Rocket precipitation enhancement operation effect evaluation method
Through multi-dimensional radar data and deep learning technology, a dedicated natural rainfall model is constructed using the Arcface algorithm model, which solves the problem of the impact of natural precipitation variability in the evaluation of rocket rain increase effect, and improves the evaluation accuracy and efficiency.
Patent Information
- Application Number
- CN202411527764.6
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-10-30
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
The prior art is difficult to accurately deal with the natural precipitation variability in the evaluation of the artificial rain-increasing effect of rockets, resulting in poor evaluation results. The method is complex and time-consuming, and it is impossible to effectively solve the problem of large natural precipitation variability.
Using multi-dimensional radar data and deep learning technology, the Arcface algorithm model is used to train historical rain-enhancing operation cloud data, find similar non-work clouds, build a dedicated natural rainfall model, predict the natural rainfall of the operation cloud under non-catalytic conditions, and combine it with The rainfall under catalytic conditions was evaluated.
It improves the accuracy and efficiency of the evaluation of the rocket rain-enhancing operation effect, eliminates the impact of natural precipitation variability, and achieves more accurate evaluation results.
Smart Images

Figure CN119047714A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of prediction and evaluation of artificial weather influence operation effects of new generation information technology, and in particular relates to a method for evaluating the effect of rocket rainfall enhancement operations. Background Art
[0002] Artificial rainfall enhancement by rockets is an act of human intervention in the weather system. Artificial rainfall enhancement rockets spread catalysts in the operating clouds to cause water vapor in the clouds to condense into raindrops, thereby increasing precipitation. Artificial rainfall enhancement plays an important role in alleviating regional drought, improving agricultural production, regulating water resource allocation, and reducing natural disasters.
[0003] However, accurate assessment of the effects of artificial rainfall enhancement is an indispensable link in the sustainable and healthy development of the weather modification industry. It is of great significance for measuring the social and economic benefits of rocket artificial rainfall enhancement operations, testing whether the theories and methods of artificial weather modification are correct, and improving the scientific and technological level of artificial rainfall enhancement operations.
[0004] In traditional statistical tests, the effect evaluation conclusions of randomized experiments have always been generally accepted as more scientific results, but they require a large sample size and give up some operating opportunities, and the method itself cannot solve the problem of large variability in natural precipitation; non-randomized artificial rainfall effect evaluation methods include sequence analysis, covariate FCM and other methods. These methods are based on the correlation of precipitation and estimate natural precipitation under certain assumptions, but the variability of natural precipitation is huge, which affects the final evaluation effect. Summary of the invention
[0005] In order to address the deficiencies in the prior art, the present invention provides a method for evaluating the effect of rocket rainmaking operations, which utilizes multidimensional radar data and deep learning technology to eliminate the influence of natural precipitation variability, and uses an Arcface algorithm model trained with historical rainmaking operation cloud data to find non-operational clouds (comparison clouds) that are most similar to the operating clouds for which rainfall enhancement is to be predicted, and constructs a special natural rainfall model for the operating clouds for which rainfall enhancement is to be predicted. After predicting and calculating the natural rainfall of the operating clouds under non-catalytic conditions, the rocket rainmaking operation effect is evaluated based on the rainfall of the operating clouds under rocket rainmaking catalytic conditions, thereby improving the evaluation effect.
[0006] In order to achieve the above object, a method for evaluating the effect of a rocket rainfall enhancement operation according to an embodiment of the present invention comprises: S1. Obtain the operational cloud data for which the rainfall increase is to be predicted and cut it to obtain the operational cloud rainfall increase evaluation interval; S2. according to the operation screening conditions of the operation cloud rainfall enhancement evaluation interval, find the similar non-operation cloud sub-matrix of the operation cloud for which rainfall enhancement is to be predicted; S3, applying a pre-built general similarity matching retrieval model to obtain a similarity ranked list of similar clouds of the job cloud in the similar non-job cloud sub-matrix; S4, tracking the trajectories of the second most marked number of clouds in the similar cloud similarity ranking list, and constructing a special natural rainfall model for the operational cloud for which rainfall increase is to be predicted; S5. Track the trajectory of the operational cloud for which the rainfall increase is to be predicted, and use the constructed special natural rainfall model to calculate the natural rainfall of the operational cloud for which the rainfall increase is to be predicted under non-catalytic conditions.
[0007] Furthermore, the method further comprises: S6. Track the trajectory of the operational cloud for which the rainfall increase is to be predicted, and obtain the rainfall of the operational cloud for which the rainfall increase is to be predicted under catalytic conditions.
[0008] Furthermore, the step S1, obtaining and clipping the operational cloud data for which the rainfall increase amount is to be predicted, to obtain the operational cloud rainfall increase evaluation interval, comprises: S11. Obtain radar three-dimensional mosaic data and rainfall data of the cloud area for rain enhancement operation; S12, with the rocket operation point as the center, the calibration distance as the radius, and the increase and decrease calibration angles of the operation azimuth as the two sides, cutting out the operation sector area; S13, taking a circumscribed rectangle of the operation sector area parallel to the coordinate axes of the rectangular coordinate system; S14, adjusting the size of the circumscribed rectangle to the training window size of the general similarity matching retrieval model stored in the system; S15. According to the resized circumscribed rectangle and the calibrated height layer, the three-dimensional data area is cut out to obtain the operational cloud rainfall enhancement evaluation interval.
[0009] Furthermore, the training window size is : ; in, is the total number of reasonable historical operation clouds, To be reasonable, the number of categories with different window sizes for historical job clouds is For the A reasonable number of historical job cloud categories, For the A reasonable size of the historical job cloud category window, For the A reasonable number of historical job cloud categories, For the A reasonable size of the historical job cloud category window, 1 to A positive integer, Indicates the rounding symbol.
