Multi-factory inventory and capacity allocation control method, device, equipment and medium

The multi-factory inventory and capacity allocation control method addresses the challenges of order allocation complexity and high costs by optimizing factory selection and production planning, enhancing collaboration and efficiency in the home appliance industry.

CN119067388AActive Publication Date: 2024-12-03GUANGDONG UNIV OF TECH

Patent Information

Application Number
CN202411163297.3
Authority / Receiving Office
CN · China
Patent Type
Applications(China)
Current Assignee / Owner
Filing Date
2024-08-23
Publication Date
2024-12-03
Estimated Expiration
2044-08-23

AI Technical Summary

Technical Problem

The existing production and manufacturing models in the home appliance industry face challenges with the allocation of large numbers of orders requiring significant computing resources, detailed resource constraint granularity complexity, and high costs in manufacturing, delivery punctuality, and logistics distance due to the lack of collaboration between factories.

Method used

A multi-factory inventory and capacity allocation control method that determines order allocation sequences, selects factories with the lowest total cost, and optimizes production line plans using a multi-level capacity verification algorithm to minimize costs and ensure timely production.

Benefits of technology

The method efficiently allocates orders to suitable factories, reducing production costs, enhancing collaboration, and improving production efficiency by ensuring timely completion and optimizing resource utilization.

✦ Generated by Eureka AI based on patent content.

Smart Images

  • Figure CN119067388A_ABST
    Figure CN119067388A_ABST
Patent Text Reader

Abstract

The invention relates to a multi-factory inventory and capacity allocation control method and device, equipment and a medium, and the method comprises the steps: carrying out the verification of the number of unproduced products according to the demand number of unproduced products and the production line information corresponding to each factory with a part of product models of production-occupying orders based on a preset multi-stage capacity verification algorithm; determining a first production line occupation scheme corresponding to the partial production occupation order with the lowest production occupation cost; sorting the order distribution sequence of the remaining to-be-produced electric appliance orders, and calculating the order distribution sequence of the remaining to-be-produced electric appliance orders based on a preset multi-level capability verification algorithm according to the product models and the product demand quantity corresponding to the remaining to-be-produced electric appliance orders and the production line information corresponding to each factory; determining a second production line occupation scheme corresponding to the remaining to-be-produced electric appliance orders with the lowest production cost; and carrying out production based on the first production line occupation scheme corresponding to the partial production occupying order and the second production line occupation scheme corresponding to the remaining to-be-produced electric appliance orders. According to the invention, the cooperation capability among multiple factories can be enhanced and the production cost can be saved.
Need to check novelty before this filing date? Find Prior Art

Description

Technical Field

[0001] The present application relates to the field of production control, and in particular to a multi-factory inventory and production capacity allocation control method, corresponding devices, electronic equipment and computer-readable storage media. Background Art

[0002] In recent years, as the home appliance industry market has shifted from incremental to stock, the production and manufacturing model of enterprises has gradually changed from production-driven sales to sales-driven production. In the customer-centric order-based production and delivery environment, large home appliance manufacturers often adopt a regional manufacturing and distribution model, setting up factories in different geographical locations for production. However, with the segmentation of sales channels caused by competition in the industry, the orders received by enterprises have gradually shown a trend of uneven distribution of customer addresses and fragmented quantities. The regional independent operation model of each factory is no longer suitable for the highly agile and changing order environment due to the lack of collaboration between factories, forcing enterprises to shift to a model of unified group order management. Therefore, research on multi-factory collaborative production in multi-address order scenarios has theoretical and practical significance.

[0003] At present, for the multi-factory inventory and capacity allocation in the home appliance industry, there are the following problems in the allocation of production orders: First, the number of orders that enterprises need to allocate is huge, which requires a lot of computing resources; second, the degree of detail of resource constraint granularity often determines the complexity of the order allocation process and the applicability of the results. If the granularity is too detailed, it will take a lot of planning time, and if the granularity is too coarse, it will not be suitable for the formulation of lower-level production plans; third, the costs incurred by orders in terms of manufacturing costs, delivery punctuality, and logistics distance are too high.

[0004] To sum up, in order to adapt to the problems of the huge number of orders that enterprises need to allocate in the existing technology, which requires a large amount of computing resources, as well as the high costs in manufacturing costs, delivery punctuality, and logistics distance, the applicant has made corresponding explorations in order to solve these problems. Summary of the invention

[0005] The purpose of this application is to solve the above-mentioned problems and provide a multi-factory inventory and production capacity allocation control method, corresponding device, electronic device and computer-readable storage medium.

[0006] In order to meet the various objectives of this application, this application adopts the following technical solutions:

[0007] A multi-factory inventory and capacity allocation control method proposed to meet one of the purposes of this application includes:

[0008] In response to the multi-factory inventory allocation instruction, determine the order allocation sequence and order information of each order of electrical appliances to be produced, select the order of electrical appliances to be produced with the highest current priority, screen out each factory that has inventory of the product model of the order of electrical appliances to be produced, and calculate and determine the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has inventory of the product model, wherein the order information includes the product model and the product demand quantity;

[0009] The factory with the smallest total cost is selected for inventory occupation, and whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the order of the electrical appliances to be produced is detected. If it cannot fully meet the demand quantity, the remaining part of the order of the electrical appliances to be produced that does not fully meet the product demand quantity is determined as a partial production order, and the unproduced product demand quantity corresponding to the partial production order is determined;

[0010] In response to the multi-factory capacity allocation instruction, the partial production orders are sorted according to the order allocation order, the partial production orders with the highest current priority are selected, and based on the preset multi-level capacity verification algorithm, according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model with the partial production orders, the first production line occupation plan corresponding to the partial production orders with the lowest production cost is determined;

[0011] Determine the remaining orders for electrical appliances to be produced, sort the order allocation sequence of the remaining orders for electrical appliances to be produced, and determine the second production line occupation plan corresponding to the remaining orders for electrical appliances to be produced with the lowest production cost based on a preset multi-level capacity verification algorithm according to the product models and product demand quantities corresponding to the remaining orders for electrical appliances to be produced and the production line information corresponding to each factory;

[0012] Production is carried out based on the first production line occupancy plan corresponding to the partial production orders and the second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced to complete multi-factory inventory and production capacity allocation control.

