Virtual power plant air conditioner load dispatching system and method
Through the load scheduling system of virtual power plant air conditioner, load decomposition and parameter optimization modules are used, combined with edge gateways and smart air conditioners, the effective regulation of load scheduling in virtual power plant is achieved, the load scheduling problem in virtual power plant is solved, the edge side scheduling tasks are simplified and the continuous Optimized for the overall architecture and network communication of virtual power plants.
Patent Information
- Application Number
- CN202411007083.7
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Filing Date
- 2024-07-25
- Publication Date
- 2024-12-03
AI Technical Summary
The load scheduling method in virtual power plants has not been effectively solved. It is mainly due to the complex load type and the difficulty in accurately modeling, which leads to overall scheduling difficulties. Air conditioning load scheduling is particularly important but difficult to implement.
A virtual power plant air conditioner load scheduling system is designed, including the power grid side, the virtual power plant management platform and the user side. Through the load decomposition module, the parameter optimization module and the communication management module, the load task is decomposed and adjusted, and the edge gateway and smart air conditioner are used. Device-level control is carried out, and communication is carried out using the combination of RS-485 and micro-power wireless communication.
It realizes effective regulation of load scheduling of virtual power plants, simplifies the scheduling tasks on the edge, and continuously optimizes the scheduling tasks through parameter optimization, which has good practicality and rationality, and is suitable for the overall architecture and network communication of virtual power plants.
Smart Images

Figure CN119067350A_ABST
Abstract
Description
Technical Field
[0001] The present invention belongs to the technical field of virtual power plants, and relates to a virtual power plant air conditioning load dispatching system and method. Background Art
[0002] The load dispatching method of virtual power plants has always been in the theoretical stage. This is because the load types in virtual power plants are too complex, including power plants, power generation equipment, power consumption equipment, energy storage equipment, etc. Each type of load has multiple elements, and it is difficult to accurately establish a model for each element, which makes it even more difficult to achieve overall load dispatching. In contrast, among power consumption equipment, air conditioners are common entities in virtual power plants, and are also relatively easy to model, and after the model is established, relatively better control effects can be achieved. Summary of the invention
[0003] The technical solution of the present invention is used to solve the problem of how to adjust the load of the air conditioner according to the load task of the virtual power plant to achieve load scheduling.
[0004] The present invention solves the above technical problems through the following technical solutions:
[0005] A virtual power plant air conditioning load dispatching system, comprising: a power grid side, a virtual power plant management platform side and a user side, wherein the virtual power plant management platform side and the user side constitute a virtual power plant;
[0006] The power grid side is provided with a power load management system, which sends load tasks to the virtual power plant, and the virtual power plant responds and gives feedback;
[0007] The virtual power plant management platform side includes: a virtual power plant management platform and a core switch; the virtual power plant management platform includes: an access management module, a communication management module, and a load control module; the access management module is used to connect to the power load management system to access and feedback load tasks; the communication management module is used to manage the communication and network security of the core switch; the load control module includes: a load decomposition submodule and a parameter optimization submodule; the load decomposition submodule analyzes the accessed load tasks, performs user-level load decomposition, and sends the decomposed results to the user side in the form of load instructions; the parameter optimization submodule records the parameters in the entire load decomposition process, and optimizes the temperature capability curve, priority parameters, and load regulation weights;
[0008] The user side includes: an edge gateway and an intelligent air conditioner; the edge gateway receives a load instruction, performs device-level load decomposition according to the instruction, and directly implements load control on the intelligent air conditioner according to the decomposition result; the intelligent air conditioner accepts the load control of the edge gateway, monitors the ambient temperature in real time and converts it into data and transmits it to the edge gateway periodically.
