Dense medium beneficiation process for barite fluorite associated ore

Through the two-stage cyclone system and medium recovery and treatment technology, the problem of insufficient selection accuracy in the heavy medium ore dressing process is solved, the ore recovery rate and product quality are improved, and efficient selection of barite fluorite associated ore is achieved. and environmentally friendly treatment.

CN119056568AInactive Publication Date: 2024-12-03HUAIBEI HUAXING GONGMAO
View PDF 0 Cites 1 Cited by

Patent Information

Application Number
CN202411281095.9
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-09-13
Publication Date
2024-12-03
Estimated Expiration
Not applicable · inactive patent

AI Technical Summary

Technical Problem

The existing heavy medium ore dressing process has insufficient sorting accuracy in the sorting of barite fluorite-associated ore, resulting in incomplete separation of minerals, affecting product quality and recovery rate, and large-shaped ores cannot be effectively discharged when the suspension flow rate is insufficient. .

Method used

Using a two-stage cyclone system, the primary and resorting is performed by adjusting the suspension density and setting the check structure and screening structure, and the primary and resorting is performed using centrifugal force, gravity and media resistance, and the separation accuracy and recycling are improved through medium recovery and dehydration treatment. Rate.

Benefits of technology

It improves the ore selection accuracy and recovery rate, ensures product quality, avoids resource waste and environmental pollution, and achieves efficient separation and environmentally friendly treatment of minerals of different densities.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119056568A_ABST
    Figure CN119056568A_ABST
Patent Text Reader

Abstract

The invention discloses a dense medium mineral separation process for barite fluorite associated ore, which relates to the technical field of mineral processing and comprises the following steps: preparing required raw materials and dense media; raw materials and a dense medium are put into the first-section cyclone; carrying out primary cyclone separation on ores in the first-section cyclone; the ores with large shape difference are treated by the non-return structure and the screening structure; the ore is screened again in the second-section cyclone; mineral with large specific gravity cannot enter the first connecting pipe, the separation precision of the first-section cyclone is high, a small amount of mineral with large shape particles can be retained in the screening groove, the quality and the recovery rate of products are ensured, the linkage structure can ensure that the non-return structure and the screening structure work synchronously, and therefore double insurance is achieved, and the separation efficiency is improved. The equipment is high in process separation precision, high in ore recovery rate, large in separation particle size range and high in waste rock discarding efficiency in pre-separation, physical separation is adopted in the separation process, and the environment cannot be affected.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The invention relates to the technical field of mineral processing, and in particular to a heavy medium beneficiation process for barite and fluorite associated ores. Background Art

[0002] Barite and fluorite coexist in the same ore deposit. The beneficiation of this coexisting ore is somewhat difficult, and higher requirements are placed on the existing ore processing technology. The heavy medium beneficiation process has received widespread attention and application in the field of ore processing technology. Particles with high density and large particle size are subject to greater centrifugal force and will be thrown to the wall of the cyclone, while particles with low density and small particle size are subject to less centrifugal force and will remain in the center area. Under the action of centrifugal force, gravity and fluid drag, the ore particles will be divided into different flow layers inside the cyclone. Due to the large centrifugal force, coarse particles will move downward along the wall to form an external vortex; fine particles will move toward the center to form an internal vortex due to the small centrifugal force.

[0003] The existing technology has certain disadvantages in the heavy medium beneficiation process of barite and fluorite associated ores. The existing heavy medium beneficiation process may have the problem of insufficient sorting accuracy, resulting in incomplete mineral separation, affecting the quality and recovery rate of the product. The low process ore recovery rate means that valuable minerals are lost more during the sorting process, resulting in waste of resources and economic losses. Due to the flow rate of the suspension, a small amount of ore with larger particles enters the interior of the first stage cyclone but is not discharged from the first stage cyclone. Summary of the invention

[0004] The object of the present invention is to provide a heavy medium beneficiation process for barite and fluorite associated ores to solve the problems raised in the above background technology.