[0013] Optionally, the step of calculating and determining the total cost corresponding to allocating the orders of the electrical appliances to be produced to the various factories that have inventory of the product model includes:

[0014] Determine the logistics cost of the order of electrical appliances to be produced based on a first product of the unit logistics cost from each factory to the address of the order of electrical appliances to be produced and the product demand quantity of the order of electrical appliances to be produced;

[0015] Calculate and determine a second product between the unit production cost of the order of electrical appliances to be produced in the selected factory and the product demand quantity of the order of electrical appliances to be produced, calculate and determine a third product between the unit production cost of the order of electrical appliances to be produced in the selected factory and the inventory occupancy of the order of electrical appliances to be produced, and determine the manufacturing cost of the order of electrical appliances to be produced based on the difference between the second product and the third product;

[0016] Calculate and determine the fourth product of the unit delay cost of the order of the electrical appliance to be produced and the number of delay days required to complete the order of the electrical appliance to be produced, so as to determine the delay cost of the order of the electrical appliance to be produced;

[0017] Based on the sum of the logistics cost, the manufacturing cost and the delay cost, the total cost corresponding to allocating the orders for the electrical appliances to be produced to the various factories that have inventory of the product model is determined.

[0018] Optionally, after the step of calculating and determining the total cost corresponding to allocating the orders of the electrical appliances to be produced to the various factories that have inventory of the product model, the method further includes:

[0019] Compare the total costs corresponding to the allocation of the order of the electrical appliance to be produced to each factory that has the product model inventory of the order of the electrical appliance to be produced, and select the factory with the lowest total cost for allocation;

[0020] Determine whether the factory with the lowest total cost can fully meet the product demand quantity corresponding to the order of electrical appliances to be produced. If it cannot fully meet the demand quantity, record the order allocation result, reduce the inventory information of the factory, and determine the remaining part of the order of electrical appliances to be produced as a partial production order. If it can fully meet the demand quantity, directly record the order allocation result, and the inventory occupation of the order of electrical appliances to be produced is completed;

[0021] If the inventory of the product model in all factories has been reduced, or the orders for the electrical appliances to be produced have been occupied by inventory, the inventory allocation of the orders for the electrical appliances to be produced is completed, and the steps after sorting the partially occupied orders according to the order allocation order are continued.

[0022] Optionally, the step of determining the first production line occupation scheme corresponding to the partial production order with the lowest production cost based on the preset multi-level capacity verification algorithm according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial production order, comprises:

[0023] Count the production line information corresponding to each factory for the product model that has some occupied production orders and the demand quantity of unproduced products corresponding to the part of the occupied production orders;

[0024] Based on the production line information corresponding to each factory of the product model with some occupied production orders and the demand quantity of unproduced products corresponding to the some occupied production orders, the production capacity of each factory is divided and sorted according to different levels, and checked from the outermost capacity to the innermost level;

[0025] For each of the partial production orders, check from outside to inside whether the capacity of each level can meet the demand of the order;

[0026] If the capacity of a certain level can meet the order requirements, the inspection will continue to the inner level;

[0027] If the capacity of a certain level is insufficient to meet the order requirements, it will return to the next block of the previous level for a new capacity check;

[0028] Continue to perform the above steps until the capabilities of all levels are checked to ensure that the production line information corresponding to the factory can fully meet the partial production order.

[0029] Optionally, for each of the partial production orders, the step of checking from outside to inside whether the capacity of each level can meet the order requirements includes:

[0030] For each of the aforementioned partial production orders, the system checks the capacity level by level starting from the outermost level;

[0031] If the capacity of the current level is sufficient to meet the production requirements of the order, continue to check the inner level;

[0032] If the capacity of a certain level is insufficient to meet order requirements, it will return to the next block of the previous level for a new capacity check, and reselect a more suitable production line or adjust capacity allocation.

[0033] Optionally, before the step of determining the order allocation sequence and order information of each order of electrical appliances to be produced, the step includes:

[0034] Obtain order information corresponding to each electrical appliance order to be produced;

[0035] Based on the order information, an order allocation sequence corresponding to each of the electrical appliance orders to be produced is determined according to a preset order allocation rule set.

[0036] Optionally, the order allocation rule set includes an order delivery date priority rule, a key model priority rule, a maximum quantity limit rule, and a maximum delay cost priority rule;

[0037] The order delivery date priority rule represents the order arrangement from the front to the back according to the order delivery date;

[0038] The key model priority rule represents the ordering of the processing factories and production lines that can process the product models corresponding to the orders according to the rule from small to large processing quantity;

[0039] The maximum quantity limited rule is to sort the order requirements from large to small, and give priority to the orders with large order quantities;

[0040] The maximum delay cost priority rule is arranged from high to low according to the unit delay cost of the order.

[0041] A multi-factory inventory and capacity allocation control device provided for another purpose of the present application includes:

[0042] A cost calculation module is configured to respond to a multi-factory inventory allocation instruction, determine the order allocation sequence and order information of each order of electrical appliances to be produced, select the order of electrical appliances to be produced with the highest current priority, screen out each factory that has a product model inventory of the order of electrical appliances to be produced, and calculate and determine the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has a product model inventory, wherein the order information includes the product model and the product demand quantity;

[0043] The partial production occupation determination module is configured to select the factory with the smallest total cost for inventory occupation, detect whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the order of the electrical appliances to be produced, and if it cannot fully meet the demand quantity, determine the remaining part of the order of the electrical appliances to be produced that does not fully meet the product demand quantity as the partial production occupation order, and determine the unproduced product demand quantity corresponding to the partial production occupation order;

[0044] A first production line plan determination module is configured to respond to a multi-factory capacity allocation instruction, sort the partial production orders according to the order allocation order, select the partial production orders with the highest current priority, and determine the first production line occupation plan corresponding to the partial production orders with the lowest production cost based on the preset multi-level capacity verification algorithm according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial production orders;

[0045] A second production line plan determination module is configured to determine the remaining electrical appliance orders to be produced, sort the order allocation sequence of the remaining electrical appliance orders to be produced, and determine the second production line occupation plan corresponding to the remaining electrical appliance orders to be produced with the lowest production cost based on a preset multi-level capacity verification algorithm according to the product models and product demand quantities corresponding to the remaining electrical appliance orders to be produced and the production line information corresponding to each factory;

[0046] The capacity allocation module is configured to produce based on a first production line occupancy plan corresponding to the partial production orders and a second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced, so as to complete multi-factory inventory and capacity allocation control.

[0047] An electronic device provided to meet another purpose of the present application includes a central processing unit and a memory, wherein the central processing unit is used to call and run a computer program stored in the memory to execute the steps of the multi-factory inventory and capacity allocation control method described in the present application.

[0048] A computer-readable storage medium is provided to meet another purpose of the present application, which stores a computer program implemented according to the multi-factory inventory and capacity allocation control method in the form of computer-readable instructions. When the computer program is called and executed by a computer, the steps included in the corresponding method are executed.

