Subway tunnel surrounding rock disturbance stress field monitoring device and method
By designing a surrounding rock disturbance stress field monitoring device for subway tunnels, using attitude adjustment parts and push rods, the detection error and construction space occupation problems in the existing technology are solved, and high-precision and real-time stress field monitoring and risk assessment.
Patent Information
- Application Number
- CN202411092537.5
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-08-09
- Publication Date
- 2024-12-03
AI Technical Summary
The existing tunnel surrounding rock surface deformation monitoring and surrounding rock pressure testing methods cannot accurately obtain the stress field distribution under excavation disturbances and complex loads, and the support frame occupies construction space, and the pressure sensor does not come into full contact with the surrounding rock, resulting in detection errors.
A monitoring device including buried ring, attitude adjustment member, push rod and self-dumping lock member is designed. By adjusting the angle and fixing method of the pressure sensor, the sensor is ensured to be in full contact with the surrounding rock, avoid detection errors, and use the separation rod and Push rods achieve rapid fixation and disassembly, reducing the impact on construction space.
It realizes high-precision surrounding rock stress monitoring, reduces detection errors, expands the measurement range, is highly adaptable, and can collect stress field changes in real time, providing an accurate basis for tunnel construction risk assessment.
Smart Images

Figure CN119063890A_ABST
Abstract
Description
Technical Field
[0001] The present application relates to the technical field of subway tunnel surrounding rock stress field testing, and in particular to a device and method for monitoring the disturbance stress field of subway tunnel surrounding rock. Background Art
[0002] When constructing urban highway, subway and railway tunnels, there is not only the redistribution of surrounding rock stress caused by the tunnel excavation unloading itself, but also the complex dynamic and static loads that bring great risks to the stability of the tunnel and the adjacent surrounding rock. The complex construction geology and construction conditions make it impossible for the existing survey and design methods to accurately predict and evaluate the risks of the entire construction process. Therefore, the acquisition of real-time monitoring results within the range of surrounding rock disturbance during tunnel excavation is extremely important for the assessment of tunnel surrounding rock stability. The surrounding rock deformation under the influence of tunnel excavation unloading and external dynamic and static combined loads has a typical time effect.
[0003] In some related technologies, the existing tunnel surrounding rock surface deformation monitoring and surrounding rock pressure testing methods can only reflect the characteristics at the tunnel boundary at the current moment, but cannot obtain the size and range of the stress field distribution under excavation disturbance and overlying dynamic and static combined loads in the first time, which is extremely important for the safety risk assessment of complex subway tunnel construction.
[0004] In addition, when testing the surrounding rock pressure, it is necessary to use a support frame or support to fix the pressure sensor at the detection position. There is a problem that the support frame occupies the construction space and it is difficult to arrange multiple pressure sensors. In addition, the contact surface of the pressure sensor cannot be fully in contact with the surrounding rock, and it is not convenient to adjust, resulting in inconsistency with the stress direction to be measured, and there is a certain detection error. Summary of the invention
[0005] The embodiments of the present application provide a device and method for monitoring the disturbance stress field of surrounding rock in subway tunnels, so as to solve the technical problems in the related art that the construction space is affected when a support frame fixes multiple pressure sensors at the detection position, and the pressure sensors cannot be in full contact with the surrounding rock, resulting in detection errors.
[0006] In a first aspect, a device for monitoring the disturbance stress field of surrounding rock in a subway tunnel is provided, comprising:
[0007] Bury the ring;
[0008] Two posture adjustment members are installed in the inner space of the embedding ring and are located at both ends of the installation line, and the installation line is the diameter of the embedding ring; the two posture adjustment members are respectively connected to the two sides of the pressure sensor in the length direction of the installation line, and are used to rotate the pressure sensor with the installation line as the rotation axis;
[0009] A pushing rod has one end connected to the embedding ring and the other end connected to a separating rod via a self-unloading locking piece.
