Intelligent water consumption monitoring system for transformer substation
Through the intelligent water monitoring system, the cooling water collection frequency is adjusted according to the power supply load and time information of the substation, which solves the dynamic adjustment problem in the water management of the substation and improves efficiency and cost-effectiveness.
Patent Information
- Application Number
- CN202411546847.X
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-11-01
- Publication Date
- 2024-11-29
- Estimated Expiration
- Not applicable · inactive patent
AI Technical Summary
During the power supply process, the substation cannot dynamically adjust the cooling water collection frequency according to the load conditions, resulting in abnormal equipment temperature or waste of cooling water, affecting efficiency and cost.
Design an intelligent water monitoring system for substations, which generates actual collection frequency by obtaining the load, date information and time information of the power supply station area, and inputs the data into the neural network for automatic training to adjust water use.
It realizes dynamic adjustment of the cooling water collection frequency according to the load conditions of the power supply area, improves water resource utilization efficiency, reduces operating costs and energy consumption, and ensures stable operation of the equipment.
Smart Images

Figure CN119048068A_ABST
Abstract
Description
Technical Field
[0001] The invention relates to data processing technology, and in particular to an intelligent water use monitoring system for a substation. Background Art
[0002] With the continuous growth of residents' electricity demand, substations play a vital role in power transmission and distribution. During the operation of substations, a certain amount of water resources are needed to reduce equipment temperature, remove dirt and moisture, and ensure the safety and stable operation of equipment. Therefore, scientific and reasonable control of water use in substations is of great significance to improve water resource utilization efficiency, reduce operating costs, and achieve energy conservation and emission reduction.
[0003] However, during the operation and maintenance of the substation, it is necessary to use water to cool the equipment, but traditional substations mainly rely on fixed cooling methods. At the same time, the substation will generate a large amount of electricity consumption data. The larger the amount of electricity consumption data, the heavier the substation load. Currently, it is impossible to make adaptive adjustments based on the load conditions of the power supply area. When the load is large, it is impossible to adaptively adjust the data collection frequency, thereby adaptively controlling the cooling water, which may cause the temperature of the equipment to rise abnormally, or the equipment to operate at low load, resulting in a waste of cooling water.
[0004] Therefore, how to control the frequency of data collection according to the actual power supply conditions of the substation, input the data set into the neural network for automatic training, and thus make adaptive adjustments to the water use of the substation has become an urgent problem to be solved. Summary of the invention
[0005] The embodiment of the present invention provides a substation intelligent water consumption monitoring system, which can control the frequency of data collection according to the actual power supply status of the substation, input the data set into the neural network for automatic training, and thus adaptively adjust the water consumption of the substation.
[0006] A first aspect of an embodiment of the present invention provides a substation intelligent water use monitoring system, including: An acquisition module, used for acquiring multiple power supply areas corresponding to a target substation, counting the area power supply loads corresponding to the multiple power supply areas, and obtaining a total power supply load corresponding to the target substation; A retrieving module, used to retrieve date information and time information, determine a preset time period corresponding to the time information as an adjustment time period, and generate an actual acquisition frequency corresponding to the target substation according to the total power supply load, date information and the adjustment time period; A collection module, used to collect the power supply load of the substation according to the actual collection frequency and input it into the neural network for processing to obtain the adjustment quantity of the control regulating valve; The control module is used to control the regulating valve of the substation water based on the adjustment quantity sent to the controller.
[0007] Optionally, in a possible implementation manner of the first aspect, the retrieving module is used to retrieve date information and time information, determine a preset time period corresponding to the time information as an adjustment time period, and generate an actual collection frequency corresponding to the target substation according to the total power supply load, date information and the adjustment time period, including: Retrieving date information and time information, and determining a preset time period corresponding to the time information as an adjustment time period according to comparison information between the time information and a preset adjustment table, wherein the preset adjustment table includes a one-to-one correspondence between multiple preset time periods and preset adjustment coefficients; According to the adjustment period, a corresponding preset adjustment coefficient is retrieved as a period adjustment coefficient, and an actual collection frequency corresponding to the target substation is generated according to the total power supply load, the date information and the period adjustment coefficient.
