Interconnected regional power grid shared energy storage planning method based on uncertainty representation and SMPC

Through Gaussian hybrid model and stochastic optimization technology, a photovoltaic output scenario is generated and a real-time operation model is built, which solves the problem of uncertainty in photovoltaic output and the impact of real-time control, realizes cost reduction and accuracy of planning results, and improves energy storage configuration economy and efficiency.

CN119047867APending Publication Date: 2024-11-29CHUXIONG POWER SUPPLY BUREAU OF YUNNAN POWER GRID CO LTD
View PDF 0 Cites 2 Cited by

Patent Information

Application Number
CN202411065772.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-05
Publication Date
2024-11-29

AI Technical Summary

Technical Problem

The existing technology is difficult to accurately characterize the uncertainty of photovoltaic output and the failure to consider the impact of real-time control on energy storage planning, resulting in high energy storage allocation costs, economical declines and optimization results deviate from actual operating results.

Method used

The Gaussian hybrid model is used to fit the photovoltaic output curve, and the scene of photovoltaic output is generated using Latin hypercube sampling and Kantorovich distance. The expected model of shared energy storage planning is proposed based on stochastic optimization, and a shared energy storage real-time operation model based on stochastic model prediction control is constructed. .

Benefits of technology

Accurately describe the output of photovoltaics, reduce the photovoltaic grid rate and shared energy storage planning costs, track the planning results in real time, make full use of the advantages of the interconnected regional power grid, and reduce the cost of the interconnected regional power grid by 42.1679% and photovoltaics compared with the interconnected regional power grid without energy storage. The Internet access rate was reduced by 5.91%.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119047867A_ABST
    Figure CN119047867A_ABST
Patent Text Reader

Abstract

The invention relates to an interconnected regional power grid shared energy storage planning method based on uncertainty representation and SMPC, and belongs to the technical field of power distribution network energy storage. The method comprises the following steps: fitting a photovoltaic output curve by using a Gaussian mixture model; a scene of photovoltaic output is generated by using Latin hypercube sampling and a Kantorovich distance; proposing an expectation model of shared energy storage planning based on stochastic optimization; and constructing a shared energy storage real-time operation model based on random model predictive control. According to the method, photovoltaic output can be accurately described, the photovoltaic networking rate and the shared energy storage planning cost are reduced, the planning result is tracked in real time, and the advantages of an interconnected regional power grid are fully utilized. Compared with an interconnected regional power grid without energy storage, the cost and the photovoltaic networking rate are reduced by 42.1679% and 5.91%. On the basis, a solution thought is provided for deployment of shared energy storage.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present invention belongs to the technical field of distribution network energy storage, and in particular relates to a method for planning shared energy storage for interconnected regional power grids based on uncertainty characterization and SMPC. Background Art

[0002] As the cost of photovoltaic power generation continues to decrease, its large-scale access to regional power grids is a future development trend. However, photovoltaic output is difficult to accurately predict and has strong uncertainty and volatility, which poses a huge challenge to the optimal operation of regional power grids. Although energy storage can supplement the uncertainty of photovoltaic output in time and space, thereby alleviating the impact of photovoltaic output uncertainty on regional power grids. However, the configuration of energy storage has the problems of high initial investment cost and long payback period, which is not conducive to the use of energy storage in regional power grids to reduce the impact of uncertainty. Therefore, the study of shared energy storage planning considering photovoltaic uncertainty has become a key issue that needs to be solved urgently.

[0003] At present, there are two main methods for dealing with uncertainty: robust optimization and stochastic optimization. Although robust optimization can provide a flexible solution to uncertainty, it is conservative, resulting in reduced economic efficiency. At the same time, the robust optimization problem is a semi-infinite optimization problem and is difficult to solve directly. However, stochastic optimization is heavily dependent on probability distribution. The pre-assumption that photovoltaic output conforms to a certain distribution cannot accurately reflect photovoltaic output, resulting in the optimization results deviating from the actual operation results.

[0004] There are some existing methods on shared energy storage planning. However, these methods have the following shortcomings: (1) they fail to accurately describe the uncertainty of renewable energy output. (2) they fail to consider the impact of real-time control on energy storage planning.