[0009] Furthermore, the method for user-level load decomposition is specifically as follows:
[0010] The lower limits of each user load are known to be l1, l2, ..., l n and upper limits h1, h2, …, h n , and load adjustment weights w1, w2, ..., w n , obtain the current load p1, p2, ..., p of each user through real-time monitoring n , for the load task target t, solve the target load t1, t2, ..., t of each user n , n is the number of users;
[0011] (1) Determine the current total load The relationship between the size of the load task target t is as follows: If the task is valley filling, execute step (2); otherwise, execute step (3);
[0012] (2) For valley filling tasks, the total load needs to be increased The difference between each user and the load limit is m i =h1-p i , i=1,2,…,n, that is, the load increase of each user is solved as d1, d2,…, d n , the constraints include: 1) the sum of the load increases of each user is equal to the total load increase 2) Satisfy weight constraints: Solve to obtain the target load t i =p i +d i ,i=1,2,…,n;
[0013] (3) For peak load reduction tasks, the total load needs to be reduced The difference between each user and the load lower limit is m i =p1-l i , i = 1, 2, ..., n, that is, the load reduction of each user is solved as d1, d2, ..., d n , the constraints include: 1) the sum of the load reduction of each user is equal to the total load reduction 2) Satisfy weight constraints: After solving, we get the target load t i =p i -d i ,i=1,2,…,n。
[0014] Furthermore, the method of equipment-level load decomposition is specifically as follows:
[0015] For a certain user, the edge gateway receives a target load instruction, and the target load is t; the user has c types of air conditioners, and each type of air conditioner has a priority parameter, which is v1, v2, ..., v c , respectively k1, k2, …, k c air conditioners, each with a temperature control capability curve And the rated power is The temperature of each air conditioner With power Bijection of; if the target power of each air conditioner is Solving the problem The following constraints are met:
[0016]
[0017] Furthermore, the optimization method of the temperature capability curve is as follows: by recording the ambient temperature monitored by each intelligent air conditioner The power required to maintain the ambient temperature Modified temperature capability curve For ambient temperatures that have not been actually tested and have practical significance The test is completed by adjusting the power to reach this temperature or according to the current The corresponding required power is obtained in the form of fitting Make corrections.
[0018] Furthermore, the optimization method of the priority parameter is as follows: according to the corrected temperature capability curve, the load decomposition process of the equipment level is simulated, and for different load instructions t, the target power is solved after decomposition. 1,2,…,k j ,j=1,2,…,c, and according to the temperature capability curve Reverse solve the temperature of each air conditioner Modify the priority parameters v1, v2, ..., v according to the results c , so that the air conditioning temperature of each priority Keep at the corresponding value.
[0019] Furthermore, the optimization method of the load regulation weight is as follows: according to the modified temperature capability curve and priority parameter, the user-level load decomposition process is simulated, and for different load task targets t, the target loads t1, t2, ..., t n , and perform equipment-level load decomposition, and combine the temperature capability curve to calculate the temperature tp of each user's various air conditioners j ,j=1,2,…,c, and modify the load adjustment weights w1, w2,…, w according to the results n , so that the temperature of the same air conditioner for different users is tpj Keep at similar values.
[0020] Furthermore, the power load management system on the grid side communicates with the core switch on the virtual power plant management platform side through the Internet; the core switch on the virtual power plant management platform side and the virtual power plant management platform use Ethernet for wired communication; the core switch on the virtual power plant management platform side and the edge gateway on the user side communicate in the form of a wireless network; the edge gateway on the user side and the smart air conditioner communicate using a combination of RS-485 and micro-power wireless communication.
[0021] A virtual power plant air conditioning load scheduling method comprises the following steps:
[0022] Step 1: The grid side issues the load task, which is then accessed by the virtual power plant management platform;
[0023] Step 2: The virtual power plant management platform performs user-level load decomposition according to the load task, and sends the decomposition result to the edge gateway on the user side in the form of load instructions;
[0024] Step 3: After receiving the load instruction, the edge gateway at the user side performs device-level load decomposition and performs air conditioning load scheduling control according to the decomposition result;
[0025] Step 4: The virtual power plant management platform monitors the completion of load instructions in real time and responds to the power grid after the load task is completed.