[0008] Optionally, in a possible implementation manner of the first aspect, generating the actual acquisition frequency corresponding to the target substation according to the total power supply load, the date information and the time period adjustment coefficient includes: Obtaining a load adjustment coefficient value based on a comparison between the total power supply load and the reference total load; Acquire the time attribute corresponding to the date information, the time attribute including the working time attribute and the idle time attribute, and retrieve the attribute adjustment coefficient value corresponding to the time attribute; The reference acquisition frequency is adjusted based on the load adjustment coefficient value, the attribute adjustment coefficient value and the time period adjustment coefficient to obtain an actual acquisition frequency corresponding to the target substation.
[0009] Optionally, in a possible implementation manner of the first aspect, adjusting the reference acquisition frequency based on the load adjustment coefficient value, the attribute adjustment coefficient value, and the time period adjustment coefficient to obtain an actual acquisition frequency corresponding to the target substation includes: The actual acquisition frequency is obtained by the following formula: ; in, is the actual acquisition frequency, is the reference acquisition frequency, is the total power supply load, is the base total load, is the load weight value, is the attribute adjustment coefficient value, The time period adjustment factor.
[0010] Optionally, in a possible implementation of the first aspect, the method further includes: The receiving regulator adjusts the actual acquisition frequency to obtain an increased acquisition frequency, and obtains an adjustment difference according to a difference between the increased acquisition frequency and the actual acquisition frequency; Increase and adjust the load weight value according to the adjustment difference to obtain an increased and adjusted load weight value; The receiving regulator adjusts the actual acquisition frequency to reduce the acquisition frequency, and obtains an adjustment difference according to the difference between the actual acquisition frequency and the reduced acquisition frequency; The load weight value is reduced and adjusted according to the adjustment difference to obtain a load weight value after reduction and adjustment.
[0011] Optionally, in a possible implementation manner of the first aspect, the increasing and adjusting the load weight value according to the adjustment difference to obtain the increased and adjusted load weight value includes: The increased load weight value is obtained through the following formula: ; in, To increase the adjusted load weight value, is the load weight value, To increase the acquisition frequency, is the actual acquisition frequency.
[0012] Optionally, in a possible implementation manner of the first aspect, the reducing and adjusting the load weight value according to the adjustment difference to obtain the reduced and adjusted load weight value includes: The load weight value after reduction adjustment is obtained by the following formula: ; in, To reduce the adjusted load weight value, is the load weight value, To reduce the frequency of acquisition, is the actual acquisition frequency.
[0013] Optionally, in a possible implementation of the first aspect, the method further includes: receiving adjustment information of the adjustment end on the adjustment quantity, retrieving a corresponding preset time period as an active replacement time period based on the adjustment information, and determining the active adjustment quantity input by the adjustment end; The adjustment quantity of the active replacement time period is replaced based on the active adjustment quantity.
[0014] Optionally, in a possible implementation of the first aspect, the method further includes: Counting the number of adjustment information sent by the adjustment terminal as the adjustment number, and obtaining the adjustment difference according to the difference between the active adjustment number and the adjustment number corresponding to the active replacement time period; An adjustment amplitude value is obtained according to the product of the adjustment quantity and the adjustment difference value, and when it is determined that the adjustment amplitude value is greater than or equal to a preset training amplitude value, a heavy training signal is sent to the adjustment end.
[0015] Optionally, in a possible implementation of the first aspect, the method further includes: When it is determined that the adjustment amplitude value is less than the preset training amplitude value and greater than the preset minimum amplitude, a medium training signal is sent to the adjustment end.
[0016] The beneficial effects of the present invention are as follows: 1. The present invention dynamically adjusts the collection interval distance of the transmission line by considering the influence values of the influencing factors corresponding to the terrain features in the hybrid distribution network, thereby determining the precise customized collection points of the line. This refined customization method based on environmental factors can ensure that the collection points are more reasonable under different terrain and meteorological conditions, and improve the accuracy of fault detection. At the same time, for the customized collection points of towers and distribution equipment, the collection positions are further refined by considering the type of equipment and the collection height, ensuring comprehensive monitoring of the equipment status and timely detection of potential faults. The customized collection path generation strategy proposed in the method can automatically plan the optimal collection path based on the customized collection points of the line and the customized collection points of the equipment. This not only reduces the flight time and distance of mobile collection devices (such as drones), but also reduces energy consumption and collection costs.