[0005] Therefore, how to overcome the shortcomings of existing technologies is an urgent problem to be solved in the field of distribution network energy storage technology. Summary of the invention

[0006] The purpose of the present invention is to solve the deficiencies of the prior art and to provide a method for planning shared energy storage in interconnected regional power grids based on uncertainty characterization and SM PC.

[0007] To achieve the above purpose, the technical solution adopted by the present invention is as follows:

[0008] The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC includes the following steps:

[0009] Step (1), using a Gaussian mixture model to fit the photovoltaic output curve;

[0010] Step (2), using Latin hypercube sampling and Kantorovich distance to generate photovoltaic output scenarios;

[0011] Step (3), propose an expected model for shared energy storage planning based on stochastic optimization;

[0012] Step (4), construct a real-time operation model of shared energy storage based on stochastic model predictive control.

[0013] Further, the specific method of step (1) is:

[0014] (1.1) GMM describes the probability density function of any PV output by weighted summation of multiple normal distributions. The probability density function P(x) of GMM is expressed by formula (1);

[0015]

[0016] In the formula, α k , are the weight factor and probability density function of the kth normal distribution respectively; x, μ k , are the mean and variance of the random variable and the kth normal distribution respectively; σ k is the standard deviation of the kth normal distribution; K is the number of photovoltaic devices;

[0017] (1.2) The objective function L estimated by maximum likelihood based on historical photovoltaic output data is:

[0018]

[0019] Where: J is the total number of photovoltaic devices, x j is the data of the jth photovoltaic device;

[0020] The maximum expectation algorithm is used to solve the objective function of maximum likelihood estimation.

[0021] Furthermore, in step (1.2), the specific steps of the maximum expectation algorithm are as follows:

[0022] (1.2.1) Use K-means clustering method to cluster photovoltaic data, use elbow method to determine the optimal number of clusters and calculate the mean and variance of samples corresponding to each component as initial values, and initialize

[0023] (1.2.2) According to the current μ k , Calculate the posterior probability P r (k,x j ):

[0024]

[0025] Where: are the mean and variance of the normal distribution of the previous iteration respectively;

[0026] (1.2.3) According to step (1.2.2) P r (k,x j ) Recalculate μ k , α k ;

[0027]

[0028] (4) Calculate the maximum likelihood objective function value of formula (2) and determine whether the maximum likelihood objective function value converges; if converged, output the current μ k , α k ; If it does not converge, return to step (1.2.2).

[0029] Further, the specific method of step (2) is:

[0030] (2.1) Use GMM to fit the photovoltaic output curve and obtain its probability density function and cumulative probability density distribution function F(x);

[0031] (2.2) Divide the curve of F(x) into H intervals and use the formula Take out the cumulative probability of each interval; where i∈H;

[0032] (2.3) i N Substitute the inverse function of F(x) to obtain the corresponding sampling value x of photovoltaic output;

[0033] (2.4) Repeat the above steps N times to obtain N sampling values ​​of photovoltaic output;

[0034] (2.5) Randomly sort the obtained results to obtain N scenarios of photovoltaic output;

[0035] (2.6) Using Kantorovich distance to perform scenario reduction, we can obtain the photovoltaic output value and corresponding probability value after scenario reduction.

[0036] Further, the specific method of step (2.6) is:

[0037] (2.6.1) Assuming that the number of scenes after reduction is n, initialize the probability value of the optimized scene and the number of cut scenes n * =N;

[0038] (2.6.2) The Kantorovich distance between scenes (Ω, Ω') is calculated using the Kantorovich distance formula: Among them, s, s' are the number of photovoltaic output scenarios, p s is the corresponding probability value, are the photovoltaic outputs of scenarios s and s', respectively, and T is the total optimization time;

[0039] (2.6.3) Select the scene s' with the smallest distance to the scene s; and calculate the product of the Kantorovich distance and the scene probability, which can be recorded as PD K (s,s')=D K (s,s')·p s :

[0040] (2.6.4) Continue to iterate step (2.6.3) and select PD k (s i ,s j ) Minimum scene and cut until the number of scenes after cutting is n * =n.