[0026] Furthermore, the method for user-level load decomposition is specifically as follows:
[0027] The lower limits of each user load are known to be l1, l2, ..., l n and upper limits h1, h2, …, h n , and load adjustment weights w1, w2, ..., w n , obtain the current load p1, p2, ..., p of each user through real-time monitoring n , for the load task target t, solve the target load t1, t2, ..., t of each user n , n is the number of users;
[0028] (1) Determine the current total load The relationship between the size of the load task target t is as follows: If the task is valley filling, execute step (2); otherwise, execute step (3);
[0029] (2) For valley filling tasks, the total load needs to be increased The difference between each user and the load limit is m i =h1-pi , i=1,2,…,n, that is, the load increase of each user is solved as d1, d2,…, d n , the constraints include: 1) the sum of the load increases of each user is equal to the total load increase 2) Satisfy weight constraints: Solve to obtain the target load t i =p i +d i ,i=1,2,…,n;
[0030] (3) For peak load reduction tasks, the total load needs to be reduced The difference between each user and the load lower limit is m i =p1-l i , i = 1, 2, ..., n, that is, the load reduction of each user is solved as d1, d2, ..., d n , the constraints include: 1) the sum of the load reduction of each user is equal to the total load reduction 2) Satisfy weight constraints: After solving, we get the target load t i =p i -d i ,i=1,2,…,n。
[0031] Furthermore, the method of equipment-level load decomposition is specifically as follows:
[0032] For a certain user, the edge gateway receives a target load instruction, and the target load is t; the user has c types of air conditioners, and each type of air conditioner has a priority parameter, which is v1, v2, ..., v c , respectively k1, k2, …, k c air conditioners, each with a temperature control capability curve And the rated power is The temperature of each air conditioner With power Bijection of; if the target power of each air conditioner is Solving the problem The following constraints are met:
[0033]
[0034] The advantages of the present invention are:
[0035] The present invention is used to adjust the load of the air conditioner according to the load task of the virtual power plant to achieve load scheduling; by performing two-level decomposition of the load instruction at the user level and the equipment level, the load control task is moved to the edge side, and the air conditioning load is simplified so that the edge side can perform the scheduling task, which has good practicality; the parameters are optimized and adjusted, and continuously updated, so that the scheduling task is continuously optimized, which has better rationality; in addition, the present invention aims at the overall architecture and network communication of the virtual power plant, adopts different communication methods between different objects, and the user level adopts a combination of RS-485 and micro-power wireless communication to communicate, which has both practicality and versatility. BRIEF DESCRIPTION OF THE DRAWINGS
[0036] Figure 1 It is the overall architecture diagram of the virtual power plant air conditioning load dispatching system of the present invention;
[0037] Figure 2 It is a structural block diagram of the virtual power plant management platform of the present invention;
[0038] Figure 3 It is a schematic diagram of a network communication mode of a virtual power plant air conditioning load dispatching system of the present invention;
[0039] Figure 4 It is a response flow chart of the load task of the present invention. DETAILED DESCRIPTION
[0040] In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the technical solution in the embodiments of the present invention will be clearly and completely described below in combination with the embodiments of the present invention. Obviously, the described embodiments are part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without creative work are within the scope of protection of the present invention.
[0041] The technical solution of the present invention is further described below in conjunction with the accompanying drawings and specific embodiments:
[0042] Embodiment 1
[0043] 1. Overall architecture
[0044] like Figure 1 As shown, the overall architecture of the virtual power plant air conditioning load dispatching system of the present invention includes: a power grid side, a virtual power plant management platform side and a user side, the latter two forming a virtual power plant.
[0045] A power load management system is provided on the grid side, which sends load tasks to the virtual power plant, and the virtual power plant is responsible for responding and providing feedback.
[0046] The virtual power plant management platform side includes but is not limited to the virtual power plant management platform and core switches. The virtual power plant management platform is the core of the virtual power plant, and its functional modules include but are not limited to Figure 2 The modules shown. Access management mainly connects the load to the power load management system to access and respond to load tasks. Communication management mainly manages the communication and network security of the core switch. Load control is the core of the air conditioning load scheduling method, which mainly includes two modules: the load decomposition module analyzes the accessed load tasks, performs user-level load decomposition, and sends the decomposed results to the user side in the form of load instructions; the parameter optimization module records the parameters in the entire process of load decomposition and optimizes them using machine learning algorithms.
[0047] The user side includes but is not limited to edge gateways and smart air conditioners. The edge gateway receives load instructions, decomposes the load at the device level according to the instructions, and directly controls the load of the smart air conditioner according to the decomposition results. Compared with general air conditioners, in addition to being able to accept load control from the edge gateway, smart air conditioners also need to be able to monitor the ambient temperature in real time and convert it into data for periodic transmission to the edge gateway.