[0010] In some embodiments, the buried ring is provided with a via hole;
[0011] The posture adjustment member comprises a screw rod, the screw rod passes through the through hole; one end of the screw rod located in the internal space is connected with a tightening block, and the other end of the screw rod is connected with the pushing rod, and a clamping nut is screwed thereon.
[0012] In some embodiments, the clamping block is provided with upper and lower limiting parts, and the width of the slot formed between the two limiting parts is equal to the thickness of the pressure sensor; adhesive glue or rubber pads are provided on the surfaces of the clamping block and the limiting parts in contact with the pressure sensor.
[0013] In some embodiments, the self-unloading locking member includes a plurality of clamping rods, which are connected to the pushing rod and are distributed in a ring shape on the circumference of the pushing rod;
[0014] A receiving groove is provided at the center of the end of one end of the separation rod connected to the self-unloading locking piece; the separation rod is also provided with a guide groove and a clamping groove corresponding to the clamping rod, and the guide groove and the clamping groove are connected with the receiving groove; the guide groove extends axially from the end of the separation rod to a designed length and is connected with the clamping groove; the clamping groove and the guide groove are not on the same axis.
[0015] In some embodiments, the self-unloading locking member includes a cylinder, an electromagnet is provided inside the cylinder, and the electromagnet is connected to a power cord and a control switch; one end of the cylinder is open and the other end is closed, the separation rod is connected to the closed end of the cylinder, and the clamping rod extends into the cylinder.
[0016] In some embodiments, one end of the release rod away from the dump locking member is connected to a plurality of extension rods along its axial direction, and the extension rods are telescopic in the axial direction of the release rod.
[0017] In some embodiments, the pushing rod is detachably connected to the embedding ring.
[0018] In some embodiments, the embedding ring is provided with a threaded connection hole; the pushing rod is connected to the embedding ring via the threaded connection hole.
[0019] In some embodiments, a wire groove is provided on the embedding ring, and the thickness of the pressure sensor is greater than or equal to the height of the embedding ring.
[0020] In a second aspect, a method for monitoring the disturbance stress field of surrounding rock in a subway tunnel is provided, which comprises the following steps:
[0021] Drill holes at the designed positions of the tunnel surrounding rock to form installation holes for pressure sensors;
[0022] Obtaining the stress direction to be measured of each pressure sensor installation hole, and adjusting the installation angle of the pressure sensor by using the posture adjustment member;
[0023] Use the separation rod and the push rod to send the buried ring and the pressure sensor to the corresponding pressure sensor installation hole for temporary fixation;
[0024] The pressure sensor is debugged and inspected, and after the inspection is completed, grouting and sealing are performed to complete the fixation of the pressure sensor; after the pressure sensor is fixed, the separation rod and the push rod are separated by the self-unloading locking piece.
[0025] The beneficial effects of the technical solution provided by this application include:
[0026] The embodiment of the present application provides a device and method for monitoring the disturbance stress field of surrounding rock of a subway tunnel. Since two attitude adjustment members are installed in the internal space of an embedded ring and located at both ends of an installation line, the installation line is the diameter of the embedded ring; the two attitude adjustment members are respectively connected to the two sides of the pressure sensor in the length direction of the installation line, and are used to rotate the pressure sensor with the installation line as the rotation axis; one end of the push rod is connected to the embedded ring, and the other end is connected to a separation rod through a self-unloading locking member; the pressure sensor is adjusted to any required angle by the attitude adjustment member, so as to ensure the adjustment and fixation of the angle of the pressure sensor, ensure the accurate measurement of the positive stress transmitted to the sensor position by the external load, and avoid the test error caused by the inconsistent direction of the stress to be measured caused by the contact surface direction of the pressure sensor; the pressure sensor is sent to the installation position by the push rod and the separation rod for fixing, and after fixing and debugging, the pressure sensor is ensured to be in full contact with the tunnel surrounding rock by grouting and sealing the hole, and the separation rod is separated and disassembled to avoid affecting the construction space and the embedding of other sensors in the borehole; when the surrounding rock is disturbed under the influence of excavation unloading or other external loads, the pressure sensor information collection results can be analyzed and evaluated. BRIEF DESCRIPTION OF THE DRAWINGS
[0027] In order to more clearly illustrate the technical solutions in the embodiments of the present application, the drawings required for use in the description of the embodiments will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present application. For ordinary technicians in this field, other drawings can be obtained based on these drawings without creative work.