[0005] The purpose of the present invention can be achieved through the following technical solutions:

[0006] A heavy medium beneficiation process for barite fluorite associated ore comprises the following steps:

[0007] S1: Prepare the required raw materials and heavy media, preliminarily crush and screen the raw ore for standby use, prepare a heavy medium suspension of a certain concentration, and adjust the density of the suspension according to the mineral density and sorting requirements;

[0008] S2: Put the raw material and heavy medium into the first cyclone. Add the raw material into the first cyclone from the feed port, pass the medium into the medium feed pipe, the heavy medium moves from the bottom to the top of the first cyclone, and the raw material moves from the top to the bottom of the first cyclone;

[0009] S3: The ore is first cyclone-separated in the first cyclone. In the heavy medium cyclone, due to the different densities of the minerals, the mineral particles are separated into layers according to their density under the effects of centrifugal force, gravity and medium resistance. Barite and heavier minerals sink to the bottom due to their higher density and are discharged from the first discharge port, while fluorite and lighter minerals follow the flow and are arranged in the upper layer of the first cyclone due to their lower specific gravity, and enter the second cyclone from the connecting pipe.

[0010] S4: The ores with large shape differences in the connecting pipes 1 and 2 are processed by the check structure and the screening structure. When the injection of heavy medium is stopped, the check structure can prevent the minerals from flowing back. The screening structure can screen a small amount of minerals with large particle diameters and retain them at the screening structure. The minerals or impurities with smaller shapes and lighter densities are passed into the second stage cyclone, and then liquid is passed into the diversion pipe to dilute the suspension to change the density of the suspension.

[0011] S5: Screening the ore again in the second cyclone, the ore passing through the connecting pipe 1 and the connecting pipe 2 is screened again by the second cyclone, so that the light density minerals and the medium density minerals are discharged from the third discharge port and the second discharge port of the second cyclone respectively;

[0012] S6: Medium recovery: the heavy medium separated from the underflow and overflow needs to be recovered. The medium and minerals are separated by the medium removal equipment, and the recovered heavy medium is circulated back to the suspension system;

[0013] S7: Dehydration treatment: the sorted barite and fluorite products are dehydrated separately to reduce the moisture content in the products;

[0014] S8: Waste treatment of minerals, environmentally friendly treatment of tailings after cyclone sorting to ensure no pollution to the environment;

[0015] The feed port and the first discharge port are arranged at the two ends of the first section cyclone, the medium pipe is arranged at the bottom end of the cylindrical surface of the first section cyclone, the second discharge port and the third discharge port are arranged at the two ends of the second section cyclone, and the connecting pipe 1 is welded to the top end of the cylindrical surface of the first section cyclone, the connecting pipe 2 is welded to one end of the cylindrical surface of the second section cyclone, and the connecting pipe 1 and the connecting pipe 2 are connected to each other, and the check structure and the screening structure are respectively arranged inside the connecting pipe 1 and inside the connecting pipe 2, and the diverter pipe is arranged at the upper end of the connecting pipe 2.

[0016] As a preferred technical solution of the present invention, the particles of the raw ore in S1 after preliminary crushing and screening are less than 10 mm, and the heavy medium includes one or more of magnetite powder and silicon-calcium alloy, which are mixed with water to adjust to an appropriate concentration and density, and the density of the heavy medium suspension is between barite and fluorite.

[0017] As a preferred technical solution of the present invention, the ore with higher specific gravity in S3 moves in a spiral shape along the inner walls of the first and second cyclones, and the ore with lower specific gravity in S3 moves in a spiral shape along the central axis of the first and second cyclones, and the movement direction of the ore with higher specific gravity is opposite to that of the ore with lower specific gravity.

[0018] As a preferred technical solution of the present invention, the medium suspension is used to push the check structure to open in S4. When the medium suspension stops working, the check structure is closed to prevent the backflow of light minerals or foreign matter. The screening structure can be adjusted in S4 to control the diameter of the particles passing through here, and a small amount of minerals with relatively large particle diameters are retained on the surface of the screening structure.

[0019] As a preferred technical solution of the present invention, the water in the diversion pipe in S4 is mixed with the previous suspension to change the density of the suspension inside the second cyclone, so that the density value of the suspension inside the second cyclone is between the density values ​​of different minerals.

[0020] As a preferred technical solution of the present invention, the check structure includes a fixed ring 1, which is welded to the inner wall of a connecting tube 1, and a middle strip is integrally arranged inside the fixed ring 1, and a swing plate 1 and a swing plate 2 for closing and opening are arranged in the middle of the fixed ring 1, and the fixed ring 1 and the swing plate 1 are adapted to the shape of the fixed ring 1, and both ends of the swing plate 1 and the two ends of the swing plate 2 are rotatably connected to the fixed ring 1 through a pin shaft, and a torsion spring is arranged in the middle of the middle strip, and both ends of the torsion spring are respectively in contact with the swing plate 1 and the swing plate 2.