[0048] 2. Network communication method
[0049] like Figure 3 As shown in the figure, the network communication mode of the virtual power plant air conditioning load dispatching system is as follows:
[0050] Between the power load management system on the grid side and the core switch on the virtual power plant management platform side: The communication method of this part is determined by the grid and is often carried out through the Internet.
[0051] Between the core switch on the virtual power plant management platform side and the virtual power plant management platform: This part belongs to the internal network on the virtual power plant management platform side, and Ethernet is often used for wired communication.
[0052] Between the core switch on the virtual power plant management platform side and the edge gateway on the user side: Due to the large number and dispersion of users, this part of the communication is often carried out in the form of a wireless network, so it is advisable to use a dedicated mobile data network for communication.
[0053] Between the edge gateway on the user side and the smart air conditioner: This part belongs to the user side. The transmission distance is relatively small and the communication volume is not large. It is advisable to use a combination of RS-485 and micro-power wireless communication for communication. For scenarios with conditional wiring, RS-485 is used for wired communication. For scenarios that are not suitable for wiring, micro-power wireless communication is used for wireless communication.
[0054] 3. Load decomposition
[0055] like Figure 4As shown in the figure, it is a complete response process of a load task: the grid side issues the load task and is accessed by the virtual power plant management platform; the virtual power plant management platform performs user-level load decomposition according to the load task, and sends the decomposition result to the edge gateway on the user side in the form of a load instruction; the edge gateway on the user side performs device-level load decomposition after receiving the load instruction, and performs scheduling and control of the air-conditioning load according to the decomposition result; the virtual power plant management platform monitors the completion of the load instruction in real time, and responds to the grid after the load task is completed.
[0056] For user-level load decomposition, the specific implementation method is as follows:
[0057] It is known that the lower limits of the load of each user (assuming the number of users is n) are l1, l2, ..., l n and upper limits h1, h2, …, h n , and load adjustment weights w1, w2, ..., w n , obtain the current load p1, p2, ..., p of each user through real-time monitoring n , for the load task target t, solve the target load t1, t2, ..., t of each user n .
[0058] (1) Determine the current total load The relationship between the size of the load task target t is as follows: If the task is valley filling, execute step (2); otherwise, the task is peak shaving, execute step (3).
[0059] (2) For valley filling tasks, the total load needs to be increased The difference between each user and the load limit is m i =h1-p i , i=1,2,…,n, that is, the load increase of each user is solved as d1, d2,…, d n , the constraints include: 1) the sum of the load increases of each user is equal to the total load increase 2) To meet the weight constraint, the optional formulas include After solving, we can get the target load t i =p i +d i ,i=1,2,…,n。
[0060] (3) For peak load reduction tasks, the total load needs to be reduced The difference between each user and the load lower limit is m i =p1-l i , i = 1, 2, ..., n, that is, the load reduction of each user is solved as d1, d2, ..., d n , the constraints include: 1) the sum of the load reduction of each user is equal to the total load reduction 2) To meet the weight constraint, the optional formulas include After solving, we can get the target load t i =p i -d i ,i=1,2,…,n。
[0061] For device-level load decomposition, the specific implementation method is as follows:
[0062] For a certain user, the edge gateway receives a target load instruction, and the target load is t. The user has c types of air conditioners, and each type of air conditioner has a priority parameter, which is v1, v2, ..., v c , respectively k1, k2, …, k c air conditioners, each with a temperature control capability curve And the rated power is The temperature of each air conditioner With power If the target power of each air conditioner is Solving the problem The following constraints are met:
[0063]
[0064] 4. Parameter Optimization
[0065] The virtual power plant management platform has a parameter optimization module, which can optimize the parameters including the load adjustment weights w1, w2, ..., w n , the priority parameters v1, v2, ..., v of each user's air conditioner c And the temperature capability curve of each air conditioner The specific optimization process is as follows:
[0066] (1) Optimize the temperature capability curve
[0067] By recording the ambient temperature monitored by each smart air conditioner The power required to maintain the ambient temperature Modified temperature capability curve For ambient temperatures that have not been actually tested and have practical significance This can be done by targeted testing (adjusting the power to reach the temperature to complete the test) or curve fitting (based on the current The corresponding required power is obtained in the form of fitting Make corrections.