[0028] Figure 1 The overall structure of the device for monitoring the disturbance stress field of surrounding rock in a subway tunnel provided in the embodiment of the present application;
[0029] Figure 2 A schematic diagram of the installation of multiple devices for monitoring the surrounding rock disturbance stress field of a subway tunnel provided in an embodiment of the present application;
[0030] Figure 3 A schematic diagram of the connection between the separation rod and the extension rod provided in an embodiment of the present application;
[0031] Figure 4 A schematic diagram of the structure of a separation rod provided in an embodiment of the present application;
[0032] Figure 5 A schematic diagram of the connection between the push rod and the self-unloading locking member provided in an embodiment of the present application;
[0033] Figure 6 A schematic diagram of the structure of the posture adjustment member provided in the embodiment of the present application;
[0034] Figure 7 A schematic diagram of the connection between the buried ring, attitude adjustment member and pressure sensor provided in an embodiment of the present application.
[0035] In the figure: 1. buried ring; 100. through hole; 101. threaded connection hole; 102. wire groove; 2. pressure sensor; 3. posture adjustment member; 300. screw; 301. tightening block; 302. clamping nut; 303. limit part; 4. push rod; 5. self-unloading locking member; 500. clamping rod; 6. separation rod; 600. accommodating groove; 601. guide groove; 602. clamping groove; 7. extension rod; 8. sleeve. DETAILED DESCRIPTION
[0036] In order to make the purpose, technical solution and advantages of the embodiments of the present application clearer, the technical solution in the embodiments of the present application will be clearly and completely described below in conjunction with the drawings in the embodiments of the present application. Obviously, the described embodiments are part of the embodiments of the present application, not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of this application.
[0037] The embodiments of the present application provide a device and method for monitoring the disturbance stress field of surrounding rock in a subway tunnel, so as to solve the technical problems in the related art that the construction space is affected when a support frame fixes multiple pressure sensors at the detection position, and the pressure sensors cannot be in full contact with the surrounding rock, resulting in detection errors.
[0038] See also Figure 1-Figure 7 A device for monitoring the disturbance stress field of surrounding rock in a subway tunnel comprises a buried ring 1, a pressure sensor 2, a posture adjustment member 3, a push rod 4, a self-unloading locking member 5 and a separation rod 6.
[0039] Among them, two posture adjustment parts 3 are installed in the internal space of the buried ring 1 and are located at both ends of the installation line, and the installation line is the diameter of the buried ring 1; the two posture adjustment parts 3 are respectively connected to the pressure sensor 2 on both sides of the length direction of the installation line, and are used to rotate the pressure sensor 2 with the installation line as the rotation axis; the push rod 4, one end of which is connected to the buried ring 1, and the other end is connected to the separation rod 6 through the self-unloading locking part 5.
[0040] Through the above settings, the posture adjustment part 3 rotates the pressure sensor 2 with the installation straight line as the rotation axis; the pressure sensor 2 is adjusted to any desired angle by the posture adjustment part 3, thereby ensuring the adjustment and fixation of the angle of the pressure sensor 2, ensuring the accurate measurement of the positive stress transmitted to the sensor position by the external load, and avoiding the test error caused by the inconsistency of the direction of the stress to be measured caused by the contact surface direction between the pressure sensor 2 and the tunnel surrounding rock; the pressure sensor is sent to the installation position for fixation by using the push rod 4 and the separation rod 6, and after fixation and debugging, the pressure sensor 2 is ensured to be in full contact with the tunnel surrounding rock by grouting and sealing the hole, and the separation rod 6 is separated and disassembled by the self-unloading locking part 5 to avoid affecting the construction space and the burial of other sensors in the borehole; when the surrounding rock is disturbed by excavation unloading or other external loads, the pressure sensor information collection results can be analyzed and evaluated.