[0049] Compared with the prior art, this application aims at solving the problems that the number of orders that enterprises need to allocate in the prior art is huge, a large amount of computing resources are required, and the costs of manufacturing costs, delivery timeliness, and logistics distance of orders are too high. This application includes but is not limited to the following beneficial effects:

[0050] First, the multi-factory inventory and capacity allocation control method of the present application can allocate and control a large number of orders for electrical appliances to be produced, and match them with various factories, so as to find the factory that is most suitable for the production order, avoid the problem of being unable to complete the production of the order, and at the same time, significantly save the production cost of each order, which is conducive to improving the production efficiency of the enterprise, avoiding the problems of excessive cost in manufacturing cost, delivery timeliness, and logistics distance of the order, realizing the timely allocation of orders, and being able to match the best factory for production, ensuring that the order can be completed in time and efficiently;

[0051] Secondly, the multi-factory inventory and capacity allocation control method of the present application can significantly improve the collaboration capabilities between factories, greatly enhance the production capacity of each factory, and at the same time significantly save the production cost of each order, which is conducive to improving the production efficiency of the enterprise and providing possibilities for the sustainable development of the enterprise. BRIEF DESCRIPTION OF THE DRAWINGS

[0052] The above and / or additional aspects and advantages of the present application will become apparent and easily understood from the following description of the embodiments in conjunction with the accompanying drawings, in which:

[0053] Figure 1 This is a flow chart of a multi-factory inventory and capacity allocation control method in an embodiment of the present application;

[0054] Figure 2 This is a general flow chart of the multi-factory inventory and capacity allocation control method in the embodiment of the present application;

[0055] Figure 3 A flowchart of inventory occupation for an order of electrical appliances to be produced in an embodiment of the present application;

[0056] Figure 4 This is a flowchart of occupying production for some production orders in an embodiment of the present application;

[0057] Figure 5 A flowchart of occupying production of remaining electrical appliance orders to be produced in an embodiment of the present application;

[0058] Figure 6 It is a flowchart of a multi-level capability verification algorithm in an embodiment of the present application;

[0059] Figure 7 This is a principle block diagram of a multi-factory inventory and capacity allocation control device in an embodiment of the present application;

[0060] Figure 8 It is a schematic diagram of the structure of the computer device in the embodiment of the present application. DETAILED DESCRIPTION

[0061] The embodiments of the present application are described in detail below, and examples of the embodiments are shown in the accompanying drawings, wherein the same or similar reference numerals throughout represent the same or similar elements or elements having the same or similar functions. The embodiments described below with reference to the accompanying drawings are exemplary and are only used to explain the present application, and cannot be interpreted as limiting the present application.

[0062] It will be understood by those skilled in the art that, unless expressly stated, the singular forms "one", "said", and "the" used herein may also include plural forms. It should be further understood that the term "comprising" used in the specification of the present application refers to the presence of the features, integers, steps, operations, elements and / or components, but does not exclude the presence or addition of one or more other features, integers, steps, operations, elements, components and / or groups thereof. It should be understood that when we refer to an element as being "connected" or "coupled" to another element, it may be directly connected or coupled to the other element, or there may be an intermediate element. In addition, the "connection" or "coupling" used herein may include wireless connection or wireless coupling. The term "and / or" used herein includes all or any unit and all combinations of one or more associated listed items.

[0063] It will be understood by those skilled in the art that, unless otherwise defined, all terms (including technical and scientific terms) used herein have the same meaning as those generally understood by those skilled in the art to which this application belongs. It should also be understood that terms such as those defined in general dictionaries should be understood to have meanings consistent with those in the context of the prior art, and will not be interpreted with idealized or overly formal meanings unless specifically defined as here.

[0064] It will be understood by those skilled in the art that the terms "client", "terminal" and "terminal device" as used herein include both devices with wireless signal receivers, which are devices with only wireless signal receivers without transmission capability, and devices with receiving and transmitting hardware, which are devices with receiving and transmitting hardware capable of two-way communication over a two-way communication link. Such devices may include: cellular or other communication devices such as personal computers, tablet computers, which have single-line displays or multi-line displays or cellular or other communication devices without multi-line displays; PCS (Personal Communications Services) which may combine voice, data processing, fax and / or data communication capabilities; PDA (Personal Digital Assistant) which may include a radio frequency receiver, pager, Internet / intranet access, web browser, notepad, calendar and / or GPS (Global Positioning System) receiver; conventional laptop and / or palmtop computers or other devices which have and / or include a radio frequency receiver. The "client", "terminal" and "terminal device" used herein may be portable, transportable, installed in a vehicle (air, sea and / or land), or adapted and / or configured to run locally, and / or in a distributed form, at any other location on the earth and / or in space. The "client", "terminal" and "terminal device" used herein may also be a communication terminal, an Internet terminal, a music / video playing terminal, such as a PDA, a MID (Mobile Internet Device) and / or a mobile phone with a music / video playing function, or may be a smart TV, a set-top box and other devices.

[0065] The hardware referred to by the names such as "server", "client", and "service node" in this application is essentially an electronic device with the equivalent capabilities of a personal computer. It is a hardware device with the necessary components revealed by the von Neumann principle, such as a central processing unit (including an arithmetic unit and a controller), a memory, an input device, and an output device. The computer program is stored in its memory, and the central processing unit calls the program stored in the external memory into the internal memory for execution, executes the instructions in the program, and interacts with the input and output devices to complete specific functions.

[0066] It should be pointed out that the concept of "server" referred to in this application can also be extended to the case of server clusters. According to the network deployment principle understood by those skilled in the art, the servers should be logically divided. In physical space, these servers can be independent of each other but can be called through interfaces, or integrated into a physical computer or a set of computer clusters. Those skilled in the art should understand this flexibility, and should not use it to restrict the implementation of the network deployment method of this application.

[0067] Unless expressly specified, one or more technical features of the present application can be deployed on a server for implementation and accessed by a client through a remote call to obtain an online service interface provided by the server, or can be directly deployed and run on a client for access.

[0068] The neural network models referenced or may be referenced in this application, unless expressly specified, can be deployed on a remote server and remotely called on the client, or can be deployed and directly called on a client with sufficient device capabilities. In some embodiments, when it runs on the client, its corresponding intelligence can be obtained through transfer learning to reduce the requirements for the client's hardware operating resources and avoid excessive occupation of the client's hardware operating resources.

[0069] Unless explicitly specified, the various data involved in this application can be stored remotely on a server or on a local terminal device, as long as it is suitable for being called by the technical solution of this application.

[0070] Those skilled in the art should be aware that, although the various methods of the present application are described based on the same concept and thus present commonality to each other, unless otherwise specified, these methods can be independently executed. Similarly, for each embodiment disclosed in the present application, they are all proposed based on the same inventive concept, therefore, concepts with the same expression, and concepts that are appropriately changed for convenience despite different expressions, should be understood as equivalent.

[0071] Unless the mutually exclusive relationship between the embodiments to be disclosed in this application is explicitly stated, the relevant technical features involved in each embodiment can be cross-combined to flexibly construct a new embodiment, as long as such combination does not deviate from the creative spirit of this application and can meet the needs of the prior art or solve certain deficiencies in the prior art. Those skilled in the art should be aware of this flexibility.