[0010] Furthermore, the step S2, searching for a similar non-operational cloud sub-matrix of the operation cloud for which the rainfall increase amount is to be predicted, according to the operation screening condition of the operation cloud rainfall increase evaluation interval, comprises: S21, determining the operation screening conditions of the operation cloud precipitation enhancement evaluation interval; S22, according to the determined operational screening conditions of the operational cloud precipitation enhancement evaluation interval, searching for a non-operational cloud sub-matrix with the same operational screening conditions in cloud systems at other locations and historical non-operational cloud systems at the same time on the operational day; S23, evaluating the rationality of the non-operation cloud sub-matrix and eliminating it to obtain a reasonable non-operation cloud sub-matrix; S24, screening the reasonable non-operational cloud sub-matrix by radar echo values to obtain a similar non-operational cloud sub-matrix; Furthermore, the screening includes: respectively calculating the differences between the radar echo values of the grid points of all non-operational clouds and the operational cloud whose rainfall increase is to be predicted in the similar non-operational cloud sub-matrix, taking the absolute values and summing them; sorting the summation results, taking the absolute values of the differences and the smallest first calibrated number samples as the similar non-operational cloud sub-matrix.
[0011] Furthermore, the S3, applying a pre-built universal similarity matching retrieval model, obtains a similarity ranking list of similar clouds of the job cloud in the similar non-job cloud sub-matrix, including: S31, applying a pre-built general similarity matching retrieval model of the job cloud and its similar clouds, respectively extracting 512-dimensional feature vectors of the non-job cloud to be matched in the job cloud and similar non-job cloud sub-matrices; S32, calculating the Euclidean distance between the 512-dimensional feature vector of the operation cloud and the 512-dimensional feature vectors of all the non-operation clouds to be matched, and arranging the calculated Euclidean distance values from small to large to obtain a similarity ranking list of similar clouds of the operation cloud.
[0012] Furthermore, the construction process of the universal similarity matching retrieval model includes: The number of input layer channels of the ResNet network, a benchmark model of the Arcface algorithm adapted to the open set classification problem, is set to the number of height layers in the historical cloud precipitation evaluation interval, and the pre-training parameters are loaded; Freeze all parameters except the first layer, use multiple historical rainfall enhancement cloud data as model input, treat each historical rainfall enhancement cloud as a class, and train the model's input layer parameters; Random Gaussian noise is added to multiple historical rainfall operation cloud samples for sample augmentation. The saved model parameters are loaded, and the parameters of all layers of the model are trained using the sample augmented operation cloud data to obtain the trained general similarity matching retrieval model.
[0013] Furthermore, the step S4, tracking the cloud cluster trajectories of the second most marked number in the similar cloud similarity ranking list, and constructing a special natural rainfall model for the operational cloud for which rainfall increase is to be predicted, comprises: S41, tracking the trajectory of the second most calibrated cloud cluster in the similar cloud similarity sorting list based on the improved optical flow method, and the tracking time is the time length of the previous and next calibrations; S42. According to the cloud cluster position information of the similar cloud obtained by tracking, radar echo data and rainfall data of the calibration duration before and after the cloud cluster operation time are obtained.
[0014] S43. Construct a special natural rainfall model for the operational cloud whose rainfall increase is to be predicted.
[0015] Furthermore, the dedicated natural rainfall model of the job cloud is a fused 3D-Unet algorithm model based on the attention mechanism.
[0016] The beneficial effects of the present invention are: 1. Based on the fact that similar matching of operating clouds and non-operating clouds belongs to an open set classification problem, the present invention proposes to apply the Arcface algorithm adapted to the open set classification problem to the feature extraction of operating clouds and non-operating clouds through transfer learning, adapting to the problems in the field of artificial rainfall, and effectively improving the performance, accuracy and analysis efficiency of the model; 2. In the preliminary preparation work for the evaluation, the present invention builds a general similarity matching retrieval model in advance, and uses the historical operation cloud data after the unified training window as the data set for training the general similarity matching retrieval model, so that the model can better understand and learn the characteristics of the rain-increasing cloud layer, so that the model can be directly applied in any subsequent formal evaluation work, which greatly improves the matching retrieval efficiency of the operation cloud to be predicted for rainfall and its similar clouds, thereby improving the efficiency of the entire evaluation work; 3. The present invention improves the original optical flow method, which is mainly used for trend tracking of image motion. For cloud tracking, since the area where the operating cloud affects the rainfall is limited, the tracking of the original optical flow method may cause the operating area to diffuse and aggregate, thereby failing to accurately calculate the rainfall in the area affected by the cloud. To alleviate this problem, the tracking method of the original optical flow method is improved and adjusted, using single pixel tracking, that is, each point of the operating cloud is tracked separately, and the method with the most pixels in a fixed area is selected as the result of tracking at a single moment, which helps to fix the size of the cloud and reduce the impact of clouds in other areas on rainfall. 4. The present invention proposes a short-term rainfall and radar echo prediction algorithm that supports small data set training, and a fused 3D-Unet algorithm model based on the attention mechanism; the 3D-Unet algorithm based on the attention mechanism is a Unet algorithm based on three-dimensional convolution, and an attention mechanism is added thereto; the rainfall and radar echo are respectively input into two independent 3D-Unet models based on the attention mechanism, and finally a convolution layer is used to fuse the inputs of the two independent models, so as to obtain a better final output prediction result.