[0041] Further, the specific method of step (3) is:

[0042] The expected model of shared energy storage planning in a deterministic environment with the goal of minimizing total cost and meeting shared energy storage constraints and power balance constraints;

[0043] The total cost C includes the cost of trading with the grid and the planning cost of shared energy storage, which can be expressed as:

[0044]

[0045] Where: T, Δt are the optimization time and time interval respectively; c b (t) is the price of purchasing power from the grid at time t; c s 、c dem They are time-of-use electricity price, on-grid electricity price and demand electricity price; P b (t), P s (t) represent the power purchased from the grid and the power connected to the grid at time t; c om 、c e 、c p , r, y are energy storage operation and maintenance cost coefficient, capacity investment cost coefficient, power investment cost coefficient, discount rate and service life respectively; P c (t), P d (t) represent the charging power and discharging power of the energy storage at time t respectively; E battery , P battery are the maximum capacity and power of energy storage planning respectively.

[0046] Furthermore, the shared energy storage constraints are as follows:

[0047]

[0048] Where: They are the upper and lower limits of the shared energy storage charging power respectively; They represent the upper and lower limits of the shared energy storage discharge power respectively; ε is the rate coefficient; η c , η d are the shared energy storage charging efficiency and discharging efficiency respectively; SOE(t) is the energy state of the energy storage at time t;

[0049] The power balance constraints are as follows:

[0050]

[0051] Where: P i,ex (t), P i,load (t), P i,pv (t) represent the exchange power, load demand and photovoltaic output of the i-th user at time t respectively; N is the number of photovoltaic equipment.

[0052] Further, the specific method of step (4) is:

[0053] The SMPC intraday operation optimization model with a prediction time domain of H is established as a real-time operation model of shared energy storage based on stochastic model predictive control. The objective function C of this model is 1 The expression is:

[0054]

[0055] Where: P b,lo , P s,lo , P c,lo , P d,lo They are respectively the purchased power, grid-connected power, charging power and discharging power of the shared energy storage at time h during the day.

[0056] Step (5) solves the expected model of shared energy storage planning based on stochastic optimization and the real-time operation model of shared energy storage based on stochastic model predictive control to obtain the maximum capacity and power of the energy storage planning, and plans according to the results.

[0057] In actual operation, there is a prediction error between the actual value of photovoltaic and the predicted value. Therefore, in order to deal with the prediction error of intraday operation, the present invention continues to introduce GMM to characterize the operation curve of photovoltaic output during the intraday operation stage, and introduces stochastic model predictive control (SMPC) to deal with the uncertainty of photovoltaic. Stochastic model predictive control combines random real-time operation and feedback correction, and can track and correct the day-ahead planning results of shared energy storage in real time. Based on this, an intraday operation optimization model based on SMPC with a prediction time domain of H is established.

[0058] Compared with the prior art, the present invention has the following beneficial effects:

[0059] The present invention discloses a method for planning shared energy storage for interconnected regional power grids based on uncertainty characterization and SMPC, comprising the following steps: fitting a photovoltaic output curve using a Gaussian mixture model; generating a photovoltaic output scenario using Latin hypercube sampling and Kantorovich distance; proposing an expected model for shared energy storage planning based on random optimization; and constructing a shared energy storage real-time operation model based on random model predictive control. The method of the present invention can accurately characterize photovoltaic output, reduce photovoltaic access rate and shared energy storage planning costs, track planning results in real time, and make full use of the advantages of interconnected regional power grids. Compared with interconnected regional power grids without energy storage, the cost and photovoltaic access rate are reduced by 42.1679% and 5.91%. At the same time, a method for random model predictive control is provided to deal with intraday prediction errors. The random model predictive control can track intraday planning results in real time. On this basis, the intraday results are corrected in real time according to the prediction error, and the operating cost is significantly reduced compared with the model predictive control. On this basis, a solution is provided for the deployment of shared energy storage. BRIEF DESCRIPTION OF THE DRAWINGS

[0060] Figure 1 It is a flow chart of the interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC of the present invention;

[0061] Figure 2 It is a schematic diagram of the interconnected regional power grid structure in an application example of the present invention;

[0062] Figure 3 It is a schematic diagram of a 30-day photovoltaic output curve in an application example of the present invention;

[0063] Figure 4 is a schematic diagram of a load demand curve in an application example of the present invention;

[0064] Figure 5 Schematic diagram of probability density fitting curves of various distribution models in the application examples of the present invention;

[0065] Figure 6 It is a schematic diagram of regional power grid output power in an application example of the present invention;

[0066] Figure 7 It is a schematic diagram of power exchange based on a regional power grid in an application example of the present invention;

[0067] Figure 8 This is a schematic diagram of the SMPC structure. DETAILED DESCRIPTION

[0068] The present invention is further described in detail below in conjunction with embodiments.