[0072] See also Figure 1 In one embodiment, the multi-factory inventory and capacity allocation control method of the present application includes:

[0073] Step S10, responding to the multi-factory inventory allocation instruction, determining the order allocation sequence and order information of each order of electrical appliances to be produced, selecting the order of electrical appliances to be produced with the highest current priority, screening out each factory that has inventory of the product model of the order of electrical appliances to be produced, and calculating and determining the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has inventory of the product model, wherein the order information includes the product model and the product demand quantity;

[0074] The multi-factory inventory and capacity allocation control system can respond to the multi-factory inventory allocation instruction, determine the order allocation sequence and order information of each order of electrical appliances to be produced, select the order of electrical appliances to be produced with the highest current priority, screen out each factory that has the product model inventory of the order of electrical appliances to be produced, and calculate and determine the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has the product model inventory, wherein the order information includes the product model and the product demand quantity;

[0075] Furthermore, the step of calculating and determining the total cost corresponding to allocating the orders of the electrical appliances to be produced to the various factories that have inventory of the product model includes:

[0076] Step S101, determining the logistics cost of the order of electrical appliances to be produced based on a first product of the unit logistics cost from each factory to the address of the order of electrical appliances to be produced and the product demand quantity of the order of electrical appliances to be produced;

[0077] Step S103, calculating and determining a second product between the unit production cost of the order of the electrical appliance to be produced in the selected factory and the product demand quantity of the order of the electrical appliance to be produced, calculating and determining a third product between the unit production cost of the order of the electrical appliance to be produced in the selected factory and the inventory occupancy of the order of the electrical appliance to be produced, and determining the manufacturing cost of the order of the electrical appliance to be produced based on the difference between the second product and the third product;

[0078] Step S105, calculating and determining the fourth product between the unit delay cost of the order of the electrical appliance to be produced and the number of delay days required to complete the order of the electrical appliance to be produced, so as to determine the delay cost of the order of the electrical appliance to be produced;

[0079] Step S207: Based on the sum of the logistics cost, the manufacturing cost and the delay cost, determine the total cost corresponding to allocating the orders for the electrical appliances to be produced to the various factories that have inventory of the product model.

[0080] Specifically, the calculation formula of the logistics cost of the electrical appliance order to be produced is expressed as follows:

[0081] Cost l =TC*R i ,

[0082] The calculation formula of the manufacturing cost of the electrical appliance order to be produced is as follows:

[0083] Cost m =PC*R i -PC*z i ,

[0084] The calculation formula of the delay cost of the electrical appliance order to be produced is expressed as follows:

[0085] Cost t =DC*d i ,

[0086] Among them, Cost l Cost represents the logistics cost of the electrical appliance order to be produced; m Cost represents the manufacturing cost of the electrical appliance order to be produced; t represents the delay cost of the electrical appliance order to be produced; TC represents the unit logistics cost from the factory to the order address, R i represents the order quantity, PC represents the unit production cost of the order in the selected factory, z i represents the inventory occupancy of the order, DC represents the unit delay cost of the order, and d i Indicates the number of days it takes to complete an order.

[0087] The total cost corresponding to the distribution of the electrical appliance orders to be produced to each factory that has inventory of the product model is calculated as follows:

[0088] Cost Total =Cost l +Cost m +Cost t

[0089] Among them, CostTotal Represents the total cost.

[0090] In some embodiments, before the step of determining the order allocation sequence and order information of each order of electrical appliances to be produced, the method includes:

[0091] Step S1001, obtaining order information corresponding to each order of electrical appliances to be produced;

[0092] Step S1003: determining the order allocation sequence corresponding to each of the electrical appliance orders to be produced based on the order information and in accordance with a preset order allocation rule set.

[0093] Specifically, the multi-factory inventory and capacity allocation control system can obtain order information corresponding to each order of electrical appliances to be produced, and determine the order allocation sequence corresponding to each order of electrical appliances to be produced according to a preset order allocation rule set based on the order information, wherein the order information includes product model, order delivery date, product demand quantity, etc.;

[0094] In some embodiments, the order allocation rule set includes an order delivery date priority rule, a key model priority rule, a maximum quantity limited rule, and a maximum delay cost priority rule, wherein the order delivery date priority rule represents the ordering from front to back according to the order delivery date to ensure that orders with urgent delivery dates have higher priority; the key model priority rule represents the ordering from small to large according to the number of processing factories and production lines that can process the product models corresponding to the order, to ensure that orders that can only use one mold or go to one production line for production are given priority in production; the maximum quantity limited rule ranks according to the rule of order demand quantity from large to small, and gives priority to orders with large order quantities; the maximum delay cost priority rule ranks according to the unit delay cost of the order from high to low.

[0095] Step S20, selecting the factory with the smallest total cost for inventory occupation, detecting whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the order of the electrical appliances to be produced, if it cannot fully meet the demand quantity, determining the remaining part of the order of the electrical appliances to be produced that does not fully meet the product demand quantity as a partial production order, and determining the unproduced product demand quantity corresponding to the partial production order;

[0096] After calculating and determining the total cost corresponding to allocating the orders for the electrical appliances to be produced to the various factories that have inventory of the product model, the factory with the smallest total cost is selected for inventory occupation, and it is detected whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the orders for the electrical appliances to be produced. If it cannot fully meet the demand quantity, the remaining part of the orders for the electrical appliances to be produced that does not fully meet the product demand quantity is determined as a partial production-occupying order, and the number of unproduced product demands corresponding to the partial production-occupying order is determined, wherein the partial production-occupying order represents the remaining part of the orders for the electrical appliances to be produced after the inventory is reduced.

[0097] After the step of calculating and determining the total cost corresponding to allocating the orders of the electrical appliances to be produced to the various factories that have inventory of the product model, the following steps are included:

[0098] Step S201, comparing the total costs of allocating the order of the electrical appliance to be produced to the factories that have the product model inventory of the order of the electrical appliance to be produced, and selecting the factory with the lowest total cost for allocation;

[0099] Step S203, judging whether the factory with the lowest total cost can fully meet the product demand quantity corresponding to the order of the electrical appliances to be produced; if it cannot fully meet the demand quantity, recording the order allocation result, and reducing the inventory information of the factory, and determining the remaining part of the order of the electrical appliances to be produced as a partial production order; if it can fully meet the demand quantity, directly recording the order allocation result, and the inventory occupation of the order of the electrical appliances to be produced is completed;

[0100] Step S205: If the inventory of the product model in all factories has been reduced, or the orders of the electrical appliances to be produced have been occupied by inventory;

[0101] Step S207, the inventory allocation of the electrical appliance orders to be produced is completed, and the steps after sorting the partial production orders according to the order allocation sequence are continued.