[0021] As a preferred technical solution of the present invention, the screening structure includes a fixed ring two, which is welded to the inside of the connecting pipe two, and a fixed plate and a rotating plate are arranged inside the fixed ring two, and three groups of screening grooves are provided on the surfaces of the fixed plate and the rotating plate, the fixed plate is welded to the fixed ring two, a reserved hole is provided in the middle of the fixed plate, a fixed column is integrally provided in the middle of the rotating plate, a fixed rod is provided inside the fixed column, a spiral strip is provided on the outer wall of the fixed rod, a spiral hole matching the spiral strip is provided on the inner wall of the fixed column, the rotating plate rotates relative to the fixed ring two, and a limit block is welded on the edge of the fixed ring two to limit the up and down movement of the fixed plate.

[0022] As a preferred technical solution of the present invention, a linkage structure is arranged between the check structure and the screening structure, the linkage structure includes a threaded line, the threaded line is opened on the outer wall of the fixed rod, and the outer wall of the fixed rod is threadedly connected to the threaded sleeve, a matching hole is opened on the top of the fixed rod, and a movable rod floating up and down is arranged inside the matching hole, a telescopic spring connecting the fixed rod and the movable rod is arranged inside the matching hole, two connecting rods are arranged on the top of the movable rod, and the two connecting rods are respectively connected to the swing plate one and the swing plate two.

[0023] Compared with the prior art, the present invention has the following beneficial effects:

[0024] The ores with large shape differences in the connecting pipe 1 and the connecting pipe 2 are processed by the check structure and the screening structure. The medium suspension is used to push the check structure to open. When the medium suspension stops working, the check structure is closed to prevent the light minerals or foreign matter from flowing back. When the flow rate of the suspension is insufficient, the swing plate 1 and the swing plate 2 can be closed. The minerals with a larger specific gravity will not enter the interior of the connecting pipe 1, and the sorting accuracy of the first-stage cyclone is higher.

[0025] A screening structure is provided, which can raise and lower the position of the fixed rod, so that the screening slots of the fixed plate and the rotating plate overlap. The size of the ore that can pass through is determined according to the degree of overlap, and a small amount of ore with larger particles can be retained in the screening slot to ensure the quality and recovery rate of the product;

[0026] A linkage structure is provided. The opening of the two swing plates of the check structure can drive the fixed rod to rise and fall, so that the screening slot can be opened when the swing plate is opened, and the screening slot can be closed when the swing plate is closed. When the flow rate of the suspension is relatively small, the screening slot can also be closed, thereby achieving double insurance;

[0027] The equipment has high process sorting accuracy, high ore recovery rate, large sorting particle size range, high efficiency in discarding waste rock in pre-selection, and the sorting process is physical separation, which will not affect the environment. BRIEF DESCRIPTION OF THE DRAWINGS

[0028] In order to facilitate understanding by those skilled in the art, the present invention is further described below with reference to the accompanying drawings.

[0029] Figure 1 It is the main structure diagram of the present invention;

[0030] Figure 2 It is a schematic diagram of the interior of the connecting pipe 1 and the connecting pipe 2 of the present invention;

[0031] Figure 3 For the present invention Figure 2 A magnified image of point A;

[0032] Figure 4 It is a schematic diagram of the non-return structure of the present invention;

[0033] Figure 5 It is a schematic diagram of the screening structure of the present invention;

[0034] Figure 6 This is a split diagram of the screening structure of the present invention;

[0035] Figure 7 It is a schematic diagram of the linkage structure of the present invention.

[0036] In the figure: 1, feed port; 2, first section cyclone; 3, medium feed pipe; 4, connecting pipe 1; 5, second section cyclone; 6, connecting pipe 2; 7, diverter pipe; 8, check structure; 81, fixing ring 1; 82, swing plate 1; 83, swing plate 2; 84, middle bar; 85, torsion spring; 86, pin shaft; 9, screening structure; 91, fixing ring 2; 92, fixing plate; 93, rotating plate; 94, fixing column; 95, screening slot; 96, fixing rod; 97, spiral hole; 98, spiral strip; 99, limit block; 910, reserved hole; 10, linkage structure; 101, thread line; 102, threaded sleeve; 103, movable rod; 104, matching hole; 105, connecting rod; 11, first discharge port; 12, second discharge port; 13, third discharge port. DETAILED DESCRIPTION

[0037] The technical solution of the present invention will be clearly and completely described below in conjunction with the embodiments. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.

