible, reduce the continuous impact on the pressure channeling well, and speed up the drainage intensity of the pressure channeling well, so that the bottom pressure of multiple wells in the area can be reduced synchronously as a whole, avoiding excessive pressure difference between wells.
[0046] It should be noted that: in this embodiment, the two treatment processes of "performing a blowout treatment on the fracturing well" and "performing a pressure reduction treatment on the pressure-channeling well" can be processed simultaneously, or after the "performing a blowout treatment on the fracturing well" is processed for a period of time, the "performing a blowout treatment on the fracturing well" and the "performing a pressure reduction treatment on the pressure-channeling well" can be performed simultaneously.
[0047] like Figure 2 As shown, the fracturing well is subjected to blowout treatment, which specifically includes:
[0048] (1) Open the needle valve at the wellhead of the fracturing well and start the spraying. When starting the spraying, the amount of spraying liquid is 30-40m 3 / d, observe the drop in wellhead pressure. The daily drop in wellhead pressure shall not be less than 0.1MPa / d and not more than 0.2MPa / d.
[0049] (2) Gradually increase the needle valve opening to increase the daily injection volume. The increase is mainly based on the wellhead pressure drop, ensuring that the daily drop in wellhead pressure is 0.2-0.3MPa / d.
[0050] Reduce the pressure of pressure-causing wells, optimize the single-well production system of pressure-causing wells, and achieve precise production; optimize the production system of pressure-causing wells, re-formulate production measures for each stage, strengthen the monitoring of production parameters of pressure-causing wells, and achieve precise production, so as to resume gas production as soon as possible.
[0051] like Figure 3 , Figure 4 As shown, the pressure-channeling well is affected by the fracturing well, the pressure increases, and groundwater is transmitted to the pressure-channeling well. Therefore, the pressure-channeling well must be depressurized and drained.
[0052] The pressure reduction treatment of pressure-channeling wells includes the rapid pressure reduction stage, the pressure profile recovery stage, and the normal drainage and production stage.
[0053] (1) Rapid pressure reduction stage: before the bottom hole pressure reaches the bottom hole pressure at the time of initial desorption and casing exposure, the drainage pump runs at the maximum speed Smax to accelerate the drainage pressure reduction rate and achieve rapid pressure reduction. During the rapid pressure reduction period, the average daily pressure reduction is about 0.06MPa / d. Smax is preferably 150-250R / min. In this implementation case, the operating speed Smax is 200R / min.
[0054] It should be noted that after the coalbed methane well is put into production, only water is produced in the initial stage. As the drainage and pressure reduction proceed, when the bottom hole pressure is lower than the critical desorption pressure, the adsorbed gas on the surface of the coal seam near the wellbore begins to desorb and diffuse into the coal seam cleats and cracks. As the amount of desorbed gas gradually increases, continuous bubbles are formed in the water, and the gas breaks through to form a mobile phase, flowing from the coal seam cracks into the wellbore casing annular space for production.
[0055] During the coalbed methane production process, the bottom hole flow pressure decreases as the production progresses. When the bottom hole pressure drops below the critical desorption pressure of the coalbed methane, the methane gas adsorbed in the original reservoir state begins to desorb and produce, and the wellhead casing pressure starts to read from zero.
[0056] In this embodiment, the rapid pressure reduction stage is to quickly reduce the bottom hole flow pressure of the pressure-channeling well (i.e., the old well disturbed by fracturing) until the bottom hole flow pressure reaches the bottom hole flow pressure value corresponding to the first desorption casing pressure (before being disturbed). The first desorption casing pressure point refers to the time point when the casing pressure of the old well appears. The casing pressure appears when the adsorbed gas in the formation becomes free gas, and the casing pressure of the well will have a value. The casing pressure at the wellhead can be directly read by a pressure gauge.
[0057] (2) Pressure profile recovery stage: The bottomhole flow pressure changes from the bottomhole flow pressure at the time of initial desorption and casing to the bottomhole flow pressure when gas production stops due to interference, and the drainage pump runs at a medium speed Smid. In this implementation case, the pump runs at Smid = 100 R / min to ensure that the flow pressure is reduced while preventing the formation from spitting out powder and sand again.
[0058] (3) Normal drainage and production stage: When gas production stops due to interference and the bottom hole pressure reaches the stage of secondary desorption and casing exposure, first gradually reduce the operating speed of the pump to observe the daily drop in return fluid and flow pressure. According to the actual fluid production and flow pressure drop, adjust the operating speed of the pump. The overall daily drop in flow pressure is about 0.03MPa / d.
[0059] After the disturbance, there has been an initial desorption process, but due to the pressure disturbance, the dynamic balance of desorption will be disrupted, and another desorption process must be achieved to reach another balance, so there will be a secondary desorption process.
[0060] (4) Production increase stage: After the second casing is exposed, observe the flowback fluid and gas production, formulate a reasonable drainage system, and implement a continuous, stable, and long-term drainage plan. At this time, the pressure-channeled well has returned to normal drainage, and a reasonable drainage system can be formulated according to the existing optimized drainage plan.
[0061] This embodiment overcomes the problems in the traditional hydraulic fracturing mining mode, where new wells in old well areas communicate with neighboring wells during fracturing transformation, causing the old wells to be unable to produce normally, horizontal wellbore blockage, unable to recover to the gas production level before the interference or even no longer produce gas, resulting in low resource recovery rate and other problems. This embodiment not only successfully restores gas production in the pressure-channeling wells, but also further breaks through the gas production after recovery, far exceeding the gas production rate before the interference, solves the technical difficulties and traditional cognition that the pressure-channeling wells cannot be restored, saves the engineering and equipment investment required for secondary transformation of the pressure-channeling wells, and obtains better economic, environmental and social benefits. The method is simple and easy to operate, and has wide practicality in this industry. This embodiment changes the traditional concepts and cognitions of shale gas and coalbed methane wells, and effectively avoids the situation where the pressure-channeling wells are difficult to recover or even unable to recover gas production after being affected by the fracturing interference of neighboring wells.