[0068] (2) Priority parameters
[0069] According to the corrected temperature capability curve, the load decomposition process at the equipment level is simulated. For different load instructions t, the target power is solved after decomposition. And according to the temperature capability curve Reverse solve the temperature of each air conditioner Modify the priority parameters v1, v2, ..., v according to the results c , so that the air conditioning temperature of each priority Keep at the corresponding value.
[0070] (3) Load adjustment weight
[0071] The load decomposition process at the user level is simulated according to the corrected temperature capability curve and priority parameters. For different load task targets t, the target loads t1, t2, ..., t n , and perform equipment-level load decomposition, and combine the temperature capability curve to calculate the temperature tp of each user's various air conditioners j ,j=1,2,…,c, and modify the load adjustment weights w1, w2,…, w according to the results n , so that the temperature of the same air conditioner for different users is tp j can be kept at similar values.
[0072] Embodiment 2
[0073] A virtual power plant air conditioning load scheduling method comprises the following steps:
[0074] Step 1: The grid side issues the load task, which is then accessed by the virtual power plant management platform;
[0075] Step 2: The virtual power plant management platform performs user-level load decomposition according to the load task, and sends the decomposition result to the edge gateway on the user side in the form of load instructions;
[0076] The method for user-level load decomposition is specifically as follows:
[0077] The lower limits of each user load are known to be l1, l2, ..., l n and upper limits h1, h2, …, h n , and load adjustment weights w1, w2, ..., w n , obtain the current load p1, p2, ..., p of each user through real-time monitoring n , for the load task target t, solve the target load t1, t2, ..., t of each user n , n is the number of users;
[0078] (1) Determine the current total load The relationship between the size of the load task target t is as follows: If the task is valley filling, execute step (2); otherwise, execute step (3);
[0079] (2) For valley filling tasks, the total load needs to be increased The difference between each user and the load limit is m i =h1-p i , i=1,2,…,n, that is, the load increase of each user is solved as d1, d2,…, d n , the constraints include: 1) the sum of the load increases of each user is equal to the total load increase 2) Satisfy weight constraints: Solve to obtain the target load t i =p i +d i ,i=1,2,…,n;
[0080] (3) For peak load reduction tasks, the total load needs to be reduced The difference between each user and the load lower limit is m i =p1-l i , i = 1, 2, ..., n, that is, the load reduction of each user is solved as d1, d2, ..., d n , the constraints include: 1) the sum of the load reduction of each user is equal to the total load reduction 2) Satisfy weight constraints: After solving, we get the target load t i =p i -d i ,i=1,2,…,n。
[0081] Step 3: After receiving the load instruction, the edge gateway at the user side performs device-level load decomposition and performs air conditioning load scheduling control according to the decomposition result;
[0082] The method of equipment-level load decomposition is as follows:
[0083] For a certain user, the edge gateway receives a target load instruction, and the target load is t; the user has c types of air conditioners, and each type of air conditioner has a priority parameter, which is v1, v2, ..., v c , respectively k1, k2, …, k c air conditioners, each with a temperature control capability curve And the rated power is The temperature of each air conditioner With power Bijection of; if the target power of each air conditioner is Solving the problem The following constraints are met:
[0084]
[0085] Step 4: The virtual power plant management platform monitors the completion of load instructions in real time and responds to the power grid after the load task is completed.
[0086] Embodiment 3
[0087] An electronic device includes a memory and a processor, wherein the memory is used to store a program that supports the processor to execute the virtual power plant air conditioning load scheduling method in Example 2, and the processor is configured to execute the program stored in the memory.
[0088] Embodiment 4
[0089] A storage medium stores a computer program, which executes the steps of the virtual power plant air conditioning load scheduling method in embodiment 2 when the computer program is executed by a processor.