[0038] Embodiment 1:

[0039] See also Figure 1 - Figure 3 As shown, a heavy medium beneficiation process for barite fluorite associated ore comprises the following steps:

[0040] S1: Prepare the required raw materials and heavy media, and perform preliminary crushing and screening on the raw ore for standby use. The ore after preliminary crushing and screening has a particle size of less than 10mm, which can effectively improve the sorting efficiency and reduce the energy consumption during the sorting process. This step is also conducive to protecting the sorting equipment such as the cyclone to prevent equipment damage due to excessive ore. Prepare a certain concentration of heavy medium suspension, and the density of the suspension is adjusted according to the mineral density and sorting requirements. The density of the suspension directly affects the sorting effect. The heavy medium includes one or more of magnetite powder and silicon-calcium alloy, which are mixed with water to adjust to an appropriate concentration and density. The density of the heavy medium suspension is between barite and fluorite. Too high or too low will affect the sorting accuracy.

[0041] S2: Put the raw material and heavy medium into the first stage cyclone 2, add the raw material into the first stage cyclone 2 from the feed port 1, pass the medium into the feed pipe 3, the heavy medium moves from the bottom to the top of the first stage cyclone 2, and the raw material moves from the top to the bottom of the first stage cyclone 2. The ore in the raw ore includes fluorite-barite associated ore, fluorite-quartz associated ore, and fluorite-calcium carbonate associated ore. Among them, the fluorite-barite associated ore with a larger specific gravity is discharged from the first discharge port 11, and the fluorite-quartz associated ore and the fluorite-calcium carbonate associated ore enter the connecting pipe 14 from the top of the first stage cyclone 2;

[0042] S3: The ore is first cyclone-separated in the first cyclone 2. In the heavy medium cyclone, due to the different densities of the minerals, the mineral particles are separated by density under the effects of centrifugal force, gravity and medium resistance. Barite and heavier minerals sink to the bottom due to their larger density, and fluorite-barite associated ore is discharged from the first discharge port 11. Fluorite-quartz associated ore, fluorite-calcium carbonate associated ore and lighter minerals are arranged in the upper layer of the first cyclone 2 due to their smaller specific gravity. Fluorite-quartz associated ore and fluorite-calcium carbonate associated ore enter the second cyclone 5 from the connecting pipe 14. The ore with a larger specific gravity moves in a spiral shape along the inner wall of the first cyclone 2 and the second cyclone 5, and the ore with a smaller specific gravity moves in a spiral shape along the central axis of the first cyclone 2 and the second cyclone 5. The ore with a larger specific gravity moves in an opposite direction to the ore with a smaller specific gravity.

[0043] S4: The ores with large shape differences in the connecting pipe 1 4 and the connecting pipe 2 6 are processed by the check structure 8 and the screening structure 9. The medium suspension is used to push the check structure 8 to open. When the medium suspension stops working, the check structure 8 is closed to prevent the light minerals or foreign matter from flowing back. The screening structure 9 can screen a small amount of minerals with larger particle diameters and retain them at the screening structure 9. The minerals or impurities with smaller shapes and lighter density are passed into the second-stage cyclone 5. The screening structure 9 can be adjusted to control the particle diameter size passing therethrough. A small amount of minerals with relatively large particle diameters are retained on the surface of the screening structure 9. Liquid is then passed into the shunt pipe 7 to dilute the suspension to change the density of the suspension. The water in the shunt pipe 7 is mixed with the previous suspension to change the density of the suspension inside the second-stage cyclone 5, so that the density value of the suspension inside the second-stage cyclone 5 is between the density values ​​of different minerals.