[0017] 5. The present invention utilizes multi-dimensional radar data and deep learning technology to find the comparison cloud that is most similar to the catalyzed operating cloud, and then constructs a special natural rainfall model for the operating cloud. By tracking the trajectory of the operating cloud and its similar clouds, the natural rainfall of the operating cloud under non-catalytic conditions and the rainfall under catalytic conditions are calculated, and the effect of rocket rainfall enhancement operations is evaluated, which effectively eliminates the influence of natural precipitation variability and improves the evaluation effect. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 A schematic diagram of a flow chart of a rocket rainfall enhancement operation effect evaluation method of the present invention; Figure 2 A schematic diagram of a job sector area of a job cloud according to an embodiment of the present invention; Figure 3 A schematic diagram of a circumscribed rectangle of an operation sector area according to an embodiment of the present invention; Figure 4 A schematic diagram of an ArcFace algorithm according to an embodiment of the present invention; Figure 5 A flowchart of a deep learning feature extraction and similarity matching retrieval algorithm according to an embodiment of the present invention; Figure 6 A 3D-Unet grid structure diagram based on an attention mechanism according to an embodiment of the present invention; Figure 7 A diagram of a fused 3D-Unet grid structure based on an attention mechanism according to an embodiment of the present invention; Figure 8 This is a comparative display diagram of natural rainfall prediction results of a natural rainfall model according to an embodiment of the present invention. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solutions and advantages of the present invention more clear, further description is given below in conjunction with the accompanying drawings and embodiments.
[0020] It should be noted that, in this article, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device.
[0021] The method of the present invention is divided into two parts: the first part is the preliminary preparation work for the evaluation of the effect of rocket rainfall enhancement operation, and the second part is the subsequent formal evaluation work of the effect of rocket rainfall enhancement operation.
[0022] First, we will carry out the first part: preliminary preparations for the evaluation of the effectiveness of rocket rainmaking operations.
[0023] The most important thing in the preliminary preparation work is to build a general deep learning similarity matching retrieval model in advance. The constructed deep learning similarity matching retrieval model is used to greatly improve the matching retrieval efficiency and matching accuracy between the job cloud and its similar clouds in each subsequent formal evaluation.
[0024] The deep learning similarity matching retrieval model is trained with a large number of historical rainfall enhancement operation cloud data sets. The construction process of the deep learning similarity matching retrieval model includes: P1. Obtain the historical cloud dataset of rain enhancement operations for training the deep learning similarity matching retrieval model, including: P11. Obtain radar 3D mosaic data (elements of which are radar echo values) and rainfall data of all historical rain enhancement cloud areas; P12, perform data time alignment preprocessing on radar 3D mosaic data and rainfall data; Data time alignment; first detect the missing radar 3D mosaic data and rainfall data respectively, and form a radar data missing list and a list of missing rainfall data , take the union of these two missing lists to get the overall missing list , and removed from both the original radar 3D mosaic data and the rainfall data The data at the corresponding moment is the data actually used later; P13. Data trimming for each historical rainfall enhancement operation cloud data, including: Due to the limited range of action of rocket operation catalysts, compared with the previous large-area method of analyzing the entire large cloud, this method considers grasping the local area of the operation to improve the accuracy of artificial rainmaking effect evaluation; further, considering the various possible movements of the cloud containing catalysts in the high altitude due to the influence of wind direction and wind speed, the operation point position is taken as the center of the circle, 10km as the radius, and the operation azimuth angle ±45º (the sides of the operation azimuth angle increase or decrease by 45º are the two sides) is used as the operation cloud system interval, the operation sector area of each historical operation cloud is determined, and the coordinates of the sector vertex and the outermost point of the arc are recorded; Since the unified coordinate system of the data is a rectangular coordinate system, different historical operation clouds have different orientations of the fan-shaped areas due to the different azimuths of rocket launches. For example, Guangdong Province carried out about a thousand rain-making operations between 2018 and 2022, and the operation sites were distributed in various meteorological stations in various cities. Assume that there are 500 operation sites, site 1 and site 2 correspond to different operation point locations (different longitudes and latitudes), and the operation azimuths of the rocket launches of the two are also different due to the operational requirements of the rainmaking operation; if site 1 has carried out multiple operations in the past five years, there are also inconsistencies in the operation azimuths at different times, which are not conducive to the analysis and comparison of subsequent data; and, in the process of rocket spreading catalysts, due to the effect of high-altitude winds, each operation cloud may also move at different speeds and directions. Considering the above two factors, the circumscribed rectangle of the operation sector area parallel to the coordinate axis is taken as the operation area; the specific method is: compare the coordinates of the operation point, the sector vertex and the outermost point of the arc horizontally and vertically, take the outermost coordinate values and arrange and combine them, so as to determine the coordinates of the four vertices of the circumscribed rectangle of the operation sector area after adjustment; obtain the circumscribed rectangle of the historical operation sector area parallel to the coordinate axis of the rectangular coordinate system.
[0025] As attached Figure 3 As shown in the figure, the rocket launch azimuth angle is 45 o When the azimuth angle of the rocket launch is 15 o When , two situations of the circumscribed rectangle B of the operating fan-shaped area of the operating cloud are obtained. Of course, when the rocket launch azimuth is of other different degrees, the circumscribed rectangle obtained is different.
[0026] After the circumscribed rectangle is determined, the data of each historical operating cloud is clipped according to the 2-3.5km altitude layer (based on a large amount of practical experience, the radar echo observation effect at this altitude layer is the best).