[0090] The above embodiments are only used to illustrate the technical solutions of the present invention, rather than to limit the same. Although the present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that the technical solutions described in the aforementioned embodiments may still be modified, or some of the technical features may be replaced by equivalents. However, these modifications or replacements do not deviate the essence of the corresponding technical solutions from the spirit and scope of the technical solutions of the embodiments of the present invention.
Claims
1. A virtual power plant air conditioning load dispatching system, It is characterized in that include: The power grid side, the virtual power plant management platform side and the user side, wherein the virtual power plant management platform side and the user side constitute a virtual power plant; The power grid side is provided with a power load management system, which sends load tasks to the virtual power plant, and the virtual power plant responds and gives feedback; The virtual power plant management platform side includes: a virtual power plant management platform and a core switch; the virtual power plant management platform includes: an access management module, a communication management module, and a load control module; the access management module is used to connect to the power load management system to access and feedback load tasks; the communication management module is used to manage the communication and network security of the core switch; the load control module includes: a load decomposition submodule and a parameter optimization submodule; the load decomposition submodule analyzes the accessed load tasks, performs user-level load decomposition, and sends the decomposed results to the user side in the form of load instructions; the parameter optimization submodule records the parameters in the entire load decomposition process, and optimizes the temperature capability curve, priority parameters, and load regulation weights; The user side includes: an edge gateway and an intelligent air conditioner; the edge gateway receives a load instruction, performs device-level load decomposition according to the instruction, and directly implements load control on the intelligent air conditioner according to the decomposition result; the intelligent air conditioner accepts the load control of the edge gateway, monitors the ambient temperature in real time and converts it into data and transmits it to the edge gateway periodically.
2. The virtual power plant air conditioning load dispatching system according to claim 1, It is characterized in that The method for user-level load decomposition is specifically as follows: The lower limit of each user's load is known. 1 , l 2 ,…,l n and upper limit h 1 、h 2 ,…,h n , and the load regulation weight w 1 、w 2 ,…,w n , obtain the current load p of each user through real-time monitoring 1 、p 2 ,…,p n , for the load task target t, solve the target load t of each user 1 ,t 2 ,…,t n , n is the number of users; (1) Determine the current total load The relationship between the size of the load task target t is as follows: If the task is valley filling, execute step (2); otherwise, execute step (3); (2) For valley filling tasks, the total load needs to be increased The difference between each user and the load limit is m i =h 1 -p i , i=1,2,…,n, that is, the load increase of each user is solved as d 1 ,d 2 ,…,d n , the constraints include: 1) the sum of the load increases of each user is equal to the total load increase 2) Satisfy weight constraints: Solve to obtain the target load t i =p i +d i ,i=1,2,…,n; (3) For peak load reduction tasks, the total load needs to be reduced The difference between each user and the load lower limit is m i =p 1 -l i , i = 1, 2, ..., n, that is, the load reduction of each user is solved as d 1 ,d 2 ,…,d n , the constraints include: 1) the sum of the load reduction of each user is equal to the total load reduction 2) Satisfy weight constraints: After solving, we get the target load t i =p i -d i ,i=1,2,…,n。 3. The virtual power plant air conditioning load dispatching system according to claim 2, It is characterized in that The method of equipment-level load decomposition is as follows: For a certain user, the edge gateway receives a target load instruction, the target load is t; the user has c types of air conditioners, each type of air conditioner has a priority parameter, v 1 、v 2 ,…,v c , respectively, there are k 1 , k 2 , …, k c air conditioners, each with a temperature control capability curve And the rated power is The temperature of each console With power Bijection of; if the target power of each air conditioner is Solving the problem The following constraints are met:
4. The virtual power plant air conditioning load dispatching system according to claim 3, It is characterized in that The optimization method of the temperature capability curve is as follows: by recording the ambient temperature monitored by each intelligent air conditioner The power required to maintain the ambient temperature Modified temperature capability curve For ambient temperatures that have not been actually tested and have practical significance The test is completed by adjusting the power to reach this temperature or according to the current The corresponding required power is obtained in the form of fitting Make corrections.