[0102] Specifically, the order allocation sequence generated in the above steps is obtained, and according to the inventory models of each factory, the available inventory order set with the corresponding model is screened out. The orders are still arranged according to the sorting priority of the order allocation sequence;

[0103] Select the order with the highest current priority to judge the inventory occupancy, and calculate the total cost required to complete the order of the to-be-produced electrical appliance in the inventory order set that can be allocated to each factory with the product model in stock, that is, the total cost of logistics cost and production cost when the order cannot completely offset the factory inventory;

[0104] Furthermore, the total cost of all factories accepting the order is compared, and the factory with the lowest cost is selected for allocation;

[0105] Determine whether the order can be fully met. If not, record the order allocation result, reduce the factory's inventory information, and mark the remaining part of the order as a partially occupied order;

[0106] If the full quantity can be met, the order allocation result is directly recorded, and the order inventory occupation is completed. If the inventory of each model of all factories has been reduced, or the orders have been occupied by inventory, the order inventory allocation is completed, and the steps after the partial production orders are sorted according to the order allocation order are executed. Otherwise, the step of selecting the order with the highest current priority to determine the inventory occupation is executed.

[0107] Step S30, responding to the multi-factory capacity allocation instruction, sorting the partial production orders according to the order allocation order, selecting the partial production orders with the highest current priority, and determining the first production line occupation plan corresponding to the partial production orders with the lowest production cost based on the preset multi-level capacity verification algorithm according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial production orders;

[0108] After determining the demand quantity of unproduced products corresponding to the partial production occupying orders, the multi-factory inventory and capacity allocation control system can respond to the multi-factory capacity allocation instructions, sort the partial production occupying orders according to the order allocation order, select the partial production occupying orders with the highest current priority, and determine the first production line occupation plan corresponding to the partial production occupying orders with the lowest production cost based on the preset multi-level capacity verification algorithm according to the demand quantity of unproduced products and the production line information corresponding to each factory of the product models of the partial production occupying orders.

[0109] Specifically, for orders of electrical appliances to be produced whose occupied inventory quantity of the selected factory is partially satisfied, the corresponding factory capacity is occupied until the order is fully satisfied; after the inventory allocation of the above orders of electrical appliances to be produced is completed, for the partial production orders that only offset part of the order quantity and the remaining orders that do not participate in the inventory reduction, the production capacity of the factory production line needs to be occupied to complete. The production occupation operation can be performed on the partially reduced inventory production occupation orders or the remaining unreduced production occupation orders based on the multi-level capacity verification algorithm.

[0110] In some embodiments, the first production line occupation plan corresponding to the part of the production orders with the lowest production cost is determined, and the calculation formula includes:

[0111] The calculation formula for the logistics cost of the production order is as follows:

[0112] Costl =TC*R i ,

[0113] The calculation formula for the manufacturing cost of the part of the production order is as follows:

[0114] Cost m =PC*R i -PC*z i ,

[0115] The calculation formula of the delay cost of the part of the production order is as follows:

[0116] Cost t =DC*d i ,

[0117] Among them, Cost l Indicates the logistics cost of the part accounted for in the production order; Cost m Indicates the manufacturing cost of the part in question in the production order; Cost t represents the delay cost of the part of the production order; TC represents the unit logistics cost from the factory to the order address, R i represents the order quantity, PC represents the unit production cost of the order in the selected factory, z i represents the inventory occupancy of the order, DC represents the unit delay cost of the order, and d i Indicates the number of days it takes to complete an order.

[0118] The total cost corresponding to the allocation of the partial production order to each factory that has inventory of the product model is calculated as follows:

[0119] Cost Total =Cost l +Cost m +Cost t

[0120] Among them, Cost Total Represents the total production cost.

[0121] Based on the above formula, the first production line occupancy plan corresponding to the partial production order with the lowest production cost can be calculated and determined.

[0122] Further, based on the preset multi-level capacity verification algorithm, according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial production order, the step of determining the first production line occupation plan corresponding to the partial production order with the lowest production cost includes:

[0123] Step S301, counting the production line information corresponding to each factory of the product model with some occupied production orders and the demand quantity of unproduced products corresponding to the some occupied production orders;

[0124] Step S303: Based on the production line information corresponding to each factory of the product model with the partial occupied production order and the demand quantity of the unproduced products corresponding to the partial occupied production order, the production capacity of each factory is divided and sorted according to different levels, and the capacity is checked from the outermost layer to the innermost layer.

[0125] Step S305: for each of the partial production orders, check from outside to inside whether the capacity of each level can meet the demand of the order;

[0126] Step S307: If the capacity of a certain level can meet the order requirements, the check will continue to the inner level. If the capacity of a certain level is not enough to meet the order requirements, it will return to the next block of the previous level to perform a new capacity check;

[0127] Step S309, continue to execute the above steps until the capabilities of all levels are checked to ensure that the production line information corresponding to the factory can fully meet the partial production order.

[0128] Furthermore, for each of the partial production orders, the step of checking from outside to inside whether the capacity of each level can meet the demand of the order includes:

[0129] Step S3051: For each of the partial production orders, the system checks the capacity level by level starting from the outermost level;

[0130] Step S3053: If the capacity of the current level is sufficient to meet the production requirements of the order, continue to check the inner levels;

[0131] Step S3055: If the capacity of a certain level is insufficient to meet the order requirements, return to the next block of the previous level to perform a new capacity check, reselect a more suitable production line or adjust capacity allocation.

[0132] Specifically, based on the preset multi-level capacity verification algorithm, according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model with the partial production order, the multi-level capacity verification of production is carried out, from the outer level to the inner level, and if the verification passes, it will enter the next level, otherwise it will return to the next block of the previous level for verification until the order is fully satisfied;

[0133] According to the sorting rules, based on the premise of uninterrupted production occupation from the front to the back, in order to clarify the daily order allocation on the work calendar under the constraints of multi-dimensional capacity, an order production occupation strategy based on multi-level capacity verification is designed to promote the capacity occupation of orders; according to the multi-dimensional constraint capacity calculation in the factory, the capacity is divided into N levels, and the capacity levels are sorted, with level 1 representing the outermost capacity and level N representing the innermost capacity;

[0134] When judging the production share of each partial production order, the capacity of each level is judged from 1 to N from the outside to the inside. If the capacity of any level is not met, it will retreat to the previous level and re-check the capacity. The order production share strategy based on N-capacity verification can effectively reduce redundant order production share judgments and greatly improve the operating efficiency of the rule algorithm.