[0041] In some preferred embodiments, reference Figure 1 and Figure 6 , the structure of the posture adjustment member 3 is set to facilitate adjusting the angle of the pressure sensor 2 in the buried ring 1. The specific structure is as follows:
[0042] The buried ring 1 is provided with a through hole 100; the posture adjustment member 3 includes a screw rod 300, which passes through the through hole; one end of the screw rod 300 located in the internal space is connected to a tightening block 301, and the tightening block 301; the other end of the screw rod 300 is connected to the push rod 4, and a tightening nut 302 is screwed thereon.
[0043] During adjustment, the clamping nut 302 is rotated to move the clamping nut 302 away from the buried ring 1, and then the angle of the clamping block 301 is adjusted to the desired angle, and then the clamping nut 302 is rotated to clamp the buried ring 1 to fix the angle; in the above process, the two clamping blocks 301 clamp the pressure sensor 2 tightly.
[0044] Furthermore, the abutting block 301 is provided with upper and lower limit parts 303, and the width of the slot formed between the two limit parts 303 is equal to the thickness of the pressure sensor 2; the surfaces of the abutting block 301 and the limit parts 303 in contact with the pressure sensor 2 are provided with adhesive glue or rubber pads. This structural setting can increase the connection strength with the pressure sensor 2. The adhesive glue strengthens the connection, and the rubber pad has the function of strengthening friction and reducing wear.
[0045] In some preferred embodiments, reference Figure 3-Figure 5 , the structure of the self-unloading locking member 5 and the release lever is described in detail:
[0046] The first structure
[0047] The self-unloading locking member 5 includes a plurality of clamping rods 500, which are connected to the push rod 4 and are distributed in a ring shape on the circumference of the push rod 4;
[0048] The center of the end of the separation rod 6 connected to the self-unloading locking member 5 is provided with a receiving groove 600; the separation rod 6 is also provided with a guide groove 601 and a clamping groove 602 corresponding to the clamping rod 500; the guide groove 601 and the clamping groove 602 are connected with the receiving groove 600; the guide groove 601 extends from the end of the separation rod 6 along the axial direction by a designed length and is connected with the clamping groove 602; the clamping groove 602 and the guide groove 601 are not on the same axis. Through the above structural setting, after the pressure sensor 2 is sent to the installation position and fixed, the separation rod 6 is rotated to make the clamping rod 500 disengage from the clamping groove 602, and then move along the guide groove 601, and finally the clamping rod 500 and the separation rod 6 are separated. When not disassembled, the push rod 4 enters the receiving groove 600, at which time the clamping rod 500 moves along the guide groove 601, and then the separation rod 6 is rotated to make the clamping rod 500 and the clamping groove 602 clamp.
[0049] The second structure
[0050] The self-unloading locking member 5 includes a cylinder, an electromagnet is arranged inside the cylinder, and the electromagnet is connected to a power line and a control switch; one end of the cylinder is open and the other end is closed, the separation rod 6 is connected to the closed end of the cylinder, and the clamping rod 500 extends into the cylinder. The power line and the control switch can control the magnetic force generated by the electromagnet to achieve the connection and separation of the separation rod 6 and the push rod 4.
[0051] In some preferred embodiments, in order to facilitate the pushing of the pressure sensor 2, the end of the release rod 6 away from the dump lock 5 is connected to a plurality of extension rods 7 along its axial direction, and the extension rods 7 are telescopic in the axial direction of the release rod 6. The extension rods 7 are telescopic rods. Two adjacent extension rods 7 are connected by a sleeve 8, and two threaded connection holes are provided in the sleeve 8.
[0052] In some preferred embodiments, in order to realize the connection and installation of the entire device, the push rod 4 is detachably connected to the buried ring 1; the buried ring 1 is provided with a threaded connection hole 101; the push rod 4 is connected to the buried ring 1 through the threaded connection hole 101. The buried ring 1 is provided with a wire groove 102, and the thickness of the pressure sensor 2 is greater than or equal to the height of the buried ring 1.