[0044] S5: the ore is screened again in the second cyclone 5, and the ore passing through the connecting pipe 1 4 and the connecting pipe 2 6 is screened again by the second cyclone 5, so that the light-density minerals and the medium-density minerals are discharged from the third discharge port 13 and the second discharge port 12 of the second cyclone 5 respectively;

[0045] S6: Medium recovery. The heavy medium separated from the underflow and overflow needs to be recovered. The medium and minerals are separated by the medium removal equipment. The recovered heavy medium is circulated back to the suspension system for recycling;

[0046] S7: Dehydration treatment: the sorted barite and fluorite products are dehydrated separately to reduce the moisture content in the products and improve the product quality;

[0047] S8: Waste treatment of minerals, environmental protection treatment of tailings after cyclone sorting, treatment of wastewater and waste residue generated during the production process, ensuring compliance with environmental protection requirements and ensuring no pollution to the environment;

[0048] The feed port 1 and the first discharge port 11 are arranged at the two ends of the first cyclone 2. The preliminarily prepared mineral is put into the feed port 1. The medium pipe 3 is arranged at the bottom of the cylindrical surface of the first cyclone 2, and the suspension is injected into the first cyclone 2 from the medium pipe 3 at the same time. At this time, the shape, diameter and entry angle of the medium pipe 3 will affect the path of the suspension inflow. The suspension in the medium pipe 3 enters the first cyclone 2, which will make the ore with a higher specific gravity flow along the first cyclone. The inner wall of the first section cyclone 2 moves in a spiral shape, and the ore with a small specific gravity moves in a spiral shape along the central axis of the first section cyclone 2, and the ore with a large specific gravity moves in the opposite direction to the ore with a small specific gravity. The second discharge port 12 and the third discharge port 13 are arranged at the two ends of the second section cyclone 5. The ore with a relatively heavy specific gravity is discharged from the first discharge port 11, and the ore with a relatively light specific gravity enters the second section cyclone 5 from the connecting pipe 1 4 and the connecting pipe 2 6, and the connecting pipe 1 4 is welded to the cylindrical portion of the first section cyclone 2. At the top of the surface, the connecting pipe 2 6 is welded to one end of the cylindrical surface of the second section cyclone 5, and the connecting pipe 1 4 and the connecting pipe 2 6 are connected to each other, the connecting pipe 1 4 and the connecting pipe 2 6 are fixed by bolts, and the connecting pipe 1 4 and the connecting pipe 2 6 can be detachably installed, and the check structure 8 and the screening structure 9 are respectively arranged inside the connecting pipe 1 4 and the connecting pipe 2 6, and the medium suspension is used to push the check structure 8 to open. When the medium suspension stops working, the check structure 8 is closed to prevent the light minerals or foreign matter from flowing back, and the screening structure 9 can be adjusted to control the diameter of the particles passing through here, and a small amount of minerals with relatively large particle diameters are retained on the surface of the screening structure 9. The shunt pipe 7 is arranged at the upper end of the connecting pipe 2 6, and then the liquid diluting suspension is introduced into the shunt pipe 7. The water in the shunt pipe 7 is mixed with the previous suspension to change the density of the suspension inside the second section cyclone 5, so that the density value of the suspension inside the second section cyclone 5 is between the density values ​​of different minerals;

[0049] The ore that has been preliminarily crushed and screened is put into the feed port 1 and processed by the suspension of specific density inside the first stage cyclone 2, so that the fluorite-barite associated ore with a larger specific gravity is discharged from the first discharge port 11, and the fluorite-quartz associated ore and the fluorite-calcium carbonate associated ore enter the connecting pipe 1 4 from the top of the first stage cyclone 2. The medium suspension is used to push the check structure 8 to open. When the medium suspension stops working, the check structure 8 is closed to prevent the light minerals or foreign matter from flowing back. When a small amount of ores with a relatively large shape and a relatively small specific gravity enter the connecting pipe 2 6, the screening structure 9 can be used to retain the relatively large ore so that the ore is located at the connecting pipe 2 6, and then the remaining ore enters the second stage cyclone 5. At this time, the fluorite-quartz associated ore and the fluorite-calcium carbonate associated ore with a relatively large specific gravity are discharged from the second discharge port 12, and the smaller specific gravity are discharged from the third discharge port 13.