[0027] P14. Evaluate the rationality of the data of each historical operation cloud after trimming to obtain a list of reasonable operation clouds; According to the rationality evaluation principle of ground rocket operations: "there is a radar echo at the altitude layer of 2-3.5km in the operation cloud system interval, the echo value is between 5 and 45dBZ, and the total number of echo values that meet this condition is greater than or equal to 10", the rationality of the clipped historical operation cloud data is evaluated to obtain a reasonable historical operation cloud list; P15. Unify the size of the circumscribed rectangle of the fan-shaped area of all historical operation clouds in the reasonable historical operation cloud list. The size of this unified circumscribed rectangle is set as the training window size, and the training window size is stored in the system for subsequent evaluation. Record the single-layer operation area size (also called window size) of each reasonable historical operation cloud in the reasonable historical operation cloud list, and count the number of operation clouds with different window sizes. The weight is the ratio of the number of operation clouds with this window size to the total number of reasonable historical operation clouds. The weighted window size obtained by multiplying the window size by the integer is the unified bounding rectangle size. This unified bounding rectangle size is defined as the training window size, and the training window size is stored in the system for subsequent evaluation. The training window size is : ; in, is the total number of reasonable historical operation clouds, To be reasonable, the number of categories with different window sizes for historical job clouds is For the A reasonable number of historical job cloud categories, For the A reasonable size of the historical job cloud category window, For the A reasonable number of historical job cloud categories, For the A reasonable size of the historical job cloud category window, 1 to A positive integer, Indicates the rounding symbol.
[0028] Training window size After the determination, the bounding rectangle windows of different sizes of each historical operation cloud need to be unified. There are two cases: 1. For the bounding rectangle size larger than the training window size, the training window size is used to slide on the bounding rectangle of each historical operation cloud, and the window position with the largest intersection with the fan is selected; 2. For the bounding rectangle size smaller than the training window size, the original smaller one should be placed in the middle of the subsequent expansion window, and the expansion should be uniform in the left and right directions or in the top and bottom directions. For example, (16, 16) is smaller than (18, 16), so the previous coordinate direction is expanded by 1.
[0029] P16. The data obtained after the unified training window of all historical job clouds is used as the data set for training the deep learning similarity matching retrieval model.
[0030] Because the historical operational cloud dataset contains operational cloud rain-enhancing cloud layer characteristics under a variety of weather and climate conditions, these characteristics can provide the model with diverse learning materials, helping the model to learn more comprehensive rain-enhancing cloud layer characteristics; and by using rain-enhancing operational cloud data at different times, locations and weather conditions, the model can learn to identify and process different types of rain-enhancing cloud layer characteristics, thereby improving the generalization ability of the model and enabling it to better adapt to unseen rain-enhancing cloud layer data; at the same time, it can better understand the characteristics of rain-enhancing operational clouds, thereby providing more accurate results in subsequent prediction and classification tasks, improving the performance and accuracy of the model, and improving analysis efficiency.
[0031] P2. After transferring the Arcface algorithm adapted to the open set classification problem and training it with the data set, a deep learning similarity matching retrieval model is obtained. Specifically: Based on the characteristics that similar matching of operating clouds and non-operating clouds belongs to the open set classification problem, it is proposed to apply the Arcface algorithm adapted to the open set classification problem to the feature extraction of operating clouds and non-operating clouds through transfer learning. The use of algorithms in other fields to adapt to the problems in the field of artificial rainfall is helpful to achieve cross-domain, open up research ideas and obtain more accurate results. The Arcface algorithm uses the ResNet network as the benchmark model, as shown in the attached figure. Figure 4 As shown in the figure, Arcface loss is used as the loss function, and its formula is as follows: ; The difference in research data means that the initial conditions are different. The difference in initial conditions is likely to show a huge difference in results after the deep learning model goes around in circles. Therefore, the present invention adopts a gradual migration strategy to adapt the data; first, the number of channels in the input layer is changed to the number of layers of the cloud cluster, the pre-trained parameters are loaded, all parameters except the first layer are frozen, and the job cloud that passes the rationality test is used as the model input. Each historical job cloud is regarded as a class, and the input layer parameters of the training model are trained; Add random Gaussian noise to the job cloud samples that pass the rationality check ( =0.0065) for sample augmentation; load the model parameters saved in the above, use the job cloud data after sample augmentation to train the parameters of all layers of the model, and obtain the trained deep learning similarity matching retrieval model.
[0032] Then the second part will be carried out: the formal evaluation of the effectiveness of subsequent rocket rainmaking operations.
[0033] After completing the preliminary preparations for the first part of the rocket rain enhancement operation effect evaluation, the trained deep learning similarity matching retrieval model can be used to evaluate the effect of a rocket rain enhancement operation at any time, that is, a quantitative evaluation of the rainfall increase of a certain operation cloud.
[0034] As attached Figure 1 As shown, the present invention provides a method for evaluating the effect of rocket rainfall enhancement operation, which comprises: S1. Obtain the data of the operational cloud for which the rainfall increase amount is to be predicted and the effect of rocket rainfall enhancement operation is to be evaluated, and cut the data to obtain the rainfall enhancement evaluation interval of the operational cloud, including: S11, obtaining radar three-dimensional mosaic data (the elements of which are radar echo values) and rainfall data of the operating cloud area for which rainfall increase is to be predicted; S12. With the rocket operation point as the center, 10km as the radius, and the sides of the operation azimuth angle increased or decreased by 45°, cut out the operation sector area, as shown in the attached figure. Figure 2 As shown; S13, taking a circumscribed rectangle of the operation sector area parallel to the coordinate axes of the rectangular coordinate system; S14, adjusting the size of the circumscribed rectangle to the training window size W of the deep learning similarity matching retrieval model stored in the system; S15. According to the adjusted circumscribed rectangle and the 2-3.5 km altitude layer, the three-dimensional data area is cut out to obtain the operational cloud rainfall enhancement evaluation interval for predicting the rainfall increase.
[0035] S2. According to the operation screening conditions of the operation cloud rainfall enhancement evaluation interval, find the similar non-operation cloud sub-matrix of the operation cloud for which rainfall enhancement is to be predicted; including: S21, determining the operation screening conditions of the operation cloud precipitation enhancement evaluation interval; The operation screening conditions for the operational cloud precipitation evaluation interval include window size, altitude, time and terrain; among them, the window size is the training window size W, the altitude is 2-3.5km, the time is the current operation time and the similar period before and after the same period in history, and the terrain is similar terrain, for example, the coastal plain terrain in both eastern and western Guangdong.