[0062] This embodiment has been successfully promoted and applied in 4 L-type horizontal wells L1 to L4 in A mining area that were disturbed by fracturing, effectively solving the problem of no gas production caused by fracturing interference in adjacent wells. At present, all wells have resumed gas production, and the cumulative gas production of the 4 wells has reached 2.7566 million m 3 , among which L4 well ( Figure 5 This is the comprehensive drainage curve before and after fracturing in this implementation case. The maximum daily gas production of a single well before being affected is 4030m 3 After adopting this embodiment, the current single well daily gas production is up to 7701m 3 / d, far exceeding the highest daily gas production before the disturbance, and the recovery effect is significant.
[0063] The technology of this embodiment is to construct a method for quickly restoring gas production and drainage after the coalbed methane pressure channeling well is affected by the fracturing of the adjacent well, which greatly reduces the negative impact of the fracturing of the pressure channeling well on the pressure channeling well, better reduces the degree and time of interference with the pressure channeling well, and successfully restores gas production in the pressure channeling well. From the perspective of direct economic benefits, the price is 1.88 yuan / m according to the gas volume. 3 According to calculation, the direct economic income from gas production after recovery has reached more than 5 million yuan; from the perspective of other benefits, this embodiment not only solves the technical difficulties and traditional cognition that the pressure-channeled well cannot be restored, but also has important significance for improving the level of coalbed methane resource development and utilization in coal mining areas, reducing greenhouse gas emissions, preventing and controlling coal mine gas disasters, and ensuring normal production of mines.
[0064] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well, characterized in that: The following steps are included Step S1: flushing the pressure channeling well; Step S2: performing blowout treatment on the fracturing well and depressurizing the pressure channeling well; The blowout treatment of the fracturing well is to gradually open the valve opening of the wellhead of the fracturing well to blowout; The pressure reduction treatment of pressure-channeling wells includes the rapid pressure reduction stage, the pressure profile recovery stage, and the normal drainage and production stage.
2. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well according to claim 1, characterized in that: In step S1, the process of washing the pressure channeling well includes: Before the operation, all components in the pressure channeling well shall be removed; Lower the oil pipe into the casing of the wellbore of the pressure channeling well, and lower the oil pipe to the horizontal section in the wellbore; Circulating fluid is pumped into the annular space between the tubing and the casing, and suction is performed from the top of the tubing.
3. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well according to claim 2, characterized in that: The inner diameter of the oil pipe is 40%-60% of the inner diameter of the casing; the circulating fluid is the water produced by the well as the medium.
4. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well according to claim 1, characterized in that: In step S2, the process of performing blowout treatment on the fracturing well includes: Open the needle valve at the wellhead of the fracturing well and start the spraying. When the spraying starts, the amount of spraying liquid is 30-40m3. 3 / d, observe the drop in wellhead pressure, the daily drop in wellhead pressure is 0.1MPa / d-0.2MPa / d; Gradually increase the needle valve opening, increase the daily injection volume, and ensure that the daily drop in wellhead pressure is 0.2MPa / d-0.3MPa / d.
5. A method for quickly recovering gas production from fracturing disturbance in a ground gas treatment well according to claim 1, characterized in that: Rapid pressure reduction stage: Before the bottom hole pressure reaches the bottom hole pressure at the time of initial desorption and casing exposure, the production pump operates at Smax to accelerate the drainage and pressure reduction rate to achieve rapid pressure reduction; the average daily pressure reduction during the rapid pressure reduction period is 0.05-0.07MPa / d.
6. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well according to claim 5, characterized in that: S max 150-250R / min.
7. A method for rapidly recovering gas production from fracturing disturbance in a ground gas treatment well according to claim 1, characterized in that: Pressure profile recovery stage: The bottom hole flow pressure changes from the bottom hole flow pressure at the time of initial desorption and casing to the bottom hole flow pressure when gas production stops due to interference. The drainage pump is S mid run.
8. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well according to claim 5, characterized in that: S mid 80-120R / min.
9. A method for quickly restoring gas production after fracturing disturbance in a ground gas treatment well according to claim 1, characterized in that: Normal drainage and production stage: When gas production stops due to interference and the bottom hole pressure reaches the secondary desorption casing stage, first gradually reduce the speed of the drainage pump, observe the daily drop in return fluid and flow pressure, and adjust the water pump speed according to the actual fluid production and flow pressure drop. The overall daily drop in flow pressure is 0.02-0.04MPa / d.
10. A method for quickly recovering gas production from fracturing disturbance in a ground gas treatment well according to claim 1, characterized in that: After the normal production phase ends, the production increase phase begins.
Citation Information
Patent Citations
Shale gas horizontal well refracturing technological process and design method
CN106845043A
Method for efficiently extracting coal seam gas of large-space thin coal seam group through multi-bottom horizontal well staged fracturing
CN111520119A
Coal bed top plate horizontal well bottom seal dragging staged fracturing coal bed gas extraction method
CN115749691A
Shale gas fracturing operation pressure channeling accident intelligent diagnosis method
CN116220654A
Shale gas horizontal well fine fracturing transformation pressure channeling inhibition method and system
CN116927741A