[0050] See also Figure 3 and Figure 4 As shown, the check structure 8 includes a fixing ring 81, which is welded to the inner wall of the connecting pipe 4, and a middle strip 84 is integrally arranged inside the fixing ring 81. A swing plate 82 and a swing plate 83 for closing and opening are arranged in the middle of the fixing ring 81. When the suspension flows in the connecting pipe 4, the swing plate 82 and the swing plate 83 can be opened, so that the swing plate 82 and the swing plate 83 are deflected, and the minerals with smaller specific gravity can be discharged from the swing plate 82 and the swing plate 83. The fixing ring 81 and the swing plate 82 are adapted to the shape of the fixing ring 81, and the swing plate 82 and the swing plate 83 are assembled into a whole circle, and the two ends of the swing plate 82 Both ends of the swing plate 82 and the swing plate 83 are rotatably connected to the fixed ring 1 81 through a pin 86. The position of the pin 86 corresponds to the edge position of the middle bar 84, so that the swing plates 1 82 and the swing plates 2 83 are not affected by the middle bar 84 when they are opened. A torsion spring 85 is arranged in the middle of the middle bar 84, and the two ends of the torsion spring 85 are respectively in contact with the swing plates 1 82 and the swing plates 2 83. The suspension pushes the swing plates 1 82 and the swing plates 2 83 to open. When the flow rate of the suspension decreases or even stops, the swing plates 1 82 and the swing plates 2 83 can be closed under the action of the torsion spring 85, thereby avoiding the situation that the flow rate of the suspension is too low, which causes the presence of minerals with a larger specific gravity in the minerals entering the second-stage cyclone 5.

[0051] See also Figure 3 , Figure 5 and Figure 6As shown, the screening structure 9 includes a second fixing ring 91, which is welded to the inside of the second connecting pipe 6, and a fixing plate 92 and a rotating plate 93 are arranged inside the second fixing ring 91. The surfaces of the fixing plate 92 and the rotating plate 93 are provided with three groups of screening slots 95. The staggered degree of the fixing plate 92 and the rotating plate 93 can make the sizes of the two screening slots 95 vary, so that ores of different sizes can be restricted from passing through this place. The rotating plate 93 can rotate on the surface of the fixing plate 92. The fixing plate 92 is welded to the second fixing ring 91, and the fixing plate 92 and the second fixing ring 91 are welded together. A reserved hole 910 is arranged in the middle of the fixing plate 92, and a fixing column 94 is integrally arranged in the middle of the rotating plate 93. A fixing column 94 is arranged inside the fixing column 94. The fixed rod 96 is provided with a spiral strip 98 on the outer wall of the fixed rod 96, and a spiral hole 97 matching with the spiral strip 98 is opened on the inner wall of the fixed column 94. The fixed rod 96 can be rotated so that the spiral strip 98 of the fixed rod 96 matches with the spiral hole 97 of the fixed column 94. The structure of the spiral hole 97 and the spiral strip 98 is similar to the hand-push bamboo dragonfly structure, so that the rotating plate 93 rotates relative to the fixed plate 92, and the rotating plate 93 rotates relative to the fixed ring 91, and the edge of the fixed ring 91 is welded with a limit block 99 for limiting the up and down movement of the fixed plate 92. The lifting and lowering of the fixed rod 96 can cause the rotating plate 93 to rotate, so that the rotating plate 93 rotates inside the fixed ring 91 and will not go out from the inside of the fixed ring 91.

[0052] See also Figure 3 and Figure 7As shown, a linkage structure 10 is arranged between the check structure 8 and the screening structure 9, and the linkage structure 10 includes a thread line 101, and the thread line 101 is opened on the outer wall of the fixed rod 96, and the outer wall of the fixed rod 96 is threadedly connected to the thread sleeve 102, and the thread sleeve 102 and the thread line 101 cooperate with each other, and the position of the thread sleeve 102 can be adjusted according to the degree of overlap between the fixed plate 92 and the rotating plate 93, and the thread sleeve 102 rotates downward along the thread line 101, so that the degree of later descent of the fixed rod 96 is limited, and a matching hole 104 is opened at the top of the fixed rod 96, and a movable rod 103 floating up and down is arranged inside the matching hole 104, and a telescopic spring connecting the fixed rod 96 and the movable rod 103 is arranged inside the matching hole 104, and the movable rod 103 rises or falls to a certain degree. When the movable rod 103 and the fixed rod 96 are moved synchronously, two connecting rods 105 are arranged on the top of the movable rod 103, and the two connecting rods 105 are respectively connected with the swing plate 1 82 and the swing plate 2 83. When the swing plate 1 82 and the swing plate 2 83 are subjected to thrust, the movable rod 103 is pressed down. After the movable rod 103 moves a distance along the matching hole 104 inside the fixed rod 96, the movable rod 103 and the fixed rod 96 move together along the spiral hole 97, so that the fixed plate 92 and the rotating plate 93 can overlap, so that the ore can pass through the screening slot 95 of the fixed plate 92 and the rotating plate 93. The position of the threaded sleeve 102 is set in advance, and the size of the expansion of the screening slot 95 can be determined. When the flow rate of the suspension is relatively small, the screening slot 95 is also closed, thereby realizing double insurance.