5. The virtual power plant air conditioning load dispatching system according to claim 3, It is characterized in that The optimization method of the priority parameter is as follows: according to the modified temperature capability curve, the load decomposition process of the equipment level is simulated, and for different load instructions t, the target power is solved after decomposition. And according to the temperature capability curve Reverse solve the temperature of each air conditioner Modify the priority parameter v according to the result 1 、v 2 ,…,v c , so that the air conditioning temperature of each priority Keep at the corresponding value.
6. The virtual power plant air conditioning load dispatching system according to claim 3, It is characterized in that The optimization method of load regulation weight is as follows: according to the modified temperature capability curve and priority parameter, the load decomposition process of the user level is simulated, and for different load task targets t, the target load t is solved after decomposition. 1 ,t 2 ,…,t n , and perform equipment-level load decomposition, and combine the temperature capability curve to calculate the temperature tp of each user's various air conditioners j ,j=1,2,…,c, modify the load adjustment weight w according to the result 1 、w 2 ,…,w n , so that the temperature of the same air conditioner for different users is tp j Keep at similar values.
7. The virtual power plant air conditioning load dispatching system according to claim 1, It is characterized in that The power load management system on the grid side communicates with the core switch on the virtual power plant management platform side through the Internet; the core switch on the virtual power plant management platform side and the virtual power plant management platform use Ethernet for wired communication; the core switch on the virtual power plant management platform side and the edge gateway on the user side communicate in the form of a wireless network; the edge gateway on the user side and the smart air conditioner communicate using a combination of RS-485 and micro-power wireless communication.
8. A virtual power plant air conditioning load scheduling method, It is characterized in that The following steps are involved: Step 1: The grid side issues the load task, which is then accessed by the virtual power plant management platform; Step 2: The virtual power plant management platform performs user-level load decomposition according to the load task, and sends the decomposition result to the edge gateway on the user side in the form of load instructions; Step 3: After receiving the load instruction, the edge gateway at the user side performs device-level load decomposition and performs air conditioning load scheduling control according to the decomposition result; Step 4: The virtual power plant management platform monitors the completion of load instructions in real time and responds to the power grid after the load task is completed.
9. The method for scheduling air conditioning load in a virtual power plant according to claim 8, It is characterized in that The method for user-level load decomposition is specifically as follows: The lower limit of each user's load is known. 1 , l 2 ,…,l n and upper limit h 1 、h 2 ,…,h n , and the load regulation weight w 1 、w 2 ,…,w n , obtain the current load p of each user through real-time monitoring 1 、p 2 ,…,p n , for the load task target t, solve the target load t of each user 1 ,t 2 ,…,t n , n is the number of users; (1) Determine the current total load The relationship between the size of the load task target t is as follows: If the task is valley filling, execute step (2); otherwise, execute step (3); (2) For valley filling tasks, the total load needs to be increased The difference between each user and the load limit is m i =h 1 -p i , i=1,2,…,n, that is, the load increase of each user is solved as d 1 ,d 2 ,…,d n , the constraints include: 1) the sum of the load increases of each user is equal to the total load increase 2) Satisfy weight constraints: Solve to obtain the target load t i =p i +d i ,i=1,2,…,n; (3) For peak load reduction tasks, the total load needs to be reduced The difference between each user and the load lower limit is m i =p 1 -l i , i = 1, 2, ..., n, that is, the load reduction of each user is solved as d 1 ,d 2 ,…,d n , the constraints include: 1) the sum of the load reduction of each user is equal to the total load reduction 2) Satisfy weight constraints: After solving, we get the target load t i =p i -d i ,i=1,2,…,n。 10. The virtual power plant air conditioning load scheduling method according to claim 9, It is characterized in that The method of equipment-level load decomposition is as follows: For a certain user, the edge gateway receives a target load instruction, the target load is t; the user has c types of air conditioners, each type of air conditioner has a priority parameter, v 1 、v 2 ,…,v c , respectively, there are k 1 , k 2 , …, k c air conditioners, each with a temperature control capability curve And the rated power is The temperature of each air conditioner With power Bijection of; if the target power of each air conditioner is Solving the problem The following constraints are met:
Citation Information
Cited By
Air conditioner load multi-objective optimization cooperative control method and system based on network load interaction
CN120474030A
A Multi-Objective Optimization and Cooperative Control Method and System for Air Conditioning Load Based on Network-Load Interaction
CN120474030B