[0017] 2. The present invention combines fault identification strategies to intelligently analyze the collected images and automatically identify the fault types of lines and equipment (such as ground faults, short circuit faults, equipment faults, etc.). This intelligent fault identification method greatly reduces the workload of manual inspections and improves the timeliness and accuracy of fault discovery. BRIEF DESCRIPTION OF THE DRAWINGS
[0018] Figure 1 This is a structural schematic diagram of a substation intelligent water use monitoring system provided by the present invention. DETAILED DESCRIPTION
[0019] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in conjunction with the drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0020] The terms "first", "second", "third", "fourth", etc. (if any) in the description and claims of the present invention and the above drawings are used to distinguish similar objects, and are not necessarily used to describe a specific order or sequence. It should be understood that the numbers used in this way can be interchanged where appropriate, so that the embodiments of the present invention described herein can be implemented in sequences other than those illustrated or described herein.
[0021] It should be understood that in various embodiments of the present invention, the size of the sequence number of each process does not mean the order of execution. The execution order of each process should be determined by its function and internal logic, and should not constitute any limitation on the implementation process of the embodiments of the present invention.
[0022] It should be understood that in the present invention, "including" and "having" and any variations thereof are intended to cover non-exclusive inclusions. For example, a process, method, system, product or apparatus comprising a series of steps or units is not necessarily limited to those steps or units explicitly listed, but may include other steps or units not explicitly listed or inherent to these processes, methods, products or apparatuses.
[0023] It should be understood that in the present invention, "plurality" refers to two or more than two. "And / or" is merely a description of the association relationship of associated objects, indicating that three relationships may exist. For example, A and / or B can represent: A exists alone, A and B exist at the same time, and B exists alone. The character " / " generally indicates that the objects associated before and after are in an "or" relationship. "Contains A, B and C", "Contains A, B, C" means that A, B, and C are all included, "Contains A, B or C" means that one of A, B, and C is included, and "Contains A, B and / or C" means that any one, any two, or any three of A, B, and C are included.
[0024] It should be understood that in the present invention, "B corresponding to A", "B corresponding to A", "A corresponds to B" or "B corresponds to A" means that B is associated with A and B can be determined based on A. Determining B based on A does not mean determining B based only on A, but B can also be determined based on A and / or other information. A and B match when the similarity between A and B is greater than or equal to a preset threshold.
[0025] Depending on the context, "if" as used herein may be interpreted as "when" or "when" or "in response to determining" or "in response to detecting."
[0026] The technical solution of the present invention is described in detail with specific embodiments below. The following specific embodiments can be combined with each other, and the same or similar concepts or processes may not be described in detail in some embodiments.
[0027] The present invention provides a substation intelligent water use monitoring system. Figure 1 As shown: The acquisition module is used to acquire multiple power supply areas corresponding to the target substation, count the area power supply loads corresponding to the multiple power supply areas, and obtain the total power supply load corresponding to the target substation.
[0028] The power supply area is the power supply area corresponding to the target substation, and the area power supply load is the power supply load corresponding to the power supply area.
[0029] The retrieval module is used to retrieve date information and time information, determine the preset time period corresponding to the time information as the adjustment period, and generate the actual collection frequency corresponding to the target substation according to the total power supply load, date information and the adjustment period.
[0030] The retrieving module is used to retrieve date information and time information, determine a preset time period corresponding to the time information as an adjustment time period, and generate an actual acquisition frequency corresponding to the target substation according to the total power supply load, date information and the adjustment time period, including: The date information and the time information are retrieved, and the preset time period corresponding to the time information is determined as the adjustment time period according to the comparison information between the time information and the preset adjustment table, wherein the preset adjustment table includes a one-to-one correspondence between multiple preset time periods and preset adjustment coefficients.
[0031] The date information is information corresponding to the date, such as July 1, and the time information is information corresponding to the current time, such as 10 o'clock.
[0032] The preset adjustment table includes a one-to-one correspondence between multiple preset time periods and preset adjustment coefficients.
[0033] Therefore, the present invention can determine the preset time period corresponding to the moment information as the adjustment time period according to the comparison information between the moment information and the preset adjustment table.
[0034] According to the adjustment period, a corresponding preset adjustment coefficient is retrieved as a period adjustment coefficient, and an actual collection frequency corresponding to the target substation is generated according to the total power supply load, the date information and the period adjustment coefficient.
[0035] It is understandable that the server will generate the actual collection frequency corresponding to the target substation according to the total power supply load, the date information and the time period adjustment coefficient.
[0036] The generating the actual acquisition frequency corresponding to the target substation according to the total power supply load, the date information and the time period adjustment coefficient includes: The load adjustment coefficient value is obtained by comparing the total power supply load with the reference total load.