[0053] The preferred embodiments of the present invention disclosed above are only used to help explain the present invention. The preferred embodiments do not describe all the details in detail, nor do they limit the invention to only specific implementation methods. Obviously, many modifications and changes can be made according to the content of this specification. This specification selects and specifically describes these embodiments in order to better explain the principles and practical applications of the present invention, so that those skilled in the art can understand and use the present invention well. The present invention is limited only by the claims and their full scope and equivalents.

Claims

1. A heavy medium beneficiation process for barite and fluorite associated ore, characterized in that: The following steps are involved: S1: Prepare the required raw materials and heavy media, preliminarily crush and screen the raw ore for standby use, prepare a heavy medium suspension of a certain concentration, and adjust the density of the suspension according to the mineral density and sorting requirements; S2: placing the raw material and the heavy medium into the first cyclone (2), adding the raw material into the first cyclone (2) from the feed port (1), passing the medium into the medium feed pipe (3), the heavy medium moving from the bottom end to the top end of the first cyclone (2), and the raw material moving from the top end to the bottom end of the first cyclone (2); S3: The ore is initially cyclone-separated in the first-stage cyclone (2). In the heavy medium cyclone, due to the different densities of the minerals, the mineral particles are separated into layers according to their density under the effects of centrifugal force, gravity and medium resistance. Barite and heavier minerals sink to the bottom due to their larger density and are discharged from the first discharge port (11), while fluorite and lighter minerals follow the flow and are arranged in the upper layer of the first-stage cyclone (2) due to their smaller specific gravity, and enter the interior of the second-stage cyclone (5) from the connecting pipe 1 (4); S4: The ores with large shape differences in the connecting pipe 1 (4) and the connecting pipe 2 (6) are processed by the check structure (8) and the screening structure (9). When the injection of the heavy medium is stopped, the check structure (8) can prevent the minerals from flowing back. The screening structure (9) can screen a small amount of minerals with large particle diameters and retain them at the screening structure (9). The minerals or impurities with smaller shapes and lighter densities are passed into the second stage cyclone (5), and then the liquid diluting suspension is passed into the diversion pipe (7) to change the density of the suspension. S5: the ore is screened again in the second cyclone (5), and the ore passing through the connecting pipe 1 (4) and the connecting pipe 2 (6) is screened again by the second cyclone (5), so that the light-density minerals and the medium-density minerals are discharged from the third discharge port (13) and the second discharge port (12) of the second cyclone (5) respectively; S6: Medium recovery: the heavy medium separated from the underflow and overflow needs to be recovered. The medium and minerals are separated by the medium removal equipment, and the recovered heavy medium is circulated back to the suspension system; S7: Dehydration treatment: the sorted barite and fluorite products are dehydrated separately to reduce the moisture content in the products; S8: Waste treatment of minerals, environmentally friendly treatment of tailings after cyclone sorting to ensure no pollution to the environment.

2. The heavy medium beneficiation process of a barite fluorite associated ore according to claim 1, characterized in that: The feed port (1) and the first discharge port (11) are arranged at the two ends of the first section cyclone (2), the medium feeding pipe (3) is arranged at the bottom end of the cylindrical surface of the first section cyclone (2), the second discharge port (12) and the third discharge port (13) are arranged at the two ends of the second section cyclone (5), and the connecting pipe 1 (4) is welded to the top end of the cylindrical surface of the first section cyclone (2), the connecting pipe 2 (6) is welded to one end of the cylindrical surface of the second section cyclone (5), and the connecting pipe 1 (4) and the connecting pipe 6 are welded to the top end of the cylindrical surface of the second section cyclone (5). The two pipes (6) are interconnected, and the check structure (8) and the screening structure (9) are respectively arranged inside the connecting pipe (4) and the connecting pipe (6), and the shunt pipe (7) is arranged at the upper end of the connecting pipe (6); the particles of the raw ore in S1 after preliminary crushing and screening are less than 10 mm, and the heavy medium includes one or more of magnetite powder and silicon-calcium alloy, which are mixed with water to adjust to an appropriate concentration and density, and the density of the heavy medium suspension is between barite and fluorite.