[0036] Under the condition of the same window size, if no detailed screening is done (from the time dimension (data year, day, time), altitude dimension and similar terrain dimension), taking the five-year historical data of Guangdong Province as an example, it is estimated that there are about 21 billion non-operational cloud sub-matrices to be retrieved. Too many sub-matrices to be retrieved will consume a lot of time and computing resources, resulting in a slower retrieval speed, which greatly affects the retrieval efficiency and evaluation process. Therefore, the following preliminary screening of non-operational cloud data is considered: Time screening: Considering that the operating conditions vary in different seasons and months, the candidate non-operating cloud data sets are the current operating time (non-operating cloud systems at other locations at the same time on the operating day) and the similar periods before and after the same period in history; Altitude screening: On the one hand, the altitude in the rationality evaluation standard of the operational cloud is limited to 2-3.5km. Only by keeping the altitude consistent can we find similar clouds to the operational cloud to a greater extent; on the other hand, the altitude distribution of the 21-layer radar echo data is not uniform. The distance between each layer of the 2-3.5km altitude layer is 0.5km, while the distances of other altitude layers are 0.5km, 1km, and 2km. The situation of the cloud layer also varies with the distance interval; comprehensively considered, the altitude layer of the fixed non-operational cloud is consistent with the operational cloud, both of which are 2-3.5km, and the radar echo observation effect of this altitude layer is also the best; Terrain screening; the same cloud group will not usually have the same rainfall on different terrains. The influence of terrain on precipitation is multifaceted, including the following aspects: Rising motion: When moist air flows encounter high ground such as mountains, they are forced to rise. This rising motion causes the air to cool, and water vapor condenses into cloud droplets and raindrops, thereby increasing the probability of precipitation. Therefore, the rainfall is usually greater on the windward slopes of the mountains. Rain shadow effect: The leeward slopes of the mountains tend to have less rainfall because the rising air flow has released most of the moisture, forming the so-called "rain shadow area". Geometry and roughness of terrain: The geometry and roughness of terrain can affect the flow pattern of airflow, which in turn affects the development of clouds and the precipitation process. Local circulation: Specific terrain may cause local circulation, such as valley winds, sea and land breezes, etc. These local circulations can affect the distribution of precipitation. Therefore, even the same cloud group will have different rainfall when it moves over different terrains due to the influence of the above factors. For example, the same cloud group may only produce light rainfall in a flat area, but may cause heavy rainfall in a mountainous area. Similarly, the same cloud may bring a lot of rain on the windward slope, but almost no rain on the leeward slope. Therefore, screening for similar terrain is equally important.
[0037] S22, according to the determined operational screening conditions of the operational cloud precipitation enhancement evaluation interval, searching for a non-operational cloud sub-matrix with the same operational screening conditions in cloud systems at other locations and historical non-operational cloud systems at the same time on the operational day; S23, evaluating the rationality of the non-operation cloud sub-matrix and eliminating it to obtain a reasonable non-operation cloud sub-matrix; Then, according to the rationality evaluation principle of ground rocket operations - there is a radar echo at the 2-3.5km altitude layer within the operating cloud system range, the echo value is between 5 and 45dBZ, and the total number of echo values that meet this condition is >= 10, the rationality of the sample cloud data in the non-operating cloud sub-matrix is evaluated, and the non-operating cloud sub-matrix that meets the above rationality evaluation conditions is then eliminated according to the echo value elimination condition. If the elimination condition is met, the sub-matrix is eliminated, and finally a reasonable non-operating cloud sub-matrix is obtained.
[0038] The echo value rejection condition is: (1) The maximum echo value is less than 5 dBZ, and the minimum echo value is greater than 45 dBZ. This is to exclude sub-matrices with echo values that are too large or too small, and ensure that the radar echo value is within a reasonable range. Because the cloud clusters corresponding to excessively large echo values have a high water content, they may represent extreme weather conditions such as heavy rainfall or thunderstorms. Continuing the rain enhancement operation will be counterproductive. Excessively small echo values may represent noise or no precipitation, which is not suitable for operation. Therefore, by limiting the reasonable range of echo values, these abnormal conditions can be excluded and the accuracy of the data can be improved. (2) The sum of the submatrix echo values is less than the minimum value of the sum of the operating cloud submatrix echo values; set the lower limit of the submatrix echo value to ensure that the submatrix contains enough valid data; first sum the echo values of all operating cloud submatrices and take the minimum value as the screening threshold; if the sum of the echo values of the non-operating cloud submatrix to be selected is less than the screening threshold, it means that the echo condition of the submatrix is outside the echo condition set of all historical operating clouds and can be excluded from the consideration range; this can help exclude those submatrices with smaller sums of echo values to ensure that the submatrix contains enough valid data and improve the quality and availability of data; (3) The number of grid points with echo values in the reasonable interval [5, 45] is less than 30% of the total number of grid points; exclude those sub-matrices with uneven echo value distribution or concentrated near extreme values; by limiting the proportion of the number of grid points with echo values in the reasonable interval to the total number of grid points, it can ensure that the echo values in the sub-matrix are distributed more evenly, avoid the influence of extreme values on the overall data, and help improve the stability and reliability of the data; After the above comprehensive screening of time, altitude layer and sub-matrix radar echo value conditions, outliers can be effectively eliminated, data quality can be improved, and data reliability and stability can be ensured, so as to better perform data analysis and processing. The number of unscreened sub-matrices is more than 1,000 times the number of candidate non-operating cloud sub-matrices after the final screening, which is equivalent to a retrieval efficiency improvement of more than 1,000 times.