[0053] The present application also proposes a method for monitoring the disturbance stress field of surrounding rock in a subway tunnel, which comprises the following steps:
[0054] Drill holes at the designed positions of the tunnel surrounding rock to form installation holes for pressure sensors;
[0055] Obtain the stress direction to be measured of each pressure sensor installation hole, and adjust the installation angle of the pressure sensor 2 by adjusting the posture adjustment member 3; set a hanger on the buried ring 1, and the hanger is used to hang the sealing slurry pipe;
[0056] Use the separation rod 6 and the push rod 4 to send the buried ring 1 and the pressure sensor 2 to the corresponding pressure sensor installation hole for temporary fixation; that is, bury the pressure sensors 2 one by one from far to near, lead out the data line, and connect the data acquisition system for debugging;
[0057] The pressure sensor 2 is debugged and tested, and after the verification is completed, grouting and sealing are performed to complete the fixation of the pressure sensor 2; the operation of grouting and sealing is to transmit sealing grout to the sealing grout pipe on the buried ring 1; the debugging test is to detect whether the angle of the pressure sensor 2 is the same as the direction of the pressure to be detected.
[0058] After the pressure sensor 2 is fixed, the release rod 6 and the push rod 4 are separated by the self-unloading locking member 5 .
[0059] The above monitoring method has the following effects:
[0060] (1) High measurement accuracy: By adjusting the angle to ensure that the normal direction of the contact surface of the pressure sensor 2 is consistent with the direction of the stress to be measured, the normal stress of the surrounding rock in the X, Y, Z direction or any direction can be accurately measured to avoid test errors caused by external loads and the direction of the pressure sensor. The principle is:
[0061] When the surrounding rock is disturbed by excavation unloading or other external loads, the normal stress σ of each pressure sensor can be collected through the pressure sensor information. n The center point of the pressure sensor is taken as the coordinate center point, the center plane of the pressure sensor fixing ring is taken as the xy plane, and its normal is the z direction. A local coordinate system is established. If the angle between the normal direction of the pressure sensor and the drilling depth direction is α, the stress component in the local coordinate system is:
[0062]
[0063] When the global coordinate system (XYZ) is established with the tunnel centerline, if the borehole inclination angle is β, the stress component in the global coordinate system is:
[0064]
[0065] (2) Wide test range: The buried depth and number of pressure sensors 2 can be adjusted arbitrarily according to construction needs, so as to obtain accurate surrounding rock disturbance range and spatiotemporal evolution characteristics of stress field.
[0066] (3) Strong adaptability: In order to address the construction risks that may be caused by external loads in any direction near the tunnel, pressure sensors can be pre-buried in the corresponding positions by drilling holes according to site needs, and the angle of the pressure sensor can be adjusted to ensure accurate measurement of the normal stress transmitted to the sensor position by the external load.
[0067] (4) Real-time data collection: After the borehole is filled and sealed with cement slurry, the data acquisition system can realize real-time data collection of surrounding rock stress field information, accurately obtain the magnitude of stress field changes and abnormal locations, and provide a basis for precise control of tunnel construction risks.
[0068] In the description of the present application, it should be noted that the terms "upper", "lower", etc. indicate orientations or positional relationships based on the orientations or positional relationships shown in the accompanying drawings, and are only for the convenience of describing the present application and simplifying the description, rather than indicating or implying that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and therefore cannot be understood as a limitation on the present application. Unless otherwise clearly specified and limited, the terms "installed", "connected", and "connected" should be understood in a broad sense, for example, it can be a fixed connection, a detachable connection, or an integral connection; it can be a mechanical connection or an electrical connection; it can be a direct connection, or it can be an indirect connection through an intermediate medium, or it can be a connection between the two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present application can be understood according to the specific circumstances.
[0069] It should be noted that, in this application, relational terms such as "first" and "second" are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the sentence "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
[0070] The above description is only a specific implementation of the present application, so that those skilled in the art can understand or implement the present application. Various modifications to these embodiments will be apparent to those skilled in the art, and the general principles defined herein can be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, the present application will not be limited to the embodiments shown herein, but will conform to the widest range consistent with the principles and novel features applied for herein.