[0135] Step S40, determining the remaining orders for electrical appliances to be produced, sorting the order allocation sequence of the remaining orders for electrical appliances to be produced, and determining the second production line occupation plan corresponding to the remaining orders for electrical appliances to be produced with the lowest production cost based on the preset multi-level capacity verification algorithm according to the product models and product demand quantities corresponding to the remaining orders for electrical appliances to be produced and the production line information corresponding to each factory;

[0136] After determining the first production line occupation plan corresponding to the part of the production orders with the lowest production cost, determine the remaining electrical appliance orders to be produced, sort the order allocation sequence of the remaining electrical appliance orders to be produced, and determine the second production line occupation plan corresponding to the remaining electrical appliance orders to be produced with the lowest production cost based on the preset multi-level capacity verification algorithm according to the product models and product demand quantities corresponding to the remaining electrical appliance orders to be produced and the production line information corresponding to each factory;

[0137] Specifically, for the remaining orders of electrical appliances to be produced, the factory selection and capacity allocation are carried out. For the order information of the remaining electrical appliances to be produced, the selected factory will be free to allocate capacity and inventory until the orders are fully met. Specifically,

[0138] Step S401, sorting out the order information of the remaining electrical appliance orders to be produced and arranging them according to the priority order established above;

[0139] Step S402: Determine the capacity occupied by each order and select the order with the highest current priority.

[0140] Furthermore, in step S402, the strategy for determining the capacity occupancy of the order specifically includes:

[0141] Step S4021: Order can go to the factory for information summary

[0142] Step S4022: determine the production share of each factory and record the total production cost;

[0143] Step S4023: Select the factory with the lowest total production cost among all factories as the factory for order allocation, and record the order allocation information. The order is completed.

[0144] Step S4024, determine whether some of the production orders have been judged. If the judgment is not completed, return to step S402, otherwise the order production process ends.

[0145] Furthermore, in step S4022, the rules for performing production verification on each factory specifically include:

[0146] Step S40221: Based on a preset multi-level capacity verification algorithm, a multi-level capacity verification is performed according to the product models and product demand quantities corresponding to the remaining electrical appliance orders to be produced and the production line information corresponding to each factory, and the verification is performed from the outer level to the inner level. If the verification passes, the next level is entered. If it fails, the next block of the previous level is returned to the next level for verification until the order is fully satisfied;

[0147] According to the sorting rules, based on the premise of uninterrupted production occupation from the front to the back, in order to clarify the daily order allocation on the work calendar under the constraints of multi-dimensional capacity, an order production occupation strategy based on multi-level capacity verification is designed to promote the capacity occupation of orders; according to the multi-dimensional constraint capacity calculation in the factory, the capacity is divided into N levels, and the capacity levels are sorted, with level 1 representing the outermost capacity and level N representing the innermost capacity;

[0148] When judging the production share of each partial production order, the capacity of each level is judged from 1 to N from the outside to the inside. If the capacity of any level is not met, it will retreat to the previous level and re-check the capacity. The order production share strategy based on N-capacity verification can effectively reduce redundant order production share judgments and greatly improve the operating efficiency of the rule algorithm.

[0149] Step S40222: After the production check is passed, the production cost of the remaining electrical appliance orders to be produced is evaluated, and the calculation formula includes:

[0150] The calculation formula for the logistics cost of the remaining electrical appliance orders to be produced is as follows:

[0151] Cost l =TC*R i ,

[0152] The calculation formula for the manufacturing cost of the remaining electrical appliance orders to be produced is as follows:

[0153] Cost m=PC*R i -PC*z i ,

[0154] The calculation formula of the delay cost of the remaining electrical appliance orders to be produced is as follows:

[0155] Cost t =DC*d i ,

[0156] Among them, Cost l Cost represents the logistics cost of the remaining electrical appliance orders to be produced; m Cost represents the manufacturing cost of the remaining electrical appliance orders to be produced; t represents the delay cost of the remaining electrical appliance orders to be produced; TC represents the unit logistics cost from the factory to the order address, R i represents the order quantity, PC represents the unit production cost of the order in the selected factory, z i represents the inventory occupancy of the order, DC represents the unit delay cost of the order, and d i Indicates the number of days it takes to complete an order.

[0157] The total cost corresponding to the remaining orders of electrical appliances to be produced are distributed to each factory that has inventory of the product model, and the calculation formula is as follows:

[0158] Cost Total =Cost l +Cost m +Cost t

[0159] Among them, Cost Total Represents the total production cost.

[0160] Based on the above formula, the second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced with the lowest production cost can be calculated and determined.

[0161] Step S40223: Select the production line occupation plan with the lowest total cost and record the occupation information.

[0162] Step S40224: determine whether the order has been verified at all factories. If not, return to step S4022; if so, return to step S4023.

[0163] Step S50: Production is performed based on the first production line occupancy plan corresponding to the partial production orders and the second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced, so as to complete multi-factory inventory and production capacity allocation control.

[0164] After determining the second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced with the lowest production cost, production is carried out based on the first production line occupancy plan corresponding to the partial production orders and the second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced to complete multi-factory inventory and production capacity allocation control.

[0165] As can be seen from the above embodiments, compared with the prior art, the present application aims at solving the problems that the number of orders that enterprises need to allocate is huge, a large amount of computing resources are required, and the costs of manufacturing costs, delivery timeliness, and logistics distance of orders are too high. The present application includes but is not limited to the following beneficial effects:

[0166] First, the multi-factory inventory and capacity allocation control method of the present application can allocate and control a large number of orders for electrical appliances to be produced, and match them with various factories, so as to find the factory that is most suitable for the production order, avoid the problem of being unable to complete the production of the order, and at the same time, significantly save the production cost of each order, which is conducive to improving the production efficiency of the enterprise, avoiding the problems of excessive cost in manufacturing cost, delivery timeliness, and logistics distance of the order, realizing the timely allocation of orders, and being able to match the best factory for production, ensuring that the order can be completed in time and efficiently;

[0167] Secondly, the multi-factory inventory and capacity allocation control method of the present application can significantly improve the collaboration capabilities between factories, greatly enhance the production capacity of each factory, and at the same time significantly save the production cost of each order, which is conducive to improving the production efficiency of the enterprise and providing possibilities for the sustainable development of the enterprise.