[0037] The reference total load is a preset total load.
[0038] The time attribute corresponding to the date information is acquired, the time attribute including a working time attribute and an idle time attribute, and the attribute adjustment coefficient value corresponding to the time attribute is retrieved.
[0039] Among them, time attributes include working time attributes and idle time attributes. The attributes corresponding to the time can be judged. For example, the working time attribute is Monday to Friday. The corresponding power consumption during working hours is large, so the collection frequency will be increased to facilitate immediate adjustment. The idle time attribute, such as Saturday and Sunday, is a spatial time attribute. The corresponding factories and office buildings will reduce the running equipment, so the load is small, and the collection frequency can be reduced, and adjustments can be made every once in a while.
[0040] The reference acquisition frequency is adjusted based on the load adjustment coefficient value, the attribute adjustment coefficient value and the time period adjustment coefficient to obtain an actual acquisition frequency corresponding to the target substation.
[0041] The adjusting the reference acquisition frequency based on the load adjustment coefficient value, the attribute adjustment coefficient value and the time period adjustment coefficient to obtain the actual acquisition frequency corresponding to the target substation includes: The actual acquisition frequency is obtained by the following formula: ; in, is the actual acquisition frequency, is the reference acquisition frequency, is the total power supply load, is the base total load, is the load weight value, is the attribute adjustment coefficient value, The time period adjustment factor.
[0042] It is not difficult to understand that the total power supply load The larger the actual acquisition frequency The larger it is, the corresponding preset attribute adjustment coefficient values of the working time attribute and the idle time attribute. For example, the preset attribute adjustment coefficient value corresponding to the working time attribute may be 3, and the preset attribute adjustment coefficient value corresponding to the idle time attribute may be 2. The load of working days is relatively large, so the corresponding attribute adjustment coefficient values are larger.
[0043] Based on the above embodiment, it also includes: The receiving regulator adjusts the increase of the actual acquisition frequency to obtain an increased acquisition frequency, and obtains an adjustment difference according to a difference between the increased acquisition frequency and the actual acquisition frequency.
[0044] The load weight value is increased and adjusted according to the adjustment difference to obtain the increased and adjusted load weight value.
[0045] The step of increasing and adjusting the load weight value according to the adjustment difference to obtain the increased and adjusted load weight value includes: The increased load weight value is obtained through the following formula: ; in, To increase the adjusted load weight value, is the load weight value, To increase the acquisition frequency, is the actual acquisition frequency.
[0046] It is not difficult to understand that increasing the acquisition frequency The larger it is, the larger the adjusted load weight value will be.
[0047] The receiving regulator adjusts the actual acquisition frequency to reduce the frequency, and obtains a reduced acquisition frequency. The adjustment difference is obtained according to the difference between the actual acquisition frequency and the reduced acquisition frequency.
[0048] The load weight value is reduced and adjusted according to the adjustment difference to obtain a load weight value after reduction and adjustment.
[0049] The load weight value after reduction adjustment is obtained by the following formula: ; in, To reduce the adjusted load weight value, is the load weight value, To reduce the frequency of acquisition, is the actual acquisition frequency.
[0050] It is not difficult to understand that reducing the frequency of collection The smaller it is, the smaller the corresponding reduction in the adjusted load weight value is.
[0051] The acquisition module is used to collect the power supply load of the substation according to the actual acquisition frequency and input it into the neural network for processing to obtain the adjustment quantity of the control regulating valve.
[0052] It should be noted that a plurality of regulating valves are connected to the cooling water of the equipment to be cooled, and the flow rate of the cooling water can be controlled by controlling the number of regulating valves.
[0053] The control module is used to control the regulating valve of the substation water based on the adjustment quantity sent to the PID controller.
[0054] Based on the above embodiment, it also includes: The adjusting end receives adjustment information of the adjustment quantity, retrieves a corresponding preset time period as an active replacement time period based on the adjustment information, and determines the active adjustment quantity input by the adjustment end.
[0055] The adjustment quantity of the active replacement time period is replaced based on the active adjustment quantity.
[0056] It is not difficult to understand that the user can actively adjust the adjustment quantity and replace the adjustment quantity of the actively replaced time period with the actively adjusted quantity.
[0057] Based on the above embodiment, it also includes: The number of adjustment information sent by the adjustment terminal is counted as the adjustment number, and the adjustment difference is obtained according to the difference between the active adjustment number and the adjustment number corresponding to the active replacement time period.