[0069] Those skilled in the art will appreciate that the following examples are only used to illustrate the present invention and should not be considered to limit the scope of the present invention. If no specific techniques or conditions are specified in the examples, the techniques or conditions described in the literature in the art or the product specifications are used. If the manufacturer of the materials or equipment used is not specified, they are all conventional products that can be purchased.

[0070] like Figure 1 As shown, the interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC includes the following steps:

[0071] Use Gaussian mixture model to fit photovoltaic output curve;

[0072] Generating photovoltaic output scenarios using Latin hypercube sampling and Kantorovich distance;

[0073] An expectation model for shared energy storage planning is proposed based on stochastic optimization;

[0074] Construct a real-time operation model of shared energy storage based on stochastic model predictive control;

[0075] As a possible implementation of this embodiment, the process of fitting the photovoltaic output curve using the Gaussian mixture model is as follows:

[0076] The output curve of photovoltaic power generation in different periods of the day is not monotonous, and its probability density curve is asymmetric and multi-peaked. However, a single normal distribution or Beta distribution cannot accurately describe the characteristics of the multi-peak distribution of photovoltaic power generation.

[0077] GMM describes the probability density function of any photovoltaic output by weighted summing of multiple normal distributions, which can fit the photovoltaic output well. The probability density function P(x) of GMM can be expressed by formula (1).

[0078]

[0079] Where: (1a) represents the Gaussian mixture model fitted by multiple normal distributions, α k , are the weight factor and probability density function of the kth normal distribution respectively. x, μ k , are the mean and variance of the random variable and the kth normal distribution respectively. (1b) is the specific probability density function of the kth normal distribution, σ k is the standard deviation of the kth normal distribution. (1c) and (1d) are the restrictions on the weight factors of each normal distribution. K is the number of photovoltaic devices

[0080] In order to solve the values ​​of each parameter in the GMM model, we first formulated the objective function L based on the maximum likelihood estimation of the historical data of photovoltaic output:

[0081]

[0082] Where: J is the total number of photovoltaic devices, x j is the data of the jth photovoltaic device.

[0083] Then, in order to solve the objective function of the proposed maximum likelihood estimation, the maximum expectation (EM) algorithm with easy convergence and fast convergence speed is introduced. The algorithm flow of the specific iterative steps of the EM algorithm is as follows:

[0084] (1.2.1) Use K-means clustering method to cluster photovoltaic data, use elbow method to determine the optimal number of clusters and calculate the mean and variance of samples corresponding to each component as initial values, and initialize

[0085] (1.2.2) According to the current μ k , σ k 2 Calculate the posterior probability P r (k,x j ):

[0086]

[0087] Where: are the mean and variance of the normal distribution of the previous iteration, respectively.

[0088] (1.2.3) According to step (1.2.2) P r (k,x j ) Recalculate μ k , α k ;

[0089]

[0090] (4) Calculate the maximum likelihood objective function value of formula (2) and determine whether the maximum likelihood objective function value converges; if converged, output the current μ k , α k ; If it does not converge, return to step (1.2.2).

[0091] As a possible implementation of this embodiment, the process of constructing a scenario of generating photovoltaic output using Latin hypercube sampling and Kantorovich distance is as follows:

[0092] After GMM is used to model the uncertainty of photovoltaic output, the GMM probability density function and cumulative probability density function are used to optimize the scenario. Compared with Monte Carlo sampling, Latin hypercube sampling performs stratified sampling on sample data, which has good sampling accuracy and efficiency and will not cause obvious sample aggregation. Its main steps include the following:

[0093] (2.1) Use GMM to fit the photovoltaic output curve and obtain its probability density function and cumulative probability density distribution function F(x);

[0094] (2.2) Divide the curve of F(x) into H intervals and use the formula Take out the cumulative probability of each interval; where i∈H;

[0095] (2.3) i N Substitute the inverse function of F(x) to obtain the corresponding sampling value x of photovoltaic output;

[0096] (2.4) Repeat the above steps N times to obtain N sampling values ​​of photovoltaic output;

[0097] (2.5) Randomly sort the obtained results to obtain N scenarios of photovoltaic output;

[0098] (2.6) Using Kantorovich distance to perform scenario reduction, we can obtain the photovoltaic output value and corresponding probability value after scenario reduction.