[0168] See also Figure 7A multi-factory inventory and capacity allocation control device is provided to meet one of the purposes of the present application, including a cost calculation module 1100, a partial production determination module 1200, a first production line plan determination module 1300, a second production line plan determination module 1400 and a capacity allocation module 1500. Among them, the cost calculation module 1100 is configured to respond to multi-factory inventory allocation instructions, determine the order allocation sequence and order information of each order of electrical appliances to be produced, select the order of electrical appliances to be produced with the highest current priority, screen out each factory that has inventory of the product model of the order of electrical appliances to be produced, and calculate and determine the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has inventory of the product model, wherein the order information includes the product model and the product demand quantity; the partial production occupation determination module 1200 is configured to select the factory with the smallest total cost for inventory occupation, detect whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the order of electrical appliances to be produced, and if it cannot fully meet the demand, determine the remaining part of the order of electrical appliances to be produced that does not fully meet the product demand quantity as a partial production occupation order, and determine the unproduced product demand quantity corresponding to the partial production occupation order; the first production line plan determination module 1300 is configured to respond to multi-factory capacity allocation instructions, and select the part of the order of electrical appliances to be produced. The occupied production orders are sorted according to the order allocation order, and the partial occupied production orders with the highest current priority are selected. Based on the preset multi-level capacity verification algorithm, according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial occupied production orders, the first production line occupation plan corresponding to the partial occupied production orders with the lowest production cost is determined; the second production line plan determination module 1400 is configured to determine the remaining electrical appliance orders to be produced, sort the order allocation order of the remaining electrical appliance orders to be produced, and based on the preset multi-level capacity verification algorithm, according to the product model and product demand quantity corresponding to the remaining electrical appliance orders to be produced, and the production line information corresponding to each factory, determine the second production line occupation plan corresponding to the remaining electrical appliance orders to be produced with the lowest production cost; the capacity allocation module 1500 is configured to produce based on the first production line occupation plan corresponding to the partial occupied production orders and the second production line occupation plan corresponding to the remaining electrical appliance orders to be produced, so as to complete the multi-factory inventory and capacity allocation control.

[0169] Based on any embodiment of this application, please refer to Figure 8 Another embodiment of the present application further provides an electronic device, which can be implemented by a computer device, such as Figure 8As shown, a schematic diagram of the internal structure of a computer device. The computer device includes a processor, a computer-readable storage medium, a memory, and a network interface connected via a system bus. Among them, the computer-readable storage medium of the computer device stores an operating system, a database, and computer-readable instructions. The database may store a control information sequence. When the computer-readable instructions are executed by the processor, the processor can implement a multi-factory inventory and capacity allocation control method. The processor of the computer device is used to provide computing and control capabilities to support the operation of the entire computer device. The memory of the computer device may store computer-readable instructions. When the computer-readable instructions are executed by the processor, the processor can execute the multi-factory inventory and capacity allocation control method of the present application. The network interface of the computer device is used to connect and communicate with a terminal. Those skilled in the art will understand that Figure 8 The structure shown in the figure is only a block diagram of a part of the structure related to the solution of the present application, and does not constitute a limitation on the computer device to which the solution of the present application is applied. The specific computer device may include more or fewer components than those shown in the figure, or combine certain components, or have a different arrangement of components.

[0170] In this embodiment, the processor is used to execute Figure 7 The memory stores the program code and various data required to execute the above modules or submodules. The network interface is used to transmit data between user terminals or servers. The memory in this embodiment stores the program code and data required to execute all modules / submodules in the multi-factory inventory and capacity allocation control device of the present application, and the server can call the program code and data of the server to execute the functions of all submodules.

[0171] The present application also provides a storage medium storing computer-readable instructions. When the computer-readable instructions are executed by one or more processors, the one or more processors execute the steps of the multi-factory inventory and capacity allocation control method described in any embodiment of the present application.

[0172] The present application also provides a computer program product, including a computer program / instruction, which, when executed by one or more processors, implements the steps of the multi-factory inventory and capacity allocation control method described in any embodiment of the present application.

[0173] Those skilled in the art can understand that all or part of the processes in the above-mentioned embodiments of the present application can be implemented by instructing the relevant hardware through a computer program, and the computer program can be stored in a computer-readable storage medium. When the program is executed, it can include the processes of the embodiments of the above-mentioned methods. Among them, the aforementioned storage medium can be a computer-readable storage medium such as a disk, an optical disk, a read-only memory (ROM), or a random access memory (RAM).

[0174] The above description is only a partial implementation method of the present application. It should be pointed out that for ordinary technicians in this technical field, several improvements and modifications can be made without departing from the principles of the present application. These improvements and modifications should also be regarded as the scope of protection of the present application.

[0175] To sum up, this application can significantly improve the collaboration capabilities between factories, greatly enhance the production capacity of each factory, and at the same time significantly save the production cost of each order, which is conducive to improving the production efficiency of the enterprise and providing possibilities for the sustainable development of the enterprise.

Claims

1. A multi-factory inventory and capacity allocation control method, characterized in that: include: In response to the multi-factory inventory allocation instruction, determine the order allocation sequence and order information of each order of electrical appliances to be produced, select the order of electrical appliances to be produced with the highest current priority, screen out each factory that has inventory of the product model of the order of electrical appliances to be produced, and calculate and determine the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has inventory of the product model, wherein the order information includes the product model and the product demand quantity; The factory with the smallest total cost is selected for inventory occupation, and whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the order of the electrical appliances to be produced is detected. If it cannot fully meet the demand quantity, the remaining part of the order of the electrical appliances to be produced that does not fully meet the product demand quantity is determined as a partial production order, and the unproduced product demand quantity corresponding to the partial production order is determined; In response to the multi-factory capacity allocation instruction, the partial production orders are sorted according to the order allocation order, the partial production orders with the highest current priority are selected, and based on the preset multi-level capacity verification algorithm, according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model with the partial production orders, the first production line occupation plan corresponding to the partial production orders with the lowest production cost is determined; Determine the remaining orders for electrical appliances to be produced, sort the order allocation sequence of the remaining orders for electrical appliances to be produced, and determine the second production line occupation plan corresponding to the remaining orders for electrical appliances to be produced with the lowest production cost based on a preset multi-level capacity verification algorithm according to the product models and product demand quantities corresponding to the remaining orders for electrical appliances to be produced and the production line information corresponding to each factory; Production is carried out based on the first production line occupancy plan corresponding to the partial production orders and the second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced to complete the allocation and control of multi-factory inventory and production capacity.

2. The multi-factory inventory and capacity allocation control method according to claim 1 is characterized in that: The step of calculating and determining the total cost corresponding to allocating the orders of the electrical appliances to be produced to the various factories that have inventory of the product model includes: Determine the logistics cost of the order of electrical appliances to be produced based on a first product of the unit logistics cost from each factory to the address of the order of electrical appliances to be produced and the product demand quantity of the order of electrical appliances to be produced; Calculate and determine a second product between the unit production cost of the order of electrical appliances to be produced in the selected factory and the product demand quantity of the order of electrical appliances to be produced, calculate and determine a third product between the unit production cost of the order of electrical appliances to be produced in the selected factory and the inventory occupancy of the order of electrical appliances to be produced, and determine the manufacturing cost of the order of electrical appliances to be produced based on the difference between the second product and the third product; Calculate and determine the fourth product of the unit delay cost of the order of the electrical appliance to be produced and the number of delay days required to complete the order of the electrical appliance to be produced, so as to determine the delay cost of the order of the electrical appliance to be produced; Based on the sum of the logistics cost, the manufacturing cost and the delay cost, the total cost corresponding to allocating the orders for the electrical appliances to be produced to the various factories that have inventory of the product model is determined.