[0039] S24, screening the reasonable non-operational cloud sub-matrix by radar echo values to obtain a similar non-operational cloud sub-matrix; Calculate the difference between radar echo values of all non-operational cloud and operational cloud grid points in the reasonable non-operational cloud sub-matrix, take the absolute value and sum them up; Sort the summation results, take the absolute value of the difference and the first 10,000 samples with the smallest minimum as the similar non-job cloud sub-matrix.
[0040] S3. Through the trained deep learning similarity matching retrieval model, a similar cloud similarity ranking list of the job cloud is obtained in the similar non-job cloud sub-matrix, as shown in the attached figure. Figure 5 As shown, including: S31, extracting 512-dimensional feature vectors of the non-operation cloud to be matched in the operation cloud and similar non-operation cloud sub-matrices respectively through the trained deep learning similarity matching retrieval model; The trained model is used to extract the features of the job cloud and the non-job cloud to be matched. The final output of the model is the 512-dimensional feature vector of the job cloud and the non-job cloud to be matched. S32, calculating the Euclidean distance between the 512-dimensional feature vector of the operation cloud and the 512-dimensional feature vectors of all the non-operation clouds to be matched, and arranging the calculated Euclidean distance values from small to large to obtain a similarity ranking list of similar clouds of the operation cloud.
[0041] Calculate the Euclidean distance between the feature vector of the job cloud and the feature vector of the non-job cloud to be matched: ; in, is the feature vector of the job cloud, is the feature vector of the non-operation cloud to be matched, The first elements; the smaller the distance value, the higher the similarity between the job cloud and the non-job cloud to be matched; according to the Euclidean distance value, a similarity sorted list of similar clouds of the job cloud can be obtained.
[0042] S4. Track the trajectories of the first 100 cloud clusters in the similar cloud similarity ranking list, and construct a special natural rainfall model for the operational cloud to predict the rainfall increase; including: S41, based on the improved optical flow method, track the trajectories of the first 100 clouds in the similar cloud similarity ranking list, and the tracking time is one hour before and after; Improved optical flow method: The original optical flow method is mainly used for trend tracking of image motion. For cloud tracking, because the area where the operating cloud affects the rainfall is limited, the tracking of the original optical flow method may cause the operating area to diffuse and aggregate, making it impossible to accurately calculate the rainfall in the area affected by the cloud. To alleviate this problem, the tracking method of the original optical flow method is improved and adjusted to adopt single-pixel tracking, that is, each point of the operating cloud is tracked separately, and the method with the most pixels in a fixed area is selected as the result of tracking at a single moment, which helps to fix the cloud size and reduce the impact of clouds in other areas on rainfall.
[0043] Based on the improved optical flow method, the motion trajectories of the first 100 similar clouds in the similarity ranking list of the job cloud are tracked, and the tracking time is one hour before and after. S42. Based on the cloud cluster position information of the similar cloud obtained by tracking, radar echo data and rainfall data with a resolution of one hour and six minutes before and after the cloud cluster operation time are obtained.
[0044] S43. Establishing a special natural rainfall model for the operational cloud, including: As attached Figure 6-7 As shown in the figure, a short-term rainfall and radar echo prediction algorithm supporting small data set training is proposed, and a fused 3D-Unet algorithm model based on attention mechanism is proposed; the 3D-Unet algorithm based on attention mechanism is a Unet algorithm based on three-dimensional convolution, and an attention mechanism is added to it; rainfall and radar echo are respectively input into two independent 3D-Unet models based on attention mechanism, and finally a convolution layer is used to fuse the inputs of the two independent models to obtain the final output; The radar echo data and rainfall data of 11 times, including the hour before the similar cloud operation time and the operation time, are taken as input factors. The output result of the model is the grid rainfall prediction value one hour after the operation time. A special natural rainfall model for the operation cloud based on the fused 3D-Unet algorithm based on the attention mechanism is established.
[0045] S5. Track the trajectory of the operational cloud for which the rainfall increase is to be predicted, and use the constructed dedicated natural rainfall model to calculate the natural rainfall of the operational cloud under non-catalytic conditions.
[0046] Based on the improved optical flow method, the trajectory of the operation cloud one hour before the operation time plus the operation time is tracked. The radar echo data and rainfall data of 11 times in total, including one hour before the operation time of the operation cloud and the operation time, are used as input factors. The constructed special natural rainfall model is used. The output result of the model is the grid point natural rainfall prediction value one hour after the operation time. The natural rainfall of the operation cloud one hour after the operation time predicted by the special natural rainfall model is recorded as .
[0047] S6. Track the trajectory of the operational cloud whose rainfall is to be predicted, obtain the rainfall of the operational cloud under catalytic conditions, and evaluate the effectiveness of the rocket rainfall enhancement operation.
[0048] Based on the improved optical flow method, the movement trajectory of the operating cloud one hour after the operating time is tracked to obtain the rainfall of the operating cloud under catalytic conditions. The rainfall of the cloud one hour after the operating time is recorded as the rainfall after the operation. ; The artificial rainfall enhancement rate calculation formula can be used to quantitatively evaluate the rainfall enhancement effect of each operation and conduct rocket rainfall enhancement operation effect evaluation, including: Artificial rainfall Effect evaluation: ; Artificial rainfall rate Effect evaluation: ; in, is the rainfall amount of the working cloud one hour after the working time under catalytic conditions, It is the natural rainfall amount of the operating cloud one hour after the operating time under non-catalytic conditions.