[0099] The method of scene optimization is used to deal with uncertainty. In order to ensure the accuracy of the optimized scene, a large number of scenes need to be generated using Latin hypercube sampling, but the number of scenes seriously affects the speed and accuracy of optimization. Therefore, in order to ensure the accuracy of optimization and the efficiency of solution, it is necessary to reduce the number of generated scenes and select representative scenes for optimization and solution. The present invention selects to use Kantorovich distance for scene reduction, and its specific steps are:

[0100] (1) Assuming that the number of scenes after reduction is n, initialize the probability value of the optimized scene and the number of cut scenes n * =N;

[0101] (2) Use the Kantorovich distance formula to calculate the Kantorovich distance between scenes (Ω, Ω'): Among them, s, s' are the number of photovoltaic output scenarios, p s is the corresponding probability value, are the photovoltaic outputs of scenarios s and s', respectively, T is the total optimization time; Ω and Ω' are two scenario sets;

[0102] (3) Select the scene s' that has the smallest distance to the scene s. And calculate the product of the Kantorovich distance and the scene probability, which can be recorded as PD K (s,s')=D K (s,s')·p s :

[0103] (4) Continue to iterate step (2.6.3) and select PD k (s i ,s j ) Minimum scene and cut until the number of scenes after cutting is n * =n.

[0104] As a possible implementation of this embodiment, the process of proposing an expected model for shared energy storage planning based on stochastic optimization is as follows:

[0105] The expected model of shared energy storage planning in a deterministic environment with the goal of minimizing total cost and meeting shared energy storage constraints and power balance constraints is the day-ahead operation optimization model.

[0106] The total cost C includes the cost of trading with the grid and the planning cost of shared energy storage, which can be expressed as:

[0107]

[0108] Where: T, Δt are the optimization time and time interval respectively; c is the price of purchasing power from the grid at time t, s 、c dem They are time-of-use electricity price, on-grid electricity price and demand electricity price; P b (t), P s (t) represent the power purchased from the grid and the power connected to the grid at time t; c om 、c e 、c p , r, y are energy storage operation and maintenance cost coefficient, capacity investment cost coefficient, power investment cost coefficient, discount rate and service life respectively; P c (t), P d (t) represent the charging power and discharging power of the energy storage at time t respectively; E battery , P battery are the maximum capacity and power of energy storage planning respectively.

[0109] In order to ensure the safe operation of the regional power grid, some inherent constraints must be met, including shared energy storage constraints and power balance constraints, whose specific expressions are:

[0110] 1) Shared energy storage constraints

[0111]

[0112] Where: They are the upper and lower limits of the shared energy storage charging power respectively; They represent the upper and lower limits of the shared energy storage discharge power respectively; ε is the rate coefficient; η c , η d are the shared energy storage charging efficiency and discharging efficiency respectively; SOE(t) is the energy state of the energy storage at time t;

[0113] 2) Power balance constraints

[0114]

[0115] Where: Formulas (7a) and (7b) represent the power balance between the regional power grid and the user, respectively. i,ex (t), P i,load (t), P i,pv (t) represent the exchange power, load demand, and photovoltaic output of the i-th user at time t, respectively. N is the number of photovoltaic devices.

[0116] As a possible implementation of this embodiment, the process of constructing a shared energy storage real-time operation model based on stochastic model predictive control is as follows:

[0117] During actual operation, there is a prediction error between the actual value of photovoltaic power and the predicted value. Therefore, in order to deal with the prediction error of intraday operation, the present invention continues to introduce GMM to characterize the operation curve of photovoltaic power output during the intraday real-time operation stage (the intraday stage is the real-time operation stage, which is tracked and corrected according to the result of formula (5)), and introduces stochastic model predictive control (SMPC) to deal with the uncertainty of photovoltaic power. Stochastic model predictive control combines random real-time operation and feedback correction, and can track and correct the day-ahead planning results of shared energy storage in real time. In summary, the structure of the SMPC intraday operation optimization model with a prediction time domain of H is established as follows: Figure 8 As shown, the expression of the objective function is:

[0118]

[0119] Where: P b,lo , P s,lo , P c,lo , P d,lo They are respectively the purchased power, grid-connected power, charging power and discharging power of the shared energy storage at time h during the day.