3. The multi-factory inventory and capacity allocation control method according to claim 1 is characterized in that: After the step of calculating and determining the total cost corresponding to allocating the orders of the electrical appliances to be produced to the various factories that have inventory of the product model, the following steps are included: Compare the total costs corresponding to the allocation of the order of the electrical appliance to be produced to each factory that has the product model inventory of the order of the electrical appliance to be produced, and select the factory with the lowest total cost for allocation; Determine whether the factory with the lowest total cost can fully meet the product demand quantity corresponding to the order of electrical appliances to be produced. If it cannot fully meet the demand quantity, record the order allocation result, reduce the inventory information of the factory, and determine the remaining part of the order of electrical appliances to be produced as a partial production order. If it can fully meet the demand quantity, directly record the order allocation result, and the inventory occupation of the order of electrical appliances to be produced is completed; If the inventory of the product model in all factories has been reduced, or the orders for the electrical appliances to be produced have been occupied by inventory, the inventory allocation of the orders for the electrical appliances to be produced is completed, and the steps after sorting the partially occupied orders according to the order allocation order are continued.

4. The multi-factory inventory and capacity allocation control method according to claim 1 is characterized in that: The step of determining a first production line occupation scheme corresponding to the partial production order with the lowest production cost based on the preset multi-level capacity verification algorithm according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial production order, comprises: Count the production line information corresponding to each factory for the product model that has some occupied production orders and the demand quantity of unproduced products corresponding to the part of the occupied production orders; Based on the production line information corresponding to each factory of the product model with some occupied production orders and the demand quantity of unproduced products corresponding to the some occupied production orders, the production capacity of each factory is divided and sorted according to different levels, and checked from the outermost capacity to the innermost level; For each of the partial production orders, check from outside to inside whether the capacity of each level can meet the demand of the order; If the capacity of a certain level can meet the order requirements, the inspection will continue to the inner level; If the capacity of a certain level is insufficient to meet the order requirements, it will return to the next block of the previous level for a new capacity check; Continue to perform the above steps until the capabilities of all levels are checked to ensure that the production line information corresponding to the factory can fully meet the partial production order.

5. The multi-factory inventory and capacity allocation control method according to claim 4 is characterized in that: For each of the partial production orders, the steps of checking from outside to inside whether the capacity of each level can meet the order requirements include: For each of the aforementioned partial production orders, the system checks the capacity level by level starting from the outermost level; If the capacity of the current level is sufficient to meet the production requirements of the order, continue to check the inner level; If the capacity of a certain level is insufficient to meet order requirements, it will return to the next block of the previous level for a new capacity check, and reselect a more suitable production line or adjust capacity allocation.

6. The multi-factory inventory and capacity allocation control method according to claim 1 is characterized in that: Before determining the order allocation sequence and order information of each electrical appliance order to be produced, the steps include: Obtain order information corresponding to each electrical appliance order to be produced; Based on the order information, an order allocation sequence corresponding to each of the electrical appliance orders to be produced is determined according to a preset order allocation rule set.

7. The multi-factory inventory and capacity allocation control method according to claim 6 is characterized in that: The order allocation rule set includes an order delivery date priority rule, a key model priority rule, a maximum quantity limit rule, and a maximum delay cost priority rule; The order delivery date priority rule represents the order arrangement from the front to the back according to the order delivery date; The key model priority rule represents the ordering of the processing factories and production lines that can process the product models corresponding to the orders according to the rule from small to large processing quantity; The maximum quantity limited rule is to sort the order requirements from large to small, and give priority to the orders with large order quantities; The maximum delay cost priority rule is arranged from high to low according to the unit delay cost of the order.

8. A multi-factory inventory and capacity allocation control device, characterized in that: include: A cost calculation module is configured to respond to a multi-factory inventory allocation instruction, determine the order allocation sequence and order information of each order of electrical appliances to be produced, select the order of electrical appliances to be produced with the highest current priority, screen out each factory that has a product model inventory of the order of electrical appliances to be produced, and calculate and determine the total cost corresponding to the allocation of the order of electrical appliances to be produced to each factory that has a product model inventory, wherein the order information includes the product model and the product demand quantity; The partial production occupation determination module is configured to select the factory with the smallest total cost for inventory occupation, detect whether the factory with the smallest total cost can fully meet the product demand quantity corresponding to the order of the electrical appliances to be produced, and if it cannot fully meet the demand quantity, determine the remaining part of the order of the electrical appliances to be produced that does not fully meet the product demand quantity as the partial production occupation order, and determine the unproduced product demand quantity corresponding to the partial production occupation order; A first production line plan determination module is configured to respond to a multi-factory capacity allocation instruction, sort the partial production orders according to the order allocation order, select the partial production orders with the highest current priority, and determine the first production line occupation plan corresponding to the partial production orders with the lowest production cost based on the preset multi-level capacity verification algorithm according to the demand quantity of the unproduced products and the production line information corresponding to each factory of the product model of the partial production orders; A second production line plan determination module is configured to determine the remaining electrical appliance orders to be produced, sort the order allocation sequence of the remaining electrical appliance orders to be produced, and determine the second production line occupation plan corresponding to the remaining electrical appliance orders to be produced with the lowest production cost based on a preset multi-level capacity verification algorithm according to the product models and product demand quantities corresponding to the remaining electrical appliance orders to be produced and the production line information corresponding to each factory; The capacity allocation module is configured to produce based on a first production line occupancy plan corresponding to the partial production orders and a second production line occupancy plan corresponding to the remaining electrical appliance orders to be produced, so as to complete multi-factory inventory and capacity allocation control.

9. An electronic device, comprising a central processing unit and a memory, characterized in that: The central processing unit is used to call and run the computer program stored in the memory to execute the steps of the method according to any one of claims 1 to 7.

10. A computer-readable storage medium, characterized in that: It stores a computer program implemented according to the method described in any one of claims 1 to 7 in the form of computer-readable instructions, and when the computer program is called and executed by a computer, the steps included in the corresponding method are executed.

Citation Information

Patent Citations

  • Order production scheduling method and device, electronic equipment and readable medium

    CN112966876A

  • Clothing order production distribution method and device, medium and electronic equipment

    CN115660310A

  • Clothing order production scheduling method, device and equipment

    CN116542508A

  • Furniture punching process flexible matching system and method based on industrial internet

    CN117047870A

Cited By

  • Production line order scheduling method and device, equipment and medium

    CN122472475A

  • Multi-factory work order factory selection and distribution method

    CN122549884A