[0049] Figure 8 The figure shows a comparison chart of the prediction results of the natural rainfall model in the present invention. There are four columns from left to right, and each figure corresponds to the first moment after the operation time to the tenth moment from top to bottom and from left to right. The first and third columns correspond to the true values, and the second and fourth columns correspond to the predicted value results of the model. At the same time, the grid average rainfall value corresponding to a certain moment has been marked. From the four columns, the rainfall distribution of the model prediction results is close to the true value, and the model result captures the rainfall position in the lower right corner. From the numerical point of view, the numerical difference between the predicted value and the true value at most times does not exceed 0.01mm; at the same time, the true value result as a whole shows a trend of gradually decreasing rainfall but with small fluctuations in the middle, which is also the change form in the model prediction results. It shows that the natural rainfall model of the fused 3D-Unet structure based on the attention mechanism can not only grasp the rainfall distribution, but also better approach the numerical size and change trend of the true value.
[0050] The rainfall results predicted by the fused 3D-Unet-based attention mechanism-based natural rainfall model are used as the natural rainfall of the operating cloud under non-catalytic conditions, and are used together with the rainfall results obtained by tracking the operating cloud through the optical flow method to evaluate the artificial rainfall effect of the operating cloud to predict the rainfall increase.
[0051] In general, the natural rainfall model of the fused 3D-Unet structure based on the attention mechanism has a high degree of grasp of the distribution trend and numerical situation of rainfall. The results of using this model can better represent the natural rainfall situation of the operating cloud.
[0052] The quantitative artificial rainmaking effect evaluation method based on the deep learning model provided by the present invention is suitable for quantitative rainmaking effect evaluation of artificial rainmaking operations. By using deep learning feature extraction and similar matching retrieval algorithms to find historical non-operation clouds with weather conditions similar to those of artificial rainmaking operations, it is possible to avoid the problem of difficulty in quantitatively evaluating the artificial rainmaking effect due to subjective selection of the operation area and the comparison area of the artificial rainmaking operation or the instability of the two areas; and by introducing an improved optical flow method to dynamically track cloud cluster trajectories and establish a fused 3D-Unet-based natural rainfall model based on the attention mechanism, a more accurate artificial rainmaking rate can be obtained.
[0053] Optionally, in this embodiment, a person of ordinary skill in the art may understand that all or part of the steps in the various methods of the above embodiments may be completed by instructing hardware related to the terminal device through a program, and the program may be stored in a computer-readable storage medium, and the storage medium may include: a flash drive, a read-only memory (ROM), a random access memory (RAM), a magnetic disk or an optical disk, etc.
[0054] If the integrated units in the above embodiments are implemented in the form of software functional units and sold or used as independent products, they can be stored in the above computer-readable storage medium. Based on this understanding, the technical solution of the present invention, or the part that contributes to the prior art, or all or part of the technical solution can be embodied in the form of a software product, which is stored in a storage medium and includes several instructions for enabling one or more computer devices (which can be personal computers, servers or network devices, etc.) to execute all or part of the steps of the methods of various embodiments of the present invention.
[0055] In the several embodiments provided in the present application, it should be understood that the disclosed client can be implemented in other ways. Among them, the device embodiments described above are only schematic, for example, the division of units is only a logical function division, and there may be other division methods in actual implementation, for example, multiple units or components can be combined or integrated into another system, or some features can be ignored or not executed. Another point is that the mutual coupling or direct coupling or communication connection shown or discussed can be through some interfaces, and the indirect coupling or communication connection of units or units can be electrical or other forms.
[0056] The units described as separate components may or may not be physically separated, and the components shown as units may or may not be physical units, that is, they may be located in one place or distributed on multiple network units. Some or all of the units may be selected according to actual needs to achieve the purpose of the solution of this embodiment.
[0057] In addition, each functional unit in each embodiment of the present invention may be integrated into one processing unit, or each unit may exist physically separately, or two or more units may be integrated into one unit. The above-mentioned integrated unit may be implemented in the form of hardware or in the form of software functional units.
[0058] Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that various changes, modifications, substitutions and variations may be made to the embodiments without departing from the principles and spirit of the present invention, and that the scope of the present invention is defined by the appended claims and their equivalents.
[0059] The present invention and its embodiments are described above, and such description is not restrictive. The drawings show only one embodiment of the present invention, and the actual structure is not limited thereto. In short, if ordinary technicians in the field are inspired by it, without departing from the purpose of the invention, they can design a structure and embodiment similar to the technical solution without creativity, which should belong to the protection scope of the present invention.
Claims
1. A method for evaluating the effect of rocket rain enhancement operations, characterized in that: It includes: S1. Obtain and crop the operational cloud data for which rainfall enhancement is to be predicted to obtain the operational cloud rainfall enhancement evaluation interval; S2. Based on the operation screening conditions of the operation cloud precipitation enhancement evaluation interval, find the similar non-operation cloud submatrix of the operation cloud for which precipitation enhancement is to be predicted; S3. Applying a pre-built general similarity matching retrieval model, a similarity-ranked list of similar clouds of operational clouds for which rainfall increase is to be predicted is obtained in the similar non-operational cloud sub-matrix; S4, tracking the trajectories of the second most calibrated number of cloud clusters in the similarity ranking list of similar clouds, and constructing a dedicated natural rainfall model for the operational cloud for which rainfall enhancement is to be predicted; S5. Track the trajectory of the operational cloud for which the rainfall increase is to be predicted, and calculate the natural rainfall of the operational cloud under non-catalytic conditions using the constructed dedicated natural rainfall model.
2. The rocket rain enhancement operation effect evaluation method according to claim 1, characterized in that: The method further comprises: S6. Track the trajectory of the cloud whose rainfall is to be predicted, obtain the rainfall of the cloud under catalytic conditions, and evaluate the effectiveness of the rocket rainfall enhancement operation.