[0120] The present invention iteratively solves the day-ahead operation optimization model and the intraday operation optimization model to obtain the maximum capacity and power of energy storage planning, and performs planning according to the results.

[0121] Application Examples

[0122] The present invention is specifically described below with an example. Figure 2 The schematic diagram of the interconnected regional power grid structure includes 1 shared energy storage and 3 microgrids. The microgrid consists of photovoltaic and load. The photovoltaic output curve and load demand are shown in Figure 2. Figure 3 Figure 4 The parameters of shared energy storage are shown in Table 1. The off-peak electricity price is 0.38 yuan / kWh (23:00-07:00), the peak electricity price is 1.14 yuan / kWh (08:00-11:00, 14:00-18:00), and the normal electricity price is 0.8200 yuan / kWh (12:00-14:00, 19:00-23:00).

[0123] Table 1 Shared energy storage coefficient

[0124] Shared energy storage <h2 style=";text-align:left;direction:ltr"><![CDATA[c <h2 style=";text-align:left;direction:ltr"> e <h2 style=";text-align:left;direction:ltr"> (kWh)<h2 style=";text-align:left;direction:ltr"> <![CDATA[c p (Yuan / kW)]]> <![CDATA[c om (Yuan / kW)]]> parameter 1000 3500 0.05

[0125] The present invention chooses to use GMM to perform uncertainty modeling on the photovoltaic output curve of a certain interconnected regional power grid. In order to demonstrate the accuracy and effectiveness of GMM in describing the photovoltaic output curve relative to other distributions, the present invention uses t distribution, normal distribution, logistic distribution and GMM distribution. Figure 5 The fitting effects of the five distributions on the photovoltaic output curve of the first regional power grid at a certain time of the day are shown. At the same time, in order to verify the accuracy of GMM fitting, three indicators, root mean square error (RMSE), mean absolute error (MAE), and cosine angle transformation (Icos), are used to measure the fitting effect of the distribution model as shown in Table 2. The smaller the values ​​of the three indicators, the better the fitting effect.

[0126] Table 2 Fitting evaluation indexes of each distribution model

[0127] Distribution Type RMSE MAE Icos t distribution 1.6612 1.3984 0.2047 normal distribution 1.6744 1.4113 0.2049 Logistic Distribution 1.4789 1.2297 0.1938 GMM Distribution 1.3643 1.0972 0.1637

[0128] from Figure 5 It can be seen that t distribution, normal distribution and logistic distribution cannot fit the photovoltaic output curve well, especially the asymmetric characteristics of the probability density curve of photovoltaic output. GMM uses multiple Gaussian distributions for weighted fitting, and the model fitting is flexible. In addition, the three indicators in Table 2 all show the fitting accuracy of GMM compared with other models.

[0129] To prove the effectiveness of the proposed model, this paper will analyze the simulation results from the following three aspects.

[0130] First, energy storage can reduce costs by charging when the time-of-use electricity price is low and discharging when the time-of-use electricity price is high, thereby shifting load demand. At the same time, the local consumption rate of photovoltaics can also be increased. Therefore, in order to prove the superiority of the shared energy storage configuration proposed in the present invention, two scenarios are set: case 1: shared energy storage is configured, case 2: shared energy storage is not configured (this is the regional power grid with shared energy storage and without shared energy storage), and the simulation results are shown in Table 3. From Table 3, we can see that the cost of the regional power grid configured with shared energy storage is 42.1679% lower than that of the regional power grid without shared energy storage, and the photovoltaic access rate is reduced by 5.91%. This is because shared energy storage can reduce the cost of the interconnected regional power grid and the photovoltaic access rate through time-of-use electricity price peak-valley arbitrage and local consumption of photovoltaics.