Claims
1. A device for monitoring the disturbance stress field of surrounding rock in a subway tunnel, characterized in that: It includes: Bury ring (1); Two posture adjustment members (3) are installed in the internal space of the embedded ring (1) and are located at two ends of an installation line, the installation line being the diameter of the embedded ring (1); the two posture adjustment members (3) are respectively connected to the pressure sensor (2) at two sides in the length direction of the installation line, and are used to rotate the pressure sensor (2) with the installation line as a rotation axis; A push rod (4) has one end connected to the embedding ring (1) and the other end connected to a separation rod (6) via a self-unloading locking piece (5).
2. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 1, characterized in that: The buried ring (1) is provided with a via hole (100); The posture adjustment member (3) comprises a screw rod (300), the screw rod (300) passes through the through hole; one end of the screw rod (300) located in the internal space is connected to a clamping block (301), and the clamping block (301) is connected to the pushing rod (4) at the other end, and a clamping nut (302) is screwed thereon.
3. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 2, characterized in that: The abutting block (301) is provided with upper and lower limit portions (303), and the width of the slot formed between the two limit portions (303) is equal to the thickness of the pressure sensor (2); and adhesive glue or rubber pads are provided on the surfaces of the abutting block (301) and the limit portions (303) that are in contact with the pressure sensor (2).
4. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 1, characterized in that: The self-unloading locking member (5) comprises a plurality of clamping rods (500), the plurality of clamping rods (500) being connected to the pushing rod (4) and distributed in a ring shape on the circumference of the pushing rod (4); A receiving groove (600) is provided at the center of the end of the separation rod (6) connected to the self-unloading locking member (5); the separation rod (6) is also provided with a guide groove (601) and a clamping groove (602) corresponding to the clamping rod (500), and the guide groove (601) and the clamping groove (602) are connected to the receiving groove (600); the guide groove (601) extends axially from the end of the separation rod (6) by a designed length and is connected to the clamping groove (602); the clamping groove (602) and the guide groove (601) are not on the same axis.
5. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 4, characterized in that: The self-unloading locking member (5) comprises a cylinder, an electromagnet is arranged inside the cylinder, and the electromagnet is connected to a power line and a control switch; one end of the cylinder is open and the other end is closed, the separation rod (6) is connected to the closed end of the cylinder, and the clamping rod (500) extends into the cylinder.
6. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 1, characterized in that: One end of the separation rod (6) away from the dump locking piece (5) is connected to a plurality of extension rods (7) along its axial direction, and the extension rods (7) are telescopic in the axial direction of the separation rod (6).
7. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 1, characterized in that: The pushing rod (4) is detachably connected to the embedding ring (1).
8. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 7, characterized in that: The embedding ring (1) is provided with a threaded connection hole (101); the pushing rod (4) is connected to the embedding ring (1) via the threaded connection hole (101).
9. The device for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to claim 1, characterized in that: The embedded ring (1) is provided with a wire groove (102), and the thickness of the pressure sensor (2) is greater than or equal to the height of the embedded ring (1).
10. A method for monitoring the disturbance stress field of surrounding rock in a subway tunnel according to any one of claims 1 to 9, characterized in that: It includes the following steps: Drill holes at the designed positions of the tunnel surrounding rock to form installation holes for pressure sensors; Obtaining the stress direction to be measured of each pressure sensor installation hole, and adjusting the installation angle of the pressure sensor (2) using a posture adjustment member (3); Using a separation rod (6) and a push rod (4), the embedded ring (1) and the pressure sensor (2) are sent to the corresponding pressure sensor installation hole for temporary fixation; The pressure sensor (2) is debugged and tested, and after the test is completed, grouting and sealing are performed to complete the fixation of the pressure sensor (2); after the fixation of the pressure sensor (2) is completed, the separation rod (6) and the push rod (4) are separated by using the self-unloading locking member (5).
Citation Information
Cited By
Tunnel under-excavation rock mass excavation method
CN121047597A