3. The rocket rain enhancement operation effect evaluation method according to claim 1, characterized in that: The step S1, obtaining and clipping the operational cloud data for which rainfall enhancement is to be predicted to obtain the operational cloud rainfall enhancement evaluation interval, includes: S11. Obtain radar 3D mosaic data and rainfall data of the cloud area for rain enhancement operations; S12, using the rocket operation point as the center, the calibration distance as the radius, and the calibration angle of the operation azimuth as the two sides, cutting out the operation sector area; S13, taking a circumscribed rectangle of the operation sector area parallel to the coordinate axes of the rectangular coordinate system; S14, adjusting the size of the circumscribed rectangle to the training window size of the general similarity matching retrieval model stored in the system; S15. Cut out the three-dimensional data area according to the resized bounding rectangle and the calibrated height layer to obtain the operational cloud precipitation enhancement evaluation interval.
4. The rocket rain enhancement operation effect evaluation method according to claim 3, characterized in that: The training window size is : ; in, is the total number of reasonable historical operation clouds, To be reasonable, the number of categories with different window sizes for historical job clouds is For the A reasonable number of historical job cloud categories, For the A reasonable size of the historical job cloud category window, For the A reasonable number of historical job cloud categories, For the A reasonable size of the historical job cloud category window, 1 to A positive integer, Indicates the rounding symbol.
5. The rocket rain enhancement operation effect evaluation method according to claim 1, characterized in that: The step S2, searching for a similar non-operational cloud submatrix of the operation cloud for which rainfall enhancement is to be predicted based on the operation screening conditions of the operation cloud rainfall enhancement evaluation interval, includes: S21. Determine the operation screening conditions for the operation cloud precipitation enhancement evaluation interval; S22. Based on the determined operational screening conditions of the operational cloud precipitation enhancement evaluation interval, search for a non-operational cloud sub-matrix with the same operational screening conditions in cloud systems at other locations and historical non-operational cloud systems at the same time on the operational day; S23, evaluating the rationality of the non-operation cloud sub-matrix and eliminating it to obtain a reasonable non-operation cloud sub-matrix; S24. Filter the reasonable non-operational cloud sub-matrix by radar echo values to obtain a similar non-operational cloud sub-matrix.
6. The rocket rain enhancement operation effect evaluation method according to claim 5, characterized in that: The screening process in S24 includes: Calculate the difference between the radar echo values of all non-operational clouds in the similar non-operational cloud sub-matrix and the operational cloud grid points for rainfall increase prediction, take the absolute value and sum them; Sort the summation results, take the absolute value of the difference and the smallest first calibration number samples as the similar non-operation cloud sub-matrix.
7. The rocket rain enhancement operation effect evaluation method according to claim 1, characterized in that: S3, applying a pre-built universal similarity matching retrieval model, obtains a similarity-ranked list of similar clouds of operational clouds for which rainfall increase is to be predicted in the similar non-operational cloud sub-matrix, including: S31, applying a pre-built general similarity matching retrieval model for the operating cloud and its similar clouds, respectively extracting feature vectors of the operating cloud for which rainfall increase is to be predicted and the non-operating cloud to be matched in the sub-matrix of similar non-operating clouds; S32. Calculate the Euclidean distance between the feature vector of the operational cloud for which rainfall increase is to be predicted and the feature vectors of all non-operational clouds to be matched, and arrange the calculated Euclidean distance values in ascending order to obtain a similarity-ranked list of similar clouds of the operational cloud for which rainfall increase is to be predicted.
8. The rocket rain enhancement operation effect evaluation method according to claim 7, characterized in that: The construction process of the universal similarity matching retrieval model includes: The number of input layer channels of the ResNet network, a benchmark model of the Arcface algorithm adapted to open set classification problems, is set to the number of height layers in the historical cloud and rain enhancement evaluation interval, and the pre-trained parameters are loaded. Freeze all parameters except the first layer, use multiple historical rainfall enhancement cloud data as model input, treat each historical rainfall enhancement cloud as a class, and train the model's input layer parameters; Random Gaussian noise is added to multiple historical rain enhancement operation cloud samples for sample augmentation. The saved model parameters are loaded and the parameters of all layers of the model are trained using the sample augmented operation cloud data to obtain the trained general similarity matching retrieval model.
9. The rocket rain enhancement operation effect evaluation method according to claim 1, characterized in that: The step S4, tracking the trajectories of the second most calibrated number of cloud clusters in the similarity ranking list of similar clouds, and constructing a dedicated natural rainfall model for the operational cloud for which rainfall enhancement is to be predicted, comprises: S41, tracking the trajectory of the second most calibrated cloud in the similarity ranking list based on the improved optical flow method, with the tracking time being the same as the time before and after calibration; S42. Obtain radar echo data and rainfall data of the calibration duration before and after the cloud cluster operation time based on the cloud cluster position information obtained by tracking the similar cloud cluster; S43. Construct a dedicated natural rainfall model for the operational cloud whose rainfall enhancement amount is to be predicted.
10. The rocket rain enhancement operation effect evaluation method according to claim 9, characterized in that: The dedicated natural rainfall model of Job Cloud is a fused 3D-Unet algorithm model based on the attention mechanism.
Citation Information
Patent Citations
Artificial influence weather operation effect evaluation method
CN111626595A
Method for evaluating artificial precipitation enhancement effect
CN114116840A
Method and device for checking cloud seeding operation effect based on UNET-GRU deep learning
CN116610959A
Artificial precipitation enhancement operation effect evaluation method based on regional intuitive comparison
CN116739439A
Multi-dimension-based rainstorm flood similar process judgment method
CN117520852A
Cited By
Distributed artificial influence weather operation cooperation instruction issuing system based on Internet of Things
CN120602522A
Method and system for estimating influence area of artificial precipitation enhancement of rocket
CN121997025A