3. The heavy medium beneficiation process of a barite fluorite associated ore according to claim 1, characterized in that: The ore with a higher specific gravity in S3 moves in a spiral shape along the inner walls of the first cyclone (2) and the second cyclone (5), and the ore with a lower specific gravity in S3 moves in a spiral shape along the central axis of the first cyclone (2) and the second cyclone (5), and the ore with a higher specific gravity moves in the opposite direction to the ore with a lower specific gravity.

4. The heavy medium beneficiation process of a barite fluorite associated ore according to claim 1, characterized in that: In the S4, the medium suspension is used to push the check structure (8) to open. When the medium suspension stops working, the check structure (8) is closed to prevent the light minerals or foreign matter from flowing back. In S4, the screening structure (9) can be adjusted to control the diameter of the particles passing therethrough, so that a small amount of minerals with relatively large particle diameters are retained on the surface of the screening structure (9).

5. The heavy medium beneficiation process of a barite fluorite associated ore according to claim 1, characterized in that: The water in the diversion pipe (7) in S4 is mixed with the previous suspension to change the density of the suspension inside the second-stage cyclone (5), so that the density value of the suspension inside the second-stage cyclone (5) is between the density values ​​of different minerals.

6. A heavy medium beneficiation process for barite fluorite associated ore according to any one of claims 1 to 5, characterized in that: The non-return structure (8) comprises a fixing ring (81) which is welded to the inner wall of the connecting pipe (4). A middle strip (84) is integrally arranged inside the fixing ring (81). A swing plate (82) and a swing plate (83) for closing and opening are arranged in the middle of the fixing ring (81). The fixing ring (81) and the swing plate (82) are adapted to the shapes of the fixing ring (81). Both ends of the swing plate (82) and both ends of the swing plate (83) are rotatably connected to the fixing ring (81) through a pin (86). A torsion spring (85) is arranged in the middle of the middle strip (84). Both ends of the torsion spring (85) are in contact with the swing plate (82) and the swing plate (83) respectively.

7. A heavy medium beneficiation process for barite and fluorite associated ore according to claim 6, characterized in that: The screening structure (9) comprises a second fixing ring (91), the second fixing ring (91) is welded to the inside of the second connecting pipe (6), a fixing plate (92) and a rotating plate (93) are arranged inside the second fixing ring (91), three groups of screening grooves (95) are provided on the surfaces of the fixing plate (92) and the rotating plate (93), the fixing plate (92) is welded to the second fixing ring (91), a reserved hole (910) is provided in the middle of the fixing plate (92), a fixing column (94) is integrally arranged in the middle of the rotating plate (93), a fixing rod (96) is arranged inside the fixing column (94), a spiral strip (98) is provided on the outer wall of the fixing rod (96), a spiral hole (97) matched with the spiral strip (98) is provided on the inner wall of the fixing column (94), the rotating plate (93) rotates relative to the second fixing ring (91), and a limit block (99) for limiting the upward and downward movement of the fixing plate (92) is welded to the edge of the second fixing ring (91).

8. A heavy medium beneficiation process for barite and fluorite associated ore according to claim 7, characterized in that: A linkage structure (10) is provided between the non-return structure (8) and the screening structure (9), the linkage structure (10) comprising a threaded line (101), the threaded line (101) being provided on the outer wall of the fixed rod (96), and the outer wall of the fixed rod (96) being threadedly connected to a threaded sleeve (102), a matching hole (104) being provided at the top end of the fixed rod (96), and a movable rod (103) floating up and down being provided inside the matching hole (104), a telescopic spring connecting the fixed rod (96) and the movable rod (103) being provided inside the matching hole (104), and two connecting rods (105) being provided at the top end of the movable rod (103), and the two connecting rods (105) being respectively connected to the swing plate 1 (82) and the swing plate 2 (83).