[0058] An adjustment amplitude value is obtained according to the product of the adjustment quantity and the adjustment difference value, and when it is determined that the adjustment amplitude value is greater than or equal to a preset training amplitude value, a heavy training signal is sent to the adjustment end.
[0059] It is not difficult to understand that if the user makes more adjustments and the adjustment amplitude is large, the corresponding adjustment amplitude value will be larger, so a certain amount of data needs to be input into the model for training.
[0060] If the adjustment amplitude value is greater than or equal to the preset training amplitude value, a heavy training signal is sent to the adjustment end, and more data corresponding to the preset heavy training signal needs to be input for training.
[0061] Based on the above embodiment, it also includes: When it is determined that the adjustment amplitude value is less than the preset training amplitude value and greater than the preset minimum amplitude, a medium training signal is sent to the adjustment end.
[0062] If the adjustment amplitude value is less than the preset training amplitude value and greater than the preset minimum amplitude, a moderate training signal is sent to the adjustment end, and preset moderate data corresponding to the moderate training signal needs to be input for training.
[0063] It is not difficult to understand that if it is less than , no training is required.
[0064] The present invention also provides a readable storage medium, in which a computer program is stored. When the computer program is executed by a processor, it is used to implement the methods provided by the various embodiments described above.
[0065] Among them, the readable storage medium can be a computer storage medium or a communication medium. The communication medium includes any medium that facilitates the transmission of a computer program from one place to another. The computer storage medium can be any available medium that can be accessed by a general-purpose or special-purpose computer. For example, a readable storage medium is coupled to a processor so that the processor can read information from the readable storage medium and write information to the readable storage medium. Of course, the readable storage medium can also be a component of the processor. The processor and the readable storage medium can be located in an application-specific integrated circuit (Application Specific Integrated Circuits, referred to as: ASIC). In addition, the ASIC can be located in a user device. Of course, the processor and the readable storage medium can also exist in a communication device as discrete components. The readable storage medium can be a read-only memory (ROM), a random access memory (RAM), a CD-ROM, a magnetic tape, a floppy disk, and an optical data storage device, etc.
[0066] The present invention also provides a program product, which includes an execution instruction, which is stored in a readable storage medium. At least one processor of a device can read the execution instruction from the readable storage medium, and at least one processor executes the execution instruction so that the device implements the methods provided in the above various embodiments.
[0067] In the embodiments of the above-mentioned devices, it should be understood that the processor may be a central processing unit (CPU), or other general-purpose processors, digital signal processors (DSP), application-specific integrated circuits (ASIC), etc. The general-purpose processor may be a microprocessor or any conventional processor. The steps of the method disclosed in the present invention may be directly implemented as being executed by a hardware processor, or may be executed by a combination of hardware and software modules in the processor.
[0068] Finally, it should be noted that the above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit it. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that they can still modify the technical solutions described in the aforementioned embodiments, or replace some or all of the technical features therein with equivalents. However, these modifications or replacements do not cause the essence of the corresponding technical solutions to deviate from the scope of the technical solutions of the embodiments of the present invention.
Claims
1. A substation intelligent water use monitoring system, characterized in that: include: An acquisition module, used for acquiring multiple power supply areas corresponding to a target substation, counting the area power supply loads corresponding to the multiple power supply areas, and obtaining a total power supply load corresponding to the target substation; A retrieving module, used to retrieve date information and time information, determine a preset time period corresponding to the time information as an adjustment time period, and generate an actual acquisition frequency corresponding to the target substation according to the total power supply load, date information and the adjustment time period; A collection module, used to collect the power supply load of the substation according to the actual collection frequency and input it into the neural network for processing to obtain the adjustment quantity of the control regulating valve; The control module is used to control the regulating valve of the substation water based on the adjustment quantity sent to the controller.
2. The intelligent water use monitoring system for substations according to claim 1 is characterized in that: The retrieving module is used to retrieve date information and time information, determine a preset time period corresponding to the time information as an adjustment time period, and generate an actual acquisition frequency corresponding to the target substation according to the total power supply load, date information and the adjustment time period, including: Retrieving date information and time information, and determining a preset time period corresponding to the time information as an adjustment time period according to comparison information between the time information and a preset adjustment table, wherein the preset adjustment table includes a one-to-one correspondence between multiple preset time periods and preset adjustment coefficients; According to the adjustment period, a corresponding preset adjustment coefficient is retrieved as a period adjustment coefficient, and an actual collection frequency corresponding to the target substation is generated according to the total power supply load, the date information and the period adjustment coefficient.