[0131] Table 3 Comparison of shared energy storage advantages

[0132] Scene Type Total cost (yuan) Photovoltaic grid connection rate (%) Case 1 1649657.7949 21.97 Case 2 1722282.8127 27.88

[0133] Table 4 Comparison of costs between MPC and SMPC (yuan)

[0134]

[0135] Second, SMPC uses the expected cost to track the results of the day-ahead planning formula (5) in real time. To prove the effectiveness of SMPC, the present invention uses SMPC to track the results of the day-ahead planning one by one, and multiplies the cost by the same probability as SMPC to obtain the intraday operation cost under 8 scenarios using Latin hypercube and scenario reduction, and compares it with the cost obtained by SMPC. The results are shown in Table 4. As shown in Table 4, the use of MPC for real-time tracking does not consider the influence of probability, and the optimization result is worse than that of SMPC. SMPC optimization has good robustness and reduces the operation cost to a certain extent.

[0136] Third, the above has proved the superiority of shared energy storage in reducing costs and photovoltaic grid access rate. Then, to prove that the proposed model meets the economic requirements, we analyze the simulation results of the interconnected regional power grid based on uncertainty representation and SMPC in the first scenario, such as Figure 6 and 7 As shown. Figure 6As shown in the figure, since shared energy storage realizes peak-valley arbitrage according to time-of-use electricity prices and load demand, it charges when the electricity price is high and discharges when the electricity price is low. At the same time, it consumes photovoltaic power locally to reduce the photovoltaic grid-connected rate and grid fluctuations. The SOC of shared energy storage is charged in the first 15 moments, and the SOC value continues to rise until it reaches the limit. This is because the electricity price at this time is the valley price, and the energy storage continues to charge to meet the subsequent load demand. From the 16th to the 23rd moment, although the electricity price at this time is the peak price, this stage is the peak period of load. Relying solely on photovoltaics and energy storage cannot meet the load demand, so the power purchased from the grid will also increase. When from the 24th to the 29th moment, the electricity price returns to the normal price, and the energy storage is charged again to prepare for arbitrage for the next electricity price and load peak. From the 30th to the 48th moment, in order to reduce costs, the shared energy storage releases all the previously stored energy to meet energy demand. At the same time, the intraday SMPC is always tracking the intraday planning results, and makes real-time adjustments and feedback corrections based on the actual operation data.

[0137] also, Figure 7 The simulation results of the switching power are shown. We can get Figure 7 It can be seen that at the 16th, 24th and 27th moments, after satisfying their own power balance, the three interconnected regional power grids transmit power to other regional power grids, thereby reducing the cost of the interconnected regional power grids.

[0138] The above shows and describes the basic principles, main features and advantages of the present invention. It should be understood by those skilled in the art that the present invention is not limited to the above embodiments, and the above embodiments and descriptions are only for explaining the principles of the present invention. Without departing from the spirit and scope of the present invention, the present invention may have various changes and improvements, which fall within the scope of the present invention to be protected. The scope of protection of the present invention is defined by the attached claims and their equivalents.

Claims

1. A method for planning shared energy storage for interconnected regional power grids based on uncertainty characterization and SMPC, characterized in that: The steps include: Step (1), using a Gaussian mixture model to fit the photovoltaic output curve; Step (2), using Latin hypercube sampling and Kantorovich distance to generate photovoltaic output scenarios; Step (3), propose an expected model for shared energy storage planning based on stochastic optimization; Step (4), construct a real-time operation model of shared energy storage based on stochastic model predictive control.

2. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 1 is characterized in that: The specific method of step (1) is: (1.1) GMM describes the probability density function of any PV output by weighted summation of multiple normal distributions. The probability density function P(x) of GMM is expressed by formula (1); In the formula, α k , are the weight factor and probability density function of the kth normal distribution respectively; x, μ k , are the mean and variance of the random variable and the kth normal distribution respectively; σ k is the standard deviation of the kth normal distribution; K is the number of photovoltaic devices; (1.2) The objective function L estimated by maximum likelihood based on historical photovoltaic output data is: Where: J is the total number of photovoltaic devices, x j is the data of the jth photovoltaic device; The maximum expectation algorithm is used to solve the objective function of maximum likelihood estimation.

3. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 2 is characterized in that: In step (1.2), the specific steps of the maximum expectation algorithm are as follows: (1.2.1) Use K-means clustering method to cluster photovoltaic data, use elbow method to determine the optimal number of clusters and calculate the mean and variance of samples corresponding to each component as initial values, and initialize (1.2.2) According to the current μ k , Calculate the posterior probability P r (k,x j ): Where: are the mean and variance of the normal distribution of the previous iteration respectively; (1.2.3) According to step (1.2.2) P r (k,x j ) Recalculate μ k , α k ; (4) Calculate the maximum likelihood objective function value of formula (2) and determine whether the maximum likelihood objective function value converges; if converged, output the current μ k , α k ; If it does not converge, return to step (1.2.2).

4. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 2 is characterized in that: The specific method of step (2) is: (2.1) Use GMM to fit the photovoltaic output curve and obtain its probability density function and cumulative probability density distribution function F(x); (2.2) Divide the curve of F(x) into H intervals and use the formula Take out the cumulative probability of each interval; where i∈H; (2.3) Substitute the inverse function of F(x) to obtain the corresponding sampling value x of photovoltaic output; (2.4) Repeat the above steps N times to obtain N sampling values ​​of photovoltaic output; (2.5) Randomly sort the obtained results to obtain N scenarios of photovoltaic output; (2.6) Using Kantorovich distance to perform scenario reduction, we can obtain the photovoltaic output value and corresponding probability value after scenario reduction.

5. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 4 is characterized in that: The specific method of step (2.6) is: (2.6.1) Assuming that the number of scenes after reduction is n, initialize the probability value of the optimized scene and the number of cut scenes n * =N; (2.6.2) The Kantorovich distance between scenes (Ω, Ω') is calculated using the Kantorovich distance formula: Among them, s, s' are the number of photovoltaic output scenarios, p s is the corresponding probability value, are the photovoltaic outputs of scenarios s and s', respectively, and T is the total optimization time; (2.6.3) Select the scene s' with the smallest distance to the scene s; and calculate the product of the Kantorovich distance and the scene probability, which can be recorded as PD K (s,s')=D K (s,s')·p s : (2.6.4) Continue to iterate step (2.6.3) and select PD k (s i ,s j ) Minimum scene and cut until the number of scenes after cutting is n * =n.

6. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 1 is characterized in that: The specific method of step (3) is: The expected model of shared energy storage planning in a deterministic environment with the goal of minimizing total cost and meeting shared energy storage constraints and power balance constraints; The total cost C includes the cost of trading with the grid and the planning cost of shared energy storage, which can be expressed as: Where: T, Δt are the optimization time and time interval respectively; c b (t) is the price of purchasing power from the grid at time t; c s 、c dem They are time-of-use electricity price, on-grid electricity price and demand electricity price; P b (t), P s (t) represent the power purchased from the grid and the power connected to the grid at time t; c om 、c e 、c p , r, y are energy storage operation and maintenance cost coefficient, capacity investment cost coefficient, power investment cost coefficient, discount rate and service life respectively; P c (t), P d (t) represent the charging power and discharging power of the energy storage at time t respectively; E battery , P battery are the maximum capacity and power of energy storage planning respectively.

7. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 6 is characterized by: The shared energy storage constraints are as follows: Where: They are the upper and lower limits of the shared energy storage charging power respectively; They represent the upper and lower limits of the shared energy storage discharge power respectively; ε is the rate coefficient; η c , η d are the shared energy storage charging efficiency and discharging efficiency respectively; SOE(t) is the energy state of the energy storage at time t; The power balance constraints are as follows: Where: P i,ex (t), P i,load (t), P i,pv (t) represent the exchange power, load demand and photovoltaic output of the i-th user at time t respectively; N is the number of photovoltaic equipment.

8. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 6 is characterized by: The specific method of step (4) is: The SMPC intraday operation optimization model with a prediction time domain of H is established as the real-time operation model of shared energy storage based on stochastic model predictive control. The expression of the objective function C1 of the model is: Where: P b,lo , P s,lo , P c,lo , P d,lo They are respectively the purchased power, grid-connected power, charging power and discharging power of the shared energy storage at time h during the day.

9. The interconnected regional power grid shared energy storage planning method based on uncertainty characterization and SMPC according to claim 1, characterized in that: Also includes: Step (5) solves the expected model of shared energy storage planning based on stochastic optimization and the real-time operation model of shared energy storage based on stochastic model predictive control to obtain the maximum capacity and power of the energy storage planning, and plans according to the results.

Citation Information

Cited By

  • Zone area shared energy storage and distributed new energy random regulation and control method based on grid-connected efficiency game

    CN120767888A

  • A random regulation method for district shared energy storage and distributed new energy based on grid-connection performance game

    CN120767888B