3. The intelligent water use monitoring system for substations according to claim 2 is characterized in that: The generating the actual acquisition frequency corresponding to the target substation according to the total power supply load, the date information and the time period adjustment coefficient includes: Obtaining a load adjustment coefficient value based on a comparison between the total power supply load and the reference total load; Acquire the time attribute corresponding to the date information, the time attribute including the working time attribute and the idle time attribute, and retrieve the attribute adjustment coefficient value corresponding to the time attribute; The reference acquisition frequency is adjusted based on the load adjustment coefficient value, the attribute adjustment coefficient value and the time period adjustment coefficient to obtain an actual acquisition frequency corresponding to the target substation.
4. The intelligent water use monitoring system for substations according to claim 3 is characterized in that: The adjusting the reference acquisition frequency based on the load adjustment coefficient value, the attribute adjustment coefficient value and the time period adjustment coefficient to obtain the actual acquisition frequency corresponding to the target substation includes: The actual acquisition frequency is obtained by the following formula: ; in, is the actual acquisition frequency, is the reference acquisition frequency, is the total power supply load, is the base total load, is the load weight value, is the attribute adjustment coefficient value, The time period adjustment factor.
5. The intelligent water use monitoring system for substations according to claim 4 is characterized in that: Also includes: The receiving regulator adjusts the actual acquisition frequency to obtain an increased acquisition frequency, and obtains an adjustment difference according to a difference between the increased acquisition frequency and the actual acquisition frequency; Increase and adjust the load weight value according to the adjustment difference to obtain an increased and adjusted load weight value; The receiving regulator adjusts the actual acquisition frequency to reduce the acquisition frequency, and obtains an adjustment difference according to the difference between the actual acquisition frequency and the reduced acquisition frequency; The load weight value is reduced and adjusted according to the adjustment difference to obtain a load weight value after reduction and adjustment.
6. The intelligent water use monitoring system for substations according to claim 5 is characterized in that: The step of increasing and adjusting the load weight value according to the adjustment difference to obtain the increased and adjusted load weight value includes: The increased load weight value is obtained through the following formula: ; in, To increase the adjusted load weight value, is the load weight value, To increase the acquisition frequency, is the actual acquisition frequency.
7. The intelligent water use monitoring system for substations according to claim 5 is characterized in that: The step of reducing and adjusting the load weight value according to the adjustment difference to obtain the load weight value after reduction and adjustment includes: The load weight value after reduction adjustment is obtained by the following formula: ; in, To reduce the adjusted load weight value, is the load weight value, To reduce the frequency of acquisition, is the actual acquisition frequency.
8. The intelligent water use monitoring system for substations according to claim 2 is characterized in that: Also includes: receiving adjustment information of the adjustment amount from the adjustment end, retrieving a corresponding preset time period as an active replacement time period based on the adjustment information, and determining the active adjustment amount input by the adjustment end; The adjustment quantity of the active replacement time period is replaced based on the active adjustment quantity.
9. The intelligent water use monitoring system for substations according to claim 8, characterized in that: Also includes: Counting the number of adjustment information sent by the adjustment terminal as the adjustment number, and obtaining the adjustment difference according to the difference between the active adjustment number and the adjustment number corresponding to the active replacement time period; An adjustment amplitude value is obtained according to the product of the adjustment quantity and the adjustment difference value, and when it is determined that the adjustment amplitude value is greater than or equal to a preset training amplitude value, a heavy training signal is sent to the adjustment end.
10. The intelligent water use monitoring system for substations according to claim 8, characterized in that: Also includes: When it is determined that the adjustment amplitude value is less than the preset training amplitude value and greater than the preset minimum amplitude, a medium training signal is sent to the adjustment end.
Citation Information
Patent Citations
Factory management system data processing method and platform
CN116959728A
Substation water consumption control system and method based on neural network adaptive PID (Proportion Integration Differentiation) control
CN118092154A
Equipment operation process monitoring system
CN118656272A
Power transmission line monitoring system and power transmission line monitoring method
WO2022052869A1
Cited By
Power distribution machine room monitoring method and system based on artificial intelligence Internet of Things technology
CN119472470A
